Past and Ongoing Projects

OFFSHORE

Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2012 GlobalIndustries Ubarana-UGG 4 Saturnax stations (Iroquois) 19km20"(12.7mm,X65) for Petrobras 5.5 km 12" (16.5 mm, X65)

2012 Subsea7 Clov 3 Saturnax stations (Seven Borealis) Angola J-LAY : for Total E&P 1,429 welds 12.75" (22.2 mm, X65) - 34.3 km 982 welds 12.75" (18.3 mm, X65) - 23.7 km 1,051 welds 12.75" (15.9 mm, X65) - 25.7 km 1,481 welds 10.75" (14.3 mm, X65) - 36.1 km S-LAY : 1,270 welds 12.75" (15.9 mm, X65) - 31 km 7 welds 12.75" (22.2 mm, X65) - 0.17 km

2012 Swiber Danau Bubut 4 Saturnax stations (Concorde) Brunei 21km12.75"(25.4MM° for Brunei Shell Petroleum Non-sour service

2012 TLOffshore Telok 4 Saturnax stations (LTS 3000) Malaysia Guntong-E to Telok-A Pipeline : for EMEPMI 27 km 28" (29.4/22.2 mm, DNV GR450)

2012 TLOffshore Tapis 4 Saturnax stations (E3) Malaysia 3.6km10"(9.3mm,CS,DNVGr450) for EMEPMI 4.0 km 10" (18.3/15.9 mm, CS, DNV Gr450) 5.6 km 12" (22.2/17.5 mm, CS, DNV Gr450) 6.0 km 14" (20.6/17.5 mm, CS, DNV Gr450) 5.8 km 16" (22.2/19.1 mm, CS, DNV Gr450) 1.6 km 18" (19.1/14.3 mm, CS, DNV Gr450) 1.7 km 18" (19.1/14.3 mm, CS, DNV Gr450) 9.3 km 18" (23.8/19.1 mm, CS, DNV Gr450)

2012 TLOffshore Bumi-B & Cakerawala-D 3 Saturnax stations (TBA) Malaysia/Thailand 525 welds 24" (14.3 mm, X65 + 3mm 316L) for Carigali Hess 320 welds 10.75" (9.27 mm, X65 + 3mm 316L)

2012 Geocean Ruby Project 2 Saturnax stations Indonesia 900welds14"(11.1mm,X65) for Total EPC Non-sour service

2012 TLOffshore SKO Pipelines 3 Saturnax stations (NorCe Endeavour) Malaysia 27km18"(14.3/16.2mm,X65,PL364) for PCSB 55 km 16" (12.7/14.9 mm, X65, PL366)

2012 Offshore Contractor Anguille 2 Saturnax stations (Jascon 34) Gabon 2,626welds18"(14,3mm,X52)-32km for Total

2012 GSP Q4-C 3 Saturnax stations (Falcon) TheNetherlands 2,500welds10,75"(14,3mm,X52)-31km for Wintershall

Offshore Projects -www.serimax.com Page 1 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2012 PT Timas Bawal 4 Saturnax stations (TBA) Indonesia 39.5km14"(14.3mm,X60) for Conoco Phillips

2012 SASB LH4 1 Saturnax station (S3000) China Carrier pipe - Inner : for CNOCC 1,008 welds 18" (15.9 mm, X65) - 12.3 km Jacket pipe - Outer : 927 welds 22" (15.9 mm, X65) - 11.3 km Buckle Arrestor pipe - Outer : 74 welds 22" (25.4 mm, X65) - 0.878 km

2012 Geocean South Mahakam Project 2 Saturnax stations Indonesia 900welds24"(14.3mm,X65) for Total EPC Non-sour service

2012 Technip LIW 5 Saturnax stations (G1201) China Base Case: for COEEC 42 welds 30" (30 mm, X65) - 0.5km 786 welds 30" (28.6 mm, X65) - 9.5km 6,447 welds 30" (30.2 mm, X65) - 78km 2,728 welds 30" (28.6 mm, X65) - 33km 2,067 welds 30" (28.6 mm, X65) - 25km 1,158 welds 30" (28.6 mm, X65) - 14km

Option: 2,645 welds 30" (28.6 mm, X65) - 32km 662 welds 30" (30.2 mm, X65) - 8km

2012 TLOffshore Serendah & Patricia 3 or 4 Saturnax stations (QP2000) Malaysia WPPA to PTSA Multiphase pipeline: for MOC 13.5km 8" (12.7 mm, X52) SNPA to WYE1 crude/condensate pipeline: 8km 8" (12.7 mm, X52) SNPA to WYE2 gas pipeline: 7.6 km 20" (12.7 mm, X52) Non sour service for all pipelines

2012 Swiber RUB 4 Saturnax stations (Concord) Indonesia Export line: for Pearl Oil 25,574 welds 14" (11.1 mm, X65) - 312km

2012 COOEC WZ 12-1 1 Saturnax station (DLB Lanjiang) China 21km18"/22",X65pipe-in-pipe for CNOOC

2012 Swiber ZSW 4 saturnax stations (PJW3000) Myanmar 12welds28"(26.97mm,X65)-0.15km for PTTEP 1,299 welds 28" (22.23 mm, X65) - 15.8 km 328 welds 28" (20.62 mm, X65) - 4 km 3,852 welds 28" (20.62 mm, X65) - 47 km 12,460 welds 28" (19.05 mm, X65) - 152 km

2011 Marathon Oil East Brae Riser 3 manual stations (Apache) UK(EastBrae) DevenickTie-backtoEastBraeproject: for BP Production riser: 10 welds 10" (30 mm, 25%Cr) External coating: 70mm insulation FJC system, Canua KLNN HSS Methanol riser: 10 welds 3" (15.24 mm, X65) External coating: 3-LPP FJC system, Canua KLNN HSS

Offshore Projects -www.serimax.com Page 2 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2011 GlobalIndustries PA11 - DLB264 4 Saturnax stations (DLB264) Malaysia KUMANG PIPELINE - 4.8 km for PCSB 394 welds 24" (19.1 mm)

KINABALU PIEPELINE - 141.8 km 148 welds 18" (14.3 mm) 11,475 welds 24" (15.9 mm) 30 welds 24" (22.2 mm)

2011 TLOffshore F23 (PB-2011) Malaysia 2,500welds16"(20mm&22,2mm,X65) for Shell & Petronas 81 welds 16" (20 mm, X65+3mm CRA UNS clad 825) 2,131 welds 24" (16 mm & 25,4 mm, X65)

2011 TLOffshore F28 4 Saturnax stations (QP2000) Malaysia 26km24"(16&25,4mm,X65) for Shell & Petronas

2011 SapuraAcergy Gumusut J-Lay 1 Saturnax station + 2 SMAW-GSFCAW (Sapura 3000) Malaysia Flowlines: for Shell 860 welds 8,625" (20.6 mm, X65) - Sour service 119 welds 10,75" (20.6 mm, X65) - Sour service 200 welds 12,75" (25.4 mm, X65) 71 welds 18" (20.6 mm, X65) SCR: 466 welds 8,625" (20.6 mm, X65) - Sour service 111 welds 10,75" (25.4 mm, X65) - Sour service 27 welds 12,75" (28.6 mm, X65) 142 welds 18" (22.2 mm, X70) SCR (Thick End - for touch down section) 83 welds 8,625" (34.9 mm, X65) - Sour service 156 welds 12,75" (36.2 mm, X65) 17 welds 18" (32.0 mm, X70)

2011 Acergy Wintershall Wingate 3 Saturnax stations (Acergy Falcon) UK(Wingate Field) 1,681 welds 12" (15.9 mm,X65)-20.5 km for Wintershall

2011 Acergy OSO 3 Saturnax stations (Polaris) Nigeria 401welds12.75"(14,3+3mmClad825/625)- for Exxon 4.8 km 115 welds 10.75" (12,7 + 3mm, X60 + Clad 825/625) - 1.4 km 649 welds 16" (11,9 + 3mm, X60 + Clad 825/625) - 7.9 km

2011 Swiber North Tapti 1 Saturnax station (PJW3000) India 1,968welds18"(15,9mm,X60) for ONGC

2011 Subsea7 Dana Medway 3 Saturnax stations ( Falcon) UK 976welds8.625"(18.3mm,X65)-11.9km for Dana

2011 Acergy EGP3B 2 x 3 Saturnax stations (Polaris & Antares) Nigeria 24km16"(11,9mm,ERWX65) for Chevron Nigeria Ltd (Polaris: 505 welds - Antares: 3,410 welds) 11,2 km 18" (11,9 mm, ERW X65) (Polaris: 663 welds - Antares: 230 welds) 37,9 km 20" (14,3 mm, DSAW X65) (Polaris: 728 welds - Antares: 2,313 welds) 0,1 km 20" (17,5 mm, DSAW X65) (Polaris: 8 welds) 25,6 km 22" (12,7 mm, ERW X65) (Polaris: 738 welds - Antares: 1,366 welds) 14,6 km 28" (15,9 mm, DSAW X65) (Polaris: 1,159 welds)

Offshore Projects -www.serimax.com Page 3 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2011 Acergy Wintershall K18 3 Saturnax stations (Falcon) UK 820welds8"(19.1mm,X65)-10km for Wintershall

2011 Acergy GDF Suez G16a 3 Saturnax stations (Acergy Falcon) UK(Wingate Field) 1,132 welds 14" (20.6 mm,X52)-13.8 km for GDF Suez

2011 Globestar/Subsea 7 Satellite Field 3 Saturnax stations (Polaris) Nigeria OYOTExportLine: for Mobil 574 welds 12.75" (11.1 mm, X65) - 7 km ABANG Export Line: 1,352 welds 16" (12.7 mm, X65) - 17 km ITUT Export Line: 1,328 welds 16" (12.7 mm, X65) - 16.2 km

