COMMON INFRASTRUCTURE PROGRAMLiE

Committee

Reference: C-M(58)19

At its meeting on 9th. Aprils 1958(3-) the Council provisionally approved the 1958 .(Slice IX) NATO common infrastructure programme submitted hy the Infrastructure Committee (2) The Council considered that a final decision on the,Slice IX programme could not he taken until the Implications. of. .document. MC 70 on the overall NATO infrastructure programme had been studied« It therefore instructed the Infrastructure Committee !l'to bring the Slice IX programme back to the Council for further consideration after this study had taken place",, However, the Council allowed the Infrastructure Committee to approve, in the meantime, individual projects which, from the NATO military point of view,, were considered exceptionally urgent and on which planning or construction could begin in 1958.

2. The Infrastructure Committee accordingly examined and approved the specific Slice IX projects, totalling approximately £14,. million, so far recommended by the NATO military authorities as meeting the conditions for such approval. It also decided, at its meeting on 20th January, 1959(3) that ."the Council's decision on advance approvals(4) should be extended so as to allow the Infrastructure Payinents and Progress Committee to continue to consider all requests for authorisation to commit funds submitted during 1959 or until a final decision is taken with respect to Slice IXii.

3, The Military Committee has meanwhile recommended that the Council waive the conditions still restricting the approval DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED

(1) See Summary Record C-R(58)19 (2) See document C-M(58)57 (3) See Summary Record ACA-R/280

(IJ.) See Summary Record C-R(58)19, paragraph 29(d) NAT0_SECRET -2-

of Slice IX It has also pointed out that some nations have heen reluctant to initiate work for fear that the provisional approval would not he finally confirmedt2),

4. The Infrastructure Committee has "begun the examination of various elements of the financial situation in the £225 million Four-Year Programme» Whilst this study is not yet Completed5 the information presented to the Committee leads to the conclusion that, as a result of the deletions proposed by the NATO military authorities and through the application of the principle of flexibility in the use of infrastructure funds,(3), final action can now be taken on the recommended Slice IX programme as a whole.

5. The NATO military authorities have also re-affirmed the military necessity of the projects remaining to be approved in Slice IX and have informed the Committee that these projects * have been duly phased into the timing of the forces build-up as accepted by the nations. 6. The Infrastructure Committee has been informed by the host countries that planning or constructi on has begun, or is expected to begin in 1959? on all projects recommended by the Committee for inclusion in Slice IX, with the exception of certain projects designated in the remarks column in Annexes B and C to the present document. The Committee considers that-these l&ttor projeots, -on which.-it1 is not certain, whether, planning can start m 1959, be kept in the programme but held in abeyance until it is ascertained whether they can appropriately be finally included in the Slice IX programme or whether they can be postponed to a later Slice without endangering their implementation according to the current military schedule. 7. The total cost of Slice IX, as now established, and including the cost of the projects already approved by the Infrastructure Committee (see paragraph 2 above), amounts to £45,937 million. 8. Consequently, the Infrastructure Committee recommends that the Council:

(a) note that projects amounting to approximately £14 million have been approved by the Infrastructure Committee, in accordance with the Council's decision in C-R(58)l9;

(b) note that it is not certain whether planning or construction can begin in 1959 on"some DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED projects included in the present programme as specifically mentioned in Annexes B and Cj

(1) Document MC 32/14, paragraph 4(d) (2) Document MC 5/13, Section II, paragraph 87 (3) See document C-M(58)110 adopted by the Council on 30th July, 1958 (C-R(58)45) NATO SECRET 26

(c) agree that the projects in (h) ahove he held in abeyance pending further recommendations hy the Standing Group and action hy the Infrastructure Committee; (d) note the statement by the -NATO military authorities that all other projects in the Slice IX programme have been duly phased into the timing of the' forces.build-up, as accepted by the'nations, and that the Infrastructure Committee has been informed by the host countries and NATO military authorities that it is expected that planning or construction can begin in 1959, or has already begun, on these projects as detailed in Annexes B and C; (e) approve for financing in the 1958 (Slice IX) NATO common infrastructure programme, the projects listed in Annexes B and Cs at a total cost of £45,937 million, subject to the conditions indicated in Annexes B and C, noting that these projects have been recommended by the Military Committee.

