Engineering, Surveying and Related Services Sumter County Continuing Contract for RFQ #015-0-2014/CRM

RFQ #015-0-2014/CRM Sumter County Continuing Contract for Engineering, Surveying and Related Services COVER SHEET

RFQ #015-0-2014/CRM Sumter County Continuing Contract for Engineering, Surveying and Related Services

Volkert, Inc.

1408 North Westshore Blvd Suite 600 Tampa, FL 33607

Office: 813.875.1365 Fax: 813.874.7656 [email protected]

TABLE OF CONTENTS TAB A – Statement of Interest TAB B – Firm Profile TAB C – Team Composition • Organizational Chart • Resumes • Licenses TAB D – Key Consultants/Associates • Resumes • Licenses TAB E – Location TAB F – Illustrative Work TAB G – Volume of Work TAB H – Additional Information TAB I – Additional Required Documents • Qualifications Document Checklist • Proposer’s Certification/Addenda Acknowledgment Form • Qualification Form • Statement of Terms and Conditions • Hold Harmless Agreement • Drug Free Workplace Certificate • Public Entity Crimes Form • Anti-Collusion Statement Form • E-Verify Certification Form • Conflict of Interest Disclosure Form • Insurance Certificates

Office Locations: Birmingham, Foley, Mobile, Montgomery, Alabama • Gainesville, Pensacola, Tampa, • Atlanta, Georgia Collinsville, Illinois • Baton Rouge, New Orleans, Slidell, Louisiana • Biloxi, Jackson, Mississippi • Jefferson City, Missouri Raleigh, North Carolina • Columbia, South Carolina • Chattanooga, Tennessee • Alexandria, Virginia • Washington, D.C. A

AIM Engineering & Surveying, Inc.

RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services

GLOSSARY 3D: Three Dimensional M: Million 3R: Resurfacing, Restoration, Rehabilitation MBA: Master of Business Administration AA: Associates of Arts MOT: Maintenance of Traffic AAS: Associate of Applied Science MPA: Master of Public Administration ADA: Americans with Disabilities Act MPH: Miles Per Hour Alt: Alternate MS: Master of Science ARRA: American Recovery and Reinvestment Act MSCE: Master of Science in Civil Engineering AS: Associates of Science MSE: Mechanically Stabilized Earth ATMS: Advanced Traffic Management System N: North Ave.: Avenue N/A: Not Applicable BA: Bachelor of Arts NE: Northeast Blvd.: Boulevard NEPA: National Environmental Policy Act BOCC: Board of County Commissioners PD&E: Project Development and Environment BS: Bachelor of Science PER: Preliminary Engineering Report BSCE: Bachelor of Science in Civil Engineering PES: Preliminary Engineering Study BSME: Bachelor of Science in Mechanical Engineering PIC: Principal-in-Charge CADD: Computer Aided Design and Drafting PLS: Professional Land Surveyor CEI: Construction Engineering and Inspection PM: Project Manager CEP: Certified Environmental Professional PSM: Professional Surveyor and Mapper CPM: Critical Path Method PSTA: Pinellas Suncoast Transit Authority CR: County Road PWS: Professional Wetland Scientist CSE: Certified Senior Ecologist QA: Quality Assurance E: East QC: Quality Control EA: Environmental Assessment Rd.: Road EAA: Agricultural Area RFQ: Request for Qualifications EI: Engineering Intern R/W: Right-of-Way EIS: Environmental Impact Statement S: South FDOT: Florida Department of Transportation SEIR: Supplemental Environmental Impact Report FGCU: Florida Gulf Coast University SJWMD: St. John’s Water Management District FL: Florida SP&M: Signing and Pavement Markings FY: Fiscal Year SR: State Road GEC: General Engineering Contract St.: Street I: Interstate SUE: Subsurface Utility Engineering ICPR: Interconnected Pond Routing SW: Southwest Inc.: Incorporated TBD: To be Determined ITS: Intelligent Transportation Systems US: United States Jr.: Junior USACE: U.S. Army Corps of Engineers K: Thousand UWHC: Utility Work by Highway Contractor LAP: Local Agency Program Volkert: Volkert, Inc. LDD: Land Development Desktop W.: West

July 14, 2014 B

AIM Engineering & Surveying, Inc. Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 1

FIRM PROFILE

Proposed Discipline: ______Professional Engineering & Surveying

1. Firm (or joint venture) Name & Address 1c. Licensed to do business in the State of Florida Volkert, Inc. ______X Yes ______No 1408 N. Westshore Blvd., Suite 600 Tampa, FL 33607 1d. Name, Title & Telephone Number of Principal to Contact Michael A. Osipov, PE Vice President/Project Manager 813.875.1365

1e. Address of office to perform work, if different from 1a. Firm is ____ National ____X Regional ____ Local Item 1

FEIN # ______63-0247014

1b. Firm is a Certified Minority Business Enterprise ____ Yes ____X No

2. Please list the number of people by discipline that your firm/joint venture will commit to the County's project. Management, QA/QC: 4 PD&E: 3 R/W Services: 2 Roadway/MOT: 4 Structures: 3 Utilities: 3 Traffic/S&PM/Signals: 2 Survey: 10 Public Involvement: 4 ITS: 2 Subsurface Utility Engineering: 2 Constructibility/Bidability/LAP: 2 Drainage/Permitting: 3 Geotechnical/Contamination: 4

3. If submittal is by joint venture list participating firms and outline specific areas of responsibility (including administrative, technical, and financial) for each firm: N/A

3a. Has this joint venture previously worked together? ____ Yes ____ No

1 Financial Services Department Page 37 of 47 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services

GLOSSARY 3D: Three Dimensional M: Million 3R: Resurfacing, Restoration, Rehabilitation MBA: Master of Business Administration AA: Associates of Arts MOT: Maintenance of Traffic AAS: Associate of Applied Science MPA: Master of Public Administration ADA: Americans with Disabilities Act MPH: Miles Per Hour Alt: Alternate MS: Master of Science ARRA: American Recovery and Reinvestment Act MSCE: Master of Science in Civil Engineering AS: Associates of Science MSE: Mechanically Stabilized Earth ATMS: Advanced Traffic Management System N: North Ave.: Avenue N/A: Not Applicable BA: Bachelor of Arts NE: Northeast Blvd.: Boulevard NEPA: National Environmental Policy Act BOCC: Board of County Commissioners PD&E: Project Development and Environment BS: Bachelor of Science PER: Preliminary Engineering Report BSCE: Bachelor of Science in Civil Engineering PES: Preliminary Engineering Study BSME: Bachelor of Science in Mechanical Engineering PIC: Principal-in-Charge CADD: Computer Aided Design and Drafting PLS: Professional Land Surveyor CEI: Construction Engineering and Inspection PM: Project Manager CEP: Certified Environmental Professional PSM: Professional Surveyor and Mapper CPM: Critical Path Method PSTA: Pinellas Suncoast Transit Authority CR: County Road PWS: Professional Wetland Scientist CSE: Certified Senior Ecologist QA: Quality Assurance E: East QC: Quality Control EA: Environmental Assessment Rd.: Road EAA: Everglades Agricultural Area RFQ: Request for Qualifications EI: Engineering Intern R/W: Right-of-Way EIS: Environmental Impact Statement S: South FDOT: Florida Department of Transportation SEIR: Supplemental Environmental Impact Report FGCU: Florida Gulf Coast University SJWMD: St. John’s Water Management District FL: Florida SP&M: Signing and Pavement Markings FY: Fiscal Year SR: State Road GEC: General Engineering Contract St.: Street I: Interstate SUE: Subsurface Utility Engineering ICPR: Interconnected Pond Routing SW: Southwest Inc.: Incorporated TBD: To be Determined ITS: Intelligent Transportation Systems US: United States Jr.: Junior USACE: U.S. Army Corps of Engineers K: Thousand UWHC: Utility Work by Highway Contractor LAP: Local Agency Program Volkert: Volkert, Inc. LDD: Land Development Desktop W.: West

July 14, 2014 C

AIM Engineering & Surveying, Inc. RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services TAB C ORGANIZATIONAL CHART SUMTER COUNTY

Michael Osipov, PE (32)

PROJECT MANAGER

Gene Quinn, PE, PLS (38) David Gwynn, Jr., PE (31)

QA/QC MANAGER PRINCIPAL-IN-CHARGE

KEY STAFF

ROADWAY/MOT STRUCTURES UTILITIES R/W SERVICES Sarah Hill, PE (12) Edward Brekhus, PE (34) Michelle Eguia Michael Osipov, PE Summer Ahrens, PE (9) Matthew Ellis, PE (6) Joseph Stukey, PSM Katie Agoado, EI (2) GEOTECHNICAL Justin Cullen (11) DRAINAGE/PERMITTING Jeff D’Huvyetter, PE (25) PUBLIC INVOLVEMENT Charles Samuels (36) Michael Osipov, PE PD&E James Townsend, PE (8) Michelle Eguia (16) ITS Nicole Harris, PE (8) Morgan Bouchard, EI (4) Jay Calhoun, PE (36) Theresa Frederick (12) Paul Looney, CEP, PWS, CSE (33) Sara Calhoun, PE (19) SURVEY CONSTRUCTIBILITY/BIDABILITY TRAFFIC/S&PM/SIGNALS Joseph Stukey, PSM (15) SUE James Lynch, PE (29) Gaelan Bishop, PE (15) William Fulghum, PLS (31) Matthew LaLuzerne, PSM (9) Brian Kanely, PE (41) 5 Survey Crews Available

SUBCONSULTANTS Note: (XX) = Years of Experience Cardno TBE | VIBEngineering, Inc.

July 14, 2014 1 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Michael A. Osipov, PE/Vice President Project assignment: Project Manager/Public Involvement/R/W Services Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______18 With other firms______14

Education: Degree(s)/year/school/specialization: MBA, University of , 1998 BSCE, Tri-State University, 1984

Active registration: Year first registered/discipline Professional Engineer, Florida #41136, 1989

Other experience and qualifications relevant to the proposed project: For 32 years, Mr. Osipov has provided design services for state and local agencies serving in various capacities which include: Project Manager, Project Engineer, and Construction Engineer and Inspector. In addition to his expertise in roadway design and planning, which includes interstate and arterial widenings/reconstructions, interchanges, milling and resurfacing, he is also highly experienced in storm sewer design, stormwater pond design, and environmental permitting. Mr. Osipov is also experienced in public involvement, utility engineering/coordination, R/W assessment, residential, commercial and industrial site development engineering. Mr. Osipov has experience providing similar services on the following relevant projects: • C-468 Preliminary Engineering Study from US 301 to East of Florida’s Turnpike, Sumter County, Florida • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida • On-Call Traffic Engineering Services Contract, Sumter County, Florida • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida • SR 80/US 27 Interchange, Hendry County, Florida • Bayshore Boulevard Redevelopment, Tampa, Florida • Intersection Improvement Projects: US 301/McIntosh Road, SR 574/McIntosh Road, SR 39/McGee Road, Hillsborough County, Florida

2

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: David Gwynn, Jr., PE/Senior Vice President Project assignment: Principal-in-Charge Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______5 With other firms______26

Education: Degree(s)/year/school/specialization: MSCE, University of Florida, 1988 BSCE, US Military Academy at West Point, 1983

