SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 1

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

1 The Construction & Completion Of Proposed 90 Units UDA Sea Park Dev. S/B Seniwisma S & O 4,993,136.99 07 Nov, 81 17 May , 82 Double Storey Link House, (Parcel C) At Taman, Tun No.2 Lorong Rahim Planner Akitek Dr. Ismail, Phase 3C, Kuala Lumpur. Kajai 14, Taman Tun Dr. 10, Jalan Manau, Off Jln Ismail, Damansara K.L Kg. Atap, Kuala Lumpur

2 The Construction & Complettion Of Proposed 104 Units - Ditto - MAA Sdn. Bhd. 6,773,959.42 21 Aug, 81 0 4 Apr, 83 Double Storey Link Houses (Parcel C) At Tmn. Tun Dr. Tingkat 15, Bangunan Dr. Ismail, Phase 3D, Kuala Lumpur Ming, Jln Bukit Nanas Kuala Lumpur

3 The Construction & Completion Of Proposed 28 Units 3 - Ditto - Gerak Reka Akitek Sdn. 4,690,269.46 21 May, 82 23 Aug, 83 Storey Shop / Offices (Parcel B), At Taman Tun Dr. Ismail 9A, Jalan Telawi 3 Phase 3E, Kuala Lumpur. Bangsar Baru, K.Lumpur

4 The Erection & Completion Of Proposed 3 storey Bank / - Ditto - MAA Sdn. Bhd. 853,685.43 20 Sept, 82 08 March, 84 Offices on Lot 30446-30448 Jln Burhanuddin Helmi (23) Tingkat 15, Bangunan Phase 2, Taman Tun Dr. Ismail, K. Lumpur Ming, Jln Bukit Nanas Kuala Lumpur

5 The Construction & Completion Of Proposed Reinforced - Ditto - Sigoh Sin Sdn. Bhd. 365,298.25 19 Oct, 83 21 March, 84 Concrete Retaining Wall & Ancillary Works Along Road No. No.11 Tingkat 4-6 99/RD No.1 At Taman Tun Dr Ismail Phase 4, K.Lumpur Jalan Cheng Lock Kuala Lumpur.

6 Proposed Construction & Completion of 83 Units Double UDA A.Karim Arkitek 4,084,674.91 06 Nov, 82 11 July, 84 Storey Terrace House on Part of Lot 3356, Fasa 1B, BB Plaza, Lot 111 Tkt 2, Bangunan Bandar Tampoi, Johor Bahru. Jalan Bukit Bintang Tabung Haji, Johor Bahru Peti Surat 10080 Kuala Lumpur

7 Construction & Completion of `Reinforced Conc. Pedestrian UDA Bep & MAA 1,166,306.16 01 Oct, 83 09 July, 84 Mall Including Demolition Of Existing Building' at Carrpark BB Plaza, Lot 111 Tingkat 1, Bangunan Behind JKR Building No. 26, Jalan Hishamuddin K.Lumpur Jalan Bukit Bintang JKR 26, Jalan Sultan Contract No. 408/84 Peti Surat 10080 Salahuddin, K. Lumpur Kuala Lumpur New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 2

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

8 Proposed Construction & Completion 58 Unit Double Negara Properties S/B Daya Bina Arkitek (M) 3,122,990.10 01 Oct, 83 09 July , 84 Storey Link Houses (Phase VII) on Lot 1519, Di Taman 1 & 2, Jalan Bandar 2 Sdn, 58A Kompleks Melawati, Ulu , Darul Ehsan , Damai, Jalan Lumut, Off Setapak, Kuala Lumpur. Jalan Pekeliling, K.Lumpur

9 Construction & Completion Of Roads, Drains & Perbadanan Kemajuan Perbadanan Kemajuan 1,154,454.10 15 Apr, 84 20 May, 85 Culverts For Tg Agas Industrial Estate, Muar Ekonomi Negeri Johor Ekonomi Negeri Johor Johor Bahru Peti Surat 907, J.Bahru Tingkat 9, Kompleks Tun Abdul Razak, Jalan Wong Ah Fook, Johor Bahru.

10 Proposed Construction 13 Units Double Storey Shop House PKENJ, Tingkat 9 A.Karim Arkitek, Tingkat 2 930,522.00 18 Apr, 84 17 July, 86 on Lot 18898 Hingga PTD 118910, Batu 5 1/4 Kompleks Tun Abdul Bangunan Tabung Haji Jalan Skudai, Johor Bahru Darul Takzim. Razak, Jalan Wong Ah Johor Bahru. Fook, Johor Bahru

11 The Construction And Completion Of Proposed UDA Sea Park Dev. S/B Sigoh Din Sdn. Bhd. 1,568,520.17 09 Feb, 84 09 Jan, 85 Drainage Works & Ancillary Works In Sub- Sections No.2, Lorong Rahim No.11 Tingkat 4-6 4B-1, 4B-2, 4C-South & 4C-West At Taman Tun Dr. Kajai 14, Taman Tun Jalan Cheng Lock Ismail, Phase 4, Kuala Lumpur Dr. Ismail, K.Lumpur Kuala Lumpur

12 Construction & Completion 106 Units Terrace House Type Jabatan Ketua Seri Jabatan Perumahan 1,276,638.00 01 Jul, 84 21 May. 85 D1/3/10A & D13/10AS Di Simpang Empat, Alor Gajah Negeri, Jalan Hang Negara, 46, Jalan Dungun Melaka. (Projek No. 4/392) Tuah, Melaka Damansara Height, Kuala Lumpur.

13 Construction & Completion 106 Terrace House Type Jabatan Ketua Seri Jabatan Perumahan 1,150,620.80 15 May, 85 15 March, 87 D1/3/10A Di Pulau Gadong 11, Melaka (Projek No. Negeri, Jalan Hang Negara, 46, Jalan Dungun 4/392). Tuah, Melaka Damansara Height, K.L.

