IN THE SUPREME COURT OF SOUTH AFRICA. (TRANSVAAL PROVINCIAL DIVISION.)

ANNEXURE A TO INDICTMENT.

Serial Object and place of Description Date Time No. Commission of Act of Act

1. Public Post Box, 9 – Night Burning cigarette, to Central Cape Town. 10.8.1961 which live matches were attached, placed in Post Box. 2. Public Post Box, 9 – Night Burning cigarette, to Central Cape Town. 10.8.1961 which live matches were attached, placed in Post Box. 3. Public Post Box, 9 – Night Burning cigarette, to Central Cape Town. 10.8.1961 which live matches were attached, placed in Post Box. 4. Main Line 2 – 11.00 pm Two cables sawn off Telephone cables 10.8.1961 with hacksaw near Springs. against pole – four wires cut. Cost of Repairs R299.37. 5. Telephone cables 7 - Night Telephone cables between 10.8.1961 cut off underground. and Cost of Repairs Krugersdorp. R20. 6. Telephone wires 10.8.1961 Night Twenty Telephone one mile outside wires cut. Cost of Alberton on the road Repairs R183.27. to Heidelberg. Annexure B - 2 - (continued)

7. Pylon at Jukskei – 8.10.1961 9.15 pm Two outside legs of river, Lombardy, corner tower sawn East, Johannesburg. off – tower toppled over. Cost of Repairs R8,000. 8. Telephone cable, 8 – Night Telephone cable Meredale, 9.10.1961 sawn off against Johannesburg pole. Cost of Repairs R4. 9. Telephone cable in 9.10.1961 Night Dynamite placed in inspection pit inspection hole and between Leeukop cables shot off. and Johannesburg. Cost of Repairs R50. 10. Telephone wires 12.10.1961 12.30 am Seven pairs of wires about 25 miles from between two poles Port Elizabeth on cut. the road to Grahamstown. 11. Telephone cable 26 – Night Telephone cable near Department of 27.10.1961 severed with an axe. Bantu Administration Offices at Pietermaritzburg. 12. Wooden electric 16 – Night Two poles sawn off. light poles, cor. Van 17.11.1961 Cost of Repairs R40. der Linde and Smith Streets, Bedfordview. 13. Municipal Bantu 15.12.1961 9.15 pm Explosion. Plastic Administration holder with blue-grey Offices, Ordnans powder packed Road, Durban. against office door. Annexure B - 3 - (continued)

14. Electric Sub-Station, 16.12.1961 9.15 pm Chemical bomb Framelsy, Port exploded damaging Elizabeth. electric Sub-Station. Cost of Repairs R100. 15. Electric Sub-Station, 16.12.1961 9.15 pm Chemical bomb Brickmakerskloof, exploded damaging Port Elizabeth. Sub-Station. Cost of Repairs R50. 16. Bantu Labour Office, 16.12.1961 9.15 pm Chemical bomb New Brighton, Port exploded. Cost of Elizabeth. Repairs R15. 17. Bantu Administration 16.12.1961 9.15 pm Chemical bomb Office, New exploded. Cost of Brighton, Port Repairs R200. Elizabeth. 18. Bantu School Board 16.12.1961 9.15 pm Chemical bomb Offices, New exploded. Cost of Brighton, Port Repairs R10. Elizabeth. 19. Municipal Bantu 16.12.1961 9.20 pm Chemical bomb Control Office, exploded. One Dube, Bantu male killed Johannesburn. and another injured. 20. Central Road Post 16.12.1961 10.12 pm Home-made bomb Office, Fordsburg, exploded shattering Johannesburg. doors and damaging windows. Cost of Repairs R375. Annexure B - 4 - (continued)

21. Office of the 16 – Night Incendiary bomb Portuguese Curator, 17.12.1961 thrown into Post Box Market Street, Office. Johannesburg. 22. Phirima Post Office, 16 – Night Chemical bomb Orlando West, 17.12.1961 placed inside. Johannesburg. 23. Peri Urban District 16 – Night Dynamite explosion. Office, Kliptown. 17.12.1961 Cost of Repairs R16. 24. Bantu Affairs 17.12.1961 2.15 pm Chemical bomb Offices, Carr Street, exploded damaging Fordsburg, doors and walls. Johannesburg. Cost of Repairs R383. 25. Bantu Administration 17.12.1961 2.20 pm Chemical bomb Office, Market exploded damaging Street, doors and walls. Ferreirastown, Cost of Repairs Johannesburg. R415. 26. Bantu Affairs 17.12.1961 9.00 pm Petrol poured over Commissioner’s floor from a red Office, Engcobo. plastic container. 27. Rissik Street Post 18.12.1961 Night Chemical bomb Office Building, placed inside. Johannesburg. 28. Superintendent’s 16 – Night Dynamite explosion. Office, Zone 3. 17.11.1961 Meadowlands. Annexure B - 5 - (continued)

