Procurement Plan Community Development Program Support Project – Phase III (Programme National de Développement Participatif – Phase III) Public Disclosure Authorized I. General

1. Bank’s approval Date of the procurement Plan [Original: February 2016]: Revision of Updated Procurement Plan, May 05, 2017 2. Date of General Procurement Notice: February 15, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year January to December 2017

II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior

Public Disclosure Authorized Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement:

Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) None 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million 5. DC (Non-Consultant Services) none

Public Disclosure Authorized 2. Prequalification. Not applicable.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Procurement (works, goods and services) for subprojects of communes, such as small infrastructure, social infrastructure, classrooms, health centers, community halls, , minor works or rehabilitation, will be procured on the basis of community participation in accordance with the clause 3.19 of the World Bank Procurement Guidelines (Community Participation in Procurement), and the Guidelines for Simplified Procurement and Disbursement for Community-Based Investments (March 3, 1998) detailed in the specific manual or guidelines to communes approved by the bank.

Public Disclosure Authorized 4. Reference to (if any) Project Operational/Procurement Manual: Guide des Acteurs intervenant dans le processus de passation et de l’exécution des marchés communaux financés par le PNDP – Juin 2010, révisé en Janvier 2016

May 05, 2017 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under - retroactive financing

6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement)

1 2 3 4 5 6 7

Ref. Descriptio Estimate Packag Domesti Review Comments No. n d es c by Bank Cost Prefere (Prior / US$ nce Post) million (yes/no) Summary of 2.328 2 No Prior the ICB (Goods) Summary of 0.700 1 No Post 1st contract the NCB for Prior (Goods) Review

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) Above US$ 500,000 Justification prior reviewed by bank 3. Individual Above US$ 200,000

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.

3. Any Other Special Selection Arrangements: not applicable

4. Consultancy Assignments with Selection Methods and Time Schedule

May 05, 2017 1 2 3 4 5 6 7 Ref Description of Estimate Selection Review Expecte Comment . Assignment d cost method by the d s/ No (US$ Bank proposal completio equivale (prior/po s n date nt) st) submissi on date For the Support for the 1 Post first year preparation of 20,000 IC 21/08/15 24/09/15 Statutory Instruments (30 days) 2 Study on the definition 40,000 Post 22/04/16 of a planning CQS 25/01/16 (03 methodology at months) regional level 3 Study on the planning 40,000 CQS Post 25/01/16 22/04/16 process in the (03 communes and urban months) communities 4 Study for the 20,000 IC Post 19/02/16 24/03/16 establishment of local (30 days) public service in communes 5 Study on the 40,000 CQS Post 11/04/16 18/07/16 sustainability of the (03 PNDP months) 6 Evaluation of the 40,000 CQS Post 13/07/16 18/10/16 decentralization (03 process in months) /supports to the finalization of the national strategy for decentralization 7 Selection of a 20,000 IC Post 20/11/15 30/12/15 consultant to develop (30 days) the practitioner's manual for the 31 communes 8 Municipal staff training 100,000 SSS Prior NA Service provided by the CEFAM (Conventio n) 9 Training of 100,000 SSS Prior NA Service procurement provided commissions by ARMP (Conventio n) 10 Financial Audits of the 150,000 LCS Post 10/03/15 Contract project for the first 2 for 2 years years 11 legal advice 10,000 IC Post 28/12/15 Annual contract

May 05, 2017 1 2 3 4 5 6 7 Ref Description of Estimate Selection Review Expecte Comment . Assignment d cost method by the d s/ No (US$ Bank proposal completio equivale (prior/po s n date nt) st) submissi on date 12 Design and 90,000 CQS Post 12/02/16 22/08/16 development of an (06 internet portal on the months) PNDP and communes 13 Translation of 90,000 CQS Post 11/05/16 20/08/16 documents (03 months) 14 Technical audit 80,000 QCBS Post 16/02/16 31/08/16 (06 months) 15 Beneficiary assessment 50,000 QCBS Post 15/11/16 22/05/17 (06 months) 16 Environmental and 70,000 QCBS Post 13/12/16 26/06/17 Social Assessment (06 months) 17 Service Follow-up of training SSS Prior NA provided deployment and by AIMF 70,000 technical assistance to expert Sim_ba software in (Conventio communes n) 18 IC Post 27/05/15 Annual contract (the 10,000 current contract ends June Insurance advice 30, 2015) 19 QCBS Post 01/12/16 16/04/16 Preparation of CDPs for 80,000 (06 the 31 communes months)

May 05, 2017 PROCUREMENT Cameroon : Community Development Program Support Project-Phase III PLAN General Information Country: Cameroon Bank’s Approval Date of the Original Procurement Plan: 2017-05-30 Revised Plan Date(s): (comma delineated, leave blank if none)2021-08-01 Project ID: P144637 GPN Date: 2016-09-06 Project Name: Community Development Program Support Project-Phase III Loan / Credit No: IDA / 57180, IDA / 62240 Executing Agency(ies):CELLULE REGIONALE DE COORDONATION - OUEST

WORKS Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Contract Description Component Review Type Method Document Amount Amount qualification Document / and Recommendation Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Completion Type (US$) (US$) Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

CM-CRC OUEST-58229-CW- RFQ / Travaux de construction d'un dalots sur le cours d'eau à Nkomlom reliant Djeukouo à Component A: Local Single Stage - One 2018-04- 2018-06- 2018-06- 2018-12- Bametchetcha dans la localité IDA / 57180 A posteriori Demande de prix Open - National 25,693.00 17,664.86 Signé development support Envelope 16 11 22 08 de Bahiala dans la Commune de Batié, Département des Hauts Plateaux, Région de l'Ouest.

CM-CRC OUEST-58232-CW- RFQ / Travaux de réhabilitation d'un bloc de 02 salles de classes, 01 bloc de 03 salles de classes avec un Component A: Local Single Stage - One 2018-04- 2018-06- 2018-06- 2018-12- bureau administratif incorporé IDA / 57180 A posteriori Demande de prix Open - National 67,355.00 51,565.75 Achevé development support Envelope 16 11 27 08 équipement d'une salle de classe et du bureau administratif et aménagement d'une borne fontaine à l'EP Bâtie-Carrefour, d

CM-CRC OUEST-58237-CW- RFQ / Travaux de réalisation d'une Adduction d'Eau Potable gravitaire à travers un captage Component A: Local Single Stage - One 2018-04- 2018-06- 2018-07- 2018-12- de source dans le village IDA / 57180 A posteriori Demande de prix Open - National 94,890.00 83,838.85 Signé development support Envelope 16 11 20 08 Tsenlah, groupement Fomopéa, dans la Commune de Fokoué, Département de la Ménoua, Région de l'Ouest.

CM-CRC OUEST-111086-CW- RFQ / Travaux d’électrification rurale par extension monophasée des localités carrefour NTS’AA, village Component A: Local Single Stage - One 2019-04- 2019-06- 2019-08- 2019-11- IDA / 57180 A posteriori Demande de prix Open - National 87,029.00 65,921.47 Signé Bametim, CES King Place avec development support Envelope 06 01 14 28 la fourniture et pose transformateur 25 KVA dans la commune de , Région de l'Ouest.

CM-CRC OUEST-111095-CW- RFQ / Travaux de Réhabilitation du tronçon de la route agricole koula- Matetchit-mbakop long de Component A: Local Single Stage - One 2019-04- 2019-06- 2019-08- 2019-11- IDA / 57180 A posteriori Demande de prix Open - National 113,785.00 90,088.57 Signé 8,50 km et large de 5,00m development support Envelope 06 01 09 28 avec construction des ouvrages de franchissement dans la Commune de , Région de l'Ouest.

CM-CRC OUEST-111089-CW- RFQ / Travaux de Construction d'un atelier de maçonnerie au CETIC de Component A: Local Single Stage - One 2019-04- 2019-06- 2019-08- 2019-11- Bangam (lot 1) et au CETIC de IDA / 57180 A posteriori Demande de prix Open - National 94,474.00 76,214.83 Signé development support Envelope 06 01 13 28 (lot 2), et d'un bloc de deux latrines dans la Commune de Bamendjou, Région de l'Ouest.

CM-CRC OUEST-111084-CW- RFQ / Travaux de Construction d'un bloc maternel de 02 salles de classes équipés de 25 tables Component A: Local Single Stage - One 2019-04- 2019-06- 2019-08- 2019-11- et 100 chaises ; 02 bureaux et IDA / 57180 A posteriori Demande de prix Open - National 52,086.00 43,858.23 Signé development support Envelope 06 01 07 28 un bloc de 04 toilettes incorporées à l'école maternelle de Balembo, dans la Commune de Kekem, Région de l'Ouest.

CM-CRC OUEST-111085-CW- RFQ / Travaux de Construction d’un hangar équipé de 23 comptoirs, 01 magasin et 01 aire de vente Component A: Local Single Stage - One 2019-04- 2019-06- 2019-08- 2019-11- d’huile de palme au marché IDA / 57180 A posteriori Demande de prix Open - National 43,156.00 36,370.34 Signé development support Envelope 06 01 07 28 de Bamengui et d’un bloc latrines de trois cabines à quatre fosses au marché de Bamengui, commune de Kékem, Région de l'Ouest.

CM-CRC OUEST-111091-CW- RFQ / Travaux de Construction d’un hangar de 32 comptoirs et d’une mini AEP muni de kit de pompe Component A: Local Single Stage - One 2019-04- 2019-06- 2019-08- 2019-11- immerge solaire, un château, IDA / 57180 A posteriori Demande de prix Open - National 47,619.00 37,446.97 Signé development support Envelope 06 01 08 28 bâche plastique et une borne fontaine au Centre commercial de , Commune de Massangam, Région de l'Ouest.

CM-CRC OUEST-111435-CW- RFQ / Travaux de Construction d'un foyer Communautaire et d'un bloc Component A: Local Single Stage - One 2019-06- 2019-08- 2020-09- 2020-01- de 02 latrines au foyer IDA / 57180 A posteriori Demande de prix Open - National 80,045.00 72,567.69 Signé development support Envelope 08 03 04 30 Communautaire de Bandounga, dans la Commune de Tonga, Département du Ndé Région de l'Ouest.

