SSuummmmaarryy

FFoorr UUnniicchheemm LLaabboorraattoorriieess LLttdd..

AAtt.. PPlloott nnoo.. TT--4477,, 55 SSTTAARR MMIIDDCC KKAAGGAALL IInndduussttrriiaall AArreeaa,, KKoollhhaappuurr

1. Summary • Name of the Project Proponent : Mr.Dinesh Sharma • Address of the Industry : M/s Unichem Laboratories Ltd Plot No. T-47,5 Star MIDC Kagal Industrial Area - 416236 Dist: Kolhapur • Total Plot Area : 33669.64 m2 • Green Belt Area : 4858 m2 (Total ) • Production Details • Production Details (MT/A) : 666.74 MT/A(Manufacturing of Existing Products has been Stopped of all the Products Except Phenylphrine Hydrochloride. The Production of Phenylphrine Hydrochloride is only 11.88 MT/A was existing production) : 809.12 MT/A ( Proposed) : 821.00 MT/A (Total) • Sr. No. in the Scheduled : 5(f) • Project Category : B1

• Water Requirement • Existing Requirement : 50 CMD • Proposed Requirement : 560 CMD • Total water requirement : 610 CMD

• Power Requirement • Existing • Connected Load : 600 KW • Power Demand : 400 KW • Proposed • Connected Load : 9748.2 KVA • Power Demand : 5180.1 KVA • Alternate Source of Power : D.G.Set : 1 nos x 320 KVA : 3 nos x 1250 KVA • Fuel Consumption • Fuel to be used : FO, HSD. • Amount of fuel to be used : FO – 25.8 MT/D : Diesel – 850 L/D (D.G Set will only be operational during power failure

• Total Cost of the project : 69.13 Cr • Existing Project Cost : 18.76 Cr • Proposed Project Cost : 50.36 Cr

• Pollution Load and Mitigation • Quantum of Waste Water Generated : 346.00 m3/d • Process Effluent : 336.00 m3/d • Sewage Effluent : 10.00 m3/d

• Effluent Treatment Plant • Company has Existing Effluent Treatment Plant of 50 CMD & Proposed capacity is 346 CMD. Existing ETP along with proposed expansion will be used for treatment of Low COD. And for treatment of High COD installation of Stripper, MEE & ATFD will be done.

Quantum of Hazardous Waste Generated: Cat. Type Quantity (TPM) Total No. Existing Proposed 5.1 Wastes/residue 0.073 2.00 2.073 containing oil

20.2 Spent solvent 0.60 520.00 520.60

20.3 Distillation residue 5.4 10.00 15.4

28.1 Residues & wastes Nil 30.00 30.00

28.2 Spent catalyst/ Spent Nil 40.00 40.00 carbon 28.3 Date-expired, discarded Nil 4.00 4.00 and off-specification drugs

28.4 Spent Mother Liquor Nil 4.00 4.00

28.5 Spent Organic Solvent Nil 520.00 520.00

33.3 Discarded 240.00 8000.00 8240.00 containers/barrels/liners

34.1 Flue gas cleaning Nil 2.00 2.00 residue

34.2 Toxic metal-containing Nil 1.00 1.00 residue from water purification

34.3 Chemical sludge from 30.00 3000.00 3030.00 waste water treatment

35.1 Filters and filter Nil 1.00 1.00 material which have organic fluid

Expansion Details Expansion of this project is for API and other various products. The Existing Production Capacity is 666.74 MT/A ((Manufacturing of Existing Products has been Stopped of all the Products Except Phenylphrine Hydrochloride. The Production of Phenylphrine Hydrochloride is only 11.88 MT/A for existing production) and Proposed Production Capacity is 809.12 MT/A. The Total Production Capacity is 821.00 MT/A.The industry expands with the increase in capacity and proposed for the new products.