Department of Public Works and Highways (DPWH)

Contract ID: 20KF0049 Contract Name: Widening of Permanent Bridges at Tugar Bridge (B00943MN) Along -Zamboanga Road, , Contract Location: Kauswagan, Lanao del Norte

REPUBUC OF THE ) .)S.S

ACKNOWLEDGEMENT

BEFORE ME, as the Notary Public for and within the City of , personally appeared ALY KHAN U. ALL QIC-District Engineer, representing the REPUBLIC OF THE PHILIPPINES (Department of Public Works and Highways), with Residence Community Tax Certificate No 09242652 issued on January 16. 2020 at Illoan Citv. and OMAR B. NOOR/ General Manager represents LANAO BUILDER AND ENTERPRISES with Community Tax Certificate No. 13126470 issued on January 08. 2020 at Marawi Citv known to me to be the same persons who executed the foregoing CONTRACT and AGREEMENT and they acknowledged to me that the same Is their true act deed for and in behalf of the parties they represented.

This instrument consists of Five (5) pages, including the page, on which this acknowledgement is written duly signed by the contracting parties and their witnesses on the left margin of the pages.

IN WITNESS WHEREOF, I have hereunto affixed my Signature and Official Seal this 14th day of February, 2020.

(Notary Public) mtw ewuc Doc. No..

Page No. ¥1

Book No.

Series of

DI>WH-INFR-51-Z016 Page 5 of i Department of Public Works and Highways (DPWH)

Contract ID: 20KF0049 Contract Name: Widening of Permanent Bridges at Tugar Bridge (B00943MN) Along Unamon-Zamboanga Road, Kauswagan, Lanao del Norte Contract Location: Kauswagan, Lanao del Norte

FORM OF CONTRACT AGREEMENT

KNOW ALL MEN BY THESE PRESENTS:

This CONTRACT AGREEMENT, made mis 14w day of .by and between:

Tne GOVERNMENT QF THE REPUBLIC Qf THE PHILIPPINES through (Department of Public Works & Highways) represented herein by ALY KHAN U. ALI, OlC-Dlitrict Engineer, duly authorized for this purpose, with main office address at Lanao del Norte 2"" District Engineering Office, Seminary Drive, Del Carmen, Illgan City, hereinafter referred to as the "PROCURING ENTITY":

-and- LANAO BUILDER & ENTERPRISES, single proprietorship and existing under and by virue of Laws of the Republic of the Philippines, with main office address Lanao Builder Building, Macapagal Avenue, Iligan City represented herein by OMAR B. NOOR. General Manaoer. duly authorized for this purpose, hereinafter referred to as the "CONTRACTOR".

WITNESSETH:

WHEREAS, the PROCURING ENTITY is desirous that the CONTRACTOR execute the Works under Contract IP; 20KFQQ49 Widening of Permanent Bridges at Tuoar Bridge (B00943MN) Along linamon-Zamboanga Road, Kauswagan, Lanao del Norte hereinafter called "the Works," and the PROCURING ENTITY has accepted the Calculated Bid of the CONTRACTOR for the execution and completion of the Works within 219 Calendar Davs at the calculated unit bid prices shown in the attached Bill of Quantities, or a total Contract price of Twenty-One Million Seven Hundred Twenty Thousand wo Huogjsj 21,720,204.92 Item 1 Four PesoDescriptios andn Ninety-TwoQuantit Centavosfy UnitP Umt Coat Total (P) Amount 1 <») • PART A. FACurries FOR THE ENGINEERS *UQQ ConstrucBon of Fkfd Offla far the LOO i* 180 B00 00 180.800 00 Engineer A-U8) Provision or Van Type Service Vertde 730 HO. 565,000 00 4,124,500 00 on Rental Bat* (Rent to Own) A.1.2W Operation and Maintenance of Van 7.10 Mo. 62.150.00" «3,695.00 Type Service Vehicle PARTI. OTHER GENERAL REQUIREMENTS B.S Project BVnaroTOonboard 2-00 each 3,660.00 7,320.00 B.7(2) Occupational Safety and Health 1.00 Li 101,70000 101.700.00 Program 8.8(11 Traffic Martaoement 7 30 Mo 2J.G00 00 ltrl.lflO OO 09 MobBluoOnyDemobiUzaaon 1.00 Li 262,500.00 262,500.00 I 13 Additional Gaotechnial InvtiOoaoon 1.00 La 395,500.00 395,500 00 Bieoi Craneway 1.00 Ut 339,000.00 339.000.00 PART C. EARTHWORKS Individual Removal of Trees (150- 26 00 each 1,501.53 39.039.78 300mm dlajj small 101(1) Ronoval of Structures and 1 (XI U 235,948 00 235,946 00 Obstruction 10KQ- Removal of Structures and 13 S9 SQ.m 4,665.63 66,123 91 Obstruction. Concrete

DPWH-INFR-51-2016 Page I of I Department of Public Works and Highways (DPWH)