29. Two Electric Pylons, 20.12.1961 10.50 pm Two legs of each of Lombardy East, two electric pylons near Edenvale damaged by Hospital. dynamite explosion. Home-made electric starters were used. 30. City Hall, Cape 8.1.1962 11.45 pm Two petrol bombs Town. placed in the storeroom beneath the stage. Cost of Repairs R45. 31. Private Store-room, 16 – Night Home-made bomb near New Brighton, 17.1.1962 placed against door Port Elizabeth. of store-room. Explosion damaged door and walls. Cost of Repairs R3. 32. Transformer station 24.1.1962 9.30 pm Roofing torn apart on premises of by explosion of Roads Department chemical bomb. near New Brighton, Cost of Repairs R6. Port Elizabeth. 33. Caledon Post Office, 3 – Night Burning cigarette, Cape Town. 4.2.1962 together with live matches placed in post box. Cost of Repairs R3. Annexure B - 6 - (continued)

34. Telephone booth in 7.2.1962 8.00 pm Chemical bomb Donkin Street, Port placed in booth. Elizabeth Door torn apart and roofing cracked by explosion. Cost of Repairs R50. 35. Rissik Street Post 7 – - Chemical bomb Office Building, 19.2.1962 placed inside drawer Johannesburg. of desk of Commissioner. 36. Telephone wires, 10.3.1962 9.00 pm Thirty telephone wire Kwazakele Location, cut. Cost of Port Elizabeth. Repairs R200. 37. Railway telephone 10.3.1962 Night Nineteen telephone wire, New Brighton, wires cut. Cost of Port Elizabeth. Repairs R100. 38. Riots – Langa 10.3.1962 11.00 pm Police vehicle Location, Cape bombarded with Town. petrol bombs, overturned and set alight. Cost of Repairs R912. One Bantu Constable killed and others injured. Annexure B - 7 - (continued)

39. Roeland Street, 15.4.1962 10.00 pm Home-made bomb Gaol, Cape Town placed against gaol door. Perpetrator caught in the act. 40. Bantu 7 – Night Home-made time- Commissioner’s 8.7.1962 bomb placed under Office, Evaton hand basin in office. Bomb found before explosion. 41. Bantu Dwelling 404 15.7.1962 Night Petrol bomb thrown Mtyeku Street, through window. Duncan Village, East London 42. Post Box, Mill 20.7.1962 11.00 pm Burning cigarette, Street, Cape Town together with live matches placed in post box. Cost of Repairs R1. 43. Post Box, corner of 20.7.1962 11.30 pm Burning cigarette, Darling and together with live Adderley Streets, matches placed in Cape Town post box. Cost of Repairs R6. 44. Wilberforce post 12.8.1962 12.00 midnight Office, Evaton, Vereeniging Annexure B - 8 - (continued)

45. Electric pylon 26.8.1962 1.00 pm Loaded blasting approximately two cartridges, miles from approximately 12 – Putfontein Police 15 inches under Station, Benoni Dist. ground, placed at outer legs of corner tower with electric starter. (Watch type) One blast exploded. Cost of Repairs R5000. 46. Office of Bantu 2 – - Dynamite explosion. Resettlement Board, 3.9.1962 Windows and wall Orlando East, damaged. Cost of Johannesburg. Repairs R90. 47. Dwelling of Bantu 18.9.1962 9.45 pm Incendiary bomb Sergeant, New thrown into dwelling. Brighton, Port Cost of Repairs R16. Elizabeth. 48. Beer Hall, 19.9.1962 2.00 – Paraffin thrown Kwazakele Location, 3.00 pm against door and set Port Elizabeth. alight. Cost of Repairs R1. 49. Beer Hall, New 20.9.1962 8.00 pm Paraffin poured Brighton, Port against door and set Elizabeth. alight. Cost of Repairs R1. 50. Bantu Single 22.9.1962 10.40 pm One bottle bomb Quarters, S.A.P., thrown into single New Brighton, Port quarters. Cost of Elizabeth. Repairs R5. Annexure B - 9 - (continued)

