PROCUREMENT PLAN [FY 2008-09]

TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATIONA ND WATER-BODIES RESTORATION AND MANAGEMET PROJECT

LN. 4846-IN/CR. 4255-IN

1. Modified Procurement Plan [PAD] for WRO [Goods and Consultancies] 2. Water Resources Department [WRO]

45907 REVISED PAD PROCUREMENT PLAN - BASED ON THE BANK’S RECOMMENDATION Sl. Description Bid Probable Current Status Bank review /comments/ Revised No. Opening Revised with recommended revised dates Bid- Opening Date Bid- Justification as on 15.04.2008 Date based on the Proposed Opening recommendations Originally Date of the Bank email dated 15.04. 08. 1. Monitoring & Evaluation April,07 June, 08. Bank accorded NOC for Short Listing of Proposed new date is fine. June, 08. Consultants for M & E on April 1, 2008. RFP already approved by Bank on March 5th, 2007. Again Bank requested the RFP for review. RFP again forwarded to Bank on 04.04.08 & 11.04.08 for reference to Bank and requested early response on the RFP. RFP is to be issued to the short listed firms. 2. Topographic and April,07 May,08 The Bank has given NOC for short Probably June 08 would be a more June, 08. Cadastral surveys. listing. Revised RFP incorporating Bank realistic date. Please change comments has been forwarded to Bank on 11.04.2008

3. Information May,07 Jan, 09 TOR & EOI with Bank Comments This is important for day to day October, 08 Management systems. forwarded to E.I.C. On receipt of the operation of the project and same after verification it will be implementation of a robust M&E forwarded to Bank for approval. system and therefore should be advanced to an earlier date: Please change to October 08 4. Design Support for June, 07 July, 09. Fresh proposal EOI, TOR, RFP This ought to be advanced to a December, 08 modernization of including estimate are to be finalised by much earlier date: same as item 6 Irrigation systems. the Chief Engineer (DRCS). below: Please change to December 08

Sl. Description Bid Probable Current Status Bank review /comments/ Revised No. Opening Revised with recommended revised dates Bid- Opening Date Bid- Justification as on 15.04.2008 Date based on the Proposed Opening recommendations Originally Date of the Bank email dated 15.04. 08. 5. Construction quality June,07 Sep, 08. Draft EOI sent to Bank on 28.03.2008. As we discussed during the July, 08 Management and Informed E-in-C to send revised TOR mission, This consultancy should Technical supervision. after attending Bank comments with be commissioned as soon as RFP and Estimate. possible especially that first year WRO program is fully under way and second year plans are being finalized. Please change to July 08 6. Basin Planning May, 07. Dec, 08. Fresh proposal EOI, TOR, RFP Proposed new date is fine. December, 08 including knowledge including estimate are still awaited from base, Design Support the Chief Engineer (IWS). system Development. 7. Procurement of 200 Feb, 07. Dec, 08. Bank cleared the Bid document. It is This has been cleared a while ago. Items 7 & 11 has Desktop Computers- decided to procure through ELCOT as It is essential that it goes in parallel been clubbed and Peripherals, 100 per Bank Guidelines. Government with the WAN and the EIMS advanced to October, Laptop. approval is awaited for IT components. consultancy. Please advance to 08 October 08. Also club with Pack.No.01/ IAMWARM / ICB Pack.No.11/IAMWARM / WRO / / WRO / Computers 06-07. Computers 07-08 (item 11 below) – as they are both for the same items. 8. Procurement of May, 07. Dec, 08. The full fledged I.T.Cell at E.I.C. Office Please club with Pack.12 / Items 8 & 12 has software. once formed will concentrate on this IAMWARM / DC / WRO / Software, been clubbed and Pack.01 / IAMWARM / DC / Package. and change date to October 08 advanced to October, WRO / Software 08 9. Procurement of May, 07. Jan, 09. In the next financial year it will be Proposed new date is fine. January, 09 Vehicles considered and completed. Pack.No.08/ IAMWARM DC / WRO / Vehicles 07-08. Sl. Description Bid Probable Current Status Bank review /comments/ Revised No. Opening Revised with recommended revised dates Bid- Opening Date Bid- Justification as on 15.04.2008 Date based on the Proposed Opening recommendations Originally Date of the Bank email dated 15.04. 08. 10. Providing Wide Area Apr, 07. Nov, 08. It is decided to procure through ELCOT Please advance to Oct 08 as well. October, 08 Net Work for WRO as per Bank Guidelines. Pack.No. 21 / IAMWARM / Correspondence between E.I.C and ICB / WRO / WANs / 06-07. ELCOT is in Progress. This will also need to match the reallocation based on bifurcation. The full fledged I.T.Cell at E.I.C. Office once formed will concentrate on this Package. 11. Procurement of Mar, 08. May, 09. In the next financial year it will be Proposed new date is fine. May, 09. Vehicles considered and completed. Pack.No.18/ IAMWARM DC / WRO / Vehicles 07-08. 12. Procurement of Office Apr 08. May, 09. After formation of WUAs, it will be Proposed new date is fine. May, 09. equipment for WUAs considered and completed in the 2009- Pack.No. 19/ IAMWARM / 2010 financial years. ICB / WRO / WUA / 07-08.