14 Construction & Completion 8 Block Family House Class Pengarah Cawangan Jurutera Daerah 9,354,609.99 22 Dec, 90 22 Dec, 92 `G' Di Kem Batu 3, Keluang Johor Darul Takzim Kerja, Ibu Pejabat JKR JKR Kluang JKR/IP/T/183/90. Jalan Sultan Salahud- Johor ` din Kuala Lumpur New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 3

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

15 The Proposed 1 Block Of 4 Storey Flats (16 Units) & 7 Ban Lee Sdn. Bhd. Arkitek MAA Sdn. Bhd. 1,712,970.02 29 Apr, 85 15 July , 87 Units Bungalow On Lot 847 Off Jalan Klang Lama, Bangunan Ming 15.01 Kuala Lumpur Damansara Height Kuala Lumpur

16 Construction & Completion Sek. Keb. Subang, Kg. JKR Selangor Shah Pejabat Jurutera Daerah, 1,260,670.00 12 June, 86 14 Apr, 87 Melayu, Sek. Ren. Keb. , Sek. Keb. Sea Alam JKR Petaling, Kompleks Park , Sek. Ren. Jenis Keb. (C) Daman- PKNS, Tingkat 2, Shah sara Selangor Darul Ehsan. (No. JKR/PER/SEL/203/86) Alam, Selangor .

17 Site Clearing & Construction & Completion Of Perbadanan Pembangu- Raja Dzulkifli Tun UDA 4,584,276.45 16 July, 85 15 March, 86 Earthworks, Roads, Drains & Ancillary Works For nan Bandar, Lot 111, Sdn. Bhd., Tingkat 3 Dev. Of Bandar Baru Tampoi, Phase 2 & 3A, Johor Menara Plaza Bt. Bintang Bt. Bintang Plaza, Jln Bahru . Jln Bt. Bintang , K.L Bt. Bintang, K.L

18 Construction of 223 Terrace House Type D1/3/7 (M) Pejabat Setiausaha Jabatan Perumahan Negara 2,677,613.00 15 Sept , 85 14 Oct , 87 and D1/3/7S(M) Dan Kolam Pengkongsian Di Batu Kerajaan (Cawangan 46 Jalan Dungun Anam, Segamat, Johor Darul Takzim (Projek No. 4/366) Perumahan) Negeri Bukit Damansara Johor Kuala Lumpur

19 Construction of 192 Units Terrace House at Renggam III Jabatan Perumahan Jabatan Perumahan Negara 2,358,801.00 01 Jul, 85 31 May. 88 Kluang, Johor Darul Takzim (Projek No. 4/366) . Negara, Wilayah Selatan 46 Jalan Dungun Jalan Wong Ah Fook Bukit Damansara 80000 Johor Bahru. Kuala Lumpur

20 Construction, Repair & Completion of abandon Wor ks Perbadanan Kemajuan Perbadanan Kemajuan 1,364,060.00 01 Aug 87 08 Aug 1988 for 200 Units Folk Houses at Pengkalan Durian Mukim Negeri, Negeri Sembilan Negeri Sembilan, Bahagian Linggi, Port Dickson, Negeri Sembilan. Peti Surat 158, Seremban Teknik, Seremban, Negeri Sembilan Darul Khusus

21 Proposed Design, Construction & Completion Hatchery Syarikat Ayam Negeri Perbadanan Kemajuan 528,570.00 24 Feb, 88 06 Nov 88 Houses Including Related Works At Simpang Pertang Sembilan, Pengurus Negeri Sembilan, Bahagian Jelebu, Negeri Sembilan . Besar, P.O. Box 143, Teknik, Seremban, Negeri 70710 Seremban Sembilan Darul Khusus

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 4 New Update : 12 June 2009

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

22 Design, Supply & Completion of 60,000 Gelen F-Panel/FFC/ Perbadanan Kemajuan Perbadanan Kemajuan 452,323.60 01 Feb 88 17 July 88 Permaglass, Pump Houses and Reti culation Works at Folk Negeri Sembilan, Peti Negeri Sembilan, Peti House Plan, Pengkalan Durian, Linggi, Port Dickson, Surat 158, Seremban Surat 158, Seremban, ` Negeri Sembilan Darul Khusus. Negeri Sembilan Darul Negeri Sembilan Darul Khusus. Khusus.

23 Proposed Brickworks, Plastering & Related Works For Mahaniaga Sdn. Bhd. 1) Daya Bina Arkitek (M) 1,150,000.00 09 Jan, 89 06 Jan , 90 200 Units Of Low Cost Flats In Phase 3C & 3D, Taman Tingkat 12, Bangunan Sdn. Bhd. K.Lumpur , Alam Megah, , Selangor Darul Ehsan. Hong Leong, K.Lumpur . Kompleks Damai 2) Arkitek Jururancang (M) Sdn. Bhd. K.Lumpur

24 Infrastructure Works For The Academic Core Univeristy University Teknologi 1) Elmec Consultants 3,589,403.10 31 Jul 89 15 March 90 Technology Main Campus, Skudai, Johor Malaysia, Karung Const. S/B K.Lumpur Baru Darul Takzim. Berkunci 791, 80990 2) Wan Mohd & Khoo P.J Johor Bahru

25 Construction & Completion Engineering Landscaping University Teknologi University Teknologi 74,216.00 07 Oct 89 08 Dec 89 Works at `Academic Core', UTM Skudai, Johor Bahru Malaysia, Karung Malaysia, Karung Fasa (1) Berkunci 791, 80990 J.Bahru Berkunci 791, 80990 Johor Bahru 26 Construction And Completion Of Six (6) Units Model Shah Alam Properties AB Kamal Akitek Asst. 370,091.75 17 May, 90 16 Dec, 91 Houses At Phase 1D-1, Bandar Baru . Sdn. Bhd. 14A & 15A, Jalan H3 26-32, Jalan 3/5, Bandar Taman Melawati , Setapak Baru Selayang, Gombak, 53100 K.Lumpur Selangor Darul Ehsan.

27 Construction And Completion Of 192 Units Low Cost Shah Alam Properties AB Kamal Akitek Asst. 3,831,903.79 02 Aug, 90 28 Apr. 92 Apartment At Phase 1D-8, Bandar Baru Selayang. Sdn. Bhd. 14A & 15A, Jalan H3 26-32, Jalan 3/5, Bandar Taman Melawati , Setapak Baru Selayang, Gombak, 53100 K.Lumpur Selangor Darul Ehsan.

