Location Work Description Aldrington Upgrade fence Aldrington Landscaping Aldrington Handrails to ramp and fix fence Amazon Lockers Installation, Agree Proposed Location, Aldrington KH or Crestel - electrical supply to be installed Alexandra Palace Access for All Funding for step-free access Footbridge strengthening and refurbishment. Bridge deck parapet crush loading dangerously inadequate. Treatment to corrosion to bottom flanges. Work to abutments rebuild Alexandra Palace collapsed retaining wall. Corrosion to columns, bearing pads, reinforcement causing spalling of concrete to deck. Potential slips/trip/falls due to dips in surface. Mitigation ie Lowest Initital Cost. Works from Assessment Alexandra Palace Defibrillator Amberley Footbridge Refurbishment - Open Lattice Amazon Lockers Installation, Agree Proposed Location, Amberley KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Angmering KH or Crestel - electrical Supply to be installed Appledore Station House Refurbishment Appledore Signage Amazon Lockers Installation, Agree Proposed Location, Appledore KH or Crestel - electrical Supply to be installed Arlesey Painting of footbridge * installation of security lighting Footbridge parapet strengthening and refurbishment, including treating localised corrosion including to main girder webs, 3mm loss. Renewal of anti-slip surfacing and superstructure/substructure deck joints to prevent Arlesey accelerated corrosion. Steel square hollw sections require new strengthening elements. Corrosion to reinforcements to deck. Remedials from 2014 ssessment report. Lowest initial cost based on targetted renewals to areas Arlesey Station repainting Amazon Lockers Installation, Agree Proposed Location, Arundel KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Ashtead KH or Crestel - electrical Supply to be installed Ashurst Car Park - Planters and Plants Ashurst Footbridge Refurbishment - Open Lattice Amazon Lockers Installation, Agree Proposed Location, Ashurst KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Balcombe KH or Crestel - electrical Supply to be installed Large housing development to north of station proposing Baldock second entrance to the station from Platform 2 Balham Reconfiguration of toilets Balham Platform Repair/Refurbishment Balham Canopy repairs / refurbishment Location Work Description Balham Install new canopy and platform coper replacement Amazon Lockers Installation, Agree Proposed Location, Balham KH or Crestel - electrical Supply to be installed Balham Defibrillator Balham Seating -groundworks Balham Seating - platform 1 and 2 Balham Toilet refurb DDA Balham Defibrillator and Case Balham Defibrillator Installation Amazon Lockers Installation, Agree Proposed Location, Banstead KH or Crestel - electrical Supply to be installed Barnham All toilets need refurbishment

Barnham Additional required toilet improvements

Station supervisors office to be refurbished to provide a more Barnham welcoming Customer Information Point to support customers with information, onward travel information, assistance. Amazon Lockers Installation, Agree Proposed Location, Barnham KH or Crestel - electrical Supply to be installed Step-free access scheme being developed at the station with Battersea Park support from Local Authority Battersea Park Platform 4/5 Refurbishment - none MFF Battersea Park Rewire & Relight Battersea Park Station House Refurbishment Amazon Lockers Installation, Agree Proposed Location, Battersea Park KH or Crestel - electrical Supply to be installed Beckenham Hill Seating groundworks - platform 1 and 2 Beckenham Hill Design & LLC - Seating Beckenham Hill Seating platform 1 and 2 Beckenham Hill Shelter - groundworks