INDIA GOVERNMENT OF TAMILNADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS

Name of Basin: Vellar Name of Sub-Basin: Anai vari odai Schedule of rate 2008-09 Name of Zone: Trichy Period of completion : 14 months Name of Circle: Middle Cauvery Basin Circle, Trichy Name of Division: Marudaiyaru Basin Division, Ariyalur

SL Estimated Prior/ . Package Description of cost Post No No. Work (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM Rehabilitation of WARM / tanks, Anaicuts WRO/ and supply AVO/ channesl in Anai Appraisal 30.6.08 NR 4.8.08 5.9.08 20.10.08 N.R 13.11.08 3.12.08 N.R 24.12.08 23.6.10 WORKS vari odai Sub Post / II ( basin of Ariyalur 220.65 NCB review 2008- District.

09) Revised

Actual

TOTAL 220.65

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Vellar Schedule of rate 2008-09 Name of Sub-Basin: Chinnar Period of completion : 14 months Name of Zone: Trichy Name of Circle: Middle Cauvery Basin Circle, Trichy Name of Division: Marudaiyaru Basin Division, Ariyalur

SL Estimat Prior/ Post . Package ed cost Description of Work Re No No. (Rs award works view bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM Rehabilitation of WARM / Anicuts, Supply WRO/ channel, tanks under CNR/ cluster NO.I, II & III, Post Appraisal 30.6.08 NR 4.8.08 5.9.08 20.10.08 N.R 13.11.08 3.12.08 N.R 24.12.08 23.6.10 274.00 NCB WORKS VI Part in Chinnar review

/ Sub Basin.

II(2008- 09) Revised

Actual

2 02/IAM Rehabilitation of WARM / Anicuts, Supply WRO/ channel, tanks under Appraisal 30.6.08 NR 4.8.08 5.9.08 20.10.08 N.R 13.11.08 3.12.08 N.R 24.12.08 23.6.10 CNR/ cluster NO.IV ,V & VI Post 262.00 NCB WORKS Part & VII in Chinnar review

/ Sub Basin.

II(2008- Revised 09) Actual

TOTAL 536.00

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Vellar River Basin Name of Sub-Basin: Swetha nadhi Sub Basin Schedule of rate 2008-09 Name of Zone: Trichy Period of completion : 12 months Name of Circle: Upper Cauvery Basin Circle, Salem Name of Division: Sarabanga Basin Division, Namakkal

Estima SL ted Prior/ . Package Description of Work cost Post No No. award works (Rs Review bidder document document

. documents ‘Lakh) Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM Rehabilitation and

WARM / Modernisation of 5 Appraisal 30.6.08 NR 4.8.08 5.9.08 20.10.08 N.R 13.11.08 3.12.08 N.R 24.12.08 23.6.10 WRO/ Nos. Anicuts and 2

SWN/ Nos. Jungle Post 110 NCB NCB/ streams of Swetha review

WORKS nadhi sub basin in Revised

/ II Rasipuram taluk of (2008- Namakkal District. 09) Actual

2 02/IAM Rehabilitation and WARM / Modernisation of Appraisal 30.6.08 NR 4.8.08 5.9.08 20.10.08 N.R 13.11.08 3.12.08 N.R 24.12.08 23.6.10 WRO/ 20 Nos. Anicuts SWN/ and 7 Nos. tanks of WORKS Swetha nadhi sub Post Revised 435 NCB / II basin in Gangavalli review (2008- Block of Salem 09) District. Actual

18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

3 03/IAM Rehabilitation and WARM / Modernisation of 4 Appraisal 25.6.08 NR 23.7.08 27.8.08 15.10.08 NR 14.11.08 27.11.08 NR 12.12.08 11.6.10 WRO/ Nos. Anicuts and 6 SWN/ Nos. tanks of Swetha Post NCB/ nadhi sub basin in 185 NCB review WORKS Thalaivasal block of Revised / II Salem District.