2011 Technip Shenzi W.I. 1 manual station (Deep Blue) USA CompletionofoffshoreTie-Ins: for BHP 6.625" x 18.26 mm - SCR 10.75" x 29.46 mm - SCR 10.75" x 25.4 mm - Flowline

2011 Kito Enterprises Reshadat 4 Saturnax stations (C-Master) Iran Aboozar & Nowrooz: for IOOC 352 welds 16" (12.7 mm, X60) - Sweet service 246 welds 10.75" (12.7 mm, X60) - Sweet service Reshadat Part I: 350 welds 10.75" (12.7 mm, X60) - Sweet service 93 welds 10.75" (14.3 mm, X60) - Sweet service 333 welds 8.625" (14.3 mm, X60) - Sweet service 90 welds 8.625" (15.9 mm, X60) - Sweet service Ilam & Salman: 246 welds 14" (15.9 mm, X60) - Sour service 305 welds 10.75" (18.2 mm, X60) - Sweet service 82 welds 10.75" (15.9 mm, X60) - Sweet service 360 welds 8.625" (18.2 mm, X60) - Sweet service 82 welds 8.625" (15.9 mm, X60) - Sweet service Reshadat part II: 181 welds 16" (20.6 mm, X60) - Sweet service 91 welds 16" (23.8 mm, X60) - Sweet service

2011 GlobalIndustries Jalilah 3 Saturnax stations (G1200) UAE 12welds6,625"(9,5mm,X60) for Dubai Petrolium 2,189 welds 6,625" (8,7 mm, X60) 11 welds 12,75" (11,1 mm, X60) 2,206 welds 12,75" (9,5 mm, X60)

2011 Swiber LF13 1 Saturnax station (PJW3000) China Inner pipe : for Offshore Oil Engineering Co. 1,000 welds 12" (12.7 mm, X70) - 12 km Outer pipe : 1,000 welds 16" (14.3 mm, X65) - 12 km Bulkhead every 500m

2011 TLOffshore Berantai 4 Saturnax stations (LTS 3000) Malaysia ANDR-A to PLET Gas Export Pipeline: for Petrofac 30 km 12" (15.9 mm, CS)

2011 SapuraAcergy Montara Development 4 Saturnax stations 116welds14"(15.9mm,DNVGR450II) for PTTEP Australia 114 welds 14" (15.9 mm, DNV GR450 II) 1,297 welds 14" (20.6 mm, DNV GR450 II) 427 welds 10.75" (20.6 mm, DNV GR450 II) 200 welds 6.625" (12.7 mm, DNV GR450 II) 113 welds 6.625" (11.0 mm, DNV GR450 II) All sweet service

Offshore Projects -www.serimax.com Page 4 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2011 Timas Terang Sirasun Batur 3 Saturnax stations (Java Constructor) Indonesia 2,049welds18"(12.7mm,X65)-25km for Migas 820 welds 20" (15.9 mm, X65) - 5.2 km

2011 Kito Enterprises Foroozan 4 Saturnax stations (C-Master) Iran(PersianGulf) 1,035 welds24"(14.3 mm,X52)-13 km for IOOC 1,449 welds 18" (12.7 mm, X52) - 18.1 km 1,564 welds 8.625" (12.7 mm, X52) - 20 km 412 welds 6.625" (12.7 mm, X52) - 4.9 km 604 welds 4.5" (14.4 mm, X52) - 7.3 km All severe sour service

2011 Subsea 7/Odebrecht Oi & Gas GSNC Gas Export Pipelin 3 Saturnax stations (Polaris) Brazil 12,343welds18"(17mm,X65) for Petrobras 41 welds 18" (19 mm, X65) All sour gas

2011 Kito Enterprises South Pars 17 & 18 4 Saturnax stations (C-Master) Iran (Persian Gulf) 16,604 welds 32" (20.6 mm, X65) - 203.5 km for POGC 82 welds 32" (28.8 mm, X65) - 1 km 16,604 welds 4.5" (6.0 mm, X52) - 203.5 km 82 welds 4.5" (7.1 mm, X52) - 1 km

2011 GlobalIndustries Tinggi-A/Tiong-A 3 Saturnax stations (DLB264) Malaysia 2,049welds10.75"(9.3mm,X65)-25km for NewField

2011 Swiber B-193 / D1 4 Saturnax stations (Conquest) India D pipelines : for ONGC 380 welds 12.75" (15.9 mm) - 9.8 km 134 welds 16" (17.5 mm) - 1.7 km 803 welds 14" (15.9 mm) - 4.9 km B193 pipelines : 408 welds 12.75" (14.3 mm) - 5 km 634 welds 8.625" (12.7 mm) - 7.8 km 1,399 welds 12.75" (14.3 mm) - 16.8 km 1,377 welds 10.75" (14.3 mm) - 16.7 km 1,927 welds 12.75" (14.3 mm) - 23.6 km 2,324 welds 16" (17.5 mm) - 28.5 km 1,717 welds 12.75" (15.9 mm) - 21 km 44 welds 20" (20.6 mm) - 0.56 km

D1 lines in continuity: 380 welds 12.75" (15.9 mm) - 9.9 km 796 welds 14" (15.9 mm) - 4.9 km 134 welds 16" (17.5 mm) - 1.7 km

2010/201 SapuraAcergy Devil Creek 4 Saturnax stations 1 (Sapura 3000) Australia 91km16"(15,9mm,X65)-7,213welds for Apache Energy (2 barges : Sapura 3000 / Leighton Stealth)

2010 Kito Enterprises South Pars 12 4 Saturnax stations (C-Master) Iran 17,700welds32"(20.6mm,X65) for Petropars 177 welds 30" (15.9 mm, X52) 17,700 welds 4.5" (6 mm, X65) Sour service : 32" Sweet service : 30" and 4.5"

2010 Swiber Selangkir 4 Saturnax stations (Conquest + Concorde) Brunei 9.4km12"(12.5mm,X65)-771joints for BSP 0.2 km 12" (14.2 mm, X65) - 16 joints 25.7 km 16" (14.2 mm, X65) - 2,107 joints 0.2 km 16" (16.0 mm, X65) - 16 joints 2.0 km 16" (20.0 mm, X65) - 164 joints

Offshore Projects -www.serimax.com Page 5 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2010 TLOffshore Petronas Package B-20 4 Saturnax stations (Enterprise 3) Malaysia 68km20"(12.7mm,X65)-5,574welds for Murphy Oil Company 49 km 8.625" (12.7 mm, x65) - 4,016 welds

2010 Kito Enterprises Olympia 4 Saturnax stations (C-Master) Russia(BlackSea) 153km20"(15mm,X52)-12,541welds for Gazprom 4.5 km 6" (12 mm, X65) - 369 welds

2010 GlobalIndustries Petronas Package A-20 4 Saturnax stations (DLB264) Malaysia 4,264welds24"(14.3mm,X65)-Sourservice for PCSB 2,320 welds 24" (14.3 mm, X65) - Sour service 1,451 welds 16" (11.9 mm, X65) - Sour service

2010 SigurRosSdnBhd Turkmenistan Block 1 4 Saturnax stations (DLB Armada Installer) Turkmenistan (Caspian Se 553 welds 12.75" (9.5 mm, X52) - 7.3 km for Petronas 554 welds 12.75" (9.5 mm, X52) - 7.3 km 5,910 welds 12.75" (15.9 mm, X65) - 73 km 5,865 welds 26" (17.5 mm, X65) - 73 km

2010 TLOffshore Petronas Package C-201 4 Saturnax stations (QP2000) Malaysia 82joints12.75"(14.3mm,X65+3mm825) for EMEPMI 410 joints 12.75" (11.1 mm, X65 + 3 mm 825) 82 joints 12.75" (14.3 mm, X65 + 3 mm 825) 221 joints 12.75" (11.1 mm, X65 + 3 mm 825) 82 joints 12.75" (14.3 mm, X65 + 3 mm 825) 279 joints 12.75" (11.1 mm, X65 + 3 mm 825) 223 joints 12.75" (11.1 mm, X65 + 3 mm 825) 697 joints 10.75" (12.7 mm, X52)

2010 SapuraAcergy Gumusut S-Lay 5 Saturnax + 3 SMAW-GSFCAW (Sapura 3000/Enterprise 3) Malaysia Enterprise 3: for Shell 1.9 km 18" (17.5 mm, X65) 37.1 km 18" (20.6 mm, X65) Sapura 3000: 127 km 18" (17.5 mm, X65) 31 km 18" (20.6 mm, X65) Buckle Arrestor in workshop: 38 buckle arrestor 18" (20.6 mm)

2010 Acergy Angola LNG 3 Saturnax stations (Polaris) Angola 1,419welds18"(23mm,X65) for Angola LNG 1,255 welds 22" (21 mm, X65) 1,296 welds 24" (29.6 mm, X65)

2010 Swiber Yadana 4 Saturnax stations (Swiber Conquest) Myanmar 146km24"(609.6mmOD)x13.6mm,X65 for Myanma Oil & Gas Enterprise 3.34 km 24" (614.2 mm OD) x 15.9 mm, X65

2010 Swiber PL Pipeline 1 Saturnax station (PJW3000) India 656welds14"(16,4mm,X60) for British Gas

2010 PBJV Kumang Shore Approac 3 Saturnax stations (Faulkner) Malaysia 467welds28"(17.5mm,X65) for PCSB 40 welds 28" (23 mm, X65)