Beckenham Hill Design & LLC Shelter Beckenham Hill Enclosed Shelter - platform 2 Beckenham Hill Footbridge Plated Girder - Remedial Works Bedford Installation of InPost locker Electrification and small extension (ramp area) of Platform 4 Bedford to support EMT services Amazon Lockers Installation, Agree Proposed Location, Belmont KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Berwick KH or Crestel - electrical Supply to be installed Bexhill Redecorate and refurbish lounge area Location Work Description Refurbish an existing unit creating up to 100 spaces in a 2 tier space to include; FREE to apply ITSO key card system that can Bexhill also be used for rail travel, maintenance/repair area, lockers, changing area, cycle hire run by the local community, CCTV, signage and LED lighting. Bexhill Toilet refurb- DDA in ticket hall- listed building Bexhill Refurbish waiting room Amazon Lockers Installation, Agree Proposed Location, Bexhill KH or Crestel - electrical Supply to be installed Biggleswade Bus / Rail Interchange development - Local Authority initiative. Biggleswade Toilet improvements Biggleswade Access for All Funding for step-free access Repairs to riser brick walls (300m2) (lack of support to copers), some subsidence requiring partial resurface of Platforms 1,2 Biggleswade (300m2) Platforms 3,4 (200m2). Spot gauging. Platform gradient risk score 5 Improve front of house presentation at Biggleswade Railway Biggleswade Station in preparation for future Access for All Scheme and Bus/Rail Interchange proposed at the station. Amazon Lockers Installation, Agree Proposed Location, Billingshurst KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Birbeck KH or Crestel - electrical Supply to be installed Bishopstone Reinstate waiting room Bishopstone Design & LLC Reinstate waiting room Amazon Lockers Installation, Agree Proposed Location, Bishopstone KH or Crestel - electrical Supply to be installed Blackfriars Creating new space on Blackfriars terrace. Extensive fit out works carried out by West Sussex County Bognor Regis Council for 2 new retail units Remove existing shingle, prepare and lay new tarmacadam Bognor Regis surfacing. Amazon Lockers Installation, Agree Proposed Location, Bognor Regis KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Bosham KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Box Hill & Westhumble KH or Crestel - electrical Supply to be installed Boxhill Footbridge Remedial - Plated Girder New Station Brentcross West, part of a wider project with Brent Cross retail development and residental. Brighton Market Brighton Shed Roof Refurbishment Brighton Platform Repair/Refurbishment Brighton Fire Alarm Renewal Amazon Lockers Installation, Agree Proposed Location, Brighton KH or Crestel - electrical Supply to be installed Brighton Install anti-slip boarding on the wooden walkway. Location Work Description Brookmans Park Additional lighting Brookmans Park CCTV in car parks Brookman's Park Defibrillator Potential car park development / redevelopment of station car Burgess Hill park area Burgess Hill Customer toilets need flooring and panelling renewed Burgess Hill Passenger lounge needs more seating and redecorating Brick & Steelwork Repairs, Clean and Painting of Undercroft Burgess Hill Steelwork Amazon Lockers Installation, Agree Proposed Location, Burgess Hill KH or Crestel - electrical Supply to be installed Burgess Hill Seating- Platform 1 and 2 Burgess Hill Design & LLC Seating - Platform 1 and 2 Burgess Hill Seating - groundworks Burgess Hill Shelter - groundworks Burgess Hill Design & LLC Shelter Burgess Hill Install base for 3 TVM canopies Burgess Hill Design & LLC Install base for 3 TVM canopies Burgess Hill Shelter - on Up platform Burgess Hill TVM canopies x3 Amazon Lockers Installation, Agree Proposed Location, Buxted KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Carshalton KH or Crestel - electrical Supply to be installed Carshalton Beeches Footbridge Refurbishment - Covered Lattice Amazon Lockers Installation, Agree Proposed Location, Carshalton Beeches KH or Crestel - electrical Supply to be installed Caterham Footbridge Remedial - OPSAP - Ramp Plated Girder Amazon Lockers Installation, Agree Proposed Location, Caterham KH or Crestel - electrical Supply to be installed Catford Step-free access scheme being developed at the station Repairs to box gutter supports, installation of 'Unifold' box Cheam gutter linings, repairs/clearing of rainwater goods. Installation of fall arrest system. Redecoration of valence & soffit boards. Amazon Lockers Installation, Agree Proposed Location, Cheam KH or Crestel - electrical Supply to be installed Chichester Prima Seating Chichester Seating - groundworks Amazon Lockers Installation, Agree Proposed Location, Chichester KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Chipstead KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Christ’s Hospital KH or Crestel - electrical Supply to be installed City ThamesLink Upgrade to AC system City ThamesLink Enhanced signage for finding lifts. Amazon Lockers Installation, Agree Proposed Location, Collington KH or Crestel - electrical Supply to be installed Location Work Description Amazon Lockers Installation, Agree Proposed Location, Cooden Beach KH or Crestel - electrical Supply to be installed Cooksbridge Car Park - Planters and Plants Amazon Lockers Installation, Agree Proposed Location, Cooksbridge KH or Crestel - electrical Supply to be installed Coulsdon South Heating to waiting room Coulsdon South Canopy over TVM Coulsdon South CIS in the waiting room Coulsdon South Glass panelling in ticket office Auto hinged door in ticket office area and draft excluders on Coulsdon South doors to the platform Coulsdon South Seating to waiting area Coulsdon South Install tap inside Gents toilets Coulsdon South Design & LLC - Canopy over TVM Coulsdon South Design & LLC - Glass Panelling in ticket office Coulsdon South Footbridge Remedial - OPSAP Amazon Lockers Installation, Agree Proposed Location, Coulsdon South KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Coulsdon Town KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Cowden KH or Crestel - electrical Supply to be installed Crawley Overline House redevelopment and concourse refurbishment. Step-free access scheme to provide a new station footbridge Crawley with lifts. Amazon Lockers Installation, Agree Proposed Location, Crawley KH or Crestel - electrical Supply to be installed Cricklewood Access for All Funding for step-free access Repairs to riser brick walls (335m2) (lack of support to copers), Cricklewood some subsidence requiring partial resurface of Platforms 1,2,4 (580m2). Spot coper gauging. Platform gradient risk score 5. Replacing life expired help points with new help points with inbuilt induction loops at the following locations: Cricklewood, Cricklewood Gordon Hill, Harringay, Hornsey, Mill Hill Broadway and Palmers Green. Crowborough Step-free access scheme being developed at the station Amazon Lockers Installation, Agree Proposed Location, Crowborough KH or Crestel - electrical Supply to be installed Cuffley Enclosed shelter screen - platform 1 Cuffley Waiting shelter - platform 1 - country end Cuffley Waiting shelter - groundworks design and LLC Cuffley Signage to DDA ramp Proposed second entrance at the station and canopy Denmark Hill extension 2, 3 & 4 Denmark Hill Defibrillator Location Work Description Repairs to box gutter supports, installation of 'Unifold' box gutter linings on platforms 1,2 & 3, repairs & clearing of Denmark Hill rainwater goods, repairs to valley gutters. Installation of fall arrest systems. Amazon Lockers Installation, Agree Proposed Location, Doleham KH or Crestel - electrical Supply to be installed Dorking Ladies and accessibility is the same toilet. Dorking Waiting room platform 2/3 needs decorating Dorking Toilet refurb - minor- platform 1 Amazon Lockers Installation, Agree Proposed Location, Dorking KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Dormans KH or Crestel - electrical Supply to be installed Station refurbishment needed throughout to consider Drayton Park provision of enhanced, lighting, painting decorating, floor finishes etc. Amazon Lockers Installation, Agree Proposed Location, KH or Crestel - electrical Supply to be installed