(2008- 09) Actual

4 04/IAM Rehabilitation and WARM / Modernisation of 4 WRO/ Nos. Anicuts and 5 Appraisal 25.6.08 NR 23.7.08 27.8.08 15.10.08 NR 14.11.08 27.11.08 NR 12.12.08 11.6.10 SWN/ Nos. tanks of Swetha Post NCB/ nadhi sub basin in 165 NCB review WORKS Veppanthatai taluk of

/ II Peramballur District. Revised

(2008- 09) Actual

TOTAL 895

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Vaippar River Basin Schedule of rate 2008-09 Name of Sub-Basin: Nishabanathi Sub Basin Period of completion : 18 months Name of Zone: Madurai Region, Madurai Name of Circle: Vaippar Basin Circle, Virudhunagar Name of Division: Upper Vaippar Basin Division, Rajapalayam

SL Estimat Prior/ . Package ed cost Description of Work Post No No. (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM Rehabilitation of WARM / Panaiyan Anicut, Appraisal 25.6.08 NR 23.7.08 27.8.08 15.10.08 NR 14.11.08 26.11.08 NR 12.12.08 11.6.10 WRO/ Achandi Anicut NBN/ Supply Channels and Post WORKS tanks in Nishabanathi 488.50 NCB review / II Sub Basin in Revised (2008- Vasudevanallur Block/ 09) Sivagiri Taluk of Tirunelveli District. Actual

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 2 02/IAM Rehabilitation of WARM / Keelachinthamani WRO/ anicut, Sonaiyan NBN/ anicut, Ariyoor anicut, WORKS Periyoor anicut, Appraisal 25.6.08 NR 23.7.08 27.8.08 15.10.08 NR 14.11.08 26.11.08 NR 12.12.08 11.6.10 / II Perumpathoor anicut, (2008- Kuvalaikanni anicut, 09) Manaloor anicut, Veeraparakirama anicut, Ilankulam Post 495.00 NCB anicut, Sankanaperi review

anicut, Chinthamani Revised

anicut, Manthikulam anicut supply channels and tanks in Nishabanathi sub basin in Vasudeva nallur and Sankaran Actual koil blocks/ Sivagiri and Sankaran koil Taluk of Tirunelveli District. 3 03/ Rehabilitation of IAMWA Thiruvengadam RM / anicut, Koothadikulam Appraisal 25.6.08 NR 23.7.08 27.8.08 15.10.08 NR 14.11.08 26.11.08 NR 12.12.08 11.6.10 WRO/ anicut, Marathoni NBN/ anicut supply WORKS channels and tanks in / II Nishabanathi sub Post 392.50 NCB (2008- basin in Sankarankoil, review Revised

09) Kuruvikulam and Vembakottai blocks / Sankarankoil and Sivakasi Taluks of Tirunelveli and Actual Virudhunagar Districts. TOTAL 1376.00 INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Schedule of rate 2008-09 Period of completion : 18 months Name of Basin: Vaippar River Basin Name of Sub-Basin: Sindapalli Uppodai Sub Basin Name of Zone: Madurai Region, Madurai Name of Circle: Vaippar Basin Circle, Virudhunagar Name of Division: Vaippar Basin Division, Virudhunagar

SL Estimat Prior/ . Package ed cost Description of Work Post No No. (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM Rehabilitation and WARM / Modernization of NCB Appraisal 30.6.08 NR 4.8.08 5.9.08 20.10.08 N.R. 13.11.08 3.12.08 N.R 24.12.08 23.6.10 WRO/ Non System tanks SPU/ in Sindapalli Post 122.00 WORKS Uppodai Sub Basin review

/ II in Sivakasi and Revised (2008- Sattur Taluks of 09) Virudhunagar District. Actual

