CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2019-2020 - ENACTMENT Act of Jul. 1, 2020, P.L. 262, No. 36 Cl. 86

An Act

Providing for the capital budget for fiscal year 2019-2020; itemizing public improvement projects, furniture and equipment projects, transportation assistance, redevelopment assistance projects, flood control projects, Fish and Boat Commission projects and Manufacturing Fund projects leased or assisted by the Department of General Services and other State agencies, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services and other State agencies; authorizing the use of current revenue for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services and other State agencies stating the estimated useful life of the projects; restricting use of funds on certain projects; and making appropriations and a repeal of a redevelopment assistance project in a prior act itemizing capital projects.

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

Section 1. Short title.

This act shall be known and may be cited as the Capital Budget Project Itemization Act of 2019-2020.

Section 2. Total authorizations.

(a) Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $8,918,863,000.

(b) Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 4 and to be acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $506,655,000.

(c) Transportation assistance.--The total authorization for the capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt shall be $383,683,000.

(d) Redevelopment assistance.--The total authorization for the capital projects in the category of redevelopment assistance capital projects itemized in section 6 for capital grants by the Department of Community and Economic Development, its successors or assigns and to be financed by the incurring of debt shall be $11,015,128,000.

(e) Flood control.--The total authorization for the capital projects in the category of flood control projects itemized in section 7 and to be constructed by the Department of Environmental Protection, its successors or assigns and to be financed by the incurring of debt shall be $39,780,000.

(f) Fish Fund and Boat Fund projects.--The total authorization for the capital projects in the category of public improvement projects itemized in section 8 to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by current revenues of the Fish Fund and the Boat Fund pursuant to executive authorization shall be $500,000.

(g) Manufacturing Fund.--The total authorization for the capital projects in the category of public improvement projects itemized in section 9 to be acquired or developed by the Department of Corrections and to be financed by current revenues of the Manufacturing Fund pursuant to executive authorization shall be $21,000,000.

Section 3. Itemization of public improvement capital projects.

Additional capital projects in the category of public improvement projects to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

Total Project

Project Allocation (1) Department of Agriculture (i) Farm Show Complex (A) Facility improvements, including site infrastructure, general building upgrades, electrical, HVAC, plumbing, technological improvements and new construction Project Allocation 28,000,000 (ii) Animal Diagnostic Laboratory (ADL), State College (A) Facility improvements, including renovations, alterations, new construction, technological improvements and site and infrastructure upgrades Project Allocation 50,000,000 (iii) Health Diagnostic Laboratory (A) Renovations, additions and new construction, including site and infrastructure improvements for design and construction to satisfy modern testing procedures Project Allocation 20,000,000 (2) Department of Conservation and Natural Resources (i) (A) Construct new woodshop, groomer storage and pole storage building Project Allocation 4,200,000 (ii) (A) Additional design and construction funding for office buildings Project Allocation 480,000 (iii) (A) Replace Sideling Hill maintenance headquarters and mechanics shop Project Allocation 4,900,000 (iv) (A) Additional design and construction funding for rehabilitation and modernization of campground facilities Project Allocation 600,000 (B) Additional design and construction funding for restoration of water lines Project Allocation 180,000 (v) (A) Multi-use trail development of lower trail extension Project Allocation 3,700,000 (vi) Cherry Springs State Park (A) Additional design and construction funding for visitors and administrative center Project Allocation 1,600,000 (vii) (A) Additional design and construction funding for rehabilitation of road and parking areas Project Allocation 960,000 (viii) (A) Additional design and construction funding for park office and attendance building Project Allocation 240,000 (ix) Delaware Canal State Park (A) Replacement of bridge at Bridge Street to provide trail grade separation and access, including site acquisition Project Allocation 3,500,000 (B) Design and construction funding for stone wall replacement Project Allocation 1,080,000 (C) Additional design and construction funding for repair and maintenance of the Delaware Canal Project Allocation 2,000,000 (D) Additional design and construction funding for infrastructure redevelopment and rehabilitation of the Delaware Canal State Park from Reigelsville to Bristol Project Allocation 1,000,000 (E) Provide additional funding for DGS 141-10 for construction, design and contingencies and land acquisition Project Allocation 7,000,000 (ix.1) (A) Additional funding to construct new resource center with storage building to meet current needs Project Allocation 2,600,000 (x) Denton Hill State Park (A) Additional design and construction funding for rehabilitation of park, including ski facilities Project Allocation 2,400,000 (xi) Division of Forest Fire Protection (A) Construct new Air Operations Facility Project Allocation 5,400,000 (xii) (A) Additional funding to replace Hicks Run maintenance headquarters Project Allocation 1,300,000 (xiii) Forest District 10 (A) Additional design and construction funding for replacement of failed acid mine drainage treatment system in Kettle Creek watershed Project Allocation 400,000 (xiv) Forest District 11 (A) Additional design and construction funding for bridge over the Project Allocation 700,000 (xv) Forest District 13 (A) Additional design and construction funding for remediation or reclamation of acid mine drainage pollution source into Little Dents Run watershed Project Allocation 1,600,000 (xvi) Forest District 14 (A) Additional design and construction funding to locate, plug and retire abandoned wells on State Forest land Project Allocation 400,000 (xvii) Fort Washington State Park (A) Construct visitor center and park amenities Project Allocation 13,200,000 (xviii) (A) Additional funding for the new district office Project Allocation 2,500,000 (B) Additional funding to replace Babcock Forest maintenance headquarters and storage building Project Allocation 1,200,000 (xix) State Park (A) Additional design and construction funding to replace water lines Project Allocation 312,000 (B) Additional design and construction funding to correct drainage and repave roads Project Allocation 156,000 (xx) (A) Additional design and construction funding to develop and construct family cabin colony Project Allocation 600,000 (xxi) (A) Bridge repair and repainting Project Allocation 15,500,000 (xxii) Laurel Mountain State Park (A) Additional design and construction funding for development and construction of phase II ski area facilities Project Allocation 600,000 (xxiii) Mira Lloyd Dock Conservation Center (A) Repairs to Penn Nursery dam or breach dam and construct alternative water supply for irrigation system Project Allocation 8,150,000 (B) Construct new seed extraction building Project Allocation 3,700,000 (xxiv) Maurice K. Goddard State Park (A) Redevelopment of park facilities Project Allocation 13,200,000 (B) Additional design and construction funding to replace marina facilities with new structures Project Allocation 2,100,000 (xxv) (A) Additional design and construction funding to upgrade sewage treatment facilities Project Allocation 1,000,000 (xxvi) (A) Repairs to Shaggers Inn Dam Project Allocation 4,900,000 (B) Additional funding to replace the Dauge Mechanics Shop and fire equipment storage Project Allocation 3,000,000 (xxvii) Penn Nursery (A) Additional funding to replace maintenance shop with new garage and sign shop Project Allocation 2,500,000 (B) Additional design and construction funding to replace maintenance shop Project Allocation 1,100,000 (xxviii) Pinchot State Forest (A) Breach and remove Olyphant Dam No. 3 Project Allocation 4,300,000 (B) Breach and remove Pine Run Dam No. 1 Project Allocation 4,250,000 (C) Additional funding to breach and remove Edgerton Dam Project Allocation 1,300,000 (D) Additional funding to breach and remove Olyphant Dam No. 2 Project Allocation 3,100,000 (E) Additional funding to construct county forestry and fire headquarters Project Allocation 6,800,000 (xxix) (A) Additional design and construction funding to connect Trail to Point State Park, including rehabilitation of amenities, walkways and parking areas Project Allocation 1,800,000 (xxx) Prince Gallitzin State Park (A) Additional design and construction funding to replace toilet room facilities Project Allocation 200,000 (B) Additional design and construction funding to replace water lines Project Allocation 650,000 (C) Additional design and construction funding to regrade and repave roads Project Allocation 480,000 (xxxi) Pymatuning State Park (A) Additional funding for campground rehabilitation Project Allocation 2,600,000 (B) Additional design and construction funding to rehabilitate campground facilities Project Allocation 480,000 (xxxii) (A) Road paving Project Allocation 3,000,000 (xxxiii) Samuel S. Lewis State Park (A) Additional design and construction funding to replace toilet facilities, including septic system Project Allocation 240,000 (xxxiv) Shawnee State Park (A) Additional design and construction funding to replace regional office Project Allocation 720,000 (xxxv) (A) Additional design and construction funding to replace dam bags Project Allocation 800,000 (xxxvi) (A) Additional funding to replace Snowshoe maintenance headquarters Project Allocation 1,300,000 (xxxvii) (A) Construct new Waterville mechanics garage and storage Project Allocation 3,400,000 (xxxviii) (A) Additional funding to replace Armenia maintenance headquarters Project Allocation 1,500,000 (xxxix) (A) Multiuse trail development of the rail trail extension into the main park use area Project Allocation 1,000,000 (xl) (A) Additional funding for New Haldeman maintenance headquarters Project Allocation 3,700,000 (xli) Various State Parks - Statewide (A) Development of full-service hookups at campsites Project Allocation 12,200,000 (B) Paving projects Project Allocation 16,200,000 (C) Camp rehabilitation Project Allocation 21,600,000 (xlii) Various State Forest Land - Statewide (A) Plug abandoned wells Project Allocation 10,000,000 (xliii) Various State Forest Land - Sproul and Susquehannock (A) Construct ATV connector trails Project Allocation 44,000,000 (xliv) Various State Forest Land - Tiadaghton and Tioga (A) Additional funding for Pine Creek maintenance offices Project Allocation 3,000,000 (xlv) Various State Parks and Forest Land (A) Park Region 1, Northcentral, Solar energy installations Project Allocation 5,200,000 (B) Park Region 2, Western, Solar energy installations Project Allocation 5,200,000 (C) Park Region 3, Southcentral, Solar energy installations Project Allocation 5,200,000 (D) Park Region 4, Eastern, Solar energy installations Project Allocation 5,200,000 (3) Department of Corrections (i) Elizabethtown Training Academy (A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements Project Allocation 3,000,000 (ii) Quehanna Boot Camp (A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements Project Allocation 2,200,000 (iii) State Correctional Institution at Albion (A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements Project Allocation 3,800,000 (iii.1) State Correctional Institution at Benner (A) Design and construction of transportation hub, including land development and site infrastructure improvements Project Allocation 3,000,000 (iv) State Correctional Institution at Cambridge Springs (A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements Project Allocation 14,820,000 (v) State Correctional Institution at Camp Hill (A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements Project Allocation 35,600,000 (vi) State Correctional Institution at Chester (A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements Project Allocation 5,450,000 (vii) State Correctional Institution at Coal Township (A) Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements Project Allocation 10,401,000 (viii) State Correctional Institution at Dallas (A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements Project Allocation 950,000 (ix) State Correctional Institution at Fayette (A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements Project Allocation 15,675,000 (x) State Correctional Institution at Forest (A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements Project Allocation 12,583,000 (xi) State Correctional Institution at Frackville (A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements Project Allocation 4,750,000 (xii) State Correctional Institution at Graterford (A) Design and construction for code, permit and site-related, utility-related and infrastructure-related issues Project Allocation 575,000 (xiii) State Correctional Institution at Greene (A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements Project Allocation 5,800,000 (xiv) State Correctional Institution at Houtzdale (A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements Project Allocation 10,000,000 (xv) State Correctional Institution at Huntingdon (A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements Project Allocation 12,500,000 (xvi) State Correctional Institution at Laurel Highlands (A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements Project Allocation 4,375,000 (xvii) State Correctional Institution at Mahanoy (A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements Project Allocation 18,600,000 (xviii) State Correctional Institution at Mercer (A) Design and construction of building upgrades, renovations and expansion, including land development and site infrastructure improvements Project Allocation 4,250,000 (xix) State Correctional Institution at Muncy (A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction Project Allocation 13,025,000 (xx) State Correctional Institution at Pine Grove (A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction Project Allocation 5,875,000 (xxi) State Correctional Institution at Retreat (A) Design and construction of building expansion, including land development, renovations and alterations and site infrastructure improvements, and new construction Project Allocation 4,000,000 (xxii) State Correctional Institution at Rockview (A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction Project Allocation 7,425,000 (xxiii) State Correctional Institution at Smithfield (A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction Project Allocation 5,730,000 (xxiv) State Correctional Institution at Somerset (A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction Project Allocation 5,107,000 (xxv) State Correctional Institution at Waymart (A) Design and construction of facility upgrades, including land development and site infrastructure improvements, and new construction Project Allocation 15,375,000 (4) Department of Education (i) (Reserved) (ii) Lincoln University (A) Facility and infrastructure upgrades, including campus security utility, information technology and building systems and envelope Project Allocation 16,000,000 (B) New building for student services, administrative offices and liberal arts classrooms Project Allocation 25,000,000 (iii) The Pennsylvania State University (A) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Physical Education Building renewal at the Abington campus Project Allocation 20,000,000 (B) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Woodland Building renewal at the Abington campus Project Allocation 10,000,000 (C) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Student Union Building at the Abington campus Project Allocation 60,000,000 (D) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Academic Building renovation at the Altoona campus Project Allocation 15,000,000 (E) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for University Support Building I renewal at the University Park campus Project Allocation 21,000,000 (F) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Thomas Building renovation at the University Park campus Project Allocation 7,200,000 (G) Additional funding for design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Physics Building at the University Park campus Project Allocation 40,000,000 (H) Additional funding for design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for College of Engineering Research and Teaching Space at the University Park campus Project Allocation 120,000,000 (I) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for College of Engineering Building at the University Park campus Project Allocation 150,000,000 (J) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Academic and Research Building renewal at the University Park campus Project Allocation 80,000,000 (K) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Ritenour Building renovation at the University Park campus Project Allocation 19,200,000 (L) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Global Programs Building at the University Park campus Project Allocation 18,000,000 (M) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Arboretum Cultural District Infrastructure at the University Park campus Project Allocation 10,000,000 (N) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Arboretum Cultural District new facility at the University Park campus Project Allocation 50,000,000 (O) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Administrative Unit Building at the University Park campus Project Allocation 85,000,000 (P) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Capital Renewal, Phase VIII at the University Park campus Project Allocation 40,000,000 (Q) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for College of Engineering Building at the University Park campus Project Allocation 180,000,000 (R) Design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Sackett Building at the University Park campus Project Allocation 80,000,000 (S) Additional funding for design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for College of Liberal Arts Research and Teaching Space at the University Park campus Project Allocation 40,000,000 (T) Additional funding for design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for Hosler Building at the University Park campus Project Allocation 60,000,000 (U) Design, construction of new space and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrade of utilities and other infrastructure needs, and other related costs for capital renewal, Phase IX at the University Park campus Project Allocation 40,000,000 (V) Acquisition, construction, abatement of hazardous materials and other related costs for a new academic building at the Pennsylvania College of Technology in the City of Williamsport Project Allocation 7,000,000 (W) Construction, infrastructure, redevelopment and other related costs for a Penn State College of Medicine Research and Learning Facility to house research and academic space to include laboratories, vivarium and imaging labs in addition to instructional studios Project Allocation 100,000,000 (X) Construction, infrastructure, redevelopment and other related costs associated with the design, demolition, grading and installation of water, sewer and streets to accommodate the planned redevelopment of the Meade Heights parcel on the Penn State Harrisburg campus as a public-private innovation park Project Allocation 1,750,000 (Y) Construction, redevelopment and other related costs associated with the renovation of Wrisberg Hall on the Penn State Harrisburg campus as a laboratory building to support expanding externally sponsored research activity Project Allocation 2,500,000 (Z) Acquisition, design, construction of new space or addition to and renovation of existing space, including demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs, and other related costs for the Transportation Training and Testing Facility at University Park Campus Project Allocation 35,000,000 (iv) Temple University (A) Multi-Purpose Academic/Administrative Building - New facility and infrastructure upgrades and associated design and construction expenses at the main campus Project Allocation 170,000,000 (B) New Academic Facility - Main campus, renovations and infrastructure upgrades and associated design and construction expenses at the main campus Project Allocation 140,000,000 (C) Annenberg/Tomlinson Hall - Additions, renovations and infrastructure upgrades and associated design and construction expenses at the main campus Project Allocation 40,000,000 (D) Anderson/Gladfelter Halls - CLA Lobby - Additions, renovations and infrastructure upgrades and associated design and construction expenses at the main campus Project Allocation 15,000,000 (E) Podiatry Building - Additions, renovations and infrastructure upgrades and associated design and construction expenses at the School of Podiatric Medicine Project Allocation 40,000,000 (F) Academic Center - Facility infrastructure improvements, including hazardous materials abatement, and utility upgrades and extensions and associated design and construction expenses at the Ambler campus Project Allocation 50,000,000 (G) New Administrative Services Building - New Facility and infrastructure upgrades and associated design and construction expenses at the main campus Project Allocation 30,000,000 (H) Classroom Building or Annex - Design, infrastructure, abatement of hazardous materials and construction of a classroom building/annex at the Anderson/Gladfelter academic complex

Project Allocation 41,000,000 (I) Design, infrastructure, abatement of hazardous materials, renovation, expansion, construction of academic, administrative and health care facilities, including utility upgrades and extensions, site improvements and code- related upgrades, including ADA compliance-related upgrades, at the Health Sciences campus Project Allocation 125,000,000 (J) Capital renewal, including existing academic and administrative spaces, as well as infrastructure which supports those spaces, at all domestic campuses Project Allocation 150,000,000 (K) Design, infrastructure, abatement of hazardous materials and construction of a classroom building or annex facility, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus Project Allocation 45,000,000 (L) Design, infrastructure, abatement of hazardous materials and construction of an academic learning center, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the Ambler campus Project Allocation 50,000,000 (M) Construction, renovation, infrastructure improvements, equipment and other related costs for the expansion and modernization of the Temple Lung Center, including related clinical, patient, community and research and education facilities Project Allocation 6,000,000 (N) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related clinical, patient, community, research, education and exterior facilities for Temple University Hospital Episcopal Campus Project Allocation 20,000,000 (O) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related clinical, patient, community, research, education and exterior facilities for Temple University Hospital Boyer Pavilion Patient Care facilities Project Allocation 10,000,000 (P) Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related clinical, patient, community, research, education and exterior facilities for Temple University Hospital Project Allocation 30,000,000 (Q) Construction, renovation, infrastructure improvements, equipment and other related costs for the expansion of the Emergency Department and related clinical, patient, community, research and education facilities for Temple University Hospital Emergency Department Project Allocation 10,000,000 (R) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related clinical, patient, community, research, education and exterior facilities for Fox Chase Cancer Center Project Allocation 10,000,000 (S) Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related clinical, patient, community, research, education and exterior facilities for Jeanes Hospital Project Allocation 10,000,000 (T) Construction and infrastructure improvement related to the development of a medical office building, including related clinical patient, community, parking, research and education facilities for Temple University Health System Project Allocation 10,000,000 (U) Acquisition, construction, infrastructure improvements and other related development costs for a food service facility on the Ambler Campus Project Allocation 10,000,000 (V) Design, infrastructure, abatement of hazardous materials and other related costs for renovation/rehabilitation and construction at the main campus Project Allocation 300,000,000 (v) Thaddeus Stevens College of Technology (A) Leonard Building - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses Project Allocation 3,000,000 (B) Dormitories - Renovations, alterations, repairs, infrastructure upgrades and associated design and construction expenses, including HVAC improvements, at the main campus dormitories Project Allocation 2,000,000 (C) Roof - Renovations, alterations, infrastructure upgrades and associated design and construction expenses at the Bourne, Brenner, Kreider, Hartzell and Metzger Buildings Project Allocation 2,500,000 (D) Snyder Building - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses Project Allocation 2,500,000 (E) Parking Garage - New construction, renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses Project Allocation 5,000,000 (F) Athletic Field - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses, including resodding of field Project Allocation 1,500,000 (G) Campus Lighting - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses Project Allocation 1,000,000 (H) Window Replacement - Renovations, alterations, additions, infrastructure upgrades and associated design and construction expenses at dormitories and other campus buildings Project Allocation 2,000,000 (I) Campus Improvements - Renovations, repairs, alterations, additions, infrastructure upgrades and associated design and construction expenses, including exterior painting Project Allocation 500,000 (J) Student Center - Renovations, alterations, additions, new construction, infrastructure upgrades, site improvements and associated design and construction expenses Project Allocation 5,000,000 (K) Dormitory Dining Hall - Renovations, alterations, additions, new construction, infrastructure upgrades, site improvements and associated design and construction expenses Project Allocation 25,000,000 (vi) University of Pittsburgh (A) Programmatic and infrastructure improvements, including design and construction for facilities at the Oakland campus Project Allocation 50,000,000 (B) Programmatic and infrastructure improvements, including design and construction for the Cathedral of Learning at the Oakland campus Project Allocation 100,000,000 (C) New Natatorium and Aquatics Building - New construction, alterations, demolition, infrastructure upgrades, site improvements and design and construction at the Oakland campus Project Allocation 100,000,000 (D) New Student Recreation Center - New construction, additions, alterations, demolition, infrastructure upgrades, site improvements and design and construction at the Oakland campus Project Allocation 80,000,000 (E) Athletic Performance Center - New construction, additions, alterations, renovations, demolition, infrastructure upgrades, site improvements and design and construction at the Oakland campus Project Allocation 60,000,000 (F) New Parking Garage - New construction, additions, alterations, renovations, demolition, infrastructure upgrades, site improvements and design and construction at the Oakland campus Project Allocation 20,000,000 (G) New Tennis Facility - New construction, additions, alterations, renovations, demolition, infrastructure upgrades, site improvements and design and construction at the Oakland campus Project Allocation 15,000,000 (H) Acquisition, construction, infrastructure and other related costs for the University of Pittsburgh Bradford's Kessel Athletic Complex, including renovation and rehabilitation of existing facilities and construction of new facilities Project Allocation 10,000,000 (I) Construction, infrastructure and other related costs for the University of Pittsburgh Bradford's Marilyn Horne Hall improvements, including renovation and rehabilitation of existing facilities, development of upper floor housing and construction of new facilities Project Allocation 10,000,000 (5) Pennsylvania Emergency Management Agency (i) State Fire Academy (A) New Rescue Truck, Certification/Training Vehicle - Firefighter and Hazardous Material facility Project Allocation 900,000 (ii) External Operations Facility (A) Design and construction of a facility to house emergency response vehicles, trailers and equipment Project Allocation 5,000,000 (6) Department of Environmental Protection (i) Allegheny County (A) Gladden Treatment Facility - Construct mine drainage treatment facility Project Allocation 5,000,000 (i.1) Clearfield County (A) DGS 182-22 Stinky Run, Clearfield Borough - Additional funding for design and construction of flood protection project Project Allocation 1,000,000 (ii) Carbon County (A) Quakake Treatment Facility - Construct acid mine drainage treatment facility Project Allocation 6,000,000 (iii) Fayette County (A) Ohiopyle Mine water treatment system design and construction upgrades to facility Project Allocation 3,300,000 (iv) Lackawanna County (A) Blakely - Design and construction of rehabilitation for flood protection at Hull Creek Project Allocation 900,000 (iv.1) Luzerne County (A) Construction of levee along the Susquehanna River, including consulting, engineering fees and other associated costs, including land acquisition and buildings, if necessary Project Allocation 5,000,000 (B) Acquisition, construction and other related costs associated with a levee project to protect West Pittston Borough Project Allocation 10,000,000 (v) Philadelphia County (A) Project - Additional funding for rehabilitation of existing facilities, including canal wall at Flat Rock Dam Project Allocation 100,000 (vi) Schuylkill County (A) Audenreid Treatment Facility - Land acquisition and construction of acid mine drainage treatment facility Project Allocation 23,000,000 (B) Mill Creek Treatment Facility - Construction of mine drainage treatment facility Project Allocation 10,000,000 (C) Schuylkill River Project - Additional funding for rehabilitation of existing facilities at Auburn Dam Project Allocation 50,000 (D) Schuylkill River Project - Additional funding for rehabilitation of existing facilities at Tamaqua Borough Dam Project Allocation 50,000 (vii) Somerset County (A) Dark Shade Creek Treatment Facility - Construction of mine drainage treatment facility Project Allocation 13,000,000 (viii) Tioga County (A) Morris Run Treatment Facility - Construction of mine drainage treatment facility Project Allocation 10,000,000 (ix) Westmoreland County (A) Design and construction of new treatment facility to eliminate need for Banning No. 4 and Euclid, including acquisition of land Project Allocation 28,025,000 (B) Crabtree Discharge Treatment Facility - Construction of mine discharge treatment facility Project Allocation 8,000,000 (C) DGS 180-43 Unnamed Tributary of Jack's Run, City of Greensburg - Additional funding for design and construction of flood protection near Northmont Street Project Allocation 1,000,000 (D) DGS 182-07 Brush Creek, City of Jeannette - Additional funding for design and construction of flood protection project Project Allocation 500,000 (E) Renovation and rehabilitation of Midway Cabin in Laurel Mountain State Park Project Allocation 500,000 (x) Bureau of Laboratories (A) Construction of new laboratory, including site and infrastructure improvements and land acquisition Project Allocation 125,000,000 (7) Department of General Services (i) Berks County (A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in Reading Project Allocation 15,000,000 (ii) Dauphin County (A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in the Harrisburg area Project Allocation 200,000,000 (B) Renovations and alterations for upgrades and infrastructure improvements to the Finance Building Project Allocation 120,000,000 (C) Renovations and alterations for upgrades and infrastructure improvements to the 18th and Herr Complex Project Allocation 30,000,000 (D) Building controls, building automation system upgrades and installation, HVAC improvements and environmental abatement and restoration to DGS-owned buildings in the Harrisburg area Project Allocation 80,000,000 (E) Facility infrastructure upgrades, including HVAC, electrical, code compliance, security and technology for Commonwealth Technology Center Project Allocation 30,000,000 (iii) Lackawanna County (A) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in Scranton Project Allocation 15,000,000 (iv) Statewide (A) Improvements, infrastructure upgrades and land acquisition for ADA accessibility and code upgrades to DGS-owned buildings Project Allocation 25,000,000 (B) Professional services for the development of facility master plans, facility assessments and agency capital planning Project Allocation 25,000,000 (C) Demolition and site restoration, including utility and infrastructure modification for State-owned buildings Project Allocation 100,000,000 (D) Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for electric vehicle charging stations and battery storage systems at DGS-owned buildings Project Allocation 30,000,000 (7.1) Department of Health (i) Bureau of Laboratories (A) Construct new laboratory, including site and infrastructure improvements and land acquisition Project Allocation 50,000,000 (8) Pennsylvania Historical and Museum Commission (i) State Archives (A) Renovate existing building for reuse Project Allocation 15,000,000 (ii) State Museum (A) Building improvements and infrastructure upgrades Project Allocation 20,000,000 (B) Exhibit upgrades Project Allocation 30,000,000 (iii) Bushy Run Battlefield (A) Building, site and infrastructure improvements Project Allocation 1,500,000 (iv) Collections Storage Facility (A) Land acquisition, building, site and infrastructure improvements Project Allocation 15,000,000 (v) Cornwall Iron Furnace (A) Building, site and infrastructure improvements Project Allocation 1,500,000 (vi) Eckley Miner's Village (A) Building, site and infrastructure improvements Project Allocation 2,000,000 (B) Exhibit upgrades Project Allocation 3,000,000 (vii) Ephrata Cloister (A) Building, site and infrastructure improvements Project Allocation 4,000,000 (vii.1) Erie Maritime Museum - U.S. Brig Niagara (A) Building and exhibit improvements Project Allocation 2,000,000 (B) U.S. Brig Niagara reconstruction Project Allocation 10,000,000 (C) U.S. Brig Niagara restoration Project Allocation 7,000,000 (D) Procurement of sailing school vessel Project Allocation 2,000,000 (E) Building and infrastructure improvements Project Allocation 2,000,000 (viii) Graeme Park (A) Building, site and infrastructure improvements Project Allocation 1,500,000 (ix) Joseph Priestley House (A) Building, site and infrastructure improvements Project Allocation 1,000,000 (x) Landis Valley Village and Farm Museum (A) Building and site improvements Project Allocation 3,000,000 (B) Exhibit upgrades Project Allocation 4,100,000 (xi) Old Economy Village (A) Building, site and infrastructure improvements Project Allocation 2,000,000 (xii) Pennsbury Manor (A) Building, site and infrastructure improvements Project Allocation 2,000,000 (B) Exhibit upgrades Project Allocation 750,000 (xiii) Pennsylvania Museum (A) Building, site and infrastructure improvements Project Allocation 2,000,000 (B) Exhibit upgrades Project Allocation 750,000 (xiv) Pennsylvania Military Museum (A) Building, site and infrastructure improvements Project Allocation 2,000,000 (xv) Railroad Museum of Pennsylvania (A) Building, site and infrastructure improvements Project Allocation 3,000,000 (xvi) Somerset Historical Center (A) Building, site and infrastructure improvements Project Allocation 1,000,000 (9) Department of Human Services (i) Clarks Summit State Hospital (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 11,000,000 (ii) Danville State Hospital (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 11,000,000 (iii) Ebensburg Center (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 11,000,000 (iv) Loysville Youth Development Center (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 13,000,000 (v) Norristown State Hospital (A) Design and construction of psychiatric forensic building on existing lands of the Commonwealth at Norristown State Hospital in West Norriton Township to be utilized for the care and treatment of clients admitted to the institution. These funds shall supplement those funds previously appropriated for the same purpose in section 3(10)(v)(B) of the act of October 30, 2017 (P.L.831, No.52), known as the Capital Budget Project Itemization Act of 2017-2018. Project Allocation 100,000,000 (B) Renovations to the institution, including new construction, alterations, additions, renovations, site improvements and infrastructure upgrades Project Allocation 65,000,000 (vi) North Central Secure Treatment Unit (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 5,000,000 (vii) Polk Center (A) Alterations, renovations, infrastructure and site modifications Project Allocation 11,000,000 (viii) Selinsgrove Center (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 11,000,000 (ix) South Mountain Secure Treatment Unit (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 3,000,000 (x) South Mountain Restoration Center (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 15,000,000 (xi) Torrance State Hospital (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 11,000,000 (xii) Warren State Hospital (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 11,000,000 (xiii) Wernersville State Hospital (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 11,000,000 (xiv) White Haven Center (A) Alterations, renovations, infrastructure and site modifications Project Allocation 11,000,000 (xv) Youth Forestry Camp No. 2 (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 5,000,000 (xvi) Youth Forestry Camp No. 3 (A) Renovate the institution, including new construction, alterations, renovations, site improvements, infrastructure upgrades and land acquisition Project Allocation 5,000,000 (10) Department of Military and Veterans Affairs (i) Gino J. Merli Veterans' Center (A) Additional funding for Project 969-16 Phase 2 0963-0204 Ph 2, Renovation and General Repairs Project Allocation 690,000 (B) Dining Room expansion Project Allocation 4,800,000 (C) Rehabilitate veterans' home Project Allocation 8,750,000 (ii) Hollidaysburg Veterans' Home (A) Additional funding for Renovation and General Repairs Project DGS 0969-0016 Ph 2 Project Allocation 825,000 (B) Infrastructure upgrades Project Allocation 8,750,000 (C) Rehabilitate veterans' home, including demolition of vacant buildings Project Allocation 5,000,000 (D) Expansion of MacArthur Hall Project Allocation 6,000,000 (iii) Pennsylvania Soldiers' and Sailors' Home, Erie (A) Rehabilitate State Veterans' Cemetery Project Allocation 7,000,000 (B) Rehabilitate veterans' home Project Allocation 6,250,000 (iv) Southeastern Veterans' Center, Spring City (A) Construction of new replacement Community Living Center Project Allocation 30,144,000 (B) Infrastructure upgrades Project Allocation 6,250,000 (v) Southwestern Veterans' Center, Pittsburgh (A) Infrastructure upgrades Project Allocation 8,125,000 (v.1) Veterans Homes Statewide (A) Land acquisition in and around existing veterans homes for green spaces and parking Project Allocation 5,000,000 (v.2) Fort Indiantown Gap National Cemetery (A) Alterations, repairs and deferred maintenance of the veterans' monument at Fort Indiantown Gap Project Allocation 14,000,000 (vi) Bucks County (A) Construct new facility and renovate existing facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 20,000,000 (vii) Cambridge Springs Maintenance Shop (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 1,000,000 (viii) Carbondale Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 5,000,000 (ix) Clearfield Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 9,000,000 (ix.1) Combined Support Maintenance Shop West, Pittsburgh, Allegheny County (A) Design, construction, land acquisition and infrastructure improvements Project Allocation 5,000,000 (ix.2) Dauphin County Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 20,000,000 (x) Erie Readiness Center (A) Acquisition of land for expansion and new facility Project Allocation 4,000,000 (B) Construct new Readiness Center Project Allocation 20,000,000 (xi) Friedens Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 9,500,000 (xii) Fort Indiantown Gap (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 27,000,000 (B) Construct new Readiness Center with new utilities and associated parking for personal vehicles and military equipment Project Allocation 7,500,000 (C) Construct new Fire Station and Ancillary Facilities Project Allocation 20,000,000 (D) Additional funding to rehabilitate Fitzpatrick Hall, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 4,000,000 (xiii) Gettysburg Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 2,000,000 (xiv) Grove City Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 6,000,000 (xv) Hamburg Readiness Center (A) Construct a new Readiness Center Project Allocation 15,000,000 (xvi) (Reserved) (xvii) Hermitage Readiness Center (A) Construct new Readiness Center with new utilities and associated parking for personal vehicles and military equipment Project Allocation 4,500,000 (xviii) (Reserved) (xix) Horsham Readiness Center (A) Renovate numerous facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 36,600,000 (xx) Jonestown Readiness Center (A) Construct new Readiness Center with new utilities and associated parking for personal vehicles and military equipment Project Allocation 10,000,000 (xxi) Lehighton Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 8,000,000 (xxii) Lock Haven Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 5,000,000 (xxiii) Mount Pleasant Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 5,000,000 (xxiv) Lawrence County or Mercer County Field Maintenance Shop (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 25,000,000 (xxv) Lawrence County or Mercer County Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 20,000,000 (xxvi) (Reserved) (xxvii) New Milford Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 10,000,000 (xxviii) Philadelphia County Readiness Centers (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 55,000,000 (xxix) Phoenixville Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 2,000,000 (xxx) Plymouth Meeting Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 5,000,000 (xxxi) Spring City Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 4,000,000 (xxxii) Washington Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 9,760,000 (xxxiii) Wilkes-Barre Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 15,000,000 (xxxiv) Williamstown Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 3,000,000 (xxxv) Schuylkill County Readiness Center (A) Renovate the facilities, including new construction, correcting structure and infrastructure deficiencies and security upgrades Project Allocation 20,000,000 (xxxvi) Statewide improvements (A) Provide force protection and physical security upgrades to DMVA facilities statewide, including new construction, renovations, electronic security systems, site work and building hardening Project Allocation 30,000,000 (B) Construct physical fitness structures at readiness centers statewide to meet readiness requirements for soldiers Project Allocation 5,000,000 (C) Construct cold storage for readiness centers throughout this Commonwealth Project Allocation 20,000,000 (11) State System of Higher Education (i) Bloomsburg University (A) Renovation or replacement of Bakeless Hall Project Allocation 18,000,000 (B) Renovation or replacement of Benjamin Franklin Hall Project Allocation 19,000,000 (C) Renovation or replacement of Simon Hall Project Allocation 6,000,000 (ii) California University (A) Construction, renovation and acquisition of student housing facilities Project Allocation 66,000,000 (B) Construction, renovation and acquisition of parking garage Project Allocation 12,000,000 (C) Facility space renovation, consolidation and demolition of academic buildings Project Allocation 15,000,000 (D) Renovation, replacement or upgrade of campus utilities infrastructure Project Allocation 22,000,000 (E) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 20,000,000 (iii) Cheyney University (A) Additional funding for Browne Hall renovation Project Allocation 1,000,000 (B) Acquisition, redevelopment, renovation/rehabilitation, construction, infrastructure improvements and abatement of hazardous materials for the redevelopment of Cheyney University Project Allocation 10,000,000 (C) Renovation and construction to address deferred maintenance and capital renewal Project Allocation 19,000,000 (D) Renovation or replacement of King and Tubman Halls Project Allocation 21,000,000 (iv) Clarion University (A) Construction, renovation and acquisition of student housing facilities Project Allocation 98,000,000 (B) Renovation, replacement or upgrade of campus utilities infrastructure Project Allocation 18,000,000 (C) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 23,000,000 (v) East Stroudsburg University (A) Additional funding for renovation of Gessner Science Project Allocation 20,000,000 (B) Additional funding for renovation of Moore Biology Project Allocation 10,000,000 (C) Additional funding for renovation of Stroud Hall Project Allocation 15,000,000 (D) Additional funding for demolition of underutilized and obsolete buildings Project Allocation 10,000,000 (E) Facility space renovation, consolidation and demolition of academic buildings Project Allocation 15,000,000 (F) Renovation, replacement or upgrade of campus utilities infrastructure Project Allocation 20,000,000 (G) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 20,000,000 (vi) Edinboro University (A) Additional funding for renovation of Hendricks Hall Project Allocation 10,000,000 (B) Additional funding for demolition of underutilized and obsolete buildings Project Allocation 15,000,000 (C) Construction, renovation and acquisition of student housing facilities Project Allocation 105,000,000 (D) Renovation or replacement of McComb Fieldhouse Project Allocation 45,000,000 (E) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 20,000,000 (vii) Indiana University of Pennsylvania (A) New construction, land development and infrastructure upgrades for replacement of academic buildings Project Allocation 50,000,000 (B) Facility space renovation, consolidation and demolition of academic buildings Project Allocation 15,000,000 (C) Renovation, replacement or upgrade of campus utilities infrastructure Project Allocation 25,000,000 (D) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 19,000,000 (viii) Kutztown University (A) Construction, renovation and acquisition of student housing facilities Project Allocation 63,000,000 (B) Renovation of Old Main Project Allocation 12,000,000 (C) Renovation or replacement of Rickenbach Education Building Project Allocation 22,000,000 (D) Renovation, replacement or upgrade of campus utilities infrastructure Project Allocation 15,000,000 (E) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 15,000,000 (ix) Lock Haven University (A) Construction, renovation and acquisition of student housing facilities Project Allocation 36,000,000 (B) Renovation of Raub Hall Project Allocation 20,000,000 (C) Renovation, replacement or upgrade of campus infrastructure Project Allocation 10,000,000 (D) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 12,000,000 (x) Mansfield University of Pennsylvania (A) Renovation, alteration, new construction, land development, infrastructure upgrades and demolition for North Hall renovation and Elliot Hall demolition Project Allocation 50,000,000 (B) Construction, renovation and acquisition of student housing facilities Project Allocation 76,000,000 (C) Renovation, replacement or upgrade of campus utilities infrastructure Project Allocation 10,000,000 (D) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 19,000,000 (xi) Millersville University (A) Renovation or replacement of Argires Science Complex Buildings Project Allocation 60,000,000 (B) Renovation, replacement or upgrade of campus water treatment and distribution utilities infrastructure Project Allocation 9,000,000 (C) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 14,000,000 (xii) Shippensburg University (A) Additional funding for replacement of Henderson Hall Project Allocation 5,000,000 (B) Additional funding for renovation of Lehman Library Project Allocation 5,000,000 (C) Construction, renovation and acquisition of student housing facilities Project Allocation 131,000,000 (D) Renovation and addition of Heiges Field House Project Allocation 40,000,000 (E) Renovation of Old Main, Phase 2 Project Allocation 15,000,000 (F) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 15,000,000 (xiii) Slippery Rock University (A) Additional funding for electrical infrastructure upgrades Project Allocation 5,000,000 (B) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 17,000,000 (xiv) West Chester University (A) Renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 19,000,000 (xv) Statewide campuses (A) Demolition and site restoration of underutilized and obsolete buildings Project Allocation 50,000,000 (12) Office of Administration (i) Commonwealth Technology Center (A) Renovations, alterations and mechanical, electrical, technology and other associated infrastructure upgrades Project Allocation 4,500,000 (13) Pennsylvania State Police (i) Troop L Headquarters/Station, Berks County (A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades Project Allocation 30,000,000 (ii) Troop D Butler Headquarters, Butler County (A) Renovate the institution, including roof and gutter replacement, alterations, renovations, site improvements and infrastructure upgrades Project Allocation 4,800,000 (iii) BESO Headquarters, Dauphin, Cumberland or Lebanon Counties (A) Facility and site improvements, including new construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades Project Allocation 34,000,000 (iv) Troop H Headquarters, Dauphin or Cumberland Counties (A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades Project Allocation 42,000,000 (v) State Police Academy, Dauphin, Cumberland or Lebanon Counties (A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades Project Allocation 180,000,000 (vi) Erie Laboratory, Erie County (A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades Project Allocation 9,600,000 (vii) Troop E Headquarters, Erie County (A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades Project Allocation 6,000,000 (viii) Troop M Headquarters/Laboratory, Lehigh County (A) New construction, alterations, renovations, site improvements, land acquisition, demolition and infrastructure upgrades Project Allocation 1,200,000 (ix) Regional Forensic Laboratory (A) Renovate and/or construct new laboratory in central Pennsylvania, including site and infrastructure improvements and land acquisition Project Allocation 50,000,000 (14) Department of Transportation (i) Adams County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (ii) Allegheny County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing western training facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (D) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Fort Pitt Tunnel Project Allocation 7,000,000 (E) New construction, renovations, expansion and alterations to existing roadside rest area at Site 11, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (F) New construction, renovations, expansion and alterations to existing roadside rest area at Site 12, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (G) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (iii) Armstrong County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (iv) Beaver County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (v) Bedford County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (vi) Berks County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (vii) Blair County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (viii) Bradford County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (ix) Bucks County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site P, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (x) Butler County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xi) Cambria County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xii) Cameron County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing bridge beam facility, including site acquisition and development, design, construction and utility work Project Allocation 3,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xiii) Carbon County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xiv) Centre County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Bellefonte Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Phillipsburg Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 29, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 30, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xv) Chester County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xvi) Clarion County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xvii) Clearfield County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xviii) Clinton County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 33, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 34, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xix) Columbia County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 37, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 38, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xx) Crawford County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Centerville Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Meadville Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 19, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 20, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (E) New construction, renovations, expansion and alterations to existing bridge beam facility, including site acquisition and development, design, construction and utility work Project Allocation 3,000,000 (F) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxi) Cumberland County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Carlisle Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Lemoyne Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 45, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 46, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxii) Dauphin County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing materials testing laboratory, including site acquisition and development, design, construction and utility work Project Allocation 8,000,000 (C) New construction, renovations, expansion and alterations to existing fleet management facility, including site acquisition and development, design, construction and utility work Project Allocation 17,000,000 (D) New construction, renovations, expansion and alterations to existing sign shop facility, including site acquisition and development, design, construction and utility work Project Allocation 15,000,000 (E) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Harrisburg Project Allocation 7,000,000 (F) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Elizabethville Project Allocation 7,000,000 (G) New construction, renovations, expansion and alterations to existing roadside rest area at Site 47, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (H) New construction, renovations, expansion and alterations to existing roadside rest area at Site 48, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (I) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxiii) Delaware County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site N, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxiv) Elk County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxv) Erie County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site L, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing welcome center at Site M, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxvi) Fayette County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxvii) Forest County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxviii) Franklin County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site G, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxix) Fulton County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site B, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 3, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction for bridge beam fabrications facility, including site acquisition and development, design, construction and utility work Project Allocation 6,000,000 (E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxx) Greene County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site D, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxxi) Huntingdon County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxxii) Indiana County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxxiii) Jefferson County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 25, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 26, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxxiv) Juniata County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxxv) Lackawanna County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 55, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxxvi) Lancaster County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxxvii) Lawrence County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 15, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 16, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxxviii) Lebanon County (A) New construction, renovations, expansion and alterations to existing eastern training facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xxxix) Lehigh County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xl) Luzerne County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 39, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 53, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 54, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xli) Lycoming County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xlii) McKean County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xliii) Mercer County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site E, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 17, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 18, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (E) New construction, renovations, expansion and alterations to existing bridge beam facility, including site acquisition and development, design, construction and utility work Project Allocation 3,000,000 (F) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xliv) Mifflin County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xlv) Monroe County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site F, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 41, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xlvi) Montgomery County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing district office parking garage, including site acquisition and development, design, construction and utility work Project Allocation 3,000,000 (C) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xlvii) Montour County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing roadside rest area at Site 35, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 36, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xlviii) Northampton County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (xlix) Northumberland County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing bridge beam facility, including site acquisition and development, design, construction and utility work Project Allocation 3,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (l) Perry County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (li) Philadelphia County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lii) Pike County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site K, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 61, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 62, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (liii) Potter County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (liv) Schuylkill County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lv) Snyder County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lvi) Somerset County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lvii) Sullivan County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lviii) Susquehanna County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site H, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 56, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lix) Tioga County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site T, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lx) Union County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lxi) Venango County (A) New construction, renovations, expansion and alterations to existing district office, including site acquisition and development, design, construction and utility work Project Allocation 10,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing roadside rest area at Site 21, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing roadside rest area at Site 22, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (E) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lxii) Warren County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing bridge beam facility, including site acquisition and development, design, construction and utility work Project Allocation 3,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lxiii) Washington County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work at Eighty Four Facility Project Allocation 7,000,000 (C) New construction, renovations, expansion and alterations to existing welcome center at Site T, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (D) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lxiv) Wayne County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lxv) Westmoreland County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lxvi) Wyoming County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lxvii) York County (A) New construction, renovations, expansion and alterations to existing maintenance facility, including site acquisition and development, design, construction and utility work Project Allocation 7,000,000 (B) New construction, renovations, expansion and alterations to existing welcome center at Site J, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (C) New construction, renovations, expansion and alterations to existing stockpile facility, including site acquisition and development, design, construction and utility work Project Allocation 5,000,000 (lxviii) Statewide (A) New construction for bridge beam fabrications facilities, including site acquisition and development, design, construction and utility work at sites to be determined Project Allocation 9,000,000