Durrington-On-Sea

Network Rail are undertaking redecoration works to the Durrington-On-Sea station canopy on Platform 2. Earlswood Install new platform shelters. Amazon Lockers Installation, Agree Proposed Location, Earlswood KH or Crestel - electrical Supply to be installed East Shelters and Gladstone Units Creation of a new station entrance to the east of the newer East Croydon station footbridge. East Croydon Footbridge Remedial - OPSAP Brick & Steelwork Repairs, Clean and Painting of Undercroft East Croydon Steelwork Amazon Lockers Installation, Agree Proposed Location, East Croydon KH or Crestel - electrical Supply to be installed Powered Electric Wheelchairs - For stations (such as East Croydon and ) with long and steep non complaint East Croydon ramps, they need powered wheelchairs to assist passengers ie those who can transfer from own chair or others who cannot walk up the ramp without assistance. JCD Screen Install. 2 New screens (in ticket hall area) and 3 on East Croydon the overbridge (exterior screens) Amazon Lockers Installation, Agree Proposed Location, East Dulwich KH or Crestel - electrical Supply to be installed East Grinstead Toilets/toilet improvements Location Work Description East Grinstead Signage East Grinstead Access for All Funding for step-free access Amazon Lockers Installation, Agree Proposed Location, East Grinstead KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, East Worthing KH or Crestel - electrical Supply to be installed Eastbourne New retail space Rotunda Eastbourne Train Shed steelwork repairs and painting Amazon Lockers Installation, Agree Proposed Location, Eastbourne KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Edenbridge KH or Crestel - electrical Supply to be installed Edenbridge Town Platform Repair/Refurbishment Amazon Lockers Installation, Agree Proposed Location, Edenbridge Town KH or Crestel - electrical Supply to be installed Edenbridge Town Seating - platform 1 and 2 Edenbridge Town Refurbish gents toilets platform 1-major Edenbridge Town Refurbish ladies toilets - major Edenbridge Town Seating - groundworks platform 1 Edenbridge Town Seating - groundworks platform 2 Edenbridge Town Landscaping/rewilding Edenbridge Town Remove bench on platform 2 Edenbridge Town Design & LLC - Groundworks Seating Platform 1 Edenbridge Town Design & LLC - Groundworks Seating Platform 2 Shopping Centre demolition and creation of new retail and Elephant & Castle residential area. Elephant & Castle Platform Repair/Refurbishment Elephant & Castle Rewire & Relight Elephant & Castle Platform - PTI Works: Platform 3 Western station entrance closure due to development: works Elephant & Castle include new CIS, Oyster Card reader, cycle rack removal, CCTV works Elephant & Castle Defibrillator Elephant & Castle Remote Roller Shutter Elephant & Castle Investigation of water leak to booking hall ceiling Construction of a new cycle hub for up to 100 bikes in a 2 tier system. CCTV with a live feed to GTR control centre, LED Elstree & Borehamwood lighting, ITSO key card access (free), maintenance area and bike detection system. Elstree & Borehamwood Overhead gateline display screen providing directional signage. Renew roof slates including front porch and all associated Emsworth works. Emsworth Design & LLC - Seating Groundworks Platform 1 &2 Amazon Lockers Installation, Agree Proposed Location, Emsworth KH or Crestel - electrical Supply to be installed Enfield Chase Mosaic mural Amazon Lockers Installation, Agree Proposed Location, Epsom KH or Crestel - electrical Supply to be installed Location Work Description Amazon Lockers Installation, Agree Proposed Location, Epsom Downs KH or Crestel - electrical Supply to be installed Eridge Access for All Funding for step-free access Eridge Canopy refurbishment inc bowing columns Eridge Footbridge Renewal - Timber Amazon Lockers Installation, Agree Proposed Location, Eridge KH or Crestel - electrical Supply to be installed Essex Road Installation of InPost Locker LED Renewal due to T12 luminaires being phased out of Essex Road production Ewell East Footbridge Remedial - Covered Lattice Amazon Lockers Installation, Agree Proposed Location, Ewell East KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Falmer KH or Crestel - electrical Supply to be installed Faygate Groundworks - cycle hoops Faygate Groundworks - cycle stands Faygate Design & LLC - Groundwork Cycle Hoops Faygate Design & LLC - Groundwork Cycle Stands Amazon Lockers Installation, Agree Proposed Location, Faygate KH or Crestel - electrical Supply to be installed Finsbury Park Access for All Funding for step-free access Partial renewal Renewal of Platform 6 and 7 Tarmac surfaces Finsbury Park including reversal of gradient away from track and gauging. Platform gradient risk score 4 Additional enhanced customer seating provision currently Finsbury Park being considered at Finsbury Park, Huntingdon and Welwyn North. Amazon Lockers Installation, Agree Proposed Location, Fishbourne KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Fishersgate KH or Crestel - electrical Supply to be installed Flitwick 150 Years Celebration Works Flitwick Bus / Rail Interchange development - Local Authority initiative. Partial resurface of island platform 2 & 3 including, renewal of Tarmac surface to reduce slip trips and falls. Spot replacement of spalled copers.Repointing of riser walls and renewal of Flitwick missing brickwork including corbelled support to copers. Re- surfacing = 500m2 (Approx. 31%) Repointing = 95m2 (Approx. 