BRIEF DESCRIPTION OF THE PROJECT

Thiru. R. Mani, 671, Munisamy Mudaliyar Street, Katharpettai, Taluk, District, . T Thiru. R. Mani has 6 years of experience in Quarrying. The production of Rough Stone Quarry in an area of 0.80.0 Ha is located at S.F. No. 416(Part-4) of Vinnamangalam Village, Taluk, , Tamil Nadu. The quarry lease was granted in Proceeding No. RC.A.109/2010 (Mines) dated 10.01.2011, the lease deed was executed on 10.11.2011 and the lease expiry on 09.11.2021 Ten years lease period.

SALIENT FEATURES OF THE PROJECT SITE ARE AS FOLLOWS:

Description Details Name of the owner Thiru. R. Mani, Address for correspondence 671, Munisamy Mudaliyar Street, Katharpettai, Vaniyambadi Taluk, Vellore District, Tamil Nadu. Project Name Vinnamangalam Rough Stone Mine

Mine G.O/ Proceeding No Yes, RC.A. 109/2010(Mines) dated 10.01.2011 for Ten years. Mining Lease Area 0.80.0 ha Location of Mine S.F. No. 416(Part-4) of Vinnamangalam Village, , Vellore District, Tamil Nadu. Topo sheet number 57 O/12 Production capacity Rough Stone for 5 months & 5 Years: 26136m³. Method of mining Open Cast Semi mechanized method Drilling/Blasting Controlled Blasting and drilling No. of working days 250 days Water demand/Source 2.5 KLD Sourced - nearby Bore wells Sources of water Water will be supplied from bore wells of the nearby area Man power 18 Nos Nearest Town/City Ambur – 6.5 km (NNE) Nearest Roadways Krishnagiri to (NH 46)– 1.9 km (N) Nearest railway station Vinnamangalam Railway station – 1.5 km (W) Nearest airport Chennai International Airport- - 160 kms (ENE) Waste The top soil of the lease area is 792m3. Topsoil formation will be removed and directly loaded in to dippers for the filling and leveling of low lying areas. The wastes (5%) are generated during the mining period is 1374m³ shall be proposed to Dumping the All side of the 7.5m boundary barrier of the lease area. Land Use/ Land Ownership Government Poramboke land– 0.80.0 ha S. Description Present Area No. (Ha.) 01. Mining (Quarry) 0.45.2 02. Waste Dump - 03. Infrastructure - 04. Mines Road 0.01.0 05. Area Under - Plantation 06. Unutilized Area 0.33.8 TOTAL 0.80.0

Infrastructures Site office, First Aid Room, Toilets, etc Climate Condition Maximum Temperature - 390 C Minimum Temperature - 200 C Average Amount of Rainfall – 800 - 900 mm/annum Project Cost 26,00,000/- Nearby Mines Few Quarries are present