(Signed) E.H. MERRILL Chairman DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED NIiTO SECRET ANNEX Ato >M(

1958 MINEi SUCE NATO COMMON WRASTRUCTIIKE EBOG-RfiMME (£~millions ) SIiAE5S *

Naval Eadar War Missile Total by Country Airfields'* Bases POL Warning Signals Headquarters Training Country

* Norway 1.082 - .598 .508 .586 - 2,774

Denmark .070 .200 .217 - .242 - .729 C O

Netherlands .136 -, - — - • .494

- Eranoe 1*954 - 1.570 •••.AOO .273 .315 4.212

Germany 2,853 - 2.990, .275 .100 - - 6.218

Italy .013 - - .285 .406 .470 - 1.174

C M j Greece • »225 .060 .290 .474 .047 fa» 1.578

Turkey 4.969 - 2.224 .189 .231 - 8,098

United Kingdom - - ••4 .250 .278 .738 1.266

Luxembourg .150 - - - - .150

Belgium .425 - - - - .425

Unlocated - - « - - 4r900 4.900

Total by 12.134 .225 7.044 2.500 2.228 2.987 4.900 32,018 category i i , i, 1. 1 . . ... i - I-'

SACIANT TOTi^L NINTH SLICE

SHiiPE : £32,018 million Country Maritime Air Naval ïleet C ommuni cations War Total Headquarters Country DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED Facilities Facilities Facilities SACLANT : £1.3,919 million

United Kingdom 2.5OO — .400 ,C47 2.947 TOTAL: £45,937 million Iceland 9,642 .115 - 9.757 Portugal - - - . 1,138 1.138

.Norway - - .077 .077 Total by oategory 2.500 9.642 .592 1.185 13.919

-5- NATO SEOBET

anönend amioaT wa asiw - amssvioaa / amscmsia onend - aauissv^aa NATO SECRET t AW-]EX_B to LIST OF PROJECTS EEC PIMPED FCR UMCLUSIOH IN SMPE : C""MT59T2T" PORTION OF THE"195"SITINTH SLICE PROGRAM® Cost estimate Estimated period Name of project Physical description (£s million) for completion Remarks TACTICAL AIRFIELDS Country; NORWAY Bardufoss Sqn, Single arrestor. gear • . Ol3 End of first con- Extension of runway .069 struction season Conversion ,028 following approval.

Rehabilitate pavement OC52 Total Bardufoss ,162

B/d^ W/M Conversion »073 Middle of first construction season Double arrestor gear ' ,026 following approval. Total B^cl/ .099 Flesland Sqn, Conversion ...058 ditto Single arrestor gear .013 Total Flesland .071 Garderaoen W/M Extension of runway ,115 Middle of second construction season Conversion " . 002 following approval. Total Gardemoen .117

Lista Sqn. Conversion . ,089 Middle of first construction season Single arrestor gear .,01.3 following approval Total Lista ,102

Orlandet w/M Extension of runway ,077 End of first con- struction season Conversion .029 following approval. Runway gradient correcting .110 Double arrestor gear ,026 Total Orlandet . 22).2 DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED NATO 'SECRET ANNEX B to C-M (59M~

Name of Project Physical description Cost estimate Estimated period Reimrks (£ million) for completion TACTICAL AIRFIELDS (contd.)