CM-CRC OUEST-147811-CW- RFQ / Travaux de réalisation d'un forage à l’école publique Component A: Local Single Stage - One 2020-11- 2020-12- 2020-12- 2021-06- IDA / 57180 A posteriori Demande de prix Open - National 23,557.00 40,218.53 Signé de Badjeghang dans la development support Envelope 04 30 01 28

Commune de Penka-Michel, Région de l'Ouest

CM-CRC OUEST-147812-CW- RFQ / Travaux de construction d’un atelier de maçonnerie et Component A: Local Single Stage - One 2020-11- 2020-12- 2020-12- 2021-06- d'un atelier IH et ESF équipé IDA / 57180 A posteriori Demande de prix Open - National 101,319.00 94,570.61 Signé development support Envelope 04 30 28 28 au lycée technique de Bana, dans la commune de Bana, Région de l'Ouest

CM-CRC OUEST-111090-CW- RFQ / Travaux de Construction et l'équipement d’une boucherie municipale Component A: Local Single Stage - One 2019-06- 2019-08- 2020-01- moderne et d'un bloc latrines IDA / 57180 A posteriori Demande de prix Open - National 92,117.00 0.00 Annulé development support Envelope 08 03 30 à trois cellules au marché central de dans la Commune de Foumbot, Région de l'Ouest.

CM-CRC OUEST-111441-CW- RFQ / Travaux de construction d'un bloc operatoire au Centre Component A: Local Single Stage - One 2019-06- 2019-08- 2020-01- Médical d'Arrondissement IDA / 57180 A posteriori Demande de prix Open - National 101,322.00 0.00 Annulé development support Envelope 08 03 30 (CMA) de demdeng dans la Commune de Demdeng, Région de l'Ouest.

CM-CRC OUEST-111437-CW- RFQ / Travaux de construction d’un bloc de deux salles de classe équipé de 60 table bancs et de bureaux Component A: Local Single Stage - One 2020-11- 2020-12- 2020-12- 2021-06- IDA / 57180 A posteriori Demande de prix Open - National 45,041.00 41,752.51 Signé enseignants au lycée bilingue development support Envelope 04 30 22 28 de Tocket 2 Commune de 3ème, Département de la , Région de l'Ouest

Page 1 CM-CRC OUEST-111436-CW- RFQ / Travaux de construction d’un hangar de 32 (trente- deux) comptoirs et d’un bloc Component A: Local Single Stage - One 2020-11- 2020-12- 2021-01- 2021-06- IDA / 57180 A posteriori Demande de prix Open - National 46,953.00 38,097.81 Signé latrine à trois compartiments development support Envelope 04 30 07 28 au marché de FOTETSA dans la commune de , Région de l'Ouest.

CM-CRC OUEST-111438-CW- RFQ / Travaux de construction et équipement d'un bloc de deux salles de classe au Lycée Component A: Local Single Stage - One 2020-11- 2020-12- 2020-12- 2021-06- IDA / 57180 A posteriori Demande de prix Open - National 50,455.00 46,894.27 Signé WOUNG 2 avec aménagement development support Envelope 04 30 22 28 d'un point d'eau, dans la Commune de Bafoussam III, Région de l'Ouest.

CM-CRC OUEST-111439-CW- RFQ / Travaux de réalisation d'un forage muni d'un kit de pompe immerge électrique solaire et d’un château avec Component A: Local Single Stage - One 2020-11- 2020-12- 2020-12- 2021-06- IDA / 57180 A posteriori Demande de prix Open - National 28,589.00 25,098.16 Signé bâche de 3000 litres, et trois development support Envelope 04 30 07 28

(03) borne fontaines au CSI de FOTSEM-LESSING dans la Commune de Dschang, Région de l'Ouest.

CM-CRC OUEST-111440-CW- RFQ / Travaux de construction d’un bloc de deux salles de classe équipé avec bureau de Component A: Local Single Stage - One En cours 2020-11- 2020-12- 2021-06- directeur et d’un bloc latrine a IDA / 57180 A posteriori Demande de prix Open - National 51,208.00 0.00 development support Envelope d'exécution 04 30 28 l’école publique de BADJEGHANG, dans la Commune de Penka Michel, Région de l'Ouest.

001/C/T/OU/MDEMDENG/202 0 / Travaux d’électrification rurale par extension triphasée sur un linéaire de 1800 m en MT et 1000m en BT avec un Component A: Local Single Stage - One 2020-11- 2020-12- 2020-12- 2021-06- IDA / 57180 A posteriori Demande de prix Open - National 66,467.00 61,954.00 Signé transformateur triphasé de development support Envelope 04 30 28 28

100 KVA dans le village Sedembom, dans la Commune de Demdeng, département de Koung-khi, région de l’Ouest.

002/C/T/OU/MDEMDENG/202 0 / Travaux de construction d'un bloc latrines à trois (03) cellules au C.E.S de Component A: Local Single Stage - One 2020-11- 2020-12- 2020-12- 2021-06- IDA / 57180 A posteriori Demande de prix Open - National 20,940.00 17,818.19 Signé bangangfondji et d’un bloc de development support Envelope 04 30 28 28

06 latrines dans la Commune de Demdeng, département de Koung-kh, région de l’Ouest.

003/C/T/OU/BAFOUSSAM I/2020 / Travaux de construction d’un dalot et l'aménagement des voies d'accès de 800ml Ndiengdam Component A: Local Single Stage - One 2020-11- 2020-12- 2020-12- 2021-06- (Lot 1) et la construction de IDA / 57180 A posteriori Demande de prix Open - National 101,309.00 89,080.47 Signé development support Envelope 04 30 22 28 deux dalots et l'aménagement des voies d'accès de 1500ml à Mvoutsa’aa (Lot 2), dans la Commune de Bafoussam I, région de l’Ouest

003/C/T/OU/MASSANGAM /2020 / Travaux d'Achèvement de Construction d’un hangar de 32 comptoirs et la Réalisation d’une mini Component A: Local Single Stage - One 2020-11- 2020-12- 2020-12- 2021-06- adduction d’eau, muni d'un kit IDA / 57180 A posteriori Demande de prix Open - National 37,951.00 38,006.64 Signé development support Envelope 04 30 03 28 solaire, un château et bâche de 4000 l, et 01 borne fontaine au Centre commercial, Commune de Massangam, Région de l'Ouest

001/C/T/OU/PETE /2021 / Travaux de construction fosses maçonnes de 80cmx50cm avec un dalot de 1,5m x 1,5m sur un Component A: Local Single Stage - One 2021-02- 2021-04- 2021-05- 2021-10- tronçon de 830 m de route IDA / 57180 A posteriori Demande de prix Open - National 47,619.00 42,730.62 Signé development support Envelope 20 17 31 14 bitumée carrefour trois villa - carrefour Jean Roger, dans la localité de Mbouo, dans la commune de Pete Bandjoun, région de l'ouest.

002/C/T/OU/BATIE/2021 / Travaux d’electrification Rurale Par Extension Component A: Local Single Stage - One 2021-02- 2021-04- 2021-06- 2021-10- Monophasee Sur 500 Ml En Bt IDA / 57180 A posteriori Demande de prix Open - National 6,481.00 6,326.57 Signé development support Envelope 20 17 02 14 du Village Balagou, dans La Commune De Batie,Region de l'Ouest

003/C/T/OU//2021 / Travaux de Construction d'un bloc de deux salles et d'un bloc latrine a trois(03) Component A: Local Single Stage - One 2021-02- 2021-04- 2021-05- 2021-10- IDA / 57180 A posteriori Demande de prix Open - National 53,403.00 45,842.65 Signé cellules, à l'ecole publique de development support Envelope 20 17 27 14

Bandja-peage, dans la commune de Bandja, region de l'Ouest

004/C/T/OU/BAFOUSSAM II/2021 / Travaux de construction d'un bloc de quatre sales de classses, equipé de 100 tables bancs et Component A: Local Single Stage - One 2021-02- 2021-04- 2021-04- 2021-10- IDA / 57180 A posteriori Demande de prix Open - National 95,238.00 84,113.09 Signé construction d'un bloc latrine development support Envelope 20 17 26 14

à trois compartiment au CETIC bilingue de Baleng dans la Commune de Bafoussam II, région de l’Ouest.

005/C/T/OU/BAFOUSSAM II/2020 / Travaux de construction d'un hall touristique avec ouvrages Component A: Local Single Stage - One 2020-11- 2020-12- 2021-06- IDA / 57180 A posteriori Demande de prix Open - National 93,915.00 0.00 Annulé connexes au lac Baleng, dans development support Envelope 04 30 28 la Commune de Bafoussam II, département de la Mifi, région de l’Ouest.

004/C/T/OU/PETE- BANDJOUN/2020 / Travaux de construction des fossés maçonnés sur 770ml avec un dalot de 0,80x0,80 sur le Component A: Local Single Stage - One 2020-11- 2020-12- 2021-06- IDA / 57180 A posteriori Demande de prix Open - National 47,619.00 0.00 Annulé tronçon de route bitumée development support Envelope 04 30 28 carrefour Centre climatique- 03 villas, dans la localité de Mbouo, Commune de Pete- Bandjoun, région de l'Ouest

GOODS Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

001/F/CRCOU/2017 / Acquisition des fournitures de bureaux (Papier format, Component C: Coordination, Chemises, Stylos, crayons, management, monitoring and Single Stage - One 2017-03- 2017-09- 2017-05- 2017-10- 2017-11- agraphes, trombones, etc...) IDA / 57180 A posteriori Demande de prix Limited 9,900.00 7,803.18 Signé evaluation and Envelope 25 08 20 23 16 pour le fonctionnement de la communication Cellule Régionale de Coordination Ouest du PNDP, dans la Région de l'Ouest

005/F/CRCOU/2017 / Fourniture des services de Component C: Coordination, liaison et envoi du courrier à management, monitoring and Single Stage - One 2017-03- 2017-05- 2017-12- IDA / 57180 A posteriori Demande de prix Limited 4,080.00 0.00 Annulé la Cellule Régionale de evaluation and Envelope 30 25 31

Coordination Ouest du PNDP, communication dans la Région de l'Ouest

Page 2 006/F/CRCOU/2017 / Fourniture des services de Component C: Coordination, maintenance du réseau et management, monitoring and Single Stage - One 2017-04- 2017-06- 2017-12- matériels informatiques à la IDA / 57180 A posteriori Demande de prix Limited 4,293.00 0.00 Annulé evaluation and Envelope 11 06 28 Cellule Régionale de communication Coordination Ouest du PNDP, dans la Région de l'Ouest

007/F/CRCOU/2017 / Fourniture des services de maintenance du réseau Component C: Coordination, électrique, climatiseurs, management, monitoring and Single Stage - One 2017-04- 2017-06- 2017-12- équipements sanitaires et IDA / 57180 A posteriori Demande de prix Limited 6,440.00 0.00 Annulé evaluation and Envelope 11 06 28 groupe électrogène à la communication Cellule Régionale de Coordination Ouest du PNDP, dans la Région de l'Ouest

