Due Diligence Report

Document Stage: Draft for Consultation Project Number: 43253-025 March 2017

IND: Integrated Urban Water Management Investment Program – Town Tranche 1 Water Supply Distribution Network Subproject (Package No. 01WS05)

Prepared by Karnataka Urban Infrastructure Development and Finance Corporation, Government of Karnataka for the Asian Development Bank.

This Due Diligence Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Contents I. EXECUTIVE SUMMARY I I. PROJECT DESCRIPTION 1 A. Introduction 1 B. General Information about the existing water supply scheme in Davangere: 2 C. Proposed Sub Project Components 2 II. SCOPE OF LAND ACQUISITION AND RESETTLEMENT IMPACT 10 D. Resettlement Framework 13 E. Temporary Impact 14 III. GENDER IMPACT AND IMPACT ON INDIGENOUS PEOPLE 23 IV. CONSULTATION, PARTICIPATION AND INFORMATION DISCLOSURE 23 F. Stakeholders 23 G. Public Consultation 24 V. GRIEVANCE REDRESSAL MECHANISM 29 VI. INCOME RESTORATION 31 VII. POLICY FRAMEWORK AND ENTITLEMENT 31 H. Policy Framework 31 I. National Policy Framework 31 J. ADB‘s Involuntary Resettlement Policy 32 K. Karnataka Land Acquisition Act 32 L. The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013‘ 33 VIII. RESETTLEMENT BUDGET 38 IX. INSTITUTIONAL ARRANGEMENTS AND IMPLEMENTATION 38 M. Existing Institutional Structure and Capacity 38 N. Implementation 38 X. IMPLEMENTATION SCHEDULE 39 XI. CONCLUSION 39

LIST OF ANNEXURES 1. PUBLIC CONSULTATIONS 2. OWNERSHIP DETAILS OF LAND 3. SAMPLE GRIEVANCE REGISTRATION FORM

CURRENCY EQUIVALENTS (As of 15 Jan 2017) Currency Unit = Rupee (INR) INR1.00 = USD 0.015 $1.00 = Rs 67.96

ABBREVIATIONS

ADB — Asian Development Bank BPL — below poverty line CBO — community-based organization CC — city corporation CDP — comprehensive development plan CLIP — city level investment plan CMC — city municipal council CPMU — central project management unit DC — deputy commissioner DLRC — district level resettlement committee DPR — detailed project report DP — displaced person EA — executing agency ELSR — elevated level storage reservoir GLSR — ground level storage reservoir GoI — Government of GoK — Government of Karnataka GRC — grievance redressal committee IWRM — integrated water resource management KMRP — Karnataka Municipal Reforms Project KUIDFC — Karnataka Urban Infrastructure Development and Finance Corporation KUWSDB — Karnataka Urban Water Supply and Drainage Board LA — land acquisition LAA — Land Acquisition Act LA and R&R — land acquisition and resettlement and rehabilitation MFF — multitranche financing facility MLA — member of Legislative Assembly NGO — nongovernment organization NKUSIP — North Karnataka Urban Sector Investment Program O&M — operations and maintenance PIU — project implementation unit PMDSC — project management and design supervision consultant PMU — project management unit PWD — Public Works Department RPMU — regional project management unit RoW — right of way

SES — Socioeconomic Survey SPS — Safeguard Policy Statement SR — storage reservoir STP — sewage treatment plant CMC — town municipal council TOR — terms of reference ULB — urban local body WSS — water supply and sanitation WTP — water treatment plant WWTP — wastewater treatment plant

WEIGHTS AND MEASURES

ha — hectare kL — Kilo litre km — kilometer lpcd — liters per capita per day Mld — million liters per day m — Meter m2 — square meter

I

I. EXECUTIVE SUMMARY

1. Introduction: The $0.75 million Karnataka Integrated Urban Water Management Investment Program (KIUWMIP, the Program) was initiated by the Asian Development Bank (ADB) with the Government of India (GoI) on Dec 30th 2014 with aims to improve water resource management in urban areas in a holistic and sustainable manner consistent with the principles of Integrated Water Resources Management (IWRM). Investment support is being provided to modernize and expand urban water supply and sanitation (UWSS), and strengthen institutions to improve water use efficiency, productivity, and sustainability. Assistance under the first phase will be used to expand and upgrade water supply and sanitation infrastructure in three towns - Byadagi, Davanagere, and Harihara. The project will also improve water resource planning, monitoring, and service delivery. Projects 2 and 3 activities are being selected based on (i) IWRM improvements impact on the State‘s water resources, (ii) ULBs reform willingness, and on (iii) infrastructure gaps

1. Sub Project Description: The entire scheme for implementing 24 x 7 water supply of Davanagere City has been divided under two Sub projects i.e. 1) Improvement of Bulk Water Supply System up to WTP and 2) Improvement of Clear Water Transmission Main and 24X7 Distribution System. The Present DDR is for the Improvement of water supply distribution network which includes laying of clear water transmission main from WTPs (Bathi and Kundwada) to OHTs of Davanagere city, construction of 19 OHTs, laying of 1163 KMs of water supply distribution network. Rehabilitation of Civil, Mechanical and Electrical works of three existing WTPs and 30 reservoirs. It also includes providing of 97587 House Service Connections. 2.

Table 1: Proposed Components under Water Supply Distribution subproject in Davanagere Infrastructure Function Description Location Clear water To cater to the Providing and From WTPs (Bathi and transmission main water supply laying of 59.7 KM of Kundwada) to OHTs of demand of pipeline Davanagere city Davanagere City Corporation OHTs To cater to the 19 Nos Devarajurs Layout water supply S.M Krishna nagar demand of Yaragunta Davanagere City Basaveshwarnagar Corporation Hosakundawad K V Shetty Park (ELSR) Avaragere Anjaneya Layout(Anjaneya mill) Subramanyanagar Bashanagar Shekarappa Nagar Azad Nagar Taluka Office K B Extension Nittavalli SSM Layout

II

Infrastructure Function Description Location Karur Sir.M.Vishweswariah park

Distribution network To cater to the 1163 KMs Davanagere city water supply demand of Davanagere City Corporation House service To cater water 97589 Davanagere city connections supply to individual households Rehabilitation works Rehabilitation to Civil, Mechanical Three Nos of existing existing retained and Electrical WTPs and 30 No of assets/ structures rehabilitation works réservoirs

3. Land Acquisition and Resettlement in project: The site verification reveals that all the components of the water supply distribution network sub projects are located on vacant government land and ROW. There is no land acquisition under the proposed subproject. The engineering designs adopted ensure that routing of pipelines and mains within the public ROW‘s are through stretches where the roads are wide and will allow for construction with little or no impact on structures alongside

4. Temporary Resettlement Impact: Public consultation and discussions with the consultant reveal that full closure of roads is not envisaged and it will be possible to maintain access to shops and businesses at all times. The site verification reveals that all the components of the water supply and distribution sub projects are either located on vacant government land or along the existing right-of-way (RoW) outside and within the city.

5. Consultation and Disclosure: Goals and objectives of the project have been disclosed to stakeholders (beneficiaries, affected persons, elected representatives and institutional stakeholders) through consultation meetings and focus group discussions. A program of continuous consultation and disclosure is proposed.

6. Conclusion: ADB‘s criteria (ADB‘s Safeguard Policy Statement, 2009) for screening and categorization of projects for involuntary resettlement will be adopted for the projects. Based on the assessment, the subproject has been categorized as ―C‖ for Involuntary Resettlement (IR) impact. Efforts have been made during the preparation of the engineering design to avoid acquisition of land and other assets and to reduce negative socioeconomic impact. Economic displacement resulting from partial closure of roads during construction is avoidable and manageable through good implementation of the EMP. It is anticipated that there will be no permanent or temporary impact either through acquisition (no acquisition) or construction. Based on the above assessments the subproject has been categorized as ―C‖ for Involuntary Resettlement (IR) impact as per the ADB‘s Safeguard Policy Statement, 2009 Hence no Resettlement Plan needs to be prepared for this sub project.

III

Water supply Distribution net work Davanagere

1

I. PROJECT DESCRIPTION

A. Introduction

2. ADB is helping the Indian state of Karnataka improve water resources management in selected urban areas of the Upper Tunga Bhadra sub-basin. Water supply and waste water systems suffer from under-investment throughout the state of Karnataka. Current water supply is intermittent. The absence of scientific wastewater treatment and sewerage systems contaminates ground water posing a health risk to the public. If the issues associated with the poor water management in the state are not resolved, the state‘s economic growth will be stunted; public health will be deteriorated; and water resource disputes will be escalated.

3. The $0.75 million Karnataka Integrated Urban Water Management Investment Program (KIUWMIP, the Program) was initiated by the Asian Development Bank (ADB) with the Government of India (GoI) on Dec 30th 2014 with aims to improve water resource management in urban areas in a holistic and sustainable manner consistent with the principles of Integrated Water Resources Management (IWRM). Investment support is being provided to modernize and expand urban water supply and sanitation (UWSS), and strengthen institutions to improve water use efficiency, productivity, and sustainability. Assistance under the first phase will be used to expand and upgrade water supply and

Davang

Map 1: Location of Davanagere in Karnataka, India

sanitation infrastructure in three towns - Byadagi, Davanagere, and Harihara. The project will also improve water resource planning, monitoring, and service delivery. Projects 2 and 3 activities are being selected based on (i) IWRM improvements impact on the State‘s water resources, (ii) ULBs reform willingness, and on (iii) infrastructure gaps.

2

4. Davanagere is a city in the Indian state of Karnataka. Positioned at the geographical centre of the state, it is the administrative headquarters of the . As of the 2011 census, Davanagere city had a population of 4, 35,125. Males constitute 52% of the population, and females 48%. Projected population for the year 2031 is 6, 94,302 and 9,21,715 by 20146. Davanagere is situated in the Tungabhadra Basin. The northeastern and southeastern part of the city drains towards north, through Bettur Nalla, whereas the western and southwestern part drains towards west, through Bathi Tank. The ground levels vary from maximum of 622.72 m at the TV station, to a low level of 561.40 m near the existing STP. River Tungabhadra is the only source of water for the town.

5. Davanagere city has four water supply schemes namely (i) Old Tungabhadra River Water Supply System, (ii) New Tungabhadra River Water Supply System, (iii) Bhadra Harihar Branch Canal Water Supply System and (iv) Kundawada Water Supply System. Presently only 80 MLD water is available to the Davanagere city from River Tungabhadra. It is assessed that there is a deficit of 9 MLD of water currently which will rise to 40 and 77 MLD in the years 2031 and 2046 respectively. Hence it can be concluded that the city requires a comprehensive water supply system to cater to this demand.