28 Proposed Construct & Complete 6 Floors Kastam Office Jabatan Kerja Raya M'sia En. Lee Yook Tong 5,166,891.26 07 Dec, 89 14 July, 92 6 Floors Building at , Kuantan, Pahang D arul Makmur. Ibu Pejabat JKR M'sia Jurutera Daerah Kuantan, Jln S'ltan Salahuddin K.L Pahang. New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 5

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

29 Proposed Construction & Completion 71 Units Double Shah Alam Properties AB Kamal Akitek Ass. 4,538,154.25 17 Jan, 91 1 Dec, 92 Storey HOuses, House scheme Phase 1D -4, Bandar Baru Sdn. Bhd. 26-32, Jalan 3/5 14A & 15A, Jalan H3 Selayang Daerah Gombak, Selangor Darul Ehsan. Bandar Baru Selayang Taman Melawati ` Gombak, K.Lumpur . Setapak, 53100 K.L

30 PPP/ARCH/10/90 Perbadanan Pembangu- Perbadanan Pembangu- 2,412,000.00 25 Feb, 91 24 Feb, 92 Proposed Construction & Completion 133 Units Double nan Bandar P.Pinang nan Bandar P.Pinang Storey Clauster Houses at Sungai Nibong Daerah Timur Jalan Sultan Azlan Shah C331+C388+C370 Jalan Sultan Azlan Shah Laut, Pulau Pinang. Bandar Bayan Baru Bandar Bayan Baru 11909 P.Pinang 11909 P.Pinang

31 B23/91 Dewan Bandaraya K.L En. Aziz B. Darmawi 10,143,863.97 08 Jan, 91 28 Sept, 92 Proposed Construction & Completion 2 Block 17 Floor Jalan Tun Razak Jabatan Akitek & Projek Low Cost Flat on Lot 841 Sentul Utara, Kuala Lumpur 80400 Kuala Lumpur Khas DBKL, Jalan Tun Razak, Kuala Lumpur.

32 Construction & Completion Furniture Complex (Integrated) Perbadanan Kemajuan Ir. Chew Tuek Peng, Bhg. 8,686,338.00 25 Feb, 91 30 Nov, 92 Consist of 8 Units Module A and 19 Units Module B at Olak Negeri Selangor (PKNS) Penyelarasan Projek PKNS Lempit Di Sebahagian Lot 2568, Mukim Tg Dua Belas Persiaran Barat, Off Jln Bandar Baru Suleiman Daerah Kuala Langat. Barat, 46505 Petaling Pelabuhan Klang, Jaya, Selangor. Selangor

33 B 50/92 Dewan Bandaraya K.L Jabatan Arkitek Dan Projek 2,062,910.00 27 Dec, 91 29 Oct, 92 Proposed Construction Works to Long House Project at Jabatan Arkitek Dan Khas DBKL, Jalan Tun Lot 4643, Jinjang Utara, K.Lumpur. Projek Khas, Jalan Razak, 50400 K.Lumpur Tun Razak, 50400 K.Lumpur

34 KU/24/1992 Perbadanan Pembangu- Kumpulan Senireka Sdn. 14,692,758.34 02 Apr, 92 25 Feb. 93 Proposed Construction of 6 Floor Department Store nan Bandar (UDA), BB Bhd. Tingkat 15, Resource Building With 3 Floor Carpark Basement at Lot PT 1, Plaza, Lot 111, Jalan House, No, 10, Jalan Raja Seksyen 24, Jalan Tun H.S Lee, Bandar aya K.Lumpur Bukit Bintang, Peti Laut, Kuala Lumpur. Surat 10080, K.L

35 Constructuin & Completion Septik `Imhoff' & Supply, Pengarah Kerjaraya Jurutera Daerah JKR 185,000.00 17 Feb, 92 20 Dec, 92 Commissioning & Testing Septic Pump System for Septic Johor, Aras 3, Bangunan Kluang, Johor Darul Tank `Imhoff'. S'tan Ibrahim, 80250 J.Bahru Takzim. New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 6

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

36 PPP/Arch 10/90 Perbadanan Pembangu- Perbadanan Pembangunan 5,428,010.00 18 Feb, 91 30 July, 93 Construction & Completion 130 Unit 2 Storey Terrace nan P.Pinang, P.Pinang, Jalan Sultan House at Bukit Gedong, DBD, Pulau Pinang. No.1, Jln Sg. Nibong Azlan Shah, Bandar Bayan Bandar Bayan Baru Baru, 11909 P.Pianng. 11909 Bayan Lepas, Pulau Pinang.

37 Proposed 3 Storey Examination Hall at Lembah Pantai Universiti Malaya KPA Partnership Akitek 9,488,147.74 04 May, 93 28 Feb, 94 Kuala Lumpur Lembah Pantai 50450 Kuala Lumpur. 59100 Kuala Lumpur

38 Proposed Development of Part Lot 3356 (Phase 15) Syarikat Bandar Baru Perunding Delima Sdn. Bhd. 8,560,909.70 07 Dec, 92 05 Dec, 94 Bandar Baru UDA, Tampoi, Johor Bahru, Johor Uda Sdn. Bhd. 27A, Lorong Rahim Kajai Darul Takzim (Earthwork & Surface Water Drainage, No. 2, 4 & 6, Jln Sekoi 13, Taman Tun Dr. Ismail Water Reticulation & Storage Tank, Roads (Bridges) Bandar Baru UDA, Bt 60000 Kuala Lumpur & Drainage & Sewerage Works) . 4 1/2, Jln Skudai, 81200 Johor Bahru.

39 The Execution And Completion Of Earthworks, Bistari Corp. Sdn. Bhd. Akitek Teknikarya 5,038,069.00 03 Feb, 94 19 May, 94 Foundation Piling & Substructure Works To Proposed Suite 1811, 18th Floor No. 26, Jln Pahang Barat, Condominiums (Phase II) On Lots 95, 96, 97, 471 And IGB Plaza, 6 Jalan Off Jalan Pahang, 53000 Part Of Lot 230, Section 46, Jalan Putra, Kuala Lumpur Kampar, 50400 K.L Kuala Lumpur For Bistari Corporation Sdn. Bhd.

