Autodesk customer success story PowerChina Engineering Corporation Limited

Customer PowerChina Kunming Engineering Hydropower Engineering Corporation Limited Location Construction in Cloud , Related software and solutions Technology Age Autodesk® Revit® Autodesk® Revit® MEP Autodesk® Navisworks® — Use of BIM Technology in Construction Autodesk® 360 Autodesk® BIM 360™ of Guanyinyan Hydropower Station on Autodesk® BIM 360™ Glue® Jinsha River — Use of BIM Technology in Construction of Guanyinyan Hydropower Station on Jinsha River

The 3D BIM Construction System equipped with Autodesk BIM software fundamentally improves the effectiveness of quality control and is an innovation in the traditional product delivery method. It provides customers with high-quality design products through instant and fast data sharing.

— Cao Yinan Director of Science and Information Department, Director of 3D Design Supervision Department PowerChina Kunming Engineering Corporation Limited

Fig. 1 Layout of Guanyinyan Hydropower Control Project

PowerChina Kunming Engineering Corporation design of roads and bridges, design of industrial Limited (hereinafter referred to as KHIDI) is a large- and civil buildings, design and construction of scale, comprehensive state-owned class A unit geotechnical engineering, budget estimates and for investigation, design and scientific research. budgeting of project, water resource evaluation, KHIDI is mainly involved in the planning, research, security evaluation, geological disaster evaluation, consultation and assessment of domestic and investigation delimitation, and engineering foreign hydropower, water conservation and wind monitoring, etc. power projects, as well as investigation, design, scientific research tests, general contracting, Since 1992, KHIDI has been among China's Top management and supervision of engineering 100 Designers and holds a leading position among projects; investment and operation of hydropower hydropower designers. It also ranks first out of the and wind power projects; design of environment Top 50 Designers in Yunnan Province. In the last protection, design of water and soil conservation, 57 years, KHIDI has surveyed and designed more Autodesk customer success story PowerChina Kunming Engineering Corporation Limited

than 460 hydropower stations and gained valuable productivity and shortened the design cycle, and its The Guanyinyan 3D BIM Construction System, experience in engineering practices; KHIDI now visualized method of creating drawings has been with based extensively on its foundation in has a total staff of 1,600 and a strong technical accepted by owners and construction companies. comprehensive 3D design, uses state-of-the-art workforce. The 3D BIM design method constitutes a revolution cloud service technology to bring design results in hydropower design. However, construction (including 3D BIM models, construction blueprints, Project Overview performed by construction companies is still based notices of design change, contract documents, etc.) The Guanyinyan Hydropower Station on the on paper construction blueprints generated by to mobile devices (iPad, iPhone, Surface, etc.), and Jinsha River, designed by PowerChina Kunming BIM models. This has some limitations, and does is used in the engineering design, construction and Engineering Corporation Limited, is located in the not embody the advantages of 3D design in a management of Guanyinyan Hydropower Station. middle reaches of the Jinsha River - where Huaping comprehensive and in-depth way. Moreover, there County, City (left bank), Yunnan Province is a certain delay in exchange of data between The 3D BIM Construction System equipped with and City, Province (right bank) different parties in the engineering construction Autodesk BIM 360 is a dynamically updating meet -- and is the last of eight cascade hydropower (owners, designers, construction companies, system. The designers update and maintain the stations planned in the middle reaches of the Jinsha supervisors, as well as operation and maintenance BIM, drawings and relevant documents in the cloud River. The hydropower station is at a straight- parties). account promptly according to the latest design line distance of about 220 km from Kunming, results and onsite change notice. The clients can the capital city of Yunnan Province. 5 units are Improving the quality and efficiency of design obtain the latest real-time design results from the installed in the hydropower station, with a unit disclosure to fully and promptly present the design cloud server and update the field construction capacity of 600MW and a total installed capacity of results and intents is one of the important topics information promptly through a network 3000MW. The engineering development function design companies face. On this basis, we have connection. of the hydropower station prioritizes power applied BIM technology heavily, exploiting its value generation and also considers water supply and to the fullest in order to provide better service in flood prevention. After completing the construction construction. We established a comprehensive data of the hydropower station, tourism and reservoir platform where users can have full and in-depth region shipping can be developed, so as to sharing of their designs -- the Guanyingyan 3D BIM promote the coordinated development of the local Construction system. economy, society and environment. Fig. 4 Cloud Service Technology

