CONSTRUCTION g) f) e) d) c) b) Project Progress walls. floor ground and floors, internal the of removal the allowing engineer by the off signed and building Institute the within installed been has structure bracing truss temporary internal The installed. been has area building new the to sheeting Roof building. the of structure floor upper the completing poured been has slab concrete suspended 1 Level The Street]. [Murray elevation western the to relocated been has scaffolding The façade. re-pointed newly the revealing exposed been has wall north Institute substantial milestones achieved in recent months. The of anumber with works building the with momentum generate to continuing are Constructions Badge d) c) b) be: will month next the over works future The Period Next the in Works j) i) h) a) a)

Scaffold has been erected across the Murray St façade façade St Murray the across erected been has Scaffold of the site with the cast iron balustrades being removed removed being balustrades iron cast the with site the of Propping removal to the Institute building’s basement; building’s Institute the to removal Propping 1floor; level Institute the to demolition Internal Building complete; Institute the to propping temporary the of Installation building ongoing; institute the of elevation northern the of Re-pointing poured; slab concrete 1suspended Level render; wall and services 1st fix demolition, floor Ground Town - Lower and Hall Institute Installation of the fire rated ceiling to the lower ground. lower the to ceiling rated fire the of Installation Town and hall; Institute the of elevation western the to works remedial External the to hall; Town services 1st fix Install ground area; lower building Institute the to services 1st fix Install walls; internal and floor building Institute the of Demolition mezzanine. Institute the to completed installation Formwork building; new the to installation roof Completed hall. town and Institute the both from refurbishment for for theregion. and becomethepre-eminentCulturalBusinessInnovationCentre will alsocreateahubforGovernment,EconomicandSocialEnterprise house theGawlerHeritageCollectionwithinanewCentre. It buildings willdeliveranewlibrary, galleryandperformancespaces The redevelopmentoftheStateHeritageListed Town HallandInstitute ...... Project Outcome Centre. returns canalsobeaccessedatthe Town ofGawler Administration Community Centre,Nixon Terrace, Gawler. Pickupreservationsand Library, 65 Angle Vale Road,EvanstonGardens and GawlerSport Full LibraryservicescanbeaccessedattheEvanstonGardens Centre, 43HighStreet,GawlerEast. Services arenowprovidedatthenew Town ofGawler Administration Customer ServiceandLibraryareashavebeenrelocated. As the Town HallandInstitutebuildingsareclosed,the Town ofGawler ...... Existing ServicesTemporarily Relocated This projectisbeingjointlyfundedbythe Australian Governmentthrough

Printed April 2018 -4thedition COMMUNITY CENTRE facebook.com/townofgawler

Twentyfirst St Twentyfirst Julian Tce Julian the NationalStrongerRegionsFund($5.6M)and Town ofGawler GAWLER SPORT & Twentythird St

BarnetRd Dead Man’s Dead

Pass

Fifth St Fifth

Ryde St Ryde

Dean St Dean

Eighteenth St Eighteenth MURRAY STREET St Sixth

Murray St

TOWN HALL & INSTITUTE

Seventh St St Twelfth RD ADELAIDE

Nixon Tce BUILDINGS Cowan Street Cowan

Duffield St

HighSt

Julian TceJulian

Fourteenth St Fourteenth Victoria Tce Victoria

twitter.com/townofgawler Calton Rd Calton

DalySt gawler.sa.gov.au/civiccentre

For further information please visit our website: For furtherinformationpleasevisitourwebsite: Tod St Tod

MURRAYST

HighSt

NORTHERN EXPRESSWAY St Jacob Jacob St Jacob Finniss St Finniss

GARDENS LIBRARY Moore St Moore

NixonTce

BAROSSA VALLEY WAY VALLEY BAROSSA Cowan St Cowan Porter St EVANSTON

Dalkeith Road Dalkeith Stebonheath Road ADMINISTRATION Queen St Queen

GAWLER

CENTRE youtube.com/TownofGawler Victoria Tce Victoria

Angle Vale Road King St King

Coventry Road

Murray Rd Clonlea Park Clonlea

Burrows St

Drury St gawler.sa.gov.au/civiccentre innovation centre for theregion The pre-eminent culturaland business p: (08)85229211 e: [email protected] Gawler East,SA 5118 43 HighStreet

