APPENDIX F Site-Specific Projects List APPENDIX F Nearshore

F-117 Protect and restore restore and Protect marine water and quality, especially near and commercial industrial areas water Improve quality Increase awareness and support for salmon recovery Integrate salmon recovery priorities into regional and local planning, regulations, and permitting(SMP, etc.) CAO, NPDES, Continue existing and conduct new research, monitoring,adaptive and management keyon issues Wednesday, August 30, 2017 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l Protect and restore forest cover and headwater areas Provide adequate flow Restore sediment processes necessary stages life key for Restore natural marine shoreline Reconnect backshore areas and pocket estuaries Page 1 of 17 of 1 Page Puget Sound Nearshore Sound Puget Protect and water cold restore sources and reduce to barriers thermal migration Improve juvenile adultand survival Locks Ballard the at Reduce predation on juvenile migrants and lake- rearing fry (or Remove reduce impacts of) overwater structures Remove fish passage barriers WRIA 8 Salmon Habitat Project List List Project Habitat 8 Salmon WRIA Protect and restore floodplain connectivity Protect and restore functional riparian vegetation Protect and restore channel complexity Restore shallow water rearing and refuge habitat Reconnect and enhance creek mouths Lake /Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

APPLICABLE STRATEGIES LEGEND: STRATEGIES APPLICABLE APPENDIX F Site-Specific Projects List APPENDIX F Puget Sound Nearshore

F-118 Applicable Strategies Applicable Strategies Nearshore Creek Mouths Creek 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and Both King County and Snohomish Snohomish and County King Both for locations identified have County a are Designs nourishment. beach phase. future Lots of drainage/slope stability Site the drainage. in problems exist sediment of bit a quite receives from the creek butdeposition could of the installation be with improved barriers passage fish Two trestle. a been have park the from upstream identified.

Page 2 of 17 of 2 Page Description Description Nearshore feasibility assessment to identify to identify assessment Nearshore feasibility and locations nourishment beach potential for designs nourishment beach develop implementation. restoration under culvert the the existing of Replacement and to restore connectivity trestle a with railroad improve from the uplands. uplands. the from transport sediment improve passage. fish benefit also may Project Total Total PS-1 PS-2 Nearshore Project Location Project Location Project Snohomish County Snohomish Restoration Restoration Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

Picnic PointCulvert Replacement No No Project Project Number Number Feeder BluffRestoration Feasibility Study Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List Creek Mouths Creek APPENDIX F Puget Sound Nearshore

F-119 Structures Applicable Strategies Backshore Applicable Strategies Overwater Overwater 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and

the Page 3 of 17 of 3 Page Description Description buildings/wharfs representing approx. 1.7 acres of of acres 1.7 approx. representing buildings/wharfs structures. over-water Enhance non-natal rearing habitat by removing a a removing by habitat rearing non-natal Enhance embankment railroad hard-armored the of portion Creek. Gulch Lund’s for culvert undersized the and one acre create nearly bridge, multi-span a Install marina dilapidated the remove and Acquire with acres, 2.17 of total a is structure. site The of tidal marsh pocket estuary and stream- marsh pocket estuary tidal of acre one approx. restore and , connected along buffers riparian and stream nearshore of 1050 ft. of shoreline. The bridge opening will process. natural and delivery sediment improve Total Total PS-3 PS-4 Project Location Project Location Project Snohomish County Snohomish County Snohomish Removal Restoration Restoration Shoreline Restoration Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No Yes Meadowdale Marina Acquisition and Meadowdale Beach ParkEstuary and Project Project Number Number Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List APPENDIX F Puget Sound Nearshore

F-120 Applicable Strategies Applicable Strategies Nearshore Creek Mouths Creek 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and Page 4 of 17 of 4 Page Description Description Conduct beach nourishment activities at the at Conduct beach nourishment activities Park. near Creek Yost mouth Shell of Creek whereculvert Shell Replace the existing to restore trestle a with the railroad crosses transport. sediment improve and connectivity Total Total PS-5 PS-6 Project Location Project Location Project Snohomish County Snohomish County Snohomish Restoration Restoration Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l Shell Creek BeachNourishment Shell Creek Culvert Replacement

No No Project Project Number Number Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List APPENDIX F Puget Sound Nearshore