Country;: NORWAY (contd.) Middle of second Rygge ff/to Extension of runway .140 construction season Advance approval Conversion .003 following is for .003 Total Rygge .143 approval. Torp Sqn. Extension of runway .140 Conversion .006 ditto Advance approval Total Toip .146 is for ,002 TOTAL NORWAY 1.082 Country: DENtMRK Aalborg Double arrestor gear ,020 Karup Double arrestor gear .020 Skydstrup Double arrestor gear .020 ditto Vaerlosc Single arrestor gear .010 TOTAL DENMARK .070 Country: NETHERLANDS Ypcnburg ïï/tl Extension of runway .136 Held in abeyance as TOTAL NETHERLANDS it is not certain Country; BELGIUM that planning or con- Beauvechain Double arrestor gear .020 ditto struction can start in Bertrix Conversion (l) .150 1959. (See paragraphs Bierset Single arrestor gear .010 6 and 8 (b) and (c) Brustem Double arrestor gear .020 of the report). Chievres Double arrestor gear .020 Plorennes • • Single arrestor gear .010 Kl. Brogel Single arrestor gear ,010 Koksyde Single arrestor gear .010 Melsbroek Conversion .175 " . " ' TOTAL BELGIUM .. DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED MTO SEGRBT Ayx B^c ÊjSHÎEE""

Name of project Physical description Cost estimate Estimated period (£s million) for completion Remarks TACTICAL AIRFIELDS (contd.)

Country:

Belfort Double arrestor gear ,020 Brienne-Ie- Château Double arrestor gear .020 Broye-le s~Pe sme s Single arrestor gear .010 Camb rai-Nie rgni e s Extension of runway .200 Sqn, . , Single arrestor gear ,010 Total Cambrai- Niergnies „ 210 Chalons Double arrestor gear .020 Chambley Double arrestor gear .020 Chaumont Double arrestor gear «,020 Chennevières Double arrestor gear .020 Colmar Double arrestor gear ,020 Damblain Single arrestor gear' ,010 One year after approval Extension of runway .145 Grostenquin Vf/M Double arrestor gear .020 Total Grostenquin ~~~ ,165 Extension 0f runway Laon Athies Sqn, .170 ditto Single arrestor. gear . ,010 Total Laon Athies ,180 Lille-Lesquin Single arrestor gear . 010 Lure Single arrestor gear .010 Merville-Calonne Sihgle arrestor gear ,010 i Mirecourt Single arrestor gear .010 Pe ."forme Single arrestor gear .010 Màrville W/M Extension of IvUnvzay .274 ditto j DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED Double arrestor gear .020 ! Total Marville • 1 i NATO SSCRET NATO SECEET ANtiEK B to SMMR

Estimated period Name of project Physical description Cost estimate Remarks (£s million) for completion

TACTICAL AIRFIELDS (contd.) Country: ÏRANCE (contd.)

Rocroi Sqn. Extension of runway .270 One year after approval Single arrestor gear .010 Total Rocroi .280 Sezanne-Marigny Double arrestor gear ,020 St.Simon Clastres Extension of runway .195 dittp^. Sqn. Single arrestor gear .010 Total St. S. Ciastres .205 Solenzara Double arrestor gear .020 ÏÏ/M Extension of runway ,170 ditto Double arrestor gear .020 Total Strasbourg .190 Etain-Rouvres Double arrestor gear .020 Laon-Couvron Double arrestor gear r 020 Luxeuil Double arrestor gear .020 Double arrestor gear .020 Hancy--Ochey Double arrestor gear .020 Double arrestor gear .020 St. Dizier Double arrestor gear .020 'Toul-Rosières Double arrestor gear .020 Vouziers Double arrestor gear .020 TOTAL FRANCE 1.954 DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED • • NATO SECRET AIWEX F,to SSÊÊT Name of project Physical description •• Cost estimate Estimated period million.) for completion Remarks TACTIGiiL AIRFIELDS (cont'd)