40 KL International Airport Enabling Works. Contract E2B KL International Airport AJAC Sdn Bhd. 6,082,338.60 22 Oct, 93 31 July, 94 Site Link Road West. Contract No: KLIA D/E/E2B/004/93 Berhad, Tingkat 11 & 12 Floor 6B, Wisma Semantan Wisma Semantan, 12, 12, Jalan Gelanggang, Jalan Gelanggang, BT. Bukit Damansara, 5490 Damansara, 50490 K.L. Kuala Lumpur.

41 Proposed Construction & Completion Resesrch Complex Jabatan Perikanan M'sia Perunding Alam Bina / 15,018,102.23 9 Jan, 93 28 May, 94 on Part of Lot 1236 Lot 1070 & HS ( M) 2 Mukim 12, Daerah Ibu Pejabat Perikanan Perunding Bersatu, Barat Daya, Pulau Pinang. Tingkat 8 & 9, Wisma Tani Struktur & Awam), Raja Jln Sultan Salahuddin Tani Sri Zainal Dan Pang 50582 Kuala Lumpur. Sdn. Bhd. New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 7

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

42 Construction & Completion 115 Rooms Budget Hotel & 4 Perbadanan Kemajuan Unit Akitek PKNS 6,100,047.02 28 June, 93 29 May, 94 Units 3 Storey Shop / Office at Pusat Daerah Seksyen 19, Negeri Selangor Persiaran Barat, Off Jalan Shah Alam, Selangor Darul Ehsan Persiaran Barat, Off Jln Barat, 46050 Petaling Jaya Barat, 46050 P.J, Selangor Selangor Darul Ehsan.

43 Construction & Completion 98 UNits Apartment on Lot Majlis Perbandaran Omarsham Akitek 8,383,836.84 18 June, 93 18 Aug, 94 546-553, Jalan Templer, Petaling Jaya Selangor D E Petaling Jaya, Jalan Yong 3, Jalan SS 5B/6 Shook Lin, 46675 , 47301 Petaling Jaya, Selangor Petaling Jaya, Selangor.

44 Proposed 7 Floors Office Building Consist of Bank at Level Malayan Banking Berhad Kumpulan Senireka Sdn. 16,558,509.40 1 July, 93 19 Oct, 94 1, 5 Floors Office Space at 12-6 Floors, 1 Floor Roof Property Management De- Bhd. Tingkat 13, Wisma (for M&E) and 2 Storey Carpark Basement at Sub-Percint partment, 16th Floor, Menara Bumi, No.10, Jalan Raja 2-3, Persiaran Perbandaran. Maybank, 100 Jalan Tun Laut, 50350 Kuala Lumpur. Razak, 50050 Kuala Lumpur.

45 Proposed Construction of 2 Storey Terrace House Syarikat Bandar Baru UDA Raja Dzulkifli Tun UDA 5,141,358.50 15 July, 93 29 July, 94 (Phase 7A) on Part of Lot 3355 and 17 F loors 2 1/2 Sdn. Bhd. No. 2, 4 & 6, Jl n Bersekutu, 7M, Jalan SS Storey Terrace House (Phase 7B) on Lot PTB No. 15899- Sekoi, Bandar Baru UDA 21/56B, , 15915 Di Bandar Baru UDA Johor Bahru, Johor D. Takzim Bt. 4 1/2, Jalan Skudai, 47400 Petaling Jaya, 81200 Johor Bahru, Selangor Darul Ehsan. Johor Darul Takzim.

46 Piling & Pilecaps For Proposed Phase 2, 3 Block MBF Construction Sdn. Pakatan Reka Akitek 2,200,238.48 25 June, 94 24 Oct, 94 Apartment No. 4 Consist of 410 Units Apartment, 1 Block of Bhd. 6th Floor, Bena Towers 39A, Jalan Dato' Haja Eusoff Recreation Facilities on Lot P.T 51, Teluk Labuan Bilek, Jalan Ampang, 50450 Kual a Kompleks Damai, 50400 Mukim Si Rusa, Port Dickson, Negeri Sembilan Darul Lumpur Kuala Lumpur. Khusus For Cempaka Mewah Sdn Bhd.

47 Proposed to Demolish & Clear 2 Oxidation Pond & Pump SSBU Sdn. Bhd. Perunding Delima 246,095.50 01 Sept, 94 20 Nov, 94 House and Related Works on Part of Lot 3356 (Phase 15D) Wisma SBBU No. 27A, Lorong Rahim Projecy Bandar Baru UDA, Johor Bahru, Johor Darul No. 1 Jalan Padi Mahsuri Kajai 13, Taman Tun Dr. Takzim. 12, Bandar Baru UDA Ismail, 60000 Kuala 81200 Johor Bahru Lumpur. Johor Darul Takzim. New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 8

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

48 KL International Airport Berhad Project Supplementary KL International Airport HSSI - Halcrow 3,158,670.00 01 Aug, 94 01 Apr, 95 Contract To Enabling Work. Contract E2B : Contract Berhad, Tingkat 11 & 12 KL International Airport No: KLIA/D/E2B(01)/044/94. Wisma Semantan, 12, No. 58A, Jalan SS21/35 Jalan Gelanggang, Bukit Damansara Utama, Damansara 50490, Petaling Jaya, 47400 Kuala Lumpur. Selangor Darul Ehsan.

49 Construction of Electrical Engineering Faculty (Workshop Universiti Teknologi M'sia Elmec Consultants Sdn. 39,367,536.07 01 June, 92 01 May, 95 & Standard Room), Universiti Teknologi Malaysia, Skudai, Karung Berkunci 791, Bhd. 1st Floor, MTUC Johor Darul Takzim. 80990 Johor Bahru Building, 19 Jalan Barat, Johor Darul Takzim. 46200 Petaling Jaya Selangor Darul Ehsan.