F-121 Riparian Applicable Strategies Applicable Strategies Backshore Vegetation 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and Surf smelt and lance spawning spawning lance sand and smelt Surf along documented been has Beach and Brackett’s Olympic two- southwestern The Landing. modified Beach is Olympic of thirds Edmonds of City The wall. sea a by the of feet but 100 all owns about and area this in tidelands upland adjoining the of two-thirds area; public used Heavily property. feasibility is likely low. Page 5 of 17 of 5 Page Description Description Riparian vegetation enhancement at Brackett’s enhancement Brackett’s at vegetation Riparian Landing including addition of low-growing trees. to the problem just species invasive an There is marine the enhance Further site. the of north to plants native adding by vegetation riparian non-native removing and areas backshore existing invasive plants. Edmonds of downstream Creek Willow Daylight Marsh to create open an connection channel fish allow and marsh and Sound the between the rearing. marsh into for access Total Total PS-7 PS-8 Edmonds Edmonds Project Location Project Location Project Restoration Restoration Enhancement Estimated Project Costs Project Estimated Costs Project Estimated Willow Creek Daylighting Creek Willow Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No Yes Brackett’sLanding Park Vegetation Project Project Number Number Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List Backshore APPENDIX F Puget Sound Nearshore

F-122 Applicable Strategies Backshore Applicable Strategies Creek Mouths Creek 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and Potential fresh water seepage into into seepage water fresh Potential good for make could lagoon should Site habitat. water shallow is little as further, be investigated known. currently tidal small several hosts Site that tracks upstream of lagoons Significant improved. be could basin. in area forested of amount fish too for steep creek is Deer passage. . he Page 6 of 17 of 6 Page Description Description Potential culvert improvement inter- an project at culvert Potential built was railroad where flat mud and lagoon tidal Park Edwards Point south of just is Site offshore. and Creek the Deer of the connectivity Enhance nearshore the with estuarine associated an with the two concrete culverts replacing by t in Include bridge. or trestle a culvert oversized project an assessment of the tidal lagoon just just lagoon the tidal of project an assessment north the creek of mouth and whether the lagoon be can enhanced. itself connection or lagoon Total Total PS-9 PS-10 Woodway Woodway Project Location Project Location Project Restoration Restoration Replacement Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l Woodway Tidal Lagoon North

Deer Deer Creek Restoration or Culvert No No Project Project Number Number Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List Backshore APPENDIX F Puget Sound Nearshore

F-123 Riparian Applicable Strategies Applicable Strategies Nearshore Vegetation 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and Page 7 of 17 of 7 Page Description Description Restore the entire Point Wells site by completely completely by site Wells Restore the Point entire fill. and dike, riprap wall, sea the removing freshwater and reconnect the site local Regrade an with system lagoon tidal a to sources re-create the north at was which opening end the point, of lagoon tidal the of mouth original the probably backshore and riparian native Reestablish system. vegetation. in on coordinated a basis species invasive Control planting implement and habitats shoreline priority treated areas. in species native with Total Total PS-11 PS-12 Nearshore Project Location Project Location Project Snohomish County Snohomish Restoration Restoration Estimated Project Costs Project Estimated Costs Project Estimated Invasive Species Control Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No Yes Point Wells Complete Site Restoration Site Complete Wells Point Project Project Number Number Migratory Area Riparian Restorationand Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List Backshore APPENDIX F Puget Sound Nearshore

F-124 Riparian Applicable Strategies Applicable Strategies Nearshore Vegetation 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and e Page 8 of 17 of 8 Page Description Description Enhance the south shoreline by removing riprap riprap removing by shoreline south the Enhance dike, eliminating invasive plants, and backshore and riparian native reestablishing three acre re-creating Evaluate vegetation. been historic have may that lagoon intertidal marsh before being filled. 1 (~ small very and a protection of Acquisition habitat riparian marine of piece remnant acre) th Despite Wells. on Point the north of side exists be would a it site, Wells to the Point proximity to protect 850 piece and Approx. restore. valuable ft of shoreline. Total Total PS-13 PS-14 Project Location Project Location Project Snohomish County Snohomish County Snohomish Restoration Restoration Restoration Restoration Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No No Project Project Number Number SouthPoint Wells Habitat Acquisition and Four-Year Four-Year Point Wells North Habitat Acquisition and and Acquisition Habitat North Wells Point Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List APPENDIX F Puget Sound Nearshore

F-125 Applicable Strategies Applicable Strategies Backshore Nearshore 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and Is at least partially fish passable and passable fish partially least at Is characteristics. wetland has already

Page 9 of 17 of 9 Page Description Description Acquisition, demolition, and restoration of of restoration and demolition, Acquisition, are that homes (30+) numerous where shoreline Beach Richmond of north nearshore the in built park. the on habitat wetland influenced tidally Enhance at Tracks Railroad Northern Burlington of side east Barnacle Creek. Evaluate whetherBarnacle better Creek. Evaluate be would replacement culvert through connection beneficial. Total Total PS-15 PS-16 Shoreline Shoreline Project Location Project Location Project Restoration Restoration and Restoration Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No No Barnacle Creek Wetland Enhancement Project Project Number Number Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? Richmond Beach North Property Acquisition APPENDIX F Site-Specific Projects List APPENDIX F Puget Sound Nearshore