1 Country; GERiVIZ 1NT Aalhorn W/M Extension of runway »350 One year after Double arrestor gear . o020 approval Total Aalhom .370 Binsfleld W/M Strengthen, pavements „385 11 (Spangdahlem) Double arrestor gear •îotal Binsfield Freiburg 7//M Extension of runway ' <,060 !» (Bremgarten) Double arrestor gear *020 Total Freiburg o080 Fricdrichshafen Single arrestor gear ,010 M Fürst enf eld'bruck: Single arrestor gear »010 Giebelstadt . Single arrestor gear ,010 Neubiburg Single arrestor gear -. »010 Pferdsfeld Single arrestor gear . »010 Wiesbaden Single arrestor gear • 010 1) Gütersloh W/M Extension, of runway - 6 344 Double arrestor gear »020 Total Gütersloh ^364 Jaegel Maritime Communications faciliti es •. <,360 1 Jever W/M. Extension of runway O 250 Double arrestor gear ,«020 Total Jever . !> 27O

Laarbruch (Goch) W/M Extension of runway «128 Double arrestor gear . .:,020 Total Laarbruch" 'j ,148 ! • DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED ^iMBiK Ji lo Q-M (59) 26 1 Name of project Physical description Cost estimate Estimated period (£s million) far completion Remarks TACTICAL AIRFIELDS (cont'd,) Country: GERMmr (cont'd*) Landstuhl W/M Extension of runway .070 . One year after Double arrestor gear ,020 approval Total 'Landstuhl ,090 II Oldenburg ?r/M Extension of runway ,180 Double arrestor gear ,020 Total Oldenburg * 200 Sollingen W/M Extension of runway ,126 Il Double arrestor gear s 020 Total Sollingen .146 Il Zweibrucken W/M 3x:tcnsion of runway .140 Double arrestor gear .020 Total Zweibrucken .160 Bitburg Double arrestor gear .020 H Büchel Double arrestor gear .020 Geilenkirchen Double arrestor gear .020 H'feLhm Double arrestor gear »020 Ingolstadt Double arrestor gear .020 Lahr Double arrestor gear ,020 N euburg-Donau Double arrestor gear .020 Nörvenich Double arrestor gear ,020 Serabach Double arrestor gear .020 Wildenrath Double arrestsr gear .020 TOTAL G-5RMMY 2.853 Country; ITALY Aviano W/M Runway lighting 11 . 013 1 Total Italy- .013 I ... ,..— j NATO SEOEET DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED NATO- SECHST ANNEX B to C-M (597*26

Name of project Ehysieal description Cost estimate Estimated period Remarks million) for completion

TACTICAL AIEFIELDS (contd.) Country; GEtLECE Andravida Double arrestor gear 8,020 One year after approval Araxos Squadron Dispersal Site •J-67 tl If Double arrestor gear Ii Il Total Araxo s .190' Elefsis Vf/k Extension of runway »080 Double arrestor gear ,023 Total Elefsis .103 tl 1! » L Kalaciai/Trikkala Squadron Extension of runway »100 Jü. Larissa Double arrestor gear 0 023 V Nea Anohialos Double arrestor gear »023 Tanagra Double arrestor gear .023 TOTAL GEEECE ,482 Country: TUEKEY /Ichisar Squadron Single arrestor gear ,010 II Il Extension of runway ,092 Conversion >338 Total Akhisar »440 Ankara (Murted) W/M Conversion »331 tl Il Double arrestor gear . a 020 Total Ankara „351 Arifye Squadron Extension of runway • • -•.07• 2 It Il Conversion .3 08 Total Arifye - -.380 DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED NATO SECRET AHNEX B to çSSEHE"

Name of project Physical description Cost estimate Estimated period Bemarks (£s million) for completion