TOTAL 122.00

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Gundar River Basin Schedule of rate 2008-09 Name of Sub-Basin: Therkkar Sub Basin Period of completion : 18 months Name of Zone: Madurai Region, Madurai Name of Circle: Vaippar Basin Circle, Virudhunagar Name of Division: Gundar Basin Division, Madurai

SL Estimated Prior/ . Package cost Description of Work Post No No. (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/ Rehabilitation of IAMWA system tanks in Appraisal 30.6.08 NR 4.8.08 5.9.08 20.10.08 NR 13.11.08 3.12.08 NR 24.12.08 23.6.10 RM / Madurai south and WRO/ Tirumangalam Post TKR/ Taluks of Madurai NCB review WORKS District. 302.00 Revised

/ II

(2008- 09) Actual

2 02/ Rehabilitation of IAMWA system tanks in Appraisal 30.6.08 NR 4.8.08 5.9.08 20.10.08 NR 13.11.08 3.12.08 NR 24.12.08 23.6.10 RM / Usilampatti , WRO/ Madurai south, Post TKR/ Tirumangalam 434.00 NCB review Revised WORKS Taluk of Madurai / II District. (2008- Actual 09)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 3 03/ Rehabilitation of IAMWA system tanks in Appraisal 23.6.08 NR 21.7.08 22.8.08 10.10.08 NR 5.11.08 20.11.08 NR 10.12.08 9.6.10 RM / Usilampatti , WRO/ Tirumangalam Post TKR/ Taluks of 499.00 NCB review Revised WORKS Madurai District. / II (2008- Actual 09) 4 04/ Rehabilitation of IAMWA non system Appraisal 30.6.08 16.7.08 30.7.08 2.9.08 3.10.08 18.10.08 10.11.08 24.11.08 8.12.08 17.12.08 16.6.10 RM / tanks in Madurai WRO/ south, Prior TKR/ Tirumangalam & 1033.40 NCB Revised review WORKS Usilampatti / II Taluks of (2008- Madurai District. Actual 09) TOTAL 2268.40

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Gundar River Basin Schedule of rate 2008-09 Name of Sub-Basin: Upper Gundar Sub Basin Period of completion : 18 months Name of Zone: Madurai Region, Madurai Name of Circle: Vaippar Basin Circle, Virudhunagar Name of Division: Vaippar Basin Division, Virudhunagar

SL Estimat Prior/ . Package ed cost Description of Work Post No No. (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM Rehabilitation of WARM / anicuts and non WRO/ system tanks and its UGR/ supply channels fed WORKS by Varattar river Post 187.00 NCB Appraisal 20.6.08 NR 18.7.08 20.8.08 6.10.08 NR 24.10.08 12.11.08 NR 26.11.08 25.5.10 / II under Upper Gundar review (2008- Sub Basin in Peraiyur 09) and Thirumangalam Taluk of Madurai District. Revised Actual 2 02/ Rehabilitation of IAMWA anicuts and non RM / system tanks and its WRO/ supply channels fed UGR/ by Goundanathi Post 281.00 NCB Appraisal 20.6.08 NR 18.7.08 20.8.08 6.10.08 NR 24.10.08 12.11.08 NR 26.11.08 25.5.10 WORKS under Upper Gundar review / II Sub Basin in Peraiyur (2008- and Usilampattti Taluk 09) of Madurai District.

Revised Actual 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 3 03/ Rehabilitation of IAMWA anicuts and non RM / system tanks and its WRO/ supply channels fed UGR/ by Goundanathi Post 397.00 NCB Appraisal 20.6.08 NR 18.7.08 20.8.08 6.10.08 NR 24.10.08 12.11.08 NR 26.11.08 25.5.10 WORKS under Upper Gundar review / II Sub Basin in (2008- Thirumangalam and 09) Peraiyur Taluk of Madurai District. Revised Actual TOTAL 865.00

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Vaippar River Basin Schedule of rate 2008-09 Name of Sub-Basin: Senkottaiyar Sub Basin Period of completion : 18 months Name of Zone: Madurai Region, Madurai Name of Circle: Vaippar Basin Circle, Virudhunagar Name of Division: Vaippar Basin Division, Virudhunagar

SL Estimat Prior/ . Package ed cost Description of Work Post No No. (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM Rehabilitation and WARM / Moderisation of Appraisal 23.6.08 NR 21.7.08 22.8.08 10.10.08 NR 5.11.08 20.11.08 NR 10.12.08 9.6.10 WRO/ Non System tanks SKR/ in Senkottaiyar sub Post 530.00 NCB WORKS basin in review