51. Bantu Administration 23.9.1962 4.30 pm Inflammable bottle Offices, Duncan bomb left in offices. Village, East London Cost of Repairs R20. 52. Bethelsdorp, Port 23.9.1962 8.30 pm Stone crushers Elizabeth explosive arsenal forced open and percussion caps stolen. Two telephone wires cut. Cost of Repairs R17. 53. Telephone wires 23.9.1962 9.30 pm Four telephone Kwazakele Location, wires cut. Cost of Port Elizabeth. Repairs R10. 54. Factory at Korsten 24.9.1962 1.00 am Incendiary bomb thrown through window. Cost of Repairs R1. 55. Wool store at New 24.9.1962 1.50 am Window broken, Brighton petrol poured on floor and wool and then set alight. Cost of Repairs R4097. 56. Bantu Shop, New 24.9.1962 8.45 am Petrol poured Brighton, Port against walls and set Elizabeth. alight. Cost of Repairs R400. Annexure B - 10 - (continued)

57. Bantu School Board 24.9.1962 12.00 pm Incendiary bomb Offices, Port used. Elizabeth 58. Dwelling of delegate 25.9.1962 10.10 pm Incendiary bomb of Chief Matanzima, thrown through Langa, Cape Tow. window. Cost of Repairs R60. 59. Bantu dwelling, New 25.9.1962 12.00 Incendiary bomb Brighton, Port midnight used. Cost of Elizabeth. Repairs R1. 60. Bantu dwelling. 25.9.1962 12.00 Incendiary bomb Member of Advisory midnight used. Cost of Board, New Repairs R1. Brighton, Port Elizabeth. 61. Dwelling of Bantu 25.9.1962 12.00 pm Bottle bomb used. Sergeant Gazo, Cost of Repairs New Brighton, Port R1.50. Elizabeth. 62. Railways, Port 25 – Night Thirty-eight Elizabeth. 26.9.1962 telephone wires cut. 63. The firm of “Boxes & 28.9.1962 7.45 pm Benzine soaked Shooks”, Port sack placed next to Elizabeth. wooden pole and set alight. 64. Radio Mast of 29.9.1962 10.15 pm Dynamite explosion. S.A..R. & H., Cost of Repairs Coronationville, R9.99. Johannesburg. Annexure B - 11 - (continued)

65. Telephone wires, 30.9.1962 Night Eight Railway New Brighton, Port telephone wires cut. Elizabeth. Cost of Repairs R200. 66. Dwelling of 1.10.1962 11.30 pm Two incendiary B/Sergeant, Stand bombs used. 1504, Kwazakele, Port Elizabeth. 67. Private dwelling of 2.10.1962 9.00 pm Incendiary bomb Bantu Regional and stones thrown Representative, Port through window. Elizabeth Cost of Repairs R9. 68. Dwelling of 6.10.1962 9.30 pm Four petrol bombs B/Constable used. Cost of Nkwakwa, New Repairs R10. Brighton, Port Elizabeth. 69. Power pylons, 7.10.1962 1.40 am Concrete base Noordgesig, damaged by Johannesburg. dynamite explosion. Cost of Repairs R411. 70. Petrol Depot, 7.10.1962 2.00 am Chemical bomb S.A.S.O.L., explosed damaging Langlaagte, outside of tank. Johannesburg. Cost of Repairs R40. 71. Electric pylon 7.10.1962 9.30 am Concrete base of Lyndhurst-Bramley electric pylon (Alexandra), damaged by Johannesburg dynamite explosion. Cost of Repairs R100. Annexure B - 12 - (continued)

72. Electric power line 7.10.1962 Night Dynamite explosion poles, used destroying Johannesburg base of poles. Cost Municipal Power of Repairs R20. Station, Orlando, Jhb. 73. Railway line, New 11.10.1962 Night Sleeper placed Brighton, Port across rails. Elizabeth. 74. Railway Signal 14.10.1962 9.15 pm Railway Signal Cables, Near cables cut in three Georgedale, places. Cost of Durban. Repairs R10. 75. Security Police 14.10.1962 9.30 pm Incendiary bomb. Office, Madeline One gallon tin Building, Durban containing flammable substance placed against office door. The detonator exploded, but not the tin. 76. Railway Carriage, 14.10.1962 9.30 pm Incendiary bomb Phoenix Station, placed in carriage of Durban. Passenger train. One gallon tin containing flammable substance and detonator. Detonator exploded, but substance in tin did not set alight. Annexure B - 13 - (continued)