50 Cadangan Membaikpulih, Memperkukuh Dan Menurap Pengarah Cawangan Kerja Jabatan Kerja Raya 7,360,207.00 14 Dec, 94 30 June, 95 Semula Jalan Persekutuan Dari FT005-220-500 Hingga Ibu Pejabat JKR, Jalan Jalan Taming Sari FT005-222-000 dan dari FT 005-229-000 Hingga FT005- Sultan Salahuddin Peti Surat 96, 75400 246-500 Di Negeri Melaka. Kuala Lumpur. Melaka.

51 KL International Bhd. - Additional Administrative Offices KL International Airport Bhd. HSSI - Halcrow 7,738,888.88 12 Oct, 94 15 March, 95 Contract No: KLIA/D/ADO/029/94 Tingkat 11 & 12, Wisma KL International Airport Semantan, 12, Jalan No. 58A, Jalan SS21/35 Gelanggang, Bukit Daman- Damansara Utama, sara, 50490 K.Lumpur . P. Jaya, 47400 Selangor,

52 Superstructive Works (Including Mechanical & Electrical) Perbadanan Pembangunan Akitek Kitas Sdn. 30,295,455.30 25 Sept, 93 28 Nov, 95 Related Works for Proposed Development 1 Block Bandar (UDA), BB Plaza 39-A, Jalan Ipoh Condominium Phase 1 for 37 Floors Consist of 189 Units Lot 111, Jalan Bukit Bintang, 51200 Kuala Lumpur. Residential & 3 Storey Carpark Basement On Lot 114, Peti Surat 10080 K.Lumpur . Jalan Sahabat/ Jalan Tong Shin, Seksyen 19, Bandar KL

53 Penyelenggaran Bangunan Di Bawah Pengawasan Pengarah Cawangan Kerja Pengarah Kerja Raya 1,793,000.00 01 Oct, 94 30 Aug, 95 Cawangan Tentera Fasa 1A (TEN/J1) Ibu Pejabat JKR, Jalan Johor, Aras 3, Sultan Salahuddin Bangunan Sultan Ibrahim, Kuala Lumpur . Peti Surat 709, 80520, J.B New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 9

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

54 Proposed Built AL-Azim Phase 2 on Lot 826, 692, 693, Pengarah Kerja Raya Akitek Ehwan Othman 14,194,324.98 12 Jan, 94 10 Jan, 96 695, 918, 1053 and par t of Government Land at Jalan Jabatan Kerja Raya Sdn. No. 38,. Taman Jalan Bukit Palah, Mukim Peringgit Daerah Melaka Tengah Negeri Melaka, Jalan Perkota, 75350 Melaka Melaka Bandaraya Bersejarah. Taming Sari, 75906 Melaka.

55 For Proposed Development Telekom Malaysia Bhd Head Telekom Malaysia Berhad Hasmi & Associates Sdn. 18,651,198.51 25 Jan, 95 15 July, 95 Quarters on Lot 45209 off Jalan Pantai Baru, Mukim Kuala 2nd Floor, Bangunan Kope- Bhd.& Bucknall Group Lumpur. rasi Polis, Jalan Pantai Baru, PLC 11th Floor, Menara 59200 Kuala Lumpur. Bank Pembangunan , Jal an Sultan 50250 K. Lumpur

56 Construction & Completion 3 Storey Business Complex Perbadanan Pembangunan F & J Akitek Dan Rakan- 27,570,400.45 17 Dec, 93 15 March, 96 & 1 Storey Sub-Basement Consist of Carpark, Shopping Bandar (UDA), BB Plaza Rakan, Lot 4.33 T ingkat 4 Mall & Food Court on Part of Lot 76936 Jalan Hospital Lot 111, Jalan Bukit Bintang Pertama Kompleks, Jalan Ipoh, Perak Darul Ridzuan Untuk Perbadanan Pemba- Peti Surat 10080, K.Lumpur Tuanku Abdul Rahman ngunan Bandar (UDA). 50100 Kuala Lumpur.

57 Construction & Completion Marine Lab & Related Works Universiti Teknologi M'sia Elmec Consultants S/B. 5,424,720.00 15 Aug, 94 02 Feb, 96 for Engineering Faculty Kejuruteraan Jentera UTM, Karung Berkunci 791, 1st Floor, MTUC Building Sekudai, Johor Darul Takzim. 80990 Johor Bahru. 19, Jalan Barat, 46200 Johor Darul Takzim. Petaling Jaya, Selangor .

58 Construction & Completion 14 Floor Office Building For SIRIM Nor Hazin Azman Arkitek & 11,589,215.69 20 Jan, 94 02 May, 96 SIRIM at Lot 1081 Per siaran Dato' Menteri, Seksyen 2, Persiaran Dato' Menteri Ass. 37-2, Jalan 11/55A Shah Alam, Selangor Darul Ehsan. Seksyen 2, Peti Surat 7035 Taman Setiawangsa 54200 40911 Shah Alam, Kuala Lumpur Selangor Darul Ehsan.

59 Construction & Completion Chemistry Engineering Faculty Universiti Teknologi M'sia Elmec Consultants S/B 32,800,000.00 01 Feb, 93 30 Nov, 95 At UTM, Sekudai, Johor Darul Takzim. Karung Berkunci 791, 1st Floor, MTUC Building 80990 Johor Bahru. 19, Jalan Barat, 46200 Johor Darul takzim. Petaling Jaya, Selangor . New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 10

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

60 Construction & Completion Sekolah Menengah Sains Pengarah Cawangan Kerja Cawangan Kontrak & Ukur 19,464,604.30 28 Apr, 94 22 Dec, 95 At , Selangor Darul Ehsan. Ibu Pejabat JKR, Jalan Bahan, Unit Pendidikan Sultan Salahuddin, Kuala Dan Tentera, Ibu Pejabat Lumpur. JKR M'sia, Jalan Sultan Salahuddin, 50582, K.L

61 Proposed Construction And Completion Of 195 Units MBF Construction Sdn. Bhd. Perunding Cahaya Sdn 9,582,000.00 16 June, 94 15 Feb, 96 1 1/2 Storey Terrace Factory And 12 Units 2 Storey 6th Floor, Bena Towers Bhd; 32A, Lorong Rahim Detached Factory And 4 Units LLN Substation On Lot Jalan Ampang, 50450 Kajai 14, Taman Tun Dr. No. 7686, Utar a, Mukim Batu Kuala Lumpur For Kuala Lumpur . Ismail, 60000 Kuala Sri Ukay Reality Sdn. Bhd. Kuala Lumpur.