F-126 Applicable Strategies Applicable Strategies Backshore Creek Mouths Creek 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and Proximity to Salmon Bay makes this this makes Bay to Salmon Proximity site potentially valuable for restoration. Page 10 of 17 of 10 Page Description Description Replace the existing culvert under culvert the railroad the existing Replace and improve to restore connectivity trestle a with passage upstream Evaluate transport. sediment improve would that ways in address and problems Chinook access. juvenile Golden at pocket estuary of creation Explore The access. can fish juvenile that Park Gardens area wetland perched a has park the of end north be could that land flat of deal great a has that complex. wetland converted more to a substantial North to allow end the park be could of modified to the wetland. access fish Total Total PS-17 PS-18 Seattle Project Location Project Location Project Study Restoration Restoration Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

Pipers Creek Culvert Replacement No No Project Project Number Number Four-Year Four-Year Four-Year Golden GardensPocket EstuaryFeasibility Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List Creek Mouths Creek APPENDIX F Puget Sound Nearshore

F-127 Applicable Strategies Applicable Strategies Nearshore Nearshore 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and

Page 11 of 17 of 11 Page Description Description Increase rearing/refuge habitat for juveniles by by juveniles for habitat rearing/refuge Increase is which site, this at the conditions restoring Natural Bay the downstream Salmon of located Alternative bridge. the railroad of west just Area bank be protection would used to measures create and riparian addition, In slope. gradual more a and the be could planted, emergent vegetation nearshore restore to amended be could substrate of ft. 70 approximately includes Site habitat. shoreline. at restoration habitat of feasibility Explore immediately located Park, Commodore on Chittenden Locks M. thedownstream Hiram of the be projectthe Purpose would of to south bank. rearing/refuge high-quality limited the increase area. through this migrate that smolts for habitat restored and removed be should seawall Armored be could Project slope. vegetated gentler, to a to Creek create a Wolfe daylighting combined with the downstream Locks. of pocket estuary Total Total PS-19 PS-20 Seattle Seattle Project Location Project Location Project Restoration Restoration Restoration Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No No Commodore Park and Wolfe Creek Project Project 36th Ave. NW Street End on Salmon Bay Salmon on End Ave. Street NW 36th Number Number Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List Nearshore APPENDIX F Puget Sound Nearshore

F-128 Applicable Strategies Backshore Applicable Strategies Creek Mouths Creek 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and Site is currently not tidally not currently tidally is Site engineered heavily A influenced. to required be would solution is but it such estuary, an maintain opportunities theone few of available.

to Page 12 of 17 of 12 Page Description Description provide juvenile rearing habitat in the nearshore. the in habitat rearing juvenile provide Explore creation of pocket estuary at West Point. Point. West at pocket estuary of creation Explore marsh salt some form of used to area have This Currently access. fish allowed to appears that have between wetland perched long, skinny, a is there possibility Explore facility. the and bulkhead the the barrier mouth at Remove Scheuerman of enhanceCreek, creek mouth, remove shoreline to vegetation riparian native restore and armoring, expand the length of this wetland (towards the (towards wetland this of expand the length permanent a with up come and lighthouse) engineering solution to allow fish access. Total Total PS-21 PS-22 Seattle Seattle Project Location Project Location Project Restoration Restoration Shoreline Restoration Estimated Project Costs Project Estimated Costs Project Estimated West Point Pocket Estuary Pocket Point West Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No Yes Project Project Scheuerman Creek Riparian and Marine Number Number Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List Nearshore APPENDIX F Puget Sound Nearshore

F-129 Riparian Applicable Strategies Applicable Strategies Vegetation Creek Mouths Creek 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and Allowing sediment to move through to move sediment Allowing and the easiest is the system beach to get way cheapest nearshore, the along nourishment creek’s this restoring thereby not is It mouth habitats. and delta passage to remove fish necessary creek the of upstream barriers mouth sediment greater to enable since nearshore, the to transport trap not do barriers those passage and fish Habitat sediment. ~ the lower in are good conditions but the Creek, Boeing of feet 1000 right the railroad of crossing culvert Page 13 of 17 of 13 Page Description Description Implement nearshore riparian revegetation on on revegetation riparian nearshore Implement Draft 2011 Mukilteo’s in identified sites priority Plan. Shoreline to mouth Creek Boeing and delta, of Restoration Dam Lake Hidden of occur concert removal in with will that improvements upstream other and downstream sediment increased facilitate will removal dam upstream Proposed transport. Boeing to benefits nourishment sediment provide to possibility Explore mouthCreek and delta. to enhance railroad at culvert remove existing process. nearshore Total Total PS-23 PS-24 Mukilteo Shoreline Project Location Project Location Project Restoration Restoration Enhancement Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No No City of Mukilteo’s RiparianVegetation Project Project Number Number Four-Year Four-Year Four-Year Boeing Creek and Mouth Delta Restoration Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List APPENDIX F Puget Sound Nearshore