2010 Swiber MHNRD 4 Saturnax stations (Conquest) India 21,6km14"(15,9mm,X60)-1,771welds for ONGC 21,5 km 12,75" (14,3 mm, X60) - 1761 welds 15,2 km 12,75" (14,3 mm, X52) - 1,253 welds 23,2 km 12,75" (12,7 mm, X60) - 1,901 welds 2,8 km 10,75" (12,7 mm, X60) - 228 welds 2,8 km 10,75" (12,7 mm, X52) - 261 welds 12,3 km 10,75" (11,1 mm, X60) - 1,009 welds 4 km 8,625" (12,7 mm, X60) - 328 welds 22,8 km 6,625" (7,9 km, X60 ) - 1,867 welds

Offshore Projects -www.serimax.com Page 6 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2010 Acergy Block 17 4 Saturnax stations (Polaris) Angola 5,893welds24"(29.6mm,X65) for Total

2010 Acergy Pazflor - Polaris 4 Saturnax stations (Polaris) Angola S-Lay: for Total E&P Angola Line 1: 1,379 welds 8" (12.7 mm, X65) Line 2: 990 welds 8" (12.7 mm, X65) Intermediate sour service

J-Lay: Line 1: 309 welds 8" (12.7 mm, X65) Line 2: 472 welds 10" (15.9 mm, X65) Line 3: 239 welds 10" (15.9 mm, X65) Sweet service

2009 CalDive PY-1 4 Saturnax stations (DLB Sea Horizon) India 4,376welds14"(12.7mm,X60)-53km for HOEC

2009 GlobalIndustries Qatif (DLB332) Saoudi Arabia Main line : for Saudi Aramco 16" (15.9 mm, X60) - 305 welds HDD String : 16" (15.9 mm, X60) - 175 welds Lateral : 16" (15.9 mm, X60) - 28 welds

2009 Kito Enterprises South Pars 15 & 16 4 Saturnax stations (C-Master) Iran South Pars 15 : for POGC 107.82 km 32" (20.8 mm, X65) + 4.5" (6 mm, X52) - 8,838 welds 1 km 32" (28.8 mm, X65) + 4.5" (7.1 mm, X52) - 82 welds South Pars 16 : 111.71 km 32" (20.8 mm, X65) + 4.5" (6 mm, X52) - 9,157 welds 1 km 32" (28.8 mm, X65) + 4.5" (7.1 mm, X52) - 82 welds

2009 Acergy GdF E-17 Gas Installatio 3 Saturnax stations (Acergy Falcon) TheNetherlands 2km12.75"(17.5mm)-164welds for Gaz de / Suez

2009 CalDive Bohai 4 Saturnax stations (DLB Sea Horizon) China 1,088welds12"(12.7mm,X65)-13km for COOEC 533 welds 10" (11.1 mm, X65) - 6.5 km 84 welds 8" (12.7 mm, X65) - 1 km 3,550 welds 8" (9.5 mm, X65) - 43 km

2009 GlobalIndustries TGI 4 Saturnax stations (Comanche) Indonesia 1737welds28"(15.9mm,X65)-23km for Transgasindo

2009 Acergy Nini - Sirri 3 Saturnax + 3 manual stations (Seaway Falcon) NorthSea 6.72km4"(11.1mm)-GL for Dong 6.2 km 8.625" (18.3 mm) - Oil 38.27 km 10.75" (18.3 mm) - WL

2009 Acergy Anguille 3 Saturnax stations (Acergy Polaris) Gabon 234welds12.75"(15.9mm,X52)-2.7km for Total Gabon Sweet service

Offshore Projects -www.serimax.com Page 7 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2009 Swiber Mol & Bugan 4 Saturnax stations (Swiber Conquest) Brunei MOLScope: for BSP 74.2 km 24" (14.2 mm, HF ERL 450 MC) 4.0 km 24" (20.0 mm, LSAW 450 MC) BUGAN scope : 2.7 km 12" (14.2 mm, HF ERWL 450 MC) 2.7 km 16" (14.2 mm, HF ERWL 450 MC)

2009 Cal-Dive Xanab-Yaxche 20" 3 Saturnax stations (Lonestar) Mexico 1,250welds20"(19.05mm,X65) for Pemex Sour service

2009 TLOffshore CPOC 4 Saturnax stations (Sapura 3000) Malaysia JKA to MDPP : for CPOC 24 km 24" (15.9 mm) 9 km 24" (19.1 mm) 1 km 24' (22.2 mm) MDB to MDPP : 1 km 18" (20.6 mm) 7.2 km 18' (15.9 mm) MDC to MDPP : 2 km 18" (20.6 mm) 1.3 km 18" (15.9 mm) MDPP to FSO : 3.2 km 8.625" (9.5 mm)

2009 Acergy AB15 Gas Gathering 4 Saturnax stations (Polaris) Angola S-Lay : for ExxonMobil 8,164 welds 18" (22.2 mm, X65) - 99.6 km 1,086 welds 10.75" (15.9 mm, X65) - 13.2 km 940 welds 10.75" (15.9 mm, X65) - 11.5 km All sour service

J-Lay : 225 welds 18" (22.2 mm, X65) - 5.5 km 898 welds 16" (22.2 mm, X65) - 21.5 km 43 welds 16" (25.4 mm, X65) - 1.0 km - Fatigue sensitive, Single Hybride Riser All sour service

2009 Swiber West Lutong 4 saturnax stations (Swiber Conquest) Malaysia 11km18"(17.5mm,X65) for Alam Maritime

2009 Acergy Hess Conger 4 & 9 2 or 3 welding stations (Falcon) GulfofMexico 44welds6.625"(25.3mm,X65) for Hess

2009 Swiber Star Energy 4 Saturnax stations (Swiber Conquest) Indonesia 12km10.75"(12.7mm,X65) for Star Energy 4.3 km 6.625" (12.7 mm, X65)

2009 CalDive Weizhou 1 Saturnax station + 3 STT-GSFCAW (Sea Horizon) China Pipe-in-pipe lines - for COOEC *WZ6-8 WHPA to WZ12-1 WHPB (4.2 km) Inner pipe : 6.625" (11 mm, X65) Outer pipe : 10.75" (11.1 mm, X65) *WZ12-1PAP to WZIT (32.3 km) Inner pipe : 16" (17.5 mm, X65) Outer pipe : 22" (12.7 mm, X60)

2009 Acergy Ormen Lange Southern 3 saturnax stations (Acergy Falcon) Norway 1,083welds6.625"(9.9mm,SML450) for Statoil Hydro

Offshore Projects -www.serimax.com Page 8 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2008/ Kito Entreprises Sirri to Assalouyeh 4 Saturnax stations 2009 (C-Master) Iran 15,842welds32"(20.6mm,X65)-193km for PEDCO Sour service

2008 CalDive Neptune 4 Saturnax stations (Lone Star) USA 1,735welds24"(14.2mm,X60)-3.6km for Suez

2008 GlobalIndustries Camarupim 4 Saturnax stations (Iroquois) Brazil 683welds24"(25.4mm,X65)-8km for Petrobras 3,503 welds 24" (22.2 mm, X65) - 42 km All sour service conditions

2008 GlobalIndustries Berri 4 Saturnax stations (DLB332) SaudiArabia 1,829welds30"(23.8mm,X70)-22.3km for Saudi Aramco 296 welds 16" (15.9 mm, X60) - 3.6 km 1,407 welds 12.75" (12.7 mm, X60) - 17.1 km All sour service

2008 Acergy Volund EPIC 3 Saturnax stations + 4 GTAW (Falcon) NorwaySea 640welds12.75"(20.6mm,SML415) for Marathon Petroleum 730 welds 4.425" (6 mm, SML415) Sour service

2008 Acergy AGBAMI 2 Saturnax stations (Polaris) Nigeria UpperOOL: for Chevron 160 welds 20" (18.3 mm, X60) - sour service 23 welds 20" (25.4 mm, X60) - sour service 5 welds 20" (27.0 mm, X60) - sour service Lower OOL : 170 welds 20" (18.3 mm, X60) - sour service 23 welds 20" (25.4 mm, X60) - sour service 5 welds 20" (27.0 mm, X60) - sour service

2008 SapuraAcergy Kikeh Gas Pipeline 4 Saturnax stations (Sea Horizon & Sapura 3000) Malaysia Shallow Water: for Murphy Oil 130 welds 13,37" (27,3 mm, X65) 2,590 welds 12,75" (18 mm, X65) Deep Water: 8,369 welds 12,75" (18 mm, X65) Prefabrication Buckle Arrestors: 210 welds 12.75" (18 mm) All sour service

2008 Acergy Tombua Landana 3 Saturnax stations (Acergy Polaris) Angola 2,485welds14"(14.3mm,X65)-30.6km for CABGOC & Chevron 2,127 welds 18" (17.5 mm, X65) - 26.2 km

2008 Kito Enterprises South Pars 1 7 TIG welding stations (C-Master) Iran 531welds18"(12.8mm)-5km for POGC 2.5 mm inconel 625 + 10.3 mm, X65

2008 Swiber Golok 3or 4 Saturnax stations (Swiber Conquest) Malaysia 68km(24"x14.3mm,X52) for Murphy 4 km (20" x 12.7 mm, X52) 24 km (8.625" x 12.7 mm, X52) 6 km (6.625" x 9.5 mm, X52)

2008 Swiber North Belut 3 or 4 Saturnax stations (Swiber Conquest) Indonesia 37km10.75"(11.1mm,X65) for Conoco Philips 37km 16" (11.9 mm, X65) 10 km 22" (15.9 mm, X70)