Section 4. Itemization of furniture and equipment projects. Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their estimated financial cost, as follows:

Total Project

Project Allocation (1) Department of Agriculture (i) Animal Health Laboratory A (A) Provide original furniture and equipment for new laboratory to serve the Pennsylvania Animal Diagnostic Laboratory System and Pennsylvania Racing Commission on the new Bolton Campus of the University of Pennsylvania Project Allocation 6,250,000 (1.1) Department of Conservation and Natural Resources (i) Cornplanter State Forest (A) Provide original furniture and equipment for new Resource Management Center Project Allocation 350,000 (ii) Division of Forest Fire Protection (A) Provide original furniture and equipment for Air Operations Building Project Allocation 150,000 (iii) Elk State Forest (A) Provide original furniture and equipment for Brooks Run Headquarters Project Allocation 150,000 (B) Provide original furniture and equipment for Hicks Run Headquarters Project Allocation 150,000 (iv) Gallitzin State Forest (A) Provide original furniture and equipment for Babcock Headquarters Project Allocation 300,000 (v) (A) Provide original furniture and equipment for new Resource Management Center Project Allocation 350,000 (vi) Moshannon State Forest (A) Provide original furniture and equipment for Dague Mechanics Shop and Fire Equipment Storage Project Allocation 150,000 (vii) Pinchot State Forest (A) Provide original furniture and equipment for Forestry and Fire Headquarters Project Allocation 350,000 (viii) Sproul State Forest (A) Provide original furniture and equipment for Snowshoe Headquarters Project Allocation 150,000 (B) Provide original furniture and equipment for Hyner Wood Shop Project Allocation 150,000 (ix) (A) Provide original furniture and equipment for East Licking Creek Headquarters Project Allocation 150,000 (x) Weiser State Forest (A) Provide original furniture and equipment for Haldeman Maintenance Headquarters Project Allocation 150,000 (2) Department of Education (i) The Pennsylvania State University (A) Provide original furniture and equipment for Physical Education Building at the Abington campus Project Allocation 4,000,000 (B) Provide original furniture and equipment for Woodland Building at the Abington campus Project Allocation 2,000,000 (C) Provide original furniture and equipment for Student Union Building at the Abington campus Project Allocation 12,000,000 (D) Provide original furniture and equipment for Academic Building at the Altoona campus Project Allocation 3,000,000 (E) Provide original furniture and equipment for the Transportation Training and Testing Facility at University Park campus Project Allocation 3,000,000 (F) (Reserved) (G) (Reserved) (H) (Reserved) (I) (Reserved) (J) (Reserved) (K) Provide original furniture and equipment for University Support Building I at the University Park campus Project Allocation 4,200,000 (L) Provide original furniture and equipment for Thomas Building at the University Park campus Project Allocation 1,440,000 (M) Provide original furniture and equipment for Physics Building at the University Park campus Project Allocation 8,000,000 (N) Provide original furniture and equipment for College of Engineering Research and Teaching Space at the University Park campus Project Allocation 24,000,000 (O) Provide original furniture and equipment for College of Engineering Building at the University Park campus Project Allocation 30,000,000 (P) Provide original furniture and equipment for Academic and Research Building at the University Park campus Project Allocation 12,000,000 (Q) Provide original furniture and equipment for Ritenour Building at the University Park campus Project Allocation 3,840,000 (R) Provide original furniture and equipment for Global Programs Building at the University Park campus Project Allocation 3,600,000 (S) Provide original furniture and equipment for Arboretum Cultural District infrastructure at the University Park campus Project Allocation 2,000,000 (T) Provide original furniture and equipment for Arboretum Cultural District new facility at the University Park campus Project Allocation 10,000,000 (U) Provide original furniture and equipment for Administrative Unit Building at the University Park campus Project Allocation 17,000,000 (V) Provide original furniture and equipment for Capital Renewal, Phase VIII at the University Park campus Project Allocation 8,000,000 (W) Provide original furniture and equipment for College of Engineering Building at the University Park campus Project Allocation 36,000,000 (X) Provide original furniture and equipment for Sackett Building at the University Park campus Project Allocation 16,000,000 (Y) Provide original furniture and equipment for College of Liberal Arts Research and Teaching Space at the University Park campus Project Allocation 8,000,000 (Z) Provide original furniture and equipment for Hosler Building at the University Park campus Project Allocation 12,000,000 (ii) Lincoln University (A) Provide original furniture and equipment for Cresson Hall Project Allocation 5,000,000 (iii) The University of Pittsburgh (A) Provide original furniture and equipment for the new engineering and computer information systems and technology building located at the University of Pittsburgh Bradford Campus Project Allocation 2,500,000 (3) Department of General Services (i) Department of General Services (A) Provide original furniture and equipment for the Forum Building Project Allocation 25,000,000 (3.1) Department of Health (i) Chester County (A) Construction, infrastructure and other related costs for the construction, furnishing and equipment of a Nemours Children's Health System pediatric facility in Chester County Project Allocation 11,000,000 (3.2) Department of Human Services (i) Norristown State Hospital (A) Provide original furniture and equipment for Norristown State Hospital Project Allocation 15,000,000 (4) Pennsylvania Historical and Museum Commission (i) Pennsylvania State Archives Building (A) Provide original furniture and equipment for facility Project Allocation 3,000,000 (ii) Collections Storage Building (A) Provide original furniture and equipment for Collections Storage Building Project Allocation 6,000,000 (5) Department of Military and Veterans Affairs (i) Hollidaysburg Veterans' Home (A) Provide original furniture and equipment for CLC Project Allocation 2,275,000 (B) Provide original furniture and equipment for MacArthur Hall Project Allocation 500,000 (ii) Clearfield Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (iii) Erie Readiness Center (A) Provide original furniture and equipment Project Allocation 1,000,000 (iv) Friedens Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (v) New Fire Station and Ancillary Facilities (A) Provide original furniture and equipment Project Allocation 1,000,000 (vi) Fitzpatrick Hall Readiness Center (A) Provide original furniture and equipment Project Allocation 1,000,000 (vii) Harrisburg Military Post Readiness Center (A) Provide original furniture and equipment Project Allocation 1,000,000 (viii) Hermitage Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (ix) Hershey Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (x) Horsham Readiness Center (A) Provide original furniture and equipment Project Allocation 2,000,000 (xi) Jonestown Readiness Center (A) Provide original furniture and equipment Project Allocation 1,000,000 (xii) Philadelphia County Readiness Center (A) Provide original furniture and equipment Project Allocation 2,000,000 (xiii) Lehighton Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (xiv) Lock Haven Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (xv) Mount Pleasant Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (xvi) Lawrence County or Mercer County Field Maintenance Shop (A) Provide original furniture and equipment Project Allocation 1,000,000 (xvii) Lawrence County or Mercer County Readiness Center (A) Provide original furniture and equipment Project Allocation 1,000,000 (xviii) New Milford Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (xix) Phoenixville Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (xx) Philadelphia Southampton Readiness Center (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxi) Spring City Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (xxii) East Stroudsburg Readiness Center (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxiii) Washington Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (xxiv) Wilkes-Barre Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (xxv) Williamstown Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (xxvi) Statewide physical fitness structures (A) Provide original furniture and equipment Project Allocation 1,000,000 (xxvii) Gettysburg Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (xxviii) Plymouth Meeting Readiness Center (A) Provide original furniture and equipment Project Allocation 500,000 (6) State System of Higher Education (i) Bloomsburg University (A) Provide original furniture and equipment for renovation or replacement of Bakeless Hall Project Allocation 1,800,000 (B) Provide original furniture and equipment for renovation or replacement of Benjamin Franklin Hall Project Allocation 1,900,000 (C) Provide original furniture and equipment for renovation or replacement of Simon Hall Project Allocation 600,000 (D) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 2,500,000 (ii) California University (A) Provide original furniture and equipment for facility space renovation, consolidation and demolition of academic buildings Project Allocation 1,500,000 (B) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 2,000,000 (iii) Cheyney University (A) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 2,000,000 (B) Provide original furniture and equipment for renovation or replacement of King and Tubman Halls Project Allocation 2,100,000 (iv) Clarion University (A) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 2,500,000 (v) East Stroudsburg University (A) Provide additional original furniture and equipment for renovation of Moore Biology Project Allocation 1,000,000 (B) Provide additional original furniture and equipment for renovation of Stroud Hall Project Allocation 1,500,000 (C) Provide additional original furniture and equipment for renovation of Gessner Science Project Allocation 2,000,000 (D) Provide original furniture and equipment for facility space renovation, consolidation and demolition of academic buildings Project Allocation 1,500,000 (E) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 2,000,000 (vi) Edinboro University (A) Provide additional original furniture and equipment for renovation of Hendricks Hall Project Allocation 1,500,000 (B) Provide original furniture and equipment for renovation of McComb Fieldhouse Project Allocation 4,500,000 (C) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 2,000,000 (vii) Indiana University of Pennsylvania (A) Provide original furniture and equipment for academic building replacement Project Allocation 5,000,000 (B) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 2,000,000 (viii) Kutztown University (A) Provide original furniture and equipment for renovation of Old Main Project Allocation 3,000,000 (B) Provide original furniture and equipment for renovation or replacement of Rickenbach Education Building Project Allocation 2,500,000 (C) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 1,500,000 (ix) Lock Haven University (A) Provide original furniture and equipment for renovation of Raub Hall Project Allocation 2,000,000 (B) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 1,200,000 (x) Mansfield University of Pennsylvania (A) Provide original furniture and equipment for North Hall renovation Project Allocation 5,000,000 (B) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 1,900,000 (xi) Millersville University (A) Provide original furniture and equipment for renovation or replacement of Argires Science Complex Buildings Project Allocation 6,000,000 (xii) Shippensburg University (A) Provide additional original furniture and equipment for replacement of Henderson Hall Project Allocation 2,000,000 (B) Provide additional original furniture and equipment for renovation of Lehman Library Project Allocation 1,500,000 (C) Provide original furniture and equipment for renovation and addition of Heiges Field House Project Allocation 4,500,000 (D) Provide original furniture and equipment for renovation of Old Main, Phase 2 Project Allocation 2,500,000 (E) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 2,200,000 (xiii) Slippery Rock University (A) Provide original furniture and equipment for renovation of Eisenberg Classroom Building Project Allocation 2,500,000 (B) Provide original furniture and equipment for renovation and addition of McKay Building Project Allocation 3,000,000 (C) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 2,500,000 (xiv) West Chester University (A) Provide additional funding for original furniture and equipment for renovation of FH Green Library Project Allocation 3,000,000 (B) Provide original furniture and equipment for renovation and construction to address deferred maintenance and capital renewal in academic buildings Project Allocation 3,500,000 (6.1) Pennsylvania State Police (i) Pennsylvania State Police Academy/Bureau of Emergency and Special Operations (A) Provide original furniture and equipment for facility Project Allocation 30,000,000 (7) Department of Transportation (i) Adams County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (ii) Allegheny County (A) Provide original furniture and equipment for District Office 11-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (C) Provide original furniture and equipment for maintenance facility at Fort Pitt Tunnel Project Allocation 600,000 (iii) Armstrong County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (iv) Beaver County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (v) Bedford County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (vi) Berks County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (vii) Blair County (A) Provide original furniture and equipment for District Office 9-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (viii) Bradford County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (ix) Bucks County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (x) Butler County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xi) Cambria County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xii) Cameron County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xiii) Carbon County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xiv) Centre County (A) Provide original furniture and equipment for maintenance facility at Bellefonte Project Allocation 600,000 (B) Provide original furniture and equipment for maintenance facility at Phillipsburg Project Allocation 600,000 (xv) Chester County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xvi) Clarion County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xvii) Clearfield County (A) Provide original furniture and equipment for District Office 2-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xviii) Clinton County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xix) Columbia County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xx) Crawford County (A) Provide original furniture and equipment for maintenance facility at Centerville Project Allocation 600,000 (B) Provide original furniture and equipment for maintenance facility at Meadville Project Allocation 600,000 (xxi) Cumberland County (A) Provide original furniture and equipment for maintenance facility at Carlisle Project Allocation 600,000 (B) Provide original furniture and equipment for maintenance facility at Lemoyne Project Allocation 600,000 (xxii) Dauphin County (A) Provide original furniture and equipment for District Office 8-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility at Harrisburg Project Allocation 600,000 (C) Provide original furniture and equipment for maintenance facility at Elizabethville Project Allocation 600,000 (xxiii) Delaware County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxiv) Elk County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxv) Erie County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxvi) Fayette County (A) Provide original furniture and equipment for District Office 12-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxvii) Forest County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxviii) Franklin County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxix) Fulton County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxx) Greene County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxxi) Huntingdon County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxxii) Indiana County (A) Provide original furniture and equipment for District Office 10-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxxiii) Jefferson County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxxiv) Juniata County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxxv) Lackawanna County (A) Provide original furniture and equipment for District Office 4-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxxvi) Lancaster County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxxvii) Lawrence County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxxviii) Lebanon County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xxxix) Lehigh County (A) Provide original furniture and equipment for District Office 5-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xl) Luzerne County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xli) Lycoming County (A) Provide original furniture and equipment for District Office 3-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xlii) McKean County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xliii) Mercer County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xliv) Mifflin County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xlv) Monroe County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xlvi) Montgomery County (A) Provide original furniture and equipment for District Office 6-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xlvii) Montour County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xlviii) Northampton County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (xlix) Northumberland County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (l) Perry County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (li) Philadelphia County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lii) Pike County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (liii) Potter County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (liv) Schuylkill County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lv) Snyder County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lvi) Somerset County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lvii) Sullivan County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lviii) Susquehanna County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lix) Tioga County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lx) Union County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lxi) Venango County (A) Provide original furniture and equipment for District Office 1-0 Project Allocation 2,000,000 (B) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lxii) Warren County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lxiii) Washington County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (B) Provide original furniture and equipment for maintenance facility at the Eighty Four Facility Project Allocation 600,000 (lxiv) Wayne County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lxv) Westmoreland County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lxvi) Wyoming County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000 (lxvii) York County (A) Provide original furniture and equipment for maintenance facility Project Allocation 600,000

Section 5. Itemization of transportation assistance projects.

(a) Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows: Total Project

Project Allocation (1) Lycoming County (i) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for River Valley Transit facilities Project Allocation 15,000,000

(b) Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Total Project

Project Allocation (1) Armstrong County (i) Freeport Terminals, Inc. (A) Rehabilitate and construct rail infrastructure in Armstrong County to accommodate current traffic volume, as well as future planned expansions, including, but not limited to, property acquisition, truck and rail car scale acquisition and installation, site preparation, engineering/permitting, drainage improvements, rail, ties, ballast, turnouts, switches, surfacing and all rail- related materials necessary for project Project Allocation 2,500,000 (B) Improve and expand intermodal facility at Freeport Terminals, Inc., in Armstrong County, to include property acquisition, engineering, site preparation/permitting, rail-related materials, loading/unloading equipment and dock improvements Project Allocation 9,500,000 (1.1) Beaver County (i) Pittsburgh Intermodal Terminals, Inc. (A) Property acquisition, engineering, site preparation/permitting, rail-related material, loading/unloading equipment and dock improvements Project Allocation 7,000,000 (B) Rehabilitate and construct rail infrastructure in Beaver County to accommodate current traffic volume, as well as future planned expansions, to include, but not be limited to, property acquisition, site preparation and improvement, truck and rail scale acquisition and installation, engineering/permitting, drainage improvements, rail, ties, ballast, turnouts, switches, surfacing and all rail-related materials necessary for project Project Allocation 4,500,000 (C) Rehabilitate and construct rail infrastructure in Beaver County to accommodate current traffic volume, as well as future planned expansion, to include, but not be limited to, site preparation, engineering/permitting, drainage improvements, rail, ties, ballast, turnouts, switches, surfacing and all rail-related materials necessary for the project Project Allocation 3,500,000 (2) Blair County (i) Curry Rail Services, Inc. (A) Site preparation, engineering/permitting, rail, ties, ballast, turnouts, switches, surfacing, crossings and all other rail- related materials for reconstruction of the former rail yard in Hollidaysburg Project Allocation 5,000,000 (B) Site preparation, engineering/permitting, drainage improvements, rail, ties, ballast, turnouts, switches, surfacing, crossings and all other rail-related materials for rehabilitation and rail infrastructure construction in Blair County Project Allocation 2,500,000 (3) Cambria County (i) County projects (A) Construction, infrastructure, redevelopment and other related costs for a new hangar Project Allocation 6,000,000 (3.1) Chester County (i) ArcelorMittal Plate (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs associated with the rehabilitation of ArcelorMittal Plate's in-plant railroad infrastructure in Chester County Project Allocation 5,000,000 (4) Clearfield County (i) Nicholas Enterprises, Inc. (A) Additional rail, site preparation and acquisition, asphalt paving, material handling equipment, rail transfer equipment, realignment of access roads and stream crossing Project Allocation 5,000,000 (5) Clinton County (i) Clinton County Economic Partnership (A) Rail siding expansion for a proposed manufacturing facility Project Allocation 4,000,000 (6) Dauphin County (i) Steelton and Highspire Railroad (A) Rehabilitate and construct rail infrastructure in Dauphin County, including engineering, site preparation, drainage, grading, rails, ties, ballast, turnouts, crossings, bridge, paving and all materials necessary for project completion Project Allocation 6,000,000 (7) Huntingdon County (i) Huntingdon County Rail Authority (A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a Huntingdon County rail project on Fairgrounds Road in Smithfield, Mount Union and other county locations Project Allocation 7,000,000 (7.1) Lackawanna County (i) Pennsylvania Northeast Regional Railroad Authority (A) Construction, renovation, infrastructure and other costs related to the Pocono Rail Infrastructure Safety Initiative Project Allocation 7,500,000 (B) Construction, renovation, infrastructure and other costs related to the Pocono Transload Warehouse facility Project Allocation 3,750,000 (C) Rehabilitation of grade crossing surface and signals at South Washington Avenue Project Allocation 200,000 (8) Lancaster County (i) Redevelopment Authority of the County of Lancaster (A) Acquisition, construction, renovation, infrastructure and other related costs for relocating existing train tracks to allow for better train flow and reduce downtown traffic, tourist and business impact Project Allocation 5,000,000 (ii) Lititz Regional Community Development Corporation (A) Acquisition, construction, infrastructure and other related costs for rail relocation, including removal of old tracks, construction of new switching track and redevelopment or restoration of old track sites Project Allocation 3,000,000 (9) Monroe County (i) Pennsylvania Northeast Railroad Authority (A) Upgrades, renovations, expansions and other related project costs crucial to rail access and operations Project Allocation 1,000,000 (B) Rehabilitation of grade crossing surface and signals at River Road Project Allocation 300,000 (C) Rehabilitation of grade crossing surface and signals at Mill Creek Road Project Allocation 100,000 (9.1) Northampton County (i) Pennsylvania Northeast Regional Railroad Authority (A) Construction, infrastructure improvements and other costs for the Lackawanna Cutoff Passenger project at Slateford Road Project Allocation 4,008,000 (9.2) Northumberland County (i) North Shore Railroad (A) Construct infrastructure necessary to reactivate rail siding and related infrastructure in Northumberland County, including: land acquisition, engineering/permitting, site preparation/clearing, grading, drainage, rail, ties, ballast, switches and related materials, rail scales, loading/unloading equipment, truck staging and scales, paving, fencing and all materials necessary for project completion Project Allocation 4,000,000 (9.3) Reading, Blue Mountain and Northern Railroad (i) Rail project (A) Purchase and installation of a welded rail train on the Tremont Branch from MP 5.1 to MP 15; on the Scranton Branch from MP 0 to 5.4; on the Main Line from MP 61.7 to MP 175; on the Susquehanna Branch from MP 0 to 29; on the Minersville Branch from MP 0 to MP 6.4; and on the Pottsville Branch from MP 78 to MP 94.5 Project Allocation 3,200,000 (10) Union County (i) Union County Industrial Railroad (A) Site preparation, engineering, grading, drainage, rail, ties, ballast, switches, signals, crossings, bridges and all other rail-related materials for rehabilitation and rail infrastructure construction Project Allocation 7,000,000 (11) Washington, Allegheny, Westmoreland and Fayette Counties (i) Wheeling and Lake Erie Railway Company (A) Rehabilitate, construct, renew or upgrade related infrastructure to support current and future traffic demands, including engineering, site preparation, grading, rail, ties, ballast, switches, signals, crossings, bridges, tunnels and all materials necessary for project completion Project Allocation 20,000,000 (12) Wayne and Pike Counties (i) Wayne County (A) Acquisition, infrastructure, rehabilitation and other related costs for a local, regional rail line for freight and passenger movement to be owned and operated by a multicounty entity Project Allocation 1,000,000 (13) York County (i) Redevelopment Authority of the County of York (A) Site preparation, infrastructure, construction and materials costs related to the relocation of active railroad tracks and other related costs for York Railway rail system improvements Project Allocation 5,000,000 (14) Multiple Counties (i) North Shore Railroad (A) Upgrade existing infrastructure and build new capacity for projected increases in traffic and new customer development in Centre, Clinton, Columbia, Lycoming, Mifflin, Montour, Northumberland and Union Counties for land acquisition, engineering, site preparation, grading, drainage, rail, ties, ballast, switches, signals, crossings, bridges and all materials necessary for project completion Project Allocation 8,000,000 (ii) Union County Industrial Railroad (A) Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ties, ballast, switches and all materials necessary for construction and rail infrastructure in multiple counties Project Allocation 6,000,000

(c) Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

Total Project

Project Allocation (1) Allegheny County (i) Pittsburgh International Airport (A) Construction, maintenance and repair of facilities and improvement and/or upgrade existing facilities Project Allocation 4,000,000 (1.1) Beaver County (i) Beaver County Airport Authority (A) Construction, infrastructure, renovation and other related costs for miscellaneous capital improvements, including updates to systems and structures, for Beaver County Airport Project Allocation 300,000 (1.2) Bedford County (i) Bedford County Airport Authority (A) Construction, infrastructure, redevelopment and other related costs for a new hangar Project Allocation 6,000,000 (2) Bucks County (i) Bucks County Airport Authority (A) Acquisition, construction, infrastructure and other related costs for airport improvements at the Quakertown Airport Project Allocation 10,000,000 (B) Acquisition, construction, infrastructure and other related costs for miscellaneous improvements at Doylestown Airport Project Allocation 15,000,000 (3) Butler County (i) Butler County Airport Authority (A) Acquisition, construction, infrastructure and other related costs for runway extensions, facility improvements and economic development initiatives at the Pittsburgh- Butler Regional Airport Project Allocation 12,500,000 (4) Cambria County (i) Johnstown Cambria County Airport Authority (A) Construction, infrastructure, redevelopment and other related costs for airport improvements Project Allocation 2,000,000 (5) Cumberland County (i) South Middletown Township (A) Acquisition, renovation, construction, infrastructure and other associated costs for the redevelopment and/or revitalization of the Carlisle Airport Project Allocation 20,000,000 (ii) Susquehanna Area Regional Airport Authority (A) Infrastructure, site work and other costs associated with the rehabilitation of existing aviation facilities Project Allocation 1,000,000 (6) Dauphin County (i) Susquehanna Area Regional Airport Authority (A) Construction, infrastructure, abatement of hazardous materials, site work and other related costs for a safety improvement and economic development project located at the Harrisburg International Airport Project Allocation 2,000,000 (7) Erie County (i) Erie Regional Airport Authority (A) Construction, infrastructure, abatement of hazardous materials and other related costs for renovation and rehabilitation of the Customs and Border Protection building at Erie International Airport Project Allocation 675,000 (B) Construction, infrastructure, renovation, abatement of hazardous materials and other related costs for expansion of terminal building, installation of in-line baggage equipment and security enhancements at Erie International Airport Project Allocation 14,925,000 (ii) Redevelopment Authority in the City of Corry (A) Construction of classroom space, aircraft hangar and maintenance garage for establishment of a flight training and aviation mechanics educational facility at the Corry Lawrence Airport Project Allocation 2,250,000 (7.1) Indiana County (i) Jimmy Stewart Airport (A) Construction, infrastructure, acquisition and related development costs for improvements at Jimmy Stewart Airport Project Allocation 5,000,000 (8) Lancaster County (i) East Donegal Township (A) Acquisition, redevelopment, renovations, construction, infrastructure and other related costs for airport improvements Project Allocation 5,000,000 (ii) Lancaster Airport Authority (A) Replacement of three aging snow removal trucks Project Allocation 225,000 (B) Replacement of two aging aircraft fueling trucks Project Allocation 250,000 (8.1) Lehigh County (i) Hanover Township (A) Construction, infrastructure improvements and other costs for the Air Cargo facility at the Lehigh Valley International Airport Project Allocation 45,000,000 (B) Acquisition, construction, infrastructure improvements and other related development costs to support commercial development at Lehigh Valley International Airport Project Allocation 5,000,000 (8.2) Luzerne County (i) Forty Fort Borough (A) Acquisition, construction, infrastructure and other related costs for safety improvements and economic development at the Wyoming Valley Airport Project Allocation 5,000,000 (8.3) Lackawanna and Luzerne Counties (i) Site design, construction, infrastructure and other related costs of a Category II Instrument Landing System at the Wilkes- Barre/Scranton International Airport Project Allocation 3,500,000 (9) Lycoming County (i) Williamsport Municipal Airport Authority (A) Acquisition, construction, infrastructure and other related costs for airport improvements, including land acquisition, hangar renovation and construction, pavement improvements, access road and parking lot rehabilitation, equipment acquisition, perimeter fencing and other necessary improvements to the Williamsport Regional Airport Project Allocation 10,000,000 (10) Monroe County (i) Pocono Mountains Municipal Airport Authority (A) Capital improvements, upgrades, renovations, expansions and other related projects crucial to airport access and operations Project Allocation 1,000,000 (11) Northampton County (i) Lehigh Northampton Airport Authority (A) Upgrades, renovations, expansions and other related projects crucial to airport access and operations at Braden Air Park Project Allocation 1,000,000 (11.1) Philadelphia County (i) Philadelphia International Airport (A) Construction, maintenance and repair of facilities and improvement and/or upgrade existing facilities Project Allocation 4,000,000 (12) Schuylkill County (i) Schuylkill County Airport Authority (A) Construction and other related costs for airport improvements at the Schuylkill County/Joe Zerbey Airport Project Allocation 5,000,000 (13) Venango County (i) County projects (A) Land acquisition, construction, infrastructure, rehabilitation of airfield pavements, airport lighting, airport terminal complex, construction and rehabilitation of aircraft hangars, acquire equipment, rehabilitate parking lot, remark airfield pavements and other improvements Project Allocation 5,000,000 (14) Washington County (i) County projects (A) Acquisition, construction, infrastructure, redevelopment and associated improvements for the Washington County Airport Northside Development Project Project Allocation 5,000,000 (B) Acquisition, site work and grading for a runway extension and corresponding areas for safety enhancement and efficiency for larger jet aircraft operations Project Allocation 10,000,000 (C) Acquisition, site grading, utilities, storm water management and associated improvements for new T- hangars and large clear span unit hangars Project Allocation 6,500,000 (15) Multiple counties (i) Philadelphia and Delaware Counties (A) Construction, infrastructure improvements and other costs for the Philadelphia and/or Northeast Airports Project Allocation 15,000,000

Section 6. Itemization of redevelopment assistance projects.