004/F/CRCOU/2017 / Fourniture des services de Component C: Coordination, gardiennage des locaux à la management, monitoring and Single Stage - One 2017-03- 2017-05- 2017-05- IDA / 57180 A posteriori Demande de prix Limited 9,600.00 0.00 Annulé Cellule Régionale de evaluation and Envelope 30 03 17

Coordination Ouest du PNDP, communication dans la Région de l'Ouest

002/F/CRCOU/2017 / Acquisition des fournitures pour véhicules (trousse de secours, tapis, Extincteur, Component C: Coordination, Fournitures et montage des management, monitoring and Single Stage - One 2017-04- 2017-09- 2017-06- 2017-12- 2017-07- IDA / 57180 A posteriori Demande de prix Limited 9,900.00 6,454.18 Signé Pneus, etc...) pour leur evaluation and Envelope 06 25 01 14 17 fonctionnement à la Cellule communication Régionale de Coordination Ouest du PNDP, dans la Région de l'Ouest

003/F/CRCOU/2017 / Acquisition et fourniture des Consomables Informatiques (Encre pour Copieurs (trois Component C: Coordination, copieurs), Encre pour huit management, monitoring and Single Stage - One 2017-03- 2017-08- 2017-05- 2017-10- 2017-06- IDA / 57180 A posteriori Demande de prix Limited 9,900.00 8,729.43 Signé imprimantes, CD vierges, evaluation and Envelope 30 31 25 26 08 etc...) pour le fonctionnement communication de la Cellule Régionale de Coordination Ouest du PNDP, dans la Région de l'Ouest

001/C/F/OU/BAFOUSSAM III/2021 / Fourniture des Equipement du Centre de Component A: Local Single Stage - One 2021-02- 2021-04- 2021-06- 2021-10- Santé Intégré de Tchouong 2, IDA / 57180 A posteriori Demande de prix Open - National 9,638.00 8,710.40 Signé development support Envelope 20 17 07 14 Commune de Bafoussam 3, Département de la Mifi, Région de l'Ouest .

002/C/F/OU/BATIE/2021 / Fourniture et pose de 19 et 08 lampadaires sur le réseau Component A: Local Single Stage - One 2021-02- 2021-04- 2021-06- 2021-10- électrique dans les villages IDA / 57180 A posteriori Demande de prix Open - National 8,140.00 7,458.43 Signé development support Envelope 20 17 07 14 de Nzang et Bametchoue fodom, dans la commune de Batié , Région de l'Ouest .

003/C/F/OU/BAMENDJOU/20 21 / Fournitures tables-bancs de 60 Tables bancs à l'Ecole Component A: Local Single Stage - One 2021-02- 2021-04- 2021-06- 2021-10- IDA / 57180 A posteriori Demande de prix Open - National 4,405.00 3,981.07 Signé Publique de Bakang, dans la development support Envelope 20 17 02 14

Commune de Bamendjou , Région de l'Ouest .

004/C/F/OU/BANGANGTE/20 21 / Fournitures tables-bancs de 120 Tables bancs à l'Ecole Component A: Local Single Stage - One En attente 2021-02- 2021-04- 2021-10- IDA / 57180 A posteriori Demande de prix Open - National 8,331.00 0.00 Publique de de Bantoum I et development support Envelope d'exécution 20 17 14

Kontap dans la Commune de Bangangté, Région de l'Ouest .

CM-CRC OUEST-147814-GO- RFQ / Equipement du Centre de Santé Intégré de Tchouong Component A: Local Single Stage - One 2020-11- 2020-12- 2021-06- IDA / 57180 A posteriori Demande de prix Open - National 9,638.00 0.00 Annulé 2, Commune de Bafoussam 3, development support Envelope 04 30 28

Département de la Mifi, Région de l'Ouest.

NON CONSULTING SERVICES Activity Reference No. / Draft Pre- Draft Bidding Bid Evaluation Report Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method qualification Document / and Recommendation Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Documents Justification for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CM-CRC OUEST-111036-NC- RFQ / Selection d'un prestatire Component A: Local Single Stage - One 2019-05- 2019-07- 2019-11- 2020-01- pour la Production d'un IDA / 57180 A posteriori Demande de prix Open - National 40,000.00 22,837.80 Signé development support Envelope 20 15 14 11 bulletin trimestriel d'informations communales.

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CM-CRC OUEST-72761-CS- CQS / Sélection d'un OAL pour la finalisation du Plan Sélection fondée Communal de Développement Component A: Local sur les 2018-09- 2018-08- 2018-10- 2018-09- 2018-11- 2018-11- 2018-12- 2019-02- 2019-06- IDA / 57180 A posteriori Open - National 10,350.00 8,932.27 Signé 2018-08-06 et la mise en œuvre des development support qualifications des 03 27 10 03 09 20 14 25 12 solutions endogènes dans la consultants Commune de Magba, Région de l'Ouest.

CM-CRC OUEST-111092-CS- CQS / Sélection d'un consultant/OAL pour Sélection fondée l'actualisation du PCD à Component A: Local sur les 2019-11- 2019-08- 2019-10- 2019-11- 2019-12- 2020-06- IDA / 57180 A posteriori Open - National 12,000.00 0.00 Annulé 2019-08-01 travers une approche de development support qualifications des 29 22 05 04 09 06 planification légère de la consultants Commune de Bana, dans la Région de l'Ouest.

CM-CRC OUEST-111093-CS- CQS / Sélection d'un consultant/OAL pour Sélection fondée l'actualisation du PCD à Component A: Local sur les 2019-11- 2019-08- 2019-10- 2019-11- 2019-12- 2020-06- IDA / 57180 A posteriori Open - National 12,000.00 0.00 Annulé 2019-08-01 travers une approche de development support qualifications des 29 22 05 04 09 06 planification légère de la consultants Commune de Bakou, dans la Région de l'Ouest.

CM-CRC OUEST-111094-CS- CQS / Sélection d'un consultant/OAL pour Sélection fondée l'actualisation du PCD à Component A: Local sur les 2019-11- 2019-08- 2019-10- 2019-11- 2019-12- 2020-06- IDA / 57180 A posteriori Open - National 12,000.00 0.00 Annulé 2019-08-01 travers une approche de development support qualifications des 29 22 05 04 09 06 planification légère de la consultants Commune de Njimom, dans la Région de l'Ouest.

CM-CRC OUEST-214370-CS- CQS / Sélection d'un Sélection fondée consultant/OSC pour la Component B: Support to the sur les En attente 2021-03- 2021-04- 2021-05- 2021-07- 2021-12- réalisation du contrôle citoyen IDA / 62240 A posteriori Open - National 36,417.00 0.00 2021-02-22 decentralization process qualifications des d'exécution 15 28 28 02 29 de l’action publique dans la consultants zone 2 (07 Communes), de la Région de l'Ouest .

CM-CRC OUEST-214369-CS- CQS / Sélection d'un Sélection fondée consultant/OSC pour la Component B: Support to the sur les En attente 2021-03- 2021-04- 2021-05- 2021-07- 2021-12- réalisation du contrôle citoyen IDA / 62240 A posteriori Open - National 41,621.00 0.00 2021-02-22 decentralization process qualifications des d'exécution 15 28 28 02 29 de l’action publique dans la consultants zone 3 (08 Communes), de la Région de l'Ouest .

CM-CRC OUEST-214371-CS- CQS / Sélection d'un Sélection fondée consultant/OSC pour la Component B: Support to the sur les En attente 2021-03- 2021-04- 2021-05- 2021-07- 2021-12- réalisation du contrôle citoyen IDA / 62240 A posteriori Open - National 36,417.00 0.00 2021-02-22 decentralization process qualifications des d'exécution 15 28 28 02 29 de l’action publique dans la consultants zone 1 (07 Communes), de la Région de l'Ouest .

INDIVIDUAL CONSULTANTS

Page 3 Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

002/C/EF/C/BAHAM/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2018-10- IDA / 57180 A posteriori Individuel Open 2,400.00 1,531.75 Achevé 2017-03-01 Construction d'un bloc development support 10 12 07 03 17 07 22 06 04 maternel à l'EPM de Demko dans la localité de Cheffou dans la Commune de Baham, Région de l'Ouest

004/C/EF/C/MALANTOUEN/2 017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2017-12- IDA / 57180 A posteriori Individuel Open 2,000.00 1,901.42 Achevé 2017-03-01 pour l'Extension du réseau development support 10 12 17 03 17 07 22 06 26

électrique dans les localités de Njinga, Matagnum dans la Commune de Malantouen, Région de l'Ouest.

005/C/EF/C/MALANTOUEN/2 017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- technique et environnemtale IDA / 57180 A posteriori Individuel Open 2,400.00 2,281.70 Signé 2017-03-01 development support 10 12 10 03 17 07 22 06 pour la Construction d'un bloc maternel à EM de Gr1 dans la Commune de Malantouen, Région de l'Ouest

006/C/EF/C/BAMENDJOU/201 7 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-08- 2017-10- environnemtale pour IDA / 57180 A posteriori Individuel Open 2,400.00 2,224.66 Achevé 2017-03-01 development support 10 12 10 03 22 07 22 06 10 l'Electrification du village Bameya II et I en basse tension dans la Commune de Bamendjou, Région de l'Ouest

007/C/EF/C/BAMENDJOU/201 7 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- IDA / 57180 A posteriori Individuel Open 1,700.00 1,543.09 Signé 2017-03-01 Construction d'un hangar de development support 10 12 10 03 17 07 22 06

30 comptoirs + bloc latrines à 03 compartiments à Batchoum II dans la Commune de Bamendjou, Région de l'Ouest

008/C/EF/C//2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-06- 2017-05- 2017-08- 2018-03- environnemtale pour la IDA / 57180 A posteriori Individuel Open 4,400.00 2,281.70 Achevé 2017-03-01 development support 10 12 10 03 07 22 06 15 Construction d'un hôtel communal R+1 à Galim dans la Commune de Galim, Région de l'Ouest

009/C/EF/C/GALIM/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-03- 2017-06- 2017-05- 2017-08- 2018-03- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,700.00 1,902.94 Achevé 2017-03-01 development support 10 12 07 03 22 07 22 06 14 Construction d'un hangar de 30 comptoirs au marché de Galim dans la Commune de Galim, Région de l'Ouest.