Active registration: Year first registered/discipline Professional Engineer, Alabama #24203, 2001 Professional Engineer, Florida #43967, 1991 Professional Engineer, Mississippi #15692, 2002 Professional Engineer, Georgia #26379, 2000 Professional Engineer, Kentucky #23037, 2003 Other experience and qualifications relevant to the proposed project: Mr. Gwynn is responsible for the overall management of the firm’s transportation practice in Florida. He has served as Project Manager, Project Director, and/or Principal-In-Charge for numerous transportation projects throughout Florida. Mr. Gwynn has also managed over 50 continuing engineering services contracts for various state, county and municipal agencies. His experience includes numerous projects ranging from transportation planning, PD&E studies and traffic engineering studies to large roadway and interchange design projects. He has also served as an expert in the area of access management and community awareness. Mr. Gwynn has experience providing similar services on the following relevant projects: • On-Call Traffic Engineering Services Contract, Sumter County, Florida • Highway Safety Program, Sumter County, Florida • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida • US 19/SR 55 from New York Avenue to the Pasco/Hernando County Line, Pasco County, Florida • C-468 Preliminary Engineering Study from US 301 to East of Florida’s Turnpike, Sumter County, Florida • SR 80/US 27 Interchange, Hendry County, Florida

3

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Gene Quinn, PE, PLS/Vice President Project assignment: QA/QC Manager Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______9 With other firms______29

Education: Degree(s)/year/school/specialization: BSCE, University of Florida, 1982

Active registration: Year first registered/discipline Professional Engineer, Florida #34908, 1984 Professional Land Surveyor, Florida #4258, 1986 Other experience and qualifications relevant to the proposed project: Mr. Quinn is responsible for project management and quality control of major survey and roadway design contracts. His responsibilities include: ensuring schedule compliance and timely delivery, administering quality assurance procedures, and quality control reviews. He is experienced in all phases of roadway design, project management and preparation of construction plans. His has surveying and mapping experience in all phases of boundary, topographic, and design survey, geodetic survey using global positioning, right of way surveys and route surveys, construction staking, legal description preparation, preparation of record plats for subdivision of lands, and preparation of right of way control maps and right of way maps for transportation projects. Mr. Quinn has experience providing similar services on the following relevant projects: • District 5 District Wide Survey Services, Florida • District 2 District Wide Survey Services, Florida • District 7 District Wide Survey Services, Florida • Bayshore Boulevard Redevelopment, Tampa, Florida • SR 25/US 27 from 1,000’ North of Lake Louisa to North of SR 50, Lake County, Florida

4

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Katie Agoado, EI/Roadway Engineer Project assignment: Roadway/MOT Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______2 With other firms______>1

Education: Degree(s)/year/school/specialization: MSCE, University of South Florida, 2010 BSCE, Florida State University, 2009

Active registration: Year first registered/discipline Engineer Intern, Florida #1100013872, 2009

Other experience and qualifications relevant to the proposed project: Ms. Agoado has over two years of experience in roadway and bridge design as well as quantities and signing and pavement markings. She is proficient in MicroStation, AutoCAD, MathCAD, Microsoft Project, Microsoft Office and Fosse. Ms. Agoado has experience providing similar services on the following relevant projects: • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida • SR 590 (NE Coachman Road) from West of Marilyn Street to East of Audrey Drive, Pinellas County, Florida • Martin Luther King Extension for the Elizabeth River Crossing Project, Portsmouth, Virginia

5

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Summer Ahrens, PE/Roadway Engineer Project assignment: Roadway/MOT Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______3 With other firms______6

Education: Degree(s)/year/school/specialization: BSCE, University of South Florida, 2004

Active registration: Year first registered/discipline Professional Engineer Florida #70642, 2010

Other experience and qualifications relevant to the proposed project: Ms. Ahrens is a roadway engineer with nine years of experience in roadway design on a variety of improvement projects ranging from conceptual layouts during PD&E to design-build. Her experience includes horizontal and vertical geometric design, superelevation calculations, pavement design, design criteria, site grading, utility coordination, design variations, signing and pavement markings, profile, cross sections, typical sections, guide signs, and quantities. She has thorough knowledge of MicroStation, and GEOPAK. Ms. Ahrens has experience providing similar services on the following relevant projects: • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida • US 19/SR 55 from New York Avenue to the Pasco/Hernando County Line, Pasco County, Florida • SR 590 (NE Coachman Road) from West of Marilyn Street to East of Audrey Drive, Pinellas County, Florida

6

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Gaelan Bishop, PE/Senior Roadway Engineer Project assignment: Traffic/S&PM/Signals Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______12 With other firms______3

Education: Degree(s)/year/school/specialization: BSME, Florida State University, 1996

Active registration: Year first registered/discipline Professional Engineer, Florida #60804, 2004

Other experience and qualifications relevant to the proposed project: Mr. Bishop has 15 years of design experience on both rural and urban facilities including new construction. He has provided design and QA/QC services for state and local agencies serving in various capacities which include Project Manager and Project Engineer. He has expertise in roadway design and planning, which includes interstate and arterial widenings/ reconstructions, interchanges, milling and resurfacing. Mr. Bishop is also experienced in: drainage design, storm sewer design, stormwater pond design, environmental permitting pavement design, signing and pavement marking, utility coordination, electronic submittals, specifications, advanced MOT, community awareness, long range estimates, access management, and ADA design. Mr. Bishop has experience providing similar services on the following relevant projects: • Preliminary Roadway Improvements for the Intersection of CR 478 and CR 707, Sumter County, Florida • On-Call Traffic Engineering Services Contract, Sumter County, Florida • Bayshore Boulevard Redevelopment, Tampa, Florida • SR 25/US 27 from 1,000’ North of Lake Louisa to North of SR 50, Lake County, Florida • SW 40th Boulevard Extension from SW 47th Avenue to the Existing SW 40th Boulevard Terminus, Alachua County, Florida

7

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Morgan Bouchard, EI/Drainage Engineer Project assignment: Drainage/Permitting Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______4 With other firms______0

Education: Degree(s)/year/school/specialization: BSCE, University of Florida, 2009

Active registration: Year first registered/discipline Engineer Intern, Florida #1100014808, 2010

Other experience and qualifications relevant to the proposed project: Ms. Bouchard has over four years of experience which includes roadway and drainage design, quantities, utility coordination, specifications and environmental permitting. Ms. Bouchard has experience providing similar services on the following relevant projects: • C-468 Preliminary Engineering Study from US 301 to East of Florida’s Turnpike, Sumter County, Florida • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida • SR 80/US 27 Interchange, Hendry County, Florida • SR 590 (NE Coachman Road) from West of Marilyn Street to East of Audrey Drive, Pinellas County, Florida • US 19/SR 55 from New York Avenue to the Pasco/Hernando County Line, Pasco County, Florida

8

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Edward Brekhus, PE/Senior Structural Engineer Project assignment: Structures Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______22 With other firms______12

Education: Degree(s)/year/school/specialization: BSCE, North Carolina State University, 1979

Active registration: Year first registered/discipline Professional Engineer, Florida #44822, 1991 Professional Engineer, Virginia #049589, 2011 Other experience and qualifications relevant to the proposed project: Mr. Brekhus has 34 years design experience in both structural design and in-service structural evaluations and is responsible for coordination of all project activities, schedules, budgets, and maintaining communications with the Project Manager. His responsibilities include the supervision and direction of design teams, including subconsultants, preparation of engineering reports and construction documents. The combination of his experience includes bridge structures, sign structures, mast arm structures and building repair/renovation, which gives him unique qualifications, extensive knowledge in the design of transportation structures and buildings, and bridge construction. Mr. Brekhus has experience providing similar services on the following relevant projects: • C-468 Preliminary Engineering Study from US 301 to East of Florida’s Turnpike, Sumter County, Florida • SR 590 (NE Coachman Road) from West of Marilyn Street to East of Audrey Drive, Pinellas County, Florida • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida • SR 80/US 27 Interchange, Hendry County, Florida • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida

9

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Justin Cullen/CADD Designer Project assignment: Roadway Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______6 With other firms______5

Education: Degree(s)/year/school/specialization: N/A

Active registration: Year first registered/discipline N/A

Other experience and qualifications relevant to the proposed project: Mr. Cullen is a CADD Designer with over 11 years of experience on similar projects. Mr. Cullen has experience providing similar services on the following relevant projects: • C-468 Preliminary Engineering Study from US 301 to East of Florida’s Turnpike, Sumter County, Florida • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida • Highway Safety Program, Sumter County, Florida • SR 595/Alt 19 from Pinellas County Line to US 19/SR 55, Pasco County, Florida

10

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Jeff D’huyvetter, PE/Geotechnical Engineer Project assignment: Geotechnical Name of firm with which associated: Allied Engineering & Testing (a Volkert, Inc. company) Years experience:

With this firm ______12 With other firms______13

Education: Degree(s)/year/school/specialization: MSCE, Georgia Institute of Technology, 2002 BSCE, Southern College of Technology, 1992

Active registration: Year first registered/discipline Professional Engineer, Florida, #59716

Other experience and qualifications relevant to the proposed project: Mr. D’Huyvetter oversees geotechnical, construction materials testing, and environmental projects and is responsible for day-to-day activities as well as long-term management. He has served as Geotechnical Engineer on the Metro Parkway and Three Oaks Parkway projects in Lee County, Florida; Suncoast Aluminum Furniture Manufacturing Facility in Fort Myers, Florida; FGCU Student Support Center at Florida Gulf Coast University; International Design Center (Miromar) in Estero, Florida and Page Field General Aviation Airport Expansion (new terminal, hangars and restaurant) in Fort Myers, Florida. Mr. D’Huyvetter has experience providing similar services on the following relevant projects: • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida • Modification to SR 90 (US 41), /Dade County, Florida • Ft Lauderdale International Airport, Ft Lauderdale, Florida • US Army Corps of Engineers Site 1 Impoundment, Palm Beach County, Florida • EAA A-1 Reservoir, South Bay, Florida

11

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Michelle Eguia/Project Coordinator Project assignment: Utilities/Public Involvement Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______10 With other firms______6

Education: Degree(s)/year/school/specialization: BA, Business Administration, St. Leo University, 2004 AS, Architecture and Building Construction Technology, Hillsborough Community College, 1999

Active registration: Year first registered/discipline N/A

Other experience and qualifications relevant to the proposed project: Ms. Eguia has over 16 years experience in the engineering field. Her experience consists of project coordination, utility coordination, review of utility/access permits, field inspection of utility improvements/relocations, public involvement, field support, UWHC and construction assistance. She has assisted with numerous PD&E reevaluations, public involvement, and roadway design projects. Ms. Eguia has experience providing similar services on the following relevant projects: • C-468 Preliminary Engineering Study from US 301 to East of Florida’s Turnpike, Sumter County, Florida • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida • SR 80/US 27 Interchange, Hendry County, Florida • Bayshore Boulevard Redevelopment, Tampa, Florida • Intersection Improvement Projects: US 301/McIntosh Road, SR 574/McIntosh Road, SR 39/McGee Road, Hillsbor- ough County, Florida • SR 590 (NE Coachman Road) from West of Marilyn Street to East of Audrey Drive, Pinellas County, Florida • SR 25/US 27 from SR 60 to Towerview Boulevard, Polk County, Florida

