Mokelumne Aqueduct IS/MND

Total Page:16

File Type:pdf, Size:1020Kb

Mokelumne Aqueduct IS/MND Mokelumne Watershed Routine Maintenance Project Counties of Amador, Calaveras, and San Joaquin, California Initial Study / Mitigated Negative Declaration EAST BAY MUNICIPAL UTILITY DISTRICT August 2021 August 2021 NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Mokelumne Watershed Routine Maintenance Project Project Title: Mokelumne Watershed Routine Maintenance Project Lead Agency: East Bay Municipal Utility District (EBMUD) Project Location: EBMUD’s Mokelumne Watershed (Watershed) property borders and includes Camanche and Pardee Dams and Reservoirs, extending from less than 50 feet (15 m) to about 3 miles (4.8 km) from the high-water surface elevation of Camanche and Pardee Reservoirs. It also includes the lands adjacent to the lower Mokelumne River for approximately one-half mile (0.8 km) below Camanche Dam. Current and recent land use practices in the Mokelumne Watershed include management for water supply, flood control, grazing, aquaculture, hydroelectric power, wastewater treatment, wildland fire prevention and suppression, facility maintenance, residential use, and recreation. Project Description: The Mokelumne Watershed Routine Maintenance Project (Project) involves the continuation of routine maintenance of the Mokelumne Watershed facilities, roads, and infrastructure at locations within the Watershed property. Many of these activities were previously authorized under Fish and Game Code Section 1602 Lake and Stream Alteration Agreements (LSAAs) with the California Department of Fish and Wildlife (CDFW). Given the expiration of the prior LSAA, the EBMUD seeks a new LSAA for the continuation of routine maintenance activities critical to Watershed operations in 1600 jurisdictional areas and that comprise the Project. permitting the continuation of routine maintenance activities critical to Watershed operations. To permit ongoing environmental stewardship activities that are part of the Project, EBMUD also seeks a Safe Harbor Agreement with CDFW covering effects to foothill yellow-legged frog (Rana boylii), California tiger salamander (Ambystoma californiense), as well as other species that may be listed under the California Endangered Species Act in the near future such as western spadefoot (Spea hammondii) and tri- colored blackbird (Agelaius tricolor). Maintenance activities include sediment and debris removal; vegetation management; facilities maintenance; erosion prevention, control, repair, and protection; and environmental stewardship activities. Routine maintenance activities are critical to operations of the Mokelumne Watershed, providing for safe travel throughout the Project area while ensuring natural flows for drainages, flood control infrastructure, dam seepage monitoring wells and weirs, and other watercourses. The routine maintenance of facilities, roads, and infrastructure is ongoing due to changing conditions resulting from weather events, deterioration of facilities and structures, and normal use. Project Objective: The Project’s objective is to maintain the health of the Mokelumne Watershed and the functional and structural integrity of EBMUD-owned Watershed property (e.g., land) and facilities located in Amador, Calaveras, and San Joaquin counties. Schedule: Key milestones for project implementation are summarized as follows: • Complete Environmental Review October 2021 • Begin Maintenance Work April 2022 Environmental Determination: Pursuant to the requirements of the California Environmental Quality Act, an Initial Study was prepared for the Project. Based on the results of the Initial Study, it was determined that project-related maintenance work could potentially generate environmental impacts to biological resources, cultural resources, geology and soils, hazards and hazardous materials, hydrology and water quality, noise, tribal cultural resources, and wildfire. In the long term, maintenance activities would have a beneficial effect by maintaining the functional and structural integrity of EBMUD-owned facilities and would not generate significant impacts. Adherence to EBMUD standard best management practices and implementation of mitigation measures would ensure that the Project would not generate a significant impact on the environment. Based on this assessment, a “Mitigated Negative Declaration” has been prepared. Environmental Mitigation: All impacts will be reduced to Less than Significant levels by implementation of mitigation measures. Initial Study/ Mitigated Negative Declaration Mokelumne Watershed Routine Maintenance Project Public Comment/Review: The Initial Study/Mitigated Negative Declaration is available for review at: • East Bay Municipal Utility Distiict, 375 11th Sti·eet, Oakland, CA 94607 • EB MUD website (https://www.ebmud.com/MokelumneWatershedRMA ) In accordance with Section 15073 of the California Environmental Quality Act Guidelines, this Mitigated Negative Declaration is available for public review from August 11, 2021 through September 10, 2021. W1itten comments on this proposed Mitigated Negative Declaration must be received no later than 4:30 pm on September 10, 2021. Please address comments to East Bay Municipal Utility District, Attn: Michelle Workman, Manager ofFishe1ies and Wildlife, One Winemaster Way, Suite K2, Lodi CA 95240, or email to [email protected]. Date Michael T. Tognolini, Director of Water and Naniral Resources August 2021 ii Initial Study / Mitigated Negative Declaration Mokelumne Watershed Routine Maintenance Project TABLE OF CONTENTS Chapter 1 Summary ................................................................................................................................ 