B. General Information about the existing water supply scheme in Davanagere:

Present Water Supply in MLD 79 MLD Intake Well & Jack well Intake Well RCC Diameter 4 m, Jack Well RCC Diameter 10 m Connecting pipe line 2 Rows of 1200 RCC pipe Existing Raw Water Pumping Main  Tungabhadra Stage II (Scheme-1)- 900 mm diameter MS & PSC pipe of length 13.3 Km.  Tungabhadra Stage II (Scheme-2)- 700 mm diameter DI(K9) pipe of length 13.0 Km. Raw Water Pumping Machineries  Tungabhadra Stage II (Scheme-1) - 2W +1S 500 HP Vertical Turbine Pump.  Tungabhadra Stage II (Scheme-2) - 1W +1S 1000 HP Vertical Turbine Pump. Present Treatment Plant Capacity  WTP at Bathi- 60 MLD.  WTP at Kundwada- 20 LD  WTP at TV station- 19 MLD Clear Water Pumping main  900mm dia MS pipe for a length of about 600mt Break Pressure Tank  15LL capacity at Bathi Hill top Clear water gravity main  Around 20.5km length with diameter varying from 1016 to 200mm Storage Reservoirs  33 nos OHTs and 1 no of GLSR Distribution Network  Around 550km length with diameter varying from 90mm to 300mm

C. Proposed Sub Project Components

6. To optimally utilize the assets created under Tungabhadra Stage II scheme, the Asian Development Bank (ADB) assisted Karnataka Integrated Urban Water Management Investment Program (KIUWMIP) seeks to improve the urban water supply and sanitation in

3

Davanagere. The entire scheme for implementing a 24 x 7 water supply of Davanagere City has been divided into sub projects i.e. 1) Improvement of Bulk Water Supply System up to WTP and 2) Water Distribution.

7. This Due Diligence report (DDR) is prepared for the subproject of the Water Supply network in the town of Davanagere. It is based on detailed designs developed and ADB‘s Safeguard Policy Statement 2009, and the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Act 30 of 2013).

8. Under the present scheme, laying of clear water transmission main from WTPs (Bathi and Kundwada) to OHTs of Davanagere city, construction of 19 OHTs, laying of 1163 KMs of water supply distribution network. Rehabilitation of Civil, Mechanical and Electrical works of three existing WTPs and 30 reservoirs. It also includes providing of 97587 water supply House Service Connections.

Map 2: Davanagere water supply Distribution Network alignment

9. The Urban Local Body (ULB) of Davanagere is the statutory entity responsible for providing water and managing water supply services to the people. At present Laying of Raw Water Pumping Main to WTP at Bathi & to Kundawada Lake from "Y" Junction, Installation of New Vertical Turbine, Centrifugal Pump sets, Construction of 15 LL CWSR and Filter House (20 MLD) in Davanagere City Corporation are in progress under NKUSIP

4

(a project that has been integrated into KIUWMIP). Table 1 describes proposed sub project component as per design.

Table 1: Proposed Components under Water Supply subproject in Davanagere

Infrastructure Function Description Location Clear water To cater to the Providing and From WTPs (Bathi and transmission main water supply laying of 59.7 KM of Kundwada) to OHTs of demand of pipeline Davanagere city Davanagere City Corporation OHTs To cater to the 19 Nos Devarajurs Layout water supply S.M Krishna nagar demand of Yaragunta Davanagere City Basaveshwarnagar Corporation Hosakundawad K V Shetty Park (ELSR) Avaragere Anjaneya Layout(Anjaneya mill) Subramanyanagar Bashanagar Shekarappa Nagar Azad Nagar Taluka Office K B Extension Nittavalli SSM Layout Karur Sir.M.Vishweswariah park

Distribution network To cater to the 1163 KMs Davanagere city water supply demand of Davanagere City Corporation House service To cater water 97589 Davanagere city connections supply to individual households Rehabilitation works Rehabilitation to Civil, Mechanical Three No of WTPs and existing retained and electrical 30 No of réservoirs assets/ structures rehabilitation works

5

Table 2: Pictures of Sites

Proposed OHT site Old Kundawada

Proposed site for construction of OHT at Yeragunta in the existing OHT site

Proposed site for construction of OHT at Anjaneya Proposed site for construction of OHT at Cotton Mill Hosakundawada in the existing OHT site

Proposed site for construction of OHT at Subrahmanya Proposed site for construction of OHT at Nittavalli in the Nagar existing OHT site

6

Proposed site for construction of OHT in SSM Layout

Proposed site for construction of OHT in Old Taluk Office in the existing OHT site.

Proposed site for construction of OHT in Avaragere in the existing OHT site

Proposed site for construction of OHT in Shekarappa Nagar in the existing OHT site

Proposed site for construction of OHT in Devaraj Uras Proposed site for construction of OHT in Karur Layout

7

Proposed site for construction of OHT in S M Proposed site for construction of OHT in Krishna Nagar Basha Nagar

Proposed site for construction of OHT in K B Proposed site for construction of OHT in Azad Extension Nagar

Proposed site for construction of OHT in Sri. M. Proposed site for construction of OHT in K. V Vishwesharaiah Park Shetty Park

8

Table 3: Proposed Water Supply Distribution Network Components: Davanagere

SL.No. Infrastructure Function Description Location Resettlement Impact

1 Clear water To cater to the Providing and laying of From WTPs (Bathi and No IR impact – Laying of clear transmission main water supply 59.7 KM of pipeline Kundwada) to OHTs of water main in the ROW. demand of Davanagere city Davanagere City Corporation

2 OHTs To cater to the 19 Nos Devarajurs Layout All 19 proposed OHTs will be water supply S.M Krishna nagar constructed in ULB land or demand of Yaragunta Government land. No temporary Davanagere City Basaveshwarnagar displacement during construction Corporation Hosakundawad K V Shetty Park (ELSR) of 19 OHTs and no IR impact Avaragere envisaged. Anjaneya Layout(Anjaneya mill) Subramanyanagar Bashanagar Shekarappa Nagar Azad Nagar Taluka Office K B Extension Nittavalli SSM Layout Karur Sir.M.Vishweswariah park

3 Distribution network To cater to the 1163 KMs Davanagere city No IR impact – Laying of water supply distribution network pipelines in demand of Davanagere City the ROW. Corporation

9

SL.No. Infrastructure Function Description Location Resettlement Impact

4 House service To cater water 97589 Davanagere city No IR impact connections supply to individual households 5 Rehabilitation works Rehabilitation to Civil, Mechanical and Three No of WTPs and 30 No No IR impact- Rehabilitation work existing retained electrical rehabilitation of réservoirs within the existing structures assets/ structures works

10

II. SCOPE OF LAND ACQUISITION AND RESETTLEMENT IMPACT

10. The Government of Karnataka understands that construction based improvements are always associated with some resettlement impacts which may be temporary or permanent in nature. Therefore, required assessments have been undertaken for early identification of these impacts to help identify solutions for mitigating these impacts to a maximum extent. Redesigning, change in site locations/alignments and adopting technology which helps minimize impact levels are some of the ways adapted to ensure minimal resettlement impacts. Efforts have been made especially to ensure that there is i) no land acquisition; ii) no demolition of structures; and iii) no displacement of people due to this project. However the following potential short-term temporary impacts may be anticipated during construction: i. Livelihood: loss of customers visiting shops due to reduced access, difficulty in bringing in supplies to shops, shifting and/or reduced access for street vendors and hawkers, reduced space for daily markets that are set up along the road sides, reduced opportunity for local employment (tyre puncture repairs, etc) ii. Accessibility: Pedestrians and vehicular traffic will face difficulty, decrease in access to shops and markets for local population, increase in travel time. iii. Others: degradation of road, damage of other utilities during construction that may impact service levels temporarily

11. In order to identify the adverse social impact of the project a joint site visit was carried out by ULB engineers, resettlement specialist and design engineer of the consultant team between the 1st and 30th September 2016 along the alignment of the sub project.

12. The site verification reveals that all the components of the water supply distribution network sub projects are located on vacant government land and the raw water mains are along public roads on the outskirts of the town with little/ no development/ structures along them.

13. There is no land acquisition under the proposed subproject. The subproject components will be located in properties held by the ULB and in public ROWs of existing roads. The engineering designs adopted ensure that routing of pipelines and mains within the public ROW‘s are through stretches where the roads are wide and will allow for construction with little or no impact on structures alongside

. 14. The impacts envisaged for construction works within the ROW are limited to the following: (i) limited mobility and access to business activities during construction. These impacts will be further avoided and managed through good implementation of Environmental Management Plan (EMP)

15. The location of the OHTs proposed under this subproject and status of land ownership and involuntary resettlement impact are presented in the table below.

11

Table 5: Location of OHTs, land ownership and IR impact Sl Zone Name Purpose for IR impact No Zone No Location land ownership required 1 Devarajurs Municipal Park Nil Construction 1 B Layout adjacent to existing Govt. land of OHT OHT 2 S.M Krishna Municipal Park Nil Construction 2 B nagar adjacent to existing Govt. land of OHT OHT 3 yaragunta Open space Govt. land Nil Construction 3 B adjacent to existing of OHT OHT 4 Basaveshwarnag Halle Kundwad Construction Govt. land Nil ar 4 B open space of OHT adjacent to govt school 5 Hosakundawad Open space Construction Govt. land Nil 6 B adjacent to existing of OHT OHT 6 K V Shetty Park Municipal Park Construction Govt. land Nil 9 B (ELSR) adjacent to existing of OHT OHT 7 Avaragere Municipal Park Construction Govt. land Nil 14 B adjacent to existing of OHT OHT 8 Anjaneya Construction Govt. land Nil Layout(Anjaneya 15 Within Govt School of OHT (Education mill) premise department ) 9 Subramanyanag Municipal Park Construction Govt. land Nil 17 B ar adjacent to existing of OHT OHT 10 Bashanagar Municipal Park Construction Govt. land Nil 19 B adjacent to existing of OHT OHT 11 Shekarappa Municipal Park Construction Govt. land Nil 20 B Nagar adjacent to existing of OHT OHT 12 Azad Nagar Municipal Park Construction Govt. Nil 22 B adjacent to existing of OHT OHT 13 Taluka Office Adjacent to existing Construction Govt. land Nil 25 B OHT in Taluk office of OHT compound 14 K B Extension Municipal Park Construction Govt. land Nil 27 B adjacent to existing of OHT OHT 15 28 A Nittavalli Municipal Park Construction Govt. land Nil