12

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Matthew Ellis, PE/Structural Engineer Project assignment: Structures Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______3 With other firms______3

Education: Degree(s)/year/school/specialization: BSCE, Florida State University, 2005

Active registration: Year first registered/discipline Professional Engineer, Florida #75462, 2013

Other experience and qualifications relevant to the proposed project: Mr. Ellis has experience in bridge, roadway, drainage/permitting, and site designs. He has worked on FDOT, municipal, and infrastructure improvement projects. His design experience includes AutoCAD (regular and Civil 3D), SLOPE W, and ICPR, LDD, WaterCAD Modeler, ICPR, AutoTurn, and Storm Tabs. Mr. Ellis has experience providing similar services on the following relevant projects: • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida • Selmon Expressway Design/Build from W of Morgan Street to W of 22nd Street, Tampa, Florida • US 19/SR 55 from New York Avenue to the Pasco/Hernando County Line, Pasco County, Florida • Martin Luther King Extension for the Elizabeth River Crossing Project, Portsmouth, Virginia • I-59/I-20 Bridge Rehabilitation from 19th Street to 20th Street, Jefferson County, Alabama • Route 738 over Glade Creek Bridge Replacement, Botetourt County, Virginia

13

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Theresa Frederick/Graphics Specialist Project assignment: Public Involvement Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______>1 With other firms______12

Education: Degree(s)/year/school/specialization: N/A

Active registration: Year first registered/discipline N/A

Other experience and qualifications relevant to the proposed project: Ms. Frederick has more than 12 years of graphic design experience. Her specific responsibilities have included website design and maintenance; logo creation; creating covers and tabs for proposals, reports and presentations; designing and editing PowerPoint presentations; as well as editing and formatting technical reports. Ms. Frederick’s responsibilities also include designing and coordinating printed graphic collaterals such as public involvement sign in sheets, name tags, advertisements, newsletters, and handouts. Ms. Frederick has experience providing similar services on the following relevant projects: • US 92 from County Line Road to Wabash Avenue, Lakeland, Florida • General Engineering Consultant Contract; Charlotte, Collier, DeSoto, Glades, Hardee, Hendry, Highlands, Lee, Mana- tee, Okeechobee, Polk, and Sarasota Counties, Florida • SR 80 Widening from Birchwood Parkway to Dalton Lane, Hendry County, Florida • Zemel Road at Burnt Store Road (CR 765) PD&E Study, Charlotte County, Florida • Harney Road at Sligh Avenue Intersection Improvements Project, Hillsborough County, Florida • US 98 Project PD&E Study from US 27 to Airport Road, Sebring, Florida

14

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: William Fulghum, PLS/Senior Surveyor Project assignment: Survey Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______4 With other firms______27

Education: Degree(s)/year/school/specialization: Vocational Technical Institute, 1990

Active registration: Year first registered/discipline Professional Land Surveyor, Florida #4993, 1991

Other experience and qualifications relevant to the proposed project: Mr. Fulghum has successfully led teams as a Project Manager, Field Supervisor, and Party Chief. He has performed and supervised both field and office work, including construction surveys, boundary surveys, topographic surveys, control surveys, condominium surveys, and pipeline and highway route surveys. His experience includes R/W control surveys, design surveys, horizontal and vertical control networks, title search analysis needed for the computation of property lines, and performing geometric calculations necessary to provide descriptions and determinations of parcel areas. Mr. Fulghum has experience providing similar services on the following relevant projects: • SR 595/Alt 19 from Pinellas County Line to US 19/SR 55, Pasco County, Florida • US 19/SR 55 from New York Avenue to the Pasco/Hernando County Line, Pasco County, Florida • Bayshore Boulevard Redevelopment, Tampa, Florida • SR 574/Martin Luther King, Jr. Boulevard from Forbes Road to Turkey Creek Road, Hillsborough County, Florida • US Business 41/SR 685/Florida Ave. from N of Fletcher Avenue to N of Bearss Ave., Hillsborough County, Florida • SR 590 (NE Coachman Road) from West of Marilyn Street to East of Audrey Drive, Pinellas County, Florida

15

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Nicole Harris, PE/PD&E Project Manager Project assignment: PD&E Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______>1 With other firms______8

Education: Degree(s)/year/school/specialization: BSCE, Mississippi State University, 2005

Active registration: Year first registered/discipline Professional Engineer, Florida #74531, 2012

Other experience and qualifications relevant to the proposed project: Ms. Harris has over eight years of transportation experience. Having worked for FDOT District 1 as a Professional Engineer Trainee and PD&E Project Manager, her experience includes project management, highway planning and design, construction, maintenance, traffic operations, drainage design and public involvement. Ms. Harris has managed numerous PD&E studies. She has been involved in the preparation of the NEPA documents and has extensive knowledge of state and federal processes. She has recent experience with SEIR as she has managed and completed a study for a new limited access roadway from SR 60 to I-4 in Polk County. Ms. Harris has experience providing similar services on the following relevant projects: • Traffic Safety Feasibility Study for Intersections Improvements at 131st Street at 82nd Avenue N, 131st Street at 86th Avenue N & 125th Street at 86th Avenue N, Pinellas County, Florida • Central Polk Parkway Project, Polk County, Florida • SR 710 Project, Okeechobee, Florida • US 17 (SR 35) Reevaluation from CR 760A (Nocatee) to Heard Street, Desoto County, Florida

16

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Sarah Hill, PE/Senior Roadway Engineer Project assignment: Roadway/MOT Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______3 With other firms______9

Education: Degree(s)/year/school/specialization: BSCE, Embry Riddle Aeronautical University, 2001

Active registration: Year first registered/discipline Professional Engineer Florida #64647, 2006

Other experience and qualifications relevant to the proposed project: Ms. Hill has served as a Project Manager and Project Engineer on a wide variety of projects. She has 12 years of experience in roadway design, signing and pavement marking, utility coordination, plans production and project management. She has worked on a wide range of state and local agency projects which range from sidewalk design, weigh stations, 3R projects, new construction, interstate widening and design-build projects. Ms. Hill has experience providing similar services on the following relevant projects: • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida • 62nd Avenue North at 58th Street North Intersection Improvements, Pinellas County, Florida • US 19/SR 55 from New York Avenue to the Pasco/Hernando County Line, Pasco County, Florida • SR 590 (NE Coachman Road) from West of Marilyn Street to East of Audrey Drive, Pinellas County, Florida

17

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Brian Kanely, PE/Traffic Engineer Project assignment: Traffic/S&PM/Signals Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______7 With other firms______34

Education: Degree(s)/year/school/specialization: MSCE, North Carolina State Univeristy, 1972 BSCE, North Carolina State University, 1969

Active registration: Year first registered/discipline Professional Engineer, Florida, #22591, 1977

Other experience and qualifications relevant to the proposed project: Mr. Kanely’s experience includes traffic calming and roundabouts; traffic and transportation engineering designs, studies, and reports; traffic operations; transportation planning; signing and pavement markings; parking; development review; and bicycle/pedestrian facilities. Prior to joining Volkert, he worked for the City of Gainesville, Florida for over 34 years as Traffic Engineering Director and Transportation Services Manager. Mr. Kanely has experience providing similar services on the following relevant projects: • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida • Preliminary Roadway Improvements for the Intersection of CR 478 and CR 707, Sumter County, Florida • On-Call Traffic Engineering Services Contract, Sumter County, Florida • Traffic Safety Feasibility Study for Intersections Improvements at 131st Street at 82nd Avenue N, 131st Street at 86th Avenue N & 125th Street at 86th Avenue N, Pinellas County, Florida • Highway Safety Program, Sumter County, Florida • Cellon Creek Preserve Traffic Impact Analysis Independent Review, Alachua, Florida • Transportation Study for the Legacy Project, Gainesville, Florida

18

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Paul Looney, CEP, PWS, CSE/Environmental Scientist Project assignment: PD&E Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______11 With other firms______22

Education: Degree(s)/year/school/specialization: MS Biology (Coastal Zone Studies), University of , 1992 BS Biology, Pennsylvania State University, State College, 1980

Active registration: Year first registered/discipline Certified Environmental Professional #05040349, 2005 Certified Senior Ecologist, 2005 Professional Wetland Scientist #1206, 1999 Other experience and qualifications relevant to the proposed project: Mr. Looney has 33 years of professional experience, including 19 years as an ecologist. His environmental project experience includes performing wetland delineations, evaluations, permitting, threatened and endangered species vegetation and wildlife investigations, coastal zone management investigations, biological assessments, Essential Fish Habitat Assessments, NEPA Documentation including EIS, EA, and environmental regulatory compliance evaluations. Mr. Looney has experience providing similar services on the following relevant projects: • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida • C-468 Preliminary Engineering Study from US 301 to East of Florida’s Turnpike, Sumter County, Florida • SR 30/US 98 from Bayshore Road to Portside Drive PD&E Reevaluation, Santa Rosa County, Florida • SR 30E/Cape San Blas from North of Test Site D3A Entrance to Coastline Drive PD&E Study, Gulf County, Florida • SR 87 from North of Clear Creek Bridge to the Alabama State Line PD&E Study, Santa Rosa County, Florida • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida

19

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: James Lynch, PE/CEI Project assignment: Constructibility/Bidability and LAP Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______3 With other firms______26

Education: Degree(s)/year/school/specialization: BSCE, Florida International University AAS Civil Engineering Technology, Delaware Technical & Community College

Active registration: Year first registered/discipline Professional Engineer Florida #44731, 1991

Other experience and qualifications relevant to the proposed project: Mr. Lynch’s experience includes office and project management, roadway design, and all aspects of roadway and bridge construction. His experience includes roadway milling, resurfacing, reconstruction, LAP projects, low and high-level bridge replacement, bascule bridge rehabilitation, signal systems, microwave towers, earthwork, retention ponds, and extensive utility relocation. He was also responsible for the evaluation of supplemental agreements, claims for entitlement, preparation of independent cost estimates and negotiated final costs, constructability reviews of design plans prior to bid, approval of CPM schedules, and preparation of as-built plans. Mr. Lynch has experience providing similar services on the following relevant projects: • General Engineering Consulting Services, Sumter County, Florida »» C-476E Resurfacing, Sumter County, Florida »» C-470 Resurfacing, Sumter County, Florida »» C-48E Resurfacing, Sumter County, Florida »» C-476W Resurfacing, Sumter County, Florida

20

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Charles Samuels/Drainage Engineer Project assignment: Drainage/Permitting Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______3 With other firms______33

Education: Degree(s)/year/school/specialization: Attended Polk Community College, Valdosta State College, Abraham Baldwin Agricultural College

Active registration: Year first registered/discipline N/A

Other experience and qualifications relevant to the proposed project: Mr. Samuels has an extensive background in all aspects of stormwater management, bridge hydraulics, open channel hydraulics, and basin hydrology. He is skilled in the use of state-of-the art computer technologies associated with his field of expertise, as well as spreadsheet applications. He has served as Project Manager and/or Project Engineer on over 200 design and/or planning projects during his career. He has significant experience in the design, permitting, and construction of stormwater management and floodplain mitigation facilities for surface water runoff as well as innovative design aspects that have become standard practice in his field. Mr. Samuels has experience providing similar services on the following relevant projects: • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida • 62nd Avenue North at 58th Street North Intersection Improvements, Pinellas County, Florida • SR 80 Widening from Indian Hills Drive to CR 833, Hendry/Glades Counties, Florida • SR 80/US 27 Interchange, Hendry County, Florida • US 19/SR 55 from New York Avenue to the Pasco/Hernando County Line, Pasco County, Florida • SR 590 (NE Coachman Road) from West of Marilyn Street to East of Audrey Drive, Pinellas County, Florida