50%) Flitwick Access for All Funding for step-free access Flitwick Repainting of handrails to stairs Flitwick Cleaning and painting to waiting shelter Pl 4 Ford Redecorate booking hall Amazon Lockers Installation, Agree Proposed Location, Ford KH or Crestel - electrical Supply to be installed Major station remodelling including new access bridges Gatwick Airport concourse etc. Location Work Description Gatwick Airport Rationalise and renew redundant DB's Gatwick Airport Escalator Renewal Amazon Lockers Installation, Agree Proposed Location, Gatwick Airport KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Gipsy Hill KH or Crestel - electrical Supply to be installed Gipsy Hill Defibrillator Gipsy Hill Defibrillator Gipsy Hill Toilet improvements - DDA Gipsy Hill Redecorate station entrance / fence Gipsy Hill Landscaping Gipsy Hill seating - groundwork Gipsy Hill seating - supply and installation Glynde Community based art and historical display Glynde Seating- platforms 1 & 2 Glynde Seating - groundworks Glynde Landscaping Glynde Design & LLC - Groundworks Seating Platform 1 &2 Amazon Lockers Installation, Agree Proposed Location, Glynde KH or Crestel - electrical Supply to be installed Godstone Footbridge Refurbishment - Open Lattice Amazon Lockers Installation, Agree Proposed Location, Godstone KH or Crestel - electrical Supply to be installed Gordon Hill Signage to local hospital Replacing life expired help points with new help points with inbuilt induction loops at the following locations: Cricklewood, Gordon Hill Gordon Hill, Harringay, Hornsey, Mill Hill Broadway and Palmers Green. Goring by Sea Footbridge Refurbishment - Open Lattice We will be extending the London end of platform 1. We are doing this so the platform can fully accommodate 8 car train formations and to prevent the train from fouling the crossing. This work is planned to take place under a possession from 6th Goring by Sea – 8th June. We are still working out mitigations on how the new portion of the platform will be managed. NR have taken full control of the car parks at this location and it will be out of use to passengers and staff until 10th June Stair Tread enhancements to be considered at a number of Goring by Sea stations including Goring by Sea, Shoreham by Sea and Worthing. Amazon Lockers Installation, Agree Proposed Location, Goring-By-Sea KH or Crestel - electrical Supply to be installed Grange Park Installation of InPost locker - awaiting landlord consent Grange Park Signage to cycle route Grange Park Installation of InPost locker Location Work Description Repairs to Platform 1 and 2 settlement damage and installation of permanent propping to support platform edges and embankment stabilisation works due to movement of Grange Park slag. Necessary to halt movement primarily with pump and grout system. Asset engineer advising overlay to platform as lowest initial cost Grange Park Cycle parking improvements Amazon Lockers Installation, Agree Proposed Location, Hackbridge KH or Crestel - electrical Supply to be installed Partial resurface of platform 1 &4 including: renewal of Tarmac surface to reduce slip trips and falls. Spot replacement of spalled copers. Repointing of riser walls and renewal of Hadley Wood missing brickwork. P1 Resurface 300m2 (32%) Riser wall repairs 90m2 (48%) P4 Resurface 300m2 (30%) Riser wall repair 90m2 (47%) Hadley Wood Defibrillator Amazon Lockers Installation, Agree Proposed Location, Ham Street KH or Crestel - electrical Supply to be installed Ham Street Upgrade station fencing Amazon Lockers Installation, Agree Proposed Location, Hampden Park KH or Crestel - electrical Supply to be installed Renewal of heavily corroded transverse beams, girders, deck plates and flanges.Renewal of heavily corroded staircases. Repointing of brick supporting piers. Renewal of deck surfacing and grit blast and redecoration of repired members only. Harlington Section of bridge has fallen onto Platform 2 in 17/18. Structural Assessment completed. Incapable of carrying live loading. 2007 temporary propping. 2 nr steel griders lost from corrosion. Repairs to Platform 2 and 3 settlement damage and installation of permanent propping to support platform edges Harlington including replacement of collapsing platform. Loss of section of reinforcement. Harpenden Creation of a new accessible toilet facility. Harpenden New cycle parking. Structural assessment notes footbridge cannot take dead load. Foot Bridge Span 2 strengthening and application of protective Harringay coating following blast cleaning. Ticket office renewal and staircase adjustments. Location Work Description Partial resurface of platform 1 & 2 including: renewal of Tarmac surface to reduce slip trips and falls. Spot replacement of spalled copers. Repointing of riser walls and renewal of missing brickwork. Removal of vegetation to retaining wall, to platform 1 & 2 treat areas with a herbicide and rebuild Harringay destabilsed section of retaining wall. Resurfacing - Plat 1 = 200m2 (Approx.33%) Platform 2 = 210m2 (Approx. 28%). Repointing Plat 1 = 130m2 (Approx 67%) Plat 2 = 130m2 (Approx 67%). Rebuilding of section of Retaining Walls -Plat 1 = 11m2 (Approx 6%) Plat 2 = 10m2 (Approx 6%). Coper joint repointing Replacing life expired help points with new help points with inbuilt induction loops at the following locations: Cricklewood, Harringay Gordon Hill, Harringay, Hornsey, Mill Hill Broadway and Palmers Green. Amazon Lockers Installation, Agree Proposed Location, Hassocks KH or Crestel - electrical Supply to be installed Hatfield Defibrillator Hatfield Toilet improvements Hatfield Waiting Shelter Podpoint installing Electric Vehicle Charging Hubs 17th August Hatfield – 28th August Haydons Road Seating Haydons Road Design & LLC - Groundworks Seating Haydons Road Landscaping Podpoint installing Electric Vehicle Charging Hubs 3rd August – Haywards Heath 14th August Haywards Heath All toilets All three passenger lounges needs redecorsting and new Haywards Heath benches Amazon Lockers Installation, Agree Proposed Location, Haywards Heath KH or Crestel - electrical Supply to be installed Haywards Heath Seating - groundworks Haywards Heath Seating - platforms 1-3