1-1 1.1 Project Objective ....................................................................................................................... 1-1 1.2 Purpose of Initial Study/ Mitigated Negative Declaration ......................................................... 1-2 1.3 Summary of Environmental Considerations .............................................................................. 1-2 1.4 Circulation of the IS/MND ........................................................................................................ 1-3 Chapter 2 Project Description ............................................................................................................... 2-1 2.1 Project Overview ....................................................................................................................... 2-1 2.1.1 Project Area ..................................................................................................................... 2-2 2.1.2 Overview of Maintenance Approach ............................................................................... 2-9 2.2 Maintenance Activities ............................................................................................................ 2-10 2.2.1 Sediment and Debris Removal ....................................................................................... 2-10 2.2.2 Vegetation Management ................................................................................................ 2-12 2.2.3 Facilities Maintenance ................................................................................................... 2-14 2.2.4 Erosion Prevention, Control, Repair, and Protection ..................................................... 2-15 2.2.5 Environmental Stewardship ........................................................................................... 2-16 2.3 Activities Not Covered Under the Proposed Routine Maintenance ........................................ 2-17 2.4 Project Implementation ............................................................................................................ 2-17 2.4.1 Work Cycle .................................................................................................................... 2-17 2.4.2 Timing of Work ............................................................................................................. 2-17 2.4.3 Equipment ...................................................................................................................... 2-18 2.4.4 Maintenance Site Access ............................................................................................... 2-18 2.4.5 Construction Staging and Work Area Limits ................................................................. 2-18 2.4.6 Temporary Water Diversions ......................................................................................... 2-19 2.4.7 Site Restoration .............................................................................................................. 2-19 2.5 EBMUD Practices and Procedures, BMPs, and Guidelines .................................................... 2-19 2.5.1 Mokelumne Watershed Routine Maintenance Standard Practices ................................ 2-19 2.5.2 General Site Operation Best Management Practices ..................................................... 2-20 2.5.3 Mokelumne Watershed Management Plan Specific Project Environmental Review Guide ................................................................................................................ 2-20 2.6 Permits and Approvals ............................................................................................................. 2-28 Chapter 3 Environmental Analysis ....................................................................................................... 3-1 3.1 Environmental Factors Potentially Affected.............................................................................
Recommended publications
  • Walter R. Mclean Papers, Bulk 1930-1968
    http://oac.cdlib.org/findaid/ark:/13030/tf7779n9g3 No online items Inventory of the Walter R. McLean Papers, bulk 1930-1968 Processed by the Water Resources Collections and Archives staff. Water Resources Collections and Archives Orbach Science Library, Room 118 PO Box 5900 University of California, Riverside Riverside, CA 92517-5900 Phone: (951) 827-2934 Fax: (951) 827-6378 Email: [email protected] URL: http://library.ucr.edu/wrca © 2008 The Regents of the University of California. All rights reserved. Inventory of the Walter R. MS 76/7 1 McLean Papers, bulk 1930-1968 Inventory of the Walter R. McLean Papers, bulk 1930-1968 Collection number: MS 76/7 Water Resources Collections and Archives University of California, Riverside Riverside, California Contact Information: Water Resources Collections and Archives Orbach Science Library, Room 118 PO Box 5900 University of California, Riverside Riverside, CA 92517-5900 Phone: (951) 827-2934 Fax: (951) 827-6378 Email: [email protected] URL: http://library.ucr.edu/wrca Processed by: Water Resources Collections and Archives staff Date Completed: October 1976 © 2008 The Regents of the University of California. All rights reserved. Descriptive Summary Title: Walter R. McLean Papers, Date (inclusive): bulk 1930-1968 Collection number: MS 76/7 Creator: McLean, Walter Reginald, 1903- Extent: ca. 19 linear ft. (40 boxes) Repository: Water Resources Collections and Archives Riverside, CA 92517-5900 Shelf location: Water Resources Collections and Archives. Language: English. Access Collection is open for research. Publication Rights Copyright has not been assigned to the Water Resources Collections and Archives. All requests for permission to publish or quote from manuscripts must be submitted in writing to the Head of Archives.