(a) Additional capital projects in the category of redevelopment assistance projects for capital grants by the Department of Community and Economic Development, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment assistance capital projects and to be financed by the incurring of debt, are hereby itemized, together with their estimated financial costs, as follows: Total Project

Project Allocation (1) Adams County (i) County projects (A) Acquisition, renovation, construction, redevelopment, infrastructure and other related costs for an emergency services or public safety facility Project Allocation 3,000,000 (ii) Cumberland Township (A) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for the municipal building and police department Project Allocation 1,000,000 (B) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for redevelopment of the foundry site Project Allocation 4,000,000 (iii) Hamiltonban Township (A) Site preparation, acquisition, construction, infrastructure and other related costs for an economic development project along Iron Spring Road Project Allocation 2,000,000 (iv) Oxford Township (A) Acquisition, renovation, construction, infrastructure and other related costs for development of Berlin Junction Manufacturing Center Project Allocation 5,000,000 (v) Adams County Industrial Development Authority (A) Site preparation, construction, redevelopment, infrastructure and other related costs for development of the Adams County Historical Society Museum Project Allocation 2,000,000 (B) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for a community and/or economic development project Project Allocation 5,000,000 (C) Acquisition, construction and other related costs for the UPMC Hanover - New Oxford Outpatient Center Project Allocation 7,500,000 (2) Allegheny County (i) County projects (A) Acquisition, construction, infrastructure improvements and other related costs for the Chatham University Homewood, Larimer, North Point Breeze, Wilkinsburg, Garfield and Squirrel Hill community redevelopment project Project Allocation 6,500,000 (B) Acquisition, infrastructure improvements, construction and other costs related to the Biotechnology Commercialization Expansion project Project Allocation 25,000,000 (C) Construction, renovation, infrastructure improvements and other related costs for the expansion of the John Jay Center, home of Robert Morris University's School of Engineering, Mathematics and Sciences Project Allocation 7,000,000 (D) Construction, infrastructure, site preparation and other related costs for Airfield development and improvements at the Allegheny County Airport in Moon and Findlay Townships Project Allocation 15,000,000 (E) Construction, infrastructure, site preparation and other related costs for Airport Site and building development and improvements at the Allegheny County Airport in Moon and Findlay Townships Project Allocation 15,000,000 (F) Construction, infrastructure, site preparation and other related costs for Airport Economic Development Site and building improvements at the Allegheny County Airport in Moon and Findlay Townships Project Allocation 15,000,000 (G) Construction, infrastructure, site preparation and other related costs for Airport Tenant Site and building improvements at the Allegheny County Airport in Moon and Findlay Townships Project Allocation 15,000,000 (H) Infrastructure and other related costs for the upgrade of a supercomputing center in Monroeville Project Allocation 4,000,000 (I) Acquisition, renovation and construction of a swimming pool and related aquatic facilities for community and competitive aquatics events Project Allocation 5,000,000 (J) Construction, infrastructure and other related costs for the development of a facility for Adagio Health medical offices Project Allocation 1,500,000 (i.1) Aleppo Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Aleppo Township Project Allocation 10,000,000 (ii) Borough of Bradford Woods, Marshall Township (A) Renovations, infrastructure, construction and other costs for Woodlands Foundation campus and facilities Project Allocation 10,000,000 (iii) Borough of Leetsdale (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Borough of Leetsdale Project Allocation 10,000,000 (iv) Bridgeville Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Bridgeville Borough Project Allocation 10,000,000 (v) Castle Shannon Borough (A) Construction, infrastructure improvements and other related costs for the completion of Phase II of the Castle Shannon Downtown District Streetscape Project Project Allocation 1,500,000 (vi) City of Duquesne (A) Construction, infrastructure improvements and other related costs for renovations to the Duquesne Family Support Center at 1 Liberty Place Project Allocation 550,000 (vi.1) City of McKeesport (A) Acquisition, construction, infrastructure and other related costs for a FQHC-anchored multiservice facility Project Allocation 1,000,000 (vii) City of Pittsburgh (A) Construction, infrastructure and other related costs for Pittsburgh Symphony Orchestra Heinz Hall renovation project Project Allocation 10,000,000 (B) Construction, renovation, infrastructure and other improvements to the Duquesne University campus Project Allocation 20,000,000 (C) Renovations, infrastructure improvements and construction for security enhancement for Jewish Federation of Greater Pittsburgh communal sites Project Allocation 2,600,000 (D) Construction, infrastructure, redevelopment and other related costs for projects at the Pittsburgh Zoo and PPG Aquarium Project Allocation 25,000,000 (E) Acquisition, construction, infrastructure and other related costs for the Bethlehem Haven housing and neighborhood remediation project Project Allocation 700,000 (F) Construction, infrastructure, redevelopment and other related costs for projects at the Frick Art and Historical Center Project Allocation 25,000,000 (G) Construction, infrastructure, renovations and other related costs for the Pittsburgh Glass Center expansion project Project Allocation 5,000,000 (H) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in the Garden Theatre Block Project Allocation 20,000,000 (I) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects for 200 Ross Street Project Allocation 20,000,000 (J) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in the Strip District Project Allocation 20,000,000 (K) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in Observatory Hill Business districts Project Allocation 20,000,000 (L) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for economic development projects in West End Business districts Project Allocation 20,000,000 (M) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in Beechview Business districts Project Allocation 20,000,000 (N) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in Hill District Business districts Project Allocation 20,000,000 (O) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development at Roberts and Skinny Building Project Allocation 20,000,000 (P) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects on East Ohio Street Project Allocation 20,000,000 (Q) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects at the intersection of Fifth Avenue and Dinwiddie Street in Uptown Pittsburgh Project Allocation 20,000,000 (R) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects at the former Fairywood School site Project Allocation 20,000,000 (S) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects along Broadway Avenue in Beechview Project Allocation 20,000,000 (T) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects for Smithfield Avenue Historic Façade Preservation Projects in Downtown Pittsburgh Project Allocation 20,000,000 (U) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects for the New Grenada Theater in the Hill District Project Allocation 20,000,000 (V) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects along the Centre Avenue corridor in the Hill District Project Allocation 50,000,000 (W) Acquisition, construction, infrastructure, redevelopment and other related costs for the Centre- Heldman Plaza in the Hill District Project Allocation 20,000,000 (X) Acquisition, construction, infrastructure and other related costs for structured parking on the Lower Hill site Project Allocation 30,000,000 (Y) Construction, infrastructure, redevelopment and other related costs for the Produce Terminal Building Project Allocation 10,000,000 (Z) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects on Mifflin Road in the Lincoln Place neighborhood of Pittsburgh Project Allocation 20,000,000 (AA) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects for the former St. Clair Village properties Project Allocation 20,000,000 (BB) Acquisition, construction, infrastructure, redevelopment and other related costs for a structured parking project at Pittsburgh Technology Center Project Allocation 20,000,000 (CC) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects at Berg Place Project Allocation 20,000,000 (DD) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in Homewood Business districts Project Allocation 20,000,000 (EE) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects located on South Beatty Street in East Liberty Project Allocation 20,000,000 (FF) Acquisition, construction, infrastructure, redevelopment and other related costs for the former Carnegie Library site in Hazelwood Project Allocation 20,000,000 (GG) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in the 4800 block of Second Avenue in Hazelwood Project Allocation 20,000,000 (HH) Acquisition, construction, infrastructure, redevelopment and other related costs for the North Homewood and Hamilton Storefronts project Project Allocation 20,000,000 (II) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in Homewood Project Allocation 50,000,000 (JJ) Acquisition, construction, infrastructure, redevelopment and other related costs for the Homewood Coliseum Project Allocation 20,000,000 (KK) Construction, infrastructure, redevelopment and other related costs for a mixed-use development at Hunt Armory Project Allocation 20,000,000 (LL) Construction, infrastructure, redevelopment and other related costs for the Carnegie Library of Pittsburgh Branch improvements Project Allocation 6,500,000 (MM) Acquisition, construction, infrastructure, renovations and other related costs for Chatham University Eastside location Project Allocation 8,300,000 (NN) Acquisition, construction, infrastructure, renovations and other related costs for Chatham University Shadyside campus Project Allocation 34,000,000 (OO) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in Larimer Project Allocation 20,000,000 (PP) Acquisition, construction, infrastructure, renovation and other related costs for the former Liberty Park site and Larimer Avenue revitalization Project Allocation 20,000,000 (QQ) Land acquisition, construction, demolition, site preparation, infrastructure improvements and other related costs for Trinity Health Project Allocation 5,000,000 (RR) Acquisition, construction, infrastructure, abatement and other related costs for Fifth and Dinwiddie mixed-use and community development project Project Allocation 3,000,000 (SS) Acquisition, construction and other costs for the development of a mixed-use LGBTQ senior housing community Project Allocation 7,500,000 (TT) Acquisition, construction and other costs for the development of a multiuse facility to house the Tree of Life congregation, Holocaust Center of Greater Pittsburgh, Chatham University and other community organizations Project Allocation 2,600,000 (UU) Construction, infrastructure, redevelopment and other related costs for a Health Sciences and Technology Building at Carlow University Project Allocation 10,000,000 (VV) Construction, renovation, technology, equipment and other costs for a film/sound/multimedia studio Project Allocation 3,000,000 (WW) Acquisition, construction, infrastructure and other related costs for upgrades to the Western Pennsylvania School for Blind Children Project Allocation 5,000,000 (XX) Construction, infrastructure improvements, renovations and other related costs for the Children's Museum of Pittsburgh Campus Phase 3 Project Allocation 5,000,000 (YY) Acquisition, construction, infrastructure, redevelopment and other costs related to Allegheny General Hospital renovations Project Allocation 10,000,000 (ZZ) Acquisition, construction, infrastructure, redevelopment and other costs related to West Penn Hospital renovations Project Allocation 10,000,000 (AAA) Construction, infrastructure and other related costs for the Family House, Inc., improvement project Project Allocation 5,000,000 (BBB) Construction, redevelopment, infrastructure, acquisition and other related costs for the Carnegie Library Project Allocation 6,500,000 (CCC) Construction, redevelopment and other related costs for the renovation and expansion of a children's museum Project Allocation 5,000,000 (DDD) Construction, infrastructure, redevelopment, renovation and other related costs for the Health Sciences & Technology Building at Carlow University Project Allocation 10,000,000 (EEE) Construction, infrastructure, redevelopment and other related costs for mixed-use brownfield redevelopment in Pittsburgh's Strip District neighborhood by Oxford Development Project Allocation 10,000,000 (FFF) Construction, infrastructure, redevelopment and other related costs for a theater at the New Hazlett Center for the Performing Arts Project Allocation 5,000,000 (GGG) Acquisition, clearing, demolition, renovation, expansion, environmental remediation, construction, infrastructure, streets, utilities and other related costs for public works facilities Project Allocation 10,000,000 (HHH) Construction, acquisition, infrastructure, redevelopment and other related costs for improvements to the smart corridor Project Allocation 2,500,000 (III) Construction, redevelopment, infrastructure and other costs related to the Squirrel Hill Gateway redevelopment project Project Allocation 2,500,000 (JJJ) Construction, infrastructure and other related costs for a community center in the 31st Ward Project Allocation 750,000 (KKK) Construction, acquisition, infrastructure and other related costs for the redevelopment of the former Prospect and Beltzhoover School buildings Project Allocation 5,000,000 (LLL) Construction, renovation, rehabilitation improvements and other costs related to a pediatric rehabilitation/private school facility Project Allocation 5,000,000 (MMM) Construction, renovation, infrastructure, storm water mitigation, redevelopment and other related costs for regional water and sewer facilities Project Allocation 10,000,000 (NNN) Demolition, preparation and other costs related to the redevelopment of former Pittsburgh public Gladstone Middle School Project Allocation 2,000,000 (OOO) Construction, site development, infrastructure and other costs related to the Almono LP mixed-use development project Project Allocation 4,000,000 (PPP) Acquisition, construction, renovation, redevelopment and other costs related to a human services center Project Allocation 2,500,000 (QQQ) Construction, infrastructure, redevelopment and other related costs for the Panther Hollow Lake restoration and boathouse project Project Allocation 3,000,000 (RRR) Construction, infrastructure, redevelopment and other costs related to the rehabilitation and renovation of the former Prospect School in the Mount Washington neighborhood for residential and commercial use, including community space Project Allocation 2,500,000 (SSS) Construction, renovation, redevelopment and other costs related to a homeless service center Project Allocation 2,500,000 (TTT) Construction, redevelopment and other costs related to the Pittsburgh Project gymnasium building project Project Allocation 500,000 (UUU) Construction, infrastructure, acquisition, redevelopment and other costs related to restoration of urban parks and facilities Project Allocation 10,000,000 (VVV) Acquisition, construction, infrastructure improvements and other related development costs for the Mattress Factory Museum Project Allocation 2,000,000 (WWW) Facilities construction, infrastructure improvements, renovations and other costs for the Carnegie Museum of Art Project Allocation 5,000,000 (XXX) Facilities construction, infrastructure improvements, renovations and other costs for the Carnegie Museum of Natural History Project Allocation 5,000,000 (YYY) Facilities construction, infrastructure improvements, renovations and other costs for the Andy Warhol Museum Project Allocation 5,000,000 (ZZZ) Facilities construction, infrastructure improvements, renovations and other costs for the Carnegie Science Center Project Allocation 5,000,000 (AAAA) Construction, redevelopment, infrastructure and other costs related to the Flats on Forward redevelopment project Project Allocation 5,000,000 (BBBB) Construction, infrastructure, acquisition, abatement of hazardous materials and other costs related to the redevelopment of a facility owned or operated by Brookfield Properties Project Allocation 20,000,000 (CCCC) Redevelopment and new construction of the former Goodwill Distribution Center in Pittsburgh's Southside neighborhood Project Allocation 3,000,000 (viii) Bellevue Borough (A) Acquisition, construction, infrastructure, redevelopment and other costs related to Suburban General Hospital renovations Project Allocation 10,000,000 (viii.1) Blawnox Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 10,000,000 (viii.2) Braddock Borough (A) Construction, infrastructure and other related costs for the development of a facility for the Braddock Carnegie Library Association Project Allocation 10,000,000 (viii.3) Bradford Woods Borough/Marshall Township (A) Construction, infrastructure and other related costs for upgrading and enhancing current facilities as well as constructing additional facilities at the Woodlands Foundation Project Allocation 10,000,000 (viii.4) Brentwood Borough (A) Construction, infrastructure, acquisition, redevelopment and other related costs for capital facilities Project Allocation 5,000,000 (ix) Collier Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Collier Township Project Allocation 10,000,000 (ix.1) Crafton Borough (A) Acquisition, construction, infrastructure improvements, redevelopment and other related costs for a maintenance and development project Project Allocation 5,000,000 (x) Edgeworth Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Edgeworth Borough Project Allocation 10,000,000 (B) Construction, infrastructure improvements, renovations and other related costs for upgrades to the Western Pennsylvania School for the Deaf Project Allocation 5,000,000 (xi) Emsworth Borough (A) Acquisition, construction, infrastructure, abatement, renovations and other related costs for Holy Family Institute's redevelopment project Project Allocation 7,500,000 (xii) Etna Borough (A) Acquisition, construction, infrastructure, abatement and other related costs for Robotics Hub High Technology Incubator Project Allocation 10,000,000 (xiii) Findlay Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Findlay Township Project Allocation 10,000,000 (xiv) Gibsonia, Richland Township (A) Acquisition, construction, infrastructure, renovations and other related costs for the Chatham University Eden Hall campus Project Allocation 16,000,000 (xiv.1) Green Tree Borough (A) Acquisition, construction, infrastructure, redevelopment, improvements and other related costs for a maintenance and development project Project Allocation 5,000,000 (xv) Harrison Township (A) Construction, infrastructure, redevelopment and other related costs for economic development projects at Heights Plaza Project Allocation 20,000,000 (B) Acquisition, construction, infrastructure, redevelopment and other costs related to Allegheny Valley Hospital renovations Project Allocation 10,000,000 (xvi) Jefferson Hills Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Jefferson Hills Borough Project Allocation 10,000,000 (xvii) Kennedy Township (A) Acquisition, construction, infrastructure, abatement and other related costs for Rosedale Technical Institute Kennedy campus Project Allocation 5,000,000 (xvii.1) Leet Township (A) Acquisition, construction, reconstruction, rehabilitation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, utilities, parking, storm water management and common areas, and all other related costs for the development, expansion, renovation and/or redevelopment of an economic development project Project Allocation 10,000,000 (xvii.2) Leetsdale Borough (A) Acquisition, construction, reconstruction, rehabilitation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, utilities, parking, storm water management and common areas, and all other related costs for the development, expansion, renovation and/or redevelopment of an economic development project Project Allocation 10,000,000 (xviii) Monroeville Borough (A) Construction, infrastructure improvements and other costs for expansion of film production facilities in the Tech One Commerce Park Project Allocation 10,000,000 (B) Acquisition, construction, infrastructure, redevelopment and other costs related to Forbes Hospital renovations Project Allocation 10,000,000 (xix) Moon Township (A) Acquisition, construction, infrastructure and other related costs for the Market Place Development economic development project in Moon Township Project Allocation 15,000,000 (B) Infrastructure and other related costs for a transportation-related economic development project in Moon Township Project Allocation 10,000,000 (C) Acquisition, construction, infrastructure and other related costs for an economic development project in Moon Township Project Allocation 10,000,000 (xx) Mt. Lebanon Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Mt. Lebanon Township Project Allocation 10,000,000 (xx.1) Mt. Lebanon Township/Scott Township (A) Construction, redevelopment and other related costs for an outpatient center at Saint Clair Hospital Project Allocation 10,000,000 (xx.2) Munhall Borough (A) Acquisition, construction, infrastructure and other related costs for the Carnegie Library of Homestead's improvement project in Munhall Borough Project Allocation 7,500,000 (B) Acquisition, construction, infrastructure and other related costs for public improvements and economic development in Munhall Borough Project Allocation 5,000,000 (C) Construction, infrastructure, redevelopment and other costs related to the renovation of Munhall Borough which will be used as a new borough building Project Allocation 10,000,000 (xxi) Municipality of Bethel Park (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Bethel Park Municipality Project Allocation 10,000,000 (xxii) North Braddock Borough (A) Acquisition, construction, infrastructure, demolition and other related costs for the revitalization projects in North Braddock Borough Project Allocation 500,000 (xxiii) North Fayette Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in North Fayette Township Project Allocation 10,000,000 (xxiv) Oakdale Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Oakdale Borough Project Allocation 10,000,000 (xxv) Ohio Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Ohio Township Project Allocation 10,000,000 (xxv.1) Penn Hills Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 10,000,000 (xxvi) Pine Township (A) Acquisition, construction, infrastructure, abatement and other related costs for Accipiter Systems headquarters Project Allocation 5,000,000 (xxvii) Pleasant Hills Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Pleasant Hills Borough Project Allocation 10,000,000 (xxviii) Plum Borough (A) Construction, infrastructure and other related costs for a flood mitigation and a recreational redevelopment project for Plum Creek area in Plum Borough Project Allocation 500,000 (B) Construction, renovations and other costs for Longwood at Oakmont campus expansion Project Allocation 2,500,000 (C) Construction and other related costs for the renovation and expansion of Longwood at Oakmont Project Allocation 2,500,000 (D) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 10,000,000 (xxix) Robinson Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Robinson Township Project Allocation 10,000,000 (B) Construction, infrastructure, abatement, acquisition, renovation and other costs for Covestro LLC headquarters Project Allocation 15,000,000 (xxx) Ross Township (A) Acquisition, construction, infrastructure, abatement and other related costs for Holy Family Institute Project Allocation 7,500,000 (xxxi) Sewickley Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Sewickley Borough Project Allocation 10,000,000 (xxxii) South Fayette Township (A) Acquisition, construction, infrastructure and other related costs for a Municipal Complex in South Fayette Township Project Allocation 5,000,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in South Fayette Township Project Allocation 10,000,000 (C) Construction, infrastructure, abatement of hazardous materials and other related costs for the El Piazza retail development and parking garage Project Allocation 25,000,000 (xxxiii) South Park Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in South Park Township Project Allocation 10,000,000 (xxxiv) Springdale Borough (A) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for development of the Business District and Colfax Street Project Allocation 2,500,000 (xxxv) Swissvale Borough (A) Construction, infrastructure improvements and other costs for POWER campus redevelopment project Project Allocation 3,000,000 (xxxvi) Upper St. Clair Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Upper St. Clair Township Project Allocation 10,000,000 (xxxvi.1) Verona Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 10,000,000 (xxxvi.2) West Mifflin Borough (A) Acquisition, construction, infrastructure, renovations, machinery and equipment and other related costs for the Pittsburgh Institute of Aeronautics project in West Mifflin Borough Project Allocation 3,000,000 (xxxvii) Whitehall Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Whitehall Borough Project Allocation 10,000,000 (xxxviii) Allegheny County Economic Development Authority (A) Costs related to potential acquisition, construction, infrastructure and machinery for the Covestro, LLC, headquarters in Robinson Township Project Allocation 15,000,000 (xxxix) Redevelopment Authority of Allegheny County (A) Acquisition, construction, infrastructure, renovations and other related costs for the Chatham University Shadyside campus Project Allocation 34,000,000 (B) Acquisition, construction, infrastructure improvements and other related costs for the Chatham University Homewood, Larimer, North Point Breeze, Wilkinsburg, Garfield and Squirrel Hill Community Development Project Project Allocation 6,500,000 (C) Acquisition, construction, infrastructure, redevelopment, renovation and other costs related to Jefferson Hospital renovations in Jefferson Hills Borough Project Allocation 10,000,000 (D) Construction, infrastructure, redevelopment and other costs related to the renovation of The Hunter Building Project Allocation 10,000,000 (xl) Redevelopment Authority of McKeesport (A) Construction, infrastructure, redevelopment and other costs related to the restoration of Penn-McKee Hotel Project Allocation 2,000,000 (xli) Urban Redevelopment Authority of Pittsburgh (A) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in Hazelwood business districts Project Allocation 20,000,000 (B) Construction, infrastructure, redevelopment and other improvements to the Duquesne University campus Project Allocation 20,000,000 (C) Acquisition, construction, infrastructure, redevelopment and other costs related to the expansion of Senator John Heinz History Center Project Allocation 2,000,000 (xlii) Wilkinsburg Community Development Corporation (A) Construction, infrastructure, acquisition, redevelopment and other costs related to the renovation and restoration of vacant houses Project Allocation 2,000,000 (3) Armstrong County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for a cultural/civic project in the county Project Allocation 4,000,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 8,000,000 (C) Demolition, paving and other related costs for a new borough parking garage and a parking lot to accommodate Butler County Community College in Ford City Project Allocation 1,000,000 (ii) East Franklin Township (A) Construction, infrastructure, renovation and other related costs for the expansion and updating of the Armstrong Center for Medicine and Health's oncology ward Project Allocation 1,000,000 (4) Beaver County (i) County projects (A) Acquisition, construction and other related costs for new fire station Project Allocation 1,500,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for an economic development project Project Allocation 6,000,000 (C) Construction, infrastructure, acquisition, redevelopment and other related costs for improvements to properties located on the left bank of the Ohio River Project Allocation 5,000,000 (D) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in Center Township Project Allocation 5,000,000 (E) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in Ambridge Borough Project Allocation 5,000,000 (F) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional uses in the county Project Allocation 15,000,000 (G) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in Big Beaver Borough Project Allocation 10,000,000 (H) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in Chippewa Township Project Allocation 7,500,000 (I) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in City of Beaver Falls Project Allocation 5,000,000 (J) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in Harmony Township Project Allocation 5,000,000 (K) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in Marion Township Project Allocation 5,000,000 (L) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in Midland Borough Project Allocation 7,500,000 (M) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in Monaca Borough Project Allocation 5,000,000 (N) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in New Brighton Borough Project Allocation 5,000,000 (O) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in New Sewickley Township Project Allocation 5,000,000 (P) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in Rochester Borough Project Allocation 5,000,000 (Q) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional projects in Shippingport Borough Project Allocation 12,500,000 (ii) Big Beaver Borough (A) Acquisition, site preparation, construction, infrastructure, redevelopment and other related costs for a multiphase industrial warehouse development in the Westgate Business Park Project Allocation 4,000,000 (B) Acquisition, site preparation, infrastructure, installation, construction and other related costs for the multiphase industrial warehouse development being constructed in Westgate Business Park Project Allocation 4,000,000 (iii) Center Township (A) Renovations and improvements for a nonprofit drug treatment and research facility, including patient wings, kitchen and cafeteria, family resource and education center, patient courtyards and green space and overall energy-efficient system updates Project Allocation 1,500,000 (iv) Chippewa Township (A) Construction, infrastructure, renovation and other related costs for miscellaneous capital improvements, including updates to systems and structures for the Beaver County Airport Project Allocation 300,000 (v) Monaca Borough (A) Acquisition, construction, site preparation, environmental and/or hazardous assessment and remediation and infrastructure improvements, including improvements to energy and utilities, and all other related costs for the development of a microgrid system Project Allocation 1,500,000 (vi) Potter Township (A) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, health care, educational or institutional uses in the county by Potter Township Development Project Allocation 5,000,000 (vii) Beaver County Corporation for Economic Development (A) Acquisition, site preparation, infrastructure, installation, construction and other related site costs for the multiphase industrial warehouse development being constructed in the Westgate Business Park in Big Beaver Borough Project Allocation 4,000,000 (viii) Hopewell Township (Beaver County) (A) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for mixed-use, commercial, industrial, entertainment, storage and transport, recreation, healthcare, educational or institutional uses in the county Project Allocation 5,000,000 (ix) Borough of Monaca (A) Acquisition, construction, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, utilities, parking and common areas, and all other related costs for the development of a hospitality facility with lodging, dining and other services Project Allocation 2,500,000 (B) Acquisition, construction, site preparation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, utilities, parking, storm water management and common areas, and all other related costs for the development of new multipurpose government, community and emergency responders building or buildings Project Allocation 3,000,000 (C) Acquisition, construction, site preparation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, recreation, utilities, storm water management and common areas, and all other related costs for the development of a multilevel parking garage Project Allocation 3,000,000 (D) Acquisition, construction, reconstruction, rehabilitation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, utilities, parking, storm water management and common areas, and all other related costs for the development, expansion, renovation and/or redevelopment of an economic development project within the borough Project Allocation 5,000,000 (5) Bedford County (i) County projects (A) Acquisition, construction, infrastructure, redevelopment and other related costs for restoration of the Anderson House for the Southern Alleghenies Museum of Art Project Allocation 1,000,000 (ii) Bedford County Development Association (A) Acquisition, infrastructure and other related costs for construction of an open-space building in a Business Park Project Allocation 2,500,000 (B) Acquisition, construction, infrastructure and other related costs for development of a bio-tech incubator at Everett Business Center Project Allocation 2,500,000 (C) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 5,000,000 (iii) Bedford/Fulton County Joint Authority (A) Acquisition, construction, infrastructure and other related costs for rehabilitation of 8.5 miles of abandoned Pennsylvania Turnpike for development of the Pike2Bike Trail Project Project Allocation 3,500,000 (6) Berks County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for a mixed-use redevelopment project on the site of the former Thomas Ford Elementary School in the City of Reading Project Allocation 5,000,000 (B) Construction, infrastructure improvements and other related costs for a Dairy Processing Production Facility Project Allocation 30,000,000 (C) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for economic development projects in Berks County Project Allocation 5,000,000 (D) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for a mixed-use commercial/affordable housing development in Berks County Project Allocation 10,000,000 (E) Construction, infrastructure improvements, renovations and other related costs for PA Adult and Teen Challenge campus Project Allocation 3,000,000 (F) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for community housing and other facilities for individuals with developmental disabilities in the county Project Allocation 7,000,000 (G) Construction, infrastructure improvements and other costs for an aquaponics facility Project Allocation 1,500,000 (H) Construction, site preparation, infrastructure improvements and other costs related to a new service center for the Berks County Conservation District and Education Center Project Allocation 6,000,000 (ii) Redevelopment Authority of the County of Berks (A) Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for an existing or new building for economic development purposes Project Allocation 5,000,000 (B) Construction and other related costs for an aeroponics facility to provide employment opportunities for homeless persons Project Allocation 1,000,000 (C) Installation of infrastructure and utilities, renovation, rehabilitation and demolition of buildings, abatement of hazardous materials and construction of new buildings at Hamburg Center Project Allocation 5,000,000 (iii) Bern Township (A) Site preparation, construction and infrastructure improvements for the Berks Park 183 industrial park project Project Allocation 3,000,000 (iv) City of Reading (A) Construction, infrastructure improvements and other costs related to the renovation of Albright College Gingrich Library Project Allocation 14,200,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for Alvernia University center city development projects Project Allocation 10,000,000 (C) Construction, infrastructure improvements, rehabilitation and other related costs for the Olivet Boys and Girls Club of Reading and Berks County Project Allocation 7,500,000 (D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a multiuse redevelopment project in vicinity of 4th and Elm Streets Project Allocation 5,000,000 (E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the Reading Area Firefighters Museum Project Allocation 2,500,000 (F) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for The Reading Science Center - The Physics Lab Project Allocation 2,000,000 (G) Construction, demolition, infrastructure, renovations and other costs for Humane Pennsylvania Reading Shelter Rebuild Project Project Allocation 2,000,000 (H) Acquisition, renovation, construction, infrastructure improvements and other related costs for revitalization of properties at 5th and Penn Streets Project Allocation 5,000,000 (I) Construction, abatement of hazardous materials, renovation, rehabilitation and other related costs of a historic building for commercial use Project Allocation 3,500,000 (J) Construction, infrastructure, acquisition, redevelopment and other related costs for the rehabilitation of recreational and educational facilities Project Allocation 1,250,000 (K) Construction, acquisition, redevelopment and other related costs for the renovation of historic vacant buildings Project Allocation 2,000,000 (L) Acquisition, renovation, rehabilitation and construction, including infrastructure and other costs for the revitalization of properties at 5th and Penn Streets in downtown Reading Project Allocation 2,500,000 (M) Acquisition, renovation, rehabilitation and construction, including infrastructure, and other costs for renovation of a civic club Project Allocation 500,000 (N) Construction, renovation, infrastructure improvements and other related costs for the service expansion project for Penn State St. Joseph Health Project Allocation 20,000,000 (O) Acquisition, design, demolition, construction, infrastructure and other costs for a public building in the City of Reading Project Allocation 15,000,000 (iv.1) Cumru Township (A) Acquisition, site preparation, infrastructure and construction related to an economic development project in Cumru Township Project Allocation 20,000,000 (B) Acquisition, site preparation, infrastructure and construction related to a fire and emergency services building in Cumru Township Project Allocation 10,000,000 (v) Exeter Township (A) Site preparation, construction and infrastructure improvements for the Exeter Township Emergency Services Building Project Allocation 5,000,000 (vi) Mohnton Borough (A) Construction, infrastructure improvements and other related costs for the Berks County Museum of Military History Project Allocation 2,500,000 (vii) West Reading Borough (A) Acquisition, construction, infrastructure, redevelopment and other related costs for West Reading mixed-use business development Project Allocation 10,000,000 (viii) Multiple municipalities (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project in multiple municipalities Project Allocation 20,000,000 (7) Blair County (i) County Projects (A) Renovation, rehabilitation and other related costs for the Family Services Incorporated shelter, including the addition of bed space for the homeless Project Allocation 1,450,000 (B) Acquisition, construction, reconstruction, renovation, rehabilitation, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and all other related costs for the renovation and expansion of the Blair Center of Penn Highlands Community College Project Allocation 2,000,000 (C) Acquisition, construction, reconstruction, renovation, rehabilitation, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and all other related costs for the construction, renovation, rehabilitation, redevelopment, expansion and/or reuse of Saint Francis University facilities for educational, cultural and/or administrative purposes within Blair County Project Allocation 2,500,000 (i.1) Logan Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 15,000,000 (B) Acquisition, construction, infrastructure and other related costs for a regional recreational facility Project Allocation 5,000,000 (C) Acquisition, construction, infrastructure and other related costs for a regional Public Safety and Emergency Services training facility Project Allocation 10,000,000 (ii) Altoona-Blair County Development Corporation (A) Infrastructure, abatement of hazardous materials and other related costs for renovation and rehabilitation of patient care areas in the Radiation Oncology treatment center at UPMC/Altoona Project Allocation 600,000 (B) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of vacant property in the City of Altoona and Logan Township in the vicinity of the Norfolk Southern Rail Yards Project Allocation 7,500,000 (C) Renovation, rehabilitation and other related costs for capital improvements to the Jaffa Shrine Center, including air conditioning and new seating Project Allocation 1,450,000 (D) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of property for the purpose of constructing a multimodal transit facility, including a parking garage in downtown Altoona Project Allocation 5,000,000 (E) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment and renovation of existing buildings in downtown Altoona to support the growth of the Pennsylvania State University-Altoona downtown campus Project Allocation 2,000,000 (F) Acquisition, construction, infrastructure, renovation, abatement of hazardous materials and other related costs for Urban Centers redevelopment projects Project Allocation 5,000,000 (G) Acquisition, infrastructure, abatement of hazardous materials and other related costs for construction of a business park along the Interstate 99 corridor Project Allocation 4,000,000 (H) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for adaptive reuse of existing buildings and facilities in the Altoona-Blair County area Project Allocation 5,000,000 (I) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 3,000,000 (J) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of properties and construction of new market rate housing Project Allocation 7,500,000 (iii) Altoona-Logan Township Mobile Medical Emergency Department Authority (A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for AMED - EMS station and/or regional EMS Training Institute Project Allocation 2,000,000 (8) Bradford County (Reserved) (9) Bucks County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for parking garages in Bucks County Project Allocation 25,000,000 (B) Acquisition, construction, infrastructure and other related costs for a new YMCA facility in Bucks County Project Allocation 8,000,000 (i.1) Bensalem Township (A) Acquisition, infrastructure, land improvements and other related costs of land for Street road extension, to provide permanent public access to the Delaware River Project Allocation 1,500,000 (ii) Bristol Borough (A) Acquisition, demolition and other related costs for the redevelopment of properties along Chestnut and Elm Streets Project Allocation 1,300,000 (B) Construction, infrastructure and other related costs for redevelopment of the Mill Street Parking Lot and Bristol Waterfront Park, including paving, electrical upgrades, construction of an amphitheater, public restrooms, parking lot reconfiguration and other park amenities Project Allocation 10,000,000 (iii) Bristol Township (A) Construction, renovation, demolition of existing buildings and construction of a senior center with an expanded parking lot Project Allocation 1,500,000 (B) Infrastructure, construction and other related costs for a new fire and rescue services building Project Allocation 3,000,000 (iii.1) Buckingham Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Buckingham Township Project Allocation 3,000,000 (iii.2) Bucks County Airport Authority (A) Acquisition, construction, infrastructure and other related costs for miscellaneous improvements at Doylestown Airport Project Allocation 15,000,000 (iii.3) Chalfont Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Chalfont Borough Project Allocation 2,500,000 (iii.4) Doylestown Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Doylestown Borough Project Allocation 3,000,000 (B) Construction, infrastructure, renovations and other costs for the James A. Michener Art Museum Project Allocation 1,000,000 (C) Acquisition, infrastructure, construction, redevelopment and other related costs for the development of an integrated cluster of nonprofit and commercial discovery scientists centers Project Allocation 5,000,000 (iii.5) Doylestown Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Doylestown Township Project Allocation 3,000,000 (B) Construction, infrastructure, renovations and other costs for the Mercer Mile rehabilitation project Project Allocation 5,000,000 (C) Acquisition, construction, infrastructure and other related costs for the development of the PA Biotechnology Center Research Clusters Project Allocation 5,000,000 (iii.6) Dublin Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Dublin Borough Project Allocation 2,500,000 (iii.7) Falls Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Falls Township Project Allocation 3,000,000 (B) Acquisition, construction, infrastructure and other related costs at the Keystone Industrial Port Complex Project Allocation 10,000,000 (iii.8) Lower Makefield Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Lower Makefield Township Project Allocation 3,000,000 (iv) Middletown Township (A) Construction, demolition, infrastructure and other related costs for renovation and expansion of the Department of Public Works' yard and facilities Project Allocation 4,150,000 (iv.1) Morrisville Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Morrisville Borough Project Allocation 3,000,000 (B) Construction, infrastructure, renovations and other costs for Patriots Park at Historic Summerseat Project Allocation 3,000,000 (C) Construction, infrastructure, renovations and other costs for Morrisville Borough Hall Project Allocation 4,000,000 (D) Redevelopment, construction, infrastructure, abatement of hazardous materials and other related costs for an economic development project at a brownfield site Project Allocation 2,000,000 (iv.2) New Britain Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in New Britain Borough Project Allocation 2,500,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in New Britain Township Project Allocation 2,000,000 (C) Construction, infrastructure, renovations and other costs for Peregrine Surgical project Project Allocation 1,500,000 (iv.3) New Hope Borough (A) Construction, redevelopment and other related costs associated with the creation of a public parking deck Project Allocation 1,500,000 (B) For costs associated with removing utility poles and burying utility lines underground Project Allocation 1,500,000 (iv.4) New Hope Borough and Solebury Township (A) Land acquisition, construction, site preparation, infrastructure improvements and other related costs for the Bucks County Children's Museum Project Allocation 5,000,000 (B) Acquisition, construction, infrastructure and other related costs for the New Hope Lodge in the Woods project Project Allocation 1,500,000 (iv.5) New Hope Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in New Hope Borough Project Allocation 5,000,000 (B) Acquisition, construction, infrastructure and other related costs for the Bucks County Playhouse Theater Project Allocation 10,000,000 (iv.6) Newtown Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Newtown Borough Project Allocation 2,500,000 (B) Construction, infrastructure, renovations and other costs for the Newtown Hall Theatre Project Allocation 1,000,000 (iv.7) Newtown Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Newtown Township Project Allocation 3,000,000 (v) Penndel Borough (A) Construction, infrastructure, renovations, abatement of hazardous materials and other related costs for upgrades and expansion of the municipal government and community center facilities Project Allocation 1,500,000 (vi) Perkasie Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Perkasie Borough Project Allocation 2,500,000 (vii) Plumstead Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Plumstead Township Project Allocation 2,500,000 (viii) Sellersville Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Sellersville Borough Project Allocation 2,500,000 (ix) Solebury Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Solebury Township Project Allocation 2,000,000 (x) Telford Borough (A) Construction, infrastructure, renovations and other costs for the Indian Valley Public Library Project Allocation 2,000,000 (xi) Upper Makefield Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Upper Makefield Township Project Allocation 1,000,000 (xii) Upper Southampton Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for Tamanend Park Project Allocation 4,000,000 (xiii) Warminster Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the municipal service complex in Warminster Township Project Allocation 9,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for Ben Wilson Public Works Facility Project Allocation 2,000,000 (C) Construction, infrastructure, acquisition, redevelopment and other related costs to support a residential substance abuse unit project at Abington Jefferson Health Project Allocation 2,000,000 (xiv) Warrington Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the police and municipal complex in Warrington Township Project Allocation 3,800,000 (B) Site design, infrastructure, construction and other related costs for a multipurpose community building at Lion's Pride Park Project Allocation 500,000 (C) Site design, redevelopment, infrastructure, construction, storm water management and other related costs associated with the development of a multiuse athletic complex on Bristol Road Project Allocation 2,500,000 (D) Acquisition, construction, infrastructure improvements and other related costs for a business campus in Warrington Township for advanced manufacturing, research and development and life sciences use Project Allocation 4,000,000 (xv) Yardley Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Yardley Borough Project Allocation 5,000,000 (xvi) Bucks County Redevelopment Authority (A) Construction, renovation and rehabilitation of athletic fields and construction of new facilities, including synthetic turf, bleachers, concession stand, restrooms and locker rooms Project Allocation 3,000,000 (B) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for physical assets of Woods Services, Inc., including adjacent areas Project Allocation 10,000,000 (xvii) Bucks County Department of Community and Economic Development (A) Construction, renovation and other related costs for a community cancer center at the Grand View Health Outpatient Center Project Allocation 6,000,000 (xviii) Redevelopment Authority of the County of Bucks (A) Acquisition, construction, redevelopment, renovation and other related costs for the replacement of an existing grass playing field with a multipurpose turf field as well as a new track, spectator seating and the installation of electrical service and lighting Project Allocation 1,250,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project Project Allocation 20,000,000 (10) Butler County (i) County projects (A) Acquisition, construction and other related costs for a new fire station for Harmony Fire District Project Allocation 1,500,000 (B) Construction, infrastructure and other related costs for a full- service, year-round