21

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: Joseph Stukey, PSM/Senior Survey Project Manager Project assignment: Survey, R/W Services Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______4 With other firms______11

Education: Degree(s)/year/school/specialization: BS Geomatics, University of Florida, 1999

Active registration: Year first registered/discipline Professional Surveyor and Mapper, Florida #6514 Professional Land Surveyor, Alabama #26873 Other experience and qualifications relevant to the proposed project: Mr. Stukey is responsible for numerous surveying and mapping activities including project research, survey production, and status reporting. He has extensive experience in R/W map preparation. Mr. Stukey has experience providing similar services on the following relevant projects: • General Engineering Consulting Services, Sumter County, Florida • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida • District 5 District Wide Survey Services, Florida • District 7 District Wide Survey Services, Florida • US 19/SR 55 from New York Avenue to the Pasco/Hernando County Line, Pasco County, Florida • SR 580/Hillsborough Avenue from Race Track Road to East of Silvermill Drive, Hillsborough County, Florida • SR 13 at Ward’s Creek, St Johns County, Florida • US Business 41/SR 685/Florida Ave. from N of Fletcher Avenue to N of Bearss Ave., Hillsborough County, Florida

22

Financial Services Department Page 38 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 2

TEAM COMPOSITION

Brief resume of key persons, specialists and individual consultants shall be assigned to the project. Utilize one sheet per person. (Include and organizational chart of the team; Additional information may be attached)

Name & Title: James Townsend, PE/Roadway Engineer Project assignment: Drainage/Permitting Name of firm with which associated: Volkert, Inc. Years experience:

With this firm ______1 With other firms______7

Education: Degree(s)/year/school/specialization: BSCE, University of Florida, 2005

Active registration: Year first registered/discipline Professional Engineer Florida #73346, 2011

Other experience and qualifications relevant to the proposed project: Mr. Townsend has over eight years of experience in roadway design on a variety of improvement projects. His experience includes drainage design, horizontal and vertical geometric design, superelevation calculation, pavement design, design criteria, site grading, design variations, signing and pavement markings, profile, cross sections, and typical sections. He has thorough knowledge of MicroStation and GEOPAK. Mr. Townsend has experience providing similar services on the following relevant projects: • 62nd Avenue North at 58th Street North Intersection Improvements, Pinellas County, Florida • Hercules Avenue Railroad Crossing Improvements, Pinellas County, Florida • SR 590 (NE Coachman Road) from West of Marilyn Street to East of Audrey Drive, Pinellas County, Florida • C-468 Widening CR 505 east of the Florida’s Turnpike, Sumter County, Florida

23

Financial Services Department Page 38 of 47 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services TAB C

July 14, 2014 24 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services TAB C

July 14, 2014 25 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services TAB C

July 14, 2014 26 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services TAB C

July 14, 2014 27 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services TAB C

July 14, 2014 28 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services TAB C

July 14, 2014 29 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services TAB C

July 14, 2014 30 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services

GLOSSARY 3D: Three Dimensional M: Million 3R: Resurfacing, Restoration, Rehabilitation MBA: Master of Business Administration AA: Associates of Arts MOT: Maintenance of Traffic AAS: Associate of Applied Science MPA: Master of Public Administration ADA: Americans with Disabilities Act MPH: Miles Per Hour Alt: Alternate MS: Master of Science ARRA: American Recovery and Reinvestment Act MSCE: Master of Science in Civil Engineering AS: Associates of Science MSE: Mechanically Stabilized Earth ATMS: Advanced Traffic Management System N: North Ave.: Avenue N/A: Not Applicable BA: Bachelor of Arts NE: Northeast Blvd.: Boulevard NEPA: National Environmental Policy Act BOCC: Board of County Commissioners PD&E: Project Development and Environment BS: Bachelor of Science PER: Preliminary Engineering Report BSCE: Bachelor of Science in Civil Engineering PES: Preliminary Engineering Study BSME: Bachelor of Science in Mechanical Engineering PIC: Principal-in-Charge CADD: Computer Aided Design and Drafting PLS: Professional Land Surveyor CEI: Construction Engineering and Inspection PM: Project Manager CEP: Certified Environmental Professional PSM: Professional Surveyor and Mapper CPM: Critical Path Method PSTA: Pinellas Suncoast Transit Authority CR: County Road PWS: Professional Wetland Scientist CSE: Certified Senior Ecologist QA: Quality Assurance E: East QC: Quality Control EA: Environmental Assessment Rd.: Road EAA: Everglades Agricultural Area RFQ: Request for Qualifications EI: Engineering Intern R/W: Right-of-Way EIS: Environmental Impact Statement S: South FDOT: Florida Department of Transportation SEIR: Supplemental Environmental Impact Report FGCU: Florida Gulf Coast University SJWMD: St. John’s Water Management District FL: Florida SP&M: Signing and Pavement Markings FY: Fiscal Year SR: State Road GEC: General Engineering Contract St.: Street I: Interstate SUE: Subsurface Utility Engineering ICPR: Interconnected Pond Routing SW: Southwest Inc.: Incorporated TBD: To be Determined ITS: Intelligent Transportation Systems US: United States Jr.: Junior USACE: U.S. Army Corps of Engineers K: Thousand UWHC: Utility Work by Highway Contractor LAP: Local Agency Program Volkert: Volkert, Inc. LDD: Land Development Desktop W.: West

July 14, 2014 D

AIM Engineering & Surveying, Inc. Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 3

OUTSIDE KEY CONSULTANTS

If respondent is not a joint venture, list outside key consultants/associates that shall be used for the proposed project. (Form may be reproduced if additional space is necessary.) Include resume of all individuals assigned to this project including projects they have worked on and contact names for each.

Company Name: Cardno TBE Address of office proposed for this project: 3038 Southfork Dr, Apopka, FL 32712

Role Projected % of Name of Individual Assigned Firm Worked Individual (i.e. Civil Engineering, Over-All Work to this Project with prime before Worked with Environmental, Landscape on Entire (Yes or No) prime before Architectural…) Project (Yes or No)

Subsurface Utility Engineering 5% Matthew LaLuzerne, PSM Yes Yes

Attach resume and projects.

Company Name: VIBEngineering, Inc. Address of office proposed for this project: 4350 West Cypress Street, Suite 225, Tampa, FL 33607

Role Projected % of Name of Individual Assigned Firm Worked Individual (i.e. Civil Engineering, Over-All Work to this Project with prime before Worked with Environmental, Landscape on Entire (Yes or No) prime before Architectural…) Project (Yes or No) Intelligent Transportation Jay Calhoun, PE 5% Yes Yes Systems Sara Colhoun, PE

Attach resume and projects. Company Name:

Address of office proposed for this project:

Role Projected % of Name of Individual Assigned Firm Worked Individual (i.e. Civil Engineering, Over-All Work to this Project with prime before Worked with Environmental, Landscape on Entire (Yes or No) prime before Architectural…) Project (Yes or No)

N/A

Attach resume and projects.

Are there any contractual agreements between the respondent (prime consultant) and any of the proposed sub- consultants? _____ yes _____ X no

If the answer is yes, the respondent shall attach, with their submittal, information describing the contractual relationship including a copy of any written contractual agreement. 1 Financial Services Department Page 39 of 47

Matthew R. LaLuzerne, PSM Contract Role Summary of Experience Subsurface Utility Engineering Mr. LaLuzerne oversees the day-to-day operations of surveying and mapping and Years' Experience subsurface utility engineering projects throughout . Mr. LaLuzerne has an extensive background with a variety of survey services. Starting with Cardno as an 9 intern his senior year of college, he has worked his way up, supplementing his hands Joined Cardno one experience with additional education. Applying practices learned while obtaining his Master’s in Business Administration, Mr. LaLuzerne has helped streamline February 2005 operational practices for both field and office procedures in Cardno’s Orlando branch. Education He has been able to utilize his strong academic background to provide enhanced professional services through faster response times and effective communication and MBA / Business / 2011 / Rollins scheduling. Mr. LaLuzerne has a complete understanding of how to identify and pull College from multiple resources (both in-house and subconsultants) to maximize field and BS / Geomatics / 2005 / University office productivity while reducing overall project schedule time. of Florida He has experience with MicroStation, GEOPAK, AutoCAD, Microsoft Excel, Microsoft Word, as well as numerous types of field equipment. Professional Registrations PSM / FL / #6766 Significant Projects Miscellaneous Surveying & Mapping/Subsurface Utility Engineering Services, Mulitple Affiliations Counties, FL Florida Surveying and Mapping Society, Central Florida Chapter: On a task work order basis, Cardno provides miscellaneous surveying and mapping President – Elect and subsurface utility engineering services for a variety of Florida Turnpike Enterprise - Most Valuable Surveyor West System projects. (December, 2013) Reference: Florida Turnpike Enterprise / Mike Joiner, PSM / 407.264.3637 Continuing Services Contract, Statewide, FL Since 1996, Cardno has provided designating (CI/ASCE Quality Level B) and locating (CI/ASCE Quality Level A) subsurface utility engineering and design surveying services for Florida Gas and Transmission, Co. (FGT). Cardno is the only firm in the state with the proper operator qualifications to complete test holes on FGT’s facilities and is extremely familiar with their procedures and protocols. Projects vary in size from very large to small and have included survey services such as sketch and descriptions, right of way surveying, topographic survey, as-built surveys and utility route surveys. To date, we have completed nearly 100 task work orders of various size and scope. Reference: Florida Gas and Transmission Co. / Larry Hood / 386.212.3136

cardno.com Matthew R. LaLuzerne, PSM Page 1 of 1 Sara E. Calhoun, PE Senior Transportation Engineer

PROFILE Years of Experience: Sara Calhoun has over 19 years of traffic operations and intelligent transportation  19 system (ITS) experience. She has served as Project Manager or Project Engineer for I-4 Surveillance and Motorist Information System (SMIS) Design-Build, the Jacksonville Education: SunGuide® Phase VIII System Manager Project, the FDOT District One Districtwide ITS  BS, Mechanical Engineering, Florida Consultant Project, the Tampa Bay SunGuide® Freeway Management System, and the Institute of Technology, 1993 SunNav ITS Incident Detection System. She is currently designing the ITS for SR 33  MS, Civil Engineering, from Old Combee Road to N of Tomkow Road, as well as serving as the QC Officer for University of South Florida, I-4 Fog Detection from East of the Polk Parkway to the Osceola County Line. 1998 PROJECT EXPERIENCE Professional Registration: Districtwide ITS Consultant | Gulf Coast of FL | FDOT D1 | Project Manager | Chris  PE : KS #18383 Birosak | (863) 519-2507  PE : FL #64295 Sara was responsible for providing a broad range of support to the FDOT D1 ITS program. Work-order assignments included the development of conceptual plans and Affiliations: system engineering documentation for three freeway segments in the District, the  Intelligent Transportation development of an operations plan for the Lakeland ATMS, support of the District traffic Society of Florida incident management teams, and technical research and document review.  Institute of Transportation

Engineers (ITE) Districtwide Transportation Systems Management and Operations | Eastern FL | FDOT D4 | Senior ITS Engineer | Melissa Ackert | (954) 777-4156 As the Senior ITS Engineer, Sara was responsible for providing technical assistance and review of plans, minimum technical requirements, and systems engineering documentation. The project included the preliminary design of five corridors in Broward County with ITS devices including arterial travel-time detection, CCTV cameras, and arterial DMSs.