/ II Aruppukottai, Revised

(2008- Virudhunagar and 09) Sattur Taluks of Virudhunagar Actual District. 2 02/IAM Rehabilitation and WARM / Moderisation of Appraisal 23.6.08 NR 21.7.08 22.8.08 10.10.08 NR 5.11.08 20.11.08 NR 10.12.08 9.6.10 WRO/ Non System tanks SKR/ in Senkottaiyar sub Post WORKS basin in 266.00 NCB review Revised / II Ettayapuram and (2008- Vilathikulam Taluks 09) of Thoothukudi Actual District. TOTAL 796.00

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Vaippar River Basin Name of Sub-Basin: Kalingalar Sub Basin Schedule of rate 2008-09 Name of Zone: Madurai Region, Madurai Period of completion : 18 months Name of Circle: Vaippar Basin Circle, Virudhunagar Name of Division: Uppper Vaippar Basin Division, Rajapalayam

SL Estimat Prior/ . Package ed cost Description of Work Post No No. (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01IAMW Rehabilitation of ARM / Koonikarai anicut, WRO/ Pottakulam anicut, Appraisal 18.6.08 NR 18.7.08 19.8.08 7.10.08 NR 3.11.08 17.11.08 NR 3.12.08 2.6.10 KGR/ Pudumadai anicut, WORKS Kanjithalai anicut, Post 294.50 NCB / II Sakkiliankal anicut review

(2008- and its tanks and

09) supply channels in Revised Kalingalar sub basin in Vasudevanallur block / Sivagiri Taluk Actual of Tirunelveli District.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 2 02/IAM Rehabilitation of WARM / Koonikarai anicut, WRO/ Kalingalar anicut, KGR/ Thamarai anicut and WORKS its tanks and supply Appraisal 18.6.08 NR 18.7.08 19.8.08 7.10.08 NR 3.11.08 17.11.08 NR 3.12.08 2.6.10 / II channels in Kalingalar (2008- sub basin in Post 09) Vasudevanallur and 273.00 NCB Sankarankoil blocks / review Sivagiri and Sankarankoil Taluks of Tirunelveli District. Revised

Actual

TOTAL 567.50

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Name of Sub-Basin: Poiny Sub Basin Schedule of rate 2008-09 Name of Zone: Chennai Region Period of completion : 18 months Name of Circle: Project Circle Name of Division: Uppper Palar Basin Division

SL Estimat Prior/ . Package ed cost Description of Work Post No No. (Rs award works Review bidder document document ICB/NCB

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Method of Procurement- Procurement- of Method Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/ Rehabilitation and IAMWA modernization of RM / Head works, Appraisal 23.6.08 NR 21.7.08 22.8.08 10.10.08 N.R. 5.11.08 25.11.08 NR 10.12.08 9.6.10 WRO/ Supply Channel Post POY/ and tanks in West 556.63 NCB review WORKS Main Channel in

/ II Sholingham, Revised

(2008- Walaja and Katpadi 09) block of Katpadi & Walaja Taluk in Actual Vellore District. 2 02/ Rehabilitation and IAMWA modernization of RM / Kondams and Appraisal 23.6.08 NR 21.7.08 22.8.08 10.10.08 N.R. 5.11.08 25.11.08 NR 10.12.08 9.6.10 WRO/ supply channel and POY/ tank in South main Post 519.04 NCB WORKS channel and East review

/ II Main Channel in Revised (2008- Wallajah Block, 09) Sholingham Block of Walaja Taluk in Actual Vellore District.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 3 03/ Rehabilitation IAMWAR and M / modernization of Appraisal 18.6.08 3.7.08 16.7.08 19.8.08 7..10.08 N.R. 3.11.08 21.11.08 NR 5.12.08 4.6.2010 WRO/ Kondams and POY/ supply channel WORKS tanks in East / II Main Channel Post (2008- and Nandhi 467.73 NCB Revised review 09) River in Kaveribakkam block of Arakkonam Taluk in Vellore Actual District.