Gig City Announced Access to affordable high-speed internet can help businesses Gawler Heritage Collection ...... develop new ideas, products and services that deliver real ...... An exciting component of the Gawler Civic Centre solutions for the community and our future. The GigCity The Gawler Heritage Collection is associated with the early redevelopment is the creation of the Business Innovation connection will transform the Town of Gawler as an early history of Gawler and its historical and cultural development Hub and the recent announcement that this Hub will be one adopter of technologies driving innovation and growth. It will from pre-European colonisation through to the twentieth of the 15 new (Stage 2) GigCity Adelaide Precincts. deliver high-speed (Ten Gigabit) internet services to users of century in . the Business Innovation Hub. GigCity Adelaide is providing fast and affordable The core of the Collection relates to the history and operation gigabit internet for start-ups, entrepreneurs and big This connectivity coupled with the digital advisors in of the Gawler Institute from its establishment in 1857 until the businesses. The new network will connect key innovation residence programs and business mentoring that the Hub will transfer of the Gawler Institute Building to Council in 1984. precincts and co-working spaces across Adelaide with deliver will provide a significant advantage to our local and Other parts of the Collection reflect Council’s municipal affordable gigabit-speed internet that is 100-times faster regional businesses and start-ups who are competing in the history, since its incorporation in 1857, and material that has than the national average. local, national and global digital economy. been acquired following the establishment of the Gawler Public Library in 1985. GigCity is making Adelaide one of the most connected cities in the Southern Hemisphere, creating a new era SMART in digital connectivity. Adelaide (and soon to be Gawler) communities continues to be Australia’s leading smart city, recognised for its enviable infrastructure projects and technology that serves for testing and trialling of smart city solutions. It is also home to the nation’s first Internet of Things innovation hub – Adelaide Smart City Studio – and Cisco’s first and only ‘Lighthouse City’ in Australia.

The Business Innovation Hub becoming a GigCity Precinct expands the reach of this new era in digital connectivity bringing it to the heart of Gawler. It will create a living and breathing test bed for entrepreneurs to thrive and develop ideas for our people, our culture and our future. The Business Innovation Hub will be part of this a new economy creating the skills and jobs of tomorrow – all with the power Smart Communities Initiatives of the Internet...... GIG ANNOUNCED CITY The GigCity expansion is the third smart cities and communities initiative that Council will be delivering this year. The first initiative is the previously announced installation of new closed circuit television (CCTV) for Murray Street, (thanks to a $100k State Government grant) and surrounding Council has recently adopted the Gawler Heritage Collection streets which will be completed by 30 June 2018. In addition, Policy to inform the decision-making process that will Council has endorsed the rollout of free public Wi-Fi in the shape the Collection and guide its management. The Policy town centre. establishes the intellectual and administrative principles that support the Collection and management of historical material which is of critical importance to the Gawler community.

The future acquisition of historical material will be tied to the notion of significance which will define key collecting areas and themes for interpreting the Collection and its development will be on the basis that it is selective and

GAWLER HERITAGE COLLECTION HERITAGE GAWLER representative rather than comprehensive. SMART COMMUNITIES INITIATIVES The Collection is currently in storage at various facilities The GigCity opportunity also joins Gawler to the US in Gawler and Adelaide. Over the course of 2018, the Ignite’s Smart Gigabit Communities program. This gives The timing of delivering free Wi-Fi and CCTV cameras in Collection is being assessed for preservation and digitisation, members of the Business Innovation Hub the chance to Murray Street forms a natural extension to the technological cleaned, catalogued and repacked ready for transferral to be part of the global gigabit community, facilitating a new advances that will be provided to the town centre as a the Cultural Heritage Centre within the Gawler Civic Centre. era of collaboration and information sharing. It will promote consequence of the Gawler Civic Centre redevelopment. the development of ground-breaking gigabit applications The installation of free Wi-Fi in Murray Street, will benefit An information event regarding the Gawler Heritage and services, delivering new advances in priority areas, residents, local businesses and visitors to the Town of Gawler Collection is being conducted as part of the SA History including healthcare, education, public safety and civic by providing fast, reliable and constant internet access to Festival in May 2018. Visit www.gawler.sa.gov.au/events for issues. those in the coverage area. further information.