Gainesville ATMS | Gainesville, FL | Gainesville, FL | Project Manager | Matt Weisman | (352) 393-7960 Sara was the Project Manager responsible for providing system management services for the installation of an area-wide ATMS. The system upgrade includes the installation of new traffic control cabinets and controllers, CCTV cameras, VDSs, and communications to the traffic management center (TMC). This will include assistance with controller and CCTV camera installation, in addition to support for the integration of the system into the new TMC. Signal timings were also developed and implemented for all of the upgraded signals, including four roadway corridors containing 27 intersections.

SR 686 ATMS Design | Pinellas County, FL | Pinellas County, FL | Project Manager | Ken Jacobs | (727) 464-8928 Sara served as the Project Manager for the design of the expansion of the Pinellas County ATMS along SR 686. The design plans included adding fiber-optic cable for communications, 5 arterial DMSs, 11 CCTV cameras, VDSs at mast-arm locations, stop-bar loops at strain-pole locations, and inground wireless detection at signalized intersections along SR 686.

Program Management Services | Pinellas County, FL | Pinellas County, FL | Project Manager | Ken Jacobs | (727) 464- 8928 Sara assists with the in-house management of the County ITS/ATMS program. She coordinates the ongoing design efforts and assists with writing specifications and procurement documents for the new equipment.

Lee County ATMS ITS Master Plan and Design-Build Criteria Package | Lee County, FL | FDOT D1 | Project Manager | Mark Roberts | (863) 519-2507 As the Project Manager, Sara was responsible for developing a detailed ATMS ITS Master Plan and Systems Engineering Management Plan to guide the County through the phased installation of a large-scale ATMS. In addition, the project documented the needs of the stakeholders, developed operational and technical requirements, and tracked the implementation of the technical requirements using the systems engineering process.

Jay H.L. Calhoun, PE Senior Transportation Engineer

PROFILE Years of Experience: Jay Calhoun, PE, has over 36 years of transportation planning and engineering  36 experience. Mr. Calhoun has served as Project Manager and QC Officer for many ITS projects, including the SunNav ITS Incident Detection System, the Jacksonville Education: BS, Civil Engineering, Lehigh SunGuide® Phase VIII, the Lee County ATMS/ITS Master Plan and Design-Build  University, 1973 Criteria Package, and the City of Winter Haven/Polk County ATMS/ITS Master Plan  MA, Planning, University of and Design-Build Criteria Package. He served as the Project Manager on the Sumter Virginia, 1977 County Advanced Transportation Management System (ATMS) Master Plan, and is  MBA, Business, University of the Project Manager for the FDOT District One I-4 Fog Detection from East of the South Florida, 1985 Polk Parkway to Osceola County Line. PROJECT EXPERIENCE Professional Registration:  PE : FL #33796 Sumter County ATMS Master Plan | Sumter County, FL | Sumter County | Project Manager | Jackey Jackson | (352) 569-6700 Affiliations: Jay serves as the Project Manager responsible for developing an ATMS Master Plan  Intelligent Transportation to guide the County through the phased installation of an ATMS. The project will Society of Florida document the needs of the stakeholders, develop operational and technical  Institute of Transportation requirements, and track the implementation of the technical requirements using the Engineers (ITE) systems engineering process.  Florida Engineering Society

Pinellas County Clearance Time Development | Pinellas County, FL | Pinellas County, FL | Project Manager | Glen Weaver | (727) 562-4794 Jay recently served as the Project Manager for the preparation of revised signal clearance intervals at 11 intersections in Pinellas County. The revised timings were required because of changes to FDOT policy on clearance intervals, particularly at those intersections with redlight running cameras.

City of Tampa ATMS Software Evaluation | City of Tampa, FL | City of Tampa, FL | Senior Project Engineer | Mike Scanlon | (813) 274‐8105 Jay served as a Senior Project Engineer responsible for the evaluation of ATMS software for the City. Several ATMS softwares were evaluated for features provided, ease of operation, and NTCIP compliance.

Districtwide Transportation Systems Management and Operations (TSM&O) Contract | Gulf Coast of FL | FDOT D1 | Senior Project Engineer | Mark Roberts | (863) 519-2507 Jay serves as the Senior Project Engineer for the completion of various tasks related to the development of the District's TSM&O program. This effort has included the preparation of ConOps and SEMP documents for the implementation of projects within the District.

Districtwide Transportation Systems Management and Operations | Eastern FL | FDOT D4 | QC Officer | Melissa Ackert | (954) 777-4156 Jay served as the QC Officer for the review of design plans, minimum technical requirements, and systems engineering documentation. The project included the preliminary design of five corridors in Broward County with ITS devices including arterial travel-time detection, CCTV cameras, and arterial DMSs.

SR 686 ATMS Design | Pinellas County, FL | Pinellas County, FL | Project Principal | Ken Jacobs | (727) 464-8928 Jay served as the Project Principal responsible for the quality control for the design of the expansion of the Pinellas County ATMS along SR 686. The design plans included adding fiber-optic cable for communications, 5 arterial DMSs, 11 CCTV cameras, VDSs at mast-arm locations, stop-bar loops at strain-pole locations, and inground wireless detection at signalized intersections along SR 686. RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services TAB D

Cardno TBE

VIBEngineering, Inc.

July 14, 2014 2 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services

GLOSSARY 3D: Three Dimensional M: Million 3R: Resurfacing, Restoration, Rehabilitation MBA: Master of Business Administration AA: Associates of Arts MOT: Maintenance of Traffic AAS: Associate of Applied Science MPA: Master of Public Administration ADA: Americans with Disabilities Act MPH: Miles Per Hour Alt: Alternate MS: Master of Science ARRA: American Recovery and Reinvestment Act MSCE: Master of Science in Civil Engineering AS: Associates of Science MSE: Mechanically Stabilized Earth ATMS: Advanced Traffic Management System N: North Ave.: Avenue N/A: Not Applicable BA: Bachelor of Arts NE: Northeast Blvd.: Boulevard NEPA: National Environmental Policy Act BOCC: Board of County Commissioners PD&E: Project Development and Environment BS: Bachelor of Science PER: Preliminary Engineering Report BSCE: Bachelor of Science in Civil Engineering PES: Preliminary Engineering Study BSME: Bachelor of Science in Mechanical Engineering PIC: Principal-in-Charge CADD: Computer Aided Design and Drafting PLS: Professional Land Surveyor CEI: Construction Engineering and Inspection PM: Project Manager CEP: Certified Environmental Professional PSM: Professional Surveyor and Mapper CPM: Critical Path Method PSTA: Pinellas Suncoast Transit Authority CR: County Road PWS: Professional Wetland Scientist CSE: Certified Senior Ecologist QA: Quality Assurance E: East QC: Quality Control EA: Environmental Assessment Rd.: Road EAA: Everglades Agricultural Area RFQ: Request for Qualifications EI: Engineering Intern R/W: Right-of-Way EIS: Environmental Impact Statement S: South FDOT: Florida Department of Transportation SEIR: Supplemental Environmental Impact Report FGCU: Florida Gulf Coast University SJWMD: St. John’s Water Management District FL: Florida SP&M: Signing and Pavement Markings FY: Fiscal Year SR: State Road GEC: General Engineering Contract St.: Street I: Interstate SUE: Subsurface Utility Engineering ICPR: Interconnected Pond Routing SW: Southwest Inc.: Incorporated TBD: To be Determined ITS: Intelligent Transportation Systems US: United States Jr.: Junior USACE: U.S. Army Corps of Engineers K: Thousand UWHC: Utility Work by Highway Contractor LAP: Local Agency Program Volkert: Volkert, Inc. LDD: Land Development Desktop W.: West

July 14, 2014 E

AIM Engineering & Surveying, Inc. Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 4

LOCATION

1. Specify address of Prime Consultant’s designated office where the majority of work on this project will be performed: Tampa office (1408 N. Westshore Blvd., Suite 600, Tampa, FL 33607)

2. Indicate percentage of total over-all project fees projected to be performed on this project by the Prime Consultant’s office specified above. (Do not include percentage of fees anticipated to be performed on this project by sub-consultants)

______%60

3. Specify address of Prime Consultant’s other office)s) where any part of the work on this project will be performed (if applicable): Gainesville office (3501 S Main Street, Suite 2, Gainesville, FL 32601)

4. Indicate percentage of total over-all fees projected to be performed on this project by the office specified above. Do not include percentage of fees anticipated to be performed on this project by sub- consultants.

______%30

5. Indicate percentage of total over-all fees projected to be performed on this project by firms located within Sumter County including the prime consultant and sub-consultants, utilizing information supplied above and on Form 2.

______%N/A

1

Financial Services Department Page 40 of 47 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services

GLOSSARY 3D: Three Dimensional M: Million 3R: Resurfacing, Restoration, Rehabilitation MBA: Master of Business Administration AA: Associates of Arts MOT: Maintenance of Traffic AAS: Associate of Applied Science MPA: Master of Public Administration ADA: Americans with Disabilities Act MPH: Miles Per Hour Alt: Alternate MS: Master of Science ARRA: American Recovery and Reinvestment Act MSCE: Master of Science in Civil Engineering AS: Associates of Science MSE: Mechanically Stabilized Earth ATMS: Advanced Traffic Management System N: North Ave.: Avenue N/A: Not Applicable BA: Bachelor of Arts NE: Northeast Blvd.: Boulevard NEPA: National Environmental Policy Act BOCC: Board of County Commissioners PD&E: Project Development and Environment BS: Bachelor of Science PER: Preliminary Engineering Report BSCE: Bachelor of Science in Civil Engineering PES: Preliminary Engineering Study BSME: Bachelor of Science in Mechanical Engineering PIC: Principal-in-Charge CADD: Computer Aided Design and Drafting PLS: Professional Land Surveyor CEI: Construction Engineering and Inspection PM: Project Manager CEP: Certified Environmental Professional PSM: Professional Surveyor and Mapper CPM: Critical Path Method PSTA: Pinellas Suncoast Transit Authority CR: County Road PWS: Professional Wetland Scientist CSE: Certified Senior Ecologist QA: Quality Assurance E: East QC: Quality Control EA: Environmental Assessment Rd.: Road EAA: Everglades Agricultural Area RFQ: Request for Qualifications EI: Engineering Intern R/W: Right-of-Way EIS: Environmental Impact Statement S: South FDOT: Florida Department of Transportation SEIR: Supplemental Environmental Impact Report FGCU: Florida Gulf Coast University SJWMD: St. John’s Water Management District FL: Florida SP&M: Signing and Pavement Markings FY: Fiscal Year SR: State Road GEC: General Engineering Contract St.: Street I: Interstate SUE: Subsurface Utility Engineering ICPR: Interconnected Pond Routing SW: Southwest Inc.: Incorporated TBD: To be Determined ITS: Intelligent Transportation Systems US: United States Jr.: Junior USACE: U.S. Army Corps of Engineers K: Thousand UWHC: Utility Work by Highway Contractor LAP: Local Agency Program Volkert: Volkert, Inc. LDD: Land Development Desktop W.: West

July 14, 2014 F

AIM Engineering & Surveying, Inc. Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 5

ILLUSTRATIVE WORK

Work by firm or joint venture members or outside key consultants which best illustrate current qualifications relevant to the County's project that have been/is being accomplished by personnel that shall be assigned to the County's project. List no more than ten (10) projects.

