Patuxent River Policy Plan
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
NON-TIDAL BENTHIC MONITORING DATABASE: Version 3.5
NON-TIDAL BENTHIC MONITORING DATABASE: Version 3.5 DATABASE DESIGN DOCUMENTATION AND DATA DICTIONARY 1 June 2013 Prepared for: United States Environmental Protection Agency Chesapeake Bay Program 410 Severn Avenue Annapolis, Maryland 21403 Prepared By: Interstate Commission on the Potomac River Basin 51 Monroe Street, PE-08 Rockville, Maryland 20850 Prepared for United States Environmental Protection Agency Chesapeake Bay Program 410 Severn Avenue Annapolis, MD 21403 By Jacqueline Johnson Interstate Commission on the Potomac River Basin To receive additional copies of the report please call or write: The Interstate Commission on the Potomac River Basin 51 Monroe Street, PE-08 Rockville, Maryland 20850 301-984-1908 Funds to support the document The Non-Tidal Benthic Monitoring Database: Version 3.0; Database Design Documentation And Data Dictionary was supported by the US Environmental Protection Agency Grant CB- CBxxxxxxxxxx-x Disclaimer The opinion expressed are those of the authors and should not be construed as representing the U.S. Government, the US Environmental Protection Agency, the several states or the signatories or Commissioners to the Interstate Commission on the Potomac River Basin: Maryland, Pennsylvania, Virginia, West Virginia or the District of Columbia. ii The Non-Tidal Benthic Monitoring Database: Version 3.5 TABLE OF CONTENTS BACKGROUND ................................................................................................................................................. 3 INTRODUCTION .............................................................................................................................................. -
MDE-Water Pollution
Presented below are water quality standards that are in effect for Clean Water Act purposes. EPA is posting these standards as a convenience to users and has made a reasonable effort to assure their accuracy. Additionally, EPA has made a reasonable effort to identify parts of the standards that are not approved, disapproved, or are otherwise not in effect for Clean Water Act purposes. Title 26 DEPARTMENT OF THE ENVIRONMENT Subtitle 08 WATER POLLUTION Chapters 01-10 Title 26 DEPARTMENT OF THE ENVIRONMENT ........................................................................................... 1 Subtitle 08 WATER POLLUTION .................................................................................................................... 1 Chapters 01-10 ................................................................................................................................................ 1 Title 26 DEPARTMENT OF THE ENVIRONMENT ........................................................................................... 2 Subtitle 08 WATER POLLUTION .................................................................................................................... 2 Chapter 01 General ......................................................................................................................................... 2 .01 Definitions................................................................................................................................................. 3 .02 Principles of Water Pollution Control.................................................................................................... -
Patuxent River Watershed Functional Plan
TI11E Functional \laster Plan for the Patuxent Ril'er Watershed in \lontgome1y Count) AUTHOR The \lai-·land-\ational Capital Park and Planning Commi:sion Functional \laster Plan for tl1e Patuxent Ril'er \\'atershed in \lontgomei- Count)· DATE \01·ember 1993 PUNNING AGENCY The \Ian land-\ational Capital Park and Planning Cammi ion s~s~ Georgia Al'enue Sill'er Spring. \\D 20910-3~60 SOURCE OF COPIES The \lai-land-\ational Capital Park and Planning Commission s~s~Georgia Al'enue Siller Spring.