12

Sl Zone Name Purpose for IR impact No Zone No Location land ownership required adjacent to existing of OHT OHT 16 Municipal Park Construction Govt. land Nil 28 B adjacent to existing of OHT OHT 17 SSM Layout Newly formed Construction ULB land Nil 30 layout beside ring of OHT road 18 31 Karur Within the premise Construction Govt. land Nil of DC office of OHT 19 Sir.M.Vishweswa Municipal Park Construction Govt. land Nil 32 B riah park adjacent to existing of OHT OHT

16. The ownership certificate issued by Davanagere CMC commissioner shows that all the lands earmarked for construction of 19 OHTs are currently in the possession of Davanagere ULB. Ownership certificate issued by CMC commissioner is attached as Appendix 2 of this report. 17. The following table explains the details of ROW where water supply distribution network pipelines will be laid. Details of ROW:

Sl. No Name of the Road ROW (M) Diameter of Required IR impact the pipe to trench width be laid(MM) 1 P B Road near Vani 16 1000 1.5 Nil Honda show room 2 Clock tower Road 12 300 0.6 Nil 3 BIET Road 10 75 0.6 Nil 4 Court Road 11 75 0.6 Nil 5 Devaraj Uras Road 8 200 0.6 Nil 6 Anjaneya Layout 8 200 0.6 Nil 7 Anjaneya temple 10 200 0.6 Nil Road 8 Arts college Road 13.5 75 0.6 Nil 9 Road 9 1000 1.5 Nil 10 K R Market Road 6 160 0.6 Nil 11 K R Market 6 300 and 75 0.6 Nil 12 K R Market 14 350 0.65 Nil 13 Devaraj Uras Layout 7 75 0.6 Nil 14 Bada cross service 12 200 0.6 Nil Road 15 Mandipete Road 10 75 0.6 Nil 16 Vasanth Talkies 10 300 0.6 Nil Road 17 Shekarappa Nagar 10 75 0.6 Nil

13

18 S S Hospital 15 300 0.6 Nil 19 MCC block 10 75 0.6 Nil 20 Kuvempu Nagar 7 75 0.6 Nil 21 Siddaveerappa 7 75 0.6 Nil Layout 22 Banashankari 8 75 0.6 Nil Nagara 23 Shiva Parvathi 9 75 0.6 Nil Temple Road 24 Vidhya Nagar Main 12 140 0.6 Nil Road 25 Shamnur Road 12 300 0.6 Nil 26 Vidhya Nagar 10 700 1.2 Nil Service Road 27 P B Road Near GMIT 15 1000 1.5 Nil College 28 Doddabathi Road 15 1000 1.5 Nil 29 Shamnur Road 15 700 and 125 1.2 and 0.6 Nil 30 Basavanagouda 10 700 and 300 1.2 and 0.6 Nil Layout Road

D. Resettlement Framework

18. The resettlement framework (RF) prepared for KIUWMIP is based on the Land Acquisition Act (Karnataka), amended in 1988, ADB‘s SPS of 2009, the National Rehabilitation and Resettlement Policy (NRRP) of the Government of India, 2007 and The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (Act 30 of 2013) and adopts the following resettlement principles:

(i) resettlement impacts of each sub-project will be avoided or minimized, exploring all viable alternative sub-project designs; (ii) where the resettlement impacts are unavoidable, the APs should be assisted in improving or at least regaining their standard of living; (iii) the APs will be involved in the sub-project preparation planning and implementation and resettlement information will be disclosed to all of them; (iv) vulnerable groups including households headed by women, the elderly or disabled, and indigenous groups and those without legal title to land and property and those living below poverty line (BPL) will be given special assistance to facilitate them improve their socio-economic status; (v) The absence of formal title to land is not a bar to policy entitlements. (vi) compensation for all lost assets acquired or affected is based on the principle of replacement cost; (vii) restoration of livelihoods and residences of the APs will be assisted with adequate resources with time bound action plan in coordination with Civil works; (viii) APs are to be assisted to integrate economically and socially into host communities where physical displacement takes place, so that adverse impacts on the host communities are minimized and social harmony are promoted. (ix) Opportunities for negotiated land purchase by adopting relevant Government of Karnataka LA Act and government order/Circular will be explored. In such cases

14

of negotiated settlement and land donation Government will engage an independent third party for supervising and validating these procedures as per ADB policy of Safeguard requirement 2 of SPS, para 25; and (x) All payments including compensation for loss of land, assets, structures, trees, income, and common properties will be made prior to physical or economic displacement and commencement of civil construction work.

E. Temporary Impact

19. Census surveys and discussions with the consultant reveal that full closure of roads is not envisaged and it will be possible to maintain access to shops and businesses. Display disruptions are not anticipated to affect livelihoods. The summary of temporary impacts is presented in the table below.

Table 6: Summary of Resettlement Impacts S. Details No. No. 1 Affected structures None 2 Parking disruption (residential and commercial areas) - no. of None affected two wheelers 3 Parking disruption (commercial areas) - no. of three-wheelers None 4 Parking disruption (commercial areas) - no. of hand driven cart None 5 Parking disruption (commercial areas) - no. of matadors None 6 Total temporarily affected hawkers and vendors None 7 Temporarily affected mobile vendors and Hawkers. None 8 Affected immovable businesses None 9 Temporarily affected employees of businesses None Source: Public Consensus/ Public Consultation: Sept 2016 and November 2016

20. Public consensus/ Public consultations in the project area reveal that there is no need for the full closure of roads or the temporary displacement of vendors and hawkers. Opening a trench in one section at a time for pipe-laying is likely to minimize disruptions and impacts. There is scope to minimize impacts on businesses through proper planning and implementation of mitigation measures to a level that will not affect business operation. Hence no major impacts on businesses and their employees are anticipated.

21. The following mitigation measures are proposed to avoid and/or reduce the temporary impacts to businesses during linear pipe laying works. (i) Provision of advance notice to community to shift their merchandise, vending items, and mobile shops at least 30 days prior to construction work. (ii) Conducting awareness campaigns through a media partner, and the project PIU/ULBs. (iii) Maintaining access to shops by providing planks and leaving spaces to avoid disturbance to residents and businesses,

15

(iv) Open pits to be guarded properly for safety reason, especially during day time working period, near road crossings, near school complex, etc. (v) Managing traffic flows as per the traffic management plan prepared by the contractor in coordination with local authorities and communities, (vi) Conducting 60% works at night and 40% during the day, (vii) Limiting period of time for open trenches and (viii) Completing works quickly where large numbers of businesses are located, (ix) avoiding full street closure to the extent possible, (x) Providing employment opportunities to the displaced persons (DPs) during construction works, especially vulnerable DPs, if necessary (xi) Placing telephone hotlines on signs on visible areas to notify in case of emergency (xii) Making the community fully aware of the grievance redress mechanism, (xiii) Providing contact number of responsible persons in the RPMU and ULB offices, and (xiv) Providing assistance to vendors and hawkers in shifting to alternative nearby locations and helping in the reinstallation of their businesses early.

Photographs of the busy roads/ market places:

PB Road near Vani honda show room. Clear water transmission pipeline to be laid. Road Clock tower road, Distribution pipeline to be width- 16m, dia of pipe- 1000mm laid. Road width- 12m, dia of pipe- 300mm

16

BIET road, Distribution pipeline to be laid. Road width- 10m, dia of pipe- 75mm Court road, Distribution pipeline to be laid. Road width- 11m, dia of pipe- 75mm

Anjaneya Layout, Distribution pipeline to be Devarajurs Layout, Distribution pipeline to be laid. Road width- 8m, dia of pipe- 200mm laid. Road width- 8m, dia of pipe- 200mm

17

Arts college roadroad, Distribution pipeline to be laid. Road width- 13.5m, dia of pipe- 75mm Anjaneya temple road, Distribution pipeline to be laid. Road width- 10m, dia of pipe- 200mm

18

Doddabathi near PB road, Clear water transmission pipeline to be laid. Road width- 9m, K R Market road, Distribution pipeline to be dia of pipe- 1000mm laid. Road width- 6m, dia of pipe- 160mm

K R road, Distribution pipeline to be laid. Road width- 14m, dia of pipe- 350mm.

K R road, Distribution pipeline to be laid. Road width- 6m, dia of pipe- 300mm and 75mm dia

19

Devarajurs Layout, Distribution pipeline to be Bada cross service road, Clear water laid. Road width- 7m, dia of pipe- 75mm transmission pipeline to be laid. Road width- 12m, dia of pipe- 200mm

Mandipete Road, Distribution pipeline to be laid. Road width- 10m, dia of pipe- 75mm Vasantha Talkies Road, Distribution pipeline to be laid. Road width- 10m, dia of pipe- 300mm.

20

S S Hospital Road, Distribution pipeline to be ShekarappaNagara, Distribution pipeline to laid. Road width- 15m, dia of pipe- 300mm. be laid. Road width- 10m, dia of pipe- 75mm.

MCC B block,

KuvempuNagara, Distribution pipeline to be laid. Road width- 7m, dia of pipe- 75mm.

Distribution pipeline to be laid. Road width- 10m, dia of pipe- 75mm.

21

Siddaveerappa layout, Distribution pipeline Banashankarinagara, Distribution pipeline to to be laid. Road width- 7m, dia of pipe- 75mm. be laid. Road width- 8m, dia of pipe- 75mm.

Besides Vidyanagara Main road, Distribution pipeline Shiva parvathi temple, Distribution pipeline to to be laid. Road width- 12m, dia of pipe- be laid. Road width- 9m, dia of pipe- 75mm. 140mm.

22

Shamanur, Distribution pipeline to be laid. Road width- 12m, dia of pipe- 300mm.

Vidyanagara Service road, Clear water transmission pipeline to be laid. Road width- 10m, dia of pipe- 700mm

Doddabathi arch, Clear water transmission PB Road road near GMIT college, Clear water pipeline to be laid. Road width- 15m, dia of pipe-

23 transmission pipeline to be laid. Road width- 1000mm 15m, dia of pipe- 1000mm

Basavanagoudabadavane, Clear water Shamanur road, Clear water transmission transmission pipeline to be laid of dia 700mm pipeline to be laid of dia 700mm distribution distribution pipeline of dia 300mm. Road width- pipeline of dia 125mm. Road width- 15m 10m.

III. GENDER IMPACT AND IMPACT ON INDIGENOUS PEOPLE

22. The initial assessment indicates that the project will not significantly affect the women. As far as impact on indigenous people is concerned, no such persons are found to be affected either permanently or temporarily. However, detailed survey will be undertaken during the project implementation by RP implementation NGO to assess gender impact and impact on indigenous people. If such IP families are found to be affected due to involuntary resettlement impact appropriate mitigation measures shall be taken as per the Resettlement Framework.