4. Project Name & Location C-468 Preliminary Engineering Study from US Project Owners Name & Address 301 to East of Florida’s Turnpike, Sumter County, Sumter County Public Works Florida 319 E. Anderson Ave. Bushnell, FL 33513 Project Manager: Michael Osipov, PE

Completion Date (Actual or Estimated 2011

Estimated Cost (In Thousands) Project Owner's Contact Person, Title, & Entire Project Work for which firm was/is Telephone Number responsible Chris Wert $ N/A $ 195K Former Assistant Director of Engineering 727.464.3642

Scope of Entire Project (Please give quantitative indications wherever possible) The PES was performed to evaluate the future transportation needs along 3.5 miles of C-468. The PES determined the long- term transportation needs and developed necessary improvements. The existing two-lane roadway will not meet future capacity and mobility needs due to anticipated growth in the area.

Nature of Firm's Responsibility in Project (Please give quantitative indications wherever possible) Volkert’s responsibilities included roadway concept development, engineering analyses, a Bridge Development Report, a Cultural Resource Assessment, environmental impact evaluations, a Pond Siting Report, utility coordination and public involvement. Alternative pond sites, including joint-use and linear ponds, were identified to address stormwater management requirements, which are based on closed basin attenuation criteria. Utility coordination included nine utility owners within the project limits. A public information meeting was held with those in attendance expressing minimal comments or concerns. A presentation was given to the Sumter BOCC summarizing the PES and its improvements were unanimously accepted. Firm's Personnel (Name/Project Assignment) That Worked on the Stated Project that Shall Be Assigned to the County's Project Michael Osipov, PE, Project Manager; Michelle Eguia, Public Involvement; Morgan Bouchard, EI, Drainage, Public Involve- ment, and Utility Coordination

1

Financial Services Department Page 41 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 5

ILLUSTRATIVE WORK

Work by firm or joint venture members or outside key consultants which best illustrate current qualifications relevant to the County's project that have been/is being accomplished by personnel that shall be assigned to the County's project. List no more than ten (10) projects.

4. Project Name & Location C-468 Widening CR 505 east of the Florida’s Project Owners Name & Address Turnpike, Sumter County, Florida Sumter County Public Works 319 E. Anderson Ave. Bushnell, FL 33513 Project Manager: Michael Osipov, PE

Completion Date (Actual or Estimated 2014 (design)

Estimated Cost (In Thousands) Project Owner's Contact Person, Title, & Entire Project Work for which firm was/is Telephone Number responsible Bradley Arnold $ 7.8M (est.) $ 1.7M County Administrator 352.689.4400

Scope of Entire Project (Please give quantitative indications wherever possible) This project involved widening, milling and resurfacing C-468 from CR 505 to east of the Florida’s Turnpike in Sumter County to aid in the design of a 4-lane highway and new bridge overpass for the Florida’s Turnpike.

Nature of Firm's Responsibility in Project (Please give quantitative indications wherever possible) Volkert’s responsibilities included roadway and drainage design, permitting, survey, 3D laser scanning, producing legal descriptions and sketches for R/W acquisition, widening from 2 to 4-lanes, linear ponds, drainage and permitting, utility coordination, and a new bridge.

Firm's Personnel (Name/Project Assignment) That Worked on the Stated Project that Shall Be Assigned to the County's Project Michael Osipov, PE, Project Manager; Michelle Eguia, Deputy Project Manager and Utility Coordination; Joseph Stukey, PSM, Surveyor/Mapper; Charles Samuels, Drainage; Morgan Bouchard, EI, Drainage; Summer Ahrens, PE, Roadway; James Townsend, PE, Roadway Engineer

2

Financial Services Department Page 41 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 5

ILLUSTRATIVE WORK

Work by firm or joint venture members or outside key consultants which best illustrate current qualifications relevant to the County's project that have been/is being accomplished by personnel that shall be assigned to the County's project. List no more than ten (10) projects.

4. Project Name & Location Preliminary Roadway Improvements for the Project Owners Name & Address Intersection of CR 478 and CR 707, Sumter Sumter County Public Works County, Florida 319 E. Anderson Ave. Bushnell, FL 33513 Project Manager: Gaelan Bishop, PE

Completion Date (Actual or Estimated 2014

Estimated Cost (In Thousands) Project Owner's Contact Person, Title, & Entire Project Work for which firm was/is Telephone Number responsible Jackey Jackson $ Concept design, $ 5K Assistant Public Works Director TBD in design phase 352.569.6700 Scope of Entire Project (Please give quantitative indications wherever possible) This work involves preliminary engineering designs, including survey and roadway design activities, for the intersection of CR 478 and CR 707.

Nature of Firm's Responsibility in Project (Please give quantitative indications wherever possible) We prepared conceptual preliminary engineering designs for intersection improvements at CR 478 and CR 707. Three design concepts were prepared along with survey and roadway design activities. We are currently preparing a preliminary engineering design for intersection improvements at CR 478 and CR 707. Once the preliminary design is completed, Sumter County will use the design to acquire R/W for the intersection improvements.

Firm's Personnel (Name/Project Assignment) That Worked on the Stated Project that Shall Be Assigned to the County's Project Gaelan Bishop, PE, Project Manager; Brian Kanely, PE, Traffic Engineer; Michael Osipov, PE, Principal-in-Charge

3

Financial Services Department Page 41 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 5

ILLUSTRATIVE WORK

Work by firm or joint venture members or outside key consultants which best illustrate current qualifications relevant to the County's project that have been/is being accomplished by personnel that shall be assigned to the County's project. List no more than ten (10) projects.

4. Project Name & Location On-Call Traffic Engineering Services Contract, Project Owners Name & Address Sumter County, Florida Sumter County Public Works 319 E. Anderson Ave. Bushnell, FL 33513 Project Manager: Gaelan Bishop, PE

Completion Date (Actual or Estimated Ongoing (fiscal year 2014)

Estimated Cost (In Thousands) Project Owner's Contact Person, Title, & Entire Project Work for which firm was/is Telephone Number responsible Jackey Jackson $ TBD, ongoing $ TBD, ongoing Assistant Public Works Director 352.569.6700

Scope of Entire Project (Please give quantitative indications wherever possible) This contract involves providing quick response services as requested for the County’s routine traffic engineering/operations issues and concerns. The contract’s scope of services includes traffic engineering design, operations, maintenance, warrant studies, and includes traffic sign and pavement marking recommendations, traffic signals, as well as traffic engineering related services. Nature of Firm's Responsibility in Project (Please give quantitative indications wherever possible) Volkert’s responsibilities include providing Sumter County with professional traffic engineering/operations services on an on- call basis. Some of the services provided under this contract are designing new and replacement traffic signs and pavement marking recommendations, as well as reviewing existing traffic signal operations and performing necessary studies. Under this contract, Volkert and VIBEngineering provided a feasibility study for a Sumter County ATMS. The purpose of the study was to determine if an ATMS was feasible for Sumter County. Firm's Personnel (Name/Project Assignment) That Worked on the Stated Project that Shall Be Assigned to the County's Project Gaelan Bishop, PE, Project Manager; Michael Osipov, PE, Principal-in-Charge; Brian Kanely, PE, Traffic Engineer; Sara Calhoun, PE, ITS

4

Financial Services Department Page 41 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 5

ILLUSTRATIVE WORK

Work by firm or joint venture members or outside key consultants which best illustrate current qualifications relevant to the County's project that have been/is being accomplished by personnel that shall be assigned to the County's project. List no more than ten (10) projects.

4. Project Name & Location SR 80 Widening from Indian Hills Drive to CR Project Owners Name & Address 833, Hendry/Glades Counties, Florida FDOT District 1 801 N. Broadway Avenue Bartow, FL 33830 Project Manager: Michael Osipov, PE

Completion Date (Actual or Estimated Ongoing

Estimated Cost (In Thousands) Project Owner's Contact Person, Title, & Entire Project Work for which firm was/is Telephone Number responsible Joseph Lauk, PE $ 26.8M $ 4.3M Project Manager 863.519.2251

Scope of Entire Project (Please give quantitative indications wherever possible) The project is for the widening of the existing 2-lane rural roadway to a 4-lane divided rural roadway for a distance of approx- imately 6 miles, as well as culvert extension and new bridges. The typical section is adding two twelve-foot lanes to the north that will serve as the westbound lanes. The existing lanes will be milled and resurfaced and converted to the eastbound lanes. The design also includes a 64-foot grassed median with accommodations for a future five-foot sidewalk. Nature of Firm's Responsibility in Project (Please give quantitative indications wherever possible) Volkert’s responsibilities include roadway design, structural design, drainage, permitting, pond siting, lighting justification report, signal warrant analysis, traffic analysis, MOT, utility coordination, public involvement, and project development and environment (PD&E) reevaluation. Key project issues are: minimizing R/W at the two horizontal curve locations; drainage, permitting and stormwater pond siting; pavement design/base clearance; and threatened and endangered species.

Firm's Personnel (Name/Project Assignment) That Worked on the Stated Project that Shall Be Assigned to the County's Project Michael Osipov, PE, Project Manager; Sarah Hill, PE, Roadway; Summer Ahrens, PE, Roadway; Katie Agoado, EI, Signing & Pavement Markings; Charles Samuels, Drainage; Morgan Bouchard, EI, Drainage; Michelle Eguia, Utility Coordination and Public Involvement

5

Financial Services Department Page 41 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 5

ILLUSTRATIVE WORK

Work by firm or joint venture members or outside key consultants which best illustrate current qualifications relevant to the County's project that have been/is being accomplished by personnel that shall be assigned to the County's project. List no more than ten (10) projects.

4. Project Name & Location SR 80/US 27 Interchange, Hendry County, Project Owners Name & Address Florida FDOT District 1 801 N. Broadway Avenue Bartow, FL 33830 Project Manager: Michael Osipov, PE

Completion Date (Actual or Estimated 2014

Estimated Cost (In Thousands) Project Owner's Contact Person, Title, & Entire Project Work for which firm was/is Telephone Number responsible Nicole Mills, PE $ 18M $ 5.5M Project Manager 863.519.2277

Scope of Entire Project (Please give quantitative indications wherever possible) This project involved upgrading the existing at grade intersection at SR 80/US 27 to an elevated “T” interchange which addressed safety concerns with the existing intersection, including sight distance constraints, high running speeds and grade issues. The interchange included three ramps. A combination of MSE walls and embankment was used for elevated portions of the roadway. Nature of Firm's Responsibility in Project (Please give quantitative indications wherever possible) Volkert developed the roadway, structural, and drainage plans; utility coordination; conducted a PD&E reevaluation; conduct- ed public involvement services; and handled cost estimates, permitting, and environmental coordination.