\!D 20910-3"6o ABSTRACT This document contains the text. 11ith supporting graphics. for the Functional \laster Plan for tl1e Patuxent Rim\\ atershed in \lontgomm Count\. This plan amends the General Plan for the ,\lan·land-\X'ashington Regional District and the \laster Plan for Highwa1, for the \lard and-\\ ashington Regional District. and the following area master plans: Damascus. Olnel'. Sandi Spring-Ashton Special Stud, Area. Eastern \lontgomei-· Count\·. as well as the Functional \laster Plan for Presefl'ation of Agriculture and Rural Open Space. and the Patuxent Ril'er \\ atershed Park .\laster Plan. COPYRIGHT The Maryland-National Capital Park and Planning Commission 1993 PUBLISHED BY The Montgomery County Planning Department of The Maryland-National Capital Park and Planning Commission 8787 Georgia Avenue Silver Spring, Maryland 20910.3760 APPROVED BY The Montgomery County Council October 1993 ADOPTED BY The Maryland-National Capital Park and Planning Commission November 1993 THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION is a bi-county agency created by the General Assembly of Maryland in 1927. The Commission's geographic authority extends to the great majority of Montgomery and Prince George's Counties; the Maryland-Washington Regional District (M-NCPPC planningjurisdiction) comprises 1,001 square miles, while the Metropolitan District (parks) comprises 919 square miles, in the two counties. -
Lll'"Iii""!Lllliillllliil MARYLAND BIRDLIFE Il~Ll;I,I,,,,,Illlllllllil
ISSN 0147-9725 lll'"iii""!lllliillllliil MARYLAND BIRDLIFE il~ll;i,i,,,,,illlllllllil, oo o L "8 N ,.j SEPTEMBER 1988 VOLUME 44 NUMBER 3 MARYLAND ORNITHOLOGICAL SOCIETY, INC. Cylburn Mansion, 4915 Greenspring Ave., Baltimore, Maryland 21209 STATE OFFICERS FOR JUNE 1988 TO JUNE 1989 EXECUTIVE COUNCIL President: Robt. F. Ringlet, 6272 Pinyon Pine Ct., Eldersburg, MD 21784 549-6031 V. President:Richard J. Dolesh, 17800 Croom Rd., Brandywine, MD 20613 627-6074 Treasurer: Emily Joyce, 816 Oak Trail, Crownsville, MD 21032 768-0142 Secretary: Patricia J. Moore, 24600 Woodfield Rd., Damascus, MD 21403 253-2796 Exec. Secy.: Joy Aso, 1250 4th St., SW, Washington, D.C. 20024 (202) 554-8529 Past Pres.: CDR Anthony White, 5872 Marbury Rd., Bethesda, MD 20817229-1641 STATE DIRECTORS Allegany: *Teresa Simons Howard: *Thomas Strikwerda Mark Weatherholt Jane H. Farrell Ralph Geuder Anne Arundel: *Sue Ricciardi Paul Zucker Helen Ford Dorothy Mumford Jug Bay: *Jean Tierney Joan Stephens Baltimore: *William Newman John Cullom Kent: *John Lorenz Graham Egerton Margaret Duncan A. MacDonough Plant Robert F. Ringler Montgomery: *Henry Bielstein Stephen W. Simon Margaret Donnald Karen Skuldt John Malcolm Joy Wheeler Lola Oberman Caroline: *Mariana Nuttle Patuxent: *Sam Droege Oliver Smith Chandler S. Robbins Carroll: *Melinda Byrd Talbot: *Lester Coble Wayne Gordon Jeff Effinger Steve Goodbred Frederick: *Stauffer Miller Melvin Bennett Washington: *Robert Keedy Joseph Swope, Jr. Harford: *Dennis Kirkwood Todd Holden Wicomico: *Gall Vaughn William Russell Charles Vaughn *Denotes Chapter President Active Membership (adults) 6.00 plus local chapter dues Student Membership (full-time students) 2.00 plus local chapter dues Junior Membership (under 18 years) 1.00 plus local chapter dues Family Membership (Mr. -
Maryland Stream Waders 10 Year Report
MARYLAND STREAM WADERS TEN YEAR (2000-2009) REPORT October 2012 Maryland Stream Waders Ten Year (2000-2009) Report Prepared for: Maryland Department of Natural Resources Monitoring and Non-tidal Assessment Division 580 Taylor Avenue; C-2 Annapolis, Maryland 21401 1-877-620-8DNR (x8623) [email protected] Prepared by: Daniel Boward1 Sara Weglein1 Erik W. Leppo2 1 Maryland Department of Natural Resources Monitoring and Non-tidal Assessment Division 580 Taylor Avenue; C-2 Annapolis, Maryland 21401 2 Tetra Tech, Inc. Center for Ecological Studies 400 Red Brook Boulevard, Suite 200 Owings Mills, Maryland 21117 October 2012 This page intentionally blank. Foreword This document reports on the firstt en years (2000-2009) of sampling and results for the Maryland Stream Waders (MSW) statewide volunteer stream monitoring program managed by the Maryland Department of Natural Resources’ (DNR) Monitoring and Non-tidal Assessment Division (MANTA). Stream Waders data are intended to supplementt hose collected for the Maryland Biological Stream Survey (MBSS) by DNR and University of Maryland biologists. This report provides an overview oft he Program and summarizes results from the firstt en years of sampling. Acknowledgments We wish to acknowledge, first and foremost, the dedicated volunteers who collected data for this report (Appendix A): Thanks also to the following individuals for helping to make the Program a success. • The DNR Benthic Macroinvertebrate Lab staffof Neal Dziepak, Ellen Friedman, and Kerry Tebbs, for their countless hours in -