IV. CONSULTATION, PARTICIPATION AND INFORMATION DISCLOSURE

F. Stakeholders

23. The stakeholders identified for this subproject are:

24

(i) Primary • Local community (residents, educational institutions, commercial and business) impacted due to utilities being built in their habitation or areas of usage • Community (residents, commercial and business) benefiting from the subproject • ULB and other state government departments, Public Health Engineering (PHE), waterworks, telecommunication, electricity, poverty alleviation, etc) • Project Management Unit (PMU) • GoK • GoI • ADB (ii) Secondary • Representatives of community based organizations, civil society groups • Police Department • NGO‘s • Builders

G. Public Consultation

24. The following methodologies have been used to carry out public consultation: (i) Local communities, Individuals affected, traders and local shopkeepers who may be directly affected to be given priority while conducting public consultation. (ii) Walk-through informal group consultations along the proposed water transmission line stretch. (iii) The local communities to be informed through public consultation with briefing on project interventions including its benefits. (iv) The social concerns and suggestions made by the participants to be listed out, discussed and suggestions to be noted for consideration during implementation

25. Formal Consultations were held with standing committee members and officials of Davanagere CMC in August, 2016 to assess the project approach. Project objectives and details were explained to the MLA of Davanagere Assembly constituency, Deputy Commissioner Davanagere and other officers of Davanagere City Corporation on 1st September, 2016.

26. Public consultations through Focus Group Discussions (FGDs) with local residents were also carried out in August 2016 and March 2017

25

Table 7: Pictures of Public Consultation

Consultation with the local Gram Panchayat (Local Public Consultation with the residents of self-Government) Dodda Bathi Yeragunta

Consultation with the residents of Halekundawada

Consultation with the shop- keepers in Old Taluk Office

Consultation with the shop keepers in Dodda Bathi

Consultation in Basha Nagar shop- keepers

26

Consultation with the shops in Court Road Consultation with the residents of Devaraj Uras Davanagere Layout

Consultation with Advocates in Court Road Consultation with the petty shops of Court Road

Consultation with the residents of Vasanth Talkies Consultation with the Auto drivers and shop Road keepers in clock tower Road

Consultation with the shop keepers in Chamrajpet Consultation with the shop keepers in Chamrajper Road Road

27

Consultation with the residents of RMC link Road, Consultation with the residents of Shekarappa K R Road Nagar

Consultation with the shop keepers of Shamanur Consultation with the residents of Shamanur Road Village Road

Consultation with the petty shops of SSHospital Consultation with the residents of Basavanagouda Layout

Consultation with the residents of Avaragere Consultation with the shop keepers of Kuvempu Nagara MCC B Block 27. Several discussions/consultations were held with local residents of the city (mainly those who are living along the project alignment and likely beneficiaries) Following are the comments/suggestions of the participants:

28

(i) The work should be completed within the shortest possible time as people of the project proposed locations are facing a lot of problems due to the absence of the proposed infrastructure at present; (ii) Water Supply connections should be given to all local residents; (iii) The local residents should be informed about the trenching at least one week before. (iv) Employment may be provided to the local skilled and semi-skilled labourers during the construction stage. (v) Inconvenience and traffic disturbances due to construction work in the city should be minimized as far as possible (vi) People are willing to cooperate by all means to implement the project successfully. 28. Public consultation had been conducted extensively to assess the impact of proposed civil work on the livelihood of the people and also to prepare Resettlement Plan (RP). The site verification reveals that all the components of the water supply and distribution sub projects are either located on vacant government land or along the existing right-of-way (RoW) of the city or enroute to villages. 29. Issues discussed in the Public Consultation:  The subproject details have been provided in detail to the people who are involved in public consultation and also asked their suggestions and willingness to complete the proposed civil work.  The inconvenience to approach the shops and residences during construction even after providing access by the contractor was explained to the participants and they expressed that they are willing to bear the inconvenience for a good cause.  People involved in consultation provided their willingness to take up the proposed civil work and also requested to provide water supply connections to their areas in the proposed Bulk water supply.  Suggestions received from the participants in the public consultation: (i) Maintaining access to shops by providing planks and leaving spaces to avoid disturbance to residents and businesses, (ii) Open pits to be guarded properly for safety reason, especially during day time working period, near road crossings, near school complex, etc. (iii) Managing traffic flows as per the traffic management plan prepared by the contractor in coordination with local authorities and communities, (iv) Limiting period of time for open trenches and (v) Completing works quickly where large numbers of businesses are located, (vi) Avoiding full street closure to the extent possible, (vii) Providing employment opportunities to the displaced persons (DPs) during construction works, especially vulnerable DPs, if necessary (viii) Placing telephone hotlines on signs on visible areas to notify in case of emergency (ix) Making the community fully aware of the grievance redress mechanism, (x) Providing contact number of responsible persons in the RPMU and ULB offices, and (xi) Providing assistance to vendors and hawkers in shifting to alternative nearby locations and helping in the reinstallation of their businesses early.

29

V. GRIEVANCE REDRESSAL MECHANISM

30. A project specific Grievance Redress Mechanism (GRM) will be established (in line with Resettlement Framework approved for the program) to receive, evaluate and facilitate concerns of, complaints and grievances of the APs (during project implementation) in relation to project‘s social and environmental performance. The main objective of the GRM will be to provide time bound action and transparent mechanism to resolve social and environment concerns. A project GRM will cover the project‘s towns for all kinds of grievances and will be regarded as an accessible and trusted platform for receiving and facilitating project related complaints and grievances. The multi-tier GRM for the program will have realistic time schedules to address grievances and specific responsible persons identified to address grievances and whom the APs have access to interact easily.

31. Grievance Redress Process. The PMU will maintain a Complaint Cell headed by a designated Grievance Officer at its office. Awareness on grievance redress procedures will be created through a public awareness campaign, with the help of print and electronic media and radio. The resettlement NGO will ensure that vulnerable households are also made aware of the GRM and assured that their grievances to be redressed adequately and in a timely manner.

32. There will be multiple means of registering grievances and complaints: by dropping grievance forms in complaint/ suggestion boxes at accessible locations, or through telephone hotlines, email, post or writing in a complaint registrar book in ULB‘s project office. There will be a complaint registrar book and complaint boxes at the construction site office to enable quick response to grievances/ complaints for urgent matters. The name, address, and contact details of the persons with details of the complaint / grievance, location of problem area, and date of receipt of complaint will be documented. The RPMU‘ social Development/resettlement officer will be responsible at the project level for timely resolution of the environmental and social safeguards issues and registration of grievances, and communication with the aggrieved persons. 33. The Grievance Officer will resolve simple issues and in case of complicated issues, consult/seek the assistance of the Environment/Social Coordinator of the PMU. Grievances not redressed through this process within one month of registration will be brought to the notice of the Project Director, KIUWMIP. The draft Grievance Redress Process will be discussed with the stakeholders at the proposed disclosure workshop.

34. Periodic community meetings with affected communities to understand their concerns and help them through the process of grievance redress (including translation from local dialect/language, recording and registering grievances of non-literate affected persons and explaining the process of grievance redress) will be conducted if required.

30

Figure 1: Grievance Redress Process

Immediate Action Complainants Contractor /PMDCSC Engineer

Not addressed in 7 Days Action within 15 days ULB/ PIU Grievance Addressed

Not addressed in 15 Days Action within 15 days Grievance GRC at Sub Addressed Divisional Level

Not addressed in 15 Days Decision made within 30 days DLIC at District Level

Grievance Addressed

Not addressed

Court of Law

31

VI. INCOME RESTORATION

35. The objective of income restoration is that no AP shall be worse off compared to pre- project status. Income restoration schemes are designed based on the data from a socio- economic survey (SES) conducted during the project preparatory stage. Existing resources in the region as well as skills of the APs, their socioeconomic status and cultural patterns will be considered while formulating income restoration programs.

36. As there is no permanent involuntary resettlement impact in this project income restoration for the vulnerable persons is not considered. If, however, during the detail project design phase, any involuntary resettlement impact due to land acquisition is considered, appropriate action will be taken. During implementation stage (after verification and updating RP by RPMU and consultation with the potential APs), the resettlement NGO under the guidance of RO at ULB level will identify the vulnerable persons eligible for income restoration assistance and conduct consultation for income restoration measures including skill development training or cash assistance to purchase equipment/ tools as desired by the APs. This activity will be included and prescribed in the final RP together with the detailed timeline and dedicated budget.

VII. POLICY FRAMEWORK AND ENTITLEMENT

H. Policy Framework

37. The resettlement principles adopted in this framework recognize the Land Acquisition Act, Karnataka, 1894 (with Amendment Act 68 of 1984), National Resettlement and Rehabilitation Policy, Govt of India as notified in 2007 and the relevant Asian Development Bank‘s (ADB) Safeguards Policy Statement (SPS) of 2009 and Operations Manual F1 (2010) on Involuntary Resettlement (2003). Since the ‗Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013‘ is in place from 2nd January, 2014 the compensation for loss of land has been estimated based the new act.

I. National Policy Framework

(i) to minimize displacement and to promote, as far as possible, non-displacing or least-displacing alternatives; (ii) to ensure adequate rehabilitation package and expeditious implementation of the rehabilitation process with the active participation of the affected families; (iii) to ensure that special care is taken for protecting the rights of the weaker sections of society, especially members of the Scheduled Castes and Scheduled Tribes, and to create obligations on the State for their treatment with concern and sensitivity; (iv) to provide a better standard of living, making concerted efforts for providing sustainable income to the affected families; (v) to integrate rehabilitation concerns into the development planning and implementation process; and

32

(vi) where displacement is on account of land acquisition, to facilitate harmonious relationship between the requiring body and affected families through mutual cooperation.

J. ADB’s Involuntary Resettlement Policy

38. Basic principles of ADB‘s Involuntary Resettlement Policy where involuntary resettlement is unavoidable are noted as below. (i) Involuntary resettlement should be avoided whenever feasible. (ii) Where population displacement is unavoidable, it should be minimized. (iii) All lost assets acquired or displaced will be compensated based on the principle of replacement cost. (iv) Each involuntary resettlement is conceived and executed as part of a development project or program. The displaced persons (DPs) need to be provided with sufficient resources to re-establish their livelihoods and homes with time-bound action plan in synchronization with civil works. (v) The DPs are to be fully informed and consulted in details. (vi) The absence of a formal title to land is not a bar to entitlements. (vii) The Displaced Persons are to be identified and recorded as early as possible to establish their eligibility, through a census, which serves as a cut-off date, and prevents subsequent influx of Encroachers. (viii) Particular attention must be paid to Vulnerable Households including those without legal title to land or other assets; households headed by women; the elderly or disabled; and indigenous groups. Assistance must be provided to help them improve their socio-economic status. (ix) The full resettlement costs are to be included in the project costs and benefits. (x) All payments including compensation for loss of land, assets, structures, trees, income common properties will be made prior to physical or economic displacement and commencement of civil construction work.

