Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

The 613th meeting of the State Level Environment Impact Assessment Authority was convened on 21.05.2020 at the Authority's Office in Environmental Planning and Co- Ordination Organization (EPCO), Paryavaran Parisar, . The meeting was chaired by Shri Rakesh K. Shrivastava, Chairman, SEIAA. The following members attended the meeting:- 1 Shri R.K. Sharma Member 2. Shri Anil Kumar Khare Member Secretary A. Following mining cases have been considered:-

S.No. Case No. Category No. & date of latest SEAC & SEIAA meeting 1. 6873/2020 1(a) 429th SEAC Meeting dated 16/23/2020

2. 6939/2020 1(a) 431st SEAC Meeting dated 18/3/2020

3. 6319/2019 1(a) 431st SEAC Meeting dated 18/3/2020 4. 5965/2019 1(a) 430th SEAC Meeting dated 17/3/2020 5. 6879/2020 1(a) 430th SEAC Meeting dated 17/3/2020 6. 6924/2020 1(a) 430th SEAC Meeting dated 17/3/2020 7. 6853/2020 1(a) 430th SEAC Meeting dated 17/3/2020 8. 6925/2020 1(a) 431st SEAC Meeting dated 18/3/2020. st 9. 6944/2020 1(a) 431 SEAC Meeting dated 18/3/2020 th 10. 6852/2020 1(a) 430 SEAC Meeting dated 17/3/2020 11. 6854/2020 1(a) 430th SEAC Meeting dated 17/3/2020. th 12. 6861/2020 1(a) 430 SEAC Meeting dated 17/3/2020. th 13. 6772/2020 1(a) 430 SEAC Meeting dated 17/3/2020. th 14. 6862/2020 1(a) 430 SEAC Meeting dated 17/3/2020 15. 6865/2020 1(a) 430th SEAC Meeting dated 17/3/2020

16. 6796/2020 1(a) 430th SEAC Meeting dated 17/3/2020.

17. 6740/2019 1(a) 420 SEAC meeting dated 27-01-20 18. 6877/2020 1(a) 431st SEAC Meeting dated 18/3/2020. 19. 6922/2020 1(a) 431st SEAC Meeting dated 18/3/2020 20. 6767/2019 1(a) 422nd SEAC meeting dated 10-02-20. 21. 6347/2019 1(a) 426th SEAC Meeting dated 27/2/2020 22. 6995/2020 1(a) EC Transfer 23. 6940/2020 1(a) EC Transfer 24. 7029/2020 1(a) EC Transfer 25. 7030/2020 1(a) EC Transfer

26. 7031/2020 1(a) EC Transfer 27. 7032/2020 1(a) EC Transfer 28. 7033/2020 1(a) EC Transfer 29. 7034/2020 1(a) EC Transfer 30. 7035/2020 1(a) EC Transfer

31. 7036/2020 1(a) EC Transfer 32. 7037/2020 1(a) EC Transfer

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 1 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

1. Case No 6873/2020 Shri Manvendra Singh S/o Late Shri Indrapal Singh, R/o Katra Mohalla, Dist. Panna, MP – 488001 Prior Environment Clearance for Flag Stone Quarry in an area of 1.00 ha. (2,001 cum per annum) (Khasra No. 188P), Village - Dhauna, Tehsil - Sahnagar, Dist. Panna (MP). This case was recommended in 429th SEAC meeting dated 16.03.2020 and PP was called for presentation but PP could not present in the meeting for presentation hence, case is deferred for upcoming SEIAA meeting. 2. Case No. 6939/2020: Prior Environmental Clearance for Murrum & Stone Quarry (opencast semi mechanized method) in an area of 4.185 ha. (34,000 cum/year Murrum and 60,000 cum/year Stone) at Khasra No. 94, 95/1, 95/2, 98/3/1, 150/3, 151, 152/1, 152/2, 172/2KA/1), Village - Bela, Tehsil - Raghuraj Nagar, Dist. - Satna (MP) by M/s Sadbhavna Stone Crusher Pvt. Ltd, Ajay Bhavan, Ayappa Mandir Road, Bhandhavgarh Colony, Dist. - Satna, MP - 485001, Email – [email protected], [email protected], Mobile - 9039239148, 9425173303. This case was recommended in 431st SEAC meeting dated 18.03.2020 and it was recorded that...... “------The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 431st SEAC meeting dated 18.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. ii. PP shall not start mining activity before execution of lease agreement. iii. The depth of the pit shall be as per the Approved Mining Plan. iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary. v. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP. vii. PP shall ensure the controlled muffle blasting with arrangements of sand bags.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 2 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

viii. Protection plan for nearby habitation should be prepared by PP. ix. Total 5000 saplings shall be planted by PP in first three year under plantation programme. Suitable tree species i.e. Mango, Kathal, Pipal, Bargad, Neem, Amaltas, Amla, etc. at mine lease boundary & approach road shall be planted by PP on priority. PP shall ensure to explore the possibity to plant trees in one chunk of village area. x. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. xi. PP must ensure implementation of the following activities in nearby Bela village with separate budget provision of Rs 1,00,000/Year under CER: a) 1st Year:  Arrangement of overhead tank (750 lit.) with water pump (0.5HP) for drinking water facility at Bela Primary School. b) 2nd Year:  To provide fan and tube lights & other material at Bela Primary School. c) 3rd Year:  To provide benches & table chairs in classroom of Bela Middle School. d) 4th Year:  Maintenance of toilets and to fulfil other need base requirement of Bela PHC. e) 5th Year:  Maintenance of hand pump of village common area and concrete it all around and maintenance of intake well. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat. xii. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Murrum & Stone Quarry (Opencast Semi Mechanized Method) in an area of 4.185 ha. (34,000 cum/year Murrum and 60,000 cum/year Stone) at Khasra No. 94, 95/1, 95/2, 98/3/1, 150/3, 151, 152/1, 152/2, 172/2KA/1), Village - Bela, Tehsil - Raghuraj Nagar, Dist. - Satna (MP) for the lease period to M/s Sadbhavna Stone Crusher Pvt. Ltd, Ajay Bhavan, Ayappa Mandir Road, Bhandhavgarh Colony, Dist. - Satna, MP - 485001.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 3 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

3. Case No. – 6319/2019 Prior Environmental Clearance for Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 2.00 ha. for expansion in production capacity from 3,500 cum / year to of 21,647 cum / year at Khasra No. 351 at Village - Bamnora Kalan, Tehsil - Ghuwara, Dist. Chhatarpur (MP) by M/s Surya Minerals , Partner - Shri Shakti Bundela, Ward no. 10, Suryanchal Gadi Gram, Post - Ghuwara, Dist. Chhatarpur, MP – 471313. This case was recommended in 431st SEAC meeting dated 18.03.2020 and it was recorded that...... “…………PP has submitted the response of above quarries same date vide letter dated 18.03.2020, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:” It is a case of expansion in production capacity from 3,500 to 21,647 cum/year, PP has submitted the earlier EC issued by DEIAA, Chhatarpur and compliance report issued by MoEF&CC vide letter no 149 dated 06/02/2020. PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 431st SEAC meeting dated 18.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. II. PP shall not start mining activity before execution of lease agreement. III. The depth of the pit shall be as per the Approved Mining Plan. IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary and towards Pucca road West, North, South (Dense Plantation) directions. V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. VI. If required, controlled muffle blasting shall be carried out with arrangements of sand bags towards canal (North-West direction). VII. Before commencing the mining activity, site demarcation should be done leaving 30m from water body (S- direction) as a “no mining zone”. The demarcation should be done by the Revenue Officials in the presence of Mining Officer, Chhatarpur. VIII. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 4 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