010/C/EF/C/BATCHAM/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2018-10- environnemtale pour IDA / 57180 A posteriori Individuel Open 2,600.00 4,663.25 Achevé 2017-03-01 development support 10 12 07 03 17 07 22 06 02 l'Electrification du village Bametim du groupement Batcham dans la Commune de Batcham, Région de l'Ouest.

011/C/EF/C/BATCHAM/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour Component A: Local 2017-03- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2018-10- IDA / 57180 A posteriori Individuel Open 2,400.00 2,186.63 Achevé 2017-03-04 l'Extension et le Branchement development support 10 12 03 17 07 22 06 02

électrique du CES de King Place de Batcham dans la Commune de Batcham, Région de l'Ouest.

014/C/EF/C//2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-04- 2017-05- 2017-06- 2017-08- rehabilitation du pont sur la IDA / 57180 A posteriori Individuel Open 3,600.00 0.00 Annulé 2017-03-04 development support 12 03 07 06 manou desservant le bassin agricole de koupa ngagnou avec aménagement des voies d'accès dans la Commune de Foumban

015/C/EF/C/BAKOU/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-04- 2017-05- 2017-06- 2017-08- IDA / 57180 A posteriori Individuel Open 3,700.00 0.00 Annulé 2017-03-04 Construction d'un pont sur la development support 12 03 07 06 rivière Yodjeu dans le groupement Bankambé dans la Commune de Bakou, Région de l'Ouest

016/C/EF/C/BATIE/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2018-05- environnemtale pour Etude de IDA / 57180 A posteriori Individuel Open 4,000.00 2,541.57 Achevé 2017-03-04 development support 10 12 07 03 17 07 22 06 29 faisabilité pour la construction d'une salle multifonctionnelle à Batié dans la Commune de Batié, Région de l'Ouest.

017/C/EF/C/BATIE/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour Etude de Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2018-03- IDA / 57180 A posteriori Individuel Open 3,700.00 2,535.67 Achevé 2017-03-04 faisabilité pour la construction development support 10 12 07 03 17 07 22 06 22 d'un pont sur la rivière Nkuh reliant Bafamgoum I et Balagou II dans la Commune de Batié, Région de l'Ouest.

018/C/EF/C/BATIE/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour Etude de Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2018-03- IDA / 57180 A posteriori Individuel Open 4,000.00 2,535.67 Achevé 2017-03-04 faisabilité pour la construction development support 10 12 10 03 17 07 22 06 22 de deux dalots sur les deux derniers cours d'eau à Nkomlom reliant Djeukouo à Bametchetcha dans la localité

019/C/EF/C/BANDJOUN/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- Construction d'un pont en IDA / 57180 A posteriori Individuel Open 3,900.00 3,615.59 Signé 2017-03-04 development support 10 12 07 03 17 07 22 06 matériaux définitifs reliant DJA-TSEGHEM sur le cours d'eau GHECHIO dans la Commune de Pété Bandjoun, Région de l'Ouest.

Page 4 020/C/EF/C//201 7 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-03- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- Construction et équipement IDA / 57180 A posteriori Individuel Open 2,400.00 37,979.69 Signé 2017-03-04 development support 10 12 03 17 07 22 06 d'un bloc maternel à l'école Maternelle Publique de Famla - Batoufam dans la Commune de Bayangam, Région de l'Ouest

021/C/EF/C/BAYANGAM/201 7 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,200.00 703.47 Signé 2017-03-04 development support 10 12 07 03 17 07 22 06 Construction des toilettes VIP à l'EP de Kagne - Batoufam dans la Commune de Bayangam, Région de l'Ouest.

022/C/EF/C/BAYANGAM/201 7 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-03- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- IDA / 57180 A posteriori Individuel Open 3,900.00 2,301.46 Signé 2017-03-04 Réhabilitation de la route development support 10 12 03 17 07 22 06 famla - Marché de Kaptche et famla - Wambo Piedjou dans la Commune de Bayangam, Région de l'Ouest.

023/C/EF/C/MAGBA/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2017-09- environnemtale pour les IDA / 57180 A posteriori Individuel Open 3,900.00 3,669.74 Achevé 2017-03-04 development support 10 12 25 03 17 07 22 06 25 Travaux d'ouverture de la route mbakop - matetchit - koula dans la Commune de Magba, Région de l'Ouest.

024/C/EF/C/BATCHAM/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2018-10- l'electrification MT/BT IDA / 57180 A posteriori Individuel Open 2,900.00 4,674.67 Achevé 2017-03-04 development support 10 12 07 03 17 07 22 06 02 triphasee au lycee de nzindong et au quartier tsa'a dans le groupement bangang dans la Commune de Batcham, Région de l'Ouest.

025/C/EF/C//2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-08- IDA / 57180 A posteriori Individuel Open 2,400.00 2,093.23 Signé 2017-03-04 Construction et équipement development support 10 12 07 03 22 07 22 06 d'un bâtiment abritant le CSI de Ngoundoup dans la Commune de Koutaba, Région de l'Ouest

027/C/EF/C/DSCHANG/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-05- 2017-06- 2017-05- 2017-08- 2018-09- IDA / 57180 A posteriori Individuel Open 1,600.00 1,522.35 Achevé 2017-03-04 Construction d'un forage avec development support 10 12 07 03 22 07 22 06 12 un système de réserve au CSI de Fotsem-Lessing dans la Commune de Dschang, Région de l'Ouest.

028/C/EF/C/DSCHANG/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2018-02- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2018-09- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,400.00 1,582.94 Achevé 2017-03-04 development support 10 12 19 03 17 07 22 06 12 Construction d'un hangar au marché de FOTETSA dans la Commune de Dschang, Région de l'Ouest.

029/C/EF/C//201 7 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- environnemtale pour la IDA / 57180 A posteriori Individuel Open 3,600.00 0.00 Annulé 2017-06-30 development support 11 01 06 05 Construction d'une plateforme multisports dans la Commune de Santchou, Région de l'Ouest.

030/C/EF/C/SANTCHOU/201 7 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- IDA / 57180 A posteriori Individuel Open 4,400.00 0.00 Annulé 2017-06-30 l'Ouverture de la piste agricole development support 11 01 06 05

Bamia-Njinjang (08Km et 05 ouvrages d'art) dans la Commune de Santchou, Région de l'Ouest.

031/C/EF/C/FOUMBOT/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- l'Aménagement du stade IDA / 57180 A posteriori Individuel Open 2,400.00 0.00 Annulé 2017-06-30 development support 11 01 06 05 municipal de Foumbot (Clôture, tribune, terrains de volleyball, handball et Basketball, toilettes et salle d'équipement) dans l

032/C/EF/C/FOUMBOT/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- Construction d'un bloc de IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2017-06-30 development support 11 01 06 05 deux salles de classe équipé de tables bancs à l'EP de NKOUONDJA dans la Commune de Foumbot, Région de l'Ouest.

033/C/EF/C/FOUMBOT/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2017-06-30 Construction d'un bloc de development support 11 01 06 05 deux salles de classe équipé de tables bancs à l'EP de FOSSET dans la Commune de Foumbot, Région de l'Ouest.

034/C/EF/C//2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- environnemtale pour IDA / 57180 A posteriori Individuel Open 3,600.00 0.00 Annulé 2017-06-30 development support 11 01 06 05 l'Aménagement de la route Carrefour Baboutcheu-Axe Lourd dans la Commune de Bafang, Région de l'Ouest.

035/C/EF/C/BAFANG/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,800.00 0.00 Annulé 2017-06-30 development support 11 01 06 05 Construction d'un hangar au marché de Bankondji dans la Commune de Bafang, Région de l'Ouest.

036/C/EF/C/NJIMOM/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2017-06-30 Construction d'un hangar de development support 11 01 06 05

30 places au marché de Machoutvi-manki 2 dans la Commune de Njimom, Région de l'Ouest

Page 5 037/C/EF/C/NJIMOM/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2017-06-30 development support 11 01 06 05 Construction d'un hangar de 30 places au marché de Folap dans la Commune de Njimom, Région de l'Ouest.

038/C/EF/C/NJIMOM/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2017-06-30 development support 11 01 06 05 Construction d'un hangar de 30 places au marché Makouetvu dans la Commune de Njimom, Région de l'Ouest.

039/C/EF/C/NJIMOM/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2017-06-30 development support 11 01 06 05 Construction d'un hangar de 30 places au marché Makounvi dans la Commune de Njimom, Région de l'Ouest.

040/C/EF/C/MASSANGAM/20 17 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-03- 2017-08- 2017-09- 2017-10- 2017-12- IDA / 57180 A posteriori Individuel Open 3,700.00 0.00 Annulé 2017-06-30 Construction d'un pont sur le development support 10 11 01 06 05

NKOUH reliant le quartier NJIDEN MATEMBAIN dans la Commune de Massangam, Région de l'Ouest.

041/C/EF/C/MASSANGAM/20 17 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- IDA / 57180 A posteriori Individuel Open 2,400.00 0.00 Annulé 2017-06-30 construction de l'école development support 11 01 06 05 maternelle à Massangam ville dans la Commune de Massangam, Région de l'Ouest.

042/C/EF/C/SANTCHOU/201 7 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-08- 2017-09- 2017-10- 2017-12- construction d'un hangar de IDA / 57180 A posteriori Individuel Open 3,600.00 0.00 Annulé 2017-06-30 development support 11 01 06 05 48 comptoir, et d'un bloc latrine a quatre (04) compartiments et d'un point d'eau au marche central de santchou

001/C/EF/C/BAHAM/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et environnemtale pour la Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-03- 2017-06- 2017-05- 2017-08- 2018-10- Construction d'un bloc de IDA / 57180 A posteriori Individuel Open 1,900.00 3,267.73 Achevé 2017-03-01 development support 10 12 10 03 17 07 22 06 04 trois (03) salles de classe et d'un bloc administratif au Lycée Bilingue de Chengne dans la Commune de Baham, Région de l

013/C/EF/C/BANA/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-04- 2017-04- 2017-05- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2017-11- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,800.00 4,508.07 Achevé 2017-03-04 development support 11 12 11 03 17 07 22 06 09 Construction d'un atelier ESF et F3 au Lycée de Bana dans la Commune de Bana, Région de l'Ouest.

