VIL NY LEDELSE I FYLKE FØRE TIL ENDRING AV KURS I NORDOMRÅDE?

GOVERNOR OF THE MURMANSK REGION МARINA V. KOVTUN

5 February 2013 Kirkenes MURMANSK REGION IN ECONOMY OF RUSSIA

100 % 100 % 100 %

Apatite Nepheline, baddeleyite Mica

17 % 15,4 %

45 %

Fish and fish products Nickel Catch of water bio-resources processed and conserved

11 % 7 % 2 %

Iron ore Refined copper Electric power concentrate

2 MURMANSK REGION IN THE ARCTIC

• Extended transport, communications and information infrastructure • Easy access to the World’s water • Three sea ports • Ice-free and deep Bay • The base of the atomic ice-breaker fleet • Oil & Gas Enterprises

3 INTEGRATED DEVELOPMENT OF THE MURMANSK TRANSPORT HUB The aim : creating of the deep-sea hub - the center for transshipment of goods II stage: Design work on federal property facilities of the Murmansk Transport Hub

1. Development of the railway infrastructure:

- New railway stations -2, Promezhutochnaya, Lavna; - New electrified railway: st. Vyhodnoy - st. Murmashi-2 – st. Lavna; Stages : - New railway bridge across the river Tuloma. I stage is completed (2010 г.) The capacity of the railway section should be at least 28 mln Development of the investments feasibility, tons per year approval of the objects placement

2. Development of the Murmansk sea port area II stage (2011-2012 г.г.) - Dredging in the Murmansk sea port area Design work on federal property facilities of the - Dredging near the new terminals. Murmansk Transportation Hub 3. Development of the sea shore infrastructure

III stage (2013-2020 г.г.) - Construction of the fleet maintenance base. Construction of the Murmansk Transportation Hub objects 4 INTEGRATED DEVELOPMENT OF THE MURMANSK TRANSPORT HUB

New coal terminal

New oil terminal

Enlarge container terminal

5 NEW COAL TRANSFER TERMINAL

July 2012 Trilateral investments Agreement

2015 - 2018 First stage of terminal put into operations

First stage of terminal Capacity is 6 million tons per year

6 NORTHERN SEA ROUTE

 connects Atlantic and Pacific oceans via Arctic waters State Law

provides access July 2012 to natural resources Northern Sea Rout of Polar North, Administration Siberia and Far East

Alternative routes with using of Murmansk Transport Hub capacity Existing routes Northern sea route Examples of deep-water hub-centers 7 NORTHERN SEA ROUTE

In transit 2011 2012 vessel escort Amount of vessels, ea. 34 46 Freight turnover, th. tons 820 1 200

3 new aicebreackers up to 2018 year

• The biggest vessels in history of the NSR : - Tanker "Vladimir Tikhonov," belonging to the JSC "Sovkomflot” (deadweight - 162 thousand tons), with a cargo of 120 thousand tons of gas condensate; - bulk carrier «Sanko Odyssey», owned by the Japanese company «Sanko Line», deadweight - 75 thousand tons with a cargo of 66 343 tons of iron ore concentrate, belonging to the JSC "Eurochem". The loading port is the port of Murmansk.

• Tanker «Palva» (deadweight - 74 tons) owned by the «Neste Oil», with a cargo of 59 313 tons of gas condensate, was escorted in record time: only 6.5 days with an average speed of 14 knots. (The voyage was hold in the second half of September: the most favorable time, that allowed Marine Operations Headquarter to choose a route navigation in completely open water The loading was carried out in the port of Vitino).

• Tanker «Perseverance» (deadweight 73 tons), with a cargo of petroleum products made ​​three transit voyages on the route for one Arctic navigation for the first time in the history of the NSR: 2 voyages from West to East (loading was carried out in the Vitino port) and one voyage from East to West.

8 PASSENGER INFRASTRUCTURE OF THE SEA TRANSPORT

Cruise tourism: - Passenger port area is being used now only for domestic voyages (Border and customs control is not provided) International holiday cruisers moor at the sea fishery port. Passing of border and customs formalities shortens duration of excursions. 2011 – 11 ship entries, ca. 5 000 cruise tourists 2012 – 15 ship entries (plan)

Project «Arctic harbor»

- Dredging and shore protection - Main pier elongation - Reconstruction and broadening of the passenger ship terminal - Establishment of checkpoint in the passenger port area - Inclusion of Murmansk in the list of ports with permit for 72-hour stay for foreign cruise tourists

The Project will: lengthen cruise line from Kirkenes (Norway) to Murmansk increase number of entries of foreign cruise companies ( UK,USA, Germany, ) provide mooring of greater portage vessels

9 INDUSTRY CLUSTERS DEVELOPMENT  “Kolskaya Ore Mining Company”, “Apatite”, “Olkon”

 “Kovdorsky Mining and Processing Plant”,

 “Lovosersky Mining and Processing Plant”

10 KOLA CHEMISTRY-TECHNOLOGY CLUSTER

11 NEW MINING IDUSTRY COMPANY

“Oleny Ruchey Mining and Processing Plant” (CJSC ”NWPC”, “Akron Plus”)

The project is at its completion stage.

There are more than 1500 people constructing the plant.

Estimated volume of apatite-nepheline deposit is 31 million tons.

12 NEW MINING IDUSTRY COMPANY

Subsurface User: CJSC “Fedorovo Resources” (“Barrick Gold”, Canada). Geological exploration and extraction till 2021 (25 years). Surface mining. 2 opencast mines. 750 million tons of mined rock, 260 million tons of ore. Construction investments ~ 40 billion rubles (1,5 billion rubles disbursed)

13 FISH IDUSTRY

14 FISH IDUSTRY

15 ENVIRONMENT

16 ENVIRONMENT

17 ENERGY

18 INTERNATIONAL COOPERATION IN 2013