39. ADB‘s Safeguard Policy Statement for Involuntary Resettlement does not apply to negotiated settlements, unless failed negotiation leads to compulsory land acquisition by expropriation.1 It also encourages the borrower/ client to acquire land / other assets through negotiated settlement, thereby avoiding lengthy land acquisition procedure and legal battle. However the borrower / client will ensure, through meaningful consultation with the displaced person(s) and those without legal title, adequate and fair price for land / other assets. The borrower/client will have to engage an independent external party to document the negotiation and settlement processes. The borrower/client will agree with ADB on consultation processes, policies, and laws that are applicable to such transactions; third- party validation; mechanisms for calculating the replacement costs of land and other assets affected; and record-keeping requirements. Similar process will be followed for voluntary donation of land where an external independent entity will supervise and document the consultation process and validate the land donation process as per legal requirement.

K. Karnataka Land Acquisition Act

40. The Land Acquisition (KARNATAKA AMENDMENT) Act, 1988 was made to the Karnataka Land Acquisition Act, 1984 with a view to facilitate land acquisition process and make it

1 ADB Policy Paper: Safeguard Policy Statement, June 2009 Safeguard Requirements 2: Involuntary Resettlement

33

more people friendly. A few relevant amendments made to the Karnataka LAA are important to understand the legal requirement in case of Land Acquisition and other ways of facilitating land availability for public purpose. These are in the form of Government Order and Circular and mentioned in brief below. (i) According to the Govt. Order (G.O. No. VAE 26 HAM 2010, Bangalore, dated 13.04.2010) issued on 13th April, 2010 a committee headed by the Deputy Commissioner of the District (DC) can decide the ―Guidance value‖‖ and even pay the land owner for compensation of land an amount up to a maximum of 3 times more than the Guidance Value. Other members of the committee are local Member of Legislative Assembly (MLA), Assistant Commissioner (AC), ULB President and ULB Commissioner. (ii) According to Govt. Circular no. RD 13 BHU.SWA.DHA. 2006 dated 24.02.2006, 50% of the award value for land will have to be submitted by the Requiring Body on the date Section 4(1) notification is served and rest of the full compensation payment to be submitted before Section 6(1) notice is served. There is one year time period for issuance of notification of section 4(1) and section 6(1) and two years between issuing section 6(1) and award of compensation. If award exceeds more than the stipulated two years period the land acquisition process will lapse and fresh LA procedure will have to be initiated (iii) In the Circular No. RGRHCL 05 HSA 2006, dated 16.06.2008, Tehsildar or AC of the district has been duly authorized by DC to purchase land for public purpose. This circular facilitates purchase of private land directly from the people for public purpose. (iv) Dy. Commissioner of the district is empowered to pay a maximum of Rs. 1 crore to an individual. Regional Commissioner of a Region is empowered to pay compensation up to a maximum of Rs 5 crores to an individual. If the compensation amount exceeds Rs 5 crores for an individual, the proposal should go to the Principal Secretary, Land Revenue Deptt., GoK for his approval and ultimately to be approved by the Minister in Charge of the Land Revenue Deptt.

L. The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013’

41. The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 recognizes the need for rehabilitation and resettlement benefits for project affected families. The ADB‘s Safeguard Policy Statement (SPS), 2009 emphasizes ―a process of free, prior, and informed consultation with the affected people at each stage of the project, and particularly during project preparation, to fully identify their views and ascertain their broad community support for the project. Similarly The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act,2013 made the public consultation mandatory (section 5) during the preparation of Social Impact Assessment of all projects.

42. The major differences identified between the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act,2013 and the Resettlement Policy Framework (RPF) approved for the project are the following

34

i. Recognition and establishment of cut-off date to identify the non-titleholders who have no recognizable legal right to the land they are occupying and extending R&R benefits under the project; ii. Compensation at full replacement cost (without depreciation) to replace the lost and other assets; iii. Additional benefits for vulnerable groups

43. As no AP‘s are identified in this project, this gap of new Act with RPF would not have any implication in this subproject. However, the RPF would be revised based on The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013. The Entitlement of Affected Persons as per new act is summarised in table-10

Table 10: Entitlement Matrix Sl. Type of Loss Type of Type of Displaced Person Compensation No. Impact Entitlement 1 Land (Residential / Permanent Owner (s) with legal 1. Cash compensation at replacement value or open market value of agricultural) title/customary rights of land to be land. identified during detailed survey 2. Subsistence cash allowance based on minimum wage rate of Rs 157.34 per head per day: (a) for a period of 6 months if residual land unviable; (b) for a period of 3 months if residual land viable. 3. If displaced household is vulnerable, compensation for entire or part of land is by means of land for land if so desired by HHs, provided land of equal productivity is available. PIU should find out alternate plot of equal productivity in lieu of land lost within close vicinity for the WHH to be provided as security for future. For other vulnerable DPs if equal productive land is not available cash compensation may be alternate option. 4. All fees, taxes and other charges (registration etc) incurred for replacement land will be borne by the project 1.a Residential land, Agricultural Permanent Tenants, Leaseholders and Share 1. Cash assistance based on 3 months‘ income from land; land Croppers 2.Reimbursement for unexpired lease in case of leaseholders; 3. Assistance to find new land/ place to leaseholder; 4. Rehabilitation assistance for tenants categorized as vulnerable (Female/disabled headed, Indigenous persons/ BPLc HH) in form of cash assistance to purchase income generating equipments/ getting skill training of their choice subject to a limit of Rs 40,000.d This provision includes the tenants of the negotiated land settlement. 1.b Permanent Encroachers: titled or non-titled 1.Vulnerable HH will be given cash assistance to purchase income land users who have extended generating tools/ equipment, or , skill development training of their their activities illegally into the choice subject to a limit of Rs 40,000 Government lands 2.Priority to be employed during construction, if do desired 1.c Commercial/ industrial, Temporary Land owner/ occupant/ land users 1.Rental value during period of temporary occupation/ loss of access residential, agricultural land to land; 2.Compensation for lost income during temporary occupation; 2 Structures (Residential/ Permanent Owner(s) of structures to be 1. Replacement value of structure to be calculated at Basic Schedule commercial – such as house, affected by the project (with or of Rates plus cost of labour. shops, barns, garage, without legal status to the land) 2.Where loss of structure is partial and the remaining portion is not outhouse) and other fixed viable for living any more, compensation should be for whole assets (pumps, wells, fences structure; otherwise compensation to be for affected structure only etc) 3.Free transport facility or shifting assistance of Rs 3000 (one-time payment) 4.Registration cost and taxes, associated with new house, if any, will be borne by the project 5. Right to salvage material from existing structure 6.Subsistence allowance in cash @ Rs157.34 per day (for 3 months) based on minimum wage rates‘ for Vulnerable Households 35

Sl. Type of Loss Type of Type of Displaced Person Compensation No. Impact Entitlement 2.a Permanent Leaseholders occupying affected 1.Reimbursement of unexpired lease; structures 2.Free transport facility or shifting assistance of Rs 3000 (one-time payment) 3.Subsistence allowance @Rs157.34 per day (for 3 months) based on minimum wage rates for Vulnerable households; 4.Replacement value of assets created by lessee at Basic Schedule of Rates and cost of labour; 5.Right to salvage material from structure created by lessee; 6. Vulnerable households will be given cash assistance to purchase income generating equipment / tools or getting training of their choice subject to a limit of Rs 40,000 3.a Loss of access to the Permanent Tenants/Leaseholders occupying 1.For tenants, 3 months‘ rental assistance to be provided based on commercial structure within affected structures rental value which DP is currently paying; the subproject area 2.For Leaseholder reimbursement of unexpired lease; 3.Subsistence allowance for 3 months based on minimum wage rates of Rs 157.34 for vulnerable households; 4.Cash assistance for purchase of income generating equipment/ or skill training if they so desire, for vulnerable households 5.Free transport facility or shifting assistance of Rs3000 (one time payment) 6.Right to salvage material from existing structure, if any part thereof is built/extended by the tenant/ lessee 3.b Permanent Squatters/ Encroachers using the 1. All DPs will be given advance intimation of 60 days to shift from affected structure the public land; 2. Free transport facility or shifting assistance of Rs3000 (one time payment); 3. Subsistence allowance for 3 months based on minimum wage rate @ Rs 157.34 for the vulnerable households; 4. Cash assistance for purchase of income generating equipment/ or skill training if they so desire, for vulnerable households 4 Loss of standing crops/ trees Permanent / Owner (titled/untitled) of trees/ 1. Notice will be given to crop/ tree owners to minimize the loss; within subproject area Temporary crops/ : Encroachers cultivating on 2. Cash compensation for lost standing crops and loss of future Govt lands, informal land users harvest (max for 2 yrs) will be paid. Compensation for cash crop will be based on market rate of that harvesting season; 3. Compensation for perennial crops to be calculated as annual net product value multiplied by no. of productive years remaining. For trees, it will be based on the market value of timber in case of timber bearing trees and replacement cost in case of fruit bearing trees 4. For vulnerable households subsistence allowance for one cropping cycle in case of seasonal crop 5. Loss of livelihood/ income Permanent Employees working in commercial 1. Assistance to persons affected due to employer being displaced, 36

Sl. Type of Loss Type of Type of Displaced Person Compensation No. Impact Entitlement establishments based on minimum wage rate for 3 months‘ income 2. Assistance to be linked to project related employment opportunities, if so desire. 5.a Temporary Employees working in commercial 1. Cash compensation equal to duration of wages lost up to 7 days at establishment minimum daily wage rate 5.b Permanent/ Farm/ Agricultural worker 1. Assistance based on minimum wage rate for 3 months. Temporary 2. For vulnerable persons: a.) Cash assistance for purchase of income generating equipment subject to a maximum of Rs 40,000 b) Skill development training, if they so desire, c) Assistance to be linked to project related employment opportunities, if so desire 6 Livelihood / Income Temporary Hawkers/ Vendors, agricultural 1. Cash assistance equivalent to maximum daily income to be paid labourers temporarily affected for the no. of days /weeks of temporary disruption during construction 2. Free transport facility or one time shifting assistance of Rs 3000 will be provided 7 Loss of community / social Permanent Community or local body owning 1 Restoration / replacement and improvement of community facility (such as, cultural the structure/ assets /place or assets, such as water pumps, wells, school, temple, shrines and /religious heritage objects/ object of worship cultural heritage sites place of worship etc) 2 Enhancement of community resources and replacement of likely to be depleted resources 8 Any other loss not identified Unidentified involuntary impacts shall be documented and mitigated based on principle provided in the ADB‘s SPS a Terms used in Entitlement Matrix: Subsistence Allowance is a transitional allowance offered to all DPs whose livelihood will be affected due to subproject and which will be utilized / consumed by DPs. Subsistence allowance will be decided based on minimum wage rate as defined/fixed by Karnataka state (current rate being Rs 157.34). For vulnerable households Subsistence Allowance will be supplemented by income generating/ skill development training. Shifting Assistance will be provided to the DPs to move from the place proposed for acquisition to a new place. The amount of the Shifting Assistance will be decided based upon volume of material/assets to be shifted and distance to new place. ULB may provide free transport facility for this. b Vulnerable households include Women Headed Household (WHH), families belonging to BPL category, disabled headed household, Indigenous people. c BPL- below Poverty line. Poverty line is fixed by The Planning Commission of India as a daily per capita income of Rs 32 in urban area and Rs 25 in rural area. In a revised estimate, The Planning Commission has published poverty line in Karnataka, with reference year of 2004-05, to be determined as per capita monthly income of Rs 417.84 and Rs 588.06 in urban area. d SDO will assist in identifying and purchase of income generating equipment / assets. e Minimum wage rates are fixed by GoK each year comprising basic pay and variable dearness allowance according to Gazette Notification no. KAE 96 LMW 2005 dt 31.07,07. Minimum wage rate for agricultural works has been fixed at Rs 157.34 per day for the year 01.04.2012 to 31.03.2013