012/C/EF/C/BANA/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-04- 2017-04- 2017-05- 2017-05- 2017-05- 2017-06- 2017-05- 2017-08- 2017-11- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,800.00 4,508.07 Achevé 2017-03-04 development support 11 12 11 03 17 07 22 06 09 Construction d'un atelier F4 et IH au Lycée Technique de Bana dans la Commune de Bana, Région de l'Ouest

003/C/EF/C/MALANTOUEN/2 017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- technique et environnemtale IDA / 57180 A posteriori Individuel Open 2,400.00 2,283.53 Signé 2017-03-01 development support 10 12 07 03 17 07 22 06 pour la Construction d'un dalot à Mandah dans la Commune de Malantouen, Région de l'Ouest

043/C/EF/C/ / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio-environnemtale pour Component A: Local 2017-08- 2018-03- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,000.00 1,842.85 Achevé 2018-01-22 l'Amélioration de l'éclairage development support 11 12 04 02 08 07 18 03 18 public avec lampes solaires sur les axes principaux de la ville de Mbouda, Commune de Mbouda, Région de l'Ouest.

044/C/EF/C/MBOUDA / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio-environnemtale pour la Component A: Local 2017-08- 2018-03- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-09- construction des stands de IDA / 57180 A posteriori Individuel Open 1,600.00 1,464.27 Achevé 2018-01-22 development support 11 12 11 02 08 07 18 03 18 vente, et l'aménagement de toilettes modernes au site actuelle de la boucherie au marché de Mbouda, Commune de Mbo

045/C/EF/C/MBOUDA / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio-environnemtale pour la Component A: Local 2017-08- 2018-03- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,000.00 1,845.03 Achevé 2018-01-22 Construction et l'équipement development support 11 12 04 02 08 07 18 03 18 de l'école maternelle bilingue, et la construction d'un bloc de latrines à trois (03) cellules à LEPI logée, Com

046/C/EF/C/MBOUDA / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-08- 2018-03- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- socio-environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,000.00 1,793.22 Achevé 2018-01-22 development support 11 12 04 02 08 07 18 03 18 construction et l'équipement d'un centre de santé intégré au quartier Fouola, Commune de Mbouda, Région de l'Ouest.

047/C/EF/C/BAKOU / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-03- 2018-04- 2018-05- 2018-11- construction et l'équipement IDA / 57180 A posteriori Individuel Open 2,400.00 0.00 Annulé 2018-01-22 development support 12 02 07 03 de la maison de la femme, l'aménagement d'un point d'eau avec ouvrage de stockage et de distribution, et la cons

048/C/EF/C/BAKOU / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-03- 2018-04- 2018-05- 2018-11- IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-01-22 construction d'un hangar, development support 12 02 07 03 l'aménagement d'un point d'eau moderne équipé de PMH, et d'un bloc latrine à trois (03) cellules au marché fopouang

Page 6 049/C/EF/C/BANA / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-03- 2018-04- 2018-05- 2018-11- IDA / 57180 A posteriori Individuel Open 3,000.00 0.00 Annulé 2018-01-22 construction d'une gare development support 12 02 07 03 routière, et d'un bloc de troilettes modernes à trois (03) cellules à Bana, Commune de Bana, Région de l'Ouest.

050/C/EF/C/BANA / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-02-12 construction et l'équipement development support 02 23 28 24 de hangars, et la construction d'un bloc de toilettes modernes à trois (03) cellules au marché central de Bana,

051/C/EF/C/BANDJ / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2017-08- 2018-04- 2017-11- 2018-04- 2017-11- 2018-05- 2017-12- 2018-11- rehalisation en vue de IDA / 57180 A posteriori Individuel Open 2,400.00 2,254.45 Signé 2018-02-12 development support 11 02 14 23 22 28 01 24 l'extension du réseau d'adduction d'eau de la ville de Bandja par la création de nouveaux points de puisage, Commune d

052/C/EF/C/BANDJA / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-08- 2018-04- 2017-11- 2018-04- 2017-11- 2018-05- 2017-12- 2018-11- 2018-10- IDA / 57180 A posteriori Individuel Open 2,400.00 2,254.45 Achevé 2018-02-12 socio-environnemtale pour development support 11 02 14 23 22 28 01 24 18 l'électrification du village song (foutouni), Commune de Bandja, Région de l'Ouest.

053/C/EF/C/BANDJA / 2017 / etude de faisabilité technique et socio- environnemtale pour la construction d'un bloc de Component A: Local 2017-08- 2018-04- 2017-11- 2018-04- 2017-11- 2018-05- 2017-12- 2018-11- 2019-01- deux (02) salles de classe, IDA / 57180 A posteriori Individuel Open 2,200.00 1,878.71 Achevé 2018-02-12 development support 11 02 14 23 22 28 01 24 24 d'un point d'eau, et d'un bloc latrines à trois (03) cellules a l'école publique de bandja- péage, Commune de Bandja, Région de l'Ouest.

054/C/EF/C/BANKA / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 3,800.00 3,558.49 Achevé 2018-02-12 l'Aménagement du site de development support 11 02 04 23 08 28 18 24 18 construction du centre commercial de Banka, Commune de Bandja, Région de l'Ouest.

055/C/EF/C/KEKEM / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- Construction et équipement IDA / 57180 A posteriori Individuel Open 2,400.00 2,269.81 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 d'un bloc maternel, l'aménagement d'un point d'eau et la construction d'un bloc latrines à trois (03) compartiment

056/C/EF/C/KEKEM / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 3,000.00 2,818.07 Achevé 2018-02-12 construction d'un pont sur la development support 11 02 04 23 08 28 18 24 18 rivière plan nchi a mboue'' et la réhabilitation de la route carrefour NOKO jusqu'à la d'éconkam passant par Ma

057/C/EF/C/KEKEM /2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,400.00 2,269.81 Achevé 2018-02-12 construction et l'équipement development support 11 02 04 23 08 28 18 24 18 d'un hangar et des comptoirs, l'aménagement d'un point d'eau, et la construction d'un bloc latrines à trois (03)

058/C/EF/C/BANGOU / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio-environnemtale pour Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,000.00 1,889.07 Achevé 2018-02-12 l'Extension du réseau development support 11 02 05 23 08 28 18 24 18

électrique ENEO de basse tension à STEMOHIA, Commune de Bangou, Région de l'Ouest.

059/C/EF/C/BANGOU / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio-environnemtale pour la Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- Construction d'un point d'eau IDA / 57180 A posteriori Individuel Open 1,600.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 (Forage ou puits a PHM), et l'aménagement d'un ouvrage de stockage pour la distribution de l'eau à Badenkop-Bad

060/C/EF/C/BANGOU / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- socio-environnemtale pour IDA / 57180 A posteriori Individuel Open 2,000.00 1,889.07 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 pour l'extension du réseau ENEO dans le quartier Tsewé sur 3,850 km, Commune de Bangou, Région de l'Ouest.

061/C/EF/C/BANGOU / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio-environnemtale pour la Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- Construction et l'équipement IDA / 57180 A posteriori Individuel Open 2,400.00 2,262.35 Achevé 2018-02-12 development support 11 02 05 23 08 28 18 24 18 d'un bloc matérnel, l'aménagement d'un point d'eau et la construction d'un bloc latrines à trois (03) cellules à

062/C/EF/C/DEMDENG / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Annulé 2018-02-12 Construction d'un bloc de 06 development support 02 23 28 24 latrines, et l'aménagement d'un point d'eau a l'école publique de Mague, Commune de Demdeng, Région de l'Ouest.

063/C/EF/C/DEMDENG / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour (i) la Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 3,000.00 2,815.89 Achevé 2018-02-12 transformation de la ligne development support 11 02 04 23 08 28 18 24 18

électrique monophasée en triphasé (de KENGNE RENE- KAYO EMA 15km), (ii) l'installation d'un réseau électrique t

Page 7 064/C/EF/C/DEMDENG / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-08- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,000.00 1,794.62 Achevé 2018-02-12 construction de 01 hangars de development support 11 02 04 23 30 28 18 24 18

30 comptoirs, et la construction d'un bloc latrines à trois (03) cellules au marché de famlaII, Commune de Demd

065/C/EF/C/DEMDENG / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,400.00 1,794.62 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 construction d'un bloc administratif, l'aménagement d'un point d'eau et la construction d'un bloc latrines à trois (03) cellules au C.E.S de

066/C/EF/C/PENKA MICHEL / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 réhabilitation de la station et du réseau SCANWATER du centre urbain de Penka- michel, Commune de Penka michel, Région de l'Ouest.

067/C/EF/C/PENKA MICHEL / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,600.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 construction et l'équipement d'un foyer communautaire, l'aménagement d'un point d'eau et la construction d'un bloc latrines à trois (03) cell

068/C/EF/C/PENKA MICHEL / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-02-12 construction d'un pont et development support 02 23 28 24 l'aménagement de ses voies d'accès sur la rivière KEUGHATO dans le quartier nemboue, village Bamendou, Commune de P

069/C/EF/C/PENKA MICHEL / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- environnemtale pour IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 l'extention du réseau électrique MT 10km Baloum- Ntone dans le village Nsang, Commune de Penka michel, Région de l'Ouest.

070/C/EF/C/PENKA MICHEL / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Annulé 2018-02-12 construction d'un hangar, development support 02 23 28 24 l'aménagement d'un point d'eau et la construction d'un bloc latrines à trois (03) cellules aux marchés (i) de Bakas

071/C/EF/C/PENKA MICHEL / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 construction et l'équipement de bloc de salles de classe, l'aménagement d'un point d'eau et la construction d'un bloc latrines à trois (03) c

072/C/EF/C/SANTCHOU / 2017 / Sélection d'un consultant pour l'élaboration d'une étude de faisabilite Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-09- technique et IDA / 57180 A posteriori Individuel Open 2,000.00 3,022.51 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 08 environnementale pour la construction de la plate forme sportive dans la Commune de Santchou, Région de l'Ouest

073/C/EF/C/SANTCHOU / 2017 / Sélection d'un consultant pour l'élaboration d'une étude de faisabilite technique et environnementale pour Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,400.00 3,022.51 Achevé 2018-02-12 l'extension du reseau development support 11 02 06 23 08 28 18 24 18 electrique MT/BT à partir de Fossong -Wentcheng - Ako sur un lineaire de 3 km dans la Commune de Santchou, Région de l'Ouest.

074/C/EF/C/SANTCHOU / 2017 / Sélection d'un consultant pour l'élaboration d'une étude de faisabilite technique et Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- environnementale pour la IDA / 57180 A posteriori Individuel Open 2,000.00 1,511.26 Résilié 2018-02-12 development support 11 02 04 23 08 28 18 24 réhabilitation du réseau d'adduction d'eau du Centre de Santé Intégré (CSI) de Nka dans la Commune de Santchou, Région de l'Ouest.

075/C/EF/C/BAFOUSSAM / 2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,000.00 1,889.07 Achevé 2018-02-12 l'Extension du reseau development support 11 02 04 23 08 28 18 24 18 electrique du quartier Houkaba (Lemgoue) sur 1 195ml, Commune de Bafoussam 1er, Région de l'Ouest.