4 04/IAMW Rehabilitation ARM / and WRO/ modernization of Appraisal 18.6.08 3.7.08 16.7.08 19.8.08 7..10.08 N.R. 3.11.08 21.11.08 NR 5.12.08 4.6.2010 POY/WO East Main RKS / II channel and (2008- Nadhi river in Post 09) Arakkonam and 555.88 NCB review Revised Kaveripakkam block of Arakonam Taluk in Vellore District. Actual

5 05/WAR Rehabilitation M / and Appraisal 20.6.08 4.7.08 18.7.08 20.8.08 6.10.08 N.R. 24.10.08 12.11.08 NR 26.11.08 25.5.2010 WRO/ modernization of POY/ East Main WORKS channel / II Kondams in Post 451.23 NCB (2008- Nemali Block review Revised 09) and Arakonam block of Arakonam Taluk in Vellore Actual District. TOTAL 2550.51

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Palar Basin Name of Sub-Basin: Koundanya Nadhi Sub Basin Schedule of rate 2008-09 Name of Zone: Chennai Region Period of completion : 18 months Name of Circle: Project Circle, Vellore Name of Division: Upper Palar Basin Division, Vellore

SL Estimated Prior/ . Package cost Description of Work Post No No. (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM Rehabilitation and WARM / modernization of WRO/ Supply Channel and KDN/ all tanks in Appraisal 25.6.08 NR 23.7.08 27.8.08 15.10.08 N.R. 25.11.08 15.12.08 NR 31.12.08 30.6.10 Post WORKS Koundanya Nadhi 245.96 NCB review / II Sub Basin in

(2008- Gudiyatham &

09) K.V.Kuppam block in Revised Gudiyatham & Katpadi Taluk in Actual Vellore District. 2 02/IAM Rehabilitation and WARM / modernization of WRO/ Supply Channel and KDN/ all tanks in Post Appraisal 18.6..08 NR 16.7..08 19.8.08 7.10.08 N.R. 27.11.08 12.12.08 NR 30.12.08 29.6.10 329.92 NCB WORKS Koundanya Nadhi review

/ II Sub Basin in (2008- K.V.Kuppam block in Revised 09) Katpadi Taluk in Vellore District. Actual TOTAL 575.88

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Vaigai Basin Name of Sub-Basin: Varattar Nagalar Sub Basin Schedule of rate 2008-09 Name of Zone: Madurai Region, Madurai Period of completion : 13 months Name of Circle: Periyar Vaigai Basin Circle, Madurai Name of Division: Manjalar Basin Division, Periyakulam

SL Estimated Prior/ . Package cost Description of Work Post No No. (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM Rehabilitation of WARM / Infrastructures of WRO/ the Varattar Appraisal 18.6.08 NR 18.7.08 19.8.08 7.10.08 NR 3.11.08 17.11.08 NR 3.12.08 2.6.10 VNR/ Nagalar Sub Basin Post NCB/ in Theni District. 157.00 NCB review WORKS Revised

/ II

(2008- 09) Actual

TOTAL 157.00

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Vaigai Basin Name of Sub-Basin: Upper Vaigai Sub Basin Schedule of rate 2008-09 Name of Zone: Madurai Region, Madurai Period of completion : 15 months Name of Circle: Periyar Vaigai Basin Circle, Madurai Name of Division: Manjalar Basin Division, Periyakulam

SL Estimat Prior/ . Package ed cost Description of Work Post No No. (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/ Rehabilitation of IAMWA Infrastructures of the 16.6.10 Appraisal 30.6.08 NR 30.7.08 2.9.08 3.10.08 N.R 10.11.08 24.11.08 N.R 17.12.08 RM / Upper Vaigai Sub WRO/ Basin in Theni Post UVG/ District. 201.00 NCB review WORKS Revised

/ II

(2008- 09) Actual

TOTAL 201.00

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Pennaiyar Basin Schedule of rate 2008-09 Name of Sub-Basin: Pennaiyar upto Period of completion : 18 months Name of Zone: Chennai Region Name of Circle: Pennaiyar Basin, Thiruvannamalai Name of Division: Upper Pennaiyar Basin, Dharmapuri

SL Estimated Prior/ . Package cost Description of Work Post No No. (Rs award works Review bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM Rehabilitation of WARM / Anicuts, tanks and its WRO/ supply channels from PNK/ Pennaiyar and suppy UPBD/ channel from Appraisal 18.6.08 3.7.08 18.7.08 19.8.08 7.10.08 20.10.08 3.11.08 17.11.08 01.12.08 3.12.08 2.6.10 WORKS Kelavarapalli / II Reservoir of (2008- Pennaiyar upto 09) Krishnagiri Reservoir

sub basin in 323.18 since it is model Bid for NCB block of Hosur block of in Revised