    [Show full text]
  • Mokelumne/Amador/Calaveras Integrated Regional Water Management Plan
    Mokelumne/Amador/Calaveras Integrated Regional Water Management Plan November 2006 Mokelumne/Amador/Calaveras Integrated Regional Water Management Plan Prepared by: Water and Environment November 2006 Mokelumne, Amador, and Calaveras IRWMP Table of Contents Executive Summary..................................................................................................................... i ES-1 Background and Authority........................................................................................... i ES-2 Local and Regional Integration .................................................................................. ii ES-3 Goals and Objectives .................................................................................................iii ES-4 Project Prioritization ...................................................................................................iii ES-5 Implementation.......................................................................................................... iv Chapter 1 Introduction ...........................................................................................................1-1 1.1 IRWMP Background................................................................................................1-1 1.2 IRWMP Standards ..................................................................................................1-2 Chapter 2 M/A/C IRWMP Development .................................................................................2-1 2.1 Resource Management & Coordination
    [Show full text]
  • Notice of Special Meeting
    BOARD OF DIRECTORS EAST BAY MUNICIPAL UTILITY DISTRICT 375 - 11th Street, Oakland, CA 94607 Office of the Secretary: (510) 287-0440 Notice of Special Meeting FY22 and FY23 Budget Workshop #2 Tuesday, March 23, 2021 9:00 a.m. **Virtual** At the call of President Doug A. Linney, the Board of Directors has scheduled a Budget Workshop for 9:00 a.m. on Tuesday, March 23, 2021. Due to COVID-19 and in accordance with the most recent Alameda County Health Order, and with the Governor’s Executive Order N-29-20 which suspends portions of the Brown Act, this meeting will be conducted by webinar or teleconference only. In compliance with said orders, a physical location will not be provided for this meeting. These measures will only apply during the period in which state or local public health officials have imposed or recommended social distancing. The Board will meet in workshop session to review the proposed Fiscal Year 2022 (FY22) and Fiscal Year 2023 biennial budget, rates, operating and capital priorities, and staffing; the proposed FY22 System Capacity Charge and FY22 Wastewater Capacity Fee; and will receive follow-up information from the January 26, 2021 Budget Workshop #1. Dated: March 18, 2021 _______________________________ Rischa S. Cole Secretary of the District W:\Board of Directors - Meeting Related Docs\Notices\Notices 2021\032321_FY22_FY23 Budget Workshop 2.docx This page is intentionally left blank. BOARD OF DIRECTORS EAST BAY MUNICIPAL UTILITY DISTRICT 375 - 11th Street, Oakland, CA 94607 Office of the Secretary: (510) 287-0440 AGENDA Special Meeting FY22 and FY23 Budget Workshop #2 Tuesday, March 23, 2021 9:00 a.m.
    [Show full text]
  • 4.9 Hydrology and Water Quality
    4.9 HYDROLOGY AND WATER QUALITY This section describes the regulations pertaining to, and the existing conditions of, surface water, groundwater, water quality, and water supply existing within the planning area, and an evaluation of impacts associated with implementation of the Draft General Plan. 4.9.1 REGULATORY SETTING FEDERAL PLANS, POLICIES, REGULATIONS, AND LAWS Clean Water Act The Clean Water Act of 1972 (CWA) is the primary federal law that governs and authorizes water quality control activities by the U.S. Environmental Protection Agency (EPA), the lead federal agency responsible for water quality management. By establishing water quality standards, issuing permits, monitoring discharges, and managing polluted runoff, the CWA seeks to restore and maintain the chemical, physical, and biological integrity of surface waters to support “the protection and propagation of fish, shellfish, and wildlife and recreation in and on the water.” EPA is the federal agency with primary authority for implementing regulations adopted pursuant to CWA, and has delegated the state of California as the authority to implement and oversee most of the programs authorized or adopted for CWA compliance through the Porter-Cologne Water Quality Control Act of 1969 described below. Water Quality Criteria and Standards EPA has published water quality regulations under Volume 40 of the Code of Federal Regulations (40 CFR). Section 303 of the CWA requires states to adopt water quality standards for all surface waters of the United States. As defined by the CWA, water quality standards consist of two elements: (1) designated beneficial uses of the water body in question and (2) criteria that protect the designated uses.