Contract ID: 20KF0049 Contract Name: Widening of Permanent Bridges at Tugar Bridge (B00943MN) Along Linanxxi-Zamboanga Road, Kauswagan, Lanao del Norte Contract Location: Kauswagan, Lanao del Norte

103(1 )a Structure Excavation 8.00 Cu.m 279.07 2,232.56 (Common Soil) 103(2}a BnOoe Excavation (Common 100.07 Cu.m 292.99 29,279.48

soEmbankmenn t from Borrow 59.34 Cu.m 1,516.05 89,962.41 (Common Soil) PART E. SURFACE COURSE LfHi ilf iTiaSi^4 A r h lit o i c.i n mi tmuisiTiea Aspnait sq.m ?4 54_ . 23,052.63 22S.52 310UX Bituminous Concrete Surface Sq.m 1.653.91 372,989.78 Weanng Course; Hot-Uid 40mm thick (2 Layers=80mm thick) PARTF. BRIDGE CONSTRUCTION 400(4)«2 Precast concrete Piles, 420.00 m 6,936.57 2,913,359.40 Furnished (450mmx450mm) 400(14) Precast concrete Piles. Dover. 420.00 m 2,573 61 1,080,916.20 (450mmx450mm) 400(16)b Test Piles, Furnished and 60.00 m 9,999.93 599,995.80 Driven {450x450mm) 40l(2)a Concrete Raiting Standard 25.50 m 4.360.90 111,202.95 404c>ef 13.00 l.m 8,089.53 105,163.89 (Multiplex) Expansion Joints PART G. DRAINAGE AND SLOPE PROTECTION STRUCTURES 50

DPWH-INFR-51-2016 Page 2 of 5 Department of Public Works and Highways (DPWH)

Contract ID: 20KF0049 Contract Name: Widening of Permanent Bridges at Tugar Bridge (B00943MN) Along Linamon-Zamboanga Road, Kauswagan, Lanao del Norte Contract Location: Kauswagan, Lanao del Norte

NOW. I III 1REFORE. for and consideration of the foregoing pfemitcs. the panto hereto agree as follow)

1. In this CONTRACT AGREEMENT, words and expressions shall hove the same meanings as are respectively assigned lo them in ihe Conditions of Contract hereinafter referred lo

2. The following documents shall be attached, deemed lo form, and be read and construed as part of this CONTRACT AGREEMENT, and shall be interpreted in the following order of priority-

a This Contract Agreement

b Documents forming part of the Conlracl Agreement

(1) Notice of Award (NOA) with the Coniracior's signed "confornve" (2) CONTRACTOR'S Bid in the Form of Bid. including its Technical and Financial Components, as calculated by the Procuring Entity and conformed to by the CONTRACTOR through ihe NOA. (3) Instructions to Bidders (1TB) and Bid Data Sheet (BDS) (4) Supplcmental/Btd Bulletins for Bidding Documents (5) Special Conditions of Contract (SCO (ft) General Conditions of Conlracl (GCC) (7) Specifications (X) Drawings ((9) Performance Security (10) Other Documents

(a) Construction Methods

(b) Construction Schedule in the form of PERT/CPM Diagram or Precedence Diagram and Bar Chan with S-Curvc. or other approved tools of project scheduling, and Cash Flow.

(c) Manpower Schedule

(d> Equipment Utilization Schedule

(c) Constmclion Sofelv and Health Program initially approved b> the Head of the Procuring Entity

(0 CONTRACTOR'S All Risk Insurance (CARD

In consideration of the payments lo be made by the PROCURING ENTITY to the CONTRACTOR as hereinafter mentioned, the CONTRACTOR hereby covenants with the PROCURING ENTITY to e*ecuic and complete the Works and remedy any defects therein in conformity with the provisions of this CONTRACT AGREEMENT.

In consideration of the execution and completion of the Works by the CONTRACTOR, the PROCURING ENTITY herebv covenants to pay the CONTRACTOR ihe uml prices in ihe CONTRACTOR'S Calculated Bid. as applied lo ihe actual quantities accomplished as certified by ihe PROCURING ENTITY under ihe provisions of this CONTRACT AGREEMENT, at ihe limes and in the manner prescribed by this CONTRACT AGREEMENT

DPWH-1NFR-51-2016 Page > of * Department of Public Works and Highways (DPWH)

Contract ID: 20KF0049 Contract Name: Widening of Permanent Bridges at Tugar Bridge (B00943MN) Along Unamon- Zamboanga Road, Kauswagan, Lanao del Norte Contract Location: Kauswagan, Lanao del Norte

IN WITNFSS W HEREOF, the parties ihcretu ict their rcapecme hands on the day. month and >cai flnl above written

PROCURING ENTITY: (IIMinCIOk:

F .A iii.f! by: Re p mm ted by:

oK'IDistnVa Engineer Genera) Manager

Witnessed b\

LADRKNTINO P. BADEM.ES Assisiani Dislnct Engineer BAC-Chairman Accountant III