076/C/EF/C/BAFOUSSAM / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour la IDA / 57180 A posteriori Individuel Open 4,000.00 5,667.21 Achevé 2018-02-12 development support 11 02 04 23 11 28 18 24 18 Construction d'un pont et l'aménagement de ses voies d'accès, (i) a l'entree de la ville de Bafoussam lieu dit ''Dagne'', (ii) à T

077/C/EF/C/BAFOUSSAM / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-02-12 Construction d'un dalot development support 02 23 28 24 definitif a Ndiengso1 en contre bas du domicile du chef de quartier Ndiengo1, Commune de Bafoussam 1er, Ré

Page 8 078/C/EF/C/BANGANGTE / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour la IDA / 57180 A posteriori Individuel Open 3,200.00 3,022.51 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 Construction et équipement d'un bloc de salles de classe, l'aménagement d'un point d'eau et la construction d'un bloc latrines à t

079/C/EF/C/BANGANGTE / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,400.00 3,022.51 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 Construction d'un bloc de salles de classe en matériaux locaux, l'aménagement d'un point d'eau et la construction d'un bloc latrin

080/C/EF/C/BANGANGTE / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,400.00 2,266.88 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 Construction d'un magasin de stockage des produits agricoles, l'aménagement d'un point d'eau et la construction d'un bloc latrines

081/C/EF/C/TONGA / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,400.00 2,240.36 Achevé 2018-02-12 Construction du foyer development support 11 02 04 23 08 28 18 24 18 communautaire de Bandounga, l'aménagement d'un point d'eau et la construction d'un bloc latrines à trois (03

082/C/EF/C/TONGA / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,400.00 2,240.36 Achevé 2018-02-12 construction des ouvrages de development support 11 02 04 23 08 28 18 24 18 franchissement sur la route Noutse-Baoua un (01) ponceau et deux (01) passages de buses, Commune de

083/C/EF/C/FOUMBAN / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour la IDA / 57180 A posteriori Individuel Open 3,000.00 2,837.27 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 construction et l'équipement d'un bloc de salles de classe, l'aménagement d'un point d'eau, et la construction d'un bloc latrines

084/C/EF/C/FOUMBAN / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour la IDA / 57180 A posteriori Individuel Open 3,000.00 5,667.21 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 construction et l'équipement d'un bloc Maternel, l'aménagement d'un point d'eau, et la construction d'un bloc latrines à trois (03

085/C/EF/C/FOUMBAN / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,000.00 2,410.37 Achevé 2018-02-12 construction et l'équipement development support 11 02 05 23 08 28 18 24 18 d'une boucherie, et l'aménagement d'un point d'eau avec ouvrage de stockage sur le site de la boucher

086/C/EF/C/FOUMBOT / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour IDA / 57180 A posteriori Individuel Open 2,000.00 5,631.79 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 l'Aménagement du site et la construction d'un complexe sportif municipal, et la construction d'un bloc latrines à trois (03) cellules

087/C/EF/C/ FOUMBOT / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,000.00 1,914.81 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 construction et l'équipement d'une boucherie municipale moderne, et la construction d'un bloc latrines à trois (03) cellules au ma

088/C/EF/C/ FOUMBOT / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,600.00 2,850.86 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 Construction d'un Hangar moderne, l'aménagement d'un point d'eau et la construction d'un bloc latrines à trois (03) cellules respe

089/C/EF/C/ FOUMBOT / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 construction d'une chambre froide à l'abattoir municipal moderne de Foumbot, Commune de Foumbot, Région de l'Ouest.

090/C/EF/C/ MAGBA / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- IDA / 57180 A posteriori Individuel Open 2,400.00 1,689.54 Achevé 2018-02-12 environnemtale pour la development support 11 02 04 23 08 28 18 24 18 construction d'une auberge municipale à Magba ville, Commune de Magba, Région de l'Ouest.

091/C/EF/C/ MAGBA / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2017-08- 2018-04- 2017-09- 2018-04- 2017-09- 2018-05- 2017-09- 2018-11- 2017-10- environnemtale pour IDA / 57180 A posteriori Individuel Open 2,000.00 2,086.45 Achevé 2018-02-12 development support 11 02 04 23 08 28 18 24 18 l'aménager d'un Parck de stationnement, et la construction d'un bloc latrines à trois (03) cellules pour les véhicules en transit à M

Page 9 092/C/EF/C/ MASSANGAM / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- environnemtale pour le Projet IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 de construction et d'équipement de l'école maternelle à Massangam, l'aménagement d'un point d'eau et la construction d'un b

093/C/EF/C/ MASSANGAM / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 Construction d'un hangar, l'aménagement d'un point d'eau et la construction d'un bloc latrines à trois (03) cellules au marché de

094/C/EF/C/ MASSANGAM / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 Construction d'un centre de Santé Intégré, l'aménagement d'un point d'eau avec ouvrage de stockage, et la construction d'un bloc l

095/C/EF/C/ MASSANGAM / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-02-12 construction d'un forage development support 02 23 28 24 respectivement à (i) mansouen, (ii) mankounkou (Fekoun, chefferie), (iii) mankembouot (haut plateau, mag

096/C/EF/C/ NJIMOM / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 construction et l'équipement d'un bloc de salles de classe, l'aménagement d'un point d'eau, la construction d'un bloc latrines à t

097/C/EF/C/ NJIMOM / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- IDA / 57180 A posteriori Individuel Open 4,200.00 0.00 Annulé 2018-02-12 environnemtale pour development support 02 23 28 24 l'Ouverture de l'axe routier Mayoun-Maloure de 10km, Commune de Njimom Région de l'Ouest.

098/C/EF/C/ NJIMOM / 2017 / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-04- 2018-04- 2018-05- 2018-11- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,800.00 0.00 Annulé 2018-02-12 development support 02 23 28 24 Construction d'un puits équipé de pompe a motricité humaine respectivement à (i) MAKOUNVI, (ii) Makam- Marche, (iii) Manki II-Quart

026/C/EF/C/DSCHANG/2017 / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et Component A: Local 2017-03- 2017-04- 2017-04- 2017-05- 2017-04- 2017-06- 2017-05- 2017-08- 2017-06- environnemtale pour IDA / 57180 A posteriori Individuel Open 2,400.00 1,502.97 Achevé 2017-03-04 development support 10 12 07 03 26 07 22 06 24 l'Electrification rural dans le village NDENKOP dans la Commune de Dschang, Région de l'Ouest.

CM-CRC OUEST-58239-CS- INDV / Sélection d'un Consultant Individuel pour le suivi / contrôle des Travaux de construction d'un dalots Component A: Local 2018-04- 2018-05- 2018-05- 2018-06- 2018-05- 2018-07- 2018-05- 2019-01- IDA / 57180 A posteriori Individuel Open 1,028.00 884.82 Signé 2018-04-11 sur le cours d'eau à Nkomlom development support 03 30 15 20 25 25 02 21 reliant Djeukouo à Bametchetcha dans la localité de Bahiala dans la Commune de Batié, Région de l'Ouest.

CM-CRC OUEST-58242-CS- INDV / Sélection d'un Consultant Individuel pour le suivi controle des Travaux de réhabilitation d'un bloc de 02 Component A: Local 2018-04- 2018-05- 2018-05- 2018-06- 2018-05- 2018-07- 2018-05- 2019-01- 2018-11- salles de classes, 01 bloc de IDA / 57180 A posteriori Individuel Open 2,694.00 2,303.75 Achevé 2018-04-11 development support 03 30 15 20 25 25 02 21 01 03 salles de classes avec un bureau administratif incorporé équipement d'une salle de classe et du bureau administr

CM-CRC OUEST-58653-CS- INDV / Sélection d'un Consultant Individuel pour le suivi / controle des Travaux de réalisation d'une Adduction Component A: Local 2018-04- 2018-05- 2018-05- 2018-06- 2018-05- 2018-07- 2018-07- 2019-01- d'Eau Potable gravitaire à IDA / 57180 A posteriori Individuel Open 3,796.00 3,273.85 Signé 2018-04-12 development support 03 31 15 21 25 26 20 22 travers un captage de source dans le village Tsenlah, groupement Fomopéa, dans la Commune de Fokoué, Département de la Méno

CM-CRC OUEST-59423-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 2,000.00 1,734.95 Signé 2018-08-31 environnemtale pour development support 22 19 24 09 02 14 10 12 l'extension électrique MT/BT du quartier Njiloum sur 3 km dans la Commune de , Région de l'Ouest.

CM-CRC OUEST-59397-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- environnemtale pour IDA / 57180 A posteriori Individuel Open 2,000.00 1,734.95 Signé 2018-08-31 development support 22 19 24 09 02 14 10 12 l'alimentation en eau potable des villages NGUEEN et THIE par captage gravitaire de deux (02) sources émergentes dans la Commune de Fongo-Tongo

CM-CRC OUEST-59121-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- environnemtale d'un projet de Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 4,000.00 3,469.90 Signé 2018-08-31 réouverture de la piste development support 22 19 24 09 02 14 10 12 carrefour nzinga - marché baboutche galeu avec construction d'un ouvrage d'un ouvrage de franchissement sur la

CM-CRC OUEST-59299-CS- INDV / Sélection d'un consultant pour l'actualisation d'une etude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-09- 2018-12- 2018-10- 2019-06- 2019-06- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,396.00 1,210.09 Achevé 2018-08-31 development support 22 19 24 09 24 14 10 12 28 construction d'un forage avec un système de réserve au CSI de Fotsem-Lessing dans la Commune de Dschang, Région de l'Ouest.

Page 10 CM-CRC OUEST-59396-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnemtale pour Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 1,600.00 1,387.96 Signé 2018-08-31 l'extension du réseau development support 22 19 24 09 02 14 10 12

éléctrique HT et BT de LEFANG A LAH DEUKH 'NZI FODA) et LAH DEUKH au site touristique Mami Watta dans la Commune de Fongo-

CM-CRC OUEST-59399-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- environnemtale pour les IDA / 57180 A posteriori Individuel Open 2,400.00 2,081.94 Signé 2018-08-31 development support 22 19 24 09 02 14 10 12 travaux d'ouverture de la route Melang-king place au marché Fossong-Ellelem dans la Commune de Fongo-tongo, Région de l'Ouest.