    [Show full text]
  • Northern Calfornia Water Districts & Water Supply Sources
    WHERE DOES OUR WATER COME FROM? Quincy Corning k F k N F , M R , r R e er th th a a Magalia e Fe F FEATHER RIVER NORTH FORK Shasta Lake STATE WATER PROJECT Chico Orland Paradise k F S , FEATHER RIVER MIDDLE FORK R r STATE WATER PROJECT e Sacramento River th a e F Tehama-Colusa Canal Durham Folsom Lake LAKE OROVILLE American River N Yuba R STATE WATER PROJECT San Joaquin R. Contra Costa Canal JACKSON MEADOW RES. New Melones Lake LAKE PILLSBURY Yuba Co. W.A. Marin M.W.D. Willows Old River Stanislaus R North Marin W.D. Oroville Sonoma Co. W.A. NEW BULLARDS BAR RES. Ukiah P.U. Yuba Co. W.A. Madera Canal Delta-Mendota Canal Millerton Lake Fort Bragg Palermo YUBA CO. W.A Kern River Yuba River San Luis Reservoir Jackson Meadows and Willits New Bullards Bar Reservoirs LAKE SPAULDING k Placer Co. W.A. F MIDDLE FORK YUBA RIVER TRUCKEE-DONNER P.U.D E Gridley Nevada I.D. , Nevada I.D. Groundwater Friant-Kern Canal R n ia ss u R Central Valley R ba Project Yu Nevada City LAKE MENDOCINO FEATHER RIVER BEAR RIVER Marin M.W.D. TEHAMA-COLUSA CANAL STATE WATER PROJECT YUBA RIVER Nevada I.D. Fk The Central Valley Project has been founded by the U.S. Bureau of North Marin W.D. CENTRAL VALLEY PROJECT , N Yuba Co. W.A. Grass Valley n R Reclamation in 1935 to manage the water of the Sacramento and Sonoma Co. W.A. ica mer Ukiah P.U.
    [Show full text]
  • Draft Supplement to the Final Environmental Impact Statement / Environmental Impact Report
    Draft Supplement to the Final Environmental Impact Statement / Environmental Impact Report Public Hearings 1 July 2017 CEQA/NEPA Previous Milestones • CCWD and Reclamation completed the Draft EIS/EIR in February 2009 • Included alternatives for reservoir expansion to 160 TAF and 275 TAF • CCWD and Reclamation completed a Final EIS/EIR for LVE in March 2010 • Selected Alternative 4 (160 TAF) for near term implementation • Included Timing Variant to describe future expansion to 275 TAF • CCWD filed the Notice of Determination for Phase 1 Expansion in April 2010 • Reclamation issued Record of Decision for Phase 1 Expansion in March 2011 • CCWD completed Phase 1 Expansion in July 2012 • Expanded reservoir from 100 TAF to 160 TAF 2 Note: TAF is thousand acre-feet Draft Supplement to the Final EIS/EIR – Public Hearings – July 2017 CEQA/NEPA Process • CCWD and Reclamation prepared Draft Supplement to the Final EIS/EIR to evaluate: • Changed conditions in the project setting • Updated demands from local agency potential partners and wildlife refuges • Refined facilities and alternatives • Modifications to project operations • Quantitative analysis of climate change scenarios 3 Draft Supplement to the Final EIS/EIR – Public Hearings – July 2017 CEQA/NEPA Process • Draft Supplement document is posted to web • CCWD website: www.ccwater.com/lvstudies • Reclamation website: www.usbr.gov/mp/vaqueros/index.html • CD copies available on request (send email to [email protected]) • Notice of Availability published in Federal Register • Notice of Completion filed with State Clearinghouse • Additional notices filed with County Clerks • Contra Costa, Alameda, Amador, and Calaveras • Direct mailing of CEQA Notice of Availability to parties that previously commented • Please submit written comments by 5:00 p.m.