3D Browsing Solution for Windows System - Autodesk Navisworks The Windows client-side provides a 3D construction Fig. 3 Guanyinyan 3D BIM Construction System simulation scheme,simulation solution for 3D construction. Through photorealistic real-time Solution 3D simulation effect, designers and construction Data exchange - Autodesk BIM 360 operators can fully understand the structure and Autodesk BIM 360 provides a proprietary arrangement of the hydropower station in advance, engineering data transmission channel, by which and grasp the overall layout before the construction the design intents can be transmitted promptly, of each system. This allows them to better Fig. 2 Dam and Power House of Guanyinyan Hydropower effectively and accurately. Traditional design coordinate the construction progress and processes Station changes are performed by sending notices of design so as to ensure high quality and efficiency in the change to the construction sites via fax or Internet, construction of the hydropower station. Project Background and then notifying the other party through phone Users on the Client side can rotate, look around, Construction of a hydropower project is complex calls or emails, or sometimes by providing newly zoom in/out, section, measure and query the system engineering. It features include: large new modified drawings. This type of process leads attributes of the BIM models. These functions numbers of participants, deployment of an entire to a certain delay of information transmission. The can compensate for paper drawings, which lack complex project hub, extensive space and a tight construction drawings sent to the construction the ability of full display, and can also be used construction schedule. In particular, construction sites are for specific regions, i.e., there is a lack of to rapidly search for the required engineering of the main power house involves a large amount connection between different regions or professional information where the drawings are not clear. of concrete casting, coordination among different drawings), and construction operators need to look disciplines and complex working procedures... all up and check different drawings before construction, is one of the keys to controlling the construction thereby increasing the difficulty of construction. quality and progress of the entire hydropower Moreover, human error is not uncommon among station. field construction operators who have to deal with large numbers of drawings and notices of change. In the hydropower industry, 3D design technology It is difficult to update engineering information has been comprehensively applied to the design promptly and wrong versions of drawings are of construction documentation by KHIDI. The sometimes used. All this severely affects the progress Fig. 5 Picture of the Latest Field Construction power of 3D design has improved documentation and quality of construction. Autodesk customer success story PowerChina Kunming Engineering Corporation Limited

Service Platform for Engineering Information Presentation - Secondary The 3D BIM Construction System Development of Navisworks, equipped with Autodesk BIM Supporting IPAD Autodesk Navisworks provides the owners of software instantly updates design construction projects with comprehensive visualized drawings and documents and browsing services for engineering information. enhances the communication With an orientation towards project management by the owner, it provides a 3D simulation of BIM between each engineering engineering models, simulation of construction construction party, all on a single plans of electromechanical equipment, simulation data platform. of actual installation progress of equipment, as well as comparison and analysis between plans Fig. 7 Browse 3D BIM Model on the Client — Zhu Zhigang and actual progress, in order for the owners of the Assistant Chief Design Engineer of projects to completely view the results, plans and Seamless Integration with Autodesk Software Guanyinyan Hydropower Station implementation of engineering construction, as For the construction of the Guanyinyan Hydropower PowerChina Kunming Engineering well as help them monitor engineering construction Station, the 3D BIM Construction System equipped Corporation Limited and make decisions in the future. with Autodesk BIM software allows each party involved in the construction of the hydropower It provides technical support to carry out overall station, including the owner, designer, construction monitoring during engineering construction, operators, supervisors, operation and maintenance solves the drawbacks of traditional engineering personnel, and leaders who are concerned with the construction where the construction effect can construction of the hydropower station to perform only be imagined according to the drawings and continuous elaborate real-time management and the real effect can only be seen after completion of control for the construction of the power houses. engineering construction, and greatly improves the level of comprehensive visualized management of engineering construction. The service modules in this platform mainly include a module for 3D model simulation and query, a module for installation planning of electromechanical equipment, and a Fig. 9 BIM Model of Power Houses of Guanyinyan Hydropower module for 3D simulation and data analysis and Station comparison of actual installation progress.