77. Bantu Administration 14.10.1962 10.00 pm Incendiary bomb Office, “P” Section, placed against door KWA MASHU, and exploded. Township, Durban. 78. Storeroom of 14.10.1962 11.30 pm Incendiary bomb Administrative thrown through Building, Nyanga window of store Location, Cape room. Cost of Town. Repairs R150. 79. Bantu Affairs 14 – Night Incendiary bomb Offices, Stanger 15.10.1962 placed against door. Street, Durban. 80. Location Authority 14 – Night Incendiary bomb Office, Kwa Mashu 15.10.1962 placed against door. Durban. 81. Langa Post Office, 15.10.1962 1.15 am Incendiary bomb Cape Town. thrown through window. Cost of Repairs R30. 82. Sub-power plant, 15.10.1962 10.15 pm Drum placed against Railway Bridge, transformer, with Braamfontein, explosive on top. Johannesburg. Explosion damaged pipes. Oil leaked and a fire started. Cost of Repairs R40966. 83. Post Office, Suider 15.10.1962 Night Attempt to throw Paarl. petrol bombs through window of Post Office. Annexure B - 14 - (continued)

84. “V” Building, 19.10.1962 8.30 pm Dynamite thrown Hamilton Street, through office . window of the Minister of Lands, Economy and Marketing. Minister’s office and adjoining office damaged and gutted. Cost of Repairs R1000. 85. European dwelling, 21.10.1962 7.30 pm Paraffin bottle bomb 3 Gold Street, thrown through Sidwell, Port window of house. Elizabeth. 86. Telephone wires 21 – Night Seven telephone near Kwazakele, 22.10.1962 wires cut. Cost of Port Elizabeth. Repairs R20. 87. Telephone wires 28 – Night Two telephone wires connecting Port 29.10.1962 cut. Cost of Repairs Elizabeth and R3. Veeplaas. 88. Telephone wires in 28 – Night Twenty-four New Brighton 29.10.1962 telephone wires cut. Location, Port Cost of Repairs R49. Elizabeth. 89. Pylon near Sarina 1.11.1962 9.45 pm Pylon damaged by Railway Station, explosion of Pinetown, Durban. dynamite which was connected to props with putty. Three props badly damaged. Cost of Repairs R495. Annexure B - 15 - (continued)

90. Pylon near 1.11.1962 10.25 pm Pylon damaged by Clearemont explosion of Location, New dynamite which was Germany, Durban. connected to props with putty. 91. Pylon near Montclair 1.11.1962 10.45 pm Pylon damaged and Quarry, Durban. overturned by explosion of dynamite which was connected to the props with putty. 92. Telephone wires 2 – Night Two telephone wires between Kleinskool 3.11.1962 cut. Cost of Repairs and Missionvale, R10. approximately eight miles from Port Elizabeth. 93. Railway Station, 6.11.1962 9.04 pm Lock of Points sawn Perseverance, Port off and thrown over. Elizabeth. Cost of Repairs R1. 94. Telephone wires on 6.11.1962 11.15 pm Twenty-two Main Line, telephone wires cut. Kwazakele and New Cost of Repairs Brighton Location, R218. Port Elizabeth. 95. Comtlivres Railway 8.11.1962 Night Twenty-three bolts Station between loosened from Uitenhage and Railway lines. Klipplaat. Annexure B - 16 - (continued)

96. Telephone cable 11.11.1962 Night Telephone cable near Langa sawn through Location, Cape approximately six Town. fee above the ground. Cost of Repairs R66. 97. Telephone cables, 12.11.1962 Night Telephone cables Nyanga Location, chopped. Cost of Cape Town. Repairs R50. 98. Telephone wires, 12 – Night Twelve telephone New Brighton, Port 13.11.1962 wires cut. Cost of Elizabeth. Repairs R36. 99. Wooden telephone 14 – Night Wooden telephone poles, Dubula 15.11.1962 poles sawn off. Cost Street, New of Repairs R14. Brighton, Port Elizabeth. 100. Telephone cable, 15 – Night Telephone cable Oak Avenue, 16.11.1962 sawn off three feet Gardens, Cape above the ground. Town. Cost of Repairs R8. 101. Dwelling of V. 17.11.1962 11.45 pm Petrol bomb thrown Tonyeni, Meki Street through window. 770, Duncan Village, Curtains and part of East London. settee destroyed by fire. Cost of Repairs R60. 102. Home of D. Dyani, 18.11.1962 12.05 pm Incendiary bomb Duncan Village, used. East London Annexure B - 17 - (continued)