Freshwater Fisheries Monthly Report – November 2019 Freshwater Fisheries
Freshwater Fisheries Monthly Report – November 2019 Freshwater Fisheries - Stock Assessment Upper Potomac River - Completed the annual fall electrofishing survey of the upper Potomac River. This survey collects information on adult smallmouth bass at multiple sites from Seneca upstream to Paw Paw, WV. Unfortunately, as expected, catch rates for adult smallmouth bass were down compared to the long-term average. Poor juvenile recruitment for the past 10 years has been a major factor behind this decline. Planning efforts are underway to produce juvenile smallmouth bass at hatchery facilities to boost numbers in areas of the river that have experienced the biggest declines. The surveys did show good numbers of juvenile fish produced during the 2019 spring spawn in some sections of the river. This is positive news that the population can bounce back if river flows remain stable during the spawning period. Average catch rate for adult smallmouth bass ( greater than11 inches) in the upper Potomac River (1988-2019). Liberty Reservoir - Conducted a nighttime electrofishing survey on Liberty Reservoir (Baltimore and Carroll counties). Fourteen random sites around the entire perimeter of Liberty Reservoir were surveyed over three nights. Preliminary results show the proportional stock density (PSD) for smallmouth bass was 62 and the catch-per-unit-effort (CPUE) of stock size and larger 1 smallmouth bass was 3/hour. Only nine smallmouth bass were collected during the survey. The largest smallmouth bass collected measured 44.9 cm (17.7 inches, 2.7 pounds). The largemouth bass PSD was 56 and the CPUE was 26/hour. The largest largemouth bass collected measured 49.1 cm (19.3 inches, 4.2 pounds). -
Report of Investigations 71 (Pdf, 4.8
Department of Natural Resources Resource Assessment Service MARYLAND GEOLOGICAL SURVEY Emery T. Cleaves, Director REPORT OF INVESTIGATIONS NO. 71 A STRATEGY FOR A STREAM-GAGING NETWORK IN MARYLAND by Emery T. Cleaves, State Geologist and Director, Maryland Geological Survey and Edward J. Doheny, Hydrologist, U.S. Geological Survey Prepared for the Maryland Water Monitoring Council in cooperation with the Stream-Gage Committee 2000 Parris N. Glendening Governor Kathleen Kennedy Townsend Lieutenant Governor Sarah Taylor-Rogers Secretary Stanley K. Arthur Deputy Secretary MARYLAND DEPARTMENT OF NATURAL RESOURCES 580 Taylor Avenue Annapolis, Maryland 21401 General DNR Public Information Number: 1-877-620-8DNR http://www.dnr.state.md.us MARYLAND GEOLOGICAL SURVEY 2300 St. Paul Street Baltimore, Maryland 21218 (410) 554-5500 http://mgs.dnr.md.gov The facilities and services of the Maryland Department of Natural Resources are available to all without regard to race, color, religion, sex, age, national origin, or physical or mental disability. COMMISSION OF THE MARYLAND GEOLOGICAL SURVEY M. GORDON WOLMAN, CHAIRMAN F. PIERCE LINAWEAVER ROBERT W. RIDKY JAMES B. STRIBLING CONTENTS Page Executive summary.........................................................................................................................................................1 Why stream gages?.........................................................................................................................................................4 Introduction............................................................................................................................................................4 -
2015 Washington Metropolitan Area Water Supply Study: Demand And