IX. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. X. Total 2100 saplings shall be planted by PP in three years under plantation programme suitable indigenous tree species both side approach road, lease boundary, Nearby Bamnorkala primary school and gram Panchayat Bhawan, Panchayat Barren land. Plantation of Neem, Peepal, Bargad, Aam, Gulmohar,Amla, Kathal, drumstick, Guava etc. will be planted on priority. XI. PP must ensure implementation of the following activities with separate budget provision of Rs 0.50 lakh/ year under CER. (a) Organizing the traffic awareness program in the village every year. (b) Develop grazing land at village Bamnora Kalan. (c) 1st Year - Arrangement of overhead tank (750 liter) with water pump (0.5 HP) for drinking water facility at primary school Bamnora Kalan. (d) 2nd Year - Providing fan and tubelight and other material at primary school - Bamnora Kalan (e) 3rd Year - Providing furniture’s (Tables, Chairs, Benches ) in classroom of Middle School Bamnora Kalan. (f) 4th Year – Maintenance of toilets and fulfil other need base requirement of PHC Bamnora Kalan. (g) 5th Year – Making Pucca Chabutra for villagers in Bamnora Kalan. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat XII. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 2.00 ha. for expansion in production capacity from 3, 500 cum / year to of 21,647 cum / year at Khasra No. 351 at Village - Bamnora Kalan, Tehsil - Ghuwara, Dist. Chhatarpur (MP) for the lease period to M/s Surya Minerals , Partner - Shri Shakti Bundela, Ward no. 10, Suryanchal Gadi Gram, Post - Ghuwara, Dist. Chhatarpur, MP – 471313

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 5 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

4. Case No. - 5965/2019 Prior Environmental Clearance for Crusher Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 4.50 Ha. for production capacity of 81,000 cum / year at Khasra No. 354/4, 355/1, 355/2, 356 at Village - Rehli, Tehsil - Hatpipliya, Dist. Dewas (MP) by M/s. Balaji Developer, Partner Shri Vekash Mittal, R/O 301, Pukhraj Corporate, Navlakha Dist. . (1) This is a project pertaining to mining of Stone Quarry in MLA of 4.50 ha The activity is mentioned at S.No. 1 (a) of the Schedule of EIA Notification 2006 as amended from time to time. The project is reported to be at a distance of more than 10 km from National park and sanctuary etc. thus it is not attracted by the general conditions and considered under category ‘B-1” by virtue of its location and mining lease area. The case was forwarded by SEIAA to SEAC for appraisal of EIA for environment clearance for the project. It was submitted that this is a proposed mine with production capacity of Stone 81,000 cum / year. (2) As per the letter issued by District Collector office (OIC, Kanij Shakha) letter no. 71 dated 14.01.2019 (referring a letter signed on dated 11.01.2019 by Asstt. Tracer) informed that there are two more lease of 3.31ha and 1.8ha area respectively and total three mines with commulative area of 9.610 ha within the the 500 meters of this mine and forms a cluster of > 5.00 ha., and shall be appraised as per recent O.M. dated 12.12.2018 for conducting EIA & Public hearing (3) The Mining Plan with Progressive Mine Closure Plan has been approved under Rule 42 of Minor Mineral Rules 1996, by The Regional Head Geology & Mining Department , Indore vide his letter no. 2225/M.Plan/ Na Kra/2018, Bhopal Date 20.08.2018 (4) SEAC in its 430th SEAC meeting dtd 17.03.2020 has recommended the case with 39 special conditions for issuance of EC. (5) The proposed plantation programme was examined and it was found that 4510 sapling of tree species covering an area of 4.5 ha shall be covered under plantation. (6) It was noted that as per Deputy Forest Division Officer, Letter no. 1658 dated. 24.07.2018, the National Park/Sanctuary are not located within 10 Km., radius from the mining site. Hence, the General Conditions are not attracted. (7) It was noted that the water requirement is 3.5 KLD (1.0 KLD for Dust Suppression + 0.50 KLD for Domestic + 1.0 KLD for Mining Operation + 1.0 KLD for Green Belt) which shall be met from mine pit & Tankers. (8) It was also noted that the Public Hearing was carried out on 20.01.2020 at nearby mine site Village - Rehli, Tehsil - Hatpipliya, Dist. Dewas under Chairmanship of Upper Collector, Dewas. The major comments of applicants during public hearing are are water for irrigation, access on approach road, Controlled blasting, employment of local people, construction & maintenance of existing / approach road connecting the mine & main road, Plantation on road side, regular health check-up of mine workers & water sprinkling to suppress the dust emission.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 6 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

After deliberation and site inspection, SEAC recommends additional four specific conditions for prior EC considering the proximity of lease with village habitation and perusal of recommendations of 430th SEAC meeting dtd 17.03.2020 , it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions: I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. II. Plantation programme as mentioned in EIA/EMP and presented during presentation in SEIAA & SEAC shall be followed in content and spirit. III. PP shall demarcate a barrier zone of 7.5 m as no mining zone in the periphery of mining lease area and develop a green belt. Three row plantation shall be carried out in the greenbelt area in current year with proper watering arrangement. IV. The mining operation shall be restricted to above ground water table and in no case it should intersect the ground water table. In case of working below the ground water table approval of the Central Ground Water Board shall be obtained. V. The over burden and waste will be stacked for five years and then simultaneously backfilled in the mined out area where plantation will be raised on it. VI. Total 4510 saplings shall be planted by PP in three years under plantation programme suitable indigenous tree species both side approach road, lease boundary along the transportation road/ in premises, Plantation at Gurariya & Karnawad village. Plantation of Neem, Peepal, Amaltas, Bargad, Jamun, Amla, Mango, Drumstick Mahua , etc. will be planted on priority. VII. No overburden will be dumped outside the mine lease area. VIII. Regular air & water quality monitoring shall be carried out by PP before discharging it into the nearby agriculture fields from authorized laboratory in consultation with Regional Officer, MPPCB. IX. PP shall ensure generation of employment opportunities to nearby Village on priority bases. X. Payments of wages to the workers shall be done in consonance with the provisions in the labour laws. XI. Proper infrastructure with shelter, drinking water, toilet and first-aid facilities shall be provided for the laborers. A provision should be made to construct a pakka rest shelter along with toilet and drinking water facility. XII. PP should also carry out regular sprinkling of water in the mining lease area to arrest dust emission from mining activities affecting the nearby agriculture fields

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 7 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

XIII. Mining shall be limited to the area as shown in surface plan and as per the approved mining scheme. XIV. PP shall ensure proper water supply arrangements for plantation especially in summer season. XV. PP shall ensure proper implementation of plantation, dust suppression, construction of CC approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. XVI. PP must ensure implementation of the following activities with separate budget provision of Rs. 5.0 Lakhs/ year under CSR as committed. (a) Providing pen, Pencil, School Uniforms, shoesand note book of students in the school nearby lease area. (b) Contribution in conservation of grazing land. (c) Organize Traffic Awareness camp in the village. (d) Planting trees in school. (e) Making availability of water filter in the school. (f) To organize of health check – up camp for villagers. (g) Providing fan , tables,black boards in schools, nearby lease area and construction of main gate of school. (h) Providing sport equipments for students in nearby school . (i) Arrangement of camps in villages for providing the knowledge about modern agricultural technologies or practices. (j) Free compulsory education for children of worker group. The Proposed CER activities will be carried out each year in the below mentioned village & same activities will be followed after 5 years ( Rehli, Karnawad, Hatpipliya, Gurariya & Borkhera). The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat XVII. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Crusher Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 4.50 Ha. for production capacity of 81,000 cum / year at Khasra No. 354/4, 355/1, 355/2, 356 at Village - Rehli, Tehsil - Hatpipliya, Dist. Dewas (MP) for the lease period to M/s. Balaji Developer, Partner Shri Vekash Mittal, R/O 301, Pukhraj Corporate, Navlakha Dist. Indore..