F-130 Applicable Strategies Applicable Strategies Nearshore Nearshore 2017 l 10-YEAR UPDATE UPDATE 10-YEAR other Considerations other Considerations l Opportunities, Constraints, and Opportunities, Constraints, and Currently 12 houses in the the in houses 12 Currently but area, project proposed no has parcel southernmost structure. Page 14 of 17 of 14 Page Description Description e futur potential for sites project to assess SPU-led of segment Shilshole along restoration shoreline shoreline. of all for property rights simple the fee Purchase and sea fill, and remove the houses, the parcels wall. Total Total PS-25 PS-26 Seattle Mukilteo Project Location Project Location Project Restoration Assessment Restoration Restoration Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No No Shilshole Bay Shoreline Restoration Naketa Beach Home Acquisition and Project Project Number Number Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List Backshore APPENDIX F Puget Sound Nearshore

F-131 Riparian Applicable Strategies Applicable Strategies Vegetation Creek Mouths Creek 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and e Page 15 of 17 of 15 Page Description Description Acquire tidelands and shoreline habitat for for habitat shoreline and tidelands Acquire purposes. protection and property private remaining last the Purchase the at estuary saltwater historic re-construct a undersized the Replace Creek. Gulch Big of mouth to restor trestle a under with culvert the railroad sediment and improve connectivity system instream Restore nearshore. the into transport habitat. riparian and Total Total PS-27 PS-28 Mukilteo Mukilteo Project Location Project Location Project Restoration Acquisitions Restoration Restoration Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No No Big Gulch Culvert Replacement and Project Project City of Mukilteo TidelandShoreline and Number Number Four-Year Four-Year Four-Year Acquisition Acquisition Work Plan? Work Plan? APPENDIX F Site-Specific Projects List APPENDIX F Puget Sound Nearshore

F-132 Riparian Applicable Strategies Applicable Strategies Nearshore Vegetation 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations other Considerations Opportunities, Constraints, and Opportunities, Constraints, and Site holds high potential for marine marine for potential high holds Site vegetation riparian mid- A restoration/enhancement. supports area backshore sized vegetation riparian marine some potential be to appears there and additional with enhancement for native planting. t Page 16 of 17 of 16 Page Description Description the site by purchasing the fee simple property property simple fee the purchasing by site the easement. or conservation some form of rights Work with the property with Work owners to enhance the would This the site. at vegetation riparian marine forage the potential amount for shade increase of zone. intertidal upper the in spawning fish restoration shoreline of ft. 1000 Approximately potential. shipyard former of restoration and Acquisition shoreline of ft. 1000 Approximately site. to protec be possible may It potential. restoration Total Total PS-29 PS-30 Project Location Project Location Project Snohomish County Snohomish County Snohomish Restoration Restoration Restoration Estimated Project Costs Project Estimated Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No No Project Project Shipwreck / Hulk Creek Acquisition and Number Number Four-Year Four-Year Four-Year Acquisition Acquisition Shipwreck/Hulk Creek Riparian Restoration Work Plan? Work Plan? APPENDIX F Site-Specific Projects List APPENDIX F Puget Sound Nearshore

F-133 Riparian Applicable Strategies Vegetation 2017 l 10-YEAR UPDATE UPDATE 10-YEAR l other Considerations Opportunities, Constraints, and

Page 17 of 17 of 17 Page Description to address flooding, , and fish passage passage fish and erosion, flooding, address to of ft 1200 approx. addresses Project problems. shoreline. Marine riparian enhancement, creosote log log creosote enhancement, riparian Marine interpretive nearshore of installation removal, signage, and feasibility and design of alternatives Total PS-31 Project Location Project Snohomish County Snohomish Restoration Estimated Project Costs Project Estimated Lake Washington/Cedar/Sammamish Watershed (WRIA 8) Chinook Salmon Conservation Plan Watershed Washington/Cedar/Sammamish Lake l

No Picnic Point Riparian Enhancement Project Number Four-Year Four-Year Acquisition Work Plan?