2008 Acergy Mexilhao Shore Approac 3 Saturnax stations (LB200) Brazil 1,778MLwelds34"(28.6mm,X60) for Petrobras

Offshore Projects -www.serimax.com Page 9 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2008 Swiber APECS 2007 (Kodeco/B 3 Saturnax stations (Swiber Conquest & HD60) Indonesia & Brunei BSP lines: for Kodeco & Shell Brunei (BSP) 112 welds 6.625" (10 mm, X60) 604 welds 8.625" (12.7 mm, X60) 1,213 welds 10.75" (10 mm, X60) 494 welds 8.625" (12.7 mm, X60) 1,214 welds 12" (14.3 mm, X60) 358 welds 12" (14.3 mm, X60) 497 welds 12" (14.3 mm, X60) Kodeco lines: 502 welds 12.75" (12.7 mm, X52) 1,645 welds 16" (11;1 mm, X52) 3,837 welds 16" (12.7 mm, X52) 69 welds 16" (14.3 mm, X52) Puteri lines: 1,086 welds 8.625" (9.5 mm, X65) 1,087 welds 8.625" (9.5 mm, X65) Talisman line: 2,791 welds 24" (12.7 mm, X65)

2008 Acergy Mexilhao 7 Saturnax stations (Acergy Piper) Brazil 697ML+ 697DJwelds34"(31.8mm,X60) for Petrobras 3,968 ML + 3,968 DJ welds 34" (28.6 mm, X60)

2008 TLOffshore Lewek 2008 4 welding stations (Lewek Champion) Malaysia 3.3km18"(15.9and20.6mm,X65) for PCSB 8.2 km 18" (15.9 and 20.6 mm, X65) 34 km 24" (15.9 / 19.1 / 22.2 mm, X65)

2008 TLOffshore TLO 2008 (Sea Horizon+ Sapura 3000) Malaysia D35R-A to J4DP-A : for PCSB 51.3 km 10,75" (9.3 & 12.7 mm, X65) B11DR-A to PC4DP-A : 22.3 km 12,75" (19.1 & 23.8 mm, X65) ANDR-A to TCOT : 164 km 24" (17.5 & 23.6 mm)

2008 Swiber BG Hydra SMAW & GTAW India Qualifications only : for BG India 504 joints 12" (15.4 mm, SMLS 415 I SD, non- sour) 1,098 joints 14" (16.4 mm, SMLS 415 I SD, non- sour) 12 joints 4.5" (6.4 mm, X65 Coil, piggy-back) 25 joints 4.5" (6.4 mm, X65 Coil, piggy-back) 6 joints 1.25" (4.8 mm, X65 Coil, piggy-back) 14 joints 1.25" (4.8 mm, X65 Coil, piggy-back)

2007/ Global Industries Khafji FDP Ph. I 4 Saturnax stations 2008 (DLB264) SaudiArabia 4.7km24"(14.3mm,X65) for KGOC & AGOC 4.7 km 24" (14.3 mm, X65) 4.6 km 24" (14.3 mm, X65) 6.1 km 24" (14.3 mm, X65) 13.9 km 28" (15.9 mm, X65) 38.8 km 36" (17.5 mm, X65) 39 km 42" (20.6 mm, X65)

2007 Petrojet Taurt Phase II Egypt(PortSiad) 31welds(22,2mm,X65) for BP

2007 GlobalIndustries Umm Al Qaiwain Field 4 Saturnax stations (DLB332) UAE 5,898welds14"(14.3mm,X60)-72km for Rakgas - Atlantis 296 welds 14" (17.5 mm, X60) - 4 km

2007 Horizon Offshore Marsopa 3 Saturnax stations (Lonestar) Mexico 2,611welds24"(11.1mm,X52) for Pemex

Offshore Projects -www.serimax.com Page 10 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2007 Acergy Lyell 3 Saturnax stations (Falcon) UK(NorthSea) 1,163welds12.75"(25.4mm,X65)-15.5km for CNR International

2007 Geocean Maritimex 2 Saturnax stations (Orion) Nigeria 10.57km12.75"(19.1mm,X52) for Addax 17.30 km 14" (15.9 mm, G. B)

2007 PMS Taurt 3 Saturnax stations (PMS 11) Egypt 2,602welds20"(22.2mm,X65)-32km for Gupco

2007 Acergy OSO 12" repair 2 Saturnax stations (Orion) Nigeria 4.5km12.75"(15.9mm,X60) for Exxon Mobil

2007 Horizon Marine North East Gateway 3 Saturnax stations (Lonestar) USA(BostonBay) 1,525welds24"(12.7mm,X65) for Spectra Energy 595 welds 24" (14.3 mm, X65) 160 welds 18" (14.3 mm, X65)

2007 Acergy Tyrihans 4 Saturnax stations (Acergy Piper) Norway 596DJ16"(20.9+3mm,X65+316L) for Statoil 1,189 DJ 18" (20.9+3 mm, X65 + 316L)

2007 TLOffshore TLO 2007 3 Saturnax stations (Sea Horizon) Malaysia PCSB : for PCSB & EMEPMI 1,533 welds 18" (Betty to Barinia) 1,082 welds 8" (Penara to Puteri) 1,082 welds 8" (Puteri to Penara) 722 welds 12" (ANDP-D to ANDR-A) 722 welds 10" (ANPG-A to ANDP-D) EMEPMI : 434 welds 16" CRA Inconel (Jerneh A to Jerneh B) 1,665 welds 18" x 15.9 & 20.6 mm (Guntong)

2007 Acergy Tyrihans 10" 3 Saturnax Stations (Falcon) Norway (North Sea) 3,531 welds 10" (22.25 mm, SML 450 ISFPD) for Statoil 52 welds 10" (25.4 mm, SML 450 ISFPD)

2007 Acergy Moho Bilondo 3 Saturnax stations (Polaris & Orion) Congo SeawayOrion: for Total E&P Congo 275 welds 16" (15.9 mm, X65) Seaway Polaris : 6,015 welds 16" (15.9 mm, X65) 1,405 welds 8.625" (12.7 mm, X65) 1,430 welds 6.625" (14.3 mm, X65)

2007 Conduto Manaus 3 Saturnax stations (BGL-1) Brazil 813welds20"(12.7mm,X70) for Petrobras 442 welds 14" (12.7 mm, X70)

2007 Acergy Minke Field Developmen 3 Saturnax stations (Seaway Falcon) North Sea (BG sector) 1,250 welds 8.625" (14.3 mm, X65) - 14.6 km for Gaz de France Britain Ltd 41 welds 8.625" (15.9 mm, X65) - 0.5 km Non-sour service

2007 Acergy Greater Plutonio - OOL 2 Saturnax stations (Polaris) Angola 177welds18"(17.5mm,X60)-Upper for BP 186 welds 18" (17.5 mm, X60) - Lower 4 welds 18" (33 mm, X60) - Upper 27 welds 18" (25 mm, X60) - Lower 28 welds 18" (25 mm, X60) - Upper 4 welds 18" (33 mm, X60) - Lower

Offshore Projects -www.serimax.com Page 11 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2007 GlobalIndustries Tapti Expansion 4 Saturnax stations (DLB264) India 1,743welds20"(19.1mm,X60)-22km for BGEPIL 6,114 welds 20" (15.9 mm, X60) - 75 km 308 welds 20" (15.9 mm, X60) - 4 km

2007 Technip PDET J-Lay Project 1 Saturnax J-Lay (Deep Blue) Brazil 367welds18"(17.5mm,X60)-Flowline for Petrobras 181 welds 18" (19.1 mmn X60) - Flowline 125 welds 18" (22.2 mm, X60) - Flowline 355 welds 18" (25.4 mm, X60) - Flowline 145 welds 18" (28.6 mm, X60) - Flowline 31 welds 18" (15.9 mm, X65) - SCR

2007 Acergy Tristan NW Field Dev. 3 Saturnax stations (Acergy Falcon) NorthSea(UK) 1,190welds6.625"(11.1mm,X65)-15km for Bluewater

2006/200 Kito (IOEC) South Pars 9 & 10 4 Saturnax stations 7 (C-Master/Abouzar 1200) Iran SouthPars10(Abouzar1200): for POGC 7,309 welds 32" (20.6 mm, X65) - 90 km South Pars 9 (C Master) : 6,840 welds 32" (20.6 mm, X65) - 85 km

2006/200 Stolt Offshore Greater Plutonio URF 2 Saturnax stations 7 (Seaway Polaris) Angola 496welds12.75"(17.5mm,X60)-12km for BP Angola 1,624 welds 12.75" (19.1 mm, X60) - 41 km 948 welds 12.75" (20.6 mm, X60) - 20 km

2006/200 Conduto PDET Campos 3 Saturnax stations 7 (BGL-1) Brazil 2,272welds20"(17.5mm,X60)-27.6km for Petrobras 346 welds 10" (12.7 mm, X60) - 4.3 km

2006/200 MRTS Varandey 3 Saturnax stations 7 (Defender) Russia 3,053welds32"(20.5mm,X70)-37km for Megregiongaz (Lukoil)

2006 StoltOffshore Okume 3 Saturnax stations (Seaway Falcon) Equatorial Guinea 1,971 welds 12.75" (15.9 mm, X65) - 24.05 km for Amerada Hess Corp. 3,050 welds 10.75" (15.9 mm, X65) - 37.20 km 2,200 welds 8.625" (14.3 mm, X65) - 27.47 km 1,500 welds 6.625" (12.7 mm, X65) - 17.65 km

2006 IOEC Paradip 4 Saturnax stations (Abouzar 1200) India 1,596welds48"(20.6mm,X65)-19.7km for IOCL

2006 StoltOffshore Njord 3 Saturnax stations (Seaway Falcon) Norway 3,240welds13"(17.5mmnSML415IFDUP) for Norsk Hydro

2006 TLOffshore PCSB 2006 3 Saturnax stations (Sea Horizon) Malaysia SFK-A to SJP-A : for Petronas Carigali (PCSB) 1,475 welds 8.625" (10.0 mm, X65) 82 welds 8.625" (11.1 mm, X65) SJP-A to SFP-A : 1,557 welds 20" (15.9 mm, X65) West Lutong : 738 welds 18" (12.7 mm, X65) 82 welds 18" (14.3 mm, X65)