Fig. 6 Visualized Browsing Through system terminal devices (iPad, iPhone, 3D Browsing Solution for iPad - surface, etc.), the system users can: (1) view, Fig. 10 3D Model of Pipelines of Generating Set Autodesk BIM 360 Glue rotate and section 3D models; (2) view and mark iPad clients are provided with a simulation solution construction plans and system schematics; (3) for 3D construction. 3D BIM models can be roam the power houses to view surrounding browsed through the Glue clients on iPad. The buildings and equipment pipelines; (4) examine browsing interface is simple, and has a game-like the components of buildings and attributes of interface which is easy to operate. iPad’s excellent electromechanical equipment; (5) examine design operating environment provides a smooth roaming notices and contract documents, etc.; (6) view experience for BIM models. site pictures to understand the latest construction progress of the hydropower station. Autodesk customer success story PowerChina Kunming Engineering Corporation Limited

3D BIM Construction System equipped with Autodesk BIM software plays an active role for all The 3D BIM Construction System parties involved in engineering construction. equipped with Autodesk BIM Using this system, designers can express their software takes huge advantage design intent accurately, promptly and effectively, of 3D design. The design intent allowing them to provide high-quality design results to the owners and construction and supervisory of engineers can be expressed parties. more explicitly, visually and quickly, and conflicts among As for construction and supervision parties, past engineering experience shows that during the different professionals in the field construction of a power station, ambiguous design construction greatly reduced. information and untimely transmission of design modifications result in construction operators — Liu zhipeng Fig. 11 Picture of the Latest Field Construction misunderstanding the design information. Frequent BIM Designer and Senior Engineer errors, omissions and risk at the construction PowerChina Kunming Engineering Implementation Results and Evaluation site likewise surface. All this has a major impact Corporation Limited 1) The engineering design results are on construction progress and quality. 3D BIM “informationized”. Traditional engineering design Construction System equipped with Autodesk results are delivered to the owners in the form BIM software, allows construction operators of paper drawings, documents, and the like. to view the 3D models on their mobile devices Summary Construction and supervision personnel also use and clearly understand the layout of equipment, By adopting a series of Autodesk software paper documents on site. The 3D BIM Construction pipelines, etc., as well as view the design change products (including the Revit series, Autodesk System equipped with Autodesk BIM software notices, and the parameters and attributes of each Navisworks series, Autodesk 360 series, etc.) and fundamentally changes the traditional approach. By equipment component. This greatly reduces errors, using state-of-the-art cloud service technology, the using handheld system terminals - mobile electronic omissions and risk, while decreasing rework and Guanyinyan 3D BIM Construction System carries devices such as iPad, iPhone, Surface, etc. - users waste. In all, the following objectives are met: out standardization, integration, networking such as owners, constructors, supervisors, field investment savings, on-time completion and quality and virtualization of engineering construction design representatives, etc. can construct with engineering. management. precision, rapidly search for drawings and relevant information, and check the status of equipment Owners using the 3D BIM Construction System Based on the successful implementation in the installations, etc. equipped with Autodesk BIM software can Guanyinyan Hydropower Station, this system effectively control key procedures in construction, can be promoted and used in other hydropower 2) The cloud server is updated in real time. get a prompt understanding of the engineering construction projects. Moreover, through further Traditionally, changes made to design documents construction progress and improve the level of research and development, the system can also be are performed by sending a notice of the change construction management. applied in the operation and maintenance phases by fax, etc. and then notifying the other party of hydropower stations, in order to realize the total by phone or email, resulting in a certain delay in lifecycle management of hydropower projects and the transmission of the information. The 3D BIM build modern digital hydropower stations. Construction System equipped with Autodesk BIM software fundamentally resolves this problem. The BIM Construction System is a dynamically updating system. Clients can connect to a wireless network, such as Wi-Fi, to obtain the latest real-time design results from the iCloud cloud server. The models and drawings of the equipment on site are always the latest versions. Fig. 12 Dynamic Update of 3D BIM Construction System

Autodesk, Revit, Revit MEP, Navisworks, BIM 360 and BIM 360 Glue are registered trademarks or trademarks of Autodesk, Inc., and/or its subsidiaries and/or affiliates in the USA and/or other countries. All other brand names, product names, or trademarks belong to their respective holders. Autodesk reserves the right to alter product and services offerings, and specifications and pricing at any time without notice, and is not responsible for typographical or graphical errors that may appear in this document. © 2015 Autodesk, Inc. All rights reserved.