Krishnagiri District. Post review

other Post Review Packages) Actual (Consider as Prior Review

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 2 02/IAM Rehabilitation of WARM / Anicuts, tanks and its WRO/ supply channels of Appraisal 18.6.08 3.7.08 18.7.08 19.8.08 7.10.08 NR 3.11.08 17.11.08 NR 3.12.08 2.6.10 PNK/ Pennaiyar upto UPBD/ Krishnagiri Reservoir WORKS Sub Basin in Post 359.66 NCB / II Shoolagiri review (2008- Kelamangalam Revised 09) Veppanapalli and Krishnagiri block, in Actual . TOTAL 682.84

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS Name of Basin: Agniyar Basin Name of Sub-Basin: Ambuliyar Schedule of rate 2008-09 Name of Zone: Trichy Region Period of completion : 18 months Name of Circle: Lower Cauvery Basin, Name of Division: Agniyar Basin Division

SL Estimated . Package cost Prior/ Post Description of Work No No. (Rs Review award works bidder bidder document document

. ‘Lakh) documents Bid Opening date Bid Invitation date Bid Invitation report (DPR) & bid & (DPR) report Bank's WBR No.&Date Bank's WBR No.&Date Letter of acceptance to the Date of Commencement of Evaluation & Contract award award Contract & Evaluation Date of completion of works Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection Signing Contract Date of Bank No objection to contract Bank No objection to contract Method of Procurement- Procurement- of Method ICB/NCB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 01/IAM WARM / Rehabilitation of Appraisal 30.6.08 16.7.08 30.7. 08 2.09. 08 3.10.08 18.10.08 10.11.08 24.11.08 8.12.08 17.12.08 16.6.10 WRO/ Irrigation ABR/ Infrastructures in NCB/W Ambuliyar Sub- ORKS/ Basin from Prior 642.14 NCB Revised 2008-09 Pallathividuthi Review

Anicut and its

group of Tanks to Senthangudi Anicut and its group of Actual Tanks in Alangudi of Pudukottai District.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 2 02/IAM WARM / Rehabilitation of WRO/ Irrigation Appraisal 30.6.08 16.7.08 30.7. 08 2.09. 08 3.10.08 18.10.08 10.11.08 24.11.08 8.12.08 17.12.08 16.6.10 ABR/ Infrastructures in NCB/W Ambuliyar Sub-Basin ORKS/ from Kulamangalam 2008-09 Anicut and its group of Tanks to Veerakondan Anicut Prior Revised 640.27 NCB in Villuniyar River and Review from Rethinakottai Anicut and its group of Tanks to Maruthangudi Anicut and its group of Tanks Actual in Maruthan gudiar River in Pudukottai District. 3 03/IAM WARM / Rehabilitation of WRO/ Irrigation ABR/ Infrastructures in Post NCB/W Ambuliyar Sub-Basin 410.09 NCB Appraisal 30.6.08 NR 18.7.08 19.8.08 19.9.08 NR 7.10.07 17.10.08 NR 28.10.08 27.4.08 Review ORKS/ Poonaikuthiyar and 2008-09 Adaikkadevan Anicuts and its group of Tanks in District. 4 04/IAM WARM / Rehabilitation of WRO/ Irrigation ABR/ Infrastructures in NCB/W Ambuliyar Sub-Basin ORKS/ Ramasamipuram, Post 2008-09 arasarkulam I & II, 453.50 NCB Appraisal 30.6.08 NR 18.7.08 19.8.08 19.9.08 NR 7.10.07 17.10.08 NR 28.10.08 27.4.08 Review Amarasimendrapuram , Chitthathikadu and Nelliyadikkadu Anicuts and its group of Tanks in Thanjavur District. TOTAL 2146.00

INDIA GOVERNMENT OF TAMILNADU TAMIL NADU IRRIGATED AGRICULTURE MODERNIZATION AND WATER RESOURCES MANAGEMENT (TN IAM WARM) PROJECT PROCUREMENT-PLAN FOR WORKS