CM-CRC OUEST-59120-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 1,120.00 971.57 Signé 2018-08-31 réalisation d'une mini AEP development support 22 19 24 09 02 14 10 12 avec puits moderne, bornes fontaines, châteaux d'eau et branchement ENEO dans la localité de Topelou, dans la Com

CM-CRC OUEST-59296-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- technique et socio- IDA / 57180 A posteriori Individuel Open 1,219.00 1,046.88 Signé 2018-08-31 development support 22 19 24 09 02 14 10 12 environnemtale pour la Construction d'un bloc de 06 latrines, dans la Commune de Demdeng, Région de l'Ouest

CM-CRC OUEST-59421-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- technique et socio- IDA / 57180 A posteriori Individuel Open 2,000.00 1,734.95 Signé 2018-08-31 development support 22 19 24 09 02 14 10 12 environnemtale pour la construction d'un CSI à Ngwefon dans la Commune de Bangourain, Région de l'Ouest.

CM-CRC OUEST-59419-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 2,000.00 1,734.95 Signé 2018-08-31 environnemtale pour la development support 22 19 24 09 02 14 10 12 construction d'un bloc maternelle à kourom-chefferie dans la Commune de Bangourain, Région de l'Ouest.

CM-CRC OUEST-59125-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-10- 2018-11- 2018-12- 2019-06- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,735.00 0.00 Annulé 2018-08-31 development support 19 09 14 12 construction d'une gare routière, et d'un bloc de troilettes modernes à trois (03) cellules à Bana, Commune de Bana, Région de l'Ouest.

CM-CRC OUEST-59297-CS- INDV / Sélection d'un consultant pour l'actualisation d'une etude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- 2019-06- IDA / 57180 A posteriori Individuel Open 1,400.00 1,206.63 Achevé 2018-08-31 environnemtale pour la development support 22 19 24 09 02 14 10 12 11 construction d'un hangar au marché de FOTETSA dans la Commune de Dschang, Région de l'Ouest.

CM-CRC OUEST-59295-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,898.00 1,561.46 Signé 2018-08-31 development support 22 19 24 09 02 14 10 12 réhabilitation de la piste agricole Bagoukoung- Poughieu dans la Commune de Bayangam, Région de l'Ouest.

CM-CRC OUEST-59412-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 1,600.00 2,081.53 Signé 2018-08-31 environnemtale pour les development support 22 19 24 09 02 14 10 12 travaux d'extension de la ligne électrique femeck I et femeck II dans la Commune de Nkong Zem, Région de l'Ouest.

CM-CRC OUEST-59428-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- environnementale pour les Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 1,500.00 1,301.21 Signé 2018-08-31 travaux d'extension electrique development support 22 19 24 09 02 14 10 12 du Marché NJITAPON - QUARTIER Ndouom passant par le CSI de NJITAPON au quartier FONKA dans la Commune de K

CM-CRC OUEST-59415-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- 2019-05- IDA / 57180 A posteriori Individuel Open 1,000.00 867.48 Achevé 2018-08-31 environnemtale pour la development support 22 19 24 09 02 14 10 12 14 réhabilitation du reseau scan water de katio dans la Commune de , Région de l'Ouest.

CM-CRC OUEST-59305-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- 2019-06- IDA / 57180 A posteriori Individuel Open 1,800.00 1,555.83 Achevé 2018-08-31 fourniture et Installation des development support 22 19 24 09 02 14 10 12 11 pressoirs à huile de palme à gestion communautaire dans les villages Ndounde et Bandoum dans la Commune de Fok

CM-CRC OUEST-59123-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- environnemtale d'un projet Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 4,000.00 2,602.43 Signé 2018-08-31 d'ouverture de la piste development support 22 19 24 09 02 14 10 12 agricole carrefour BABOUTCHEU - INTER RN5 (MOUANKEU) avec construction d'un ouvrage de franchissement dans la Com

CM-CRC OUEST-59416-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- 2019-02- environnemtale pour IDA / 57180 A posteriori Individuel Open 1,830.00 1,587.48 Achevé 2018-08-31 development support 22 19 24 09 02 14 10 12 27 l'aménagement d'une plage avec espaces de loisirs sur les rives du fleuve Ndé dans la Commune de Tonga, Région de l'Ouest.

Page 11 CM-CRC OUEST-59292-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- technique et socio- IDA / 57180 A posteriori Individuel Open 2,432.00 2,107.96 Signé 2018-08-31 development support 22 19 24 09 02 14 10 12 environnemtale pour l'éclairage public par lampadaire solaire dans la Commune de Banka.

CM-CRC OUEST-59293-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- 2019-02- technique et socio- IDA / 57180 A posteriori Individuel Open 1,600.00 1,380.64 Achevé 2018-08-31 development support 22 19 24 09 02 14 10 12 28 environnemtale pour la construction d'un CSI à TCHITCHI dans la Commune de Bangou, Région de l'Ouest.

CM-CRC OUEST-59294-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 1,200.00 1,125.83 Signé 2018-08-31 environnemtale pour development support 22 19 24 09 02 14 10 12 l'aménagement des espaces vert à l'entrée du marché MBA dans la Commune de Bayangam, Région de l'Ouest.

CM-CRC OUEST-59414-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- environnemtale pour la Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 2,400.00 1,734.90 Signé 2018-08-31 construction de deux asiles development support 22 19 24 09 02 14 10 12 pour moto taxi dont un à l'entrée chefferie et un (01) à Mbou dans la Commune de Nkong Zem, Région de l'Ouest.

CM-CRC OUEST-59417-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 1,400.00 1,214.46 Signé 2018-08-31 environnemtale pour la development support 22 19 24 09 02 14 10 12 construction d'un poste agricole dans la localité de Noutse dans la Commune de Tonga, Région de l'Ouest.

CM-CRC OUEST-59424-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 2,000.00 1,734.95 Signé 2018-08-31 environnemtale pour development support 22 19 24 09 02 14 10 12 l'extension électrique MT/BT du village Koumengba sur 3,5 km, dans la Commune de Bangourain, Région de l'Ouest.

CM-CRC OUEST-59436-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,000.00 867.48 Signé 2018-08-31 development support 22 19 24 09 02 14 10 12 construction d'une gare routière en face de la commune de koutaba dans la Commune de Koutaba, Région de l'Ouest.

CM-CRC OUEST-59184-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- Component A: Local 2018-10- 2018-11- 2018-12- 2019-06- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,735.00 0.00 Annulé 2018-08-31 development support 19 09 14 12 construction et l'équipement de hangar, et la construction d'un bloc de toilettes modernes à trois (03) cellules au marché central de Bana, C

CM-CRC OUEST-59413-CS- INDV / Sélection d'un consultant pour l'élaboration d'une étude de faisabilité technique et socio- environnemtale pour Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- IDA / 57180 A posteriori Individuel Open 2,400.00 1,734.90 Signé 2018-08-31 l'aménagement de deux (02) development support 22 19 24 09 02 14 10 12 arrêts auto dont un à l'entrée chefferie Bafou et un à Ndouzen dans la Commune de Nkong Zem, Région de l'Ouest.

CM-CRC OUEST-59437-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06- 2019-03- IDA / 57180 A posteriori Individuel Open 1,200.00 1,040.97 Achevé 2018-08-31 environnemtale pour la development support 22 19 24 09 02 14 10 12 04 construction d'une gare routière dans la localité dans la Commune de Malantouen, Région de l'Ouest.

CM-CRC OUEST-111109-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de Réhabilitation du tronçon de Component A: Local 2019-04- 2019-04- 2019-06- 2019-05- 2019-06- 2019-06- 2019-08- 2019-12- IDA / 57180 A posteriori Individuel Open 4,551.00 3,800.57 Signé 2019-03-01 la route agricole koula- development support 29 19 12 10 28 14 09 11

Matetchit-mbakop et construction des ouvrages de franchissement Commune de Magba, Région de l'Ouest.

CM-CRC OUEST-111108-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de Construction d'un atelier de Component A: Local 2019-11- 2019-04- 2019-06- 2019-05- 2019-06- 2019-06- 2019-08- 2019-12- maçonnerie au CETIC de IDA / 57180 A posteriori Individuel Open 3,779.00 3,168.47 Signé 2019-03-01 development support 25 19 12 10 28 14 13 11 Bangam et au CETIC de Bamendjou et d'un bloc de deux latrines, dans la Commune de Bamendjou, Région de l'Ouest.

CM-CRC OUEST-111112-CS- INDV / Selection d'un Consultant Individuel pour suivi Controle des Travaux de Construction d'un bloc Component A: Local 2019-04- 2019-04- 2019-06- 2019-05- 2019-06- 2019-06- 2019-08- 2019-12- maternel de 02 salles de IDA / 57180 A posteriori Individuel Open 2,083.00 1,677.25 Signé 2019-03-01 development support 29 19 12 10 28 14 07 11 classes équipés de tables et un bloc de 04 toilettes à l'école maternelle de Balembo, dans la Commune de Kekem, Région de l'Ouest.

CM-CRC OUEST-111111-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de Construction d’un hangar Component A: Local 2019-04- 2019-04- 2019-06- 2019-05- 2019-06- 2019-06- 2019-08- 2019-12- équipé de 23 comptoirs, et IDA / 57180 A posteriori Individuel Open 1,726.00 1,447.79 Signé 2019-03-01 development support 29 19 12 10 12 14 07 11 Construction d’un bloc latrines de trois cabines au marché de Bamengui, dans la commune de Kékem, Région de l'Ouest.

CM-CRC OUEST-111110-CS- INDV / Selection d'un Consultant Individuel pour Suivi Controle Travaux de Component A: Local 2019-04- 2019-04- 2019-06- 2019-05- 2019-06- 2019-06- 2019-08- 2019-12- Construction d’un hangar de IDA / 57180 A posteriori Individuel Open 1,905.00 1,596.24 Signé 2019-03-01 development support 29 19 12 10 28 14 08 11 32 comptoirs, d’une mini AEP au Centre commercial de Massangam, Commune de Massangam, Région de l'Ouest

Page 12 CM-CRC OUEST-147808-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de construction d’un atelier de Component A: Local En cours 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 57180 A posteriori Individuel Open 4,053.00 0.00 2020-10-30 maçonnerie et d'un atelier IH development support d'examen 20 18 08 12 11 et ESF équipé au lycée technique de Bana, dans la commune de Bana, Région de l'Ouest

CM-CRC OUEST-111098-CS- INDV / Sélection d'un consultant individuel pour élaboration etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- environnemtale de IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2019-06-03 development support 22 12 16 14 construction équipement d’un bloc salles de classe, latrines et bloc administratif et aménagement point d'eau, Commune de Njimom

CM-CRC OUEST-111104-CS- INDV / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- environnemtale pour IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2019-06-03 development support 22 12 16 14 construction et équipement de l’école maternelle, d'un bloc latrines et l'aménagement point d'eau, Commune de Massangam.