TACTICAL AIRFIEIJ3S (Contd.) The inclusion of £368,716 worth of con- Country» TURKEY (contd.) version works in Turkey Balikesir V/k Conversion .354 2"a years after is without prejudice to ; Double arrestor gear .020 approval any decisions to be taken in the Infrastruc- Total Balikesir .374 ture Payments and Pro- !» I» gress Committee with Bandirma W/M Conversion .347 Double arrestor gear 020 respect to authorisations p requested for these works Total Bandirma .36 7 Batman Squadron Extension of runway .062 T Conversion .299 Single arrestor gear .010 Total Batman .371 Diyarbalcir w/M Conversion .334 1» !» Double arrestor gear t020 Total Diyarbakir .354 Eskisehir W/k Extension of runway .062 I! t! Convers ion .326 Double arrestor gear ,020 Total Eskisehir .408 Izmir Squadron Extension of runway .092 » Il Conversion .342 Single arrestor gear ,010 Total Izmir Konya Squadron Conversion .253 i It Il Single arrestor gear .010 DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED ! Total Konya .263 j i . , ;, , ,, , ; • • NATO SECRET ' ANNEX B to c-M (5

i — ,1, Name of project Physical description Cost estimate Estimated period (£s million) for completion

TACTIOiiL AIRFIELDS (contd.) Country. TURKEY (contd.) Malatya Conversion .314 years after approval Double arrestor gear «r 020 Total Malatya .334 Merzifon Squadron Extension of runway .192 » u Conversion .327 Single arrestor gear .010 Total Merzifon .529 Sivas Squadron Conversion .354 u u TOTiiL TURKEY 4.969 Country; LUXEMBOURG Sandweiler Squadron Conversion .150 TOTAL LUXMffiOURG .150 Ii years after approval NAVAL BASE INSTALLATIONS Country; GREECE Souda Bay Ammunition pier .145 POL pier .080 TOTAL GREECE .225 Ii years after approval POL INSTjJiLiiT IONS

Country; DENjVIZ1RK Prederikshavn Discharge facility: double 8" pipeline for mogas and jet fuel

DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED from Frederikshayn main storage depot to coastal tanker loading point. ,200 1 year after approval Ni>TO SECRET iNNEX B to"

Name of Project Physical' description Cost estimate I Estimated period j Remarks (£s million) j for completion I POL INSTALLATIONS (contd.) Country; GilPI Mainz-Hanau Pipeline; approx. 60 kms x 8" .740 18 months from approval Kehl -- Tubingen Pd-peline: 95kms x 8" 1,600 Tt It It tt Ikuifiu Working storage; 5,000 cu0mo jet and 5,000 cuBm, mogas .325 » H II « it Tubingen Working storage; 5,000 cu,ms jet and 5,000 cu,m, raogas .325 i TOTAL GEIMZ1NY . . 2,990. Country: FRANCE Châlons-Cambrai-Reims Spur line from existing Chalons- Cambrai pipeline to airfield at* Eeims ; 4 kms x 4" ,018 it tt ti ti Off-base storage: 2,500 CU0Hi, jet for airfield at Dreux ,120 tt tt » tt Off-base storage; 2,500 cu„m, N tt II it jet for airfield at Evreux ,095 ! Discharge facility, Pointe de ! ' ! 1'Espiguette (Marseille) 1.337 2 years from approval i

I TOTZ1L FRÙNCE 1*370 i DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED • • Cost estimate Estimated period i Name of project Physical description Remarks • (;Ss million) for completion

POL INSTALLATIONS (Contd.) Coiintry:" GREECE • Souda Bay . Nayal base POL depot to Souda Bay Eiaritine airfield Lj. kms :c 4" „060 TOTAL GREECE „060 2 years from approval Country: TURKEY 1 Erz incan—Erauruia Pipeline (mogas): 204 Ions X 6" 2,119 « ti ti it Erzurum Storage: 2,500 eu,m» mogas at Erzurum = 105 TOTJiL TURKEY 2.224 DATA TRANSMISSIONS MMNTS FOR RADAR WARNING- • INSTALLATIONS NORWAY ,598 u u u »