baseball and sports training facility Project Allocation 1,500,000 (ii) Butler County Airport Authority (A) Acquisition, construction, infrastructure and other related costs for runway extensions, facility improvements and economic development initiatives at the Pittsburgh-Butler Regional Airport Project Allocation 12,500,000 (11) Cambria County (i) County projects (A) Construction, demolition, infrastructure, redevelopment, renovation and other related costs for expansion of the Mount Aloysius College with a Living and Learning Center Project Allocation 2,500,000 (B) Infrastructure and other related costs for a new 911 emergency call system Project Allocation 14,000,000 (C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for Saint Francis University Health Sciences facility Project Allocation 10,000,000 (D) Acquisition, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for Saint Francis University Engineering facility Project Allocation 5,000,000 (E) Construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for Conemaugh Health System improvements Project Allocation 10,000,000 (F) Construction, infrastructure, renovation, abatement of hazardous materials and other related costs for economic projects in the county Project Allocation 10,000,000 (G) Acquisition, construction, reconstruction, rehabilitation, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and all other related costs for the development of a large scale solar energy project Project Allocation 5,000,000 (H) Acquisition, construction, reconstruction, renovation, rehabilitation, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and all other related costs for the development of a new technology center Project Allocation 5,000,000 (I) Construction, reconstruction, renovation, rehabilitation, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and all other related costs for the renovation and infrastructure needs of the Richland Campus of Penn Highlands Community College Project Allocation 2,000,000 (J) Construction, infrastructure, acquisition and other related costs for the buildings and infrastructure throughout the county Project Allocation 10,000,000 (ii) City of Johnstown (A) Construction, infrastructure, redevelopment, acquisition and other related costs for the renovation of a building to accommodate a manufacturing business Project Allocation 500,000 (iii) Clearfield Township (A) Construction, infrastructure, redevelopment and other related costs for the renovation of a swimming pool and the surrounding area Project Allocation 2,000,000 (iv) Ebensburg Borough (A) Construction and other related costs for a training center for apprentice electricians and upskill training for journeyperson linemen for the power generation and power distribution industry Project Allocation 3,000,000 (v) City of Johnstown Redevelopment Authority (A) Acquisition, construction, reconstruction, rehabilitation, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and other related costs for the development, expansion, renovation, redevelopment and/or reuse of medical facilities Project Allocation 10,000,000 (vi) Upper Yoder Township (A) Demolition, construction, reconstruction, rehabilitation, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and all other costs for demolition of the former Goucher Street Elementary School and the construction of a new community recreation center on the site by the West Hill Recreation Commission or by a related or designated entity Project Allocation 2,000,000 (vii) Cambria County Economic Development Authority (A) Construction and other related costs for the IBEW Local 126 OSHE Apprenticeship Training Center Expansion West Project Project Allocation 3,000,000 (12) Cameron County (Reserved) (13) Carbon County (i) County projects (A) Acquisition, construction, infrastructure, machinery, equipment, renovation and other related costs for a Lehigh Valley Health Network facility Project Allocation 10,000,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 2,000,000 (C) Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project in the county Project Allocation 7,500,000 (D) Acquisition, construction, infrastructure, renovations and other related costs for Lehigh Carbon County Community College Project Allocation 5,000,000 (E) Construction, infrastructure and other related costs associated with building a veteran suicide prevention retreat lodge Project Allocation 1,400,000 (ii) Franklin Township (A) Construction, infrastructure and other related costs for a new township and community building Project Allocation 1,000,000 (B) Construction, infrastructure improvement and other related costs for a new cancer treatment facility at St. Luke Hospital Blue Mountain campus Project Allocation 2,500,000 (iii) Nesquehoning Borough (A) Construction, renovation and other related costs for expansion of Carbon County Correctional Facility Project Allocation 1,500,000 (iv) Palmerton Borough (A) Acquisition, abatement, construction, infrastructure and other related costs for expansion of St. Luke's Hospital Blue Mountain campus Project Allocation 5,000,000 (v) Parryville Borough (A) Construction, redevelopment, renovation and other related costs for a new combined borough hall and volunteer fire company building and the demolition and removal of the old fire company building Project Allocation 1,300,000 (vi) Towamensing Township (A) Construction, infrastructure and other related costs for a new township and community building Project Allocation 2,000,000 (vii) Carbon Chamber and Economic Development Corporation (A) Acquisition, construction, infrastructure and other related costs for a distribution warehouse Project Allocation 6,000,000 (14) Centre County (i) County projects (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the Centre Volunteers in Medicine facilities Project Allocation 10,000,000 (ii) State College Borough (A) Acquisition, construction, infrastructure and other related costs for an economic and/or community development project Project Allocation 15,000,000 (15) Chester County (i) County projects (A) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for a mixed-use commercial or cultural/affordable housing development in Chester County Project Allocation 10,000,000 (B) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for an economic development project in Chester County Project Allocation 1,500,000 (C) Acquisition, construction, infrastructure improvements and other related costs for the Chester County Stadium development project Project Allocation 20,000,000 (D) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for economic development projects in Chester County Project Allocation 5,000,000 (E) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for the West Pharmaceutical project Project Allocation 5,000,000 (F) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for community redevelopment projects in the county Project Allocation 9,500,000 (G) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for a multipurpose event center Project Allocation 10,000,000 (H) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for improvements to park facilities Project Allocation 20,000,000 (I) Acquisition, construction, infrastructure improvements, abatement of hazardous materials and other related costs for redeveloping an industrially zoned site into a regional commercial park Project Allocation 2,500,000 (J) Construction, renovation, infrastructure improvements and other costs for an Early Learning Center Project Allocation 2,000,000 (K) Construction, renovation, infrastructure improvements and other costs for a STEM magnet school Project Allocation 2,500,000 (L) Construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs related to enhancements at Devereux facilities Project Allocation 6,000,000 (M) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for a mental health facility in the county Project Allocation 10,000,000 (N) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for redeveloping an industrially zoned site into a modern regional commercial park Project Allocation 10,000,000 (O) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for redeveloping an industrially zoned site into a modern regional commercial park Project Allocation 5,000,000 (P) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for a multipurpose event center in Chester County Project Allocation 20,000,000 (Q) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for park improvements in Chester County Project Allocation 20,000,000 (R) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the Chester County Stadium Development Project Project Allocation 20,000,000 (S) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs related to enhancements at Devereux facilities Project Allocation 6,000,000 (T) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for an Early Learning Center in Chester County Project Allocation 2,000,000 (U) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for historic preservation projects in Chester County Project Allocation 10,000,000 (V) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for an economic development project in Chester County Project Allocation 10,000,000 (W) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for a multipurpose event center in Chester County Project Allocation 10,000,000 (X) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for an aquatic center in Chester County Project Allocation 5,000,000 (Y) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for a regional economic development project Project Allocation 5,000,000 (Z) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for a school in Chester County with an emphasis on Science, Technology, Mathematics and Engineering (STEM) Project Allocation 2,500,000 (AA) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for transit-orientated commercial and residential development projects in Chester County Project Allocation 10,000,000 (BB) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs associated with a mushroom-related business Project Allocation 10,000,000 (CC) Construction, infrastructure improvements and other costs for an aquaponics facility Project Allocation 1,500,000 (DD) Acquisition, construction, infrastructure, abatement, renovations and other related costs for the development of the Downingtown Senior Center Project Allocation 2,500,000 (EE) Construction, infrastructure and other related costs for the construction, furnishings and equipment for Nemours Children's Health System pediatric facility Project Allocation 11,000,000 (i.1) Chadds Ford Borough (A) Construction and other related costs for the renovation and expansion of the Brandywine Conservancy and Museum of Art facilities Project Allocation 6,500,000 (ii) Charlestown Township (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for development project at the University of Valley Forge Project Allocation 20,000,000 (iii) Downingtown Borough (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the development of a parking garage at the Educational Services Center in Downingtown Borough Project Allocation 3,000,000 (iv) East Coventry Township (A) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for the expansion of the Ridge Fire Company Project Allocation 1,000,000 (B) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for Frick's Lock Village Project Allocation 1,000,000 (iv.1) East Goshen Township (A) Construction, acquisition and other related costs for the development of Paoli Pike Trail project Project Allocation 2,777,000 (v) East Vincent Township (A) Renovation, site preparation, construction, rehabilitation and other related costs for the redevelopment of the former Pennhurst State Hospital Project Allocation 10,000,000 (vi) East Whiteland Township (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for Nursing and Science Buildings at Immaculata University Project Allocation 10,000,000 (B) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the People's Light and Theater Expansion development project Project Allocation 2,500,000 (C) Construction, infrastructure, acquisition, redevelopment and other related costs for a pediatric facility Project Allocation 11,000,000 (vii) Easttown Township (A) Construction, infrastructure improvements and other costs for the renovation of the Devon Train Station Project Allocation 10,000,000 (viii) Honey Brook Borough (A) Construction, renovation, infrastructure improvements and other costs for the Honey Brook Warehouse and Coffee community project Project Allocation 2,500,000 (viii.1) Kennett Township (A) Acquisition, infrastructure, rehabilitation, construction and other related costs for the Indoor Agriculture Center of Excellence Project Allocation 5,000,000 (B) Acquisition, infrastructure, rehabilitation, construction and other related costs for the new Kennett Township Library Project Allocation 5,000,000 (viii.2) Kennett Square Borough (A) Construction and other related costs to build the Kennett Library Project Allocation 5,000,000 (ix) London Britain Township (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for projects in the London Tract Historic District Project Allocation 10,000,000 (x) Lower Oxford Township (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the development of Lincoln University Project Allocation 25,000,000 (xi) New Garden Township (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the redevelopment of the Village of Toughkenamon in New Garden Township Project Allocation 10,000,000 (xii) Oxford Borough (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the restoration of the Old Oxford Borough Theater Project Allocation 2,500,000 (xiii) Phoenixville Borough (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the development of a hotel in Phoenixville Borough Project Allocation 10,000,000 (B) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the development of municipal infrastructure projects in Phoenixville Borough Project Allocation 10,000,000 (C) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the former Phoenixville Steel Site Project Allocation 40,000,000 (D) Construction and other related costs for the expansion, renovation and development of the Phoenixville Fire Company Project Allocation 2,000,000 (xiv) South Coatesville Borough (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for a revitalization project in South Coatesville Project Allocation 2,500,000 (xiv.1) Spring City Borough (A) Construction, infrastructure and other related costs for a parking and safety project in Spring City Borough Project Allocation 500,000 (xiv.2) Thornbury Township (A) Construction and other related costs for the development and renovation of Thornbury Township Municipal Building Project Allocation 550,000 (xv) Tredyffrin Township (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the restoration of the expansion of the Paoli Fire Company Project Allocation 1,000,000 (xv.1) Uwchlan Township (A) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other related costs for the West Pharmaceutical Chester County construction project Project Allocation 5,000,000 (xvi) West Bradford Township (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the development of a municipal complex in West Bradford Township Project Allocation 25,000,000 (xvi.1) West Caln Township (A) Acquisition, construction, infrastructure, abatement, renovations and other related costs for the Locust Lane Riding Center Project Allocation 2,500,000 (xvii) West Chester Borough (A) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the expansion of the FAME Fire Company Project Allocation 2,500,000 (B) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the development of a public works building in West Chester Borough Project Allocation 6,000,000 (C) Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the development of a community grocery and market Project Allocation 10,000,000 (D) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for the Westside Community Center development project Project Allocation 5,000,000 (E) Construction, acquisition and other related costs for the development of a public works facility Project Allocation 500,000 (F) Construction, infrastructure, redevelopment and other related costs for the renovation and expansion of a history center Project Allocation 1,000,000 (xvii.1) West Goshen Township (A) Construction and other related costs for the expansion of Fame Fire Company Project Allocation 1,800,000 (xviii) West Whiteland Township (A) Construction, demolition, renovation, new infrastructure and fitout costs for repurposing of Exton Mall Project Allocation 12,000,000 (xix) Chester County Industrial Development Authority (A) Acquisition, redevelopment, renovation/rehabilitation, construction, infrastructure improvements and abatement of hazardous materials for the redevelopment of Cheyney University Project Allocation 10,000,000 (B) Renovation, site preparation, construction, rehabilitation and other related costs associated with the redevelopment of the former Pennhurst State Mental Hospital Project Allocation 10,000,000 (xx) Chester County Economic Development Council (A) Acquisition, construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other related costs for Frick's Lock Village in East Coventry Township Project Allocation 1,000,000 (B) Construction, acquisition, redevelopment and other related costs for the renovation, site preparation and rehabilitation of the former Pennhurst State Hospital in East Vincent Township Project Allocation 10,000,000 (C) Acquisition, construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other related costs for nursing and science buildings at Immaculata University in East Whiteland Township Project Allocation 20,000,000 (D) Construction, infrastructure, redevelopment, renovation/rehabilitation, infrastructure, abatement of hazardous materials and other related costs for the People's Light and Theater Company expansion development project in East Whiteland Township Project Allocation 1,000,000 (E) Acquisition, redevelopment, renovation, rehabilitation, construction, infrastructure improvements, abatement of hazardous materials and other related costs for the development of Lincoln University Project Allocation 10,000,000 (F) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project in multiple municipalities Project Allocation 20,000,000 (G) Acquisition, redevelopment, renovation/rehabilitation, construction, infrastructure improvements and abatement of hazardous materials for the redevelopment of the Village of Toughkenamon in New Garden Township Project Allocation 2,000,000 (H) Acquisition, construction, redevelopment, renovation/rehabilitation, infrastr ucture, abatement of hazardous materials and other related costs for an economic development project Project Allocation 1,500,000 (I) Acquisition, construction, redevelopment, renovation/rehabilitation, infrastructure, abatement of hazardous materials and other related costs for an economic development project in the county Project Allocation 5,000,000 (J) Acquisition, construction, infrastructure, redevelopment and other related costs for the Chester County Stadium development project Project Allocation 20,000,000 (K) Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other related costs for redeveloping an industrially zoned site into a modern, regional commercial park Project Allocation 2,500,000 (L) Acquisition, redevelopment, renovation/rehabilitation, construction, infrastructure improvements, abatement of hazardous materials and other related costs for a multipurpose event center Project Allocation 10,000,000 (M) Acquisition, infrastructure, redevelopment, renovation, rehabilitation, construction, abatement of hazardous materials and other related costs for improvements to park facilities in the county Project Allocation 20,000,000 (N) Construction, rehabilitation, redevelopment, infrastructure and other related costs to renovate an existing building to be used as a new magnet school with an emphasis on Science, Technology, Math and Engineering (STEM) Project Allocation 2,500,000 (O) Construction, acquisition, redevelopment and other related costs for a community center Project Allocation 10,000,000 (P) Redevelopment, acquisition, rehabilitation, construction, infrastructure and other related costs to renovate an existing building to be used as an early learning center Project Allocation 2,000,000 (Q) Construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other related costs for enhancements at Devereux facilities Project Allocation 6,000,000 (R) Acquisition, construction, redevelopment, renovation/rehabilitation, infrastructure, abatement of hazardous materials and other related costs for community redevelopment projects in the county Project Allocation 9,500,000 (S) Acquisition, construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other related costs for the restoration of the Old Oxford Borough Theater Project Allocation 1,000,000 (T) Construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other costs related to the CCIU Educational Services Center Parking Garage project in Downingtown Borough Project Allocation 3,000,000 (U) Acquisition, construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other related costs for the expansion of the Ridge Fire Company in East Coventry Township Project Allocation 1,000,000 (V) Acquisition, redevelopment, renovation, rehabilitation, construction, infrastructure improvements, abatement of hazardous materials and other related costs for the development of Cheyney University Project Allocation 10,000,000 (W) Acquisition, construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other related costs for the former Phoenixville Steel site Project Allocation 1,250,000 (X) Acquisition, construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other related costs for a revitalization project in South Coatesville Project Allocation 1,552,000 (Y) Acquisition, construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other related costs for the expansion of the Paoli Fire Company Project Allocation 1,000,000 (Z) Acquisition, construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other related costs for the Paoli Transit Center in Tredyffrin Township and Willistown Township Project Allocation 20,000,000 (AA) Acquisition, construction, infrastructure, redevelopment, renovation/rehabilitation, abatement of hazardous materials and other related costs for the expansion of the FAME Fire Company Project Allocation 1,000,000 (16) Clarion County (i) County projects (A) Development, construction, acquisition of equipment and other related costs for an economic expansion project Project Allocation 3,200,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 2,000,000 (C) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 20,000,000 (D) Infrastructure, construction and other related costs for the rehabilitation of the historic Clarion Fire Hall, including roofing, interior and exterior improvements and new facade Project Allocation 550,000 (E) Infrastructure, construction and other related costs for the Greenville Avenue sidewalk project running from Reinhard Village to Clarion University Project Allocation 500,000 (F) Acquisition, infrastructure, site planning, construction and other related costs for redevelopment of the O-I Clarion site Project Allocation 1,000,000 (ii) Knox Borough (A) Acquisition, construction, infrastructure, equipment, redevelopment and other related costs for an economic development project in the borough Project Allocation 5,000,000 (iii) Monroe Township (A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs to acquire land and develop, engineer and construct an indoor/outdoor multiuse facility to accommodate multiple athletic trainings and events, sports medicine and physical therapy offices and treatment spaces, convention/conference space, construct a secure data center with shared business space and construct energy-efficient housing Project Allocation 24,250,000 (17) Clearfield County (i) City of DuBois (A) Acquisition, construction and other related costs for a sports and performing arts arena Project Allocation 10,000,000 (B) Acquisition, construction and other related costs for a new Municipal and Emergency services building Project Allocation 5,000,000 (C) Improvements to the City of DuBois public recreational areas Project Allocation 2,000,000 (D) Acquisition, construction, infrastructure and other related costs for a state of the art emergency services training facility Project Allocation 2,500,000 (ii) Clearly Ahead Clearfield County Economic Development Corporation (A) Acquisition, construction, infrastructure, redevelopment and other related costs for the East Broad Top Railroad Project Allocation 17,700,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for economic development projects Project Allocation 10,000,000 (C) Acquisition, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for construction of a two-unit commercial, multioccupancy building in Clearfield Borough Project Allocation 1,000,000 (D) Acquisition, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for construction of a two-unit commercial, multioccupancy building in Curwensville Borough Project Allocation 1,000,000 (18) Clinton County (i) Clinton County Industrial Development Authority (A) Construction, redevelopment, rehabilitation and other related costs for UPMC Susquehanna Lock Haven improvements and facility upgrades Project Allocation 5,000,000 (ii) Clinton County Economic Partnership (A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic project in the county Project Allocation 10,000,000 (19) Columbia County (i) County projects (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a power conversion project at an automotive carpet manufacturing facility Project Allocation 2,000,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a cultural, civic or historical project in the county Project Allocation 5,000,000 (C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for an economic development project in the county Project Allocation 10,000,000 (D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for an expansion of a foundry manufacturing facility Project Allocation 5,000,000 (ii) Columbia County Housing and Redevelopment Authority (A) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 3,000,000 (B) Acquisition, construction, infrastructure, renovation, abatement of hazardous materials and other related costs for redevelopment and reuse of land and buildings, including parking and common area improvements Project Allocation 3,000,000 (C) Acquisition, construction, infrastructure, renovation, abatement of hazardous materials and other related costs for development of the former Bloom Mills property Project Allocation 3,000,000 (D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for redevelopment of the former Moose building and adjoining properties Project Allocation 3,000,000 (E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a hotel and supporting facilities, including, but not limited to, parking and recreation Project Allocation 3,000,000 (20) Crawford County (i) County projects (A) Acquisition, renovation and construction for an in-patient opioid rehabilitation center Project Allocation 1,000,000 (ii) City of Meadville (A) Acquisition, construction, demolition, infrastructure, rehabilitation and other related costs for redevelopment of land parcels and commercial properties within the city Project Allocation 4,000,000 (B) Acquisition, renovation, infrastructure and other related costs for rehabilitation and restoration of the historic Huidekoper House Project Allocation 3,000,000 (iii) Economic Progress Alliance of Crawford County (A) Acquisition, construction, infrastructure, site planning, storm water management, abatement of hazardous materials and other related costs for phases of development at the Keystone Regional Industrial Park Project Allocation 15,000,000 (B) Infrastructure improvements, roadway extension, sanitary sewers, storm water management facilities, utilities infrastructure and water and sewer system improvements at the Keystone Regional Industrial Park Project Allocation 10,000,000 (C) Acquisition, assessment, remediation, demolition and other related costs for redevelopment along Bessemer Street in the City of Meadville Project Allocation 10,000,000 (D) Acquisition, construction, infrastructure, site planning, storm water management, abatement of hazardous materials and other related costs for Phase 2 development and redevelopment for the French Creek Heritage and Entertainment District Initiative Project Allocation 20,000,000 (E) Construction, renovation and infrastructure improvements for the redevelopment of Conneaut Lake Park Project Allocation 10,000,000 (F) Infrastructure, site planning, construction, hazardous materials abatement, storm water management and other related costs for phases of development at the Crawford Business Park Project Allocation 10,000,000 (G) Construction, renovation and redevelopment of the Crawford Business Park Project Allocation 10,000,000 (H) Acquisition, construction, infrastructure, redevelopment and other related costs for historic structures in the county Project Allocation 5,000,000 (I) Acquisition, construction, infrastructure, redevelopment and other related costs for economic development projects in the county Project Allocation 5,000,000 (J) Acquisition, construction, redevelopment and other related costs for economic projects in the county Project Allocation 5,000,000 (iv) Titusville Redevelopment Authority (A) Acquisition, construction, infrastructure, rehabilitation and other related costs for development of a pedestrian bridge across Oil Creek in the City of Titusville Project Allocation 1,000,000 (B) Acquisition, construction, infrastructure, rehabilitation and other related costs for redevelopment of abandoned blighted properties located within the City of Titusville Project Allocation 1,500,000 (C) Renovation and rehabilitation of old steel mill buildings within the Titusville Opportunity Park in the City of Titusville Project Allocation 1,500,000 (D) Acquisition, rehabilitation, construction and other related costs for redevelopment of blighted properties located within the downtown area of the City of Titusville Project Allocation 1,500,000 (21) Cumberland County (i) County projects (A) Acquisition, construction and infrastructure development for a neighborhood redevelopment project Project Allocation 1,000,000 (i.1) Carlisle Borough (A) Design, construction, renovation, infrastructure and other related costs to support the rehabilitation of the Carlisle Regional Performing Arts Center Project Allocation 5,000,000 (B) Construction, renovation, rehabilitation, infrastructure improvements, including, but not limited to, security enhancements, HVAC and plumbing improvements, elevator installation, public accessibility improvements, rehabilitation and renovation of building exterior and interior and all other related activities for improvements to the Carlisle Borough Building Project Allocation 1,500,000 (i.2) East Pennsboro Township (A) Acquisition, design, construction, infrastructure, redevelopment, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for a mixed-use economic development project Project Allocation 5,000,000 (ii) New Cumberland Borough (A) Design, inspection, acquisition, demolition, site preparation, infrastructure, utility expansion, abatement/remediation of hazardous materials, addition, construction, renovation, rehabilitation, redevelopment, equipment and other related costs for the West Shore Theater revitalization Project Allocation 2,500,000 (ii.1) Shippensburg Township (A) Infrastructure improvements and construction of the Shippensburg Regional Conference Center Project Allocation 3,000,000 (iii) South Middletown Township (A) Acquisition, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for an economic development project Project Allocation 5,000,000 (iv) Capital Region Economic Development Corporation (A) Construction, infrastructure redevelopment and other related costs for the Penn State Health Hampden Medical Center and Campus Project Allocation 70,000,000 (v) Cumberland County Historical Society (A) Design, inspection, acquisition, demolition, site preparation, infrastructure, abatement/remediation of hazardous materials, construction, renovation, redevelopment and other related costs for the Mt. Tabor Church revitalization Project Allocation 500,000 (vi) Cumberland County Industrial Development Authority (A) Design, inspection, acquisition, demolition, site preparation, infrastructure, utility expansion, abatement/remediation of hazardous materials, addition, construction, renovation, rehabilitation, redevelopment, equipment and other related costs for the Hampden Terminal II redevelopment site Project Allocation 4,000,000 (vii) Cumberland Area Industrial Development Authority (A) Acquisition, demolition, site work, infrastructure, renovation, abatement of hazardous materials and construction related to redevelopment of agricultural expansion Project Allocation 10,000,000 (B) Acquisition, demolition, site work, infrastructure, abatement of hazardous materials, construction and other costs related to the development of a mixed-use, medical, allied health, commercial and educational training facility Project Allocation 10,000,000 (C) Acquisition, demolition, site work, infrastructure, abatement of hazardous materials and construction related to redevelopment projects located in business districts and downtown areas Project Allocation 20,000,000 (22) Dauphin County (i) County projects (A) Acquisition, construction, infrastructure, rehabilitation and other related costs for redevelopment of the State Hospital grounds Project Allocation 20,000,000 (B) Construction and other related costs for a new training facility and office space for the Local 520 Federal Credit Union and renovation of headquarters, assembly room, assembly room bathrooms and kitchen, lobby, front offices, training department offices and conference room Project Allocation 590,000 (C) Construction and other related costs for a new training facility and office space for the Local 520 Federal Credit Union and renovation of headquarters, assembly room and training department offices in West Hanover Township Project Allocation 2,000,000 (ii) City of Harrisburg (A) Design, inspection, acquisition, demolition, site preparation, infrastructure, utility expansion, abatement/remediation of hazardous materials, addition, construction, renovation, rehabilitation, redevelopment, equipment and other related costs for Morning Star Development Project Project Allocation 1,500,000 (B) Acquisition, construction, infrastructure and other related costs for development of a mixed-use building in the Camp Curtin neighborhood Project Allocation 2,000,000 (C) Design, inspection, acquisition, demolition, site preparation, infrastructure, utility expansion, abatement/remediation of hazardous materials, addition, construction, renovation, rehabilitation, redevelopment, equipment and other related costs for the Eco-Village Project Allocation 5,000,000 (D) Design, inspection, acquisition, demolition, site preparation, infrastructure, utility expansion, abatement/remediation of hazardous materials, addition, construction, renovation, rehabilitation, redevelopment, equipment and other related costs for economic and housing projects within the Olde Uptown neighborhood Project Allocation 5,000,000 (E) Acquisition, construction, redevelopment and other related costs of acquiring and developing a parcel of land for commercial, residential and industrial use Project Allocation 15,000,000 (F) Design, civil and land planning, acquisition, demolition, site preparation, abatement/remediation of hazardous materials, paving, restoration, MEP, code compliance, architecture, construction, rehabilitation, redevelopment, equipment, buildout, greenspace, security and other related costs for the 1923 Hudson Building located in the Uptown Harrisburg neighborhood of Camp Curtin Project Allocation 6,000,000 (iii) Hummelstown Borough (A) Acquisition, environmental study, permitting, demolition, construction, infrastructure, renovation and other related costs associated with an economic development project Project Allocation 550,000 (iv) Lower Swatara Township (A) Construction and other related costs for walking trails, ball fields, courts, playground, pavilion, pollinator meadow and parking lot Project Allocation 1,059,000 (iv.1) West Hanover Township (A) Construction, renovation, abatement of hazardous materials and other related costs for construction of a township administration building Project Allocation 750,000 (v) Capital Region Economic Development Corporation (A) Construction, infrastructure, redevelopment and other related costs for a Penn State College of Medicine Research and Learning Facility to house research and academic space to include laboratories, vivarium and imaging labs in addition to instructional studios Project Allocation 100,000,000 (B) Construction, infrastructure, redevelopment and other related costs for the Penn State Milton S. Hershey Medical Center campus Project Allocation 30,000,000 (C) Construction, redevelopment and other related costs associated with the renovation of Wrisberg Hall on the Penn State Harrisburg campus as a laboratory building to support expanding externally sponsored research activity Project Allocation 2,500,000 (D) Construction, infrastructure, redevelopment and other related costs associated with the design, demolition, grading, installation of water, sewer and streets to accommodate the planned redevelopment of the Meade Heights parcel on the Penn State Harrisburg campus as a public-private innovation park Project Allocation 1,750,000 (E) Acquisition, construction, rehabilitation and other related costs for the redevelopment activities of historic properties within a neighborhood of Midtown Harrisburg known as Olde Uptown Project Allocation 5,000,000 (vi) Dauphin County Industrial Development Authority (A) Infrastructure, site preparation, renovation, information technology and construction costs related to the redevelopment of the Whitaker Center for Science and the Arts Project Allocation 10,000,000 (vii) Steelton Economic Development Corporation (A) Acquisition, construction, infrastructure, redevelopment, rehabilitation and other related costs for a community-based medical health center in the Borough of Steelton to expand health service capacity in the area Project Allocation 4,000,000 (viii) Township of Derry Industrial and Commercial (A) Acquisition, site preparation, renovation, construction, infrastructure and other related costs for the development of Hershey West End situated along State Route 322, Waltonville Road, Wood Road and Bullfrog Valley Road Project Allocation 20,000,000 (23) Delaware County (i) County projects (A) Construction, infrastructure improvements, remediation and other costs for the Crozer Keystone Health System renovation project Project Allocation 40,000,000 (B) Land acquisition, infrastructure improvements, demolition, site improvement, renovation, addition, utility expansion, construction, purchase of equipment and other related costs for Riddle Hospital or other facilities of Main Line Health Project Allocation 2,500,000 (C) Acquisition, infrastructure, renovations, construction and other related costs associated with a new public safety facility for Rocky Run Fire Company Project Allocation 5,000,000 (D) Design, infrastructure, abatement of hazardous materials, renovation, construction and other costs related to improvements and upgrades to Doane Residence Hall at Eastern University Project Allocation 1,650,000 (E) Acquisition, design, infrastructure, renovation, construction and other related costs for athletic facilities at Eastern University Project Allocation 12,500,000 (F) Design, construction, renovation, infrastructure and other costs for ADA accessibility and compliance campuswide at Eastern University Project Allocation 1,000,000 (G) Acquisition, construction, abatement of hazardous materials, infrastructure improvements and other costs related to the countywide 911 communication system Project Allocation 10,000,000 (ii) Darby Township (A) Construction, infrastructure, redevelopment and other related costs for a multipurpose training facility Project Allocation 1,700,000 (iii) Eddystone Borough (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the Eddystone Emergency Services Building Project Allocation 1,650,000 (iv) Haverford Township (A) Construction, infrastructure and other related costs for a public library Project Allocation 8,750,000 (v) Media Borough (A) Construction, infrastructure improvements and other costs for Plum Street Mall renovation project Project Allocation 550,000 (vi) Middletown Township (A) Acquisition, infrastructure, renovations, construction and other related costs associated with open space and trails Project Allocation 5,000,000 (B) Acquisition, infrastructure, renovations, construction and other related costs associated with the Middletown Library facility Project Allocation 500,000 (vii) Nether Providence Township (A) Acquisition, infrastructure, rehabilitation, construction and other related costs for cultural, civic or historic facilities Project Allocation 4,000,000 (viii) Newtown Township (A) Acquisition, construction, demolition, infrastructure improvements and other costs for Marple Newtown Soccer Association expansion Project Allocation 1,250,000 (ix) Norwood Borough (A) Construction and other related costs for a new borough hall Project Allocation 2,500,000 (x) Prospect Park Borough (A) Construction, infrastructure improvements and other costs for Route 420 and Prospect Park Flood Mitigation and downtown redevelopment Project Allocation 2,500,000 (xi) Radnor Township (A) Construction, infrastructure and other related costs for the South Wayne Avenue flood reduction project Project Allocation 1,025,000 (xii) Ridley Park Borough (A) Construction, infrastructure improvements and other costs for Ridley Park Borough Building renovation and preservation Project Allocation 500,000 (xiii) Ridley Township (A) Construction, infrastructure improvements and other costs for Senior Community Services, Inc., Schoolhouse Center expansion Project Allocation 750,000 (B) Construction, infrastructure improvements and other costs for Healthplex renovation project Project Allocation 1,000,000 (xiv) Sharon Hill (A) Construction, infrastructure, renovation and other costs related to the Darby Township Volunteer Fire Company #4 remodel project Project Allocation 1,000,000 (xv) Upper Darby Township (A) Acquisition, construction, redevelopment and other related costs for renovation of Drexelbrook Project Allocation 1,000,000 (B) Acquisition, demolition, remediation, construction, renovations and other costs for the Delaware County Community College Project Allocation 10,000,000 (C) Redevelopment, construction, demolition, infrastructure and other related costs for commercial and retail development of Upper Darby Township 69th Street corridor Project Allocation 5,000,000 (xvi) Yeadon Borough (A) Construction, infrastructure improvements, redevelopment and other related costs to the Nile Swim Club Project Allocation 1,000,000 (xvii) Chester Economic Development Authority (A) Acquisition, remediation, redevelopment, renovation, infrastructure and other related costs for capital improvements to Silvercare Subacute Care Project Allocation 2,500,000 (xviii) Delaware County Industrial Development Authority (A) Acquisition, remediation, redevelopment, renovation, site infrastructure and other related costs for capital improvements and expansion of Power Home Remodeling Group, Inc. Project Allocation 5,000,000 (B) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for capacity expansion at an existing marine terminal Project Allocation 10,000,000 (xix) Delaware County Redevelopment Authority (A) Acquisition, construction, renovations, infrastructure and other related costs for the Neuro ICU and SDU expansion at Crozer- Chester Medical Center Project Allocation 500,000 (B) Acquisition, construction, renovations, infrastructure and other costs related to the Women's Unit at Crozer-Chester Medical Center Project Allocation 500,000 (C) Acquisition, design, construction, infrastructure and other costs related to the construction of the Prospect Medical East Coast Business Office Project Allocation 2,000,000 (D) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for relocation of the Community Transit of Delaware County Headquarters Project Allocation 2,500,000 (E) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for capital improvements to the Rocky Run Fire Company No. 1 Project Allocation 4,000,000 (F) Acquisition, design, infrastructure, construction and other related costs for an access ramp within Crozer-Chester Medical Center to allow for ingress and regress Project Allocation 5,000,000 (G) Acquisition, construction, renovations, infrastructure and other related costs for central heating and cooling systems upgrades at Crozer-Chester Medical Center Project Allocation 5,600,000 (H) Acquisition, design, construction, infrastructure and other related costs for a Microhospital at Brinton Lake Project Allocation 9,000,000 (I) Demolition, infrastructure, construction, environmental remediation and other related costs for redevelopment of the former Sleighton School property in Middletown and Edgmont Townships Project Allocation 10,000,000 (J) Construction, expansion, infrastructure improvements, demolition, environmental remediation and other related costs for implementation of the Elwyn campus master plan in Middletown Township Project Allocation 15,000,000 (K) Demolition, site preparation, renovation, infrastructure, environmental remediation, equipment, construction and related costs for a plant modernization and energy efficiency project at Monroe Energy's plant in Trainer Borough Project Allocation 20,000,000 (L) Acquisition, design, construction, infrastructure and other costs related to the expansion of the Neurosciences Research Facility of Crozer-Chester Medical Center Project Allocation 50,000,000 (M) Design, construction, demolition, abatement of hazardous materials, extensions or upgrading of utilities and other infrastructure needs and other related costs for athletic facilities at the Brandywine campus of The Pennsylvania State University Project Allocation 10,000,000 (N) Construction, infrastructure, acquisition, redevelopment and other costs related to conversion and upgrade of a hospital in Upper Darby Township Project Allocation 2,000,000 (O) Construction, redevelopment, infrastructure and other costs related to the improvements of medical or health care facilities in Upper Darby Township Project Allocation 500,000 (P) Construction, redevelopment, infrastructure and other costs related to a laboratory associated with a hospital in Upper Darby Township Project Allocation 3,500,000 (Q) Construction, redevelopment, infrastructure and other related costs for a women's health unit associated with a hospital in Upper Darby Township Project Allocation 500,000 (R) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project Project Allocation 20,000,000 (S) Construction, infrastructure, redevelopment and related costs for the plant modernization and energy efficiency project at Monroe Energy's plant in Trainer Borough Project Allocation 20,000,000 (24) Elk County (i) Elk County Redevelopment Authority (A) Acquisition, construction, infrastructure and other related costs to develop a retail facility Project Allocation 5,000,000 (25) Erie County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for a Federally Qualified Health Center (FQHC) anchored multiservice facility Project Allocation 1,000,000 (i.1) Erie County General Authority (A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs associated with the expansion of the facilities of Erie Homes for Children and Adults, Inc. (EHCA) Project Allocation 5,000,000 (i.2) City of Erie (A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for renovation and rehabilitation of the former Wayne School building Project Allocation 9,000,000 (B) Acquisition, construction, infrastructure, remediation, redevelopment and related costs for improvement of properties within and neighboring the City of Erie's 12th Street Industrial Corridor Project Allocation 20,000,000 (C) Construction, infrastructure, acquisition, redevelopment and other costs related to the renovation of St. Vincent Hospital Project Allocation 10,000,000 (i.3) Millcreek Township (A) Construction, infrastructure and other related costs for the upgrade and expansion of an airport in Millcreek Township Project Allocation 2,500,000 (ii) North East Borough (A) Construction, acquisition, redevelopment, renovation, rehabilitation, infrastructure improvement and abatement of hazardous materials in support of the Sustain North East initiative Project Allocation 10,000,000 (B) Acquisition, renovation, infrastructure, construction, abatement of hazardous materials and other related costs for Mercyhurst University campus Project Allocation 25,000,000 (iii) Union City Borough (A) Acquisition, construction, infrastructure and other related costs for a new medical building to house the Union City Rural Health Clinic Project Allocation 700,000 (iv) Redevelopment Authority in the City of Corry (A) Construction, infrastructure, rehabilitation and other related costs for renovations and upgrades to the Corry YMCA building Project Allocation 900,000 (B) Renovation, rehabilitation and other related costs for redevelopment of the City Garage into a central, four municipality region firehouse Project Allocation 1,250,000 (v) City of Erie Economic Development (A) Acquisition, redevelopment, renovation and other related costs for construction and expansion of the Performing Artists' Collective Alliance (PACA) Project Allocation 1,800,000 (vi) Erie County Redevelopment Authority (A) Acquisition, renovation, infrastructure, construction and other related costs for Mercyhurst University campus Project Allocation 20,000,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the Barber National Institute Group Home Project Project Allocation 5,000,000 (C) Construction, infrastructure, renovation and other related costs for the Sarah A. Reed Children's Center expansion project in Millcreek Township Project Allocation 1,100,000 (D) Erie Maritime Museum - U.S. Brig Niagara - Building and exhibit improvements Project Allocation 2,000,000 (E) Erie Maritime Museum - U.S. Brig Niagara - U.S. Brig Niagara reconstruction Project Allocation 10,000,000 (F) Erie Maritime Museum - U.S. Brig Niagara - U.S. Brig Niagara restoration Project Allocation 7,000,000 (G) Erie Maritime Museum - U.S. Brig Niagara - Procurement of sailing school vessel Project Allocation 2,000,000 (H) Acquisition, infrastructure, improvements, redevelopment, construction and other related costs for an industrial and business park and/or properties Project Allocation 10,000,000 (I) Construction, acquisition, improvement, redevelopment and other related costs of residential properties suitable and appropriate for persons with intellectual disabilities and physical challenges Project Allocation 5,000,000 (J) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for the expansion of Erie Homes for Children and Adults facilities Project Allocation 5,000,000 (26) Fayette County (i) County projects (A) Construction, reconstruction, renovation, rehabilitation, restoration, replacement, preservation, installation and improvements of new and existing facilities and infrastructure at Highlands Hospital Project Allocation 25,000,000 (ii) Brownsville Borough (A) Construction, infrastructure, acquisition, redevelopment and other related costs for redevelopment projects Project Allocation 10,000,000 (iii) Redstone Township (A) Construction, infrastructure and other related costs for a mixed- use redevelopment project in Redstone Township Project Allocation 20,000,000 (27) Forest County (Reserved) (28) Franklin County (i) County projects (A) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for a community and/or economic development project Project Allocation 5,000,000 (ii) Guilford Township (A) Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for an industrial development project along Interstate 81 Project Allocation 4,000,000 (iii) Mercersburg Borough (A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a revitalization project Project Allocation 3,000,000 (iv) Quincy Township (A) Site preparation, acquisition, renovation, construction, infrastructure and other related costs for development of a commercial town