103. Telephone pole in 18 – Night Telephone pole “A” Avenue, New 19.11.1962 sawn off. Cost of Brighton, Port Repairs R15. Elizabeth. 104. Railway Bridge 19.11.1962 7.30 pm Dynamite explosion Mast, Cliffdale, destroyed one leg of Durban on Railway Mast. Property. 105. Vasco High School, 27.11.1962 1.30 am Two class rooms Goodwood, Cape destroyed by fire Town. and two others badly damaged. Cost of Repairs R20000. 106. Vasco Preparatory 27.11.1962 1.30 am Paraffin poured School, Cape Town. against door and set alight. Cost of Repairs R5. 107. Pylon on farm in 28.11.1962 4.40 am Two outside legs of Petit, Police District corner tower above Benoni Three and a concrete tower half miles from blown off with Police Station. dynamite (electric starter – watch type – used). Tower toppled over and damaged power line adjoining it. 108. Telephone cable in 28.11.1962 10.15 am Telephone cable Goodwood Street, partially sawn off. Goodwood, Cape Cost of Repairs R10. Town. Annexure B - 18 - (continued)

109. Telephone cable in 28.11.1962 Night Telephone cable Aubrey Road, Salt sawn off. Cost of River, Cape Town. Repairs . 110. Signal boxes at 29.11.1962 8.55 pm Explosion of Wipsey Bridge near dynamite placed in Maraisburg, Railway signal Johannesburg. boxes. Electric wires destroyed. Cost of Repairs R856.17. 111. Signal Boxes at 29.11.1962 8.55 pm Signal coupling Canada Station, transformer box Johannesburg. damaged by explosion. Cost of Repairs R883. 112. Bantu dwelling at 30.11.1962 12.15 am A bottle bomb was Pongolo Street, thrown through Uitenhage Location. bedroom window. 113. Bantu dwelling and 30.11.1962 12.15 am Bottle bombs of shiop2, 18th Avenue, benzene were Uitenhage Location. thrown through lounge window of house and window of shop. 114. Bantu dwelling, 6 30.11.1962 12.15 am Two bottle bombs of Nobakada Street, benzene thrown Uitenhage Location. through window. 115. Concrete Stand of 30.11.1962 Night Dynamite explosion. Pylon at Diepkloof, to Orlando, 5.12.1962 Johannesburg. Annexure B - 19 - (continued)

116. Telephone Booth, 3.12.1962 9.30 pm Home-made bomb corner Water Street in tin placed in and Menin Avenue, telephone booth and Newlands, Cape exploded. Booth Town. destroyed. 117. Municipal 3.12.1962 10.00 pm Incendiary bomb Workshops, New thrown through Brighton window. 118. Telephone wires, 3.12.1962 10.15 pm Thirty Main Line Matomela Street, telephone wires to Kwazakele Location, the North cut. Port Elizabeth. 119. Telephone cable, 3.12.1962 Night Telephone cable Lansdowne Road, sawn off. Cost of Phillippi, Cape Repairs R50. Town. 120. Electric 5.12.1962 8.30 pm Dynamite explosion Transmission Pole damaging pole. at Umlaas Bridge, Cost of Repairs near Louis Botha R100. Airport, Durban. 121. Telephone cable, 7 – Night Telephone cable cut Shapel Street, Cape 8.12.1962 off. Cost of Repairs Town. . 122. Office of Indian A.S. 9.12.1962 7.30 pm Dynamite and safety Kajee, 26 Alice fuse placed outside Street, Durban. against door. Explosion damaged front door and inside door. Cost of Repairs R100. Annexure B - 20 - (continued)