Haywards Heath Seating - groundworks Hertford North Access for All Funding for step-free access Location Work Description Partial resurface of platforms 1, 2 & 3 including, renewal of Tarmac surface to reduce slip trips and falls. Spot replacement of spalled copers. Repointing of riser walls and rake out and repoint affected deck joints and piers with a suitable mortar compound. 30% of old arch supports now collapsed. These are Hertford North redundant strucures no longer supporting the platform deck. Remove redundant material from site. Platform 1 - Resurface = 220m2 Repointing = 50m2. Platform 2 - Resurface = 650m2 Repointing = 70m2 Removal of redundant arch supports = 20m2 Hertford North Defibrillator Hertford North Improve toilets - Ladies & Gents Platform 3 Hever Footbridge Remedial - OPSAP Amazon Lockers Installation, Agree Proposed Location, Hever KH or Crestel - electrical Supply to be installed LED Renewal due to T12 luminaires being phased out of Highbury & Islington production Amazon Lockers Installation, Agree Proposed Location, Holmwood KH or Crestel - electrical Supply to be installed Horley General repairs Horley Car Park - NCP car park to come back into GTR control Brick & Steelwork Repairs, Clean and Painting of Undercroft Horley Steelwork Amazon Lockers Installation, Agree Proposed Location, Horley KH or Crestel - electrical Supply to be installed Horley Toilets / toilet improvements Horley Seating platform 1 Horley Shelter screens platform 1 Horley Cantilever shelter platform 1 Horley Canopy over TVM Horley Seating - groundworks Horley Cantilever - groundworks Horley Shelter - groundworks for x5 shelter screens Horley Design & LLC - Canopy over TVM Horley Design & LLC - Seating Horley Repaint the steel beams on all platforms Side panel walls / glazing with scaffold access and all painting Horley works include 12 line blocks and 4 52 hr possessions Hornsey Installation of InPost locker - awaiting landlord consent Hornsey Installation of InPost locker Hornsey Shelter - groundworks platform 2 Hornsey Enclosed Shelter- platform 2 Hornsey Design & LLC - Shelter Groundworks Hornsey Defibrillator Location Work Description Replacing life expired help points with new help points with inbuilt induction loops at the following locations: Cricklewood, Hornsey Gordon Hill, Harringay, Hornsey, Mill Hill Broadway and Palmers Green. Gents toilet platform 1/2 and 3/4 really smell as the old Horsham pipework does not work Horsham Passenger waiting room platform 1&2. Amazon Lockers Installation, Agree Proposed Location, Horsham KH or Crestel - electrical Supply to be installed Hove Porte Cochere Refurbishment Amazon Lockers Installation, Agree Proposed Location, Hove KH or Crestel - electrical Supply to be installed Network Rail are undertaking the painting of all windows, doors and rendered surfaces at the station front. Works will Hove also include the full repair and painting fo windows, doors, rendered surfaces and handrails on the Training Centre building, both road and platform side. Huntingdon Toilet refurbishment A14 Highway Scheme over the station including requirement Huntingdon to provide a new decked car park Repairs and stabilisation with underpinning to Grade 2 Listed Huntingdon Coal Building. Live movement. Lowest initial cost. Partial platform 1 & 2 patch resurfacing, spot coper Huntingdon replacement, repairs to riser wall expansion joints and new drainage system works with gradient adjustment. Huntingdon Refurbishing the booking hall Additional enhanced customer seating provision currently Huntingdon being considered at Finsbury Park, Huntingdon and Welwyn North. Hurst Green Additional works to waiting room Amazon Lockers Installation, Agree Proposed Location, Hurst Green KH or Crestel - electrical Supply to be installed Hurst Green Automatic door to booking office Hurst Green Seating - free issue platform 1 Hurst Green Door to waiting room Hurst Green Seating Platform 1- groundworks Hurst Green Seating additional- platform 1- groundworks Hurst Green Canopy over TVM Hurst Green Design & LLC - Waiting Room Hurst Green Design & LLC - Seating Platform 1 Hurst Green Design & LLC - Canopy over TVM Amazon Lockers Installation, Agree Proposed Location, Ifield KH or Crestel - electrical Supply to be installed Ifield General Station Refurbishments Amazon Lockers Installation, Agree Proposed Location, Kenley KH or Crestel - electrical Supply to be installed Location Work Description Partial resurface of platform 2 & 3 including: renewal of Tarmac surface to reduce slip trips and falls. Spot replacement Kentish Town of spalled copers. Repointing of riser walls and renewal of missing brickwork including corbelled support to copers. Stitching of fractured brick risers Kings Lynn New network sidings to support 8-car berthing. Kings Lynn Toilet improvements Amazon Lockers Installation, Agree Proposed Location, Kingswood KH or Crestel - electrical Supply to be installed Remedial works to Harp platform supports Plat 1 and 4, repairs to infill concrete panels riser walls, loss of cover and Knebworth corrosion to reinforcements. Annual inspections in CP5 to review risk . Improved and enhanced wayfinding signage at the following Knebworth locations, Knebworth, Sandy, Extending the Country end of platform 2. We are doing this so the platform can fully accommodate 8 car train formations and to prevent the train from fouling the crossing. This work is planned to take place under a possession from 6th – 8th June. Lancing We are still working out mitigations on how the new portion of the platform will be managed. NR have taken full control of the car parks at this location and it will be out of use to passengers and staff until 10th June Stair Tread enhancements to be considered at a number of Lancing stations including Lancing, West Worthing, Amazon Lockers Installation, Agree Proposed Location, Lancing KH or Crestel - electrical Supply to be installed Leagrave Cycle parking enhancements. Leagrave Three Horses Roundabout link to station. Footbridge strengthening to steel (including tarmacadam deck renewal and spot blasting & spot painting due to heavy Leagrave corrosion and delamination). July 2014 Structural Assessment identified reduction in capacity of support columns due to buckling. Stair support repairs. New drainage system required. Repairs to the riser walls to island platfrom 2 and 3 The riser wall joints are open and spalling has occurred to a depth where accelerated asset degradation will occur, loss of profile to corbel faces is also evident. Temporary bricks supporting coper and corbel load in one area. Numerous stepped Leagrave fractures throughout platform supports an hairline fractures to piers to be investigated. Spalling to concrete piers. Repointing of riser walls and renewal of missing brickwork including supporting corbelled brickwork to copers. Stitching of fractured brick risers. Leagrave Defibrillator Leagrave Leagrave Bridge Refurbishment Leatherhead Landscaping - installing wild flowers Location Work Description Leatherhead Installation of canopies Leatherhead Step-free access scheme being developed at the station Amazon Lockers Installation, Agree Proposed Location, Leatherhead KH or Crestel - electrical Supply to be installed Leatherhead Defibrillator Amazon Lockers Installation, Agree Proposed Location, Leigh KH or Crestel - electrical Supply to be installed Leigh (Kent) Electrical connection for LED CIS Leigh (Kent) Data connection for LED CIS Leigh (Kent) Design and LLC for CIS works Leigh (Kent) CIS Letchworth Accessible toilet - platform 2 Letchworth Toilet improvements Amazon Lockers Installation, Agree Proposed Location, Lewes KH or Crestel - electrical Supply to be installed Lingfield Decorating / painting / tiling Lingfield Seating Lingfield Landscaping and opening up of the grassed areas Lingfield Seating - Groundworks Lingfield Design & LLC - Seating Lingfield Footbridge Refurbishment - Plated Girder Amazon Lockers Installation, Agree Proposed Location, Lingfield KH or Crestel - electrical Supply to be installed Lingfield Toilet improvements Lingfield Heating to waiting room and upgrade to distribution board Lingfield Upgrade of old waiting room/WC to heated waiting room. Lingfield Provide store so above old waiting room can be cleared. Lingfield Design & LLC - Waiting Room Lingfield Design & LLC -Store Room Littlehampton Refurb of all public toilets Amazon Lockers Installation, Agree Proposed Location, Littlehampton KH or Crestel - electrical Supply to be installed Littlehaven Seating Littlehaven Seating- groundworks platforms 1 and 2 Littlehaven Design and LLC Cycle Parking Littlehaven Refurbishment and expansion to Cycle Parking Littlehaven Design & LLC - Seating Amazon Lockers Installation, Agree Proposed Location, Littlehaven KH or Crestel - electrical Supply to be installed Littleport Platform extension to support 8-car working and new ramp