2015 Washington Metropolitan Area Water Supply Study Demand and Resource Availability Forecast for the Year 2040 Prepared by S.N. Ahmed, K.R. Bencala, and C.L. Schultz August 2015 ICPRB Report No. 15-4 The Section for Cooperative Water Supply Operations on the Potomac Interstate Commission on the Potomac River Basin 30 West Gude Drive, Suite 450 · Rockville, Maryland 20850 2015 Washington Metropolitan Area Water Supply Study: Demand and Resource Availability Forecast for the Year 2040 Prepared by S.N. Ahmed, K.R. Bencala, and C.L. Schultz August 2015 ICPRB Report No. 15-4 Copies of this report are available at the ICPRB website, at www.PotomacRiver.org, under “Publications.” To receive printed copies of this report, please write to ICPRB at 30 West Gude Drive, Suite 450, Rockville, MD 20850; or call 301-984-1908. 2015 Washington Metropolitan Area Water Supply Study Table of Contents Acknowledgements .................................................................................................................................... viii Disclaimer .................................................................................................................................................. viii List of Abbreviations ................................................................................................................................... ix Executive Summary ..................................................................................................................................... xi Recent & Forecasted Water Use ............................................................................................................. -
Watershed Observer NEWSLETTER of the AMERICAN CHESTNUT LAND TRUST ‐ VOLUME 29 NO
Watershed Observer NEWSLETTER OF THE AMERICAN CHESTNUT LAND TRUST ‐ VOLUME 29 NO. 2 SPRING 2015 CONTENTS FORESTS OF THE PARKERS CREEK PRESERVE Science in the Watershed PART II 1 Forests of the Parkers Creek Preserve TH THE 28 ANNUAL MEETING OF THE MEM‐ By Peter Vogt BERSHIP OF THE AMERICAN CHESTNUT LAND TRUST 2 Part II—The forests of the Chesapeake region as they once ACLT CREATES A NEW PATH IN HONOR OF were—in the words of Thomas Hariot and Captain John Smith OUR OWN “TRAILBLAZER” 4 What were the “Old Growth” forests of the Chesapeake region really like before HIKING TRAIL MAINTENANCE DAY 4 European colonists replaced them with farms? We will never know in detail: no paintings of forests are known, and of course cameras had not been invented. WATER QUALITY MONITORING ‐ 2015 5 The early English explorers (notably Thomas Hariot (1588) and John Smith (1612)) described some of the many kinds of trees (and other plants) they had ACLT’S AGRICULTURE TO SUPPORT THE seen in the Chesapeake Bay region, in the context of what might be merchant‐ COMMUNITY PROGRAM 5 able for export or at least useful to the settlers they expected to attract. The only ACLT WELCOMES JANEL YOUNG 6 native tree already being harvested and sold in Europe for reputed medicinal properties was the sassafras. Hariot and Smith are ‘primary sources’ who left NEW! ACLT MONTHLY PHOTO clues about what did once grow in the Parkers Creek Preserve (PCP), and, for us CONTEST 6 restoration ecologists, what could grow there again someday to the extent that’s CALENDAR OF EVENTS 6 feasible. -
2019-2020 Patuxent River Policy Plan Implementation Report
2019-2020 Biennial Report Implementation of the Patuxent River Policy Plan Executive Summary The Patuxent River is one of eight major tributaries of the Chesapeake Bay, and it is the longest and deepest, with a maximum depth of about 175 feet. Its watershed is contained entirely within Maryland, and it flows 110 miles and stretches more than one mile across at its entrance to the Bay. Its watershed covers 937 square miles, or about one-tenth of Maryland’s land mass. The influence of the Patuxent extends into multiple jurisdictions within the state, including seven counties in the Baltimore/Washington D.C. metropolitan area, two of Maryland’s largest cities (Laurel and Bowie), and one of Maryland’s largest unincorporated areas (Columbia). With incidents of heavy rain becoming more common and the 2025 deadline for achieving the Chesapeake Bay Total Maximum Daily Load (TMDL) cap for nitrogen, phosphorus, and sediment fast approaching, the health of the Patuxent