This informations is from the internet pages of the Federal of Transport, Building and Urban Affairs. Please read the disclaimer at http://www.bmvbs.de/artikel,- 939488/Website-publication.htm.

– 114 – State: -Western First priority projects

Con- Ser- FG inv. struc- Length Re- ial Road Title costs from FTIP no. tion (km) marks no. 2003 (€ m) type

Ongoing and definitely planned projects

1 A 20 Groß Grönau (Lgr. SH/MV)–AS Schönberg 04KB 14.2 71.6 VDE 2 A 20 AK –AS Sanitz 04KB 14.0 4.1 VDE 3 A 20 AS Sanitz–AS Tessin 04KB 9.5 56.2 VDE 4 A 20 AS Tessin–AS 04KB 19.8 65.4 VDE 5 A 20 AS Tribsees–AS /W 04KB 11.2 47.2 VDE 6 A 20 AS Grimmen/O– 04KB 15.7 68.2 VDE 7 A 20 Dersekow–AS Gützkow 04KB 10.1 29.7 VDE 8 A 20 AS Gützkow–AS /S 04KB 6.8 9.1 VDE 9 A 20 AS Jarmen/S–AS 04KB 10.6 40.0 VDE 10 A 20 AS Anklam–AS /N 04KB 16.5 86.8 VDE 11 A 20 AS Neubrandenburg/N–AS Neubrandenburg/O 04KB 9.5 12.7 VDE 12 A 20 AS Neubrandburg/O–AS Friedland 04KB 11.9 21.8 VDE 13 A 20 AS Friedland–AS Strasburg 04KB 9.4 14.6 VDE 14 A 20 AS Strasburg–AS /S 04KB 20.3 14.4 VDE 15 A 241 N –AS Schwerin/S 04KB 11.5 22.3 16 A 241 (A 20)–Jesendorf (+ ERDF) 04KB 11.2 18.0 17 A 241 Jesendorf–N Schwerin 04KB 14.5 78.2 18 B 96 /B 109 OU (4. BA) 02KK 4.0 13.2 19 B 96 OU 02KK 3.7 11.1 20 B 96 OU Neubrandenburg (B 104/O – B 96/S) 04KK 7.3 26.3 21 B 96n –A 20 (+ ERDF) (o. 2. Strelasundquerung) 04/24 48.9 25.5 22 B 96n 2. Strelasundquerung 24KK 4.7 102.5 23 B 104 N-OU Schwerin, 1. BA 02KK 5.7 25.0 24 B 105 /B 96 OU , 5. BA 02KK 5.4 23.8 25 B 105 OU Ribnitz 02KK 5.9 22.8 26 B 109 OU Anklam (1. BA) 02KK 1.8 13.3 27 B 109 OU Anklam (2. BA) 02KK 2.5 4.1 28 B 192 OU Penzlin (2. BA) 02KK 1.8 2.2 29 B 321 OU Pampow 02KK 3.4 9.9 30 B 321 OU Crivitz 02KK 4.9 17.4 31 Residual amounts for transport units open to traffic 7.8 32 + Repayment 50 % federal state share 18.0 33 + ERDF 200.0 34 + VDE 2001/02 TOTAL 369.0 35 + PROGRAMME REALIZATION 2001/02 TOTAL 109.0 SUB-TOTAL 1,661.1

New projects

36 B 104 OU Neubrandenburg (B 104/W – B 96/N) 02KK 4.2 31.7 MV5001 37 B 104 OU Neubrandenburg (B 96/N – B 104/O) 02KK 5.0 37.7 MV5001 RWA 38 B 104 BAB-Zubringer Neubrandenburg 02KK 7.3 10.0 MV5063 39 B 104 N-OU Schwerin, 2. BA 02KK 7.0 41.2 MV6010 40 B 104 OU Güstrow 02KK 11.9 36.0 MV8604 41 B 104 OU Pasewalk 02KK 5.3 15.0 MV7605 42 B 105 OU Bad Doberan 02KK 7.4 19.9 MV8023 – 115 – State: Mecklenburg- First priority projects