    [Show full text]
  • An Introduction to High-Frequency Nutrient and Biogeochemical Monitoring for the Sacramento– San Joaquin Delta, Northern California
    Prepared in cooperation with the Delta Regional Monitoring Program An Introduction to High-Frequency Nutrient and Biogeochemical Monitoring for the Sacramento– San Joaquin Delta, Northern California Scientific Investigations Report 2017–5071 U.S. Department of the Interior U.S. Geological Survey FRONT COVER: Top left: Photograph showing monitoring buoy at Liberty Island, California, being serviced by hydrologic technician. Photograph by Bryan Downing, December 19, 2013. Bottom Left: Example of a daily report for the monitoring buoy in Liberty Island, California that is emailed out to interested parties. Report generated by Frank Anderson, 2014. Bottom middle: Photograph showing vertical water quality profiler in the Sacramento River. Photograph by Michael Sauer, April 16, 2013. Right: Map of nitrate concentrations collected via high speed boat mapping in the Cache Slough Complex/North Delta. Map created by Travis von Dessonneck and Bryan Downing, October 10, 2014. BACK COVER: Top left: Photograph showing monitoring buoy at Liberty Island, California. Photograph by Bryan Downing, March 8, 2017. Bottom Left: Photograph showing vertical profiling instrumentation, Sacramento River, Freeport, California. Photograph courtesy of Michael Sauer, April 16, 2013. Right: Photograph showing flow monitoring station in Liberty Island, California. Photograph by Bryan Downing, March 8, 2017. Bottom: Photograph showing sunset in the northern Delta, Little Holland Tract, California. Photograph by Bryan Downing, March 8, 2017. An Introduction to High-Frequency Nutrient and Biogeochemical Monitoring for the Sacramento–San Joaquin Delta, Northern California By Tamara E.C. Kraus, Brian A. Bergamaschi, and Bryan D. Downing Prepared in cooperation with the Delta Regional Monitoring Program Scientific Investigations Report 2017–5071 U.S.
    [Show full text]
  • Verifying Reported Historical Natural Barriers to the Upstream Migration Of
    1 2 Verifying Reported Historical Natural Barriers to the Upstream Migration of 3 Chinook Salmon (Oncorhynchus tshawytscha) and Steelhead (Oncorhynchus mykiss) 4 in the Mokelumne River Watershed 5 6 7 February, 2014 8 9 10 11 12 Stephen R. Boyd 13 Fisheries and Wildlife Division, East Bay Municipal Utility District, 1 Winemasters Way, 14 Suite K, Lodi, CA 95240, USA. Correspondent: [email protected] 15 16 17 18 19 20 21 22 23 1 24 ACKNOWLEDGMENTS 25 26 I am indebted to Elton V. Rodman, owner of Roaring Camp, for allowing access through 27 his property to a difficult to access part of the Mokelumne River Basin near the 28 confluence of the North Fork and Middle Fork, for providing valuable information 29 regarding the locations of potential migration barriers and how to reach them, and for 30 providing some insightful first hand historical accounts regarding salmonids spawning in 31 the river in years past. Ricky Lague, Mike Rodman, and Dennis Rodman are deserving 32 of high praise as well for providing cheerful, valuable advice and guide service. Pat 33 McGreevy provided very useful trail maps of the region around Glenco and guided 34 EBMUD staff during the 2011 site visit to the Middle Fork. I am also grateful for help 35 received on this project from EBMUD colleagues Robyn Bilski, Casey Del Real, Charles 36 Hunter, and James Jones, and from two anonymous reviewers for their comments on a 37 draft of this report. Thank you all. 38 39 ABSTRACT 40 41 Substantial uncertainty exists regarding historical use of the Mokelumne River 42 watershed by native anadromous salmonid runs.