center Project Allocation 3,000,000 (v) Washington Township (A) Acquisition, renovation, construction, redevelopment, infrastructure and other associated costs for a municipal and/or emergency services facility Project Allocation 2,500,000 (vi) Borough of Waynesboro (A) Acquisition, renovation, construction, redevelopment, infrastructure and other related costs for an emergency services or public safety facility Project Allocation 2,500,000 (vii) Franklin County Area Development Corporation (A) Construction and infrastructure improvements related to economic development in the vicinity of Interstate 81, PA Exit 3, Antrim Township Project Allocation 10,000,000 (29) Fulton County (i) County projects (A) Construction, infrastructure and other related costs for improvements to the Fulton County Medical Center Project Allocation 5,000,000 (B) Construction, renovation, rehabilitation and other related costs for the Fulton County Area Vocational Technical School Project Allocation 15,000,000 (30) Greene County (i) County projects (A) Acquisition, infrastructure and other related costs for construction of an ethane storage hub Project Allocation 15,000,000 (B) Construction, acquisition, redevelopment, infrastructure and other related costs for streetscape improvement projects throughout the county Project Allocation 5,000,000 (C) Acquisition, infrastructure improvements, construction and other costs related to a recreation center Project Allocation 5,000,000 (D) Construction, acquisition, redevelopment, infrastructure and other related costs for economic development projects throughout the county Project Allocation 25,000,000 (E) Construction, acquisition, redevelopment, infrastructure and other related costs for economic development projects throughout the county Project Allocation 5,000,000 (F) Acquisition, infrastructure improvements, construction and other costs related to a health care project Project Allocation 5,000,000 (G) Acquisition, infrastructure improvements, construction and other costs related to a business industrial park Project Allocation 5,000,000 (H) Acquisition, infrastructure improvements, construction and other costs related to a reclamation project Project Allocation 5,000,000 (I) Acquisition, infrastructure improvements, construction and other costs related to a medical facility Project Allocation 5,000,000 (J) Acquisition, infrastructure improvements, construction and other costs related to a beautification project Project Allocation 5,000,000 (K) Construction, acquisition, redevelopment, infrastructure and other related costs for redevelopment projects throughout the county Project Allocation 5,000,000 (L) Acquisition, infrastructure improvements, construction and other related costs for a manufacturing facility Project Allocation 5,000,000 (M) Construction, acquisition, redevelopment and other related costs for a facility to support the storage, transportation and processing of natural gas Project Allocation 20,000,000 (N) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for the improvement and renovation of the former East Franklin School Project Allocation 2,578,000 (ii) Franklin Township (A) Construction, acquisition, redevelopment and other related costs for a new business complex Project Allocation 3,000,000 (iii) Greene County Industrial Development Corporation (A) Construction, equipment and machinery, including, but not limited to, a face drill, single broom roof bolter and auxiliary ventilation fan, belt winder, mantrip and skid steer, and other related costs for training and retraining coal miners at the GMS American Mining Academy and Career Center site Project Allocation 1,000,000 (31) Huntingdon County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for the September 11th National Memorial Trail and Mainline Canal Greenway Trail Project Allocation 2,000,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a Huntingdon County economic development capital project Project Allocation 2,000,000 (C) Construction, renovation, rehabilitation and other related costs for the Huntingdon County Business and Industry (HCBI) office facilities redevelopment project Project Allocation 3,475,000 (D) Construction, renovation and other related costs for ADA compliance and security-related upgrades to the Huntingdon County Courthouse Project Allocation 1,000,000 (E) Acquisition, construction, infrastructure and other related costs for a multipurpose correctional facility Project Allocation 2,000,000 (i.1) Central Pennsylvania Railroad and Industrial Heritage Corporation (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the East Broad Top Railroad, including the development of other recreational amenities Project Allocation 40,000,000 (ii) Mount Union Borough (A) Construction, infrastructure and other related costs for completion of the Pennsylvania Avenue corridor reconstruction and Linear Park enhancements Project Allocation 1,000,000 (iii) Walker Township (A) Acquisition, construction, redevelopment and other related costs for the Walker Township multiuse Municipal Center Project Allocation 875,000 (iv) Wood Township Supervisors (A) Acquisition, construction, infrastructure and other related costs for a senior housing project Project Allocation 950,000 (v) Huntingdon County Business and Industry (A) Construction, infrastructure, redevelopment, renovation and other related costs for preparation of lots, permitting and building of office space and spec shell buildings in the Riverview Business Center Project Allocation 3,475,000 (B) Construction, infrastructure, redevelopment, renovation and other related costs for the Huntingdon County Business and Industry facilities and shared tenant space Project Allocation 1,028,000 (vi) Huntingdon County Redevelopment Authority (A) Acquisition, construction, reconstruction, renovation, rehabilitation, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and all other related costs for the renovation and expansion of the Huntingdon Center of Penn Highlands Community College Project Allocation 2,000,000 (32) Indiana County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for a cultural or civic project Project Allocation 4,000,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development/business park project Project Allocation 6,000,000 (C) Acquisition, construction, infrastructure and other related costs for an economic development/building project Project Allocation 4,000,000 (D) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 8,000,000 (E) Construction, infrastructure, acquisition and related development costs for office building projects Project Allocation 2,000,000 (F) Construction, infrastructure, acquisition and other related development costs for anchor building improvements Project Allocation 5,000,000 (G) Construction, infrastructure, acquisition and other related development costs for an industrial building project Project Allocation 6,000,000 (H) Construction, infrastructure, acquisition and other related development costs for an economic development project Project Allocation 10,000,000 (I) Construction, infrastructure, acquisition and related development costs for improvements at the Jimmy Stewart Airport Project Allocation 5,000,000 (J) Construction, infrastructure, acquisition and other related development costs for multitenant building projects Project Allocation 5,000,000 (K) Construction, infrastructure, acquisition and other related development costs for a commercial economic development project Project Allocation 3,000,000 (ii) Blairsville Borough (A) Design, inspection, acquisition, demolition, site preparation, infrastructure, utility expansion, abatement/remediation of hazardous materials, addition, construction, renovation, rehabilitation, redevelopment, equipment and other related costs for the Blairsville Terminal Expansion Project Training Center Project Allocation 2,000,000 (B) Acquisition of land, construction and other related costs associated with the construction of a building to house a grocery store Project Allocation 750,000 (C) Construction, infrastructure and other related costs associated with the development of affordable housing at Grandview Point Project Allocation 500,000 (iii) Indiana County Development Corporation (A) Acquisition, construction, reconstruction, renovation, rehabilitation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and all other related costs for the acquisition, renovation and infrastructure needs of the former S. W. Jack Towers Project Allocation 1,050,000 (B) Excavation, construction, infrastructure and other costs related to a new natural gas distribution pipeline to the Seward Power Plant located in New Florence Project Allocation 9,000,000 (33) Jefferson County (i) County projects (A) Acquisition, design, rehabilitation, construction, infrastructure improvements and other related costs for a downtown development project in the county Project Allocation 5,000,000 (34) Juniata County (i) County projects (A) Renovation of the former Juniata County Prison for development of a Public Safety Center and Community Conference Center Project Allocation 1,000,000 (35) Lackawanna County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for an economic development project at the Valley View Business Park Project Allocation 2,500,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in South Abington Township Project Allocation 3,500,000 (C) Acquisition, construction, infrastructure and other related costs for the redevelopment of Lackawanna County Stadium Project Allocation 5,000,000 (D) Acquisition, construction, infrastructure and other related costs for expansion of a Lakeland School District facility Project Allocation 5,000,000 (E) Acquisition, construction, infrastructure and other related costs for campus parking and street redevelopment for Lackawanna College campus in Scranton Project Allocation 3,000,000 (F) Acquisition, construction, infrastructure and other related costs for an economic development project at Lackawanna College Learning and Technology Center Project Allocation 5,000,000 (G) Acquisition, construction, infrastructure and other related costs for an athletic facility at Lackawanna College Project Allocation 10,000,000 (H) Acquisition, construction, infrastructure and other related costs for a historic building at Lackawanna College Project Allocation 5,000,000 (I) Acquisition, construction, infrastructure and other related costs for an E-Sports Arena at Lackawanna College Project Allocation 10,000,000 (J) Acquisition, construction, infrastructure and other related costs for an economic development project in Lackawanna County Project Allocation 10,000,000 (K) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 3,000,000 (L) Acquisition, construction, infrastructure, redevelopment and other related costs for Fidelity Bank headquarters Project Allocation 5,000,000 (ii) Archbald Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Archbald Borough Project Allocation 3,000,000 (B) Acquisition, construction, infrastructure and other related costs for the Casey Casa Silverbrook site Project Allocation 3,000,000 (C) Construction, renovation, infrastructure and other costs related to Archbald Route 6 industrial facility Project Allocation 2,000,000 (iii) Blakely Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Blakely Borough Project Allocation 3,000,000 (iii.1) City of Carbondale (A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in the City of Carbondale Project Allocation 5,000,000 (iv) City of Scranton (A) Acquisition, construction, infrastructure and other related costs for an economic development project in the City of Scranton Project Allocation 3,000,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in the City of Scranton Project Allocation 3,500,000 (C) Acquisition, construction, infrastructure and other related costs for an economic development project on Franklin Avenue in Downtown Scranton Project Allocation 3,000,000 (D) Acquisition, construction, infrastructure and other related costs for an economic development project on Spruce Street in Scranton Project Allocation 2,500,000 (E) Acquisition, construction, infrastructure and other related costs for an economic development project on Mulberry Street in Scranton Project Allocation 7,000,000 (F) Acquisition, construction, infrastructure and other related costs for an economic development project on 7th Avenue in Scranton Project Allocation 10,000,000 (G) Acquisition, construction, infrastructure and other related costs for a multipurpose stadium in the City of Scranton Project Allocation 15,000,000 (H) Acquisition, construction, infrastructure and other related costs for an economic development project on Olive Street in Scranton Project Allocation 3,000,000 (I) Acquisition, construction, infrastructure and other related costs for an economic development project at Montage Mountain Project Allocation 5,000,000 (J) Acquisition, construction, infrastructure and other related costs for an Early Learning Center for the Scranton Lackawanna Human Development Agency Project Allocation 5,000,000 (K) Acquisition, construction, infrastructure and other related costs for an economic development project at 401 Adams Avenue in Scranton Project Allocation 7,000,000 (L) Acquisition, construction, infrastructure and other related costs for the redevelopment of Reddington Hall on the Johnson College campus in Scranton Project Allocation 5,000,000 (M) Acquisition, construction, infrastructure and other related costs for an economic development project in the 100 Block of Penn Avenue in Downtown Scranton Project Allocation 3,000,000 (N) Acquisition, construction, infrastructure and other related costs for an economic development project in the 100 and 200 Block of Mifflin Avenue in Downtown Scranton Project Allocation 3,000,000 (O) Acquisition, construction, infrastructure and other related costs for an economic development project on Capouse Avenue in Downtown Scranton Project Allocation 10,000,000 (P) Acquisition, construction, infrastructure and other related costs for a mixed-use facility for Scranton Lackawanna Human Development Agency Project Allocation 5,000,000 (Q) Construction, infrastructure, acquisition, redevelopment and other related costs for the consolidation, modernization, improvement and purchase of an emergency forces training facility in the City of Scranton Project Allocation 3,500,000 (R) Construction, remodeling, rehabilitation, infrastructure, acquisition, redevelopment and other related costs of a hospital/health care facility Project Allocation 6,000,000 (S) Acquisition, construction, infrastructure and other related costs for a primary care clinic Project Allocation 4,500,000 (T) Construction, infrastructure, redevelopment and other related costs for the Laceworks complex Project Allocation 4,500,000 (U) Construction consolidation, modernization, upgrade facilities within the Scranton School District Project Allocation 5,200,000 (V) Renovation, construction and other costs related to the rehabilitation of Geneva House in downtown Scranton to improve quality, affordable housing for the senior population Project Allocation 3,000,000 (W) Acquisition, design, demolition, construction, infrastructure and other costs for a public building in the City of Scranton Project Allocation 15,000,000 (X) Construction, infrastructure, acquisition, redevelopment, expansion and other costs related to the restoration and redevelopment of an area to be used for parks and recreation activities Project Allocation 2,000,000 (Y) Construction, infrastructure, remediation, acquisition, redevelopment, demolition and other costs related to the economic and social improvement of residential, commercial or industrial areas Project Allocation 2,000,000 (Z) Construction, infrastructure, acquisition, redevelopment and other costs related to an economic development project in the Scranton area Project Allocation 5,000,000 (AA) Construction, infrastructure, recreation, restoration and other costs related to the revitalization of Nay Aug Park Project Allocation 1,500,000 (BB) Acquisition, renovation, infrastructure, construction and other costs related to the Scranton School District recovery program Project Allocation 5,000,000 (iv.1) Carbondale Township (A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in Carbondale Township Project Allocation 3,500,000 (v) Clarks Summit Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Clarks Summit Borough Project Allocation 3,500,000 (v.1) Dickson City Borough (A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in Dickson City Borough Project Allocation 3,500,000 (vi) Dunmore Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Dunmore Borough Project Allocation 3,000,000 (vi.1) Glenburn Township (A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in Glenburn Township Project Allocation 3,500,000 (vi.2) Greenfield Township (A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in Greenfield Township Project Allocation 3,500,000 (vii) Jessup Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Jessup Borough Project Allocation 3,000,000 (vii.1) Mayfield Borough (A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in Mayfield Borough Project Allocation 3,500,000 (viii) Moosic Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Moosic Borough Project Allocation 5,000,000 (B) Construction, infrastructure, acquisition, redeveloping and other related costs for an economic development project in Moosic Borough Project Allocation 3,500,000 (viii.1) North Abington Township (A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in North Abington Township Project Allocation 3,500,000 (viii.2) Old Forge Borough (A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in Old Forge Borough Project Allocation 3,500,000 (ix) Olyphant Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Olyphant Borough Project Allocation 3,000,000 (B) Acquisition, construction, rehabilitation, infrastructure, abatement, redevelopment and other related costs of an area adjacent to Marshwood Road east of the Casey Highway in Olyphant Borough Project Allocation 7,500,000 (x) Scott Township (A) Acquisition, construction, infrastructure and other related costs for the Scott Technology Park facility Project Allocation 3,000,000 (B) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in Scott Township Project Allocation 3,500,000 (x.1) Taylor Borough (A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in Taylor Borough Project Allocation 3,500,000 (xi) Throop Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Throop Borough Project Allocation 3,000,000 (xii) Waverly Township (A) Construction, infrastructure, acquisition, redevelopment and other related costs for an economic development project in Waverly Township Project Allocation 3,500,000 (36) Lancaster County (i) Adamstown Borough (A) Acquisition, design, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs, including machinery and equipment, for an economic development project in the borough Project Allocation 15,000,000 (B) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation, restoration and other related costs for a community asset project in the borough Project Allocation 5,000,000 (i.1) City of Lancaster (A) Acquisition, infrastructure, construction, redevelopment and other related costs for the Manor Street Corridor economic development project Project Allocation 10,000,000 (B) Acquisition, infrastructure, construction, redevelopment and other related costs for the Conestoga River Plaza economic development project Project Allocation 7,500,000 (C) Acquisition, infrastructure, construction, redevelopment and other related costs for the Harrisburg Pike Corridor economic development project Project Allocation 10,000,000 (D) Acquisition, infrastructure, construction, redevelopment and other related costs for the South Queen Street Corridor economic development project Project Allocation 10,000,000 (E) Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the northeastern area Project Allocation 10,000,000 (F) Acquisition, design, infrastructure, construction and other related costs for a mixed-use facility in the center of the city to be utilized by Millersville University, community services and shopping venues Project Allocation 10,000,000 (G) Acquisition, infrastructure improvements, construction and other costs related to a reclamation project Project Allocation 10,000,000 (H) Acquisition, infrastructure, construction, redevelopment and other related costs for the area along the Conestoga River Waterfront that borders the southeast quadrant of the City of Lancaster Project Allocation 10,000,000 (I) Acquisition, infrastructure improvements, construction and other costs related to the expansion and renovation of a medical center facility Project Allocation 5,000,000 (J) Construction, infrastructure, acquisition, redevelopment and other related costs for the strategic reuse of the former UPMC building located along College Avenue Project Allocation 10,000,000 (K) Construction, renovation and other related costs for fire public safety infrastructure Project Allocation 5,000,000 (ii) East Donegal Township (A) Acquisition, redevelopment, renovations, construction, infrastructure and other related costs for airport improvements Project Allocation 5,000,000 (iii) East Hempfield Township (A) Acquisition, design, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for the Treasures of Hope Foundation warehouse, supporting a discount grocery and thrift shop Project Allocation 2,000,000 (B) Acquisition, redevelopment, renovation, construction, infrastructure and/or other associated costs related to the expansion of organic foods manufacturing operations at a facility on Richardson Drive Project Allocation 2,000,000 (iii.1) Borough of Mount Joy (A) Acquisition, demolition, construction, renovation and other related costs for a new building or buildings to serve as the offices for the Mount Joy Borough Police Department, council chambers, administrative offices and the departments of Borough Administration, Codes Enforcement and Borough Planning Project Allocation 2,483,000 (B) Acquisition, construction and other related costs for an aquatic and recreational facility Project Allocation 5,500,000 (iii.2) Ralpho Township (A) Acquisition, design, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs, including machinery and equipment, for a 413,860-square-foot building situated on 30 acres in the township Project Allocation 10,000,000 (iv) Capital Region Economic Development Corporation (A) Construction, infrastructure, redevelopment and other related costs for the Penn State Health Lancaster Medical Center facility and campus Project Allocation 15,000,000 (iv.1) Elizabethtown Area Community Services Authority (A) Design, redevelopment, renovation, abatement of hazardous materials, construction and other related costs for expansion of the GEARS Community Center Project Allocation 1,500,000 (v) Lancaster County Redevelopment Authority (A) Acquisition, construction, infrastructure, renovation and other related costs for modernization and expansion of the Lancaster Cleft Palate Clinic Project Allocation 5,000,000 (B) Acquisition, redevelopment, renovations, construction, infrastructure and other associated costs related to the expansion or relocation of Spartan Motors Lancaster County manufacturing and operations facility Project Allocation 4,000,000 (C) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for community and economic development projects Project Allocation 5,000,000 (D) Acquisition, construction, renovation, infrastructure and other related costs for the modernization and expansion of a clinic Project Allocation 5,000,000 (E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for Welsh Mountain Community Health Center facilities Project Allocation 10,000,000 (F) Acquisition, construction, renovation, redevelopment, infrastructure, machinery, equipment and technology and other related costs for Excentia Human Services for an autism treatment center Project Allocation 2,500,000 (vi) Lancaster County Solid Waste Management Authority (A) Construction, renovation, infrastructure and other related costs for solid waste, recycling and energy-related projects Project Allocation 10,000,000 (B) Construction, renovation, infrastructure and other related costs for solid waste, recycling and energy related projects for the Lancaster County Solid Waste Management Authority Project Allocation 10,000,000 (vii) Lititz Regional Community Development Corporation (A) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for a community asset project Project Allocation 5,000,000 (B) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for an economic development project in Elizabeth Township Project Allocation 15,000,000 (C) Acquisition, design, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for the expansion of an egg processing plant Project Allocation 10,000,000 (D) Acquisition, design, demolition, construction, infrastructure, renovation and rehabilitation, streetscape enhancements and other related costs for the redevelopment and preservation of historic mills along Lititz Run in Warwick Township Project Allocation 2,000,000 (E) Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials and other related costs for a parking garage project Project Allocation 10,000,000 (F) Acquisition, construction, infrastructure and other related costs for rail relocation, including removal of old tracks, construction of new switching track and redevelopment or restoration of old track sites Project Allocation 3,000,000 (G) Acquisition, construction, infrastructure, abatement of hazardous materials, renovation, restoration and other related costs for a community asset project Project Allocation 5,000,000 (H) Acquisition, design, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs, including machinery and equipment, for an economic development project Project Allocation 15,000,000 (viii) SACA Development Corporation (A) Construction, acquisition, redevelopment and other related costs for the development of a bilingual workforce development center Project Allocation 1,500,000 (37) Lawrence County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for a Federally Qualified Health Center (FQHC) anchored multiservice facility Project Allocation 1,000,000 (38) Lebanon County (i) City of Lebanon (A) Acquisition, construction, rehabilitation, demolition, site preparation, infrastructure and other related costs for a redevelopment project Project Allocation 20,000,000 (ii) Lebanon County Redevelopment Authority (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for Welsh Mountain Community Health Centers' facilities Project Allocation 10,000,000 (39) Lehigh County (i) County projects (A) Construction, rehabilitation, abatement of hazardous materials and other related costs for the county-owned Cedarbrook skilled nursing facility Project Allocation 5,000,000 (B) Acquisition, land development, infrastructure and other related costs for construction of Air Products Global Headquarters, with research and development, office and administrative facilities Project Allocation 20,000,000 (C) Construction, renovation and other related costs associated with the creation of new primary care offices at the West End Medical Center Project Allocation 500,000 (D) Acquisition, construction, infrastructure and other related costs for a sports facility Project Allocation 10,000,000 (E) Acquisition, construction, infrastructure and other related costs for an economic development project Project Allocation 5,000,000 (F) Acquisition, construction, infrastructure and other costs for a facility to provide human services Project Allocation 25,000,000 (G) Construction, infrastructure, acquisition, rehabilitation and other costs related to the renovation and expansion of St. Luke's Allentown Campus Project Allocation 10,000,000 (H) Acquisition, construction, infrastructure and other related costs for Da Vinci Science Center Project Allocation 30,000,000 (I) Construction, infrastructure, redevelopment, renovation and expansion of the art and educational facilities of the Allentown Art Museum Project Allocation 1,500,000 (J) Acquisition, construction, renovation, infrastructure and other related costs for construction of housing units to accommodate special needs of veterans with brain injuries and other disabilities Project Allocation 2,250,000 (k) Construction, renovation and other related costs for expansion of the Labuda Center for the Performing Arts, to support the growing student body and community through program development, innovation and community service engagement and involvement Project Allocation 9,000,000 (L) Acquisition, construction, infrastructure improvements and other related development costs to support commercial development at Lehigh Valley International Airport Project Allocation 5,000,000 (M) Design, infrastructure, construction and other related costs for development of a Good Shepherd medical complex Project Allocation 5,000,000 (ii) City of Allentown (A) Renovation, rehabilitation and other related costs for Meals on Wheels of the Greater Lehigh Valley building renovations Project Allocation 1,250,000 (B) Construction, infrastructure and other related costs for capital improvements to the Boys & Girls Club of Allentown Sixth Street Clubhouse, including swimming pool area, locker rooms, shower areas, classrooms, kitchen area and facility equipment replacements Project Allocation 500,000 (C) Construction, infrastructure improvements and other costs for building renovations for Meals on Wheels of the Greater Lehigh Valley Project Allocation 1,250,000 (D) Construction, redevelopment and other related costs for the creation of vehicle production capability at the Mack Customer Center Project Allocation 1,000,000 (E) Acquisition, construction, infrastructure, redevelopment and other costs for a college access network center Project Allocation 7,000,000 (F) Acquisition, construction, infrastructure, redevelopment and other related costs for the development of affordable housing units in the West End of the City of Allentown Project Allocation 5,000,000 (G) Acquisition, construction, infrastructure and other related costs for the development or redevelopment of affordable housing in the City of Allentown Project Allocation 5,000,000 (H) Acquisition, construction, infrastructure and other related costs for the development or redevelopment of affordable housing in the East Side of the City of Allentown Project Allocation 5,000,000 (I) Acquisition, construction, infrastructure and other related costs for the development or redevelopment of affordable housing in the Center City North of the City of Allentown Project Allocation 5,000,000 (J) Acquisition, redevelopment, construction, infrastructure and other related costs for facilities to provide services to homeless individuals Project Allocation 5,000,000 (K) Acquisition, redevelopment, construction, infrastructure and other related costs for facilities to provide services for substance abuse recovery Project Allocation 5,000,000 (L) Acquisition, redevelopment, construction, infrastructure and other related costs for facilities to provide services for veterans Project Allocation 5,000,000 (M) Acquisition, redevelopment, construction, infrastructure and other related costs for facilities to provide social services Project Allocation 5,000,000 (N) Acquisition, redevelopment, construction, infrastructure and other related costs for facilities to provide youth recreation Project Allocation 5,000,000 (O) Acquisition, construction, infrastructure and other related costs for facilities to provide early childhood education in Center City North of the City of Allentown Project Allocation 3,000,000 (P) Acquisition, construction, infrastructure and other related costs for facilities to provide early childhood education in the West Side of the City of Allentown Project Allocation 3,000,000 (Q) Acquisition, construction, infrastructure and other related costs for facilities to provide early childhood education in the East Side of the City of Allentown Project Allocation 3,000,000 (R) Acquisition, construction, infrastructure and other related costs for a sports facility Project Allocation 10,000,000 (S) Acquisition, construction, infrastructure and other related costs for the redevelopment and rehabilitation of facilities at the Lehigh County Agricultural Society grounds Project Allocation 5,000,000 (T) Acquisition, construction, infrastructure and other related costs for the development or redevelopment of former industrial property in the 1st Ward or the 6th Ward Project Allocation 15,000,000 (U) Acquisition, construction, infrastructure and other related costs for the redevelopment of former industrial property in the East Side of the City of Allentown Project Allocation 12,500,000 (V) Acquisition, construction, infrastructure and other related costs for the redevelopment of former industrial property in the West End of the City of Allentown Project Allocation 12,500,000 (W) Acquisition, construction, infrastructure and other related costs for the redevelopment of former industrial property in Center City North of the City of Allentown Project Allocation 12,500,000 (X) Acquisition, construction, infrastructure and other related costs for the development of educational space and other commercial enterprises Project Allocation 15,000,000 (Y) Acquisition, construction, infrastructure and other related costs for an educational, cultural or student services building at Muhlenberg College Project Allocation 2,000,000 (Z) Acquisition, construction, infrastructure and other related costs for Good Shepherd Rehabilitation Hospital Project Allocation 30,000,000 (AA) Acquisition, construction, infrastructure, redevelopment and other related costs for the development of a mixed-use commercial and residential community complex in Jordan Heights Project Allocation 5,000,000 (BB) Construction, redevelopment and other related costs for the renovation of a performing arts center on North 6th Street Project Allocation 750,000 (CC) Acquisition, construction, infrastructure, redevelopment and other related costs for property improvement projects on North 7th Street south of Linden Street and surrounding areas Project Allocation 5,000,000 (DD) Acquisition, construction, infrastructure and other related costs for an educational, cultural or student services building at Cedar Crest College Project Allocation 3,000,000 (EE) Construction, infrastructure, acquisition, redevelopment and other related costs for the renovation and expansion of Saint Luke's Sacred Heart Hospital Project Allocation 10,000,000 (FF) Infrastructure, redevelopment and other related costs for the renovation of Saint Luke's Sacred Heart Hospital Project Allocation 10,000,000 (GG) Construction, infrastructure and other related costs for the renovation and expansion of the Lehigh County Humane Society facility Project Allocation 3,000,000 (HH) Construction, infrastructure, acquisition, redevelopment and other related costs for the redevelopment of former industrial property in Center City North in the City of Allentown Project Allocation 2,000,000 (II) Construction, infrastructure, redevelopment and other costs related to the development, renovation and expansion of an existing transit hub and the surrounding area Project Allocation 5,000,000 (jj) Construction, renovation, improvements, abatement of hazardous materials, redevelopment, infrastructure, machinery and equipment, HVAC and other related costs for the Capital Blue Cross Lehigh Valley office Project Allocation 2,000,000 (ii.1) City of Bethlehem (A) Construction, infrastructure improvements and other costs for a Medical Office Building and Parking Project Allocation 9,000,000 (B) Acquisition, infrastructure improvements, construction and other costs related to the West Bethlehem Development project building Project Allocation 10,000,000 (C) Acquisition, infrastructure improvements, construction and other costs related to a mixed-use building on Broad Street Project Allocation 10,000,000 (D) Acquisition, infrastructure improvements, construction and other costs related to a parking garage project Project Allocation 5,000,000 (E) Acquisition, construction, infrastructure improvements and other costs for historic rehabilitation and other improvements for national historic Moravian Bethlehem Historic District Project Allocation 3,000,000 (ii.2) Catasauqua Borough (A) Construction, infrastructure, redevelopment and other related costs for a mixed-use development project on a former brownfield site Project Allocation 2,100,000 (ii.3) Emmaus Borough (A) Construction, renovation and other related costs for the renovation of the former Rodale Publishing building into the Emmaus Creative Arts and Innovation Center Project Allocation 2,000,000 (iii) Fountain Hill Borough (A) Construction, infrastructure improvements and other costs for St. Luke's Bethlehem Campus Pediatric Care Unit renovation Project Allocation 2,700,000 (iv) Hanover (A) Construction, infrastructure improvements and other costs for Economic Development and Safety Enhancement for the Terminal Connector at the Lehigh Valley International Airport Project Allocation 12,500,000 (B) Construction, infrastructure improvements and other costs for parking garage facilities and roadway improvements at the Lehigh Valley International Airport Project Allocation 15,000,000 (iv.1) Lowhill Township (A) Construction, infrastructure and other related costs for a cabin renovation project at Valley Youth House Project Allocation 500,000 (iv.2) North Whitehall Township (A) Construction, infrastructure, renovations and other related costs for upgrades and improvements at the KidsPeace Orchard Hills Campus Project Allocation 2,000,000 (v) South Whitehall Township (A) Construction, infrastructure, renovations and other related costs for rehabilitation of municipal building, including a secure public meeting room, police training rooms and police sally port, new central point of entry into the building and relocation of the resident recycling center Project Allocation 6,000,000 (B) Acquisition, construction, redevelopment, infrastructure and other related costs for the development of affordable housing Project Allocation 5,000,000 (C) Acquisition, redevelopment, construction, infrastructure and other related costs for facilities to provide social services Project Allocation 5,000,000 (D) Acquisition, construction, redevelopment, infrastructure and other related costs for redevelopment of former industrial property Project Allocation 5,000,000 (E) Acquisition, construction, infrastructure and other related costs for the development of facilities for educational and commercial enterprises Project Allocation 3,000,000 (F) Acquisition, construction, infrastructure development and other related costs for a mixed-use project along Cedar Crest Boulevard in South Whitehall Township Project Allocation 10,000,000 (vi) Whitehall Township (A) Construction, infrastructure improvements and other costs for St. Luke's Medical Office Building Project Allocation 2,000,000 (B) Land acquisition, infrastructure improvements, demolition, site improvements, including utility expansion, construction, abatement of hazardous materials and other costs related to an economic development project in Whitehall Township Project Allocation 5,000,000 (40) Luzerne County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 5,000,000 (A.1) Acquisition, construction, infrastructure and other related costs for an industrial and manufacturing facility in the South Valley of the county Project Allocation 20,000,000 (B) Acquisition, construction, infrastructure improvements and other development costs to expand the D&L trail in Luzerne County from Wilkes-Barre City River Commons to Laurel Run Project Allocation 10,000,000 (C) Acquisition, construction, infrastructure and other related costs for creation of a petrochemical plant in the South Valley of Luzerne County Project Allocation 30,000,000 (D) Acquisition, construction, infrastructure, renovations and other related costs for Luzerne County Community College Project Allocation 10,000,000 (E) Acquisition, construction, infrastructure and other related costs for the Luzerne County Correctional Facility project Project Allocation 20,000,000 (F) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 3,500,000 (G) Construction, renovation, infrastructure and other related costs for the Luzerne County Community College main campus in Nanticoke Project Allocation 5,199,000 (H) Construction, renovation, infrastructure and other related costs for the Luzerne County Community College public safety training institute Project Allocation 2,500,000 (I) Construction, renovation, infrastructure and other related costs for the Luzerne County Community College health sciences center Project Allocation 400,000 (J) Construction, renovations and infrastructure improvements for an industrial facility Project Allocation 1,000,000 (K) Acquisition, site preparation, renovation, demolition, construction, infrastructure and other related costs for the expansion of the Weinberg Northeast Pennsylvania Regional Food Bank Project Allocation 500,000 (L) Acquisition, renovation, rehabilitation, construction and other costs related to the construction and development of Luzerne County Biomedical Research Institute Project Allocation 10,000,000 (M) Construction, development and other related costs for the renovation and expansion of sports fields and facilities in Hazleton Township Project Allocation 2,500,000 (N) Acquisition, construction, infrastructure, redevelopment, renovations and other related costs for an economic development project in the county Project Allocation 4,000,000 (ii) Ashley Borough (A) Acquisition, demolition, construction and other related costs to redevelop 56 Main Street Project Allocation 500,000 (B) Acquisition, construction, infrastructure and other related costs for the Huber Breaker Preservation Society Park Project Allocation 500,000 (C) Construction, abatement of hazardous materials and other related costs to redevelop the Q-stick property Project Allocation 1,000,000 (D) Construction, redevelopment and other related costs for Conyngham Street Park improvements Project Allocation 500,000 (E) Acquisition, demolition, construction and other related costs to redevelop 61-63 Main Street Project Allocation 1,000,000 (F) Acquisition, demolition and other related costs to redevelop the area along 65-71 Mary Street Project Allocation 500,000 (G) Acquisition, demolition, construction and other related costs for the Main Street Renovation Project Project Allocation 1,000,000 (H) Acquisition, construction and other related costs to redevelop the Carosel Printing building Project Allocation 500,000 (I) Acquisition, demolition, construction and other related costs to redevelop 122 Main Street Project Allocation 500,000 (J) Acquisition, demolition, construction and other related costs to redevelop property at 23 High Street Project Allocation 500,000 (K) Acquisition, construction and other related costs to redevelop the former Sony site Project Allocation 500,000 (L) Acquisition, demolition, construction and other related costs to redevelop 44-46 Fall Street Project Allocation 500,000 (M) Acquisition, demolition, construction and other related costs to redevelop 48 Fall Street Project Allocation 500,000 (N) Acquisition, construction, infrastructure and other related costs for the redevelopment of the Huber Breaker site Project Allocation 10,000,000 (iii) Avoca Borough and Pittston Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project at the Wilkes-Barre/Scranton International Airport Project Allocation 10,000,000 (iv) Avoca Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Avoca Borough Project Allocation 5,000,000 (v) City of Hazleton (A) Construction, infrastructure and other related costs for Hazleton Area Public Library renovations Project Allocation 1,000,000 (B) Construction, redevelopment, abatement of hazardous materials and other related costs for the Serento Gardens Project Project Allocation 750,000 (C) Construction, infrastructure and other costs related to the intermodal facility, phase II Project Allocation 9,500,000 (D) Design, acquisition, demolition, site preparation, infrastructure, construction and other related costs for an economic and housing project in the City of Hazleton Project Allocation 1,000,000 (E) Acquisition, construction, infrastructure and other related costs for an economic development project in the City of Hazleton Project Allocation 5,000,000 (F) Acquisition, construction, infrastructure and other related costs for the Anthracite Loop Tourism Project Project Allocation 5,000,000 (G) Construction, infrastructure, redevelopment, paving of roads, lighting, signage, renovations and other related costs associated with redevelopment of the downtown Wyoming Street Business District Project Allocation 2,000,000 (H) Construction, renovation and other related costs for USA Pork Packers, Inc., to add additional processing capacity and meat product lines Project Allocation 5,000,000 (I) Acquisition, construction, redevelopment, renovations and other related costs associated with redevelopment of the former Hazleton YWCA building, pool and parking lot for the purpose of community recreation or education Project Allocation 2,000,000 (J) Acquisition, construction, infrastructure, renovation, abatement of hazardous materials and other related costs for the development of public and private projects at Hazleton Regional Airport to improve services and facilities Project Allocation 10,000,000 (vi) City of Nanticoke (A) Acquisition, demolition, construction and other related costs for redevelopment of downtown City of Nanticoke Project Allocation 750,000 (B) Acquisition, demolition, construction and other related costs for a new regional municipal service building Project Allocation 500,000 (C) Acquisition, demolition, construction and other related costs for the South Valley Parkway Project Allocation 20,000,000 (D) Construction, redevelopment and other related costs for Lower Broadway Park improvements Project Allocation 500,000 (E) Acquisition, demolition, construction and other related costs for Market Street redevelopment project Project Allocation 1,750,000 (F) Acquisition, demolition, infrastructure and other related costs associated with the redevelopment of the LS Bowl-A-Rama Site Project Allocation 5,000,000 (G) Acquisition, construction, infrastructure and other related costs for an economic development project in the City of Nanticoke Project Allocation 5,000,000 (vii) Pittston City (A) Acquisition, construction and infrastructure development for a mixed-use project in Pittston City Project Allocation 4,000,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in the City of Pittston Project Allocation 5,000,000 (vii.1) City of Wilkes-Barre (A) Acquisition, construction and other related costs for an indoor recreational facility at King's College Project Allocation 3,000,000 (B) Construction and other related costs for the redevelopment of the former Sterling Hotel property in downtown Wilkes-Barre Project Allocation 10,000,000 (C) Acquisition, construction, infrastructure and other related costs for kinship square adjacent to King's College Project Allocation 10,000,000 (D) Acquisition, construction, infrastructure improvements and other costs for an economic development project in the City of Wilkes- Barre Project Allocation 3,500,000 (E) Acquisition, construction, infrastructure improvements and other related development costs to expand and retain company at 454 South Main Street Project Allocation 5,000,000 (F) Acquisition, construction, infrastructure, renovations and other related costs for Wilkes University Project Allocation 10,000,000 (G) Design, acquisition, demolition, site preparation, abatement of hazardous materials, infrastructure, construction and other related costs for facility improvements at King's College. Project Allocation 5,000,000 (H) Acquisition, construction, infrastructure and other related costs for an economic development project in the City of Wilkes-Barre Project Allocation 5,000,000 (I) Design, acquisition, demolition, site preparation, infrastructure, utility expansion, abatement of hazardous materials, construction and other related costs for expansion of the Westmoreland Club Project Allocation 2,500,000 (J) Construction, acquisition, infrastructure, redevelopment and other related costs for a mixed-use commercial space consisting of a hotel and convention center Project Allocation 5,000,000 (vii.1) Conyngham Borough (A) Construction, acquisition, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for redevelopment projects Project Allocation 10,000,000 (viii) Dupont Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Dupont Borough Project Allocation 5,000,000 (ix) Duryea Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Duryea for the Pride Mobility expansion project Project Allocation 5,000,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in Duryea Borough Project Allocation 5,000,000 (x) Exeter Borough (A) Acquisition, construction, infrastructure improvements and other costs for an economic development project in Exeter Borough Project Allocation 3,500,000 (xi) Forty Fort Borough (A) Acquisition, construction, infrastructure and other related costs for safety improvements and economic development at the Wyoming Valley Airport Project Allocation 5,000,000 (B) Construction, acquisition, renovation, redevelopment and other related costs associated with 900 Rutter complex Project Allocation 5,000,000 (xii) Freeland Borough (A) Acquisition, construction, infrastructure, abatement, renovations and other related costs for Freeland Borough economic improvement projects Project Allocation 10,000,000 (xiii) Hanover Township (A) Construction, renovations and infrastructure improvements for the Truesdale Terrace and Witinski Villa Project Allocation 1,000,000 (xiv) Hazle Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Hazle Township Project Allocation 5,000,000 (xv) Jenkins Township (A) Construction, renovations and infrastructure improvements for an industrial facility Project Allocation 1,000,000 (B) Construction, redevelopment and other related costs to expand, renovate and upgrade WVIA Public Media facilities Project Allocation 5,000,000 (C) Construction, infrastructure, remediation and other related costs for the redevelopment of the former Techneglas, Inc., facility near Pittston Project Allocation 3,000,000 (xvi) Newport Township (A) Construction, infrastructure and other related costs for the Whitney Pointe industrial/commercial park Project Allocation 2,000,000 (B) Construction, infrastructure and other related costs for a new All- Terrain Vehicle Park Project Allocation 5,000,000 (C) Construction, infrastructure and other related costs for the Whitney Pointe industrial/commercial park Project Allocation 10,000,000 (D) Acquisition, construction, infrastructure and other related costs for an economic development project to repurpose SCI Retreat Project Allocation 10,000,000 (xvii) Pittston City (Reserved) (xviii) Plains Township (A) Acquisition, demolition, construction and other related costs to redevelop properties along South River and Maffet Streets Project Allocation 500,000 (B) Acquisition, demolition, construction and other related costs to redevelop properties along Main and Carey Streets Project Allocation 800,000 (C) Construction and other related costs to expand, remodel and upgrade the township's police department Project Allocation 800,000 (D) Acquisition, construction, infrastructure and other related costs for an economic development project in Plains Township Project Allocation 5,000,000 (E) Acquisition, construction, infrastructure improvements and other costs for an economic development project in Plains Township Project Allocation 3,500,000 (xix) Plymouth Borough (A) Acquisition, demolition, construction and other related costs for redevelopment of downtown Plymouth Borough Project Allocation 1,000,000 (B) Construction, renovations and infrastructure improvements for the Wyoming Valley West School District Community Center Project Allocation 750,000 (C) Acquisition, construction, infrastructure and other related costs for an economic development project in Plymouth Borough Project Allocation 5,000,000 (xix.1) Sugarloaf Township (A) Construction, infrastructure, paving of roads, lighting, signage, renovations and other related costs associated with road improvement for public safety purposes Project Allocation 1,000,000 (xx) Swoyersville Borough (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Swoyersville Borough