123. Railway Bridge Mast 9.12.1962 10.20 pm Dynamite explosion near Hammersdale damaged mast. Station on Main Cost of Repairs Durban – R1271.92. Pietermaritzburg line. 124. New uninhabited 10.12.1962 9.00 pm Inside and outside dwelling in Indian walls and corrugated Township, Laudium. iron roof badly damaged by dynamite explosion. Cost of Repairs R1300. 125. Port Elizabeth. 10 – Night Three telephone 11.12.1962 wires along Railway lines cut. Cost of Repairs R6. 126. Bantu dwelling – F. 12.12.1962 10.00 pm Home-made bomb 1460 Kwa Mashu made with piece of Township, Durban. hosepipe through window. 127. Bantu dwelling – E. 12.12.1962 10.00 pm Home-made bomb 307, Kwa Mashu placed against Township, Durban. window. 128. Bantu dwelling – G. 12.12.1962 10.00 pm Home-made bomb 914, Kwa Mashu placed in front of Township, Durban. door. 129. Bantu dwelling – 15.12.1962 11.30 pm Incendiary bomb 774 Kwina Street, thrown through Duncan Village, bedroom window. East London. Considerable damaged to clothing and bedding. Two young Bantu girls badly burnt. Annexure B - 21 - (continued)

130. Government 18.12.1962 2.40 am Incendiary bomb vehicles at Cape thrown amidst Town Castle. parked vehicles. 131. Dwelling of D. 19.12.1962 12.30 am Home-made bomb Goldberg, made with a piece of Claremont, Cape pipe exploded in Town. garden. 132. Telephone wires 22.12.1962 10.15 pm Two telephone wires near Coega, Port cut. Cost of Repairs Elizabeth. R5. 133. Main Post Office, 23.12.1962 9.30 pm Home-made bomb West Street, placed in Air Mail Durban. Post Box. 134. Railway cable on the 23.12.1962 10.00 pm Home-made time Esplanade, next to bomb made with a bay on Main line water pipe fixed to from Docks to cable. Weats Station, Durban. 135. Railway Line 8.1.1963 10.10 pm Main Railway Line between Umgababa damaged by and Karridene – 23 dynamite explosion. miles from Durban. Cost of Repairs R76.30. 136. Telephone wires 9.1.1963 10.30 pm Six telephone wires between Coega and cut off and removed. Adelaide – 12 miles Cost of Repairs R30. from Port Elizabeth. 137. Bata Shoe Factory, 11.1.1963 10.10 pm Home-made bomb corner Pine and thrown into letter Grey Streets, box. Cost of Durban. Repairs R10. Annexure B - 22 - (continued)

138. Garage of Bantu 11 – 3.15 pm Explosion of Administration 12.1.1963 dynamite placed in a Offices, Boipatong bucket between two Location, vehicles. Vanderbijlpark. 139. Telephone 15.1.1963 10.00 pm Dynamite blew off Inspection pit, South one cable and broke Coast Road, lid. Cost of Repairs Mobeni, Industrial R260. Zone, Durban. 140. Telephone wires in 16 – Night Twenty-one New Brighton 17.1.1963 telephone wire Location. damaged and two wooden telephone poles sawn off. Cost of Repairs R50. 141. Kirkwood, Addo 16 – Night Seven telephone Road, Port 17.1.1963 wires cut. Cost of Elizabeth. Repairs R20. 142. Vicinity of Power 16 – Night Nine telephone Station, Swartkops. 17.1.1963 wires cut. Cost of Repairs R50. 143. Sondagsrivier 16 – Night Paraffin thrown on Irrigation Store, 17.1.1963 floor of store and set Addo. alight. 144. Petrol Supply Tank, 17.1.1963 9.40 pm One of the petrol Table Bay Harbour, pipes unscrewed so Cape Town. that petrol flowed out. Rope saturated with petrol and set alight. Annexure B - 23 - (continued)

145. Telephone wires cat 17 – Night Two telephone wires Coega, Port 18.1.1963 cut. Cost of Repairs Elizabeth. R5.0 146. Office of “Die 18.1.1963 9.19 pm Front walls, windows Natalier”, 305 and office furniture Umbilo Road, badly damaged by Durban. an explosion. A european male passing by in the street sustained injuries as a result of explosion. Cost of Repairs R1000. 147. Bantu Room at 18.1.1963 11.00 pm Home-made bomb McCord Zulu placed in room. Hospital, Durban. 148. Old Jewish 24.1.1963 2.00 am Bucket containing Synagogue, Paul twelve sticks of Kruger Street, dynamite and a tin of Pretoria. raw linseed oil found in building. 149. Signal Box S.A.R. & 31.1.1963 12.45 am Dynamite placed in H. between Dube signal box. and Phomaleng Stations, Johannesburg. 150. Telephone poles at 31.1.1963 Night Three telephone Avoca, North of poles sawn off. Cost Durban. of Repairs R50. Annexure B - 24 - (continued)