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 8 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

5. Case No. 6879/2020: Prior Environmental Clearance for Soil Quarry (Opencast Manual/Semi Mechanized Method) in an area of 1.0 ha. for production capacity of 1500 cum per annum at Khasra No. 36/Min-1 Pvt. Land at Village - Jonsil, Tehsil - Sabalgarh, Dist. Morena (MP) by Shri Pappan Yadav S/o Shri Pankshi Yadav R/o Village & Post - Jonsil, Tehsil - Sabalgarh, Dist. Morena, MP, This case was recommended in 430th SEAC meeting dated 17.03.2020 and it was recorded that...... "------Vide letter dated 17.03.2020, PP has submitted the desired information, which was placed before the committee. After deliberations, the EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 430th SEAC meeting dated 17.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. II. PP shall not start mining activity before execution of lease agreement. III. The depth of the pit shall be as per the Approved Mining Plan. IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary. V. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. VI. Total 1200 saplings shall be planted by PP under plantation programme suitable indigenous tree species Lease boundary, approach road. Plantation of Neem,Pipal,Bargad,Gulmohar,Aam etc. on priority shall be ensured by PP. VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. VIII. PP must ensure implementation of the following activities with separate budget provision of Rs.0.60 Lakh under CER. a) Provide to Making availability of water filter in the school. b) Provide to organizing a medical health checkup for the villagers c) Provide to contribution in conservation of grazing land.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 9 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat. IX. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Soil Quarry (Opencast Manual/Semi Mechanized Method) in an area of 1.0 ha. for production capacity of 1500 cum per annum at Khasra No. 36/Min-1 Pvt. Land at Village - Jonsil, Tehsil - Sabalgarh, Dist. Morena MP for the lease period to Shri Pappan Yadav S/o Shri Pankshi Yadav R/o Village & Post - Jonsil, Tehsil - Sabalgarh, Dist. Morena, MP, 6. Case No 6924/2020 Prior Environmental Clearance for Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 1.0 ha. for production capacity of 5000 cum / year at Khasra No. 124/1 at Village - Updi, Tehsil - Tonkkhurd, Dist. Dewas (MP) by Shri Ajay Fuleriya S/o Shri Jagdeesh Fuleriya, R/o Bherwakhedi, Tehsil - Tonkkhurd, Dist. Dewas, MP – 455001. Email - ajay124[dot]env[at]gmail[dot]com, Mobile – 9752526355. This case was recommended in 430th SEAC meeting dated 17.03.2020 and it was recorded that...... “…………PP has submitted the response of above quarries same date vide letter dated 17.03.2020, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:’ PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 430th SEAC meeting dated 17.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. II. PP shall not start mining activity before execution of lease agreement. III. The depth of the pit shall be as per the Approved Mining Plan.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 10 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary and towards Kachcha road SW-SE directions. V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. VI. If required, controlled blasting shall be carried out with arrangements of sand bags towards Kachcha road SW-SE directions. VII. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road. VIII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. IX. Total 1200 saplings shall be planted by PP under plantation programme suitable indigenous tree species both side approach road ,barrier zone, all around the boundary of school of village Mukundgarh & Guradiya Kalan with tree guards. Plantation of Neem, Peepal, Bargad, Aam, Gulmohar,Amla etc. will be planted on priority. X. PP must ensure implementation of the following activities with separate budget provision of Rs 0.60 lakh/ year under CER.

(a) 1st Year - Organizing the traffic awareness programme with sigh boards at Updi village, Cost of development of grazing land in the identified area, Providing furniture’s for Health care centre, Pakka chabutra and construction of hand pump periphery and haud. (b) 2nd Year - Providing furniture’s (Tables, Chairs, Benches ) for Govt. School of Khareli village and School , construction of hand pump periphery and haud (c) 3rd Year - Bore well in Updi village. (d) 4th Year – Sports kits and water purifier for Govt. School of Panda village. (e) 5th Year – 5 solar lights poles @ 10,000/ pole with the fire and fitting in Updi village, Cost of development of grazing land in the identified area . The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat XI. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 11 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

Hence, Prior Environmental Clearance is granted for Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 1.0 ha. for production capacity of 5000 cum / year at Khasra No. 124/1 at Village - Updi, Tehsil - Tonkkhurd, Dist. Dewas (MP) for the lease period to Shri Ajay Fuleriya S/o Shri Jagdeesh Fuleriya, R/o Bherwakhedi, Tehsil - Tonkkhurd, Dist. Dewas, MP – 455001. Email - ajay124[dot]env[at]gmail[dot]com, Mobile – 9752526355

7. Case No 6853/2020 Prior Environmental Clearance for Crusher Stone Quarry in an area of 1.0 ha. for production capacity of 12000 cum / year at Khasra No. 118 at Village - Guradiyakalan, Tehsil - Bagli, Dist. Dewas (MP) by Shri Sunil Patidar S/o Shri Ghanshyam Patidar, R/o Mukundgarh, Tehsil - Bagli, Dist. Dewas, MP . Email - sunilbagli[dot]env[at]gmail[dot]com, Mobile - 7987306952 This case was recommended in 430th SEAC meeting dated 17.03.2020 and it was recorded that...... “…………PP has submitted the response of above quarries same date vide letter dated 17.03.2020, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:’ PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 430th SEAC meeting dated 17.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. II. PP shall not start mining activity before execution of lease agreement. III. The depth of the pit shall be as per the Approved Mining Plan. IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary and towards Pucca road SE direction. V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. VI. If required, controlled blasting shall be carried out with arrangements of sand bags towards Pucca Road (PMGSY) –SE direction. VII. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 12 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

VIII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. IX. Total 1200 saplings shall be planted by PP under plantation programme suitable indigenous tree species both side approach road ,barrier zone, all around the boundary of school of village Khareli, Panda and Updi with tree guards. Plantation of Neem, Peepal, Bargad, Aam, Gulmohar,Amla etc. will be planted on priority. X. PP must ensure implementation of the following activities with separate budget provision of Rs 0.60 lakh/ year under CER.