2006 Acergy Eldfisk 24" Oil Pipeline 4 Saturnax stations (Acergy Piper) NorthSea 9.3km24"(25.0mm,SAWL450)-388welds for Conoco Philips

Offshore Projects -www.serimax.com Page 12 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2006 NipponSteel South Sumatra West Ja 4 Saturnax stations (Kuroshio II) Indonesia 3,248welds32"(22.2mm,X65)-40km for Perusahaan Gas Negara 3,904 welds 32" (19.05 mm, X65) - 49 km

2006 Oceanografia DLB801 - OSA36 3 Saturnax stations (DLB801) Mexico 56km36"(19.1mm,API5LX52) for Pemex

2006 Geocean Sisi Nubi 2 Saturnax stations (Mariam) Indonesia 19.4km26"(18.3mm,X65)-1,557welds for Total

2006 StoltOffshore MEG 3 Saturnax stations (Seaway Falcon) Norway (North Sea) 19,912 welds 6.625" (9.9 mm, X65) - 243 km for Norsk Hydro

2006 TLOffshore B12 3 Saturnax stations (DLB264) Malaysia (Sarawak) 0.810 km 14" (22.5 mm X65 + 3 mm Inconel for Sarawak Shell 825) 8.930 km 14" (15.2 mm X65 + 3 mm Inconel 825)

2006 IOEC Salman EPC-3 4 Saturnax stations (Jascon 5) Iran 2,136welds30"(15.9mm,X60) for Pedco 224 welds 30" (17.5 mm, X60)

2006 Horizon Offshore Kumaza-J 4 Saturnax stations (Lone Star) Mexico 315welds20"(12.7mm,X52) for Pemex 262 welds 20" (14.3 mm, X52) 494 welds 24" (19.1 mm, X60) 925 welds 24" (19.1 mm, X60)

2006 StoltOffshore Britannia Satellites 3 Saturnax stations (Seaway Falcon) UK(NorthSea) 2,008welds12.75"(15.9mm,L450QC)-25km for Conoco Phillips 3,350 welds 12.75" (17.5 mm, L450QC) - 41 km 2,009 welds 6.625" (9.5 mm, L360QC) - 25 km

2006 TLOffshore Tabu 4 Saturnax stations (DLB264) Malaysia (Peninsular) 1.07 km 16" (22.2 mm, X65) for ExxonMobil 2.80 km 16" (15.9 mm, X65) 1.00 km 28" (37 mm, X65) 6.10 km 28" (25.4 mm, X65)

2005/200 Conduto Golfinho 3 Saturnax stations 6 (BGL-1) Brazil 740welds12"(15.9mm,X60) for Petrobras 41 welds 12" (20.6 mm, X60)

2005/ Horizon Offshore WAGP 4 Saturnax stations 2006 (Sea Horizon) Ghana/Togo 45,270welds20"(11.2mm,X70)-564km for WAGP 1,210 welds 18" (10.1 mm, X70) - 17 km 184 welds 20" (16.1 mm, X70) - 2 km

2005/ Stolt Offshore Angostura 3 Saturnax stations 2006 (DLB801) Trinidad&Tobago 500welds30"(15.9mm,X60) for BHP 6,925 welds 18" (12.7 mm, X60) 62 welds 18" (15.9 mm, X60)

2005/ Global Industries Panyu 4 Saturnax stations 2006 (Hercules) China Year 2005 : for CNOOC 109 welds 12" (12.7 mm, X65) 8,697 welds 20.62" (14.3 mm, X65) - Buckle arrestors Year 2006 : 5,486 welds 20.62" (14.3 mm, X65) - Buckle arrestors

Offshore Projects -www.serimax.com Page 13 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2005/ Stolt Offshore Ormen Langeled 2 Saturne + 6 Saturnax stations 2006 (LB200) Norway 2005SeasonOLTSouth: for Statoil 19,091 DJ 44" (23.3 mm, X65) 2006 Season OLT North : 20,789 DJ 42" (33 mm, X65)

2005/ Stolt Offshore Erha 1 Saturnax + 1 GTAW station (J-Lay) 2006 (Polaris) Nigeria (auto STT root) for Exxon 212 welds SCR 4.5" (11.1 mm, X65) 199 welds SCR 6.625" (15.9 mm, X65) 20 welds SCR 6.625" (15.9+4 mm, X65 + Inconel 825) 403 welds SCR 10.75" (20.6 mm, X65) 36 welds SCR 10.75" (20.6+4 mm, X65 + Inconel 825) 106 welds SCR 10.75" (23.8 mm, X65) 108 welds SCR 12.75" (34.3 mm, X65)

2 Saturnax stations (S-Lay) (auto STT root) 102 welds OLL 20" (22.2 & 28 mm, X60) 318 welds OLL 22" (19.8 mm, X60)

2006 : ERHA NORTH (J-Lay auto STT root) 805 welds 10.75" (20.6 mm, X65) 320 welds 6.625" (15.9 mm, X65)

2005 StoltOffshore EPC2B 2 + 3 Welding stations (Orion / Polaris) Nigeria Orion: for Mobil 9,479 welds 12.75" (11.1 mm, X65) Polaris : 1,375 welds 12.75" (11.1 mm, X65) 2,493 welds 18" (17.5 mm, X65) 2,520 welds 20" (14.3 mm, X65) All sweet service

2005 StoltOffshore Casino 3 Saturnax stations (Seaway Falcon) Australia 20.4km12.75"(18.1mm,X65)-sourservice for Santos Ltd 11.7 km 12.75" (22.2 mm, X65) - sour service

2005 StoltOffshore Valdemar 3 Saturnax stations (Seaway Falcon) TheNetherlands 1,445welds12.75"(17.5mm,SML360) for Maersk 18.5 km - Sour service

2005 StoltOffshore Tors 3 Saturnax stations (Seaway Falcon) UK(NorthSea) 1,793welds8.625"(11.1mm,X65)-22km for ATP Blue Water 1,686 welds 12" (15.9 mm, X65) - 22 km

2005 Conduto Manati 3 Saturnax stations (BGL-1) Brazil 4,687welds24"(12.7mm,X60) for Petrobras

2005 TLOffshore Shell 2005 4 Saturnax stations (DLB264) Malaysia Shell Sarawak : for Shell Sarawak 10.8 km 16" (14.2 mm, X65) 42.7 km 28" (22 to 35 mm, X65) 0.76 km 28" (20 mm, L360) Shell Brunei : 34.9 km 16" (15.9 & 17.5 mm, X65)

2005 Technip K2 1 Saturnax station (2G position) (DeepBlue) USA 83quadjoints7.625"(26.9mm,X65)-SCR for ENI

Offshore Projects -www.serimax.com Page 14 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2005 TLOffshore PCSB 2005 3 Saturnax stations (KP1 McDermott) Malaysia PCSB Semarang : for Petronas Carigali (PCSB) 48 km 20" (11.1 mm, X65)

PCSB MCOT Project : 2,787 welds 16" (12.7 mm) 82 welds 16" (14.3 mm) 820 welds 10.75" (11.1 mm) 148 welds 10.75" (11.1 mm)

2005 StoltOffshore Amenam / Kpono 5 Saturnax stations (Orion / Polaris) Nigeria Orion(Sourservice): for Total 903 welds 24" (22.2 mm, X65) 347 welds 24" (15.9 mm, X65)

Polaris (sour service): 2,828 welds 24" (15.9 mm, X65) 336 welds 24" (22.2 mm, X65) 144 welds 18" (25.4 mm, X65)

2005 NipponSteel Sakhalin 4 Saturnax stations (Kuroshio II) Russia 10.8km36"(26.04mm,Gr.L415MC) for Exxon Neftegas 10.8 km 24" (30.2 mm, Gr. L415MC)

2005 StoltOffshore NGC Bud Pipeline 3 Saturnax stations (DLB801) Trinidad&Tobago 5,514welds36"(18.7mm,X60)-62km for NGC 20 welds 36" (22.2 mm, X60) - 0.8 km

2005 Geocean Tatar Strait 2 Saturnax stations (Mariam-281) Russia 19.78km24"(15.63mm) for Exxon Neftegas

2005 Hyundai Heavy Industries MUT 4 Saturnax stations (HD-60) India 5,205DJ28"(17.5mm,X60)-119km for ONGC 7,172 DJ 30" (17.5 mm, X60) - 182 km

2005 StoltOffshore L6 3 Saturnax stations (Seaway Falcon) TheNetherlands 3,200welds6.625"(14.3mm,X52)-39km for ATP Blue Water 89 welds 6.625" (18.3 mm, X52) - 1 km

2005 StoltOffshore Dolphin Deep 3 Saturnax stations (DLB801 + Falcon) Trinidad&Tobago 7,335weldskm24"(12.7mm,X65)-86km for BG 324 welds 24" (14.0 mm, X65) - 3.5 km 130 welds 24" (25.4 mm, X65) - 1 km 486 welds 12" (20.6 mm, X60) - 6 km

2004/ PMS PMS Barboni 2005 (PJ12) Egypt 847welds26"(19.1mm,X65)-10km for Petrobel/Rashpitco 948 welds 20" (15.9 mm, X60) - 11 km

2004 TLOffshore PCSB / EPMI Scope 200 4 Saturnax stations (DLB264) Malaysia 33km16"(16mm,X52)forEPMI-2,705welds for Petronas Carigali