62 Proposed Development of Training Centre Consist of Bank Simpanan M'sia Fau Akitek 14,146,844.50 03 Jan, 95 06 Nov, 95 1 Block 2 Storey Store, 1 Block of 3 Storey Hostel and No. 117, Jalan Ampang 17-2, Jalan 2A/2A Sport Facilities on PT No. 3286, Mukim , 50450 Kuala Lumpur. Section 1, Wangsa Maju Selangor Darul Ehsan. 53300 Kuala Lumpur.

63 Proposed Condominium Project Consist of 300 Units Equatora Sdn. Bhd. Kota Akitek Sdn. 45,229,334.90 07 Aug, 95 07 Oct, 96 Resindential and 3 Storey Carpark, Clubhouse & 6th Floor, East Asia Building 29-2, Jalan 5/76B, Desa Swimming Pool on Lot 48627 (F5), Mukim Kuala Lumpur No. 23, Jalan Tun Perak Pandan, Jln Kg. Pandan Untuk Equatora Sdn Bhd. 50050 Kuala Lumpur 55100 Kuala Lumpur.

64 Proposed Built Workshop & Related Works For Engineering Universiti Teknologi Malaysia Elmec Consultants Sdn. 2,307,053.00 15 May, 95 15 May, 96 Fakulti Kejuruteraan Jentera, UTM, Sekudai Johor Karung Berkunci 791, 80990 Bhd. 1st Floor, MTUC Johor Bahru, Johor Darul Building, 19 Jalan Barat Takzim. 46200 Petaling Jaya Selangor Darul Ehsan

65 Development of High Voltan Lab System & High Flow At Universiti Teknologi Malaysia Elmec Consultants Sdn. 2,186,334.97 15 Feb, 95 31 July, 97 High Flow Voltan lab, Electrical Engineering Faculty Karung Berkunci 791, 80990 Bhd. 1st Floor, MTUC Universiti Teknologi Malaysia, Sekudai Johor Johor Bahru, Johor Darul Building, 19 Jalan Barat Takzim. 46200 Petaling Jaya Selangor Darul Ehsan New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 11

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

66 Proposed Phase 1, 3 Block Apartment Consist of 632 MBF Construction Sdn. Pakatan Reka Akitek 39,212,345.81 16 June, 94 15 Feb, 96 Unit, 1 Block Recreation Facilities on Part of Lot 105, 106 Bhd., 6th Floor Bena Towers 39A, Jalan Dato' Haja and 107 Teluk Labuan Bilek, Mukim Si Rusa, Port Dickson Jalan Ampang, 50450 Eusoff, Kompleks Damai, Negeri Sembilan Darul Khusus. Kuala Lumpur 50400 Kula Lumpur.

67 Proposed Central Complex (Library) International International Islamic Univer- Kemasrunding Sdn. Bhd. 31,141,318.17 20 May, 94 10 Aug, 95 Islamic University, Gombak Campus, Selangor sity Malaysia, P.O Box 70 96 & 96, Jalan SS 15/4 Darul Ehsan. Jalan Sultan, 46700 47500 Subang Jaya Petaling Jaya, Selangor. Selangor Darul Ehsan.

68 The Execution And Completion Of Superstructure Skyline Tower Sdn. Bhd. MNA Architect Suite 701 56,209,863.16 16 June, 95 15 Sept, 96 Works For To The Proposed Hotel On Lot No. 2903, Suite 701, Level 7, Menara Level 7, Menara Bukit 4463, 4465 & 4466 At Jal an Bukit Meldrum, Johor Bukit Meldrum, 9N, Jalan Meldrum, 9N, Jalan Bahru, Johor Darul Takzim. Tenteram, 80300 Johor Bahru Tenteram 80300 J. Bahru.

69 Construction & Completion Federal Building Seri Manjung Ketua Pengarah Kerja Raya Jurutera Daerah 10,144,926.20 31 Jan, 96 12 Nov, 97 Bandar Seri Manjung Perak Darul Ridzuan Ibu Pejabat JKR Malaysia JKR Manjung Jalan Sultan Salahuddin 32040 Seri Manjung 50582 Kuala Lumpur Perak Darul Ridzuan

70 Proposed Developmet Islamic Academy Campus Akademi Universiti Malaya Akitek Hejeedar & 19,938,856.80 07 March, 96 30 Dec, 97 Islam Universiti Malaya Consist of 4 Floors Pra-Aium Pejabat Bendahari Associates Sdn. No. 8 Faculty, 4 Floors Usoludin Faculty Library, 3 Storey Universiti Malaya Jalan Telawi Tiga, Administrative and Surau on Lot 5270 Uni versiti Malaya Lembah Pantai, 59100 Bangsar Baru, 59100 Lembah Pantai, Kuala Lumpur Kuala Lunpur. Kuala Lumpur.

71 The Execution And Completion Of The Proposed The Alice Smith School Jurutera Perunding Beca 12,630,000.00 22 July, 96 30 Nov, 97 New "Alice Smith" School On Lot PT 27421, Mukim 2, Jalan Bellamy, 50460 Carter Sdn. Bhd. Petaling, Selangor Darul Ehsan. Kuala Lumpur 57-2, Jalan Bangkung Bukit Bandaraya Kuala Lumpur. New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 12

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

72 Proposed Development of 400 Units Apartment on Lot PKNS Engineering & PKNS Engineering & 15,443,352.86 01 Oct, 93 05 Jan, 98 27422 Dan Sebahagian Lot 25120 (Phase 5) Mukim Construction Berhad Construction Berhad Ampang, Daerah Ulu Langat, Selangor Darul Ehsan Lot 12, Persiaran S'ngor Lot 12, Persiaran S'ngor Kawasan Perusahaan, Kawasan Perusahaan, 40000 Shah Alam, 40000 Shah Alam, Selangor Darul Ehsan. Selangor Darul Ehsan.