(a) 1st Year - Organizing the traffic awareness programme with sigh boards at Guradiya Kalan village, Cost of development of grazing land in the identified area, Constriction of Badminton Court & sports kit for Govt. Middle School of Amajhar. (b) 2nd Year - Providing Swings, slides & see saw for Govt. Primary School of Amajhar along with teaching aids (c) 3rd Year - Boundary wall construction in Govt. Primary School of Mukundgarh village. (d) 4th Year – Providing 2 computers for Govt. middle School of Mukundgarh village.. (e) 5th Year – Furniture and five beds with bedsheets and pillows @ 8000/ bed The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat XI. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Crusher Stone Quarry in an area of 1.0 ha. for production capacity of 12000 cum / year at Khasra No. 118 at Village - Guradiyakalan, Tehsil - Bagli, Dist. Dewas (MP) for the lease period to Shri Sunil Patidar S/o Shri Ghanshyam Patidar, R/o Mukundgarh, Tehsil - Bagli, Dist. Dewas, MP . Email - sunilbagli[dot]env[at]gmail[dot]com, Mobile – 7987306952.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 13 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

8. Case No. 6925/2020: Prior Environmental Clearance for Murrum Quarry (Opencast Manual/Semi Mechanized Method) in an area of 1.00 ha. for production capacity of 2,500 cum per annum at Khasra No. 137/122/2 at Village - Guradiya Manda, Tehsil - Jawar, Dist. Sehore (MP).by Shri Sawai Singh S/o Shri Sajan Singh, R/o Village - Guradiya Manda, Tehsil - Jawar, Dist. Sehore, MP – 466221. This case was recommended in 431th SEAC meeting dated 18.03.2020 and it was recorded that...... "------PP further stated that no blasting is proposed and only manual mining shall be carried out. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee after deliberation found that The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 431th SEAC meeting dated 18.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. II. PP shall not start mining activity before execution of lease agreement. III. The depth of the pit shall be as per the Approved Mining Plan. IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary. V. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. VI. Total 1200 saplings shall be planted by PP under plantation programme suitable indigenous tree species Lease boundary, approach road. Plantation of Neem,Gulmohar, Munga, Amla etc. on priority shall be ensured by PP. VII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. VIII. PP must ensure implementation of the following activities with separate budget provision of Rs.0.60 Lakh/Years under CER. a) 1st Year: Provide to two computers for Govt. Girls school in Mehatwara,traffic awareness programme with sign boards at

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 14 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

Guradiya manda village & development of grazing land in the identified area. b) 2nd Year: Provide to construction of Pakka Chabutra in Health care centre and furniture c) 3rd Year: Provide to furnitures, whitewash, swings, slides and see saw in Govt. Primary school, Salarasi village d) 4th Year: Provide to construction of Boundary wall in govt. Middle school, Salarasi village e) 5th Year: Provide to maintenance of approach road from govt. Middle school to Shekhukhera village. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat. IX. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Murrum Quarry (Opencast Manual/Semi Mechanized Method) in an area of 1.00 ha. for production capacity of 2,500 cum per annum at Khasra No. 137/122/2 at Village - Guradiya Manda, Tehsil - Jawar, Dist. Sehore (MP). for the lease period to Shri Sawai Singh S/o Shri Sajan Singh, R/o Village - Guradiya Manda, Tehsil - Jawar, Dist. Sehore, MP – 466221. 9. Case No. 6944/2020: Prior Environmental Clearance for Crusher Stone Quarry (opencast semi mechanized method) in an area of 1.0 ha. (6909 cum per annum) (Khasra No. 48/6 Part), Village - Nimbhora, Tehsil - Bhensdehi, Dist. - Betul (MP) by Shri Jeevan Singh S/o Shri Jai Singh Parte, R/o Khomai, Tehsil - Bhensdehi, Dist. - Betul, MP - 460220, Email - [email protected], Mobile – 8668994670. This case was recommended in 431st SEAC meeting dated 18.03.2020 and it was recorded that...... “------The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 431st SEAC meeting dated 18.03.2020, presentation made by

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 15 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. ii. PP shall not start mining activity before execution of lease agreement. iii. The depth of the pit shall be as per the Approved Mining Plan. iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary. v. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP. vii. Total 1200 saplings shall be planted by PP in first three year under plantation programme. Suitable tree species i.e. Mango, Kathal, Pipal, Bargad, Neem, Amaltas, Amla, Dalbargia sissoo, Imli, Jamun etc. in barrier zone of western part, along both sides of approach road (500m) with tree guards, in barrier zone of eastern, northern and southern part, along boundary wall of schools with tree guards shall be planted by PP on priority. viii. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. ix. PP must ensure implementation of the following activities with separate budget provision of Rs 60,000/Year under CER: a) 1st Year:  Whitewash, swings, slides and see saw in Aganwadi of Thapoda village.  Traffic awareness programme with sign boards at Nimbhora village & Development of grazing land in the identified govt. land. b) 2nd Year:  Construction of Pakka Chabutra and sitting benches with sheds in Nimbhora. c) 3rd Year:  Furnitures and sports kit for Govt. middle school, Nimbhora village. d) 4th Year:  Construction of cemented water tank and supply of water. e) 5th Year:  Construction of water pond in nearby govt. land with the help of Gram Panchayat.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 16 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat. x. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Crusher Stone Quarry (opencast semi mechanized method) in an area of 1.0 ha. (6909 cum per annum) (Khasra No. 48/6 Part), Village - Nimbhora, Tehsil - Bhensdehi, Dist. - Betul (MP) for the lease period to Shri Jeevan Singh S/o Shri Jai Singh Parte, R/o Khomai, Tehsil - Bhensdehi, Dist. - Betul, MP - 460220. 10. Case No 6852/2020 Prior Environmental Clearance for Crusher Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 1.0 ha. for production capacity of 12000 cum / year at Khasra No. 681/2, 681/3 at Village - Dhabaladheer, Tehsil - Kalapepal, Dist. Shajapur (MP) by Shri Janardan Sharma S/o Shri Vikram Sharma, R/o Dhabaladheer, Tehsil - Kalapeepal, Dist. Shajapur, MP. Email - janardan[dot]env[at]gmail[dot]com, Mobile - 9826245662 This case was recommended in 430th SEAC meeting dated 17.03.2020 and it was recorded that...... “…………PP has submitted the response of above quarries same date vide letter dated 17.03.2020, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:’ PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 430th SEAC meeting dated 17.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. II. PP shall not start mining activity before execution of lease agreement. III. The depth of the pit shall be as per the Approved Mining Plan.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 17 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary and towards Pucca road West direction. V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. VI. If required, controlled blasting shall be carried out with arrangements of sand bags towards Pucca Road W direction. VII. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road. VIII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. XII. Total 1200 saplings shall be planted by PP under plantation programme suitable indigenous tree species both side approach road ,barrier zone, all around the boundary of school of village Dhabaladheer, pardakhedi & Chayni with tree guards. Plantation of Neem, Peepal, Bargad, Aam, Gulmohar,Amla etc. will be planted on priority. XIII. PP must ensure implementation of the following activities with separate budget provision of Rs 0.60 lakh/ year under CER. (a) 1st Year - Organizing the traffic awareness programme with sigh boards at Dhabaladheer village, Cost of development of grazing land in the identified area, Whitewash, Story painting & maintenance of Toilat Govt. School of pardakhedi. (b) 2nd Year - Providing furnitures & Sport Kits for students of Govt. Middle School, Dhabaladheer. (c) 3rd Year - Construction of Pakka chabutra and periphery of hand pump with haud and white wash in Govt. School, Chayni. (d) 4th Year – Water tank, water purifier and maintenance of toilet in Govt. School, Moondla Maina. (e) 5th Year – 6 solar lights poles @ 10,000/ pole with the fire and fitting in Govt. School and Panchayat Bhawan of Dhabaladheer . The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat IX. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 18 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Crusher Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 1.0 ha. for production capacity of 12000 cum / year at Khasra No. 681/2, 681/3 at Village - Dhabaladheer, Tehsil - Kalapepal, Dist. Shajapur (MP) for the lease period to Shri Janardan Sharma S/o Shri Vikram Sharma, R/o Dhabaladheer, Tehsil - Kalapeepal, Dist. Shajapur, MP. Email - janardan[dot]env[at]gmail[dot]com, Mobile - 9826245662