Con- Ser- FG inv. struc- Length Re- ial Road Title costs from FTIP no. tion (km) marks no. 2003 (€ m) type 43 B 105 OU Neubukow 02KK 4.4 15.7 MV8027 44 B 109 OU 02KK 1.9 1.9 MV8060 45 B 191 /B 321 OU Parchim 02KK 10.6 32.2 MV6040 RWA 46 B 191 N-OU Plau 02KK 3.4 10.3 MV8607 47 B 192 OU (B 192/W – B 108/N) 02KK 3.1 9.6 MV8614 48 B 192 OU Waren (B 108/N – B 192/O) 02KK 6.1 20.0 MV8614 49 B 194 OU 02KK 4.7 13.5 MV8044 50 B 196 OU Bergen 02KK 7.5 17.9 MV8612 51 B 321 OU Raben Steinfeld 24KK 2.1 9.6 MV7052 RWA 52 B 321 OU Bandenitz 02KK 2.2 6.6 MV7050 RWA 53 B 321 OU Warsow 02KK 2.2 6.4 MV7050 RWA 54 B 321 OU Hagenow 02KK 3.9 11.7 MV8051 SUB-TOTAL 347.0 Ongoing and definitely planned projects with a special nature conservation planning mandate for the first priority category (see Chapter 3.4.6.2) 55 A 14 Schwerin (A 24)–Lgr. MV/BB 04KB 3.4 56.5 ST 5142 VUNO 56 B 198 W-OU , 1. BA 02KK 3.9 10.3 ST 5142 VUNO 57 B 198 S-OU Mirow, 2. BA 02KK 4.1 6.6 ST 5142 VUNO 58 B 198 /B 189 OU Mirow–Lgr. MV/BB 02KK 2.4 2.9 ST 5142 VUNO SUB-TOTAL 76.3 New projects with a special nature conservation planning mandate for the first priority category (see Chapter 3.4.6.2) 59 B 96 Neubrandenburg–Neustrelitz 24KK 20.6 69.0 MV6603 60 B 96 OU Neustrelitz 24KK 3.7 8.0 NB 61 B 110 OU 02KK 3.4 10.8 MV8031 62 B 111 OU 02KK 5.6 39.0 MV8035 SUB-TOTAL 126.8

TOTAL, first priority projects 2,211.1 – 116 – State: Mecklenburg-Western Pomerania

Second priority projects

Con- Ser- FG inv. struc- Length Re- ial Road Title costs from FTIP no. tion (km) marks no. 2003 (€ m) type

New projects with planning go-ahead (WB*)

63 B 5 S-OU Ludwigslust 02KK 3.1 6.1 MV6036 64 B 191 S-OU Plau 02KK 6.1 14.3 MV8608 SUB-TOTAL 20.4

New projects

65 B 104 OU Strasburg 02KK 3.1 6.6 MV6012 66 B 104 OU Lützow 02KK 2.1 4.8 MV8009 67 B 104 OU Schwerin/Friedrichsthal 02KK 3.4 15.5 MV8011 68 B 104 OU Rehna 02KK 3.3 9.5 MV8022 69 B 104 OU Löcknitz 02KK 6.8 19.8 MV7605 70 B 105 OU Rövershagen 02KK 4.0 12.2 MV8024 71 B 105 Damgarten 24KK 1.8 11.4 MV8025 72 B 105 OU Selmsdorf 02KK 4.8 12.4 MV8062 73 B 109 OU Belling 02KK 2.0 3.9 MV7029 74 B 109 OU 02KK 2.6 6.1 MV7029 75 B 110 OU Gnoien 02KK 3.6 10.6 MV8030 76 B 191 OU Neustadt-Glewe 02KK 4.4 17.3 MV7039 77 B 194 W-OU 02KK 4.5 7.8 MV8611 78 B 197 OU Friedland 02KK 8.3 16.5 MV7047 SUB-TOTAL 154.3

New projects where a high ecological risk has been identified

79 B 104 OU 02KK 5.6 16.6 MV8610 80 B 104 OU Sternberg 02KK 2.9 20.1 MV8021 81 B 104 OU Teterow 02KK 6.7 14.8 MV8610 82 B 104 S-OU Stavenhagen 02KK 4.9 9.6 MV8610 83 B 104 OU 02KK 4.2 13.0 MV6012 84 B 110 OU 02KK 1.1 3.2 MV8034 85 B 110 OU 02KK 11.1 47.1 MV6032 86 B 117 OU Bützow 02KK 13.7 40.5 MV6053 87 B 119 OU Bad Sülze 02KK 2.7 7.6 MV8054 88 B 191 /B 106 OU Ludwigslust 02KK 7.6 22.0 MV5064 89 B 191 Ludwigslust–Dömitz 02KK 27.2 50.5 MV5064 90 B 192 OU Goldberg 02KK 1.9 6.0 MV8043 91 B 195 OU Dömitz 02KK 4.7 13.8 MV5064 92 B 198 OU 02KK 1.4 3.1 MV8048 SUB-TOTAL 267.7

TOTAL, second priority projects 442.4