73 Proposed Public Residential on Lot 17668, (456 Unit) Dewan Bandaraya K.L Jabatan Arkitek & Projek 19,738,997.93 19 Sept, 94 30 March, 98 Gombak Kuala Lumpur Urusetia Bandaraya Khas, DBKL, Urusetia Jalan Raja Laut, 50350 Bandaraya, Jln Raja Laut Kuala Lumpur. 50350 Kuala Lumpur

74 Package 12B - Water Reticulation, Sewerage, Messrs. Kemasepakat Sdn. Bhd. 10,480,000.00 10 June, 96 30 April, 98 Drainage And Road Wor ks For The Proposed Stage Sdn. Bhd. Tingkat 16, 602-604, Block A, Glomac 1, Development On Lot 1501, Muki m Sg. Gumut Block B, Wisma Semantan Business Centre, No. 10 Daerah Hulu Selangor, Selangor. No.12, Jalan Gelanggang Jalan SS 6/1, Kelana Jaya Bukit Damansara 50490 47301 Petaling Jaya Kuala Lumpur Selangor Darul Ehsan.

75 Proposed Construction And Completion of 235 Units Sri Damansara Sdn. Bhd. Kumpulan Senireka Sdn. 24,592,496.85 20 Oct, 95 30 June, 98 Proposed Condominium Development On Part Of Lot Wisma Sri Damansara, 10 Bhd., Tingkat 13, Wisma 23305-G33798 (Sub-Zone A04-5) of Mukim Sungei Persiaran Dagang, Bandar Bumi Raya, No. 10 Jalan Buloh And Batu Daerah Petaling, Selangor Darul Sri Damansara, 52200 Raja Laut 50350 K.Lumpur Ehsan For Sri Damansara Sdn. Bhd. Kuala Lumpur

76 The Execution And Completion Of The Proposed 22- Syarikat Malacca Straits Inn Akitek KHP 98,036,548.72 06 May 1996 26 June, 98 Storey Hotel On Lot 159 And 160 Jal an Bandar Hilir Sdn. Bhd. 3rd Floor, Wisma No. 261, Taman Melaka Melaka Consplant, No.2 Jalan SS Raya, Off Jalan Bandar 16/4, Subang Jaya, 47500 Hilir, 75000 Melaka. Petaling Jaya, Selangor Darul Ehsan. New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 13

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

77 Cadangan Membina Dua Blok Bangunan Amona Sdn Bhd KAZ Akitek 36,198,871.00 16 May, 1996 15 April, 1998 Mengandungi 360 Unit Pangsapuri Kos Sederhana No. 10A & 10B, Jalan 'A' Di Atas Lot PTD 64144 Mukim Tebrau, Off Jalan Tun Abdul Razak Daerah Johor Bahru 80000 Johor Bahru

78 Kerja-kerja Superstruktur Dan Infrastruktur Untuk UDA Holding Sdn Bhd Omarsham Akitek 36,987,939.40 18 Feb, 1997 8 June, 1998 Cadangan Membina Business Hotel 15 Tingkat 3 SS 5B/6, Kelana Jaya Di Atas Lot P.T. 81 & 89, Seksyen 56, Lor ong 47301 Petaling Jaya Sultan Kuala Lumpur Selangor Darul Ehsan

79 Cadangan Membina Dua Blok Bangunan Amona Sdn Bhd KAZ Akitek 36,198,871.00 16 May, 1996 15 June, 1999 Mengandungi 64144 Mukim Tebrau, Lot PTD 64142, Jln Hospital No. 10A & 10B, Jalan 'A' Daerah Johor Bahru Tampoi, 81200 Johor Bahru Off Jalan Tun Abdul Razak 80000 Johor Bahru

80 Cadangan Pembangunan Semul a Hospital Jabatan Kerja Raya Jabatan Kerja Raya 11,131,626.14 9 May, 1997 15 June, 1999 Selangor Darul Ehsan (Fasa II) Cawangan Bangunan Cawangan Bangunan Unit Kerja Perubatan Dan Unit Kerja Perubatan Dan Kesihatan, Level 12 Kesihatan, Level 12 Peti Surat 34 & 35 Peti Surat 34 & 35 Menara Dato' Onn, Menara Dato' Onn, Kompleks UMNO Malaysia Kompleks UMNO Malaysia 45, Jalan Tun Ismail 45, Jalan Tun Ismail

81 Cadangan Bangunan Pentadbi ran, Pusat Kawalan TNB Properties Sdn Bhd TNB Properties Sdn Bhd 9,763,091.80 18 Feb, 1997 September 1998 Dan Workshop Di Atas Sebahagian Lot P.T 4839, Aras 3 & 4, Block C (Central) Aras 3 & 4, Block C (Central) Mukim Dengkil, Daerah , Selangor Pusat Bandar Damansara Pusat Bandar Damansara Jalan Damanlela, 50490 KL Jalan Damanlela, 50490 KL

82 New Water Reticulation System at Pantai Baru Telekom Malayisa Berhad Bahagian Pembangunan 2,650,000.00 9 Feb, 1998 June, 1999 New Headquarters Building Hartanah Serviceco, Menara Telekom Project Site Tingkat 11, Wisma Telekom Level 3, Off Jalan Pantai Taman Desa, Jalan Desa Baru, 59200 Kuala Lumpur Utama, 58100 Kuala Lumpur New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 14

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

83 Proposed Construction And Upgrading Pejabat Pengarah Pejabat Jurutera 5,095,834.44 11 Oct, 1999 13 Apr, 2001 Of Sekolah Menengah Teknik, Kerja Raya Johor, Daerah Jabatan Kerja Sungai Abong, Muar Johor. Aras 3, Bangunan Raya, Jln. Othman, Sultan Ibrahim, Peti Surat 84000 Muar, Johor 709, 80520 Johor Bahru