CM-CRC OUEST-111448-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de construction d'un bloc Component A: Local 2019-07- 2019-07- 2019-08- 2020-02- IDA / 57180 A posteriori Individuel Open 4,053.00 0.00 Annulé 2019-05-15 operatoire au Centre Médical development support 03 24 28 24 d'Arrondissement (CMA) de demdeng dans la Commune de Demdeng, Région de l'Ouest.

CM-CRC OUEST-111106-CS- INDV / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,800.00 0.00 Annulé 2019-06-03 development support 22 12 16 14 Construction d’un puits équipé de PMH à Makounvi, Makam-Marche, Manki II- Quartier Yamba, Commune de Njimom, Région de l'Ouest

CM-CRC OUEST-111101-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- environnementale pour IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Annulé 2019-06-03 development support 22 12 16 14 Construction hangar, d'un bloc latrines et aménagement d'un point d'eau aux marchés de Bakassa et Bnéghang, Commune de Penka michel

CM-CRC OUEST-111096-CS- INDV / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2019-06-03 environnemtale pour la development support 22 12 16 14 construction d’un forage à mansouen, mankounkou, mankembouot, Commune de Massangam

CM-CRC OUEST-111102-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- environnemtale pour la IDA / 57180 A posteriori Individuel Open 1,400.00 0.00 Annulé 2019-06-03 development support 22 12 16 14 réhabilitation de la station et du réseau SCANWATER du centre urbain de Penka- michel, Commune de Penka michel, Région de l'Ouest

CM-CRC OUEST-111113-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de Construction et l'équipement Component A: Local 2019-04- 2019-05- 2019-06- 2019-12- d’une boucherie municipale IDA / 57180 A posteriori Individuel Open 3,685.00 0.00 Annulé 2019-03-01 development support 19 10 14 11 moderne et d'un bloc latrines à 03 cellules au marché central de fombot dans la Commune de Foumbot, Région de l'Ouest

CM-CRC OUEST-111105-CS- INDV / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- IDA / 57180 A posteriori Individuel Open 4,200.00 0.00 Annulé 2019-06-03 environnemtale pour development support 22 12 16 14 l'Ouverture de l’axe routier Mayoun-Maloure de 10km, Commune de Njimom Région de l'Ouest.

CM-CRC OUEST-111107-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- environnemtale pour la IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2019-06-03 development support 22 12 16 14 construction d’un Pont et aménagement des voies d'accès sur la rivière KEUGHATO, village Bamendou, Commune de Penka michel.

CM-CRC OUEST-111097-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- environnementale pour la IDA / 57180 A posteriori Individuel Open 1,600.00 0.00 Annulé 2019-06-03 development support 22 12 16 14 construction et équipement d’un foyer communautaire, bloc latrines et aménagement point d'eau, Commune de Penka michel.

CM-CRC OUEST-111100-CS- INDV / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- environnementale pour Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2019-06-03 Construction d’un hangar, development support 22 12 16 14 d'un bloc latrines et l'aménagement d'un point d'eau au marché de Massangam, Commune de Massangam

CM-CRC OUEST-111103-CS- INDV / Sélection d'un consultant pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- environnementale pour IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2019-06-03 development support 22 12 16 14 l'extention du réseau électrique MT 10km Baloum- Ntone dans le village Nsang, Commune de Penka michel, Région de l'Ouest.

CM-CRC OUEST-111099-CS- INDV / Sélection d'un consultant individuel pour l'élaboration d'une etude de faisabilité technique et socio- Component A: Local 2019-07- 2019-08- 2019-09- 2020-03- environnemtale pour IDA / 57180 A posteriori Individuel Open 2,000.00 0.00 Annulé 2019-06-03 development support 22 12 16 14 Construction d’un CSI, d'un bloc latrines et l'aménagement d'un point d'eau avec ouvrage de stockage, Commune de Massangam

Page 13 CM-CRC OUEST-111445-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de construction d’un hangar de Component A: Local En cours 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 57180 A posteriori Individuel Open 1,878.00 0.00 2020-10-30 32 (trente-deux) comptoirs et development support d'examen 19 18 08 12 11 d’un bloc latrine à trois compartiments au marché de FOTETSA dans la commune de Dschang, Région de l'Ouest.

CM-CRC OUEST-111444-CS- INDV / Selection d'un Consultant Individuel pour suivi Contrôle Travaux de réalisation d'un forage muni Component A: Local En cours 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- d'un kit de pompe immerge IDA / 57180 A posteriori Individuel Open 1,144.00 0.00 2020-10-30 development support d'examen 19 18 08 12 11 électrique solaire et d’un château e avec bâche, et trois borne fontaines au CSI de FOTSEM-LESSING dans la Commune de Dschang.

CM-CRC OUEST-111450-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de construction et équipement Component A: Local En cours 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 57180 A posteriori Individuel Open 1,802.00 0.00 2020-10-30 d'un bloc de deux salles de development support d'examen 19 18 08 12 11 classe au Lycée Bilingue de TOCKET 2, dans la Commune de Bafoussam III, Région de l'Ouest.

CM-CRC OUEST-111442-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de construction et équipement Component A: Local En cours 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- d'un bloc de deux salles de IDA / 57180 A posteriori Individuel Open 2,018.00 0.00 2020-10-30 development support d'examen 19 18 08 12 11 classe au Lycée WOUNG 2 avec aménagement d'un point d'eau, dans la Commune de Bafoussam III, Région de l'Ouest

CM-CRC OUEST-111446-CS- INDV / Selection d'un Consultant Individuel pour suivi Controle des Travaux de construction d’un bloc de Component A: Local En cours 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- IDA / 57180 A posteriori Individuel Open 2,048.00 0.00 2020-10-30 deux salles de classe équipé development support d'examen 20 18 08 12 11 avec bureau directeur et d’un bloc latrine a l’école publique de BADJEGHANG, dans la Commune de Penka Michel.

CM-CRC OUEST-111447-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de Construction d'un foyer Component A: Local 2019-12- 2019-07- 2019-07- 2019-08- 2020-02- Communautaire et d'un bloc IDA / 57180 A posteriori Individuel Open 3,202.00 0.00 Annulé 2019-05-15 development support 12 03 24 28 24 de 02 latrines au foyer Communautaire de Bandounga, dans la Commune de Tonga, Département du Ndé Région de l'Ouest.

003/C/SC/OU/BAFOUSSAM I/2020 / Sélection d'un CI pour le suivi contrôle des Travaux de construction d’un dalot et aménagement des Component A: Local En cours 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- voies d'accès à Ndiengdam IDA / 57180 A posteriori Individuel Open 3,810.00 0.00 2020-10-30 development support d'examen 20 18 08 12 11 (Lot 1) et construction de 02 dalots et aménagement des voies d'accès à Mvoutsa’aa (Lot 2), Commune de Bafoussam I.

002/C/SC/OU/DEMDENG/202 0 / Sélection d'un CI pour le suivi contrôle des Travaux de construction d'un bloc latrines Component A: Local En cours 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- à trois (03) cellules au C.E.S de IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 2020-10-30 development support d'examen 21 18 08 12 11 bangangfondji et d’un bloc de 06 latrines dans la Commune de Demdeng, département de Koung-khi, région de l’Ouest

CM-CRC OUEST-147809-CS- INDV / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de Component A: Local En cours 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- réalisation d'un forage à IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 2020-10-30 development support d'examen 20 18 08 12 11 l’école publique de Badjeghang dans la Commune de Penka-Michel, Région de l'Ouest

001/C/SC/OU/PETE BANDJOUN/2021 / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de construction Component A: Local En cours 2021-04- 2020-04- 2020-04- 2020-05- 2020-11- fosses maçonnes de IDA / 57180 A posteriori Individuel Open 1,905.00 0.00 2020-02-15 development support d'examen 16 04 25 30 26 80cmx50cm avec un dalot sur le tronçon de 830 m de route , localité de Mbouo, dans la commune de Pete Bandjoun, région de l'ouest.

003/C/SC/OU/BANDJA/2021 / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de Construction d'un bloc de Component A: Local En cours 2021-04- 2020-04- 2020-04- 2020-05- 2020-11- IDA / 57180 A posteriori Individuel Open 2,136.00 0.00 2020-02-15 deux salles et d'un bloc development support d'examen 16 04 25 30 26 latrine a trois(03) cellules, à l'ecole publique de Bandja- peage,dans la commune de Bandja, region de l'Ouest

002/C/SC/OU/BATIE/2021 / Selection d'un Consultant Individuel pour le suivi Controle desTravaux Component A: Local 2020-04- 2020-04- 2020-05- 2020-11- d’electrification Rurale Par IDA / 57180 A posteriori Individuel Open 1,000.00 0.00 Annulé 2020-02-15 development support 04 25 30 26 Extension Monophasee Sur 500 Ml En Bt du Village Balagou, Dans La Commune De Batie,Region de l'Ouest

004/C/SC/OU/BAFOUSSAM II/2021 / Selection d'un Consultant Individuel pour le suivi Controle des Travaux de construction d'un bloc de 04 Component A: Local En attente 2020-04- 2020-04- 2020-05- 2020-11- sales de classses, de 100 IDA / 57180 A posteriori Individuel Open 3,810.00 0.00 2020-02-15 development support d'exécution 04 25 30 26 tables bancs et bloc latrine à trois compartiment au CETIC de Badeng , Commune de Bafoussam II, région de l’Ouest.

004/C/SC/OU/PETE- BANDJOUN/2020 / Sélection d'un CI pour le suivi contrôle des Travaux de construction des fossés maçonnés sur Component A: Local 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- 770ml avec un dalot de IDA / 57180 A posteriori Individuel Open 1,905.00 0.00 Annulé 2020-10-30 development support 21 18 08 12 11 0,80x0,80 sur le tronçon de route bitumée carrefour Centre climatique-03 villas, dans à Mbouo, Commune de Pete-Bandjoun

005/C/SC/OU/BAFOUSSAM II/2020 / Sélection d'un CI pour le suivi contrôle des Travaux de construction d'un Component A: Local 2020-10- 2020-12- 2021-01- 2021-02- 2021-08- hall touristique avec ouvrages IDA / 57180 A posteriori Individuel Open 3,757.00 0.00 Annulé 2020-10-30 development support 20 18 08 12 11 connexes au lac Baleng, dans la Commune de Bafoussam II, département de la Mifi, région de l’Ouest

Page 14