Name of Basin: AGNIYAR Schedule of rate 2008-09 Name of Sub-Basin: AGNIYAR Period of completion – 18 Months Name of Zone: TRICHY REGION Name of Circle: LOWER CAUVERY BASIN CIRCLE Name of Division: AGNIYAR BASIN DIVISION

S Estimate L. Description of d cost Package No. N Work (Rs award works Bidder Bidder document document o. ‘Lakh) ICB/NCB Bid Opening date Bid Invitation date Bid Invitation Prior/ Post Review Bank's WBR No.&Date Bank's WBR No.&Date Method of Procurement- Procurement- of Method Date of Contract Signing Contract Date of Date of Commencement of Letter of Acceptance to the Evaluation & Contract award award Contract & Evaluation Date of completion of works Bank No objection to contract to contract Bank No objection Recommendation & Approval Approval & Recommendation Preparation of detailed project detailed project of Preparation Bank's no objection to bidding to bidding Bank's no objection report (DPR) (DPR) & bid documents report 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 01/IAMWAR Rehabilitation 1 M/WRO/AG of Irrigation R/WORKS/ II Infrastructures (2008-09)- in Agniyar Sub- Appraisal 30.6.08 16.7.08 30.7. 08 2.09. 08 3.10.08 18.10.08 10.11.08 24.11.08 8.12.08 17.12.08 16.6.10 Basin from west Prior boundary to 928.00 NCB Review Senyakudi

Anicut and its

group of Tanks Revised and Rain fed Tanks in Pudukottai District. Actual

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 02/IAMW Rehabilitation of 2 ARM/WR Irrigation O/AGR/ Infrastructures in WORKS/ Agniyar Sub- II Basin from Appraisal 30.6.08 16.7.08 30.7. 08 5.09. 08 3.10.08 18.10.08 10.11.08 24.11.08 8.12.08 17.12.08 16.6.10 (2008- Andakulam 09) Anicut to Prior Kammankadu 759.00 NCB Review Anicut and its

group of Tanks

and Rainfed

Tanks in Revised Pudukottai District.

Actual 03/IAMW Rehabilitation of 3 ARM/WR Irrigation O/AGR/ Infrastructures in WORKS/ Agniyar Sub- II Basin from Appraisal 30.6.08 16.7.08 30.7. 08 5.09. 08 3.10.08 18.10.08 10.11.08 24.11.08 8.12.08 17.12.08 16.6.10 (2008- Vallipatti vari 09) Anicut I & II and its group of Tanks to Kulathunaickerp Prior 857.00 NCB atti Anicut and its Review

group of Tanks

in Vallipatti vari and Mudhukulam vari Revised and Tanks fed by Pulavankadu Anicut left side channel and Rain fed Tanks of Pudukkottai District Actual

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 04/IAMW Rehabilitation of 4 ARM/WR Irrigation O/ Infrastructures in AGR/WO Agniyar Sub- RKS/ II Basin from 30.6.08 16.7.08 30.7. 08 5.09. 08 3.10.08 18.10.08 10.11.08 24.11.08 8.12.08 17.12.08 16.6.10 (2008- Pulavankadu 09) Anicut and Tanks fed by Right side Appraisal channel to Prior 733.00 NCB Maniyavayal Review

Anicut and its

group of Tanks and in from Revised Nariyar Upper Anicut and its group of Tanks to Nariyar Lower Anicut and its group of Tanks in Pudukkottai District. Actual 05/IAMW Rehabilitation of 5 ARM/WR Irrigation O/ Infrastructures in AGR/WO Agniyar Sub- RKS/ II Basin 30.6.08 NR 18.7.08 19.8.08 19.9.08 NR 7.10.08 17.10.08 NR 28.10.08 27.4.10 Post (2008- Madathikadu, 553.00 NCB Review

09) Yogahaghipuram

and Appraisal NariyarAnicuts and its group of Revised Tanks in Thanjavur District. Actual 06/IAMW Rehabilitation of 6 ARM/WR Irrigation O/AGR/ Infrastructures in WORKS/ Agniyar Sub- 30.6.08 16.7.08 30.7. 08 9.09. 08 3.10.08 18.10.08 10.11.08 24.11.08 8.12.08 17.12.08 16.6.10 Prior II Basin Poovanam 656.00 NCB Review (2008- and Appraisal 09) Thokkalikadu

Anicuts and its Revised group of Tanks in Thanjavur District. Actual

TOTAL 4486.00