11. Case No 6854/2020 Shri Ayushman Singh S/o Shri Ravendra Singh, R/o Pahruwa, Tehsil & Dist. Katni, MP Prior Environment Clearance for Flag Stone Quarry in an area of 1.01 ha. (3500 cum per annum) (Khasra No. 38/2), Village - Sigda, Tehsil - Pawai, Dist. Panna (MP) This case was recommended in 430th SEAC meeting dated 17.03.2020 and PP was called for presentation but PP could not present in the meeting for presentation hence, case is deferred for upcoming SEIAA meeting. 12. Case No 6861/2020 Shri Rajendra Kumar Rai S/o Shri Nathuram Rai, R/o HIG 05, Sun City Colony, Dist. Chhatarpur, MP - 471318, Prior Environment Clearance for Metal Stone Quarry in an area of 2.10 ha. (200003 cum per annum) (Khasra No. 103), Village - Banpura, Tehsil - Buxwaha, Dist. Chhatarpur (MP) This case was recommended in 430th SEAC meeting dated 17.03.2020 and PP was called for presentation but PP could not present in the meeting for presentation hence, case is deferred for upcoming SEIAA meeting. 13. Case No 6772/2020 Smt. Kumkum Singh W/o Collector Singh, Village - Kubri, Tehsil - Bahari, Dist. Sidhi, MP – 486771 Prior Environment Clearance for Stone Quarry in an area of 2.00 ha. (24,000 cum per annum) (Khasra No. 405, 409/2 Part), Village - Karaundi, Tehsil - Kubri, Dist. Sidhi (MP). This case was recommended in 430th SEAC meeting dated 17.03.2020 and PP was called for presentation but PP could not present in the meeting for presentation hence, case is deferred for upcoming SEIAA meeting. 14. Case No 6862/2020 Shri Rajendra Kumar Rai S/o Shri Nathuram Rai, R/o HIG 05, Sun City Colony, Dist. Chhatarpur, MP – 471318 Prior Environment Clearance for Metal Stone Quarry in an area of 4.70 ha. (209822 cum per annum) (Khasra No. 1402/1), Village - Bajna, Tehsil - Buxwaha, Dist. Chhatarpur (MP) This case was recommended in 430th SEAC meeting dated 17.03.2020 and PP was called for presentation but PP could not present in the meeting for presentation hence, case is deferred for upcoming SEIAA meeting.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 19 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

15. Case No. 6865/2020 Prior Environmental Clearance for Metal Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 2.0 ha. for production capacity of 8075 cum / year at Khasra No. 68/1 at Village - Khargone, Tehsil - Manawar, Dist. Dhar (MP) by Smt. Deepika Sogani W/o Shri Rishabh Sogani (Jain), Village - Borjhiri, Tehsil - Manawar, Dist. Dhar, MP – 454221 Email - mpapplica[dot]tion123[at]gmail[dot]com, Mobile - 9685502701 This case was recommended in 430th SEAC meeting dated 17.03.2020 and it was recorded that...... “…………PP has submitted the response of above quarries same date vide letter dated 17.03.2020, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘B’:’ PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 430th SEAC meeting dated 17.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. II. PP shall not start mining activity before execution of lease agreement. III. The depth of the pit shall be as per the Approved Mining Plan. IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary and towards Kaccha road West direction & Settlement South direction. V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. VI. If required, controlled blasting shall be carried out with arrangements of sand bags towards towards Kaccha road (West direction), Stop Dam (South & North direction) & Settlement (South direction). VII. PP shall ensure to construct garland drain with settling tank (towards Stop Dam South & North direction), all around the lease area and regular cleaning & maintenance shall also be carried out by PP. VIII. PP should first carry-out plantation in and around mining lease and submit compliance within six months otherwise EC will be revoked IX. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road. X. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 20 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

Environmental Management Plan. Additional budget provision shall be made as part of EMP. XI. Total 3000 saplings shall be planted by PP in three years under plantation programme suitable indigenous tree species both side approach road, lease boundary, Village road. Plantation of Neem, Peepal, Bargad, Aam, Karanj etc. will be planted on priority. XII. PP must ensure implementation of the following activities with separate budget provision of Rs 0.40 lakh/ year under CER. (a) 1st Year - Providing furnitures & swings, slides to primary school in village & development of grazing land in the Khargone village. (b) 2nd Year - Leveling playground in the village Primary School at Khargone village . (c) 3rd Year - Repairing and white wash of village Aganwadi & construction of its new toilet at Pipalya village. (d) 4th Year – Organizing the traffic awareness camp at village, Concreting work in Nigarni village Temple ground . (e) 5th Year – Providing Smart class & Furnitures in the Khargone village. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat XIII. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Metal Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 2.0 ha. for production capacity of 8075 cum / year at Khasra No. 68/1 at Village - Khargone, Tehsil - Manawar, Dist. Dhar (MP) for the lease period to Smt. Deepika Sogani W/o Shri Rishabh Sogani (Jain), Village - Borjhiri, Tehsil - Manawar, Dist. Dhar, MP – 454221 Email - mpapplica[dot]tion123[at]gmail[dot]com, Mobile - 9685502701

16. Case No. 6796/2020: Prior Environmental Clearance for Metal Stone Quarry (opencast semi mechanized method) in an area of 3.0 ha. (20064 cum per annum) (Khasra No. 187), Village - Phulara, Tehsil - Seoni, Dist. - Seoni (MP) by Shri Naval Kishore Baghel S/o Shri Nemi Singh Baghel, R/o Mu. Po. Lakhnawada, Tehsil - Seoni, Dist. - Seoni, MP - 480661, Email - [email protected], Mobile – 7987977277. This case was recommended in 430th SEAC meeting dated 17.03.2020 and it was recorded that......