37

ANNEXURE 1

VIII. RESETTLEMENT BUDGET

44. Incomes of affected persons if any will be compensated based on replacement value of losses as detailed in the entitlement matrix. The cost of all resettlement related activities if any is an integral part of overall costs. Activities that may need to be carried out as part of short term resettlement plans if any will be part of RPMU‘s Social Safeguard Unit activities.

45. The engineering design and technology adopted for the project indicate that there is no scope for roads to experience full closure. Impacts on access due to partial closure of roads are avoidable and manageable through good implementation of the Environmental Management Plan (EMP). If in the unlikely event during construction it is found that partial closure is creating loss of income to any business, these businesses would be entitled to livelihood assistance. Discussions with engineers reveal that the duration of such an unforeseen event if any will not be for more than 3 days. Currently, there are no businesses affected by this sub project.

IX. INSTITUTIONAL ARRANGEMENTS AND IMPLEMENTATION

M. Existing Institutional Structure and Capacity

46. Karnataka Urban Infrastructure Development and Finance Corporation (KUIDFC) is the nodal executing agency (EA) responsible for implementing KIUWMIP. KUIDFC is a fully owned Government of Karnataka company incorporated under the Companies Act, 1956. KUIDFC will establish a central project management unit (CPMU) and regional project management unit (RPMU) at the district level to facilitate KIUWMIP. The RPMU will assign a special resettlement officer (RO) to manager settlement activities, supervise and monitor activities. This person will be selected based on their experience in handling resettlement activities for similar external aided projects. The PMDSC resettlement specialist and the resettlement NGO will support the assigned resettlement officer at RPMU to manage the resettlement activities of the project.

47. The subproject ULBs are the implementing agency (IA), supported by the project implementing Unit (PIU) to implement subproject components including resettlement activities, if any

N. Implementation

48. The roles and responsibilities of the various Institutions/ organisations are listed below

Table 11: Roles and Responsibilities of Institutions Sl No. Activities Responsible Authority/ Agency Time schedule

1 Conduct RO engaged by PIU (ULB) to convene To continue FGD/Meetings/workshop meetings/ workshop depending on throughout RP during SIA / census survey project requirement. Resettlement NGO preparation and to attend based on requirement implementation phase 2 Disclosure of Final RP, ULB to circulate copies of Draft RP with 15 days particularly final entitlement entitlement packages to all and rehabilitation packages to stakeholders in disclosure meeting, all APs where NGO/CBOs/ people‘s representatives will be present 15 days APs to approve / accept entitlement and rehabilitation measures in the RP

Sl No. Activities Responsible Authority/ Agency Time schedule 3 Approval of Final RP ADB to approve subproject RP 15 days RPMU to arrange for translation and disclosure of final RP among the APs 15 days and stakeholders

RP Implementation stage 4 Grievance Redress RPMU to set up GRC at district level To continue during ULB to convene meeting on receiving RP implementation complaints NGO to coordinate GRC meeting, assist APs, especially the vulnerable, in having access to GRC 5 Monitoring & Reporting ULB will prepare quarterly progress Every quarter reports and ADB compliance reports during RP with cooperation from NGO/ RO and implementation send to RPMU Throughout RP CPMU to report RP activities to ADB implementation RPMU will monitor activities of ULB/ DLRC (for LA payment only), if required

X. IMPLEMENTATION SCHEDULE

49. The detailed design stage started in January 2017, and the construction period will cover 24 months.

50. All the compensation and assistance as per Entitlement Matrix will be completed prior to the start of the civil work at each specific site and/or stretch. Written confirmation is required to be sent by the PMU to ADB stating that all compensation has been paid to affected persons. Construction work can begin only in sites and sections where compensation has been paid.

XI. CONCLUSION

51. ADB‘s criteria (ADB‘s Safeguard Policy Statement, 2009) for screening and categorization of projects for involuntary resettlement will be adopted for the projects. (i) Category A: 200 or more people will be severely affected (physically displaced from housing or losing 10% or more of their productive/income-generating assets). (ii) Category B: Less significant impacts than Category A. (iii) Category C: No person will be affected.

52. Efforts have been made during the preparation of the engineering design to avoid acquisition of land and other assets and to reduce negative socioeconomic impact. Economic displacement resulting from partial closure of roads during construction is avoidable and manageable through good implementation of the EMP. It is anticipated that there will be no permanent or temporary impact either through acquisition (no acquisition) or construction. Based on the above assessment, the subproject has been categorized as ―C‖ for Involuntary Resettlement (IR) impact. Hence no Resettlement Plan needs to be prepared for this sub project.

ANNEXURE 1

Annexure-1 Public Consultations

Name of the ULB: City Corporation Davanagere Water supply subproject: Water supply Distribution Network in order to implement 24X7 water supply in Davanagere City Date: 14.03.2017 to 16.3.2017 Area: Davanagere City

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) 1 Mr. Basavanayappa S/o Satisfied with the Kenchappa chovdavvar, proposed sub Yaragunti. Construction of OHT‘s and project 7337856009 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 2 Mr. Nagaraj S/o Satisfied with the Hanumanthappa proposed sub Yaragunti, W.No-1 project implementation. Construction of OHT‘s and Precautions 9880689787 laying of water supply Yes No should be taken distribution pipe lines. to avoid possible accidents

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) 3 Mr Adiveppa S/o Satisfied with the Kannappa, Halehalli, proposed sub Yeragunti project Construction of OHT‘s and implementation. 9972065344 laying of water supply Yes No Safe work distribution pipe lines. environment should be created. 4 Mr. Parassppa S/o Satisfied with the Devendrappa proposed sub Goneyappar house, project Yaragunti, W.No-1 Construction of OHT‘s and implementation. 7090915711 laying of water supply Yes No Restoration work distribution pipe lines. needs to be completed without delay. 5 Mr. Renuka B, Satisfied with the Anganawadi teache proposed sub Janatha colony, Construction of OHT‘s and project Halekundawada. 9901100619 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis. 6 Mr. Sathish S/o Satisfied with the Manjappa, Janatha proposed sub colony, Halekundawada. project Construction of OHT‘s and implementation. - laying of water supply Yes No Restoration work distribution pipe lines. should be

focused. 41

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) 7 Mr. Basavaraja S/o Satisfied with the Basavanthappa , proposed sub Janatha colony, project Halekundawada. Construction of OHT‘s and implementation. 7259331178 laying of water supply Yes No Restoration work distribution pipe lines. should follow the construction work. 8 Mr Nagappa. N S/o Satisfied with the Sannanagappa. Opp. proposed sub Govt higher Primary Construction of OHT‘s and project school, Halekundawada. 9632028278 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be prioritised. 9 Mr. K.N Kalingappa S/o Satisfied with the Nagapp opp. Govt Govt proposed sub higher Primary school, Construction of OHT‘s and project Halekundawada. 9741749854 laying of water supply Yes No implementation. distribution pipe lines. Priority should be given for restoration work. 10 Mr.Shivappa S/o Satisfied with the Nagappa , opp. Govt proposed sub Govt higher Primary project school, Halekundawada. Construction of OHT‘s and implementation. 9902097271 laying of water supply Yes No Proper distribution pipe lines. restoration work should be

implemented.42

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) 11 Mr Madhu, Press Satisfied with the reporer, Samyuktha proposed sub Karnataka, opp. Govt project Govt higher Primary Construction of OHT‘s and implementation. 9743300772 laying of water supply Yes No school, Halekundawada. Restoration work distribution pipe lines. should be taken up without any delay. 12 Mr Ganesha Kundwad Satisfied with the S/o Virupakshappa, proposed sub Valmiki nilaya Construction of OHT‘s and project Ravindranath Layout, 9964693049 laying of water supply Yes No implementation. New Kundawada. distribution pipe lines. Safety measures should be followed 13 Mr Kariyappa S/o Satisfied with the Nagappa, Hosa proposed sub Kundawada Construction of OHT‘s and project 9663688793 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 14 Mrs. Shashikala, Satisfied with the Angnawadi teacher proposed sub Hoskundwada, Construction of OHT‘s and project Ravindranath layout. 9972474804 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed

15 Mrs. Halamma, Construction of OHT‘s and Satisfied with43 the

7760487159 Yes No Angnawadi Helper, laying of water supply proposed sub

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) Ravindranath layout. distribution pipe lines. project Hoskundwada, implementation. Safety measures should be followed 16 Mrs. Kariyamma W/o Satisfied with the Rangappa. proposed sub Ravindranath layout. Construction of OHT‘s and project Hoskundwada, - laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 17 Mrs. Sharadamma, Satisfied with the Teacher , proposed sub Govt higher primary Construction of OHT‘s and project school Anjaneya 8095550801 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 18 Mrs. Shasikala. H Satisfied with the Teacher, Govt, Higher proposed sub Primary School Anjaneya Construction of OHT‘s and project 9480388770 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 19 Mrs. Uma W/o, Veeraiah, Satisfied with the #1675-173-9, Srinivas Construction of OHT‘s and proposed sub nagar, 9th Crssoss, opp 8095559030 laying of water supply Yes No project

ITI park, road, distribution pipe lines. implementation.44 Davanagere Precautions