151. Telephone Booth 2.2.1963 7.50 pm Home-made bomb corner Queen placed in booth. Victoria and Thomas Cost of Repairs R20. Streets, Cape Town. 152. Wooden telephone 9.2.1963 3.30 am Poles sawn off. pole, Dubula Street, Falling pole broke New Brighton two wires. Cost of Location, Port Repairs R20. Elizabeth. 153. Telephone Booth, 9.2.1963 9.00 pm Home-made bomb corner Victoria and in tin. The explosion Thomas Streets, badly damaged the Cape Town. telephone and broke the door of the booth. Cost of Repairs R30. 154. Municipal Beer Hall, 10.2.1963 1.15 pm Home-made bomb Bell Street, Durban. made with a piece of water piping placed under a table. The explosion injured three Bantu males. 155. Bantu dwelling, New 10.2.1963 10.00 pm Incendiary bomb Brighton, Port thrown through Elizabeth. window. Cost of Repairs R10. 156. Railway line, 10.2.1963 11.49 pm Sheet of iron placed Landsdowne on Railway lines. Station, Cape Province. Annexure B - 25 - (continued)

157. Provincial Hospital, 11 - Night Two telephone wires Uitenhage. 12.2.1963 cut. Cost of Repairs R5. 158. Telephone Wires 11 – Night Two telephone wires outside Uitenhage 12.2.1963 cut. Cost of Repairs Location. R5. 159. Innesdal Post Office, 12.2.1963 3.00 am Five sticks of Pretoria. dynamite and two detonators thrown through window. 160. Telephone wires, 13.2.1963 Night Telephone wires cut. Bestersrus, near Ladysmith. 161. Telephone wires 14 – Night Twenty telephone outside 15.2.1963 wires cut. Cost of Grahamstown Repairs R10. Location. 162. Bantu dwelling, 707 14 – Night Two petrol bombs Meki Street, Duncan 15.2.1963 thrown at the home Village Location, of V. Tonyeni. One East London. burst against the wall and the other fell about thirty feet from the house. 163. Railway Line at 16.2.1963 Early hours of the Two sheets of iron Pinelands Station. morning. and 25 inch bolt placed on Railway line. Annexure B - 26 - (continued)

164. Telephone cable, 18.2.1963 Night Telephone cable corner Settlers and sawn off Modderdam Roads, approximately six Athlone, Cape feet above the Town. ground. Cost of Repairs R20. 165. Telephone cable 18.2.1963 Night Telephone cable near Heideveld sawn off six feet Railway Station, above the ground. Cape Town. Cost of Repairs R20. 166. Bantu School, 18.2.1963 Night Fire set to hard Langabuya board wall of school. Location, Paarl. Cost of Repairs R20. 167. Derailment between 23.2.1963 9.00 pm Rails loosened. Alberton and Vereeniging. 168. Post Office 26 – Night Dynamite explosion Inspection pit, near 27.2.1963 caused damage to Leeukop, cable. Cost of Johannesburg. Repairs . 169. Telephone cables, 26.2.1963 4.00 pm Thirty to Thirty-five Rifle Range Road, to stocks of dynamite Booysens, 1.3.1963 affixed to lead Johannesburg. covering of cable. 170. Wooden Poles 2.3.1963 2.00 am Two poles sawn off carry-power line causing line to fall between Alice and and resulting in a Kingwilliamstown, short circuit. about a mile outside Alice. Annexure B - 27 - (continued)

171. Bantu School, 3.3.1963 Night Fire set to hard Langebuya board wall of School. Location, Paarl. Cost of Repairs R4. 172. Telephone cables, 3.3.1963 8.00 pm Two telephone Nyanga East. cables sawn off at Post Office and also at a cement factory. 173. Telephone cable, 3 – Night Telephone cable Landsdown Road, 4.3.1963 sawn off against Phillipi. pole. 174. Signal Box, corner 8.3.1963 Night Safety fuse, gelignite End and Noord and two percussion Streets, caps. Johannesburg. 175. Bantu Affairs 10.3.1963 6.30 pm Dynamite bomb Commissioner’s placed against Office, Cato Street, corner of temporary Durban. structure. Explosion damaged asbestos wall and windows. Cost of Repairs R53.82. 176. Railway Line under 21.3.1963 1.05 am Part of rail ripped Victoria Street away by dynamite Bridge, Durban. explosion. 177. Telephone cable 21.3.1963 Night Cable sawn off 5 across Nyanga feet 6 inches above Station, Cape Town. the ground. Cost of Repairs R135. Annexure B - 28 - (continued)