DEmfiRK 9 217 ti « » u

HL11NCE .100 il ri M » GERMANY .275 it Ii Ii it ITALY .285 ti » t» it GREECE .290 Il H (1 tl TURKEY .485 » u n ti it ti u ti UNITED KINGDOM .250 I ! .-. i I DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED MHHF- 1 Cost estimate Estimated period ; Name of Project Physical description Remarks (£s million) "for completion

IsiGNiJJS COMMUNICATIONS PROJECTS Country: NOIMAX Stavanger Additional multiplex equip- ment. Extension from 24 to 36 of channelling capacity and installation of 2-12 ch. VF telegraph equip. .008 1 year after approval COTintry: FHENCII NORTH AFRICA Tropospheric scatter Hi COQibraltar-Ora n (French portion) 3 years after approval 1 .273 TOTAL FRENCH NA .273 Country: GEIiyANI Carrier equipment For details of channel requirements see p,51 of AG 6lOO/9/lP-109/57 PROG ,100 ! 2 n a a ( TOTAL GERHANT .100 j Country: ITiiLY I j 1 CaiTsmnications facs. between | ! AF30UTH and STRIKE?QRSOUTH j afloat ! .270 2 't 1! II Communications facs. between j 5 AffAB1' /CŒ^u'JîiDSOÎrrK JCOC and ! STRBEFORSOUTH afloat j .104 2 it » ti

NATO SECJSET DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED NATO 'TSCRST ANNEX B to QU 39)26 Cost estimate Estimated period Physical description Remarks Hame of project (,2s million) for completion

SIGNALS COB*TJNICATIONS PROJECTS XCœïtinuêdJ" Country: ITALY (cohtinuecl) Lccce Additional equipment for 12-voice channel on Slice IV(a) radio relay link Italy-Groece-Turkey 032 2 years after approval TOI1AL ITALY "74O£ Country: GREECE \raxos-Agrinion radio For details of channel re- ,269 ditto Agrinion-Larissa radio relay quirements see page 53 of AG 6lOO/9/rp/57 PRCG0 Parnis-Halkis radio relay .074 ditto i i H Herkyra-Panos radio relay ,030 ditto H MD KIO t Adda- carrier equipment ,101 TOTAL GREECE ,474 TÜRKE,Y Communications faos, between 6 For details Qf. channel re- ATAP/COM IMTDS0UTHEA3T JCOC quirements see page 54 of and STRIKEPGRSOUTH afloat AG 6IOO/9/IP-109/57 PROG . 106 ditto Fixed HF-radio terminals for 6 ATJiF/cœî.ANDSOUTHJi'.ST «O66 ditto Add, carrier equipment terminal YamanIaiO terminal Knoya ) TOTAL TURKEY .017 ditto. .189 I Country:" UNITED KING-DOM j • i - - iG-ibraltar-Oran • Tx"Opospheric scatter 273 i 3 years after approval DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED JJAA1X ,-> bo

Name of project Estimated period Physical description Cost estimate Remarks (£s million) for completion

SIGNALS CŒMUNICATIQNS PROJECTS ( continue dj" Country; UNITED KINGDOM (contd.) Turkey-Cyprus Additional equipment f«r 12-voice channel on Turkey- Cyprus radio relay link .005 2 years after TOTAL UNITED KINGDOM .27 8 approval WiR HEADQUARTERS

DENMARK IJie inclusion of the Vfer Headquarters Radi« station JCOC i JCOC station .242 2 years after projects is without, M approval 01 TOTAL DENMARK .242 prejudice to the study undertaken by NORWAY the NATO military authorities in Radio station JCOC No.l JCOC station HF and LF pursuance of the facility .311 ditto Council's instruc- Radio station JCOC No. 2 JCOC station HF and LP tions in CR(58)56 facility .275 ditto TOTAL NORWAY 758S NETHERLANDS NORTHAG/2 ATAP Headquarters ,558 1 year after approval FRENCH NORTH ZiFRICA COIvEDOC .315 3 years after approval DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED NATO SECRET ANNEX~B to