Proposal to install an additonal WAG at northern end of the SN London Bridge gateline to provide an additional entrance/exit for passengers with access needs to cross the gate line independently. Installation of a 'Bar code reader' to the current gate line London Bridge (SE Gates) (selected gates) - CMS required from server to gate line Amazon Lockers Installation, Agree Proposed Location, London Road (Brighton) KH or Crestel - electrical Supply to be installed Location Work Description Amazon Lockers Installation, Agree Proposed Location, London Victoria KH or Crestel - electrical Supply to be installed Loughborough Junction Improve station entrance/painting Loughborough Junction Seating - platform 1 and 2 Loughborough Junction Groundworks - seating Loughborough Junction Design & LLC - Seating Loughborough Junction Platform Repair/Refurbishment Loughborough Junction Disused Platform Repairs Access for All Funding for step-free access and development of Luton station masterplan Refix slipped glazing and cladding, currently temporarily fixed Luton although incidences of emergency call outs to repair. New roof covering to Platform 1,2 to main bridge. Luton Canopy lighting renewals. Luton Toilet improvements Luton Cycle parking improvements including formal cycle hub DART scheme provide new connections to the airport and Luton Airport Parkway access onto Platform 1. Scheme also includes the introduction of a second footbridge at the station. Partial Platforms 1, 2, 3, 4 coper bedding replacement and Luton Airport Parkway riser wall re-pointing Luton Airport Parkway Lift renewal Meldreth Toilet improvements Amazon Lockers Installation, Agree Proposed Location, Merstham KH or Crestel - electrical Supply to be installed Mill Hill Broadway Access for All Funding for step-free access Platform 1 riser wall has numerous full height vertical stepped fractures, bulging and areas of damp staining, there are alos some areas of loose and spalled brick. Platform 1 surface has large scale ponding evident throughout increasing slips, trips and falls. Resurface of platform including, renewal of Tarmac Mill Hill Broadway surface to reduce slip trips and falls. Spot replacement of spalled copers. Repointing of riser walls and renewal of missing brickwork including corbelled support to copers. Repointing of coper beds. Stitching of fractured brick risers. Resurface = 1400m2. Brickwork repairs including repointing = 125m2 Replacing life expired help points with new help points with inbuilt induction loops at the following locations: Cricklewood, Mill Hill Broadway Gordon Hill, Harringay, Hornsey, Mill Hill Broadway and Palmers Green. Amazon Lockers Installation, Agree Proposed Location, Eastfields KH or Crestel - electrical Supply to be installed Mitcham Eastfields Waiting shelter - Design and LLC Mitcham Eastfields Waiting shelter - groundwork Mitcham Eastfields Waiting shelter - Supply and installation Mitcham Eastfields A sheltering wall next to the ticket office Mitcham Eastfields seating - groundwork Mitcham Eastfields seating - supply and installation Location Work Description Mitcham Junction Additional Benches Amazon Lockers Installation, Agree Proposed Location, Mitcham Junction KH or Crestel - electrical Supply to be installed Mitcham Junction Shelter- groundworks- Platform 1 Mitcham Junction Shelter - platform 1 Mitcham Junction Toilet refresh LED Renewal due to T12 luminaires being phased out of Moorgate production Amazon Lockers Installation, Agree Proposed Location, Moulsecoomb KH or Crestel - electrical Supply to be installed New Barnet Installation of InPost locker - awaiting landlord consent New Barnet Installation of InPost locker Newhaven Harbour Pigeon Proofing on Platform 2 Newhaven Harbour Canopy repairs / refurbishment Amazon Lockers Installation, Agree Proposed Location, Newhaven Harbour KH or Crestel - electrical Supply to be installed Newhaven Harbour Community based art work Newhaven Town Footbridge Refurbishment - Open Lattice Amazon Lockers Installation, Agree Proposed Location, Newhaven Town KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Norbury KH or Crestel - electrical Supply to be installed Norbury Defibrillator Powered Electric Wheelchairs - For stations (such as East Croydon and Norbury) with long and steep non complaint Norbury ramps, they need powered wheelchairs to assist passengers ie those who can transfer from own chair or others who cannot walk up the ramp without assistance. Amazon Lockers Installation, Agree Proposed Location, Normans Bay KH or Crestel - electrical Supply to be installed Brick & Steelwork Repairs, Clean and Painting of Undercroft North Dulwich Steelwork Additional shelter on platforms to provide customer comfort North Dulwich when waiting for train services, encouraging spread along the platform. Note: this is a listed station. Amazon Lockers Installation, Agree Proposed Location, North Dulwich KH or Crestel - electrical Supply to be installed Nunhead Refurbishing retail unit Nunhead Refurbishment of stairs Nunhead Station entrance refresh Canopy repairs / refurbishment - New Roof Sheets, GRP Fascia Nunhead Boards & Man-Safe System. Prep. & Paint Exisinting Steel/Timber Elements. Nunhead Platform Repair/Refurbishment Nutbourne Platform - Trestle Platform Repairs Amazon Lockers Installation, Agree Proposed Location, Nutbourne KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Nutfield KH or Crestel - electrical Supply to be installed Location Work Description Resurfacing of Platforms including cope replacement and riser Oakleigh Park wall re-pointing and reversal of gradient away from track. Platform risk gradient score 5 Ockley Cycle storage Ockley Cycle storage - groundworks Ockley TVM Canopy Ockley TVM canopy groundworks Ockley Design & LLC Cycle Parking