2004 GlobalIndustires Arzew 4 Saturnax stations (Iroquois) Algeria 2,023welds42"(22.2mm,X65) for Sonatrach 937 welds 42" (23.8 mm, X65)

2004 Technip Simian / Sienna & Sapp 1 Saturnax station (2G position) (Deep Blue) Egypt Simian : for Burullus Gas Co. 843 welds 26" (24.4 mm, L485) 151 welds 20" (21.2 mm, L450) Sapphire : 328 welds 26" (26.3 mm, L485)

Offshore Projects -www.serimax.com Page 15 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2004 StoltOffshore Arthur 3 Saturnax stations (Seaway Falcon) NorthSea 32km12.75"(17.5mm,X65) for Mobil

2004 GlobalIndustries Pemex 4 Saturnax stations (Hercules) USA 53km36"(19.05mm,X60)-4,345welds for Pemex

2004 StoltOffshore Paladin WI 3 Saturnax stations (Seaway Falcon) Scotland 9km10"(18.3mm,X65) for Paladin

2004 StoltOffshore Q5 3 Saturnax stations (Seaway Falcon) TheNetherlands 13.5km8"(12.7mm,L415) for Wintershall

2004 Hyundai Heavy Industries Chunxiao 4 Saturnax stations (HD423) China 321km28"(15.9mm,X60) for CNOOC

2004 StoltOffshore Benguela-Belize 3 Saturnax stations (Polaris) Cabinda(Angola) 24.88km20"(15.9mm,X52) for Cabinda Gulf Oil Cy 4.51 km 10" (12.7 mm, X52) 20.2 km 16" (19.1 mm, X52) Sour service 42.3 km 16" (19.1 mm, X52) Sour service

2004 GlobalIndustries Serai 4 Saturnax stations (DLB264) Malaysia 82welds 14"(20.6mm+3mm316L)-1km for Shell Sarawak 680 welds 14" (14.3 mm + 3 mm 316L) - 8.3 km

2004 NipponSteel Jintan 2004 3 Saturnax stations (Kuroshio II) Malaysia 6.75km612.0OD(18.3mm,X65) for Shell Sarawak Berhad + clad 316L 4 mm)

1.00 km 621.6 OD (23.1 mm, X65) + clad 316L 4 mm)

2003 Coflexip Stena Offshore Devils Tower, prefab 4 Saturnax stations (5G position) (Spoolbase) USA 10,091welds18"(22.2mm,X60) for Williams 1,602 welds 18" (23.8 mm, X60) 5,207 welds 18" (25.4 mm, X60) 3,182 welds 18" (28.6 mm, X60) 768 welds 14" (20.6 mm, X60) 768 welds 14" (22.2 mm, X60)

2003 COOEC Bonan 4 Saturnax stations (Lanjiang) China 6,204welds14"(12.7mm,X60)-75km for CNOOC

2003 StoltOffshore Sanha Condensate 3 Saturnax stations (Polaris) Angola 42.4km6"(12.7mm) for Cabinda Gulf Oil Corp. 1.0 km 30" (14.1 mm) 3.2 km 24" (15.9 mm) Sour service 14.3 km 18" (12.7 mm) Sour service 7.2 km 12" (12.7 mm) 14.3 km 12" (12.7 mm) 8.0 km 16" (12.7 mm) Sour service

2003 StoltOffshore Hubline Marine Pipeline 3 Saturnax stations (DLB801) USA(BostonBay) 3,000welds30"(14.3mm,X65) for Duke Energy 290 welds 30" (28.6 mm, X60)

Offshore Projects -www.serimax.com Page 16 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2003 Horizon Offshore MSE 3 Saturnax stations (Sea Horizon) Malaysia 122welds12.75"(15.9mm,X65) for Petronas 1,480 welds 12.75" (11.1 mm, X65) 122 welds 8.625" (12.7 mm, X65) 1,432 welds 8".625 (9.5 mm, X65)

2003 Coflexip Stena Offshore Nakika, offshore 1 Saturnax + 1 GTAW station (2G position) (Deep Blue) USA 2x725welds10.75"(20.6mm) for Shell in 16" (19.1 mm.) - FL PIP

2 x 120 welds 10.75" (22.2 mm) in 16" (19.1 mm) - SCR PIP

110 welds 18" (19.1 mm) - SCR 110 welds 20" (25.4 mm) - SCR

2003 NipponSteel Bunga Raya & Kinarut 3 Saturnax stations (Kuroshio II) Malaysia Kinarut : for Petronas Carigali 3,083 welds 16" (12.7 mm, X70) - 37.7 km 40 welds 16" (17.5 mm, X70) - 0.5 km 12,520 welds 24" (14.2 mm, X70) - 153 km 205 welds 24" (15.7 mm, X70) - 2.5 km 80 welds 24" (21.7 mm, X70) - 1 km

2003 TLOffshore MLNG-3 2003 4 Saturnax stations (DLB264) Malaysia 9,471welds32"(16.5mm,X65)-116km for Petronas Carigali 40 welds 32" (23.4 mm, X70) - 0.5 km 3,283 welds 24" (12.8 mm, X65) - 39 km 40 welds 24" (17.5 mm, X65) - 0.5 km 40 welds 24" (21.3 mm, X65) - 0.5 km

2003 Horizon Offshore Heavy Lift 3 Saturnax stations (Sea Horizon) Brunei 122welds20"(20.6mm,X60)-1.5km for Shell 1,863 welds 20" (14.3 mm, X60) - 23 km 223 welds 20" (12.7 mm, X60) - 2,7 km 142 welds 16" (15.9 mm, X60) - 1.7 km 1,703 welds 10.75" (11.1 mm, X60) - 20 km

2003 GlobalIndustries Powergas 3 Saturnax stations (DLB264) 2,147welds28"(16.3mm,X70)-26km for Jan de Nul

2003 StoltOffshore Vigdis 3 Saturnax stations (Seaway Falcon) Norway 1,422welds12.75"(20.4mm,X65/0,5%Cr)- for Norsk Hydro

2003 StoltOffshore Skirne Byggve 3 Saturnax stations (Seaway Falcon) Norway 2,037welds12.75"(20.6mm,X65) for TFE

2003 StoltOffshore K7-K15 Development 3 Saturnax stations (Seaway Falcon) TheNetherlands 1,369welds12.75"(23.6mm,X65)-16km for NAM 82 welds 12.75" (24.8 mm, X65) - 1 km

2003 StoltOffshore Rogass Pipeline Develop 3 Saturnax stations (Seaway Falcon) Norway 3,623welds10.75"(14.3mm,X52)45km for Lyse Gass AS 494 welds 4.5" (8.5 mm, X52) - 6 km

2003 GlobalIndustries Gunnison 2 + 3 Saturnax stations (Hercules) USA 8,156welds18"(14.3mm,X60) for Williams 120 welds 18" (19.05 mm, X60) SCR : 60 welds onshore (DJ) + 60 offshore

Offshore Projects -www.serimax.com Page 17 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2003 Hyundai Heavy Industries PGN Project 4 Saturnax stations (HD423) Indonesia 15,092welds28"(12.7mm,X65)-184km for PGN

2003 Hyundai Heavy Industries Dong-Hae 4 Saturnax stations (HD423) SouthKorea 4,807welds14"(12.7mm,X65)-58km for KNOC

2002/ Conduto Peroa-Cangoa 4 Saturnax stations 2003/ (BGL1) Brazil 3,489welds18"(15.9mm,X60) 2004/ for Petrobras 527 welds 16" (14.3 mm, X60) 2005 1,316 welds 22" (22.2/17.5 mm, X60) 5,610 welds 22" (15.9 mm, X60) 742 welds 20" (17.5 mm, X60) 1,296 welds 22" (15.9 mm, X60) 308 welds 28" (15.9 mm, X60)

2002/ Stolt Offshore OGGS 9 Saturnax stations 2003 (CBL101 / LB200) Nigeria 256.2km32"(18.9/22.9mm,X65) for Shell Petroleum 88 km 24" (14.2/17.2 mm, X65) 18 km 16" (9.5/11.5 mm, X65)

2002/ COOEC Dong Fang 4 Saturnax stations 2003 (Lanjiang) China 8,176welds22"(12.7mm,X65)-105km for CNOEC

2002 StoltOffshore BP Mirren & Madoe 3 Saturnax stations (Seaway Falcon) UK 15.2km10"(18.3mm,X60) for BP 19.7 km 10" (18.3 mm + piggy 4" x 7.9 mm)

2002 GlobalIndustries Alba Phase II 4 Saturnax stations (Comanche) EquatorialGuinea 5,434 welds 16" (1.031",X70) for Marathon 2,717 welds 24" (0.725", X70) 1,230 welds 12" (0.5", 12% Cr)

2002 StoltOffshore Tchatamba (Marathon 5 3 Saturnax stations (Polaris) Gabon 3,360welds10,75"(12.7mm,X52)-41km for Marathon Petroleum

2002 StoltOffshore K12 3 Saturnax stations (Seaway Falcon) Holland 6.85km6"(14.3mm,168OD) for GdF

2002 StoltOffshore Helvellyn 3 Saturnax stations (Seaway Falcon) UK 15.4km8.625"(12.7mm,X65)-1,230welds for ATP Helvellyn

2002 StoltOffshore Calm Buoy 3 Saturnax stations (Polaris) EquatorialGuinea 1.6km30"(19.1mm,X60)-132welds for Blue Water

2002 StoltOffshore Falcon Gas Pipeline 3 Saturnax stations (DLB801) USA 1,852welds18"(12.7mm,X65) for Delos Offshore

2002 StoltOffshore Scarab Saffron Dev. 6 Saturnax stations (LB200/Falcon) Egypt 1,721DJ36"(30.2mm,X65) for Burullus Gas Company 1,645 DJ 24" (22.2 mm, X60) 1,566 DJ 20" (20.6 mm, X60) 3,360 DJ 10" (13.9 mm, X60)