Firm's Personnel (Name/Project Assignment) That Worked on the Stated Project that Shall Be Assigned to the County's Project Michael Osipov, PE, Project Manager; Summer Ahrens, PE, Roadway; Charles Samuels, Drainage; Morgan Bouchard, EI, Drainage; Ed Brekhus, PE, Structures; Michelle Eguia, Utility Coordination and Public Involvement

6

Financial Services Department Page 41 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 5

ILLUSTRATIVE WORK

Work by firm or joint venture members or outside key consultants which best illustrate current qualifications relevant to the County's project that have been/is being accomplished by personnel that shall be assigned to the County's project. List no more than ten (10) projects.

4. Project Name & Location 62nd Avenue North at 58th Street North Project Owners Name & Address Intersection Improvements, Pinellas County, Pinellas County Florida 315 Court Street Clearwater, FL 33756 Project Manager: Sarah Hill, PE

Completion Date (Actual or Estimated Ongoing

Estimated Cost (In Thousands) Project Owner's Contact Person, Title, & Entire Project Work for which firm was/is Telephone Number responsible Nancy McKibben, MPA $ TBD (ongoing) $ 200K Project Manager 727.464.4812

Scope of Entire Project (Please give quantitative indications wherever possible) This project consists of widening all four legs of the existing intersection to provide additional left turn lanes eastbound and westbound along 62nd Avenue North and additional right turn lanes northbound and southbound along 58th Street North.

Nature of Firm's Responsibility in Project (Please give quantitative indications wherever possible) Project elements include sidewalk connectivity to meet ADA requirements, addition of bicycle lanes, correction of existing cross slopes, and safety improvements. Drainage improvements will be provided to address localized flooding issues within the existing ditches along the roadway. Dual mast arm signal assemblies will replace the existing diagonal span and con- crete strain poles.

Firm's Personnel (Name/Project Assignment) That Worked on the Stated Project that Shall Be Assigned to the County's Project Michael Osipov, PE, Principal-in-Charge; Sarah Hill, PE, Project Manager; Summer Ahrens, PE, Roadway; James Townsend, PE, Roadway; Charles Samuels, Drainage

7

Financial Services Department Page 41 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 5

ILLUSTRATIVE WORK

Work by firm or joint venture members or outside key consultants which best illustrate current qualifications relevant to the County's project that have been/is being accomplished by personnel that shall be assigned to the County's project. List no more than ten (10) projects.

4. Project Name & Location Bayshore Boulevard Redevelopment, Tampa, Project Owners Name & Address Florida City of Tampa 306 E. Jackson St., 4E Tampa, FL 33602 Project Manager: Michael Osipov, PE

Completion Date (Actual or Estimated Ongoing

Estimated Cost (In Thousands) Project Owner's Contact Person, Title, & Entire Project Work for which firm was/is Telephone Number responsible Milton Martinez, PE $ 3M $ 250K Chief Project Management & Design Engineer 813.274.8998

Scope of Entire Project (Please give quantitative indications wherever possible) This project was for the redevelopment of 4.5 miles of Bayshore Boulevard to create a safe, accessible, and mobile corri- dor. Services included developing a master concept for the portion of Bayshore Boulevard between Platt Street and Gandy Boulevard and providing detailed engineering design and landscape design services for the concrete portion between West Bay Street and South DeSoto Avenue (1.5 miles). Nature of Firm's Responsibility in Project (Please give quantitative indications wherever possible) Volkert’s responsibilities included redevelopment design involving streetscaping, road rechannelization, and pedestrian/bicy- cle enhancements, as well as concrete rehabilitation for a portion of the project which consisted of a six lane urban roadway both divided and undivided. Approximately 2,200 concrete pavement slabs were evaluated for rehabilitation.

Firm's Personnel (Name/Project Assignment) That Worked on the Stated Project that Shall Be Assigned to the County's Project Michael Osipov, PE, Project Manager; Gene Quinn, PE, PLS, Survey QA/QC Manager; Michelle Eguia, Project Coordinator; Joseph Stukey, PSM, Project Surveyor; William Fulghum, PLS, Survey

8

Financial Services Department Page 41 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 5

ILLUSTRATIVE WORK

Work by firm or joint venture members or outside key consultants which best illustrate current qualifications relevant to the County's project that have been/is being accomplished by personnel that shall be assigned to the County's project. List no more than ten (10) projects.

4. Project Name & Location Intersection Improvement Projects: US 301/ Project Owners Name & Address McIntosh Road, SR 574/McIntosh Road, SR 39/ FDOT District 7 McGee Road, Hillsborough County, Florida 11201 N. Malcolm McKinley Drive Tampa, FL 33612 Project Manager: Michael Osipov, PE

Completion Date (Actual or Estimated 2006

Estimated Cost (In Thousands) Project Owner's Contact Person, Title, & Entire Project Work for which firm was/is Telephone Number responsible Manuel Santos $ 1.2M $ 900K Project Manager 813.975.6173

Scope of Entire Project (Please give quantitative indications wherever possible) The scope of services for these intersection designs included the development of roadway plans, MOT, drainage, geotechni- cal, signing and pavement markings, signalization, utility adjustment plans, cost estimates, and quantity computation books.

Nature of Firm's Responsibility in Project (Please give quantitative indications wherever possible) Volkert’s responsibilities included design for the reconstruction of a portion of McIntosh Road to improve alignment and grade for the intersection with US 301. The design also included the widening of US 301 to provide for a turn lane at McIn- tosh Road, resurfacing US 301 within the limits of construction, and improving the existing turning radii to accommodate heavy vehicle traffic. The SR 574/McIntosh Road project involved the design for the widening of SR 574 to provide a west- bound right turn lane onto McIntosh Road, as well as resurfacing SR 574 within the area of construction and replacement of the existing traffic signal. Firm's Personnel (Name/Project Assignment) That Worked on the Stated Project that Shall Be Assigned to the County's Project Michael Osipov, PE, Project Manager; Ed Brekhus, PE, Structures

9

Financial Services Department Page 41 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 5

ILLUSTRATIVE WORK

Work by firm or joint venture members or outside key consultants which best illustrate current qualifications relevant to the County's project that have been/is being accomplished by personnel that shall be assigned to the County's project. List no more than ten (10) projects.

4. Project Name & Location District 5 District Wide Survey Services, Project Owners Name & Address Florida FDOT District 5 719 S. Woodland Blvd. DeLand, FL 32720 Project Manager: Joseph Stukey, PSM

Completion Date (Actual or Estimated Ongoing

Estimated Cost (In Thousands) Project Owner's Contact Person, Title, & Entire Project Work for which firm was/is Telephone Number responsible Thomas LaCorte $ 1.5M (total contract value) $ 1.5M (divided amongst Professional Land Surveyor task orders) 368.943.5267 Scope of Entire Project (Please give quantitative indications wherever possible) The scope of services involves providing miscellaneous surveying and mapping tasks for the District on an as-needed, task order basis.

Nature of Firm's Responsibility in Project (Please give quantitative indications wherever possible) We are providing miscellaneous surveying and mapping services for the District, including design survey & maintenance maps, updating previous design surveys, gathering topographic/digital terrain models and cross section data, R/W control survey, alignment determination, section and subdivision surveys, control and R/W maps.

Firm's Personnel (Name/Project Assignment) That Worked on the Stated Project that Shall Be Assigned to the County's Project Joseph Stukey, PSM, Project Manager; Gene Quinn, PE, PLS: QA/QC Manager

10

Financial Services Department Page 41 of 47 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services

GLOSSARY 3D: Three Dimensional M: Million 3R: Resurfacing, Restoration, Rehabilitation MBA: Master of Business Administration AA: Associates of Arts MOT: Maintenance of Traffic AAS: Associate of Applied Science MPA: Master of Public Administration ADA: Americans with Disabilities Act MPH: Miles Per Hour Alt: Alternate MS: Master of Science ARRA: American Recovery and Reinvestment Act MSCE: Master of Science in Civil Engineering AS: Associates of Science MSE: Mechanically Stabilized Earth ATMS: Advanced Traffic Management System N: North Ave.: Avenue N/A: Not Applicable BA: Bachelor of Arts NE: Northeast Blvd.: Boulevard NEPA: National Environmental Policy Act BOCC: Board of County Commissioners PD&E: Project Development and Environment BS: Bachelor of Science PER: Preliminary Engineering Report BSCE: Bachelor of Science in Civil Engineering PES: Preliminary Engineering Study BSME: Bachelor of Science in Mechanical Engineering PIC: Principal-in-Charge CADD: Computer Aided Design and Drafting PLS: Professional Land Surveyor CEI: Construction Engineering and Inspection PM: Project Manager CEP: Certified Environmental Professional PSM: Professional Surveyor and Mapper CPM: Critical Path Method PSTA: Pinellas Suncoast Transit Authority CR: County Road PWS: Professional Wetland Scientist CSE: Certified Senior Ecologist QA: Quality Assurance E: East QC: Quality Control EA: Environmental Assessment Rd.: Road EAA: Everglades Agricultural Area RFQ: Request for Qualifications EI: Engineering Intern R/W: Right-of-Way EIS: Environmental Impact Statement S: South FDOT: Florida Department of Transportation SEIR: Supplemental Environmental Impact Report FGCU: Florida Gulf Coast University SJWMD: St. John’s Water Management District FL: Florida SP&M: Signing and Pavement Markings FY: Fiscal Year SR: State Road GEC: General Engineering Contract St.: Street I: Interstate SUE: Subsurface Utility Engineering ICPR: Interconnected Pond Routing SW: Southwest Inc.: Incorporated TBD: To be Determined ITS: Intelligent Transportation Systems US: United States Jr.: Junior USACE: U.S. Army Corps of Engineers K: Thousand UWHC: Utility Work by Highway Contractor LAP: Local Agency Program Volkert: Volkert, Inc. LDD: Land Development Desktop W.: West

July 14, 2014 G

AIM Engineering & Surveying, Inc. Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services FORM 6

VOLUME OF WORK

Prime Consultant’s volume of work performed for the Sumter County Board of County Commissions As a prime consultant and as a sub consultant – currently and previously

Name of Project (include continuing Prime or Sub Total Contracted Approximate date of award contracts) Fee Amount of contract Sumter County Highway Safety Program Prime $130,000 2012, 2013, 2014

C470 Guardrail & Marsh Bend Park Prime $4,875 2012

Relocation of Shell Base on C-470 & I-75 Prime $17,500 2012

C-469 Resurfacing Prime $80,451 2012

The Villages Traffic Gate Prime $6,891 2013

C-468 Design Prime $1,780,000 2013

Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related C-478Services Intersection Concepts Prime $17,775 2013, 2014 FORM 6 On-Call Traffic Engineering Services Prime $30,000 2014 VOLUME OF WORK

General EngineeringPrime Consultant’s Consulting volume Services, of workPrime performed for the Sumter$543,000 County Board of County2010 Commissions Sumter County, Florida As a prime consultant and as a sub consultant – currently and previously C-468 PES Prime $195,000 2011 Name of Project (include continuing Prime or Sub Total Contracted Approximate date of award contracts) Fee Amount of contract Sumter County Miscellaneous Tasks Prime $27,796 2010

1

Financial Services Department Page 42 of 47

Financial Services Department Page 42 of 47 RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services