Project Allocation 5,000,000 (xxi) West Hazleton Borough (A) Acquisition, construction, infrastructure, abatement, renovations and other related costs for West Hazleton Borough economic improvement projects Project Allocation 10,000,000 (xxii) West Pittston Borough (A) Acquisition, construction, infrastructure and other related costs to build the new West Pittston Library Project Allocation 1,000,000 (xxiii) White Haven Borough (A) Construction, acquisition, infrastructure, abatement of hazardous materials and other related costs for the White Haven Community and Office building project Project Allocation 500,000 (xxiv) Wilkes-Barre Township (A) Construction, infrastructure and other related costs for a new municipal building Project Allocation 500,000 (xxv) Greater Wilkes-Barre Industrial Fund (A) Construction, infrastructure, redevelopment, renovation and other related costs for the Jewish Community Alliance JCC day camp Project Allocation 4,000,000 (B) Acquisition, construction, renovation, infrastructure and other related costs for an economic development project within Kingston Borough Project Allocation 3,500,000 (C) Acquisition, construction, infrastructure, renovation and other related costs for Misericordia University facilities Project Allocation 7,500,000 (xxvi) Luzerne County Redevelopment Authority (A) Acquisition, construction, infrastructure improvements, renovation, equipment and other related costs for the Weinberg Northeast Pennsylvania Regional Food Bank and its member agencies Project Allocation 2,000,000 (xxvii) Commonwealth Health (A) Construction, remodeling, rehabilitation, infrastructure, acquisition, redevelopment and other related costs for a hospital/health care facility Project Allocation 7,000,000 (xxviii) Downtown Hazleton Alliance for Progress (A) Acquisition, construction, infrastructure, redevelopment, renovations and other related costs associated with an economic development or education project Project Allocation 5,000,000 (41) Lycoming County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for an economic and/or community development project Project Allocation 15,000,000 (B) Acquisition, construction, infrastructure and other related costs for the rehabilitation and renovation of Little League International, including facility improvements, new dormitories, infirmary and laundry facilities, enhanced parking, restrooms and gift shop Project Allocation 3,000,000 (C) Construction, renovation, expansion and alterations to a former warehouse and product distribution center, including site acquisition and development, design, equipment purchase, construction and utility work in Porter Township Project Allocation 2,500,000 (D) Acquisition, construction and other related costs for a regional public safety building Project Allocation 10,000,000 (ii) City of Williamsport (A) Acquisition, construction, infrastructure and other related costs for the rehabilitation and renovation of Historic Bowman Field, including lighting improvements, office space, exercise facility and expansion of the concourse Project Allocation 1,000,000 (B) Acquisition, construction, infrastructure and other related costs for a Lycoming College redevelopment project in the City of Williamsport Project Allocation 10,000,000 (C) Acquisition, construction, abatement of hazardous materials and other related costs for a new academic building at the Pennsylvania College of Technology Project Allocation 7,000,000 (ii.1) Muncy Township (A) Construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for the renovation, expansion and alteration of the former fire company social hall into municipal offices for general government, local police and public works while maintaining and improving the area housing the volunteer fire company Project Allocation 950,000 (ii.2) Muncy Township and Muncy Borough (A) Acquisition, construction, site development and other related costs for the construction and/or refurbishing of a new building for Spotts Appliance Project Allocation 1,000,000 (iii) Lycoming County Industrial Development Authority (A) Construction, renovation and other related costs for UPMC Susquehanna Lycoming County facility improvements and updates Project Allocation 10,000,000 (B) Construction, renovation, expansion and alterations for community projects and economic development initiatives, including site acquisition and development, design, equipment purchase, construction and utility work Project Allocation 8,000,000 (iv) Pennsylvania College of Technology (A) Acquisition, construction, abatement of hazardous materials and other related costs for infrastructure improvements, including additions and renovations, at the Community Arts Center Project Allocation 2,500,000 (v) Williamsport Municipal Airport Authority (A) Acquisition, construction, infrastructure and other related costs for airport improvements, including land acquisition, hangar renovation and construction, pavement improvements, access road and parking lot rehabilitation, equipment acquisition, perimeter fencing and other necessary improvements to the Williamsport Regional Airport Project Allocation 10,000,000 (42) McKean County (i) County projects (A) Acquisition, infrastructure, abatement of hazardous materials and other related costs for the University of Pittsburgh at Bradford, including renovation and rehabilitation of existing facilities and construction of new facilities Project Allocation 10,000,000 (ii) Bradford Township (A) Land acquisition, demolition, site clearance, building rehabilitation, building construction, site work, infrastructure, gateway and streetscape improvements, recreational projects and other community improvements for economic development and community impact projects Project Allocation 2,500,000 (iii) Foster Township (A) Construction of a multitenant facility, infrastructure improvements and other related redevelopment costs associated with development of the Lafferty Hollow Industrial Park Project Allocation 2,500,000 (43) Mercer County (i) County Projects (A) Rehabilitation, acquisition, infrastructure improvements, abatement of hazardous materials, construction and other related costs for renovation of the old East Elementary School building into a community center Project Allocation 500,000 (B) Construction, infrastructure, acquisition, abatement of hazardous materials, renovations, flood mitigation and other related costs for redevelopment of a facility owned or operated by Balmaghie Beverage Group Project Allocation 5,000,000 (i.1) City of Farrell (A) Design, inspection, acquisition, demolition, site preparation, infrastructure, utility expansion, abatement of hazardous materials, construction and other related costs for facilities and field improvements at Farrell Area School District Project Allocation 1,500,000 (i.2) City of Hermitage (A) Construction, infrastructure and other related costs for the LindenPointe Business Campus Project Allocation 3,000,000 (B) Acquisition, construction, renovation and infrastructure improvements for an IT facility Project Allocation 4,000,000 (C) Acquisition, construction, renovation and infrastructure improvements for an industrial facility Project Allocation 2,000,000 (D) Acquisition, construction, infrastructure and other related costs for facilities associated with the Hermitage 2030 Comprehensive Plan and Town Center Project Project Allocation 4,000,000 (i.3) City of Sharon (A) Acquisition, construction, infrastructure and other related costs for a redevelopment project Project Allocation 5,000,000 (B) Construction, infrastructure and other related costs for the renovation of regional recreational facilities Project Allocation 2,500,000 (C) Acquisition, construction, infrastructure and other related costs for a regional medical center and associated facilities Project Allocation 5,000,000 (D) Acquisition, construction, infrastructure, redevelopment and other related costs for an economic development project Project Allocation 7,500,000 (E) Acquisition, construction, infrastructure, redevelopment and other related costs for a municipal building Project Allocation 5,000,000 (F) Acquisition, construction, renovation, infrastructure and other related costs for a neighborhood redevelopment project downtown Project Allocation 5,000,000 (i.4) Borough of Greenville (A) Rehabilitation, infrastructure improvements, abatement of hazardous materials and other related costs for upgrades and renovation of Thiel College Academic Center Project Allocation 5,000,000 (ii) Greenville-Reynolds Development Corporation (A) Infrastructure expansion of GRDC's subsidiaries' existing water and wastewater collection main lines at Reynolds East Business Park Project Allocation 1,000,000 (B) Infrastructure expansion south of GRDC's subsidiaries' existing water and wastewater collection service territories Project Allocation 1,000,000 (C) Rehabilitation and other related costs for Reynolds Industrial Park building renovations Project Allocation 1,000,000 (D) Construction, infrastructure and other related costs for multitenant spec building Project Allocation 1,000,000 (E) Construction and other related costs for an industrial building in Delaware and/or Hempfield Townships Project Allocation 1,250,000 (F) Infrastructure, construction and other related costs for the improvement of a business park complex in Delaware and Hempfield Townships Project Allocation 750,000 (G) Infrastructure, construction and other related costs for the improvement of a business park complex in Pymatuning Township Project Allocation 750,000 (iii) Penn-Northwest Development Corporation (A) Construction, infrastructure, redevelopment and other related costs for the expansion and renovation of an industrial facility and industrial corridor in Grove City Borough Project Allocation 2,000,000 (B) Construction, expansion, redevelopment and other related costs for the improvement of the Industrial Technical Renovation and Corridor enhancement project in the City of Farrell Project Allocation 4,000,000 (44) Mifflin County (i) County projects (A) Acquisition, construction, reconstruction, rehabilitation, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and all other related costs for the development, expansion, renovation, redevelopment and/or reuse of a facility to serve and assist individuals with visual impairments and to provide industrial, manufacturing, office and other employment for individuals with visual, mental or physical impairments Project Allocation 3,000,000 (B) Acquisition, site development, construction, infrastructure, redevelopment and other related costs for an open space, recreation project in the county Project Allocation 5,000,000 (C) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for expansion of the Mifflin County Academy Project Allocation 5,000,000 (D) Acquisition, site development, construction, infrastructure, redevelopment and other related costs for a community development project in the county Project Allocation 10,000,000 (E) Acquisition, site development, construction, infrastructure, redevelopment and other related costs for an economic project in the county Project Allocation 10,000,000 (45) Monroe County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for a Passenger Rail project in Monroe County Project Allocation 15,000,000 (B) Acquisition, construction, infrastructure and other related costs for the Lackawanna Cutoff Passenger Project Project Allocation 29,906,000 (C) Infrastructure, rehabilitation, construction and other related costs for St. Luke's Monroe Campus Expansion - pad readiness project Project Allocation 2,500,000 (D) Acquisition, construction, infrastructure, machinery, equipment, renovation and other related costs for Lehigh Valley Health Network healthcare facilities Project Allocation 10,000,000 (E) Infrastructure and redevelopment of the former Buck Hill Inn, including construction of a hotel/condominium complex Project Allocation 3,500,000 (i.1) Barrett Township (A) Infrastructure and redevelopment of the former Buck Hill Inn, including construction of a hotel/condominium complex Project Allocation 3,500,000 (i.2) Chestnuthill Township (A) Acquisition, infrastructure, construction and other related costs for a shared emergency services facility Project Allocation 2,500,000 (ii) Monroe County Industrial Development Authority (A) Construction, infrastructure and other related costs for the Monroe County Historical Association's Stroud Mansion addition project Project Allocation 2,000,000 (B) Acquisition, construction, infrastructure, redevelopment and other related costs for the west end economic development project Project Allocation 2,500,000 (C) Demolition, redevelopment and construction of the former International Boiler Works building, including infrastructure and other related costs Project Allocation 3,000,000 (D) Construction of an access road and associated infrastructure in the Pocono Mountains Corporate Center South Project Allocation 3,000,000 (E) Development of a rail-served site within the Pocono Mountains Corporate Center West, including construction, infrastructure and other related costs Project Allocation 3,000,000 (F) Redevelopment of the Pocono Mountains Corporate Center East, including construction, infrastructure and other related costs Project Allocation 4,000,000 (G) Construction, infrastructure and other related costs for a parking facility and terminal for passenger rail service in the area of Delaware Water Gap Borough Project Allocation 5,000,000 (H) Construction, infrastructure and other related costs for a parking facility and terminal for passenger rail service in the area of Pocono Township Project Allocation 5,000,000 (I) Construction, infrastructure and other related costs for the upgrade and expansion of the regional sewage treatment plant Project Allocation 5,000,000 (J) Construction, renovation, rehabilitation and infrastructure and other related costs for rehabilitation of the courthouse Project Allocation 5,000,000 (K) Costs related to the expansion of technical education in Monroe County through the Monroe Career and Technical Institute Project Allocation 5,000,000 (L) Construction, infrastructure and other related costs for the redevelopment of the former Mountain Manor property Project Allocation 10,000,000 (M) Development of the Route 611 Corridor gas line project, including infrastructure and other related costs Project Allocation 10,000,000 (N) Acquisition, construction, infrastructure and other related costs associated with the development of an in-land port Project Allocation 10,000,000 (O) Construction, infrastructure and other related costs for redevelopment of the former Paradise Golf site Project Allocation 5,000,000 (iii) Pocono Mountain Economic Development Corporation (A) Construction, infrastructure, renovation and other related costs for East Stroudsburg State University for athletic fields and facilities Project Allocation 7,000,000 (46) Montgomery County (i) County projects (A) Construction, infrastructure improvements and other costs for the County Recycling Center Project Allocation 5,000,000 (B) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for economic development projects in Montgomery County Project Allocation 5,000,000 (C) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for a mixed-use commercial/affordable housing development in Montgomery County Project Allocation 10,000,000 (D) Construction, infrastructure improvements and other costs for an Aquaponics facility Project Allocation 1,500,000 (E) Construction, infrastructure and other costs related to affordable housing units and neighborhood redevelopment in Montgomery County Project Allocation 10,000,000 (F) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for Salem Adult Citizens Project Project Allocation 5,000,000 (G) Construction, infrastructure, renovation and other related costs associated with improving infrastructure and space related to the Neonatal Abstinence Syndrome Program and creating a predelivery and postdelivery transition residence at Holy Redeemer Hospital Project Allocation 1,000,000 (H) Demolition, construction, renovation, infrastructure improvements and other related costs associated with meeting growth and demand for cancer care and prevention and emergency care at Holy Redeemer Hospital on its Meadowbrook Campus Project Allocation 5,000,000 (I) Design, acquisition, infrastructure, construction and other related costs for development of Thomas Jefferson University advanced training facilities Project Allocation 20,000,000 (J) Construction, acquisition, infrastructure, redevelopment and other costs related to the renovation and relocation of a facility occupied by a nonprofit organization Project Allocation 500,000 (K) Construction, infrastructure, acquisition, redevelopment and other costs related to the development of a senior center Project Allocation 6,000,000 (L) Construction, infrastructure, acquisition, redevelopment and other related costs for the development of a community center Project Allocation 6,000,000 (M) Acquisition, construction, demolition, redevelopment, infrastructure and other costs related to the renovation, expansion and rehabilitation of a domestic violence emergency shelter and related facilities Project Allocation 10,000,000 (N) Acquisition, construction, infrastructure, redevelopment and other related costs for Laurel House Project Allocation 5,000,000 (ii) Abington Township (A) The Pennsylvania State University Abington campus renovations and miscellaneous improvement projects Project Allocation 10,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for projects at Abington Hospital, Jefferson Health Project Allocation 10,000,000 (C) Demolition, construction, renovation and infrastructure improvements necessary to meet growth and demand for cancer care and prevention and emergency care at Holy Redeemer Hospital on the Meadowbrook campus Project Allocation 5,000,000 (D) Construction and improvements to infrastructure for Holy Redeemer Hospital Neonatal Abstinence Program, including a new residential facility Project Allocation 1,000,000 (E) Construction, infrastructure improvements and other related costs for the Pennsylvania Horticultural Society's Meadowbrook Farm Project Allocation 3,500,000 (F) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Abington Township Project Allocation 5,000,000 (iii) Ambler Borough (A) Construction, infrastructure, renovations and other related costs for the Ambler Branch of the Wissahickon Valley Public Library Project Allocation 1,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Ambler Borough Project Allocation 5,000,000 (iv) Borough of Conshohocken (A) Infrastructure, site development, demolition, construction and other related costs for parking, hotel and historic firehouse as part of the SORA West redevelopment project, corner of First and Fayette Streets Project Allocation 20,000,000 (v) Bryn Athyn Borough (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Bryn Athyn Borough Project Allocation 1,000,000 (vi) Cheltenham Township (A) Arcadia University campus renovations and miscellaneous improvement projects Project Allocation 10,000,000 (B) Salus University campus renovations and miscellaneous improvement projects Project Allocation 10,000,000 (C) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for projects at Einstein Medical Center Elkins Park Project Allocation 10,000,000 (D) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for Camp William Penn Museum Project Allocation 5,000,000 (E) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Cheltenham Township Project Allocation 5,000,000 (F) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project at Curtis Hall Arboretum Project Allocation 5,000,000 (G) Acquisition, construction, infrastructure and other related costs for a veterans' rehabilitation center Project Allocation 15,000,000 (H) Acquisition, construction, infrastructure and other related costs for Einstein Medical Center Elkins Park Project Allocation 10,000,000 (I) Construction, infrastructure, renovation, acquisition and other related costs for Salus University to rehabilitate existing dining and student life common areas Project Allocation 1,638,000 (vii) Collegeville Borough (A) Acquisition, construction, infrastructure improvements, redevelopment, abatement of hazardous materials and other related costs for the IBEW Local 126 OSHE Apprenticeship Training Center East expansion Project Allocation 4,000,000 (B) Construction, renovation, infrastructure improvements and other costs for the historic Perkiomen Bridge Hotel Project Allocation 1,000,000 (C) Construction, infrastructure and other related costs for the redevelopment, reconstruction and maintenance projects on Ridge Pike Project Allocation 8,500,000 (vii.1) Douglass Township (A) Demolition, abatement of hazardous materials, construction, renovation and other related costs for a new building for emergency service personnel and equipment Project Allocation 4,000,000 (viii) Eagleville (A) Acquisition, renovations and other costs related to the Arc Alliance expansion project Project Allocation 1,000,000 (viii.1) East Norriton Township (A) Acquisition, demolition, construction, renovation, infrastructure and other development costs for emergency, inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Montgomery Project Allocation 10,000,000 (ix) Elkins Park (A) Acquisition, demolition, construction, renovation, infrastructure and other related costs for MossRehab Veterans Training Center Project Allocation 15,000,000 (B) Acquisition, demolition, construction, renovation, infrastructure and other related costs for Einstein Medical Center Project Allocation 10,000,000 (x) Franconia Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the police and municipal service complex in Franconia Township Project Allocation 5,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for a new public works building Project Allocation 2,000,000 (C) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for community and economic development projects Project Allocation 5,000,000 (D) Construction, infrastructure, acquisition, redevelopment and other related costs for the renovations to Peter Becker Community Project Allocation 15,000,000 (xi) Hatboro Borough (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Hatboro Borough Project Allocation 1,000,000 (xii) Hatfield Borough (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Hatfield Borough Project Allocation 1,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for community and economic development projects Project Allocation 5,000,000 (xiii) Hatfield Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for a new police station Project Allocation 5,000,000 (B) Acquisition, site design, redevelopment, construction and other related costs for a park and recreation facility Project Allocation 5,000,000 (C) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for community and economic development projects Project Allocation 5,000,000 (xiv) Horsham Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Horsham Township Project Allocation 3,000,000 (xv) Jenkintown Borough (A) Campus renovations and miscellaneous improvement projects at Manor College Project Allocation 10,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Jenkintown Borough Project Allocation 4,000,000 (xv.1) Lansdale Borough (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for community and economic development projects Project Allocation 5,000,000 (B) Construction, infrastructure, acquisition, redevelopment and other costs related to the renovation and expansion of Penndale Middle School Project Allocation 10,000,000 (C) Construction, infrastructure, acquisition, redevelopment and other costs related to the renovation of Knapp Elementary School Project Allocation 10,000,000 (xvi) Lower Gwynedd Township (A) Acquisition, infrastructure, construction, storm water management, safety improvements and other related costs for Phase III of the Bethlehem Pike revitalization project in Lower Gwynedd Township Project Allocation 1,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Lower Gwynedd Township Project Allocation 1,000,000 (C) Design, acquisition, infrastructure, construction and other related costs for development of Thomas Jefferson University Advanced Education and Training facilities Project Allocation 10,000,000 (D) Construction, infrastructure, renovation and other related costs for the expansion of Gwynedd Mercy University's East Campus academic facilities Project Allocation 10,000,000 (E) Infrastructure, acquisition, redevelopment and other related costs for the expansion of Gwynned Mercy University's academic facilities Project Allocation 10,000,000 (xvii) Lower Moreland Township (A) Construction, infrastructure, redevelopment and other related costs for pedestrian enhancements and storm water management in Huntington Pike Project Allocation 3,000,000 (xvii.1) Lower Pottsgrove Township (A) Construction, acquisition, infrastructure, redevelopment and other costs related to the Lower Pottsgrove Township Complex Project Allocation 4,000,000 (xvii.2) Lower Providence Township (A) Construction, infrastructure, acquisition, redevelopment and other related costs for the development of the area within and adjacent to the Park Pointe at Lower Providence business park Project Allocation 8,000,000 (B) Construction, acquisition, renovation and other costs related to the improvement of Lower Providence Township police facility and administration building Project Allocation 4,750,000 (xviii) Montgomery Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Montgomery Township Project Allocation 5,000,000 (xviii.1) Norristown Borough (A) Acquisition, demolition, construction, renovation, infrastructure and other development costs to support the consolidation of a fire station into a new facility Project Allocation 2,000,000 (B) Acquisition, construction, infrastructure, remediation and other related costs for a recreational facility Project Allocation 10,000,000 (xix) North Wales Borough (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in North Wales Borough Project Allocation 1,000,000 (B) Construction, infrastructure, acquisition, redevelopment and other related costs for the renovation of the North Penn Fire Company Project Allocation 1,000,000 (xix.1) Pottstown Borough (A) Construction, infrastructure, acquisition, redevelopment and other related costs for repairs to a storm water arch system Project Allocation 3,000,000 (xx) Rockledge Borough (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Rockledge Borough Project Allocation 1,000,000 (xx.1) Salford Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for community and economic development projects Project Allocation 5,000,000 (xx.2) Skippack Township (A) Construction, infrastructure, redevelopment and other related costs for the redevelopment, reconstruction and maintenance of bridges throughout the township Project Allocation 6,500,000 (xxi) Souderton Borough (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Souderton Borough Project Allocation 1,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for community and economic development projects Project Allocation 5,000,000 (C) Infrastructure, redevelopment and other related costs for developing the site of the former Souderton Area High School Project Allocation 2,000,000 (D) Construction, infrastructure, acquisition, redevelopment and other costs related to the development of a new public works facility Project Allocation 2,000,000 (xxii) Springfield Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Springfield Township Project Allocation 5,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the Ducky Birts Foundation's development project at 1337 Ivy Hill Road Project Allocation 10,000,000 (xxii.1) Telford Borough (A) Construction and other related costs for the Indian Valley Public Library Project Allocation 2,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for community and economic development projects Project Allocation 5,000,000 (xxii.2) Trappe Borough (A) Construction, infrastructure, acquisition, redevelopment and other costs related to the development of a new fire house Project Allocation 3,500,000 (xxiii) Upper Gwynedd Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Upper Gwynedd Township Project Allocation 2,000,000 (xxix) Upper Merion Township (A) Renovation, site preparation, construction, rehabilitation and other related costs for restoration of the Moore-Irwin House Project Allocation 1,000,000 (xxx) Upper Moreland Township (A) Acquisition, infrastructure, renovations, rehabilitation, construction, storm water management and other related costs for improvements to Upper Moreland Township facilities Project Allocation 2,000,000 (xxx.1) Upper Providence Township (A) Construction, infrastructure, acquisition, redevelopment and other related costs for the development of a public safety training facility Project Allocation 500,000 (B) Construction, acquisition and other costs related to the development of a new central emergency services facility Project Allocation 4,500,000 (C) Facilities construction, infrastructure improvements and other costs for an emergency services facility in Upper Providence Township Project Allocation 6,500,000 (xxx.2) West Norriton Township (A) Construction, infrastructure, acquisition, redevelopment and other related costs for the development of brownfield sites Project Allocation 11,000,000 (B) Construction, infrastructure and other costs related to the development of a community and recreation center at the corner of Burnside Avenue and Main Street Project Allocation 2,500,000 (xxx.3) Worcester Township (A) Construction, acquisition, infrastructure, redevelopment and other related costs for the renovation and expansion of the Variety, the Children's Charity of the Delaware Valley campus Project Allocation 17,000,000 (xxxi) Pottstown Area Industrial Development, Inc. (A) Construction, redevelopment and other related costs for a Life Sciences Incubator Hub Project Allocation 1,000,000 (B) Construction, infrastructure and other related costs for the Keystone Boulevard extension project Project Allocation 2,500,000 (C) Construction, renovation, rehabilitation, abatement of hazardous materials and other related costs for conversion of the Mercury Building into a boutique hotel Project Allocation 2,500,000 (D) Construction, infrastructure, redevelopment of 225 acres and other related costs for the Pottstown Keystone Employment and Economic Plan (KEEP) Project Project Allocation 5,000,000 (E) Construction, infrastructure and other related costs for the Pottstown network of underground arches project Project Allocation 3,000,000 (F) Construction, renovation, rehabilitation, abatement of hazardous materials and other related costs for conversion of the PNC building Project Allocation 500,000 (G) Construction, redevelopment and other related costs for the renovation and expansion of a historic bank building to serve as a music education institution and live music venue Project Allocation 500,000 (H) Construction, acquisition, redevelopment and other related costs for the renovation and expansion of a vacant building to serve as a boutique hotel with a wine and whiskey bar Project Allocation 1,000,000 (I) Construction, infrastructure and other related costs for the expansion of Keystone Boulevard west to Old Reading Pike Project Allocation 2,500,000 (J) Construction, redevelopment and other related costs for the renovation of a vacant building to serve as a life sciences incubator hub Project Allocation 1,000,000 (xxxii) Montgomery County Redevelopment Authority (A) Acquisition, design, construction, infrastructure, environmental capping and other related costs for an office building/headquarters Project Allocation 7,500,000 (B) Acquisition, construction, infrastructure, remediation and other costs related to a project in Montgomery County Project Allocation 10,000,000 (xxxiii) Redevelopment Authority of Montgomery County (A) Construction, infrastructure, acquisition, redevelopment and other related costs for job creation and business attraction and retention projects Project Allocation 15,000,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for an economic development project Project Allocation 20,000,000 (C) Construction, acquisition, redevelopment, infrastructure and other related costs for the renovation of the Montgomery County Justice Center and county campus Project Allocation 10,000,000 (D) Acquisition, construction, redevelopment and other related costs for commercial, residential and industrial projects Project Allocation 5,000,000 (E) Infrastructure, site development, demolition, construction and other related costs for the construction of a parking structure, hotel and historic fire house as part of the SORA West master- planned development located at the corner of First Avenue and Fayette Street Project Allocation 20,000,000 (F) Acquisition, infrastructure, renovations, construction and other related costs for the development of a railroad trestle plaza and riverfront in Royersford Borough Project Allocation 5,000,000 (G) Construction, infrastructure and other costs related to The Discovery Labs (former GSK West campus) site in Upper Merion Township Project Allocation 10,000,000 (H) Construction, acquisition, infrastructure, redevelopment and other costs related to a mixed-use development project at Main and DeKalb Streets Project Allocation 15,000,000 (xxxiv) Greater Norristown Society for the Arts (A) Construction and other costs related to the Elmwood Park Zoo Education Center project Project Allocation 2,500,000 (B) Construction and other costs related to the expansion of a parking lot Project Allocation 1,000,000 (C) Construction and other related costs for development of an animal hospital Project Allocation 5,000,000 (47) Montour County (i) County projects (A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs to renovate and expand a community center, which includes, but is not limited to, replacement of an entry bridge, creation of a community room for after-hours usage, creation of a kitchen, renovation of the locker rooms and improvements to address energy efficiency Project Allocation 2,000,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a cultural, civic or historical project in the county Project Allocation 5,000,000 (C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for an economic development project in the county Project Allocation 10,000,000 (48) Northampton County (i) County projects (A) Acquisition, infrastructure and other related costs for construction of a county forensic center on the Gracedale Nursing Home campus Project Allocation 535,000 (B) Air conditioning, remediation, building upgrades, renovations, expansions and other related project costs for the Pen Argyl High School Project Allocation 750,000 (C) Acquisition, construction, infrastructure, machinery, equipment, renovation and other related costs for Lehigh Valley Health Network healthcare facilities Project Allocation 10,000,000 (D) Construction, infrastructure, acquisition, redevelopment and other related costs for a senior center and construction, infrastructure, acquisition, redevelopment and other related costs for a community center Project Allocation 6,000,000 (E) Construction, renovation, expansion and alterations for the development of a dairy processing center capable of supporting various product lines, including site acquisition and development, design, equipment purchase and utility work Project Allocation 20,000,000 (ii) (Reserved). (iii) Bethlehem Township (A) Construction, infrastructure improvements and other costs for St. Luke's Anderson Campus Community Health Facility Project Allocation 500,000 (B) Construction, infrastructure, renovations and other related costs for the Northampton Community College college center and other academic buildings Project Allocation 6,000,000 (C) Construction, infrastructure, renovations and other related costs for the Northampton Community College automotive technology program building Project Allocation 3,000,000 (iv) Borough of Hellertown (A) Construction, infrastructure improvements and other costs for a public works facility Project Allocation 1,500,000 (v) City of Bethlehem (A) Construction, infrastructure improvements, abatement of hazardous materials and other related costs related to the Hoover- Mason Trestle redevelopment project Project Allocation 10,000,000 (B) Acquisition, construction, infrastructure improvements and other costs for the Southside Athletic and Community Center project Project Allocation 15,000,000 (C) Acquisition, construction, infrastructure improvements and other costs for a mixed-use building on the Southside Project Allocation 5,000,000 (D) Construction, infrastructure improvements, renovation and other costs for the City Center Complex Project Allocation 10,000,000 (E) Acquisition, construction, infrastructure improvements and other costs for an Adaptive Reuse Building Project on the Northside Project Allocation 10,000,000 (F) Acquisition, construction, infrastructure improvements and other costs for an Adaptive Reuse Building Project on the Southside Project Allocation 10,000,000 (G) Acquisition, construction, infrastructure improvements and other costs for a parking garage in the City of Bethlehem Project Allocation 5,000,000 (H) Land acquisition, construction, demolition, infrastructure improvements and other related costs for Lehigh University buildings and campus Project Allocation 20,000,000 (I) Acquisition, construction, infrastructure improvements and other costs for ArtsQuest Project Allocation 15,000,000 (J) Acquisition, construction, infrastructure improvements and other costs for Lehigh Valley Public Media Facilities expansion project Project Allocation 2,000,000 (K) Acquisition, construction, infrastructure improvements and other costs for the Moravian College buildings and campus Project Allocation 10,000,000 (L) Acquisition, construction, infrastructure improvements and other costs for the Moravian College off-campus buildings Project Allocation 10,000,000 (M) Construction, infrastructure, renovation and rehabilitation of National Museum of Industrial History, including expansion of museum exhibit space Project Allocation 2,000,000 (vi) City of Easton (A) Acquisition, construction, infrastructure improvements and other costs for the rehabilitation of the 6th Street Fire Station Project Allocation 1,000,000 (B) Construction, infrastructure improvements, renovation and other costs for a mixed-use facility at the corner of South Third Street and Larry Holmes Drive in the Downtown Development District Project Allocation 5,000,000 (C) Construction, infrastructure improvements and other costs for redevelopment of a pedestrian corridor on Church Street between 4th Street and Bank Street Project Allocation 1,000,000 (D) Acquisition, construction, infrastructure improvements and other costs for the Elevated Highline Park and Rail Site redevelopment project Project Allocation 4,000,000 (E) Construction, infrastructure improvements and other costs for Cottingham Stadium facilities renovations Project Allocation 7,000,000 (F) Construction, infrastructure, redevelopment and related costs to establish a pedestrian walkway and community area Project Allocation 1,000,000 (G) Acquisition, construction, infrastructure, redevelopment and other related costs to rehabilitate a fire station Project Allocation 1,000,000 (H) Construction, infrastructure, redevelopment and other related costs for the renovation and expansion of a stadium Project Allocation 7,000,000 (I) Construction, infrastructure, acquisition, redevelopment and other related costs for commercial and residential mixed-use development at the former rail site at the intersection of Washington Street and Lehigh Drive Project Allocation 4,000,000 (J) Construction, infrastructure, redevelopment and other related costs for the renovation of Cottingham Stadium and related facilities Project Allocation 4,000,000 (K) Construction, infrastructure, redevelopment and other related costs for the renovation of Cottingham Stadium and related facilities Project Allocation 7,000,000 (L) Construction, infrastructure, redevelopment and other related costs for a parking garage in the City of Easton Project Allocation 7,000,000 (vii) Borough of Freemansburg (A) Acquisition, construction, infrastructure and other related costs for a municipal complex and community park improvements Project Allocation 1,000,000 (viii) Upper Mount Bethel Township (A) Regional economic development initiatives in the county, including Portland area water, sewer and natural gas infrastructure Project Allocation 10,000,000 (ix) Lower Nazareth Township (A) Acquisition, construction, infrastructure, machinery, equipment, renovation and other related costs for Lehigh Valley Health Network healthcare facilities Project Allocation 10,000,000 (x) Wilson Borough (A) Construction, infrastructure, renovation, redevelopment and other related costs for a recreational pool complex Project Allocation 3,000,000 (B) Construction, infrastructure, renovation, equipment purchase and other costs related to the expansion and improvement of a health care facility Project Allocation 5,000,000 (49) Northumberland County (i) County projects (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a cultural, civic or historical project in the county Project Allocation 5,000,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 10,000,000 (ii) City of Sunbury (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs to repurpose an old historic church into a community center with a stage for performing arts, a reception area and office spaces/incubator, HVAC replacement, weatherization of the building, historic preservation and restoration and construction of a stage Project Allocation 3,000,000 (iii) Northumberland County Industrial Development Authority (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the expansion of an existing restaurant/catering business Project Allocation 750,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for expansion and improvements to an existing shotgun association facility Project Allocation 1,000,000 (C) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for expansion of an existing high quality spice production business and establish a new facility in the county Project Allocation 2,000,000 (D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs to expand and establish a new production facility for high quality health and beauty aids Project Allocation 2,000,000 (E) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for restoration of an old mill for multiple uses, including, but not limited to, community areas and businesses Project Allocation 2,000,000 (F) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for development of an area located near the intersection of a major state highway and an Interstate for commercial and/or industrial uses Project Allocation 3,000,000 (G) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for the relocation of an existing container manufacturing business to a former deteriorating industrial facility Project Allocation 3,000,000 (H) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for expansion of an existing warehouse and logistics/trucking business, including construction of additional warehouse space, expanding the logistics and trucking business and making improvements to infrastructure Project Allocation 3,000,000 (I) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs to repurpose a former industrial site for an economic development in the City of Sunbury and/or Upper August Township Project Allocation 5,000,000 (50) Perry County (i) Duncannon Borough (A) Renovation, rehabilitation and other related costs associated with the restoration of the historic Clark's Ferry Tavern Project Allocation 500,000 (ii) Perry County Economic Development Authority (A) Construction, reconstruction, renovation, restoration, rehabilitation, replacement, preservation, installation and improvements of new and existing facilities in communities Project Allocation 10,000,000 (51) Philadelphia County (i) County projects (A) Construction, infrastructure and other costs related to affordable housing units and neighborhood redevelopment in Northwest Philadelphia Project Allocation 10,000,000 (B) Acquisition, infrastructure, renovations, rehabilitation, construction and related costs for Vernon House and other neighborhood redevelopment Project Allocation 3,000,000 (C) Infrastructure, renovations, rehabilitation, construction and other related costs for historic Germantown buildings Project Allocation 5,000,000 (D) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the redevelopment of the former Germantown High School Project Allocation 20,000,000 (E) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for Grace Baptist Church in the Germantown neighborhood of Philadelphia Project Allocation 2,000,000 (F) Construction, infrastructure and other costs related to the Hagert Street redevelopment project Project Allocation 10,000,000 (ii) City of Philadelphia (A) Renovations, infrastructure improvements, construction and other related costs for Magee Rehabilitation Hospital Project Allocation 2,000,000 (B) Demolition of single-story retail structure, construction and other costs for mixed-use commercial and residential structure for PREIT Market East project, Phase 2 Project Allocation 20,000,000 (C) Renovations, infrastructure improvements and construction for Philadelphia Film Center, formerly known as the Prince Theater Project Allocation 2,500,000 (D) Site work, infrastructure, renovation, construction and other costs related to the redevelopment of the historic Methodist Services campus Project Allocation 4,000,000 (E) Renovations, infrastructure, construction and other costs for the Mann Center for the Performing Arts Project Allocation 16,000,000 (F) Construction, infrastructure and other costs related to the Smith Memorial Playground and Playhouse in Fairmount Park Project Allocation 4,000,000 (G) Demolition, infrastructure, construction and other costs related to the redevelopment of the historic Carl Mackley Apartment Homes and associated commercial development Project Allocation 5,000,000 (H) Acquisition, construction, infrastructure, renovations and other related costs for Rhoads Industries industrial and manufacturing center at the Navy Yard Project Allocation 15,000,000 (I) Construction, infrastructure, redevelopment and other related costs for improvements of new and existing facilities at the Eastern State Penitentiary Project Allocation 25,000,000 (J) Construction, infrastructure, redevelopment and other related costs for improvements of new and existing facilities at the National Constitution Center Project Allocation 25,000,000 (K) Land acquisition, site preparation, demolition, construction, infrastructure and other related costs for Thomas Jefferson University Hospital Project Allocation 30,000,000 (L) Construction, infrastructure, redevelopment and other related costs to increase capacity and safety for the Thomas Jefferson University Hospital Post Anesthesia Care Unit Project Allocation 2,000,000 (M) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Southwest Philadelphia Project Allocation 10,000,000 (N) Acquisition, construction, infrastructure and other related costs for the Kensington and Allegheny Commercial Corridor Project Project Allocation 2,500,000 (O) Acquisition, construction, infrastructure, redevelopment and other related costs for expansion of the Energy Coordinating Agency Training Center Project Allocation 1,500,000 (P) Acquisition, demolition, construction, infrastructure, redevelopment and other related costs for Einstein Medical Center Project Allocation 10,000,000 (Q) Construction, demolition, renovations, infrastructure and other costs related to the expansion of the Philadelphia College of Osteopathic Medicine campus Project Allocation 25,000,000 (R) Site work, infrastructure, environmental remediation, construction and other related costs for the Left Bank Apartments at 3131 Walnut Street Project Allocation 5,000,000 (S) Construction and other related costs for a community Boat House Project Allocation 5,000,000 (T) Construction and other related costs for an Urban Youth Racing School and community center Project Allocation 15,000,000 (U) Construction, infrastructure improvements, redevelopment and other related costs for a community gym and learning space Project Allocation 1,000,000 (V) Acquisition, construction, demolition, renovations, infrastructure and other costs related to an art gallery, education and commercial use facility on the 3600 and 3700 Blocks of Mount Vernon Street Project Allocation 5,000,000 (W) Construction, renovation, infrastructure improvements and other development costs associated with a performance and exhibition center at the University of the Arts Project Allocation 5,000,000 (X) Acquisition, construction, infrastructure improvements and other related costs for facility upgrades at the Kimmel Center for the Performing Arts campus Project Allocation 20,000,000 (Y) Construction, infrastructure, acquisition, abatement of hazardous materials and other related costs for revitalization and development of the Metal Bank Superfund Site in Philadelphia Project Allocation 2,000,000 (Z) Construction, infrastructure, acquisition, abatement of hazardous materials and other related costs for capital improvements and renovations to Holy Family University buildings and campus at its Northeast Philadelphia campus Project Allocation 10,000,000 (AA) Construction, infrastructure, acquisition, redevelopment and other related costs for capital improvements and renovations to the St. Hubert High School buildings and campus at the Northeast Philadelphia campus Project Allocation 2,500,000 (BB) Construction, infrastructure, acquisition, redevelopment and other related costs for capital improvements and renovations to the St. Christopher Elementary School buildings and campus at the Northeast Philadelphia campus Project Allocation 2,000,000 (CC) Construction, infrastructure, redevelopment, renovation, machinery and equipment and other related costs for the Glen Foerd on the Delaware project in the Torresdale section of Northeast Philadelphia Project Allocation 1,000,000 (DD) Construction, infrastructure, acquisition, redevelopment and equipment for capital improvements and renovation of a community recreation center in Northeast Philadelphia Project Allocation 5,000,000 (EE) Infrastructure, development, construction and other related costs for the redevelopment of properties along the Route 13 commercial corridor in Northeast Philadelphia, including streetscape, lighting and sidewalk enhancements Project Allocation 2,000,000 (FF) Infrastructure, development, construction and other related costs for the redevelopment of properties along the Route 1 industrial/commercial corridor in Northeast Philadelphia, including streetscape, lighting and sidewalk enhancements Project Allocation 5,000,000 (GG) Infrastructure, development, construction and other related costs for the redevelopment of properties along the Aramingo Avenue industrial/commercial corridor in Philadelphia, including streetscape, lighting and sidewalk enhancements Project Allocation 2,000,000 (HH) Infrastructure, development, construction and other related costs for the redevelopment of properties along the Castor Avenue commercial corridor in the greater Rhawnhurst/Oxford Circle sections of Northeast Philadelphia, including streetscape, lighting and sidewalk enhancements Project Allocation 2,000,000 (II) Infrastructure, development, construction and other related costs for the redevelopment of properties along the State Route 1009/0532 commercial corridor in Northeast Philadelphia, including streetscape, lighting and sidewalk enhancements Project Allocation 2,000,000 (JJ) Infrastructure, development, construction and other related costs for the redevelopment of properties along the Torresdale Avenue commercial corridor in Philadelphia, including streetscape, lighting and sidewalk enhancements Project Allocation 2,000,000 (KK) Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction, rail line installations and other related costs for revitalization and development of industrial and commercial sites in Northeast Philadelphia Project Allocation 10,000,000 (LL) Renovation, site preparation, construction, rehabilitation and other related costs for renovations to the Bok Building Auditorium Project Allocation 1,500,000 (MM) Construction, infrastructure improvements and other costs for a Police Department Athletic League facility on Trinity Church Oxford grounds