Offshore Projects -www.serimax.com Page 18 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2002 StoltOffshore Amenam/Kpono 3 Saturnax stations (Polaris) Nigeria 38km6"(12.7mm,X52) for Elf 34 km 16" (9.5 mm, X60) 4 km 24" (14.3 mm, X60) 3 km 36" (20.6 mm, X60)

2002 StoltOffshore CMS 3 3 Saturnax stations (Seaway Falcon) UK 22km10"(23.8mm,X65)Sourservice for Conoco 23 km 12" (25.4 mm, X65) Sour service

2002 StoltOffshore Matia/Cabrito 3 Saturnax stations (Seaway Falcon) USA 25.6km6.625"(10.9mm,X52) for Blue Water

2002 StoltOffshore Scarab Saffron Develop 3 Saturnax stations (Petrojet 12) Egypt 2098DJ-24"(25.4/20.6mm)-25.6km for Burullus Gas Company 1912 DJ - 36" (33.3/30.2 mm) - 23.3 km

2002 TL Offshore/Global Industries Bintulu/MNLG-3 4 Saturnax stations (DLB264) Malaysia 3.5km28"(14.5/21.2mm,X65) for Petronas Carigali 119 km 32" (16.5/23.4 mm, X65) 155 km 30" (16.8/21.5 mm, X65)

2002 Hyundai Heavy Industries East HP Gas Expansion 4 Saturnax stations (HD2500) Brunei 820welds14"(15.9mm,X60)-10km for Shell 5,262 welds 28" (12.7 mm, X60) - 64.2 km 328 welds 28" (13.8 mm, X60) - 4 km

2002 NipponSteel Jintan 4 Saturnax stations (Kuroshio II) Malaysia 65km32"(17.5/23.8mm,X65) for Petronas/Shell Sarawak 7.6 km 24" (14.3/19.1 mm + 3 mm 316L, X65)

2002 StoltOffshore Shell EA 3 Saturnax stations (Polaris) Nigeria 6.2km8.62"(12.7mm,X52) for Shell 6.3 km 10.75" (14.3 mm, X52) 10.3 km 12.75" (12.7 mm, X52) 5.7 km 16" (12.7 mm, X52) 5.7 km 18" (14.3 mm, X52)

2001 StoltOffshore Boomvang 3 Saturnax stations (DLB801) GulfofMexico 46.4km24"(11.1mm,X65) for Williams 19.5 km 24" (12.7 mm, X65) 28.4 km 24" (14.3 mm, X65) 0.7 km 24" (17.5 mm, X65)

2001 Global Asia Pacific F23 SW & M4 3 Saturnax stations (DLB264) Malaysia 200welds12"(9.5+3mm,X65)-2.5km for Shell Sarawak Berhad 80 welds 12" (11.1 + 3 mm, X65) - 1 km 662 welds 14" (14.3 + 3 mm, X65) - 8 km 80 welds 14" (17.7 + 3 mm, X65) - 1 km All : base metal + cladded with 3 mm A 316L

2001 StoltOffshore Girassol 1 Saturnax station (2G position) (Polaris) Angola 6.3km12"(14mm) for Elf Angola 10 km 12" (22.3 mm) Flowlines - J-Lay (1,450 m water depth)

2001 GlobalIndustries Ampa Fairley 4 Saturnax stations (DLB264) Brunei 31km40"(19.1mm,X60) for Shell 6.3 km 28" (12.7 mm, X60)

2001 TLOffshore Angsi (Seligi) 4 Saturnax stations (DB30) Malaysia 78km24"(15.9mm,X60) for Petronas 43 + 48 km 16" (12.7 mm, X60/X65)

Offshore Projects -www.serimax.com Page 19 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2001 StoltOffshore Gulfstream 4 + 3 + 2 Saturnax stations (LB200/DLB801/Spud) GulfofMexico LB200:607km36"(20.8to26.1mm,X65/X70) for ANR/Duke Williams DLB801 : 60 km 36" (20.8/31.8 mm, X65/X70) Spud : 36 km 36" (20.8/31.8 mm, X65/X70)

2001 Hyundai Heavy Industries West Natuna 3 Saturnax stations (HD423) Indonesia 2,903welds12.75"(14.3mm,X52)-35km for Conoco 617 welds 14" (14.3 mm, X52) - 7.6 km 383 welds 8.625" (9.5 mm, X52) - 5 km

2001 StoltOffshore Triton-La Ceiba Ph. 1A 3 Saturnax stations (Polaris) Equatorial Guinea 34.3 km 10.75" (20.6 mm, X65) for Triton 23.8 km 10.75" (18.3 mm, X65) 1.32 km 8.625" (14.3 mm, X65)

2001 StoltOffshore Vale 3 Saturnax stations (Seaway Falcon) Norway 16km8"(22.2mm,X65-Alloyed0.5Cr) for Norsk Hydro 0.5 km 8" (25.1 mm, X65 Alloyed 0.5 Cr)

2001 StoltOffshore Hanney 3 Saturnax stations (Seaway Falcon) UK 13km8"(18.3mm,X65)Sourservice for Talisman

2001 StoltOffshore Einset Flowlines 3 Saturnax stations (Seaway Falcon) USA 5.3miles6.625"(0.5",X65)-633welds for Shell

2001 StoltOffshore Lady Bug 3 Saturnax stations (Seaway Falcon) GulfofMexico 54km6"(11mm,X52) for Blue Waters

2000 GlobalIndustries Viosca Knoll 251 3 Saturnax stations (Sea Constructor) GulfofMexico 51km12"(12.7mm,X52) for Williams Services US

2000 StoltOffshore Skiff 3 Saturnax stations (Seaway Falcon) UK 11.3km12"(22.2mm,X60) for Shell

2000 TLOffshore Angsi 4 Saturnax stations (Kuroshio II) Malaysia 17,888welds32"(22mm,X65)-217km for Petronas

2000 Hyundai Heavy Industries South Pars 2 & 3 4 Saturnax stations (HD2500) Iran 2x105km32"(20.6mm,X65) for Total Sour Service + Piggy Back

2000 StoltOffshore Ceiba 2 Saturnax stations (Polaris) EquatorialGuinea 4,507 welds 8.625" (14.3 mm,X65) for Triton Energy 8 lines

2000 StoltOffshore Tchatamba West 2 Saturnax stations (Polaris) Gabon 7.5km6"(9.6mm,X42)-Sourservice for Marathon

2000 StoltOffshore Draugen Gas Export 4 Saturnax stations (LB200) Norway 75km16"(15.9mm,X65)Sourservice for Shell

Offshore Projects -www.serimax.com Page 20 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

2000 StoltOffshore Northwestern Flowlines 3 Saturnax stations (Seaway Falcon) GulfofMexico 2x23.2km6"(14.3mm)non-sourservice for Amerada Hess

2000 StoltOffshore Malongo Waterflood 2 Saturnax stations (Polaris) Cabinda(Angola) 1,105welds16"(15.9mm,X52)-12.8km for Chevron 282 welds 8" (12.7 mm, X42) - 3.5 km

1999 ETPM Åsgard Subsea 4 Saturnax stations (LB200) Norway 97km20"(17.6to25.4mm,X65) for Statoil 0.2 km 18" (19.1 mm, X65) Total of 3,985 DJ

1999 ETPM Easington Catchment Ar 3 Saturnax stations (LB200) UK 6.4km16"(9.5mm,X65)+3"piggyback for BG Exploration

1999 CCC (JV Global-CPC) Cantarell Nitrogen Line 4 Saturnax stations (DLB Iroquois) Mexico 7,655welds36"(19.1mm,X70)-94km for ICA-Fluor Daniel 395 welds 42" (17.5 mm, Gr. B) - 5 km 752 welds 48" (25.4 mm, Gr. B) - 9 km

1999 Conduto Roncador + Tramandai 2 Saturnax stations (BGL1) Brazil 86.5km20"(12.7mm,X60) for Petrobras 49.5 km 20" (14.3 mm, X60) 5 km 28" (14.3 mm, X60)

1999 ETPM Åsgard Transport Pipeli 2 Saturne 8T + 2 x 2 Saturnax stations (LB200) Norway 350km42"(30to34mm,X65) for Statoil

1999 TLOffshore Resak 4 Saturnax stations (DB26) Malaysia 9,878welds28"(16.2mm,X65) for Petronas 405 welds 28" (18.1 mm, X65) 43 welds 28" (25.1 mm, X65) Total 128 km

1999 Hyundai Heavy Industries Yung-An to Tung-Hsiao 4 Saturnax stations (1 with 4 bugs) (HD423) Taiwan 238km36"(14.3to20.6mm,X65) for China Petroleum Corp.