Ockley Design & LLC Canopy over TVM Amazon Lockers Installation, Agree Proposed Location, Ockley KH or Crestel - electrical Supply to be installed

Old Street Staircase refurbishment

Old Street Signage

Old Street Design & LLC LED Renewal due to T12 luminaires being phased out of Old Street production Refurbishment of Access routes including new cladding, Old Street drainage renewals, new surfacing and Diversity Inclusion specialist measures Ore Footbridge Remedial - Open Lattice

Amazon Lockers Installation, Agree Proposed Location, Ore KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Oxted KH or Crestel - electrical Supply to be installed

Palmers Green Landscaping + bee garden installation

Palmers Green Toilet improvements - gents and ladies

Palmers Green Cycle parking - groundworks

Palmers Green Cycle parking

Palmers Green Design & LLC - Groundworks Cycle Parking Palmers Green Access for All Funding for step-free access Defibrillator Palmers Green

Palmers Green Commissing of Art and landscaping Replacing life expired help points with new help points with Palmers Green inbuilt induction loops at the following locations: Cricklewood, Gordon Hill, Harringay, Hornsey, Mill Hill Broadway and Location Work Description

Peckham Rye Toilet refurbishments - minor

Peckham Rye Toilet refurbishment

Peckham Rye Painting

Peckham Rye Station capacity improvement works.

Amazon Lockers Installation, Agree Proposed Location, Peckham Rye KH or Crestel - electrical Supply to be installed Defibrillator

Peckham Rye

Penshurst Cycle parking

Penshurst Cycle parking groundworks

Penshurst Refurbish shelter platform 2 Penshurst Refurbish shelter platform 1

Penshurst Design & LLC - Groundworks Cycle Parking Amazon Lockers Installation, Agree Proposed Location, Penshurst KH or Crestel - electrical Supply to be installed

Pevensey & Westham Footbridge Refurbishment - Open Lattice

Amazon Lockers Installation, Agree Proposed Location, Pevensey & Westham KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Pevensey Bay KH or Crestel - electrical Supply to be installed Provision of a new modern help point located to provide key Plumpton customer information.

Plumpton Car Park - Planters and Plants

Amazon Lockers Installation, Agree Proposed Location, Plumpton KH or Crestel - electrical Supply to be installed

Polegate Footbridge Refurbishment - Boxed Steel

Amazon Lockers Installation, Agree Proposed Location, Polegate KH or Crestel - electrical Supply to be installed

Portslade Refurbishing Station House to let

Amazon Lockers Installation, Agree Proposed Location, Portslade KH or Crestel - electrical Supply to be installed Location Work Description Remedial works to Harp platform supports Plat 1 and 4, Potters Bar repairs to infill concrete panels riser walls, loss of cover and corrosion to reinforcements. Annual inspections in CP5 to Potters Bar Defibrillator

Potters Bar Improve toilets

Enhancing the accessible ramps to be slip resistant and Potters Bar installing automatic doors on waiting shelters.

Preston Park Forecourt Redesign

Amazon Lockers Installation, Agree Proposed Location, Preston park KH or Crestel - electrical Supply to be installed

Pulborough Canopy repairs / refurbishment

Amazon Lockers Installation, Agree Proposed Location, Pulborough KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Purley KH or Crestel - electrical Supply to be installed Defibrillator Purley

Amazon Lockers Installation, Agree Proposed Location, Purley Oaks KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Queens Road Peckham KH or Crestel - electrical Supply to be installed Defibrillator Queen's Road Peckham

Queens Road Peckham Stn Platform Repair/Refurbishment

Radlett Replacement of flooring to Gents Toilets

Radlett Replacement of doors to booking hall.

Ravensbourne Wheel ramp/bike wheel track on stairs

Ravensbourne Improve seating - platform 1 and 2

Ravensbourne Groundworks - seating

Ravensbourne Design & LLC Seating Redhill Ticket Office Refurishment

Redhill Seating platform 3

Redhill Seating -groundworks

Redhill Seating - platforms 1-2 Location Work Description

Redhill Toilet refurb

Redhill Design & LLC Seating

Redhill Rewire & Relight

Amazon Lockers Installation, Agree Proposed Location, Redhill KH or Crestel - electrical Supply to be installed

Redhill Refurbish staff and customer toilets

Amazon Lockers Installation, Agree Proposed Location, Reedham KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Reigate KH or Crestel - electrical Supply to be installed

Riddlesdown Shelter

Riddlesdown Seating - platform 1

Riddlesdown Shelter - groundworks including design and LLC

Riddlesdown Seating - seating groundworks

Riddlesdown Design & LLC Shelter

Riddlesdown Design & LLC Seating Amazon Lockers Installation, Agree Proposed Location, Riddlesdown KH or Crestel - electrical Supply to be installed

Royston Toilet improvements Partial renewal of Platform Tarmac surface, coper repairs, Royston installation of 'Tactiles' and isolated repairs to concrete harp platform supports and infill panels. Plat 1 Royston Landscaping

Amazon Lockers Installation, Agree Proposed Location, Rye KH or Crestel - electrical Supply to be installed Salfords Car Park - Planters and Plants

Salfords Footbridge Remedial - OPSAP

Amazon Lockers Installation, Agree Proposed Location, Salfords KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Sanderstead KH or Crestel - electrical Supply to be installed

Sanderstead Improve heating in waiting area Location Work Description Sanderstead Seating Sanderstead Cantilever shelter Sanderstead Canopy over TVM Sanderstead Shelter frontage platform one and associated works Sanderstead Shelter frontage platform two and associated works Sanderstead Seating -groundworks Sanderstead Toilet refresh Sanderstead Canopy over TVM - groundworks Sanderstead Cantilever shelter groundworks Sanderstead Design & LLC Groundworks Shelter Sanderstead Design & LLC Canopy over TVM Sanderstead Design & LLC Groundworks Seating Sandy Drop off - up side Footbridge repairs to heavily corroded sections of steel structure including cross members and trestle beams, Sandy corroded column base plates. Renewal of stair treads and application of spot protective coating. Existing porous decking and inadequate drainage system accelerating degradation.

Improved and enhanced wayfinding signage at the following Sandy locations, Knebworth, Sandy,

Sandy Landscaping + bee garden installation

Seaford The waiting room needs refurbishing.

Seaford Cycle parking

Seaford Toilet improvements - Ladies and DDA Amazon Lockers Installation, Agree Proposed Location, Seaford KH or Crestel - electrical Supply to be installed Refurbish ticket office following extensive works to remove Selhurst asbestos.

Amazon Lockers Installation, Agree Proposed Location, Selhurst KH or Crestel - electrical Supply to be installed Location Work Description

Selhurst Accessible toilet feasibility

Shoreham By Sea Platform Canopy repairs / refurbishment

Shoreham By Sea Subway canopy and main station building works Stair Tread enhancements to be considered at a number of Shoreham By Sea stations including Goring by Sea, Shoreham by Sea and Worthing. Amazon Lockers Installation, Agree Proposed Location, Shoreham-By-Sea KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, South Bermondsey KH or Crestel - electrical Supply to be installed

South Croydon Platform - PTI Works: Platform 3, 4 & 5

South Croydon Access for All Feasibility

Amazon Lockers Installation, Agree Proposed Location, South Croydon KH or Crestel - electrical Supply to be installed

South Merton Landscaping

Southbourne Platform - Trestle Platform Repairs

Amazon Lockers Installation, Agree Proposed Location, Southbourne KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Southease KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Southwick KH or Crestel - electrical Supply to be installed New units being built - signed terms with M&S, Starbucks and St Albans AMT Major station enhancement including extended station St Albans building, toilets, waiting room, retail, cycle shelters and new station entrance from Ridgmont Road. Second footbridge scheme to improve capacity / pedestrian St Albans movements from the island platform. St Albans Car Park luminaire renewal and new fire detection. St Albans Defibrillator

St Helier Landscaping (CSR)

Refurbishment of platform canopies including coverings, St Helier paintwork to soffit and valence boards, timber repairs, gutters.

St Neots Toilet improvements

St Neots Signage for community project Replacement of Ticket Vending Machines and repair of floor St Pancras area Location Work Description

Stevenage Unit 1 & 2 on overbridge opned new Greggs

Introduction of Platform 5 to support Hertford Loop turnback Stevenage services.

Stevenage Canopy lighting renewals.

Stevenage Toilet improvements

Stewarts Lane LMD Footbridge Refurbishment (London) Brick & Steelwork Repairs, Clean and Painting of Undercroft Steelwork

Streatham Step-free access scheme being developed at the station

Amazon Lockers Installation, Agree Proposed Location, Streatham KH or Crestel - electrical Supply to be installed Defibrillator Streatham

Amazon Lockers Installation, Agree Proposed Location, Streatham Common KH or Crestel - electrical Supply to be installed Brick & Steelwork Repairs, Clean and Painting of Undercroft Streatham Hill Steelwork Amazon Lockers Installation, Agree Proposed Location, Streatham Hill KH or Crestel - electrical Supply to be installed Defibrillator Streatham Hill

Sutton Canopy and station refurbishment, including lift refurb

Sutton Canopy repairs / refurbishment

Sutton Rewire & Relight

Sutton Lift Renewal

Sutton Platform - PTI Works: Platform 3

Sutton Footbridge Remedial - OPSAP

Brick & Steelwork Repairs, Clean and Painting of Undercroft Sutton Steelwork Amazon Lockers Installation, Agree Proposed Location, Sutton KH or Crestel - electrical Supply to be installed Defibrillator Sutton

Sutton Common Lighting Location Work Description

Sutton Common Seating- platform 1& 2

Sutton Common Seating- platform 1& 2 groundworks

Sutton Common Design & LLC Seating

Sutton Common CCTV

Amazon Lockers Installation, Agree Proposed Location, Tadworth KH or Crestel - electrical Supply to be installed

Tattenham Corner Replace roof and rotten windows on external toilet block