GLOSSARY 3D: Three Dimensional M: Million 3R: Resurfacing, Restoration, Rehabilitation MBA: Master of Business Administration AA: Associates of Arts MOT: Maintenance of Traffic AAS: Associate of Applied Science MPA: Master of Public Administration ADA: Americans with Disabilities Act MPH: Miles Per Hour Alt: Alternate MS: Master of Science ARRA: American Recovery and Reinvestment Act MSCE: Master of Science in Civil Engineering AS: Associates of Science MSE: Mechanically Stabilized Earth ATMS: Advanced Traffic Management System N: North Ave.: Avenue N/A: Not Applicable BA: Bachelor of Arts NE: Northeast Blvd.: Boulevard NEPA: National Environmental Policy Act BOCC: Board of County Commissioners PD&E: Project Development and Environment BS: Bachelor of Science PER: Preliminary Engineering Report BSCE: Bachelor of Science in Civil Engineering PES: Preliminary Engineering Study BSME: Bachelor of Science in Mechanical Engineering PIC: Principal-in-Charge CADD: Computer Aided Design and Drafting PLS: Professional Land Surveyor CEI: Construction Engineering and Inspection PM: Project Manager CEP: Certified Environmental Professional PSM: Professional Surveyor and Mapper CPM: Critical Path Method PSTA: Pinellas Suncoast Transit Authority CR: County Road PWS: Professional Wetland Scientist CSE: Certified Senior Ecologist QA: Quality Assurance E: East QC: Quality Control EA: Environmental Assessment Rd.: Road EAA: Everglades Agricultural Area RFQ: Request for Qualifications EI: Engineering Intern R/W: Right-of-Way EIS: Environmental Impact Statement S: South FDOT: Florida Department of Transportation SEIR: Supplemental Environmental Impact Report FGCU: Florida Gulf Coast University SJWMD: St. John’s Water Management District FL: Florida SP&M: Signing and Pavement Markings FY: Fiscal Year SR: State Road GEC: General Engineering Contract St.: Street I: Interstate SUE: Subsurface Utility Engineering ICPR: Interconnected Pond Routing SW: Southwest Inc.: Incorporated TBD: To be Determined ITS: Intelligent Transportation Systems US: United States Jr.: Junior USACE: U.S. Army Corps of Engineers K: Thousand UWHC: Utility Work by Highway Contractor LAP: Local Agency Program Volkert: Volkert, Inc. LDD: Land Development Desktop W.: West

July 14, 2014 H

AIM Engineering & Surveying, Inc.

RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services

GLOSSARY 3D: Three Dimensional M: Million 3R: Resurfacing, Restoration, Rehabilitation MBA: Master of Business Administration AA: Associates of Arts MOT: Maintenance of Traffic AAS: Associate of Applied Science MPA: Master of Public Administration ADA: Americans with Disabilities Act MPH: Miles Per Hour Alt: Alternate MS: Master of Science ARRA: American Recovery and Reinvestment Act MSCE: Master of Science in Civil Engineering AS: Associates of Science MSE: Mechanically Stabilized Earth ATMS: Advanced Traffic Management System N: North Ave.: Avenue N/A: Not Applicable BA: Bachelor of Arts NE: Northeast Blvd.: Boulevard NEPA: National Environmental Policy Act BOCC: Board of County Commissioners PD&E: Project Development and Environment BS: Bachelor of Science PER: Preliminary Engineering Report BSCE: Bachelor of Science in Civil Engineering PES: Preliminary Engineering Study BSME: Bachelor of Science in Mechanical Engineering PIC: Principal-in-Charge CADD: Computer Aided Design and Drafting PLS: Professional Land Surveyor CEI: Construction Engineering and Inspection PM: Project Manager CEP: Certified Environmental Professional PSM: Professional Surveyor and Mapper CPM: Critical Path Method PSTA: Pinellas Suncoast Transit Authority CR: County Road PWS: Professional Wetland Scientist CSE: Certified Senior Ecologist QA: Quality Assurance E: East QC: Quality Control EA: Environmental Assessment Rd.: Road EAA: Everglades Agricultural Area RFQ: Request for Qualifications EI: Engineering Intern R/W: Right-of-Way EIS: Environmental Impact Statement S: South FDOT: Florida Department of Transportation SEIR: Supplemental Environmental Impact Report FGCU: Florida Gulf Coast University SJWMD: St. John’s Water Management District FL: Florida SP&M: Signing and Pavement Markings FY: Fiscal Year SR: State Road GEC: General Engineering Contract St.: Street I: Interstate SUE: Subsurface Utility Engineering ICPR: Interconnected Pond Routing SW: Southwest Inc.: Incorporated TBD: To be Determined ITS: Intelligent Transportation Systems US: United States Jr.: Junior USACE: U.S. Army Corps of Engineers K: Thousand UWHC: Utility Work by Highway Contractor LAP: Local Agency Program Volkert: Volkert, Inc. LDD: Land Development Desktop W.: West

July 14, 2014 I

AIM Engineering & Surveying, Inc. Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services

PART 1 - INTENT AND GENERAL INFORMATION

QUALIFICATION DOCUMENTS CHECKLIST OF ITEMS REQUIRED TO BE SUBMITTED The following documents and forms in the following arrangement must accompany each Qualification Package or alternate RFQ submitted:

One (1) original, one (1) electronic single PDF version on a CD or Flash Drive of the original RFQ in its entirety not password protected, and four (4) copies of the original RFQ packet.

RFQ Cover Page. This is to be used as the first page of the RFQ. This form must be fully completed and signed by an authorized officer of the vendor.

Tab A – Statement of Interest Form

Tab B – Form 1 – Firm Profile

Tab C - Form 2 – Team Composition

Tab D - Form 3 – Outside Key Consultants

Tab E - Form 4 – Location

Tab F - Form 5 – Illustrative Work

Tab G - Form 6 – Volume of Work

Tab H - Form 7 – Additional Information

Tab I – Qualification Document Checklist

o Proposer’s Certification / Addenda Acknowledgement Form o Qualification Form for Board of Sumter County Commissioners o Statement of Terms and Conditions - statement must be signed and returned with the RFQ form. o A sworn, notarized Statement of Reference and Similar Project Experience Form (delete since Form 5 covers this in detail). o Contractor’s Affidavit o Hold Harmless Agreement o A sworn, notarized Drug Free Work Place Certificate must accompany each Qualification Package or alternate RFQ. o Public Entity Crimes Form o Anti-Collusion Statement Form o E-Verify Certification Form and the electronic signature page of the Memorandum of Understanding from the Department of Homeland Security. o Conflict of Interest Disclosure Form o A separate sheet or sheets, clearly identified and numbered, of Exceptions or Deviations from the minimum specifications, must be attached to the Qualifications Form (if applicable). o A Certificate of Insurability, acceptable to the BOCC, shall accompany each Qualification or alternate qualification, in the amounts as prescribed by State and Sumter County Board of County Commissioners. Financial Services Department Page 5 of 47 Sumter County Board of County Commissioners – RFQ# 015-0-2014/CRM –Continuing Contract for Engineering, Surveying and Related Services

• Liability Insurance: The submitter shall purchase and maintain such insurance as will protect him/her from claims which may arise out of or result from the vendor’s operations under the terms and conditions of the RFQ. Liability insurance shall be obtained at the vendor’s expense and in his/her name as the insured, which Certificate shall show Sumter County Board of County Commissioners as additional name insured. Liability insurance shall be provided on a form approved by Sumter County Board of County Commissioners and shall include endorsements for contractual liability and such other endorsements appropriate for the work required by this RFQ as may be required by the Sumter County Board of County Commissioners. The limit of liability for this coverage shall not be less than $1,000,000 single event limit.

• Automobile Liability Insurance covering all automobiles and trucks the vendor may use in connection with this RFQ. The limit of liability for this coverage shall not be less than $500,000 CSL per occurrence for bodily injury and property damage. This is to include owned, hired, and non-owned vehicles.

• Workers’ Compensation Insurance, as required by the State of Florida.

All insurance policies shall be written on companies authorized to do business in the State of Florida and satisfactory to the Sumter County Board of County Commissioners. Prior to commencing services pursuant to the award of this RFQ, the Contractor shall furnish to the Sumter County Board of County Commissioners certificates of insurance showing the required coverage has been procured and paid for in advance. Within thirty (30) days prior to expiration, the Contractor shall provide the Sumter County Board of County Commissioners with proof that required coverage has been extended.

Date: ______7.9.2014

I, Michael______A. Osipov, PE (name), an authorized officer of ______Volkert, Inc. (company/vendor), confirm that the above listed documents are provided in our company’s RFQ being submitted to Sumter BOCC and confirm I have read and understand the RFP document in its entirety.

Financial Services Department Page 6 of 47

RFQ # 015-0-2014/CRM Continuing Contract for Engineering, Surveying and Related Services

GLOSSARY 3D: Three Dimensional M: Million 3R: Resurfacing, Restoration, Rehabilitation MBA: Master of Business Administration AA: Associates of Arts MOT: Maintenance of Traffic AAS: Associate of Applied Science MPA: Master of Public Administration ADA: Americans with Disabilities Act MPH: Miles Per Hour Alt: Alternate MS: Master of Science ARRA: American Recovery and Reinvestment Act MSCE: Master of Science in Civil Engineering AS: Associates of Science MSE: Mechanically Stabilized Earth ATMS: Advanced Traffic Management System N: North Ave.: Avenue N/A: Not Applicable BA: Bachelor of Arts NE: Northeast Blvd.: Boulevard NEPA: National Environmental Policy Act BOCC: Board of County Commissioners PD&E: Project Development and Environment BS: Bachelor of Science PER: Preliminary Engineering Report BSCE: Bachelor of Science in Civil Engineering PES: Preliminary Engineering Study BSME: Bachelor of Science in Mechanical Engineering PIC: Principal-in-Charge CADD: Computer Aided Design and Drafting PLS: Professional Land Surveyor CEI: Construction Engineering and Inspection PM: Project Manager CEP: Certified Environmental Professional PSM: Professional Surveyor and Mapper CPM: Critical Path Method PSTA: Pinellas Suncoast Transit Authority CR: County Road PWS: Professional Wetland Scientist CSE: Certified Senior Ecologist QA: Quality Assurance E: East QC: Quality Control EA: Environmental Assessment Rd.: Road EAA: Everglades Agricultural Area RFQ: Request for Qualifications EI: Engineering Intern R/W: Right-of-Way EIS: Environmental Impact Statement S: South FDOT: Florida Department of Transportation SEIR: Supplemental Environmental Impact Report FGCU: Florida Gulf Coast University SJWMD: St. John’s Water Management District FL: Florida SP&M: Signing and Pavement Markings FY: Fiscal Year SR: State Road GEC: General Engineering Contract St.: Street I: Interstate SUE: Subsurface Utility Engineering ICPR: Interconnected Pond Routing SW: Southwest Inc.: Incorporated TBD: To be Determined ITS: Intelligent Transportation Systems US: United States Jr.: Junior USACE: U.S. Army Corps of Engineers K: Thousand UWHC: Utility Work by Highway Contractor LAP: Local Agency Program Volkert: Volkert, Inc. LDD: Land Development Desktop W.: West

July 14, 2014 Engineering, Surveying and Related Services Sumter County Continuing Contract for RFQ #015-0-2014/CRM

RFQ #015-0-2014/CRM Sumter County Continuing Contract for Engineering, Surveying and Related Services