Project Allocation 1,500,000 (NN) Construction, infrastructure improvements and other costs for Temple University Hospital pharmacies renovations Project Allocation 1,600,000 (OO) Construction, infrastructure improvements and other costs for Temple University Alpha Center renovations Project Allocation 10,000,000 (PP) Construction, infrastructure improvements and other costs for Temple University Hospital Radiology Suite renovations Project Allocation 1,500,000 (QQ) Construction, infrastructure improvements and other costs for Temple University Hospital Gamma Knife Suite renovations Project Allocation 2,000,000 (RR) Land acquisition, construction, demolition, site preparation, infrastructure improvements and other related costs for Trinity Health Project Allocation 5,000,000 (SS) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Northwest Philadelphia Project Allocation 20,000,000 (TT) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project in Mt. Airy Project Allocation 10,000,000 (UU) LaSalle University campus renovations and miscellaneous improvement projects Project Allocation 10,000,000 (VV) Chestnut Hill College campus renovations and miscellaneous improvement projects Project Allocation 10,000,000 (WW) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for projects at Chestnut Hill Hospital, Tower Health Project Allocation 10,000,000 (XX) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for projects at Sedgwick Theater Project Allocation 5,000,000 (YY) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project at ACES Museum Project Allocation 1,000,000 (ZZ) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project at Awbury Arboretum Project Allocation 5,000,000 (AAA) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project at Morris Arboretum Project Allocation 5,000,000 (BBB) Acquisition, construction, infrastructure and other related costs for the Bible Way Baptist Church Community Revitalization Complex Project Allocation 5,000,000 (CCC) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for Calvary Agape facilities Project Allocation 1,500,000 (DDD) Construction, renovations, infrastructure, remediation and other costs related to the Children's Hospital Project Allocation 30,000,000 (EEE) Acquisition, construction, infrastructure and other related costs for the Family Health and Birth Center Project Allocation 2,000,000 (FFF) Construction, infrastructure, remediation and other costs related to the Share Food Program Distribution Warehouse renovation project Project Allocation 5,000,000 (GGG) Renovation, development, abatement of hazardous materials, demolition and improvements to Franklin Delano Roosevelt Park Project Allocation 50,000,000 (HHH) Acquisition, design, demolition, construction, infrastructure, abatement, streetscape enhancements and other related costs of a mixed-use high rise economic development project Project Allocation 15,000,000 (III) Acquisition, construction, infrastructure and equipment related to the development of low-income intergenerational housing in North Philadelphia Project Allocation 5,000,000 (JJJ) Site preparation, acquisition, infrastructure, demolition, remediation, construction and related design activities for the redevelopment of the vacant Logan Triangle site Project Allocation 40,000,000 (KKK) Acquisition, construction and development of a complex of neighborhood multiseason, multipurpose indoor and outdoor sports facilities in North Philadelphia Project Allocation 20,000,000 (LLL) Acquisition, construction, infrastructure and equipment related to the multiphase, mixed-use, urban transit-oriented North Station District project in North Philadelphia Project Allocation 50,000,000 (MMM) Rehabilitation, construction, infrastructure and equipment related to the redevelopment of the iconic Oaklane Diner in the Oaklane neighborhood of North Philadelphia Project Allocation 3,000,000 (NNN) Acquisition, construction and rehabilitation of properties for use as transitional residential housing and for ancillary uses in the Greater Swampoodle/Lehigh Avenue areas of North Philadelphia west of Broad Street Project Allocation 5,000,000 (OOO) Construction, renovation, infrastructure improvement and equipment related to the development of a neighborhood/community facility Project Allocation 2,000,000 (PPP) Construction, acquisition, redevelopment and other costs related to the redevelopment of North Philadelphia's historic Uptown Theater Project Allocation 5,000,000 (QQQ) Acquisition, construction, infrastructure and equipment related to the development of a dairy processing plant in North Philadelphia Project Allocation 5,000,000 (RRR) Acquisition, construction, infrastructure and equipment related to the development of a hemp cultivation and processing facility in North Philadelphia Project Allocation 5,000,000 (SSS) Acquisition, construction, infrastructure and equipment related to the development of a halal meat processing facility in North Philadelphia Project Allocation 2,000,000 (TTT) Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for site of Beury Building on North Broad Street Project Allocation 5,000,000 (UUU) Acquisition, construction, infrastructure and equipment related to the neighborhood development of the Nicetown/Wayne Junction/Germantown section of North Philadelphia Project Allocation 10,000,000 (VVV) Acquisition, construction, infrastructure and equipment related to the neighborhood development of the Cecil B. Moore area of North Philadelphia Project Allocation 10,000,000 (WWW) Acquisition, construction, infrastructure and equipment related to the neighborhood development of the Tioga area of North Philadelphia Project Allocation 10,000,000 (XXX) Acquisition, construction, infrastructure and equipment related to the neighborhood development of the Feltonville area of North Philadelphia Project Allocation 10,000,000 (YYY) Acquisition, construction, infrastructure and equipment related to business corridor development along Broad Street in North Philadelphia Project Allocation 10,000,000 (ZZZ) Construction, infrastructure and equipment related to the redevelopment of the Sultan Ahmad Community Center in North Central Philadelphia Project Allocation 500,000 (AAAA) Design, construction, infrastructure and other related costs associated with upgrades and redevelopment projects at St. Christopher's Hospital for Children Project Allocation 60,000,000 (BBBB) Design, acquisition, demolition, construction, remediation of hazardous materials and other related costs for the Imvax Expansion Project Phase II Project Allocation 5,000,000 (CCCC) Acquisition, demolition, renovation, construction, infrastructure and other related costs for improvements to Drexel University campus and adjacent properties Project Allocation 20,000,000 (DDDD) Acquisition, renovation, construction, infrastructure improvements and other related costs for upgrades to the Overbrook School for the Blind Project Allocation 5,000,000 (EEEE) Acquisition, construction, infrastructure, remediation and other related costs for the Upper Lancaster Avenue Business Corridor Project Project Allocation 10,000,000 (FFFF) Acquisition, construction, infrastructure and other related costs for the Bibleway Baptist Church Community Revitalization Complex Project Project Allocation 5,000,000 (GGGG) Acquisition, construction, infrastructure and other related costs for the New Africa Center Project Allocation 8,000,000 (HHHH) Acquisition, construction, infrastructure and other related costs for the Paul Robeson House Project Project Allocation 2,000,000 (IIII) Acquisition, construction, infrastructure and other related costs for the House of Umoja Project Project Allocation 5,000,000 (JJJJ) Acquisition, construction, infrastructure and other related costs for the North Philadelphia Revitalization Project Project Allocation 10,000,000 (KKKK) Construction, infrastructure, renovations and other related costs for the Dell Music Center Project Allocation 1,000,000 (LLLL) Construction, redevelopment, restoration and other related costs for the renovation of a Christian center Project Allocation 2,500,000 (MMMM) Construction, infrastructure, redevelopment, restoration and other related costs for projects at historic Germantown sites Project Allocation 10,000,000 (NNNN) Construction, infrastructure, redevelopment and other related costs for the renovation of the Studebaker Building Project Allocation 2,000,000 (OOOO) Construction, infrastructure, redevelopment and other related costs for the Divine Lorraine project Project Allocation 2,000,000 (PPPP) Acquisition, construction, infrastructure, renovation, redevelopment and other related costs for improving recreation trails and parks on the Delaware River in northeast Philadelphia Project Allocation 5,000,000 (QQQQ) Construction, redevelopment, infrastructure, acquisition and other related costs for the Highline Park project Project Allocation 500,000 (RRRR) Acquisition, clearing, demolition, renovation, environmental remediation, construction, infrastructure, design, streets, utilities and other costs associated with the development of Drexel Square Park Project Allocation 7,000,000 (SSSS) Construction, infrastructure, redevelopment and other costs for the renovation of Eastern State Penitentiary and related facilities Project Allocation 12,500,000 (TTTT) Construction, redevelopment, infrastructure, acquisition and other related costs for the Liberty on the River development project Project Allocation 13,000,000 (UUUU) Construction, redevelopment, infrastructure, acquisition and other related costs for a performing arts center Project Allocation 4,500,000 (VVVV) Construction, redevelopment and other related costs to support the Mural West facility project Project Allocation 7,500,000 (WWWW) Construction, redevelopment, infrastructure, acquisition and other related costs for the renovation and restoration of a marina Project Allocation 3,000,000 (XXXX) Construction, infrastructure and other related costs for a playground and playhouse Project Allocation 4,000,000 (YYYY) Construction, infrastructure, acquisition, redevelopment and other related costs for a community performance and exhibition center at University of the Art Project Allocation 5,000,000 (ZZZZ) Construction, infrastructure, redevelopment and other related costs for a center for performing arts Project Allocation 16,000,000 (A5) Acquisition, construction, reconstruction, rehabilitation, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities and storm water management and common areas and all other related costs for the development, expansion, renovation, redevelopment and/or reuse of a facility within the City of Philadelphia to increase production and utilization of green energy alternatives to fuel the thermal dryers at the existing Philadelphia Biosolids Recycling Center Project Allocation 15,000,000 (B5) Acquisition, demolition, construction, renovation, infrastructure and other development costs for emergency, inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Philadelphia projects Project Allocation 10,000,000 (C5) Construction, acquisition, redevelopment, infrastructure and other costs related to the expansion and renovation of a training facility in south Philadelphia Project Allocation 17,000,000 (D5) Construction, infrastructure, redevelopment and other related costs for adaptive reuse of residential and commercial facilities associated with the Left Bank Apartments project Project Allocation 5,000,000 (E5) Construction, acquisition, redevelopment and other related costs for a new school building Project Allocation 4,500,000 (F5) Construction and related costs for the renovation of a community center Project Allocation 5,363,000 (G5) Construction and other related costs for the renovation of historic Carpenter's Hall Project Allocation 1,000,000 (H5) Acquisition, construction, infrastructure, redevelopment and other related costs for the renovation of Laurel Hill and West Laurel Hill garden cemeteries Project Allocation 7,500,000 (I5) Construction and other related costs for an emergency disaster facility Project Allocation 1,500,000 (J5) Construction, infrastructure, acquisition, development and other related costs related to the renovation, expansion and development of recreational space utilized by the Starfinder Foundation Project Allocation 10,000,000 (K5) Construction, infrastructure, redevelopment and other related costs for the restoration of the Rose Playground and surrounding areas Project Allocation 5,000,000 (L5) Construction, infrastructure and other related costs for the expansion of an athletic facility Project Allocation 1,500,000 (M5) Construction, infrastructure, acquisition, redevelopment and other related costs for the renovation of a hotel Project Allocation 4,000,000 (N5) Acquisition, construction, infrastructure and other related costs to reutilize East Market Street between City Hall and Independence Mall Project Allocation 7,500,000 (O5) Construction, infrastructure, redevelopment and other related costs for the restoration of the Cobbs Creek Golf Course and surrounding areas Project Allocation 10,000,000 (P5) Construction, infrastructure, redevelopment and other related costs for the restoration of the Haverford Library and surrounding areas Project Allocation 5,000,000 (Q5) Construction and other related costs for the renovation of an existing auditorium for community theater, meeting space and high school functions Project Allocation 1,500,000 (R5) Construction, infrastructure improvements, renovation, rehabilitation, equipment, technology and other related costs for Associated Services for the Blind and Visually Impaired Project Allocation 2,500,000 (S5) Construction, acquisition, redevelopment, infrastructure and other costs related to the environmental remediation of a facility that will promote urban agriculture Project Allocation 9,000,000 (T5) Construction, infrastructure, redevelopment and other related costs for the restoration of the Science Leadership Academy and surrounding areas Project Allocation 5,000,000 (U5) Construction, redevelopment, infrastructure and other related costs for the renovation of a wellness center Project Allocation 3,500,000 (V5) Construction, redevelopment, infrastructure and other related costs for the Haddington Library improvement project Project Allocation 5,000,000 (W5) Construction, redevelopment, infrastructure and other related costs for the Wynnefield Library improvement project Project Allocation 5,000,000 (X5) Construction, infrastructure, redevelopment and other costs related to the restoration of Shepard Recreation Center and surrounding areas Project Allocation 5,000,000 (Y5) Construction, infrastructure, redevelopment and other costs related to the restoration of Overbrook High School and surrounding areas Project Allocation 5,000,000 (Z5) Construction, infrastructure, redevelopment and other costs related to the restoration of Overbrook Education Center and surrounding areas Project Allocation 5,000,000 (A6) Construction, infrastructure, redevelopment and other costs related to the restoration of Morris Park and surrounding areas Project Allocation 5,000,000 (B6) Construction, infrastructure, redevelopment and other costs related to the restoration of Robert E. Lamberton Elementary School and surrounding areas Project Allocation 5,000,000 (C6) Construction, infrastructure, redevelopment and other costs related to the restoration of Granahan Playground and surrounding areas Project Allocation 5,000,000 (D6) Construction, infrastructure, redevelopment and other costs related to the restoration of Gompers Elementary School and surrounding areas Project Allocation 5,000,000 (E6) Construction, infrastructure, redevelopment and other costs related to the restoration of Cassidy Elementary School and surrounding areas Project Allocation 5,000,000 (F6) Construction, infrastructure, redevelopment and other costs related to the restoration of Barry Elementary School and surrounding areas Project Allocation 5,000,000 (G6) Construction, infrastructure, redevelopment and other costs related to the restoration of Baker Playground and surrounding areas Project Allocation 5,000,000 (H6) Construction, redevelopment and other costs related to the renovation and repair along the Delaware River waterfront Project Allocation 3,000,000 (I6) Construction, redevelopment, infrastructure and other related costs for an art museum Project Allocation 5,000,000 (J6) Construction, infrastructure and other related costs for the Glen Foerd Access improvement project Project Allocation 750,000 (K6) Construction, infrastructure, redevelopment and other costs related to the restoration of Papa Playground and surrounding areas Project Allocation 5,000,000 (L6) Construction, infrastructure, redevelopment and other costs related to the restoration of Overbrook Elementary School and surrounding areas Project Allocation 5,000,000 (M6) Construction, infrastructure, redevelopment and other related costs for the Simons Recreation Center renovation project Project Allocation 5,000,000 (N6) Acquisition, redevelopment, infrastructure and other related costs for improvements to the Central Delaware riverfront within the Delaware River Waterfront Corporation's planning district Project Allocation 4,000,000 (O6) Construction, redevelopment and other related costs for the demolition and reconstruction of existing buildings for affordable housing Project Allocation 2,000,000 (P6) Construction, infrastructure and other costs related to the renovation and rehabilitation of a public radio and television station Project Allocation 2,500,000 (Q6) Construction, acquisition, infrastructure, redevelopment and other costs related to the renovation and relocation of a facility occupied by a nonprofit organization Project Allocation 500,000 (R6) Construction, infrastructure, redevelopment, acquisition, renovation and other costs related to Peirce College projects Project Allocation 10,000,000 (S6) Construction, infrastructure and other related costs for renovation of the Independence Seaport Museum Project Allocation 15,000,000 (T6) Acquisition, construction, demolition, redevelopment, infrastructure and other related costs for a training center in South Philadelphia Project Allocation 10,000,000 (U6) Construction, renovation and other costs related to mixed-use development Project Allocation 10,000,000 (V6) Construction, renovation and other related costs for a museum facility Project Allocation 10,000,000 (W6) Construction, renovation and other related costs for a museum Project Allocation 5,000,000 (X6) Construction, infrastructure, acquisition and other costs related to the expansion and renovation of a facility used for dance education and training Project Allocation 15,000,000 (Y6) Construction, redevelopment and other costs related to the development of residential and commercial properties located at A Street and Indiana Avenue Project Allocation 5,000,000 (Z6) Construction, infrastructure and other related costs for the site merger of the Fishtown Library Brand and Recreation Center Project Allocation 7,000,000 (A7) Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for the Grand Hank STEM Center and Creative Space for Inner City Youth Project Allocation 1,000,000 (B7) Construction, infrastructure, redevelopment and other related costs for renovations to the Historical Society of Pennsylvania's Family History Center Project Allocation 5,000,000 (C7) Construction, infrastructure, redevelopment and other related costs for renovations to facilities at St. Joseph Preparatory School Project Allocation 25,000,000 (D7) Construction, infrastructure and other related costs for the creation of a new early childhood center and outdoor playground Project Allocation 1,100,000 (E7) Construction, infrastructure and other related costs for the Sterling Lofts building site for retail and commercial space Project Allocation 10,000,000 (F7) Demolition, construction and rehabilitation of 52nd Street Business Corridor in West Philadelphia Project Allocation 25,000,000 (G7) Construction, acquisition, infrastructure, redevelopment and other costs related to the expansion of the IATSE Local 8 training center Project Allocation 2,000,000 (H7) Construction, infrastructure and other costs related to the Northern Liberties Redevelopment Project Project Allocation 20,000,000 (iii) Philadelphia Industrial Development Corporation (A) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for research laboratories, coworking spaces, meeting/conference facilities, office space with incubation/acceleration platforms for supporting development of technology and biomedical/biopharmaceutical innovations Project Allocation 5,000,000 (B) Construction, infrastructure and other costs related to the Saint Joseph's University improvement project Project Allocation 10,000,000 (C) Construction, demolition, renovation, infrastructure and other costs related to the expansion of the campus of the Philadelphia College of Osteopathic Medicine Project Allocation 12,500,000 (D) Construction, renovation, infrastructure and other related costs for a performing arts campus Project Allocation 20,000,000 (D.1) Construction, infrastructure and other costs related to the facilities Master Plan Phase II of the Philadelphia Art Museum Project Allocation 20,000,000 (E) Acquisition, construction, infrastructure, redevelopment and other related costs for the improvement of empty fields to provide the community with access to a facility that would provide afterschool activities for children and adults Project Allocation 1,500,000 (F) Acquisition, construction, infrastructure, redevelopment and other related costs for the improvement of fields and facilities Project Allocation 2,000,000 (G) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment, abatement of hazardous materials and other related costs for economic development Project Allocation 2,000,000 (H) Acquisition, construction, infrastructure, redevelopment, renovation, machinery and equipment, abatement of hazardous materials and other related costs for economic development to fight blighted property Project Allocation 3,000,000 (I) Acquisition, construction, infrastructure and other costs for an economic development project Project Allocation 250,000,000 (J) Acquisition, construction, infrastructure and other related costs to revitalize the lower Schuylkill area from Gray's Ferry Avenue to 70th Street, including adjacent areas Project Allocation 100,000,000 (K) Acquisition, construction, infrastructure and other related costs for an industrial facility at the Philadelphia Navy Yard Project Allocation 100,000,000 (L) Acquisition, construction, infrastructure, remediation and other related costs for life sciences projects Project Allocation 250,000,000 (M) Acquisition, construction, infrastructure, renovation and other costs related to the redevelopment and rehabilitation of the abandoned PECO power plant and the surrounding areas located along the Delaware River Project Allocation 10,000,000 (iv) Philadelphia Authority for Industrial Development (A) Infrastructure, acquisition, construction, redevelopment and other related costs for adaptive reuse of residential and commercial facilities Project Allocation 5,000,000 (v) Philadelphia Redevelopment Authority (A) Construction, infrastructure, renovation, rehabilitation, machinery, technology, equipment and other related costs for the PA School for the Deaf Project Allocation 5,000,000 (B) Acquisition, construction, renovation, rehabilitation, abatement of hazardous materials and other related costs for an integrated physical and behavioral health campus Project Allocation 5,000,000 (C) Construction, infrastructure, acquisition, redevelopment, abatement of hazardous materials and other related costs for an integrated physical and behavioral health campus Project Allocation 5,000,000 (vi) Roxborough Development Corporation (A) Construction, infrastructure, acquisition, redevelopment and other related costs for adaptive reuse of existing buildings and new facilities associated with the Ridge Avenue Streetscape Phase II Project Project Allocation 1,500,000 (vii) Nicetown Community Development Corporation (A) Acquisition, construction, infrastructure, redevelopment and other related costs for the Nicetown CDC Commercial Corridor revitalization project Project Allocation 5,000,000 (viii) School District of Philadelphia (A) Construction, infrastructure, redevelopment, renovation and other costs related to the restoration of the Francis Scott Key Elementary School playground improvement project and surrounding areas Project Allocation 1,000,000 (B) Construction, infrastructure, redevelopment, renovation and other costs related to the restoration of the A.S. Jenks Elementary School playground improvement project and surrounding areas Project Allocation 1,000,000 (ix) South Philly Healthy Schools Coalition (A) Construction, infrastructure, redevelopment, renovation and other costs related to establishing health school buildings in the designated area Project Allocation 15,000,000 (x) The William H. Gray III Memorial Foundation (A) Construction, redevelopment and other costs related to the William H. Gray III memorial project Project Allocation 1,000,000 (xi) Westside Venture Group, LLC (A) Construction, infrastructure, renovation, redevelopment and other costs related to the development of the 615-655 North 55th Street improvement project and surrounding areas Project Allocation 10,000,000 (52) Pike County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 5,000,000 (B) Infrastructure and other related costs for expansion of central water and sewage facilities Project Allocation 8,000,000 (53) Potter County (i) Potter County Industrial Development Authority (A) Redevelopment, rehabilitation and other related costs for UPMC Cole improvements and facility upgrades Project Allocation 3,000,000 (54) Schuylkill County (i) County projects (A) Construction, infrastructure, rehabilitation and other related costs for the St. Luke's Medical Office Building in Mahanoy City Project Allocation 1,500,000 (B) Acquisition, construction, infrastructure, rehabilitation and other related costs for a St. Luke's Medical Office Building in Tamaqua Borough Project Allocation 1,500,000 (C) Construction, infrastructure, rehabilitation and other related costs for the St. Luke's Coaldale Medical Office Building and Pharmacy expansion Project Allocation 1,500,000 (D) Acquisition, construction, infrastructure and other related costs for a Federally Qualified Health Center (FQHC) anchored multiservice facility Project Allocation 1,000,000 (E) Acquisition, construction, infrastructure, redevelopment and other related costs for a community revitalization project in the county Project Allocation 5,000,000 (F) Acquisition, construction, infrastructure, rehabilitation, redevelopment and other related costs for an economic development project in the county Project Allocation 7,000,000 (G) Acquisition, construction, infrastructure, redevelopment and other related costs for an economic development project in the county Project Allocation 5,000,000 (ii) City of Pottsville (A) Acquisition, renovation, construction and infrastructure for a downtown anchor building redevelopment Project Allocation 5,000,000 (B) Acquisition, demolition, renovation, construction and infrastructure for downtown buildings as part of the city redevelopment plan Project Allocation 5,000,000 (iii) Schuylkill County Airport Authority (A) Construction, infrastructure and other related costs for water and sewer extensions, infrastructure improvements and development of an airport industrial park Project Allocation 5,000,000 (iv) Schuylkill Economic Development Corporation (A) Phase II of construction, including automatic sprinkler system, tank, office space and electrical service, of an industrial building at the Highridge Industrial Park Project Allocation 500,000 (B) Construction of a 50,000 square foot industrial building for an advanced manufacturing operator Project Allocation 750,000 (v) Schuylkill County Municipal Authority (A) Construction, infrastructure and other related costs for upgrades and expansion of the Gordon Borough wastewater treatment plant Project Allocation 10,000,000 (B) Construction, acquisition, infrastructure, redevelopment and other related costs for water and sewer improvements and upgrades Project Allocation 7,000,000 (55) Snyder County (i) County projects (A) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for renovation and rehabilitation of the former prison for additional office and storage space within the courthouse complex Project Allocation 1,500,000 (B) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for rehabilitation of a former furniture manufacturing facility, including ventilation system upgrades and new equipment Project Allocation 3,000,000 (C) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for expansion or renovation of Susquehanna University Project Allocation 5,000,000 (D) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a cultural, civic or historical project in the county Project Allocation 5,000,000 (E) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 10,000,000 (56) Somerset County (i) County projects (A) Redevelopment, infrastructure, construction and other related costs for Twin Lakes Center Alcohol and Drug Facility - Phase II Project Allocation 2,000,000 (B) Construction, redevelopment and other related costs for renovations and upgrades to the Somerset Hospital Inpatient Unit Project Allocation 2,500,000 (57) Sullivan County (i) County projects (A) Construction, redevelopment and other related costs for a multigenerational regional wellness and cultural community center Project Allocation 7,500,000 (58) Susquehanna County (i) County projects (A) Construction, infrastructure and other related costs for a countywide recreation center Project Allocation 2,500,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 5,000,000 (59) Tioga County (i) County projects (A) Construction, infrastructure, redevelopment, rehabilitation and other related costs for Tyoga Container expansion project Project Allocation 10,000,000 (ii) Develop Tioga (A) Construction, infrastructure, redevelopment and other related costs for the Mill Cove Environment Education Center Project Allocation 1,500,000 (B) Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic project in the county Project Allocation 10,000,000 (iii) Tioga County Industrial Development Authority (A) Redevelopment, rehabilitation and other related costs for UPMC Susquehanna Soldiers and Sailors improvements and facility upgrades Project Allocation 5,000,000 (iv) Tioga County Development Corporation (A) Construction, redevelopment, renovation and other related costs associated with UPMC facility improvements and expansion Project Allocation 5,000,000 (60) Union County (i) County projects (A) Infrastructure, site preparation, construction, design and other related costs for renovations of a nursing and assisted living facility, a capital improvement project at Albright Care Services located in the county Project Allocation 1,500,000 (B) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 2,000,000 (ii) Union County Industrial Development Corporation (A) Construction, renovation and other related costs for UPMC expansion and facility updates Project Allocation 2,000,000 (61) Venango County (i) County Projects (A) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 2,000,000 (B) Renovation, rehabilitation, construction and other costs related to county historical redevelopment projects, including improvements in the Venango County courthouse and the Oil City Library Project Allocation 600,000 (C) Infrastructure, abatement of hazardous materials, renovations, rehabilitation, construction and all other costs related to county economic development projects, including the Barkeyville corridor improvements, Brody block redevelopment and revitalization and the Franklin industrial and commercial development authority economic growth project Project Allocation 1,100,000 (D) Infrastructure, abatement of hazardous materials, renovation, rehabilitation, construction and all other costs related to community and economic development projects dedicated to the reuse of downtown buildings for office, living and retail space Project Allocation 2,000,000 (62) Warren County (i) Northwest Regional Planning Commission (A) Property acquisition, expansion and/or renovation projects to support business and employment stabilization and growth within the county Project Allocation 1,500,000 (63) Washington County (i) County projects (A) Redevelopment, infrastructure and other related costs for Phase 1- C earthwork and infrastructure at Starpointe Business Park Project Allocation 1,000,000 (B) Infrastructure, abatement of hazardous materials and other related costs for construction and development of a campus for rescuing, raising and training of medical service dogs for military veterans, first responders and citizens with disabilities Project Allocation 4,500,000 (C) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 950,000 (ii) Canonsburg Borough (A) Demolition, construction, renovation, rehabilitation, building, installation and improvement of an industrial manufacturing and/or processing facility in or near the City of Canonsburg Project Allocation 60,000,000 (iii) Monongahela Township (A) Construction, reconstruction, renovation, rehabilitation, restoration, installation and improvements for a Level IV Opioid Detox Unit Project Allocation 8,000,000 (B) Construction, reconstruction, renovation, rehabilitation, restoration, replacement, preservation, installation and improvements of new and existing facilities and infrastructure at Monongahela Valley Hospital Project Allocation 30,000,000 (iv) North Franklin Park (A) Acquisition, construction, infrastructure and other related costs for rehabilitation of the water company building and surrounding land for conversion to a community center and event pavilion Project Allocation 8,000,000 (v) North Strabane Township (A) Acquisition, construction, infrastructure and other related costs for a township municipal building Project Allocation 5,500,000 (B) Acquisition, construction, infrastructure and other related costs for a public safety building Project Allocation 4,100,000 (vi) Peters Township (A) Acquisition, construction, infrastructure and other related costs for an economic development project in Peters Township Project Allocation 10,000,000 (vi.1) South Franklin Township (A) Construction, infrastructure and other related costs for Phase one of a public sewage plant project Project Allocation 12,000,000 (B) Construction, infrastructure and other related costs for the Friend AirCare Hangar construction project Project Allocation 2,500,000 (C) Acquisition, construction, infrastructure, redevelopment and other costs related to Skypointe business park Project Allocation 5,000,000 (D) Acquisition, construction, infrastructure, redevelopment and other costs related to development of site adjacent to Washington County Airport for aviation-related business park Project Allocation 10,000,000 (E) Construction, infrastructure, redevelopment and other costs related to the Washington County Airport northside development project Project Allocation 1,500,000 (vi.2) South Strabane Township (A) Construction, infrastructure and other related costs for the Washington Penn Plastic Headquarters and plant development project Project Allocation 10,000,000 (vii) Washington County Redevelopment Authority (A) Acquisition, construction, infrastructure, renovations, abatement, machinery and equipment and other related costs for the Andrew G. Uram Partnership's redevelopment project Project Allocation 1,500,000 (B) Construction, renovation and other related costs for rehabilitation and development of a 1,200-acre contiguous property in the county Project Allocation 15,000,000 (C) Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for Canonsburg Hospital renovations Project Allocation 10,000,000 (D) Acquisition, construction, infrastructure, redevelopment and other related costs for a visitors center, educational facility improvements and care of historic collections at Meadowcroft Rockshelter and Historic Village Project Allocation 2,000,000 (64) Wayne County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 5,000,000 (ii) Wayne Economic Development Corporation (A) Construction, infrastructure, renovation, redevelopment and other related costs for improvements to the Salvation Army Camp Ladore Project Allocation 2,000,000 (B) Construction, infrastructure and other related costs for the Sterling Business and Technology Park Project Allocation 20,000,000 (65) Westmoreland County (i) County projects (A) Acquisition, infrastructure, redevelopment, renovation and other related costs for Westmoreland Cultural Trust Project Allocation 500,000 (B) Acquisition, construction, renovation and rehabilitation for construction of a Controlled Environment Agriculture (CEA) facility, a restaurant incubator/public market as a priority project for the comprehensive plan "Reimagining Our Westmoreland" Project Allocation 5,000,000 (C) Acquisition, construction, environmental and/or hazardous assessment and remediation, site preparation, infrastructure improvements, including improvements related to energy, transportation, parking, utilities, storm water management and common areas, and all other related costs for the construction of a new facility to house a medical school for Seton Hill University Project Allocation 5,000,000 (D) Acquisition, construction, renovation and rehabilitation for the development of a convention center as a priority project for the comprehensive plan "Reimagining Our Westmoreland" Project Allocation 5,000,000 (E) Acquisition, construction, renovation and rehabilitation for the development of a regional modern sports and recreational complex as a priority project for the comprehensive plan "Reimagining Our Westmoreland" Project Allocation 5,000,000 (F) Acquisition, construction, infrastructure, renovation and redevelopment of brownfield sites to support revitalization efforts Project Allocation 20,000,000 (G) Acquisition, construction, renovation and rehabilitation for economic development projects in the county as identified in the comprehensive plan "Reimagining Our Westmoreland" Project Allocation 25,000,000 (H) Construction, reconstruction, renovation, rehabilitation, restoration, replacement, preservation, installation and improvements of new and existing facilities at the Westmoreland Museum of American Art Project Allocation 25,000,000 (I) Construction, infrastructure, redevelopment and other related costs for the expansion and/or renovation of facilities housing Saint Vincent College's academic and outreach programs in Unity Township Project Allocation 7,500,000 (ii) City of Greensburg (A) Construction, reconstruction, renovation, rehabilitation, restoration, preservation, improvements and other related costs for new and existing facilities at the Westmoreland Museum of American Art Project Allocation 25,000,000 (iii) City of Lower Burrell (A) Construction, infrastructure, renovations and other related costs for the Burrell Plaza revitalization project Project Allocation 500,000 (iv) City of New Kensington (A) Acquisition, construction, infrastructure, renovation, machinery and equipment and other related costs for the Eye-Bot Aerial Solutions project Project Allocation 5,000,000 (B) Construction, infrastructure and other related costs for the redevelopment of a former research lab Project Allocation 2,500,000 (C) Acquisition, construction, infrastructure improvements and other related development costs for the New Kensington Family Health Center Project Allocation 2,000,000 (v) Fairfield Township (A) Construction, infrastructure and other related costs for the rebuilding of a fire department Project Allocation 650,000 (vi) Mount Pleasant Township (A) Construction and other related costs for a new fire department building Project Allocation 700,000 (vii) Sewickley Township (A) Construction and other related costs for a new recreation center and public library Project Allocation 1,612,000 (viii) Economic Growth Connection of Westmoreland (A) Acquisition, construction, redevelopment, renovation, machinery and other related costs for an industrial hemp facility in South Huntingdon Township Project Allocation 1,000,000 (ix) Westmoreland County Industrial Development (A) Construction, infrastructure and other related costs for renovation of the Alumisource processing facility in the City of Monessen Project Allocation 2,500,000 (x) Westmoreland County Industrial Development Corporation (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery and equipment and other related costs for demolishing dilapidated structures and redeveloping the Alcoa Manufacturing Facility site Project Allocation 5,000,000 (66) Wyoming County (i) County projects (A) Acquisition, construction, infrastructure and other related costs for an economic development project in the county Project Allocation 5,000,000 (67) York County (i) County Projects (A) Design, inspection, acquisition, demolition, site preparation, infrastructure, utility expansion, abatement of hazardous materials, construction and other related costs for facilities at Northern York Area School District Project Allocation 1,500,000 (B) Construction, infrastructure, renovation and other related costs to expand the current training facility of the Manufacturers' Association of South Central PA Project Allocation 2,000,000 (i.1) Springettsbury Township (A) Acquisition, design, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, roadway and utility improvements, streetscape enhancements and other related costs for the construction of a new Police Station and Administration Building Project Allocation 5,000,000 (ii) City of York (A) Construction, rehabilitation, abatement of hazardous materials and other related costs for the historic Laurel/Rex Fire Station Project Allocation 750,000 (ii.1) Hanover Borough (A) Infrastructure, renovation, construction, acquisition, redevelopment and other related costs associated with the construction of a new Hanover Borough Police Department facility Project Allocation 2,500,000 (ii.2) York Township (A) Acquisition, design, construction, infrastructure and other related costs for a new indoor community recreation center Project Allocation 6,418,000 (iii) Northern York County Historical Preservation Society (A) Acquisition, design, construction, infrastructure, redevelopment, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for the preservation of Dill's Tavern Project Allocation 1,000,000 (iv) Redevelopment Authority of York County (A) Site preparation, infrastructure, abatement of hazardous materials, construction and materials costs related to the relocation of approximately 850 l.f. of active railroad tracks currently owned and operated by York Railway, a subsidiary of the Genesee and Wyoming Railroad and other related costs for York Railway rail system improvements located throughout the City of York Project Allocation 5,000,000 (B) Acquisition, site preparation, infrastructure, construction and other related costs associated with a large-scale, mixed-use development project north of Canal Road Project Allocation 5,000,000 (C) Construction, infrastructure, renovation and other related costs associated with UPMC Hanover improvements and upgrades Project Allocation 10,000,000 (v) York County Economic Alliance (A) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for a York Opportunity Zone Redevelopment Project Project Allocation 4,000,000 (B) Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for York County healthcare modernization Project Allocation 5,000,000 (C) Construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for York County Parks and Recreation improvements and modernization Project Allocation 5,000,000 (D) Redevelopment of a riverfront area Project Allocation 5,000,000 (E) Acquisition, construction infrastructure, redevelopment and other related costs for a multipurpose senior service facility Project Allocation 5,000,000 (F) Acquisition, design, construction, infrastructure, redevelopment and other related costs for local agricultural expansion Project Allocation 5,000,000 (G) Infrastructure, redevelopment and other related costs for redevelopment of York County boroughs Project Allocation 5,000,000 (H) Acquisition, abatement of hazardous materials, redevelopment, infrastructure, construction and other related costs for an industrial complex in the City of York Project Allocation 7,500,000 (I) Construction, infrastructure, acquisition, redevelopment and other related costs for an industrial complex Project Allocation 3,500,000 (J) Construction, acquisition, redevelopment and other related costs for the renovation of a farmer's market Project Allocation 1,500,000 (K) Relocation, construction, acquisition, infrastructure, redevelopment and other related costs for nonprofits in the county Project Allocation 12,000,000 (L) Construction, infrastructure, redevelopment and other related costs for redevelopment efforts within the county Project Allocation 5,000,000 (M) Acquisition, construction, infrastructure, redevelopment and other related costs for a multipurpose, multiuse senior service facility Project Allocation 5,000,000 (N) Acquisition, construction, infrastructure, redevelopment and other related costs to expand or establish a manufacturing facility Project Allocation 10,000,000 (O) Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for a redevelopment project to remediate blight and restore the property to productive use Project Allocation 5,000,000 (P) Redevelopment and other related costs to spur the revitalization and placemaking opportunity for a riverfront area in the county Project Allocation 5,000,000 (Q) Acquisition, construction, infrastructure, redevelopment and other related costs to provide resources to the local agricultural community in the county Project Allocation 5,000,000 (R) Acquisition, construction, infrastructure, redevelopment and other related costs for infrastructure and efficiency improvements and expansions to support York County healthcare systems Project Allocation 5,000,000 (S) Construction, infrastructure, abatement of hazardous materials and other related costs for the demolition and environmental remediation of a former industrial site and the redevelopment of the site to support the regional agricultural tourism economy with the neighboring York County fairgrounds property Project Allocation 5,000,000 (T) Infrastructure, redevelopment and other related costs for the renovation and expansion of higher education in the county Project Allocation 5,000,000 (U) Construction, infrastructure, abatement of hazardous materials, redevelopment and other related costs for the restoration of a historic farmer's market Project Allocation 3,000,000 (V) Construction, redevelopment and other related costs for the revitalization, improvement and expansion of existing county parks Project Allocation 5,000,000 (W) Acquisition, abatement of hazardous materials, construction, infrastructure, redevelopment and other related costs for a brownfield site to remediate blight and restore the property to productive use Project Allocation 7,500,000 (X) Acquisition, renovation, construction, infrastructure, redevelopment and other related costs associated with the adaptive use of historically significant conservation sites and green and open spaces in the Susquehanna National Heritage Area of York County Project Allocation 4,000,000 (Y) Construction, infrastructure, abatement of hazardous materials and other related costs for the development and expansion of the York County Rail Trail Project Allocation 5,000,000 (Z) Acquisition, site preparation, infrastructure, construction and other related costs associated with large-scale, mixed-use development project north of Canal Road Project Allocation 5,000,000 (AA) Construction, redevelopment and other related costs for the renovation of historic buildings and residential units Project Allocation 3,000,000 (BB) Construction, infrastructure, acquisition, redevelopment and other related costs for an industrial complex Project Allocation 8,000,000 (CC) Construction, infrastructure, acquisition, redevelopment and other related costs for economic development projects within qualified opportunity zones Project Allocation 3,000,000 (DD) Construction, infrastructure and other related costs to expand or establish a manufacturing facility Project Allocation 10,000,000 (EE) Construction, infrastructure, acquisition, redevelopment and other related costs for the renovation of a brownfield site Project Allocation 4,750,000 (FF) Acquisition, construction, infrastructure, redevelopment and other related costs for projects to remediate blight Project Allocation 4,750,000 (GG) Construction, infrastructure, acquisition, redevelopment and other related costs for a facility occupied by nonprofit organizations Project Allocation 12,000,000 (HH) Construction, infrastructure, redevelopment and other related costs for environmental remediation of a former industrial site Project Allocation 3,000,000 (II) Construction, infrastructure, redevelopment and other related costs for the renovation of The Colonial Hotel on Continental Square Project Allocation 8,000,000 (JJ) Construction, redevelopment and other related costs for a health education facility by Susan P. Byrnes Health Education Center, Inc. Project Allocation 2,000,000 (KK) Construction, infrastructure and other related costs for the renovation of the CASA York Welcome Center Project Allocation 500,000 (LL) Acquisition, redevelopment and other related costs for a children's advocacy center Project Allocation 3,090,000 (MM) Construction, infrastructure, acquisition, redevelopment and other related costs for the relocation, modernization and service enhancements of nonprofit organizations Project Allocation 12,000,000 (vi) York City Redevelopment Authority (A) Construction, infrastructure, redevelopment and other related costs for Phase 2 of the York Plan 2.0 Innovation District to include office, retail, flex commercial, residential and parking space Project Allocation 20,000,000 (B) Construction, infrastructure, redevelopment and other related costs for the headquarters of a clean/renewable energy and potable water system developer and operator Project Allocation 4,000,000 (vii) York County Industrial Development Corporation (A) Construction, infrastructure, redevelopment, renovation and other related costs for the demolition, removal and/or rehabilitation and replacement of sidewalks, curbing and wall and other affected areas of the York Expo Center Project Allocation 750,000 (68) Multiple Counties (i) Allegheny and Washington Counties (A) Construction, infrastructure and other related costs for development of an Industrial Park near the Westport Road Interchange on PA 576 bridging the Allegheny County and Washington County line Project Allocation 10,000,000 (ii) Philadelphia and Delaware Counties (A) Construction, infrastructure improvements and other costs for the Philadelphia and/or Northeast Airports Project Allocation 15,000,000 (iii) (Reserved) (iv) Centre, Clinton, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Luzerne, Lycoming, Mifflin, Montour, Northumberland, Schuylkill, Snyder and Union Counties (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs of Geisinger Health facilities for the Geisinger Authority Project Allocation 15,000,000 (v) Clinton, Lycoming, Northumberland and Union Counties (A) Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a multicounty broadband deployment project for the Northumberland County Industrial Development Authority Project Allocation 10,000,000 (vi) Centre, Clinton, Juniata, Mifflin, Montour, Northumberland, Perry and Union Counties in the SEDA-COG Natural Gas Cooperative (A) Construction, infrastructure, redevelopment, renovation and other related costs for natural gas projects for the Perry County Economic Development Corporation Project Allocation 15,000,000 (vii) Perry County Economic Development Corporation (A) Construction, reconstruction, rehabilitation, renovation, restoration, replacement, installation and improvements of natural gas infrastructure projects in municipalities or counties in the SEDA-COG Natural Gas Cooperative Project Allocation 7,500,000 (viii) Wayne and Pike Counties (A) Design, acquisition, demolition, site preparation, infrastructure, utility expansion, abatement of hazardous materials, construction and other related costs for a hemp production processing facility project Project Allocation 3,000,000