178. Telephone cable 21 – Night Cable sawn off about 200 yards 22.3.1963 approximately three from Langa Police feet above the Station, Cape Town. ground. Cost of Repairs R30. 179. Telephone cable, 21 – Night Cable sawn off two Klipfontein Road 22.3.1963 feet above the near Whitfields ground. Cost of Dairy, Cape Town. Repairs R30. 180. Bantu Administration 22.3.1963 10.20 pm Dynamite explosion Building, caused damage to Bezuidenhout floor and windows. Street, Cost of Repairs Ferreirastown, . Johannesburg. 181. Passenger Train 7.4.1963 7.30 pm Two bottles between Verulam containing and Duabad flammable Stations, Durban. substance thrown on 1st and 4th carriage of moving train carrying European and Non-European passengers. 182. Dwelling of 10.4.1963 - Bottle containing B/Constable L. petrol and oil thrown Fanyle, Dube through window. Location, Johannesburg. Annexure B - 29 - (continued)

183. Fordsburg Post 12.4.1963 6.45 am Eighteen sticks of Office, dynamite connected Johannesburg. with two pieces of fuse. Each fuse had a detonator connected. All this was placed in a shoe box. One detonator and four sticks of dynamite exploded. 184. Empty Building and 17.4.1963 12.30 pm Empty Building Signal Box of S.A.R. blown up with & H., Riverlea, dynamite. Cost of Johannesburg. Repairs R1000. 185. Bales of Cotton on 19 – - Matches placed board ship from Port 21.4.1963 between bales. Elizabeth to Bundles of five Liverpool. matches each were found in five bales. Only the match heads appeared. 186. Inspection Pit of Between Unknown Telephone cable Post Office, corner 1.11.1962 sawn off. About 900 of First Avenue and to wires. Cost of Second Street, 25.4.1963 Repairs R50. Lower Houghton, Johannesburg. 187. Bantu Beer Hall, 14 – Night Two bottles Langa Location. 17.6.1963 containing oil wrapped in brown paper was set alight and thrown on thatch roof of Beer Hall. Annexure B - 30 - (continued)

188. Bottle Store in 17 – - Five bottles course of erection, 18.6.1963 containing diesel oil Langa. wrapped in old pieces of cloth strewn around the building. Three burnt. 189. Railway Signal Box, 21.6.1963 1.50 am Railway Signal box ½ mile from Duffs damaged by Road Railway dynamite explosion. Station, Kwa Mashu, Cost of Repairs Durban. R207.37. 190. S.A. Railway Trailer 26.6.1963 9.00 pm Fuel, presumably parked on corner of paraffin, turpentine Lilian and Avenue or brake fluid, was Roads, Fordsburg, strewn over trailer. Johannesburg. A four-gallon tin containing the same fuel substance was placed between the rear wheels and set alight. Four tyres, two canvas covers and body of trailer damaged. Cost of Repairs R500. 191. Beer Hall in Langa 30.6.1963 5.30 am Two wine bottles Location. containing petrol mixed with some unknown substance, thrown on asbestos roof of Beer Hall. Annexure B - 31 - (continued)

192. Home of 3.7.1963 3.00 am Petrol thrown in B/Constable No. under front door and 129003 J. set alight. Fire Makgoale, 738 Dube started on back Location, verandah. Johannesburg. 193. Underground Power 6.7.1963 Unknown Power cables cables, Bridgetown, damaged with some Athlone. sharp instrument.

COLLECTION NAME: Rivonia Trial Collection COLLECTION NUMBER: AD1844 ITEM NUMBER: A2.3 Second Indictment: Annexure B: Particulars of commission of DOCUMENT: acts

LEGAL NOTICES

This document is part of a private collection, the Rivonia Trial Collection, donated to Historical Papers at The University of the Witwatersrand, Johannesburg.

Copyright Notice: All materials on the Historical Papers website are protected by South African copyright law and may not be reproduced, distributed, transmitted, displayed, or otherwise published in any format, without the prior written permission of the copyright owner.

Disclaimer and Terms of Use: Provided that you maintain all copyright and other notices contained therein, you may download material (one machine readable copy and one print copy per page) for your personal and/or educational non-commercial use only.

Because of the possibility of human and mechanical error as well as other factors, the University is not responsible for any errors or omissions and excludes any and all liability for any errors in or omissions from the information on the website or any related information on third party websites accessible from this website.