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) should be taken to avoid possible accidents 20 Mr. Amith patil, Satisfied with the Siddeshwara medicals, proposed sub #283/4A 4th Main, P.J. Construction of OHT‘s and project Extension, opp. Park, 962016805 laying of water supply Yes No implementation. Davanagere. distribution pipe lines. Restoration work should be focused 21 Mr. Siddesh, Basava Satisfied with the cyber cafe, #283/2, 4th proposed sub Main, P.J. Extension, Construction of OHT‘s and project opp. Vishsweswaraiah 9480169037 laying of water supply Yes No implementation. Park, Davanagere. distribution pipe lines. Priority should be given for restoration work 22 Mr. K.H Srinivas S/o N. Satisfied with the Hanumathappa, 4th proposed sub Cross, #231, old Taluk, project gandhinagara office, Construction of OHT‘s and implementation. 9513031759 laying of water supply Yes No Davanagere. Proper distribution pipe lines. restoration work should be implemented. 23 Mr. Rudresh S/o Satisfied with the Revanasiddappa, 4th proposed sub Cross, old Taluk office, Construction of OHT‘s and project 9738858806 laying of water supply Yes No near Head post office. implementation. distribution pipe lines. Restoration45 work to be completed

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) on priority basis 24 Mr. H. Kotreshappa, S/o Satisfied with the Murgeppa, 4th Cross, old proposed sub Taluk office Near Head project post office, Davanagere Construction of OHT‘s and implementation. 8792313528 laying of water supply Yes No Precautions distribution pipe lines. should be taken to avoid possible accidents 25 Mr. Ramachar S/o late Satisfied with the puruachar, old Taluk proposed sub office near Head post Construction of OHT‘s and project office, Davanagere. 9980171055 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 26 Mr. Nagaraj Shetty , S/o Satisfied with the Late Mukundaiah shetty, proposed sub old taluk office, near Construction of OHT‘s and project head post office, 9986746640 laying of water supply Yes No implementation. Davanager. distribution pipe lines. Restoration work to be completed on priority basis 27 Mrs. C.K Vishalakshi, Satisfied with the W/o late C.N.K Shetty, proposed sub old Taluk office, near Construction of OHT‘s and project Head post office, 9844509451 laying of water supply Yes No implementation. Davanagere. distribution pipe lines. Restoration work should be

focused 46 28 Mr. Junaidkahan, S/o 7349443856 Construction of OHT‘s and Yes No Satisfied with the

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) Saturkahan, Tea Stall, laying of water supply proposed sub Bismillah layout , distribution pipe lines. project Davanagere, Near B.N implementation. Layot park. Proper restoration work should be implemented. 29 Mr. Sirajkhan S/o, Satisfied with the Sabjamsab, Fathe proposed sub Enterprisess, project Bashanagar, Construction of OHT‘s and implementation. 9886827571 laying of water supply Yes No Davanagere. Precautions distribution pipe lines. should be taken to avoid possible accidents 30 Mr. Mohanmmed shariff, Satisfied with the S/o Syed Bashasab, proposed sub S.S.M Nagara, Construction of OHT‘s and project Davanagere. 9008270090 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 31 Mr. Shivashankar S/o Satisfied with the Late Kotrappa, Patyshop proposed sub near Arch, Doddabathi Construction of OHT‘s and project post, Davanagere Taluk 9741812059 laying of water supply Yes No implementation. & Dist., distribution pipe lines. Priority should be given for restoration work

32 Mr. Revanasiddappa, Construction of OHT‘s and Satisfied with47 the

9663344357 Yes No S/o Rudrachar, laying of water supply proposed sub

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) Doddbathi, Davanagere distribution pipe lines. project Taluk and Dist., implementation. Restoration work should be focused 33 Mr . Manjunath S/o Satisfied with the Sangappa, Doddabathi, proposed sub Davanagere (T) & (P), Construction of OHT‘s and project 9980638709 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 34 Mr. Narendra Kumar, S/o Satisfied with the Kotreshappa, Medical proposed sub Store. Doddabathi, Construction of OHT‘s and project Davanagere (T) & (D) 9980727774 laying of water supply Yes No implementation. distribution pipe lines. Priority should be given for restoration work 35 Mr. T.S. Kenchappa. Satisfied with the PDO. Doddabathi, proposed sub Davanagere (T) & (D) Construction of OHT‘s and project 8494833192 8494833192 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 36 Mr. Manohar, C/o Satisfied with the Siddojirao, New GMIT Construction of OHT‘s and proposed sub College, Davanagere. 9035144410 laying of water supply Yes No project

distribution pipe lines. implementation.48 Restoration work

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) to be completed on priority basis 37 Mrs. Lakshimmi, C/o Satisfied with the Maruthi, Near GMIT proposed sub college, Davangere. Construction of OHT‘s and project 9535468238 laying of water supply Yes No implementation. distribution pipe lines. Priority should be given for restoration work 38 Mr. Santhosh S/o Satisfied with the Sommanna, Near GMIT proposed sub College, Davanagere. Construction of OHT‘s and project 9916620016 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 39 Mr. P.R Nagaraj S/o Satisfied with the Rajap, Pisale compound proposed sub 3rd cross, Davanagere. project Construction of OHT‘s and implementation. 9341011163 laying of water supply Yes No Precautions distribution pipe lines. should be taken to avoid possible accidents 40 Mr. Manjunath. S/o Satisfied with the Gurusidappa. 1476/2A proposed sub Jallinagar, 2nd Main, Construction of OHT‘s and project Davanagere. 8277596953 laying of water supply Yes No implementation. distribution pipe lines. Restoration work

should be 49 focused

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) 41 Mr. Chandrappa, S/o Satisfied with the Nithur Basappa. proposed sub Road, Davanagere. Construction of OHT‘s and project 9844255407 laying of water supply Yes No implementation. distribution pipe lines. Priority should be given for restoration work 42 Mr. Shivakumar, J.C S/o Satisfied with the Chandrashekarappa. proposed sub Halekundwads. Construction of OHT‘s and project Davanagere. 9742191661 laying of water supply Yes No implementation. distribution pipe lines. Priority should be given for restoration work 43 Mr. Sayadsulthan, S/o Satisfied with the Sayed Shammsha, proposed sub Telephone office beside Construction of OHT‘s and project Devarj urs layout, 9844111131 laying of water supply Yes No implementation. Davanagere. distribution pipe lines. Restoration work to be completed on priority basis 44 Mr. Ramesh. S S/o Late. Satisfied with the Hanumanthappa. 3423 proposed sub cigateri layout, 3rd Cross, Construction of OHT‘s and project Davanagere. 9844756022 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 45 Mr Mahadevappa. S/o Construction of OHT‘s and Satisfied with the

Late Devendrappa, 9740592890 laying of water supply Yes No proposed 50 sub Budhal distribution pipe lines. project

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) road,Davanagere. implementation. Safety measures should be followed 46 Mr. Sharif S/o Nazeer Satisfied with the Ahmed. MG. Engineering proposed sub works, Court road, Construction of OHT‘s and project Davanagere. 9964051014 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 47 Mr Athef S/o Satisfied with the Mujeebahamed, proposed sub Amaravathi Enterpisess, Construction of OHT‘s and project Court road, Davanagere. 998627270 laying of water supply Yes No implementation. distribution pipe lines. Priority should be given for restoration work 48 Mr. Lingaraj S/o Satisfied with the Bhimappa, S/o Nataraj , proposed sub Public Court opposite, Construction of OHT‘s and project Davanagere. 9448233844 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 49 Mr. Jakithussen S/o Satisfied with the Karim sahib, Shivaji proposed sub nagar, court road, Construction of OHT‘s and project 9449781952 laying of water supply Yes No Davanagere implementation. distribution pipe lines. Precautions51 should be taken

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) to avoid possible accidents 50 Mr. Purashuram, S/o Satisfied with the Hanumanthappa. Court proposed sub Road, Davanagere. Construction of OHT‘s and project 9008452755 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 51 Mr. Sayed Nazir, S/o Satisfied with the Syed Rehaman sahib, proposed sub Court road, Davanager. Construction of OHT‘s and project 9535128470 laying of water supply Yes No implementation. distribution pipe lines. Priority should be given for restoration work 52 Mr. Noorahamed, S/o Satisfied with the Mkihas ahmed, Court proposed sub road, Davanagere Construction of OHT‘s and project 9035633854 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 53 Mr. Ashok. S/o Nagara Satisfied with the sheti, proposed sub Vasantha thalkies , Construction of OHT‘s and project Davanagere. 9620657785 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed

on priority52 basis 54 Mr Prakash S/o 8197870240 Construction of OHT‘s and Yes No Satisfied with the

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) Veerabhadrappa. Opp laying of water supply proposed sub Vasantha Theater , distribution pipe lines. project Davanagere. implementation. Priority should be given for restoration work 55 Mr. N. Nagappa. S/o Satisfied with the Rajappa. Quarters No-8, proposed sub Jali quarteres Construction of OHT‘s and project Davanagere. 9902191539 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 56 Mr Srinivasa S/o Satisfied with the Errappa. S.S layout, proposed sub Davanagere. Construction of OHT‘s and project 9902245916 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 57 Mr. Nagaraj S/o Satisfied with the Hanumanthappa. proposed sub Autostand, Clock Tower, project Davanagere. Construction of OHT‘s and implementation. 8904758481 laying of water supply Yes No Proper distribution pipe lines. restoration work should be implemented. 58 Mr. Virupaksha S/o Construction of OHT‘s and Satisfied with the

Devendrappa. Auto 9743215135 laying of water supply Yes No proposed 53 sub stand clock tower, distribution pipe lines. project

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) Davanagere. implementation. Restoration work should be focused 59 Mr. Jagadesh S/o Satisfied with the Lakshamappa, Auto proposed sub stand, Clock tower, project Davanagere. Construction of OHT‘s and implementation. 99022245996 laying of water supply Yes No Precautions distribution pipe lines. should be taken to avoid possible accidents 60 Mr. Mirajkar textiles, Satisfied with the Madipet, Davanagere proposed sub project 08192 Construction of OHT‘s and laying of water supply Yes No implementation. 233211 distribution pipe lines. Safety measures should be followed 61 Mr. M. Jagadeesh, sri Satisfied with the malakshmi jewelles, proposed sub chama raj pet 081992, Construction of OHT‘s and project Davanagere. 577 001 231445, laying of water supply Yes No implementation. 9844290690 distribution pipe lines. Priority should be given for restoration work 62 Neelamma, W/o Satisfied with the Rammanna, Chamaraj Construction of OHT‘s and proposed sub pet road, Road vendors. laying of water supply Yes No project