1999 ETPM Tchatamba South 1 Saturnax station + 2 FCAW (CBL101) Gabon 1,352welds12"(16.4mm,X42)-16.6km for Marathon

1999 ETPM Kungulo Waterflood 3 Saturnax stations (Polaris) Cabinda(Angola) 0.5km24"(17.5mm,X52) for Chevron 4.5 km 20" (22.2 mm, X52) 15.2 km 16" (12.7 & 15.9 mm, X52)

1999 ETPM Tchibeli 2 Saturnax stations (Polaris) Congo 11.6km10"(12.7mm,X42)-Waterinjection for Elf 25.6 km 10" (12.7 mm, X52) - Pipe-in-pipe

1999 ETPM North Nemba 3 Saturnax stations (Polaris) Cabinda(Angola) 603welds12.75"(14.3mm,GrB)-7.24km for Chevron 609 welds 12.75" (14.3 mm, Gr B) - 7.31 km 72 welds 24" (15.9 mm, X60) - 0.86 km

1998 ETPM Elgin/Franklin 1 Saturne 8T + 2 Saturnax stations (DLB1601) UK(GasExport) 470km34"(17.7to25.0mm,X70) for Elf

Offshore Projects -www.serimax.com Page 21 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

1998 ETPM Elgin/Franklin 3 Saturnax stations (LB200) UK(LiquidsExport) 45km24"(24mm,X70) for Elf

1998 ETPM Phoenix 3 Saturnax stations (DLB1601) UK 563welds16"(22.2mm,X65) for Conoco 589 welds 3" piggy back (12.7 mm, X52)

1998 ETPM Ekofisk By-Pass 1 Saturne 8T + 3 Saturnax stations (DLB1601) Norway 16km36"(22.2to31mm,X65) for Statoil

1998 Conduto Pescada 2 Saturnax stations (BGL1) Brazil 6,120welds26"(14.3mm,X65)-77.5km for Petrobras

1998 ETPM Åsgard Transport Pipeli 2 Saturne 8T + 2 x 2 Saturnax stations (LB200) Norway 355km42"(30to34mm,X65) for Statoil

1997 McDermott-ETPM Lombo East 3 Saturnax stations (Polaris) Angola 500welds20"(15.9mm,Gr.B)-6km for Texaco

1997 McDermott-ETPM Nemba-Lomba 3 Saturnax stations (Polaris) Angola 841welds16"(12.7mm,X52)-10.2km for Chevron 57 welds 18" (12.7 mm, X52) - 0.7 km

1997 McDermott-ETPM Ofon 3 Saturnax stations (Polaris) Nigeria 383welds10.75"(12.7mm,X42)-4.8km for Elf Petroleum 3,273 welds 12.75" (12.7 mm, X42) - 41 km

1997 McDermott-ETPM NorFra 2 Saturne 8T + 3 Saturnax stations (LB200/DLB1601) from Draupner to Dunkirk 825 km 42" (24.5 to 30.3 mm, X65) for Statoil

1997 McDermott-ETPM Sangu 3 Saturnax stations (DB27) Bangladesh 48km20"(22.2mm,X52) for Cairn Energy

1997 McDermott-ETPM Escravos 3 Saturnax stations (Polaris) Nigeria 367welds8"(9.5mm,X42)-4.67km for Chevron 758 welds 8" (9.5 mm, X42) - 9.62 km 712 welds 8" (10.3 mm, X42) - 9 km

1997 ETPM Sirri A & C 3 Saturnax stations (DLB801) Iran 2.9+3.6km12"(12.7mm,X65) for Total 3.0 + 3.6 km 14" (9.5 mm, X52) 23.6 + 18.4 km 16" (9.5 mm, X52) 18.1 km 16" (17.5 mm, X60) 18.4 km 18" (14.3 mm, X52)

1997 McDermott-ETPM Kinabalu to Samarang 2 Saturnax stations + SMAW (DLB264) Sabah(Borneo) 31km12"(9.5mm) for Shell 31 km 14" (9.5 mm)

1997 McDermott-ETPM Saga 2 Saturnax stations + 1 SMAW (DLB264) Sabah(Borneo) 62km16"(12.7mm) for Petronas

Offshore Projects -www.serimax.com Page 22 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

1997 McDermott-ETPM Gombe 2 Saturnax stations + 1 SMAW (DLB1) Gabon 2,126welds12.75"(12.7mm,X42)-27km for Perenco 2,053 welds 10.75" (12.7 mm, X42) - 26 km

1996/ McDermott-ETPM Zeepipe 2B 2 Saturne 8T + 3 Saturnax stations 1997 (LB200) Norway 292km40"(28.6/30.3mm,X65) for Statoil

1996 McDermott-ETPM Fateh to WP7 1 Saturnax station (DB27) Dubai 546welds24"(12.7mm,X65) for Dubai Petroleum Cy 448 welds 16" (22.2 mm, X65) 291 welds 20" (27.0 mm, X65)

1996 McDermott-ETPM Bongkot 1 Saturnax station (DLB264) Thailand 867 welds 16" (15.9 mm, X65) for Total 581 welds 14" (15.9 mm, X65)

1996 McDermott-ETPM Ewan 3 Saturnax stations (Polaris) Nigeria 982welds12"(10.3mm,Gr.B)-12.25km for Chevron

1996 McDermott-ETPM Opolo 3 Saturnax stations (Polaris) Nigeria 1,732welds10"(15.1mm,X42)-21km for Chevron

1996 McDermott-ETPM Santan 2 Saturnax stations + 1 SMAW (DLB264) Kalimantan 1,720 welds 12" (12.7 mm) for Unocal 1,713 welds 16" (12.7 mm) 638 welds 24" (12.7 mm)

1996 McDermott-ETPM Erskine to Lomond 3 Saturnax stations (DLB1601) UK 30km16"(20.6mm,X65) for Texaco Pipe-in-pipe (16" within 24") 50 welds 16" Clad pipe : - Line pipe : 3 mm 304L + 11.9 mm - Forged elbows : 3 mm Inconel 625 + 11.9 mm

1995 McDermott-ETPM Galahad 3 Saturnax stations (DLB1601) UK 657DJ12"(15.9mm,X52)-16km for Mobil 572 welds 3" (11.1 mm, X52) - Piggy back

1995 McDermott-ETPM Nemba EPS 2 Saturnax + 2 manual stations (Polaris) Cabinda 429welds18"(12.7mm,X52)-5.5km for Chevron-CABGOC 1,776 welds 16" (12.7 mm, X52) - 21.7 km

1994 McDermott-ETPM Pambi 1 Saturnax station (Polaris) Angola 20km16"(17.5mm,X52) for Elf 6 km 10" (15.9 mm, X52)

1994 McDermott-ETPM Liverpool Bay Saturnax (LB200) UK 32km12"(12.7mm,X65)+Piggyback for Hamilton 14 km 14" (12.7 mm, X60) + Piggy Back 17 km 14" (11.1 mm, X52) + Piggy Back 33 km 14" (11.1 mm, X60) + Piggy Back 32 km 16" (11.9 mm, X60) 11 km 20" (15.9 mm, X60) + Piggy Back 27 km 20" (20.6 mm, X65) + Piggy Back

1994 McDermott-ETPM Froy to Frigg TCP2 Saturnax (LB200) Norway 2x33km12"(14.3mm,X65) for Elf 33 km 16" (20.6 mm, X65)

Offshore Projects -www.serimax.com Page 23 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

1994 McDermott-ETPM Dunbar to N. Alwyn 3 Saturnax stations (LB200) UK 22km16"(17.5mm,X60) for Total Pipe-in-pipe (16" within 20")

1993 McDermott-ETPM Scotland to Ireland Saturne 8T + 2 Saturnax + FCAW (DLB1601) Interconnector 8,187DJ24"(15.9mm,X65)-202km for Bord Gais Eireann

1993 McDermott-ETPM North Morecambe Saturne 8T + Saturnax (DLB1601) UK 32km36"(18.3mm,X65)+4"PiggyBack for British Gas

1993 McDermott-ETPM Nelson to Forties Saturne 8T + Saturnax (LB200) UK 25km20"(22.2mm,X65) for Shell

1993 McDermott-ETPM Frostpipe Saturnax (LB200) Norway 82km16"(15.9mm,X52) for Elf

1992 McDermott-ETPM Lancelot/Guinevere Saturne 8T + Saturnax (DLB1601) UK 61km20"(19.1mm,X52) for Mobil

1991/ McDermott-ETPM CATS Saturne 8T + Saturnax 1992 (LB200) UK 405km36"(28.4mm,X65) for Amoco

1991 McDermott-ETPM Nogat Saturne 8T + Saturnax (DLB1601) TheNetherlands 107km24"(13.1mm,X60) for Elf Petroland 145 km 36" (17.7 mm, X60)

1990 ETPM Bombay High Saturne 8T + Saturnax (DLB801) India 78km24"(20.6mm,X60) for ONGC 78 km 26" (22.2 mm, X60)

1990 ETPM Forties to Cruden Bay Saturne 8T + Saturnax (DLB1601) UK 165km36"(28.6/33.9mm,X65) for BP

1990 ETPM K/15 AMI + Saturnax (DLB1601) The Netherlands 14 km 10" (7.3/12.7 mm) for NAM Duplex type TÜV 1.4462

1988 ETPM Hidra Saturnax (DLB1601) Argentina 14km12"(12.7mm,X52) for Total 14 km 20" (12.7 mm, X52) 14 km 22" (14.3 mm, X52)

1988 ETPM Tommeliten AMI + Saturnax (DLB1601) Norway 44km9"(15.8/24.4mm) for Statoil Duplex type TÜV 1.4462

1987 ETPM K/14 to K/15 AMI (DLB1601) The Netherlands 17 km 12" (9.5/12.7 mm, Duplex) for NAM

1983/ ETPM Statpipe Saturne 4 Torch 1984 (DLB1601) Norway 340km36"(22.2mm,X65) for Statoil

Offshore Projects -www.serimax.com Page 24 of 2521/05/2012 Date Contractor Project Number of Welding Stations (vessel if offshore) Country Pipelines welded Operator

1982 ETPM North Rankin Saturne 4 Torch (DLB1601) Australia 135km40"(23.8mm,X65) for Woodside Petroleum

1981 ETPM Upper Zakum Saturne 4 Torch (LB203) UAE 23km24"(17.5mm,X70) for Zadco (Total Operator) 23 km 24" (28.9 mm, X70)

Offshore Projects -www.serimax.com Page 25 of 2521/05/2012