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 21 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

“------The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 430th SEAC meeting dated 17.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. ii. PP shall not start mining activity before execution of lease agreement. iii. The depth of the pit shall be as per the Approved Mining Plan. iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary. v. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP. vii. PP shall ensure the controlled blasting with arrangements of sand bags as recommended by SEAC. viii. Total 3600 saplings shall be planted by PP in first three year under plantation programme. Suitable tree species i.e. Mango, Pipal, Bargad, Neem, Amla, Dalbargia sissoo, Gultarra etc. at both sides of nearby flowing rainy nalla, 7.5 m periphery of quarry area, both sides of approach road which is connected to village road, nearby Govt. waste land in consultation with revenue department, crusher plant area & at remaining periphery of quarry area shall be planted by PP on priority. ix. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. x. PP must ensure implementation of the following activities with separate budget provision of total Rs. 4.0 lakh (Rs. 80,000/Year) under CER: a) 1st Year (Fulara village):  Construction of Kitchen in village Anganwadi in consultation with aganwadi authority.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 22 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

b) 2nd Year (Sakarda village):  Installation of hand Pump in village common area in consultation with Gram Panchayat. c) 3rd Year (Sakarda village):  To provide school dress & benches to local village school students. d) 4th Year (Fulara village):  To provide water filter, slides & swings at village school in consultation with school authority. e) 5th Year (Bhaliwada village):  To provide computer lab at Bhaliwada village school in consultation with school authority. The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat. xi. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Metal Stone Quarry (opencast semi mechanized method) in an area of 3.0 ha. (20064 cum per annum) (Khasra No. 187), Village - Phulara, Tehsil - Seoni, Dist. - Seoni (MP) for the lease period to Shri Naval Kishore Baghel S/o Shri Nemi Singh Baghel, R/o Mu. Po. Lakhnawada, Tehsil - Seoni, Dist. - Seoni, MP - 480661. 17. Case No. 6740/2019 Prior Environment Clearance for Stone Mine in an area of 0.356 ha. (24000 cum per annum) (Khasra No. 881), Village - Ghatahari, Tehsil - Gaurihar, Dist. Chhatarpur (MP) by Shri Rohit Tiwari S/o Shri Mahesh Tiwari, Village - Khiruhi, Dist. Mahoba, UP – 21050 This case was recommended in 420th SEAC meeting dated 27.01.2020 and PP was called for presentation but PP could not present in the meeting for presentation hence, case is deferred for upcoming SEIAA meeting. 18. Case No. 6877/2020: Prior Environmental Clearance for Stone Quarry (opencast semi mechanized method) in an area of 1.696 ha. (10000 cum per annum) (Khasra No. 77, 78, 79), Village - Jhinna, Tehsil - Amarpatan, Dist. - Satna (MP) by Shri Pushpraj Singh, Village - Jhinna, Tehsil - Amarpatan, Dist. - Satna, MP - 485775, Email - [email protected], Mobile – 9560403831. This case was recommended in 431st SEAC meeting dated 18.03.2020 and it was recorded that......

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 23 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

“------The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee after deliberation found that The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 431st SEAC meeting dated 18.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. ii. PP shall not start mining activity before execution of lease agreement. iii. The depth of the pit shall be as per the Approved Mining Plan. iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary. v. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP. vii. Total 2000 saplings shall be planted by PP in first three year under plantation programme. Suitable tree species i.e. Mango, Kathal, Pipal, Bargad, Neem, Amaltas, Amla, Dalbargia sissoo, Khirni, Guava, Imli etc. at mine lease boundary, approach road & village road passing through Jhinna shall be planted by PP on priority. viii. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. ix. PP must ensure implementation of the following activities in nearby villages with the help of Gram Panchayat with separate budget provision of total Rs. 3.0 lakh (Rs. 60,000/Year) under CER: a) 1st Year:  Contribution for patient beds in public health centre of Jhinna village,  Health awareness camps for local community in Jhinna village.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 24 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

 Development of grazing land in the identified village area (Charnoi Bhoomi)  Awareness Camp on Traffic Rules & Regulation b) 2nd, 3rd, 4th & 5th Year:  To provide water filter & sports equipment for school in village Jhinna  Contribution for construction of boundary wall of primary school of Jhinna village  Awareness Camp on Traffic Rules & Regulation  Development of grazing land in the identified village area (Charnoi Bhoomi) The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat. x. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast semi mechanized method) in an area of 1.696 ha. (10000 cum per annum) (Khasra No. 77, 78, 79), Village - Jhinna, Tehsil - Amarpatan, Dist. - Satna (MP) for the lease period to Shri Pushpraj Singh, Village - Jhinna, Tehsil - Amarpatan, Dist. - Satna, MP - 485775. 19. Case No 6922/2020 Prior Environmental Clearance for Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 2.00 ha. for production capacity of Stone-9,500 cum / year at & Saleable Murrum 5000 cum / year at Khasra No. 282 at Village - Gawla, Tehsil - Khargone, Dist. Khargone (MP) by Shri Dharmendra Rathore, R/o Village - Gawla, Tehsil & Dist. Khargone, M.P. Email - minegawla[at]gmail[dot]com, Mobile - 9560403831 This case was recommended in 431st SEAC meeting dated 18.03.2020 and it was recorded that...... “…………PP has submitted the response of above queries vide letter dated 18.03.2020, which was placed before the committee and the same found satisfactory. The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee after deliberation found that The EMS and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’:

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 25 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 431st SEAC meeting dated 18.03.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- I. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. II. PP shall not start mining activity before execution of lease agreement. III. The depth of the pit shall be as per the Approved Mining Plan. IV. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary and towards western side as nallha flowing. V. PP shall ensure that the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. VI. PP shall ensure to construct and maintained the approach road. Plantation will be carried out on both side of approach road. VII. PP shall ensure to construct garland drain with settling tank (towards River West direction), all around the lease area and regular cleaning & maintenance shall also be carried out by PP. VIII. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing road & as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. IX. Total 2400 saplings shall be planted by PP in five years under plantation programme suitable indigenous tree species both side approach road,lease boundary. Plantation of Neem, Peepal, Bargad, Aam, Amaltas, Khirni Guava, Imli etc. will be planted on priority.PP shall ensure to raise thick plantation towards western side to avoid adverse impact on nalla. X. PP must ensure implementation of the following activities with separate budget provision of Rs 3.0 lakhs for five year @ 60000 / year under CER.

(a) 1st Year - Water filter at Govt. School Gwala, Cost of development of grazing land in the identified village area (Charnoi Bhoomi), Awareness Camp on Traffic rules & regulation. (b) 2nd Year, 3rd Year, 4th Year & 5th Year - Toilet for school children with 2000L overhead tank, Contribution for construction of boundary wall of primary school, Gawla , Cost of development of grazing land in the identified village area (Charnoi Bhoomi). The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat XI. PP should ensure to submit half yearly compliance report and CSR activity report with photographs of plantation in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 26 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Stone Quarry (Opencast Manual / Semi Mechanized Method) in an area of 2.00 ha. for production capacity of Stone-9,500 cum / year at & Saleable Murrum 5000 cum / year at Khasra No. 282 at Village - Gawla, Tehsil - Khargone, Dist. Khargone (MP) for the lease period to Shri Dharmendra Rathore, R/o Village - Gawla, Tehsil & Dist. Khargone, M.P. Email - minegawla[at]gmail[dot]com, Mobile – 9560403831

20. Case No. 6767/2020: Prior Environmental Clearance for Stone Quarry (opencast semi mechanized method) in an area of 1.522 ha. (9000 cum per annum) (Khasra No. 178, 179, 180/1), Village - Dataur, Tehsil - Ramnagar, Dist. - Satna (MP) by Shri Atul Singh, Village/PO - Gorsari, Tehsil - Ramnagar, Dist. - Satna, MP - 485881, EMail - [email protected], Mobile – 9752957808. This case was recommended in 422nd SEAC meeting dated 10.02.2020 and it was recorded that...... “------The EMP and other submissions made by the PP were found to be satisfactory and acceptable, hence committee decided to recommend the case for grant of prior EC subject to the following special conditions in addition to the standard conditions at annexure ‘A’: PP/Consultant made a presentation on all aspects of the project and all concerned issues were discussed in detail. After detailed discussions and perusal of recommendations of 422nd SEAC meeting dated 10.02.2020, presentation made by the PP in SEIAA, it was decided to accept the recommendation of SEAC for grant of prior EC to the project subject to the following specific conditions:- i. Before commencing any mining activity fencing shall be carried out all around the lease area. Proper watch and ward arrangements should be made with installation of signage at 4 corners of lease area to avoid any untoward incident involving public and animals by the PP. ii. PP shall not start mining activity before execution of lease agreement. iii. The depth of the pit shall be as per the Approved Mining Plan. iv. The entire area shall be fenced and three rows of plantation should be done on the periphery of the boundary. v. PP shall ensure the proper water supply arrangements for dust suppression, regular sprinkling, plantation and drinking purposes especially in summer season. vi. PP shall ensure to construct garland drain with settling tank all around the lease area and regular cleaning & maintenance shall also be carried out by PP. vii. Total 1900 saplings shall be planted by PP in first three year under plantation programme. Suitable tree species i.e. Mango, Pipal, Bargad, Neem,