Davanagere. distribution pipe lines. implementation.54 Restoration work

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) should be focused 63 Indra W/o Manjunatha, Satisfied with the Road Vendors, proposed sub Chamarajpet, Road, Construction of OHT‘s and project Davanagere. 9741252154 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 64 Mr. Nijaguna swamy, S/o Satisfied with the Bhomalingaya , proposed sub Chamaraj circle., project Davanagere. Construction of OHT‘s and implementation. 9740250110 laying of water supply Yes No Proper distribution pipe lines. restoration work should be implemented. 65 Virupakshappa G.N. S/o Satisfied with the Nanjappa, Chamarajpet, proposed sub Davanagere Construction of OHT‘s and project 9844569075 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 66 Basavaraj S/o Satisfied with the Saranabasappa, proposed sub Vinayaka Weigh Bridge, Construction of OHT‘s and project RMC Linkroad, H,K 97414533067 laying of water supply Yes No implementation. Road, Davanagere. distribution pipe lines. Precautions

should be 55 taken to avoid possible

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) accidents 67 Mr Karthik S/o Mahesh, Satisfied with the Myamthi tradress, K.R. proposed sub Road, Davanagere. project Construction of OHT‘s and implementation. 9066565401 laying of water supply Yes No Proper distribution pipe lines. restoration work should be implemented. 68 Nazi shah timber shed, Satisfied with the K.R.Road, Davanagere. proposed sub Construction of OHT‘s and project 9743020710 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 69 Mr. Maruthi, S/o Satisfied with the Hanumappa pujari, proposed sub Shekrappanagar, party Construction of OHT‘s and project office, Davanagere. 9740457052 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 70 Mr. Kiran R S/o Satisfied with the Armugam, proposed sub Shekarappanagara ―B‘ Construction of OHT‘s and project Block, Davanagere. 8892835296 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be

followed 56 71 Thippeswamy.A S/o 9661837027 Construction of OHT‘s and Yes No Satisfied with the

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) Ajjappa. laying of water supply proposed sub Shekarappanagara, distribution pipe lines. project Davanagere. implementation. Priority should be given for restoration work 72 B.M Ajay kumar, S/o Satisfied with the Manjunatha Shety, proposed sub Shekarappanagara, Construction of OHT‘s and project Davanagere. 9900857851 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 73 Eshwar Rao. Hiremath, Satisfied with the S/o Basavannay proposed sub hiremath, Opp lakshmi Construction of OHT‘s and project plour mill shamnur road, 8861319288 laying of water supply Yes No implementation. Davanagere. distribution pipe lines. Restoration work to be completed on priority basis 74 Ravikumar T. C/o Satisfied with the Tippeswamy opp proposed sub Lakshmi Flour mill, project Shamnur road , Construction of OHT‘s and implementation. 98446475370 laying of water supply Yes No Davanagere Proper distribution pipe lines. restoration work should be implemented. 75 Raghvendra Hotel Construction of OHT‘s and Satisfied with the

Shamnur road, 8095829123 laying of water supply Yes No proposed 57 sub Davanagere. distribution pipe lines. project

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) implementation. Safety measures should be followed 76 D. Manjunatha. Friends Satisfied with the service, Shamnur road, proposed sub Davanagere. Construction of OHT‘s and project 9740011819 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 77 Ganesh S/o Basappa. Satisfied with the Shamnur village, proposed sub Davanagere. project Construction of OHT‘s and implementation. 9620421286 laying of water supply Yes No Proper distribution pipe lines. restoration work should be implemented. 78 Parameshwarapp S/o G. Satisfied with the Shekarappa, proposed sub Shamanur village, Construction of OHT‘s and project Davanagere. 7406941466 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 79 Mr. Manjunath S/o Satisfied with the Basaiah, Shamanur Construction of OHT‘s and proposed sub village, Davanagere. 9901431063 laying of water supply Yes No project

distribution pipe lines. implementation.58 Precautions

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) should be taken to avoid possible accidents 80 Mrs. Vanjakshamma, Satisfied with the W/o Late. Kummarappa, proposed sub near S.S Hospital, Construction of OHT‘s and project Davanagere. 9035607842 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 81 Arjun S/o Ramachandra Satisfied with the rao, R.R food point, near proposed sub SS hospital, Construction of OHT‘s and project Davanagere. 9164235723 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 82 Kenchappa S/o Satisfied with the Pakirappa, proposed sub Near Bada cross, Veena Construction of OHT‘s and project Valkanizing , Davnagere. 9845788942 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 83 Kuberappa. S/o Satisfied with the Gurusidhappa, proposed sub Basavanagowd Construction of OHT‘s and project Badavane , Davanagere 8971178202 laying of water supply Yes No implementation. distribution pipe lines. Restoration work

to be completed59 on priority basis

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) 84 Manjappa S/o Erappa, Satisfied with the Basavanagowd proposed sub Badavane , Davanagere project Construction of OHT‘s and implementation. - laying of water supply Yes No Proper distribution pipe lines. restoration work should be implemented. 85 Rathmamma, W/o Satisfied with the Shivanna, proposed sub Basavanagowd Construction of OHT‘s and project Badavane , Davanagere - laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 86 Manjunath S/o Erasappa Satisfied with the Basavanagowd proposed sub Badavane , Davanagere Construction of OHT‘s and project 9740304757 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 87 Anand S/o Velluswamy, Satisfied with the Basavanagowd proposed sub Badavane , Davanagere project Construction of OHT‘s and implementation. 9740936334 laying of water supply Yes No Proper distribution pipe lines. restoration work should be

implemented.60 88 Manjunatha. R 9916826550 Construction of OHT‘s and Yes No Satisfied with the

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) S/o Parushuram reddy. laying of water supply proposed sub Basavanagowd distribution pipe lines. project Badavane , Davanagere implementation. Restoration work should be focused 89 Igar Jayappa, Satisfied with the Shekarappa Bdavane, proposed sub OHT, Davanagere. project Construction of OHT‘s and implementation. 9731909929 laying of water supply Yes No Precautions distribution pipe lines. should be taken to avoid possible accidents 90 Mallikarjun, S/o Durgana Satisfied with the gowdappa, Avargere proposed sub near OHT , Davanagere. Construction of OHT‘s and project 9481672576 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 91 Shiva Sharanappa, S/o Satisfied with the Ramappa, Avargere near proposed sub OHT, Davanagere. Construction of OHT‘s and project laying of water supply Yes No implementation. distribution pipe lines. Priority should be given for restoration work 92 Mr Gurumurthy, Construction of OHT‘s and Satisfied with the th 2009/197. 17 Cross, 9448428371 laying of water supply Yes No proposed 61 sub Cidyanagar, Davngere. distribution pipe lines. project

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) implementation. Restoration work should be focused 93 Chaman, S/o Ismail Satisfied with the sahib, Vidyanagar, proposed sub Davanagere. Construction of OHT‘s and project 9632105115 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 94 Vijaykumar S/o Satisfied with the Karegowda, proposed sub Banashankari layout , Construction of OHT‘s and project Davanagere. 9844503340 laying of water supply Yes No implementation. distribution pipe lines. Priority should be given for restoration work 95 Umapathi S/o Satisfied with the Somashekarappa, proposed sub Banashankari Badavane, Construction of OHT‘s and project Davanagere. 9916111500 laying of water supply Yes No implementation. distribution pipe lines. Safety measures should be followed 96 Raju S/o Ashok, Mear Satisfied with the old RTO, Kuvempu proposed sub Construction of OHT‘s and project nagar M.C.C ―B‖ Block 8884901610 laying of water supply Yes No Davanagere. implementation. distribution pipe lines. Restoration62 work should be

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) focused 97 Mr. Mahesh G Hiremath. Satisfied with the S/o Gurupadaiha, proposed sub Hiremath, Kuvempu project Construction of OHT‘s and implementation. nagar, M.C.C ‗B‘, 9740769894 laying of water supply Yes No Davanagere. Proper distribution pipe lines. restoration work should be implemented. 98 Mr Anandappa. S.K, Satisfied with the S/o Siddalingapp, proposed sub Kuvempu nagar M.C.C Construction of OHT‘s and project ‗B‘ 9844300446 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 99 Gurumurthy verankar S/o Satisfied with the Kashinath, Kuvempu proposed sub nagar, M.C.C ‗B‘ Block, project Davnagere. Construction of OHT‘s and implementation. 9242905735 laying of water supply Yes No Precautions distribution pipe lines. should be taken to avoid possible accidents 100 Bakesh, Prabath Bakery. Satisfied with the Besides Anjaneya proposed sub Temple, Anjaneya Construction of OHT‘s and project layout, Davanagere. 9902028159 laying of water supply Yes No implementation. distribution pipe lines. Safety measures

should be 63 followed

Proposed Contacted project cause person is the Suggestions for Sl. Name and address of and social Contact No Issues discussed beneficiary of the proposed No the person consulted issue? Yes/ No the proposed project. (If Yes provide project Yes /No details) 101 Mahesh, opp Anjaneya Satisfied with the temple, Anjaneya layout, proposed sub Davanagere. Construction of OHT‘s and project 9448520436 laying of water supply Yes No implementation. distribution pipe lines. Priority should be given for restoration work 102 Ravi , Joshap fast food, Satisfied with the Near BIET college, proposed sub Davanagre. Construction of OHT‘s and project 9448402072 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 103 Sridhar, Near BIET Satisfied with the Collage, Davanagere. proposed sub Construction of OHT‘s and project 9535124339 laying of water supply Yes No implementation. distribution pipe lines. Restoration work to be completed on priority basis 104 G.B Lokesh, Hotel Satisfied with the Jayanth, Near BIET proposed sub College, Davanagere. Construction of OHT‘s and project 9844164673 laying of water supply Yes No implementation. distribution pipe lines. Restoration work should be focused 64

ANNEXURE 2

Annexure-2 Ownership details of land

ANNEXURE 3

ANNEXURE 3: SAMPLE GRIEVANCE REGISTRATION FORM (To be available in & English)

The ______Project welcomes complaints, suggestions, queries, and comments regarding project implementation. We encourage persons with grievance to provide their name and contact information to enable us to get in touch with you for clarification and feedback.

Should you choose to include your personal details but want that information to remain confidential, please inform us by writing/typing *(CONFIDENTIAL)* above your name.

Thank you.

Date Place of Registration Contact Information/Personal Details Name Gender * Male Age * Female Home Address Village/Town District Phone no. E-mail Complaint/Suggestion/Comment/Question – Please provide the details (who, what, where, and how) of your grievance below: If included as attachment/note/letter, please tick here: How do you want us to reach you for feedback or update on your comment/grievance?

FOR OFFICIAL USE ONLY

Registered by: (Name of Official Registering Grievance) Mode of Communication: Note/Letter E-mail Verbal/Telephonic Reviewed by: (Names/Positions of Officials Reviewing Grievance) Action Taken: Whether Action Taken Disclosed:

Means of Disclosure: