Location Work Description Aldrington Upgrade Fence Aldrington
Total Page:16
File Type:pdf, Size:1020Kb
Location Work Description Aldrington Upgrade fence Aldrington Landscaping Aldrington Handrails to ramp and fix fence Amazon Lockers Installation, Agree Proposed Location, Aldrington KH or Crestel - electrical supply to be installed Alexandra Palace Access for All Funding for step-free access Footbridge strengthening and refurbishment. Bridge deck parapet crush loading dangerously inadequate. Treatment to corrosion to bottom flanges. Work to abutments rebuild Alexandra Palace collapsed retaining wall. Corrosion to columns, bearing pads, reinforcement causing spalling of concrete to deck. Potential slips/trip/falls due to dips in surface. Mitigation ie Lowest Initital Cost. Works from Assessment Alexandra Palace Defibrillator Amberley Footbridge Refurbishment - Open Lattice Amazon Lockers Installation, Agree Proposed Location, Amberley KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Angmering KH or Crestel - electrical Supply to be installed Appledore Station House Refurbishment Appledore Signage Amazon Lockers Installation, Agree Proposed Location, Appledore KH or Crestel - electrical Supply to be installed Arlesey Painting of footbridge * installation of security lighting Footbridge parapet strengthening and refurbishment, including treating localised corrosion including to main girder webs, 3mm loss. Renewal of anti-slip surfacing and superstructure/substructure deck joints to prevent Arlesey accelerated corrosion. Steel square hollw sections require new strengthening elements. Corrosion to reinforcements to deck. Remedials from 2014 ssessment report. Lowest initial cost based on targetted renewals to areas Arlesey Station repainting Amazon Lockers Installation, Agree Proposed Location, Arundel KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Ashtead KH or Crestel - electrical Supply to be installed Ashurst Car Park - Planters and Plants Ashurst Footbridge Refurbishment - Open Lattice Amazon Lockers Installation, Agree Proposed Location, Ashurst KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Balcombe KH or Crestel - electrical Supply to be installed Large housing development to north of station proposing Baldock second entrance to the station from Platform 2 Balham Reconfiguration of toilets Balham Platform Repair/Refurbishment Balham Canopy repairs / refurbishment Location Work Description Balham Install new canopy and platform coper replacement Amazon Lockers Installation, Agree Proposed Location, Balham KH or Crestel - electrical Supply to be installed Balham Defibrillator Balham Seating -groundworks Balham Seating - platform 1 and 2 Balham Toilet refurb DDA Balham Defibrillator and Case Balham Defibrillator Installation Amazon Lockers Installation, Agree Proposed Location, Banstead KH or Crestel - electrical Supply to be installed Barnham All toilets need refurbishment Barnham Additional required toilet improvements Station supervisors office to be refurbished to provide a more Barnham welcoming Customer Information Point to support customers with information, onward travel information, assistance. Amazon Lockers Installation, Agree Proposed Location, Barnham KH or Crestel - electrical Supply to be installed Step-free access scheme being developed at the station with Battersea Park support from Local Authority Battersea Park Platform 4/5 Refurbishment - none MFF Battersea Park Rewire & Relight Battersea Park Station House Refurbishment Amazon Lockers Installation, Agree Proposed Location, Battersea Park KH or Crestel - electrical Supply to be installed Beckenham Hill Seating groundworks - platform 1 and 2 Beckenham Hill Design & LLC - Seating Beckenham Hill Seating platform 1 and 2 Beckenham Hill Shelter - groundworks Beckenham Hill Design & LLC Shelter Beckenham Hill Enclosed Shelter - platform 2 Beckenham Hill Footbridge Plated Girder - Remedial Works Bedford Installation of InPost locker Electrification and small extension (ramp area) of Platform 4 Bedford to support EMT services Amazon Lockers Installation, Agree Proposed Location, Belmont KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Berwick KH or Crestel - electrical Supply to be installed Bexhill Redecorate and refurbish lounge area Location Work Description Refurbish an existing unit creating up to 100 spaces in a 2 tier space to include; FREE to apply ITSO key card system that can Bexhill also be used for rail travel, maintenance/repair area, lockers, changing area, cycle hire run by the local community, CCTV, signage and LED lighting. Bexhill Toilet refurb- DDA in ticket hall- listed building Bexhill Refurbish waiting room Amazon Lockers Installation, Agree Proposed Location, Bexhill KH or Crestel - electrical Supply to be installed Biggleswade Bus / Rail Interchange development - Local Authority initiative. Biggleswade Toilet improvements Biggleswade Access for All Funding for step-free access Repairs to riser brick walls (300m2) (lack of support to copers), some subsidence requiring partial resurface of Platforms 1,2 Biggleswade (300m2) Platforms 3,4 (200m2). Spot gauging. Platform gradient risk score 5 Improve front of house presentation at Biggleswade Railway Biggleswade Station in preparation for future Access for All Scheme and Bus/Rail Interchange proposed at the station. Amazon Lockers Installation, Agree Proposed Location, Billingshurst KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Birbeck KH or Crestel - electrical Supply to be installed Bishopstone Reinstate waiting room Bishopstone Design & LLC Reinstate waiting room Amazon Lockers Installation, Agree Proposed Location, Bishopstone KH or Crestel - electrical Supply to be installed Blackfriars Creating new space on Blackfriars terrace. Extensive fit out works carried out by West Sussex County Bognor Regis Council for 2 new retail units Remove existing shingle, prepare and lay new tarmacadam Bognor Regis surfacing. Amazon Lockers Installation, Agree Proposed Location, Bognor Regis KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Bosham KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Box Hill & Westhumble KH or Crestel - electrical Supply to be installed Boxhill Footbridge Remedial - Plated Girder New Station Brentcross West, part of a wider project with Brent Cross retail development and residental. Brighton Market Brighton Shed Roof Refurbishment Brighton Platform Repair/Refurbishment Brighton Fire Alarm Renewal Amazon Lockers Installation, Agree Proposed Location, Brighton KH or Crestel - electrical Supply to be installed Brighton Install anti-slip boarding on the wooden walkway. Location Work Description Brookmans Park Additional lighting Brookmans Park CCTV in car parks Brookman's Park Defibrillator Potential car park development / redevelopment of station car Burgess Hill park area Burgess Hill Customer toilets need flooring and panelling renewed Burgess Hill Passenger lounge needs more seating and redecorating Brick & Steelwork Repairs, Clean and Painting of Undercroft Burgess Hill Steelwork Amazon Lockers Installation, Agree Proposed Location, Burgess Hill KH or Crestel - electrical Supply to be installed Burgess Hill Seating- Platform 1 and 2 Burgess Hill Design & LLC Seating - Platform 1 and 2 Burgess Hill Seating - groundworks Burgess Hill Shelter - groundworks Burgess Hill Design & LLC Shelter Burgess Hill Install base for 3 TVM canopies Burgess Hill Design & LLC Install base for 3 TVM canopies Burgess Hill Shelter - on Up platform Burgess Hill TVM canopies x3 Amazon Lockers Installation, Agree Proposed Location, Buxted KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Carshalton KH or Crestel - electrical Supply to be installed Carshalton Beeches Footbridge Refurbishment - Covered Lattice Amazon Lockers Installation, Agree Proposed Location, Carshalton Beeches KH or Crestel - electrical Supply to be installed Caterham Footbridge Remedial - OPSAP - Ramp Plated Girder Amazon Lockers Installation, Agree Proposed Location, Caterham KH or Crestel - electrical Supply to be installed Catford Step-free access scheme being developed at the station Repairs to box gutter supports, installation of 'Unifold' box Cheam gutter linings, repairs/clearing of rainwater goods. Installation of fall arrest system. Redecoration of valence & soffit boards. Amazon Lockers Installation, Agree Proposed Location, Cheam KH or Crestel - electrical Supply to be installed Chichester Prima Seating Chichester Seating - groundworks Amazon Lockers Installation, Agree Proposed Location, Chichester KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Chipstead KH or Crestel - electrical Supply to be installed Amazon Lockers Installation, Agree Proposed Location, Christ’s Hospital KH or Crestel - electrical Supply to be installed City ThamesLink Upgrade to AC system City ThamesLink Enhanced signage for finding lifts. Amazon Lockers Installation, Agree Proposed Location, Collington KH or Crestel - electrical Supply to be installed Location Work Description Amazon Lockers Installation, Agree Proposed Location, Cooden Beach KH or Crestel - electrical Supply to be installed Cooksbridge Car Park - Planters and Plants Amazon Lockers Installation,