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 27 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

Amaltas, Amla, Dalbargia sissoo, Khirni, etc. at mine lease boundary & approach road shall be planted by PP on priority. viii. PP shall ensure proper implementation of plantation, dust suppression, construction of approach road and maintenance of existing pakka road as part of Environmental Management Plan. Additional budget provision shall be made as part of EMP. ix. PP must ensure implementation of the following activities in nearby village with the help of Gram Panchayat with separate budget provision of Rs 40,000/Year under CER: a) 1st Year:  20 benches for students of Nado Primary School  Development of grazing land in the identified village area (Charnoi Bhumi) b) 2nd, 3rd, 4th & 5th Year:  Development of grazing land in the identified village area (Charnoi Bhumi)  To provide sports items like see saw, slides, badminton, football, marry go round  Installation of Water Purifier at Nado Primary School  Construction of boundary wall of Nado Primary School The modification to the above activities can be made with the permission of the district administration and need based activity for the development of nearby villages shall be implemented by PP in consultation with the District Collector and Gram Panchayat. x. PP should ensure to submit half yearly compliance report, Plantation and CER activity report along with photographs of all activities in MP-SEIAA. If PP is failed to upload or submit two consecutive half yearly compliance reports of EC conditions to concerned authority (SEIAA and Regional Office, MoEF&CC,GoI,Bhopal) than prior environmental clearance issued to PP will automatically be treated as cancelled/ revoked as per OM No. 930/SEIAA/2019 dated 30.05.2019 issued by MPSEIAA. Hence, Prior Environmental Clearance is granted for Stone Quarry (opencast semi mechanized method) in an area of 1.522 ha. (9000 cum per annum) (Khasra No. 178, 179, 180/1), Village - Dataur, Tehsil - Ramnagar, Dist. - Satna (MP) for the lease period to Shri Atul Singh, Village/PO - Gorsari, Tehsil - Ramnagar, Dist. - Satna, MP - 485881. 21. Case No. – 6347/2019 Shri Sukhdeo Prasad Goyanka, Village - Kubri, Tehsil - Maihar, Dist. Satna, MP Prior Environment Clearance for Expansion of Limestone, Bauxite and Clay Quarry in an area of 69.30 ha. (2,10,803 tonne per annum) (Khasra No. 27, 29, 30P, 31P, 32P, 33, 34, 35P, 110P, 112, 113, 114, 119, 1), Village - Kubri, Tehsil - Maihar, Dist. Satna (MP).EIA CONSULTANT-CSIR-Central Institute of Mining and Fuel Research This case was recommended in 426th SEAC meeting dated 27.02.2020 and PP was called for presentation but PP could not present in the meeting for presentation hence, case is deferred for upcoming SEIAA meeting.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 28 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

22. Case No. 6995/2020: Prior Environmental Clearance for Stone Quarry (Opencast Manual/Semi Mechanized Method) in an area of 4.60ha. for production capacity of 50000 cum per annum at Khasra No. 536, 537/2 at Village - Shakarpur, Tehsil - , Dist. Gwalior (MP) by M/s Ambica Stone Industries, Pro. Late Smt Lata Sharma W/o Shri Laxmi Narayan Sharma, R/o Ramdas Ghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP – 474001. Regarding transfer of EC in the name of M/s Ambica Stone Industries, Pro.Shri Vipin Sharma, R/o Ramdas Ghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP - 474001 (1) It was noted that the PP had applied in Form-I for Prior Environmental Clearance of 4.60ha. for production capacity of 50000 cum per annum at Khasra No. 536, 537/2 at Village - Shakarpur, Tehsil - Gwalior, Dist. Gwalior (MP) by M/s Ambica Stone Industries, Pro. Late Smt. Lata.Sharma W/o Shri Laxmi Narayan Sharma, Ramdas Ghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP - 474001 (2) The Prior Environmental Clearance letter was issued DEIAA vide L.No. 308/DEIAA/N.K-1/2018 dtd. 5.10.2018 in the name of " M/s Ambica Stone Industries, Pro..Smt.Lata Sharma W/o Shri Laxmi Narayan Sharma, Ramdas Ghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP – 474001. (3) It is noted that PP has requested vide no Nil dtd.17.3.2020 to make amendment in the Prior EC letter by changing the name of PP of the mining project namely " M/s Ambica Stone Industries, Shri Vipin Sharma, Ramdasghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP - 474001.” in place of M/s Ambica Stone Industries, Pro. Late Smt.Lata Sharma W/o Shri Laxmi Narayan Sharma, Ramdas Ghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP – 474001. " (4) It is noted that in support of his request the PP has submitted the following documents i. No objection letter of previous Project Proponent (to whom prior EC was granted) for transfer of prior EC in the name of M/s Ambica Stone Industries, Shri Vipin Sharma, Ramdas Ghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP – 474001. ii. Notarised affidavit of M/s Ambica Stone Industries, Shri Laxmi Narayan Sharma,W/o Late Smt. Lata Sharma Ramdas Ghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP,".mentioning that no legal action/ credible action has been initiated against the mine till date and commitment to comply all the standard and specific conditions stipulated in the prior EC issued. iii. Copy of Prior EC issued by DEIAA vide letter No. 308/DEIAA/N.K.1/2018 dtd. 5.10.2018. iv. Copy of Approved Mining Plan with Environmental Management Plan of M/s Ambica Stone Industries, Shri Vipin Sharma, Ramdas Ghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP – 474001.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 29 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