Oost estimate j Estimated period Remarks Name of project Physical description dGs million for completion

WAR HEADQUARTERS (contd.) ITALY COMEDCENT War HQs .270 Unknown COMLAKDSOUTH/5 ATAP „200 1 year after approval TOTAL ITALY .470 GREECE COMEDEAST War IIQs «047 3 years after approval TUPJ-ODY COMETMOmSAST .231 4 years after approval UNITED KINGDOM "(Mediterranean) CINCAFKED (Malta) «640 3 years after approval COMGIB (Gibraltar) . 098 ditto TOTAL POR UNITE) KINGDOM-TMediterranean) .738 MISSILE TRAINING- INSTMIt/VTION' Held in abeyance untiJf Host country not 4.900 Unlcnoivn SAOEUR notifies the selected Standing Group of the name of the host country selected. (See paragraphs 6 and 8(b) and (c) of the report). DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED NATO SECRET ANNEX C to

ImC-M'(5T)2r— Iiiwii a^B i mm ~ LI3T OF PROJECTS RECOMMENDED FOR INCLUSION-IN SAGLANTsS PORTION OF THE 1958 NINTH SLICE PROGRAMME

Physical description Cost estimate Estimated period Name or project Remarks (oSs million) for completion •

MARITIME' AIR FACILITIES Oomtzy: TOITEp" EfflGDOM Third Clyde airfiled 2.500 5 years after approval TOTAL UNIiED KINGDOM 2.5OO HAVAL FLEET FACHITIES Country: ICKLMD ~ Hvalf jordur.'POL storage Construction of semi- Held in abeyance depot 145,000 cm. buried oil tanks, (.see paragraphs 6 & hardstands for lubricant 8(b) 'and (c)'of the drums, pump station, report ) pipelines, heating facs. for tanks and pipelines, an electric power 4 years after approval station and off-load- ing fuel oil facilities 6.000 Hvalfjordur ammunition Construction of seroi- depot 15,000 cm buried storage chambers laboratories and non- explosive storage facs. for.various types of naval ammunition 3.000 4 years after approval DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED MATO SECRET ANNEX C to C-Ifi(W)W

Physical description Cost estimate Estimated period (£s million) for completion WAVAL FLEET AACILITIBS (continued) Country: ICELAND (contd. ) Hvalfjordur moorings Purchase and laying of 26 buoys of various types to provide . ade- ; quate dispersed berth- ; ing facilities for MATO fleet units- in existing sufficient water depths of Hvalfjordur harbour ! „642 4 years after TCTAL ICELAND 9.642 : approval COMfflMICATIONS . 1 FACILITIES * . M • -F- Country: United t • Kiniè?™ Signals facilities 3 years after on the Clyde »400 approval Country: ICKAMD Circuit HA-G5 terminal block 2 yea.rs after at Keflavik ,115 approval Country: NOES/AT Circuit MA-85 terminal 2 years after block .065' approval Orlandet airfield Signals facilities » 012 2 years after TOTiiL NORWAY . .077 approval DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED NATO SECRET Aj^ISX" C_ to " C-"M(59)25"*

i . Name of project Physical description Cost estimate î Estimated period Remarks (£s million) for completion

WAR RO^J^^RAGS Country: ÎJNITED ItlWiDOM

Modifications to JOINTE/,STIAAND War HQ, . 047. 2 years after approval

Country: PORTUGAL

C INCIITiDlLAHT War HQ and communications facilities. 1.138 4 years cafter Held in abeyance approval (see paragraphs 6 and 8 (b) and (c) of the report). DECLASSIFIED - PUBLIC DISCLOSURE / DÉCLASSIFIÉ - MISE EN LECTURE PUBLIQUE LECTURE EN - MISE / DÉCLASSIFIÉ DISCLOSURE - PUBLIC DECLASSIFIED