    [Show full text]
  • Draft Initial Study and Mitigated Negative Declaration
    Initial Study and Mitigated Negative Declaration Recoat Mokelumne Aqueducts Phase 8 - Slough Crossings Project East Bay Municipal Utility District May 2010 Initial Study and Mitigated Negative Declaration Recoat Mokelumne Aqueducts Phase 8 - Slough Crossings Project East Bay Municipal Utility District May 2010 TABLE OF CONTENTS Recoat Mokelumne Aqueducts Phase 8 - Slough Crossings Project Initial Study/Mitigated Negative Declaration Acronyms and Abbreviations ..............................................................................................A-1 Executive Summary ............................................................................................................. E-1 1. Introduction Purpose/Legal Authority .............................................................................................1-1 Scope and Content .......................................................................................................1-2 Federal Review Process ..............................................................................................1-2 Public Review Process.................................................................................................1-2 2. Project Description Project Background .....................................................................................................2-1 Proposed Sequencing of Work.....................................................................................2-2 Description of Sites......................................................................................................2-3
    [Show full text]
  • Walter R. Mclean Papers
    http://oac.cdlib.org/findaid/ark:/13030/tf7779n9g3 No online items Walter R. McLean papers Processed by the Water Resources Collections and Archives staff. Special Collections & University Archives The UCR Library P.O. Box 5900 University of California Riverside, California 92517-5900 Phone: 951-827-3233 Fax: 951-827-4673 Email: [email protected] URL: http://library.ucr.edu/libraries/special-collections-university-archives © 2008 The Regents of the University of California. All rights reserved. Walter R. McLean papers WRCA 077 1 Descriptive Summary Title: Walter R. McLean papers Date (bulk): bulk 1930-1968 Collection Number: WRCA 077 Extent: 19 linear feet40 boxes Repository: Rivera Library. Special Collections Department. Riverside, CA 92517-5900 Languages: English. Access Collection is open for research. Publication Rights Copyright has not been assigned to the Water Resources Collections and Archives. All requests for permission to publish or quote from manuscripts must be submitted in writing to the Director of Distinctive Collections. Permission for publication is given on behalf of the Water Resources Collections and Archives as the owner of the physical items and is not intended to include or imply permission of the copyright holder, which must also be obtained by the reader. Preferred Citation [identification of item], [date if possible]. Walter R. McLean papers (WRCA 077). Water Resources Collections and Archives. Special Collections & University Archives, University of California, Riverside. Biographical Information Walter Reginald McLean, the son of Walter Reginald and Sarah Jane (Patterson) McLean, was born on July 16, 1903 in the town of Broderick in Yolo County, California. His distinguished career embraces fifty-three years of service to the East Bay Municipal Utility District, plus fifteen years as a consultant to water-related projects in the United States, South America, and South Africa.
    [Show full text]
  • San Joaquin River Hydrologic Region
    Volume 3 Chapter 7 San Joaquin River Hydrologic Region California Water Plan Update 2005 Chapter 7 San Joaquin River Hydrologic Region Contents Chapter 7 San Joaquin River Hydrologic Region ........................................................................................................7-1 Setting ................................................................................................................................................................7-1 Climate ...............................................................................................................................................................7-1 Population ..........................................................................................................................................................7-1 Land Use ............................................................................................................................................................7-2 Water Supply and Use .........................................................................................................................................7-5 State of the Region ..............................................................................................................................................7-8 Challenges ......................................................................................................................................................7-8 Accomplishments ..........................................................................................................................................7-10
    [Show full text]
  • East Bay Watershed Master Plan Update
    East Bay Watershed Master Plan 2016 EAST BAY WATERSHED MASTER PLAN UPDATE East Bay Municipal Utility District Board of Directors Frank Mellon President William B. Patterson Vice President John A. Coleman Andy Katz Doug Linney Lesa R. McIntosh Marguerite Young District Personnel Alexander R. Coate General Manager Richard G. Sykes Director of Water and Natural Resources Douglas I. Wallace Environmental Affairs Officer, Master Plan Update Project Manager Scott D. Hill Manager of Watershed and Recreation Jose D. Setka Manager of Fisheries and Wildlife Rick Leong Principal Management Analyst Rachel R. Jones Office of General Counsel East Bay Watershed Master Plan Prepared by: East Bay Municipal Utility District 375 - 11th Street Oakland, CA 94607 510-287-1370 Contact: Douglas I. Wallace February 29, 1996 Revised March 15, 1999 Updated Month, 2016 This document should be cited as: East Bay Municipal Utility District. 1996. East Bay Watershed Master Plan. February 29, 1996. Revised March 15, 1999. Updated [July] 2016. With technical assistance from Jones & Stokes Associates; Brady and Associates; Dillingham Associates; REM & Associates; Merritt Smith Consulting; Reza Ghezelbash, GIS Consultant; and Montgomery Watson. (JSA 94-320.) Oakland, CA. Table of Contents Section 1 Introduction 1 Purpose of the East Bay Watershed Master Plan . .1 Plan Terminology . .3 Board of Directors’ Policy Direction. 4 History of East Bay Watershed Land Use Planning. 5 Scope of the East Bay Watershed Master Plan . .5 Public Involvement. 5 Organization and Use of the Plan. 6 Section 2 District Lands and Resources 9 Introduction . .9 Overview of District Lands . .9 General Description of Watershed Lands. 11 District-Owned Nonreservoir Watershed Lands .
    [Show full text]