River is more important than ever. Forty years ago, the state recognized the importance of protecting the ecological, recreational, historical, and cultural resources of the Patuxent River and its tributaries. The Patuxent River Watershed Act, adopted in 1980, directed the establishment of the Patuxent River Policy Plan (Policy Plan) and the Patuxent River Commission (Commission or PRC). The Policy Plan serves as a guide for local jurisdictions and state agencies in carrying out their actions and regulatory programs in the Patuxent River watershed, while the PRC is charged with assisting in coordinating and facilitating the work of state and local governments in implementing the Policy Plan. -
Montgomery County Comprehensive Water Supply and Sewerage Systems Plan Chapter 2: General Background 2017 – 2026 Plan (County Executive Draft - March 2017)
Montgomery County Comprehensive Water Supply and Sewerage Systems Plan Chapter 2: General Background 2017 – 2026 Plan (County Executive Draft - March 2017) Table of Contents Table of Figures: ........................................................................................................................ 2-2 Table of Tables: ......................................................................................................................... 2-2 I. INTRODUCTION: ........................................................................................................... 2-3 II. NATURAL ENVIRONMENT: .......................................................................................... 2-3 II.A. Topography:................................................................................................................. 2-4 II.B. Climate: ....................................................................................................................... 2-4 II.C. Geology: ...................................................................................................................... 2-4 II.D. Soils: ............................................................................................................................ 2-5 II.E. Water Resources: ....................................................................................................... 2-6 II.E.1. Groundwater: ........................................................................................................ 2-6 II.E.1.a. Poolesville Sole Source Aquifer: -
Washington Suburban Sanitary Commission Clean Water
IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF MARYLAND UNITED STATES OF AMERICA, ) ) Plaintiff, ) ) STATE OF MARYLAND, ) ) Plaintiff-Intervenor, ) ) and ) ) ANACOSTIA WATERSHED SOCIETY, ) Civil Action No. PJM-04-3679 AUBUBON NATURALIST SOCIETY OF ) THE CENTRAL ATLANTIC STATES, INC. ) FRIENDS OF SLIGO CREEK, and ) Judge Messitte NATURAL RESOURCES DEFENSE COUNCIL, ) ) Plaintiffs-Intervenors, ) ) v. ) ) WASHINGTON SUBURBAN SANITARY ) COMMISSION, ) ) Defendant. ) _ ) CONSENT DECREE TABLE OF CONTENTS SECTIONS PAGES I. JURISDICTION AND VENUE 4-5 II. BINDING EFFECT 5-6 III. PURPOSES 6 IV. DEFINITIONS 7-16 V. REMEDIAL MEASURES SECTION 16-65 Article One Collection System Characterization Report, 16-18 Article Two Collection System Evaluation 18-25 Article Three Fats, Oils and Grease Control Program 26-33 Article Four Flow Monitoring 33-36 Article Five Collection System Modeling 36-40 Article Six Sewer Basin Repair, Replacement, Rehabilitation 40-43 Plans (SR3 Plans) and Schedules Article Seven Performance Assessments 43-45 Article Eight Illegal Stormwater Discharges to the Collection 45-46 System Article Nine Information Management System 46-48 Article Ten Pump Stations 49-52 Article Eleven Collection System Operation and Maintenance 52-57 Plan Article Twelve Emergency Response Plan(s) 57-60 Article Thirteen Reporting and Recordkeeping 61-62 ii VI. REVIEW AND APPROVAL PROCEDURES 62-65 VII. REPORTING REQUIREMENTS 65-66 VIII. CIVIL PENALTY 66-67 IX. STIPULATED PENALTIES 67-80 X. SUPPLEMENTAL ENVIRONMENTAL PROJECTS 80-85 XI. EFFECT OF SETTLEMENT/RESERVATION OF RIGHTS 85-87 XII. FORCE MAJEURE 87-89 XIII. DISPUTE RESOLUTION 89-92 XIV. RETENTION OF JURISDICTION 92-93 XV. MODIFICATION 93 XVI. RIGHT OF ENTRY 93-94 XVII.