Section 7. Itemization of flood control projects.

Additional capital projects in the category of flood control projects to be constructed by the Department of Environmental Protection, its successors or assigns and to be financed by the incurring of debt are hereby itemized, together with their respective estimated costs, as follows:

Total Project

Project Allocation (1) Department of Environmental Protection (i) Allegheny County (A) Construction, infrastructure and other related costs for a flood mitigation project for Plum Creek in Plum Borough Project Allocation 500,000 (ii) Bucks County (A) Acquisition of homes, construction, drainage system improvements and other related costs to mitigate flooding Project Allocation 500,000 (ii.1) Luzerne County (A) Construction of a levee along the Susquehanna River, including consulting and engineering fees along with other associated costs, including acquisition of land and buildings if necessary Project Allocation 5,000,000 (B) Acquisition, construction and other related costs associated with a levee project to protect West Pittston Borough Project Allocation 10,000,000 (ii.2) Lycoming County (A) Design, engineering, construction, infrastructure and other related costs for a flood mitigation project in the Grafius Run Watershed to address flood hazard conditions in the City of Williamsport Project Allocation 3,500,000 (iii) Mercer County (A) Construction, infrastructure and other related costs for the Jamestown Borough Flood Control Project Project Allocation 630,000 (iv) Schuylkill County (A) Infrastructure, construction of a force main and purchase and installation of two diesel pumps for flood control measures Project Allocation 500,000 (v) Somerset County (A) Infrastructure and other related costs for a flood control project in Conemaugh Township Project Allocation 10,000,000 (vi) Washington County (A) Infrastructure and other related costs for the East Washington Flood Control Project Project Allocation 5,000,000 (vii) York County (A) Construction, infrastructure, renovation and other related costs for rehabilitation of the Sheppard-Myers Dam, a Class B, Category 1 dam to bring it into compliance with current Department of Environmental Protection regulations and updates to include, but not be limited to, a new spillway, modification to embankments, intake towers, discharge channel, addition of an abutment berm and storm water improvements Project Allocation 4,150,000

Section 8. Itemization of Pennsylvania Fish and Boat Commission capital projects. The individual capital projects in the category of public improvement projects to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by the current revenues of the Fish Fund and the Boat Fund pursuant to executive authorizations are hereby itemized, together with their respective estimated costs, as follows:

Total Project

Project Allocation (1) Pennsylvania Fish and Boat Commission (i) Cumberland County (A) Design, permit, acquire properties and construct a dam rehabilitation project to include repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operation as necessary at Children's Lake Project Allocation 500,000

Section 9. Itemization of Manufacturing Fund capital projects.

Capital projects in the category of public improvement projects to be acquired or developed by the Department of General Services, its successors and assigns, for the Department of Corrections and to be financed from current revenues of the Manufacturing Fund are hereby itemized, together with their respective estimated costs, as follows:

Total Project

Project Allocation (1) Department of Corrections (i) State Correctional Institution at Forest (A) Interior upgrades and modifications to support correctional incentives program Project Allocation 2,000,000 (ii) State Correctional Institution at Houtzdale (A) Interior upgrades and modifications to support correctional incentives program Project Allocation 5,000,000 (iii) State Correctional Institution at Mercer (A) Interior upgrades and modifications to support correctional incentives program Project Allocation 14,000,000

Section 10. (Reserved).

Section 11. Debt authorization. (a) Public improvements.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(a).

(b) Furniture and equipment.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(b) as may be found necessary to carry out the acquisition and construction of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in the capital budget.

(c) Transportation assistance.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(c) as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.

(d) Redevelopment assistance.--Subject to the limitations in section 317(b) of the act of February 9, 1999 (P.L.1, No.1), known as the Capital Facilities Debt Enabling Act, the Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(d) as may be found necessary to carry out the redevelopment assistance capital projects specifically itemized in the capital budget.

(e) Flood control.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(e) as may be found necessary to carry out the acquisition and construction of the flood control projects specifically itemized in a capital budget.

(f) Pennsylvania Fish and Boat Commission projects.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(f) as may be found necessary to carry out the acquisition and construction of the Pennsylvania Fish and Boat Commission projects.

Section 12. Issue of bonds. The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, the Auditor General and the State Treasurer shall determine, but the latest stated maturity date shall not exceed the estimated useful life of the projects being financed as stated in section 13.

Section 13. Estimated useful life and term of debt.

(a) Estimated useful life.--The General Assembly states that the estimated useful life of the capital projects itemized in this act is as follows:

(1) Public improvement projects, 30 years.

(2) Furniture and equipment, 10 years.

(3) Transportation assistance projects:

(i) Rolling stock, 15 years.

(ii) Passenger buses, 12 years.

(iii) Furniture and equipment, 10 years.

(iv) All others, 30 years.

(4) Redevelopment assistance projects, 30 years.

(b) Term of debt.--The maximum term of the debt authorized to be incurred under this act is 30 years.

Section 14. Appropriations.

(a) Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount specified in section 2(a) to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the money as required and certified by it to be legally due and payable.

(b) Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount specified in section 2(b) to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the money as required and certified by it to be legally due and payable.

(c) Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount specified in section 2(c) to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the money as required and certified by it to be legally due and payable.

(d) Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community and Economic Development in the maximum amount specified in section 2(d) to be used by it exclusively to defray the financial cost of the redevelopment assistance capital projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community and Economic Development the money as required and certified by it to be legally due and payable.

(e) Flood control.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Protection in the maximum amount specified in section 2(e) to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental Protection the money as required and certified by it to be legally due and payable.

(f) Pennsylvania Fish and Boat Commission projects.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Pennsylvania Fish and Boat Commission in the maximum amount specified in section 2(f) to be used by it exclusively to defray the financial cost of the Pennsylvania Fish and Boat Commission projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Pennsylvania Fish and Boat Commission the money as required and certified by it to be legally due and payable.

Section 15. Federal funds.

(a) Projects itemized in this act.--All money received from the Federal Government for the projects specifically itemized in this act are also hereby appropriated for those projects.

(b) Projects not requiring itemization.--Department of Military and Veterans Affairs construction projects which are totally federally funded and to be administered by the Department of General Services are hereby authorized.

Section 16. Restriction on use of funds. The following restrictions shall apply to the projects specified in section 3(9):

(1) No amount of the project allocation to the Polk Center may be expended on deactivation or decommissioning of the Polk Center.

(2) No amount of the project allocation to the White Haven Center may be expended on deactivation or decommissioning of the White Haven Center.

Section 17. Editorial changes.

In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The Legislative Reference Bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and department totals as necessary to agree with the total monetary amounts of the projects.

Section 18. Repeal.

Section 6(25)(vii)(A) of the act of October 30, 2017 (P.L.831, No.52), known as the Capital Budget Project Itemization Act of 2017-2018, is repealed.

Section 19. Effective date.

This act shall take effect immediately.