v. Lease transfer order issued by Office of Collector (Mining Division) to M/s Ambica Stone Industries, Shri Vipin Sharma, Ramdasghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP - 474001.vide letter No. Q.L.-57/08/Khanij//2019 dated 14.6.2019. (5) It is noted that in EIA Notification 2006 as per Para-11 Transferability of Environmental Clearance (EC) there is a provision of transferring the EC. Para-11 :- A prior environmental clearance granted for a specific project or activity to an applicant may be transferred during its validity to another legal person entitled to undertake the project or activity on application by the transferor, or by the transferee with a written “no objection” by the transferor, to, and by the regulatory authority concerned, on the same terms and conditions under which the prior environmental clearance was initially granted, and for the same validity period. No reference to the Expert Appraisal Committee or State Level Expert Appraisal Committee concerned is necessary in such cases. In context of above it seems that PP has submitted adequate documents to make the change in the name of PP as per EIA Notification 2006 (Para-11). Hence, prior EC issued DEIAA on 5.10.2018 in the name of "M/s Ambica Stone Industries, Pro. Late Smt. Lata Sharma W/o Shri Laxmi Narayan Sharm R/o Ramdasghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP – 474001 MP." is hereby transferred to M/s Ambica Stone Industries, Shri Vipin Sharma, Ramdasghati Near Kaila Devi Mandir, Shinde Ki Chawni, Gird, Dist. Gwalior, MP - 474001.for Stone Quarry in an area of 4.60ha. for production capacity of 50000 cum per annum at Khasra No. 536, 537/2 at Village - Shakarpur, Tehsil - Gwalior, Dist. Gwalior (MP)." on the same terms & conditions and validity period under which the prior environmental clearance was initially granted. All concerned be informed accordingly. 23. Case No.6940/2020 Prior Environmental Clearance for Sand Quarry (Opencast Manual Method) in an area of 4.0 ha. for production capacity of 46000 cum / year at Khasra No. 49 at Village - Bhasunda, Tehsil - Maheswar, Dist. Khargone by M/s R.K.Gupta Contractors and Engineers Pvt. Ltd, B-72, Shahpura, Dist. Bhopal, MP – 462039. PP has submiited application in SEIAA to transfer the prior EC in the name of PP.The case was discussed and it was decided to defer the case for upcoming SEIAA meeting. 24. Case No.7029/2020 Prior Environment Clearance for Sand Quarry in an area of 4.50ha. (1200 cum per annum) (Khasra No. 938), Village - Gopalpura, Tehsil - Sitamau, Dist. Mandsaur (MP) by M/s Maa Bhagwati Construction, House No. 23, Village - Kilagari, Tehsil - Shamgarh, Dist. Mandsaur, MP, Email - mandsaursand[at]gmail[dot]com, Mobile – 9425105411. PP has submiited application received in SEIAA on 11.05.20 to transfer the prior EC in the name of PP. The case was discussed and it was decided to defer the case for upcoming SEIAA meeting.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 30 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

25. Case No.7030/2020 Prior Environment Clearance for Sand Quarry in an area of 4.00ha. (1200 cum per annum) (Khasra No. 845), Village - Dhaturiya, Tehsil - Sitamau, Dist. Mandsaur (MP) by M/s Maa Bhagwati Construction, House No. 23, Village - Kilagari, Tehsil - Shamgarh, Dist. Mandsaur, MP, Email - mandsaursand[at]gmail[dot]com, Mobile – 9425105411. PP has submiited application received in SEIAA on 11.05.20 to transfer the prior EC in the name of PP.The case was discussed and it was decided to defer the case for upcoming SEIAA meeting. 26. Case No.7031/2020 Prior Environment Clearance for Sand Quarry in an area of 4.00ha. (1200 cum per annum) (Khasra No. 346), Village - Mamatkhera, Tehsil - Sitamau, Dist. Mandsaur (MP) by M/s Maa Bhagwati Construction, House No. 23, Village - Kilagari, Tehsil - Shamgarh, Dist. Mandsaur, MP, Email - mandsaursand[at]gmail[dot]com, Mobile – 9425105411 PP has submiited application received in SEIAA on 11.05.20 to transfer the prior EC in the name of PP.The case was discussed and it was decided to defer the case for upcoming SEIAA meeting. 27. Case No.7032/2020 Prior Environment Clearance for Sand Quarry in an area of 4.00ha. (1200 cum per annum) (Khasra No. 383, 338 New Survey No. 578), Village - Tatka, Tehsil - Sitamau, Dist. Mandsaur (MP) by M/s Maa Bhagwati Construction, House No. 23, Village - Kilagari, Tehsil - Shamgarh, Dist. Mandsaur, MP, Email - mandsaursand[at]gmail[dot]com, Mobile – 9425105411 PP has submiited application received in SEIAA on 11.05.20 to transfer the prior EC in the name of PP.The case was discussed and it was decided to defer the case for upcoming SEIAA meeting. 28. Case No.7033/2020 Prior Environment Clearance for Sand Quarry in an area of 4.00 ha. (1200 cum per annum) (Khasra No. 624), Village - Parsi, Tehsil - Sitamau, Dist. Mandsaur (MP) by M/s Maa Bhagwati Construction, House No. 23, Village - Kilagari, Tehsil - Shamgarh, Dist. Mandsaur, MP, Email - mandsaursand[at]gmail[dot]com, Mobile – 9425105411 PP has submiited application received in SEIAA on 11.05.20 to transfer the prior EC in the name of PP.The case was discussed and it was decided to defer the case for upcoming SEIAA meeting. 29. Case No.7034/2020 Prior Environment Clearance for Sand Quarry in an area of 4.50 ha. (1200 cum per annum) (Khasra No. 1039), Village - Meriya Kheri, Tehsil - Sitamau, Dist. Mandsaur (MP) by M/s Maa Bhagwati Construction, House No. 23, Village - Kilagari, Tehsil - Shamgarh, Dist. Mandsaur, MP, Email - mandsaursand[at]gmail[dot]com, Mobile – 9425105411 PP has submiited application received in SEIAA on 11.05.20 to transfer the prior EC in the name of PP.The case was discussed and it was decided to defer the case for upcoming SEIAA meeting.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman

613th SEIAA Meeting dtd. 21.05.2020 Page 31 of 32

Minutes of the 613th Meeting of SEIAA dated. 21.05.2020

30. Case No.7035/2020 Prior Environment Clearance for Sand Quarry in an area of 4.00 ha. (1200 cum per annum) (Khasra No. 122), Village - Jetpura, Tehsil - Sitamau, Dist. Mandsaur (MP) by M/s Maa Bhagwati Construction, House No. 23, Village - Kilagari, Tehsil - Shamgarh, Dist. Mandsaur, MP, Email - mandsaursand[at]gmail[dot]com, Mobile – 9425105411 PP has submiited application received in SEIAA on 11.05.20 to transfer the prior EC in the name of PP.The case was discussed and it was decided to defer the case for upcoming SEIAA meeting. 31. Case No.7036/2020 Prior Environment Clearance for Sand Quarry in an area of 4.00 ha. (1200 cum per annum) (Khasra No. 202, 333), Village - Basgon, Tehsil - Garoth, Dist. Mandsaur (MP) by M/s Maa Bhagwati Construction, House No. 23, Village - Kilagari, Tehsil - Shamgarh, Dist. Mandsaur, MP, Email - mandsaursand[at]gmail[dot]com, Mobile – 9425105411. PP has submiited application received in SEIAA on 11.05.20 to transfer the prior EC in the name of PP.The case was discussed and it was decided to defer the case for upcoming SEIAA meeting. 32. Case No.7037/2020 Prior Environment Clearance for Sand Quarry in an area of 4.00 ha. (1200 cum per annum) (Khasra No. 617), Village - Ekalgad, Tehsil - Sitamau, Dist. Mandsaur (MP) by M/s Maa Bhagwati Construction, House No. 23, Village - Kilagari, Tehsil - Shamgarh, Dist. Mandsaur, MP, Email - mandsaursand[at]gmail[dot]com, Mobile – 9425105411 PP has submiited application received in SEIAA on 11.05.20 to transfer the prior EC in the name of PP.The case was discussed and it was decided to defer the case for upcoming SEIAA meeting.

Meeting ended with a vote of thanks to the Chair.

(Anil Kumar Khare) (R.K. Sharma) (Rakesh K. Shrivastava) Member Secretary Member Chairman