84 Construction And Completion Of Sekolah Menengah Jab. Kerja Raya Malaysia Jabatan Kerja Raya 5,380,999.00 20 Apr, 2000 28 May, 2001 Sri Bera, Bera, Pahang Caw. Bangunan Ibu Pejabat Daerah Bera JKR Malaysia 28300 Triang Pahang

85 Design And Build For Pembinaan Asrama Untuk 3000 Universiti Teknologi Malaysia Arkitek Bersinar 65,000,000.00 28 May 2001 27 May 2003 Pelajar Di Universiti Teknologi Malaysia, Skudai, Johor Karung Berkunci 791 1st Floor, Lot 8376 80990 Johor Bahru Lorong Datuk Abang Johor Darul Takzim Abdul Rahim 7B 93450 Kuching, Sarawak

86 The Construction and Completion of Sekolah Menengah Jab. Kerja Raya Malaysia Jab. Kerja Raya Malaysia 8,097,017.00 04 October 2001 30 August 2003 Bandar Tun Hussien Onn (2), Hulu Langat Selangor Cawangan Bangunan Ibu Cawangan Bangunan Ibu Darul Ehsan Pejabat JKR Malaysia Pejabat JKR Malaysia Jalan Sultan Slahuddin Jalan Sultan Slahuddin 50582 Kuala Lumpur 50582 Kuala Lumpur

87 The Execution and Completion of Uncompleted Works Cygal Development Sdn Bhd BZ Architect 34,497,000.00 03 October 2002 02 October 2003 Phase 1-Basement Carpark and Twenty Storey Office Lot 4.43, Plaza Prima Batu 4 1/2 25-2, Tingkat 2, Jln USJ 10/1 Building for the Proposed Commercial Development On Jalan Klang Lama, 58200 Taipan Business Centre Lot 33794, Jalan Pantai, Mukim Kuala Lumpur Kuala Lumpur 47410 Petaling Jaya, Selangor

88 Construction of 3 Block, 16-18 Floor, 948 Units Flat & Ketua Pengarah, JPN, KAC Architect 41,522,800.00 31 July 2000 31 March 2004 Related Works For Residential Program on Lot 3024 Kementerian Perumahan & B8-3, Jln. Selaman 1 & 3984, Mukim Ampang Kuala Lumpur Kerajaan Tempatan, Tkt. 5 & 6, Dataran Palma Wisma Cheras Perdana, Jln 68000 Ampang Samantan, Damansara Heights, Kuala Lumpur 50650 Kuala Lumpur. New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 15

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

89 Proposed Development At Lot Pt 475 Bandar Benih Murni Sdn Bhd YSCA Consultantcy Sdn Bhd 32,398,000.00 15 Dec, 2002 25 Jan, 2005 Selayang, Mukim Batu, Daerah Gombak, Selangor Darul 1-06, Garden Business Centre No. 6-3, Jalan Wangsa 2/5 Ehsan. Jalan Istana Taman Wangsa Permai 41000 Klang, Selangor D.E 52200 Kuala Lumpur

90 Proposed Development 1 Block 208 Units Medium Cost Sri Wijaya Sdn Bhd Arkitek Axis 13,254,912.00 02 June 2004 12 May, 2006 Flat 13 Floors, Carpark Basement and Related Works No. 8A, Jln Sri Sarawak 20 M4-D9, Jln Pandan On Lot 3025, Mukim Ampang, Daerah Hulu Langat Indah, Selangor Darul Ehsan 41200 Klang 55100 Kuala Lumpur Selangor Darul Ehsan

91 Construction of 6 Block 16-18 Floor Flat & Related Jabatan Perumahan Negara Arkitek Urbanisma Sdn Bhd 87,222,222.00 01 March, 2000 23 Feb, 2007 Works Di Bukit Jalil 1, Mukim Wilayah Persekutuan Aras 6 & 7, Blok K 2-3, Jalan USJ 9/5Q Kuala Lumpur Pusat Bandar Damansara Subang Business Centre 50782 Kuala Lumpur 47620 Subang Jaya, Sel .

92 Proposed Commercial Development Cygal Development Sdn Bhd BZ Architect 40,653,261.00 15 July 2005 30 June 2007 Consisting Of 1 Block Of 33 Storey Office Lot 4.43, Plaza Prima 21-1, Jalan USJ 1/1A Tower (2) Lot 33794, Mukim Kuala Lumpur Batu 4 1/2, Jalan Klang Regalia Business Off Jalan Pantai Baru Kuala Lumpur Lama, 58200 Kuala Centre, 47620 Lumpur Subang Jaya Selangor

93 Building and External Works for Cadangan Pembinaan Pine Properties Sdn Bhd BEP Akitek Sdn Bhd 39,910,487.29 06 June, 2005 01 April, 2008 168 Units Kondominium (Phase 2A) Di Atas Lot 3991, Two IOI Square, IOI Resort 7th Floor, Bangunan 3M Mukim Dengkil, Daerah Sepang Selangor Darul Ehsan 62502 Putrajaya, Malaysia 6A, Persiaran Tropicana Tropicana Golf & Country Resort, 47410 Petaling Jaya Selangor Darul Ehsan New Update : 12 June 2009

SYCAL BERHAD Company No. 62606-V Completed Projects Sheet 16

No Name & Location Of Project Employer Project Architect / Contract Date Date Engineer Sum Started Completed

94 Cadangan Membina 5 Blok Pangsapuri 17 Hingga 19 Suditasia (M) Sdn Bhd A.H TEE architect 40,828,342.46 08 Mar, 2005 07 Sep, 1996 Tingkat Yang Mengandungi 616 Yunit Kediaman Serta No. 28, Lorong Tiara 1B 94A, Jalan SS21/35 (Package 1) (Package 1) (Package 1) Kemudahan Di Atas Lot PT 6472, Jalan Ampang, Damansara Utama 25,875,000.00 02 Feb, 2007 01 Nov, 2008 Mukim Ampang, Daerah Hulu Langat, Selangor Darul Ehsan 41150 Klang 47400 Petaling Jaya (Package 2) (Package 2) (Package 2) Selangor Darul Ehsan Selangor Darul Ehsan

TOTAL 1,404,668,932.90