Appendix 4 – Listing of Projects

Greater Memphis Regional Freight Plan

Table of Contents

4.1 Project Groupings by Corridors ...... 4-1 4.1.1 Interstate Corridors Project Groupings ...... 4-1 4.1.2 Non-Interstate Corridors Project Groupings ...... 4-5 4.2 Project Groupings by Type ...... 4-12 4.2.1 Interstate Interchanges ...... 4-12 4.2.2 Construction and/ or Widening of Interstates ...... 4-13 4.2.3 Widening and Interchange Improvements/Modifications on Non-Interstate Roads ...... 4-14 4.2.4 Improving Freight Mobility around Memphis International Airport...... 4-17 4.2.5 Intelligent Transportation Systems Projects ...... 4-18

i Greater Memphis Regional Freight Plan

4.1 Project Groupings by Corridors

4.1.1 Interstate Corridors Project Groupings

4.1.1.1 Projects

Project Description Plan/Policy Project Type Estimated Year Estimate Cost Cost Estimate $2017 Cost of Completion ($M) Year Estimate

I-40 Interchange at Canada Road Livability 2040 RTP (Existing New interchange 2017 25 2014 26.2 and Committed) NHS-2002-004 Interchange for I-40 at Chambers Livability 2040 RTP (Existing New interchange 2025 19.6 2014 20.5 Chapel Rd and Committed) Livability #276 Widen from 6 to 8 lanes (I-55 to I-40 Livability 2040 RTP (2017-20 New interchange 2025 51 2017 51.0 interchange along I-240 at Midtown) TIP) Livability #116 Widen from 6-8 Lanes (From Jackson to Livability 2040 RTP (Vision) Interstate 2041+ 32.7 2014 34.3 Chelsea) Livability # 117 widening Widen from 6-8 Lanes (From Chelsea to Livability 2040 RTP (Vision) Interstate 2041+ 49 2014 51.4 SR 300) Livability # 118 widening Widen from 6-8 Lanes (From Covington Livability 2040 RTP (Vision) Interstate 2041+ 56.7 2014 59.4 Rd to I-240) Livability # 158 widening Total 242.8 Source: Memphis MPO, TDOT

4-1 Greater Memphis Regional Freight Plan

4.1.1.2 Interstate 240 Projects

Project Description Plan/Policy Project Type Estimated Year Estimate Cost Estimate Year $2017 Cost of Completion ($M) Estimate

Reconstruct interchange of Airways Livability 2040 RTP (2017-20 Reconstruct 2025 47.5 2017 47.5 Blvd and I-240 TIP) interchange Livability # 48 Widen from 2 to 3 lanes (I-55 to I-240) Livability 2040 RTP (Fiscally Interstate 2025 26.5 2014 27.8 Constrained) widening Livability # 7 Widen from 6 to 8 lanes (I-55 to I-40 Livability 2040 RTP (Fiscally New interchange 2025 51 2014 53.5 interchange along I-240 at Midtown) Constrained) Livability # 116 Widen Lamar Avenue from 6 to 8 lanes TDOT Statewide Multimodal Road widening N/A 9.5 2016 9.7 (Semmes Street to American way Freight Plan across I-240) TDOT W-33 New Bridge on Lamar Avenue Over TDOT IMPROVE Act (Shelby New bridge N/A 3.4 2017 3.4 Ramps from I-240 and SR4 County Projects) Widen ramp to 2 lanes – (NB Ramp to I- Livability 2040 RTP (Vision) Ramp Widening 2041+ 42.3 2014 44.3 55) Livability # 87 Widen from 6 to 8 lanes (Covington Rd Livability 2040 RTP (Vision) Interstate 2041+ 56.7 2014 59.4 to I-240) Livability # 158 widening 245.6 Source: Memphis MPO, TDOT

4-2 Greater Memphis Regional Freight Plan

4.1.1.3 Interstate 55 Projects

Project Description Plan/Policy Project Type Estimated Year Estimate Cost Estimate Year $2017 Cost of Completion ($M) Estimate

Widen from 2 to 3 lanes (I-55 to I-240) Livability 2040 RTP (Fiscally Interstate widening 2025 26.5 2014 27.8 Constrained) Livability # 7 Widen from 6 to 8 lanes (I-55 to I-40 Livability 2040 RTP (2017-20 New interchange 2025 51 2017 51.0 interchange along I-240 at Midtown) TIP) Livability #116 I-55 At Commerce Street (MS) Livability 2040 RTP (Fiscally New interchange 2020 24.4 2014 25.6 Constrained) MS-NHPP-2016-02 Livability # 332. Construct new overpass at Nail Road (I- Livability 2040 RTP (Existing New Overpass 2025 59.3 2014 62.1 69/I-55) and Committed) MS-LSTP-2014-06 Livability # 147 Widen from 4 to 8 lanes and construct Livability 2040 RTP (Fiscally Interstate widening 2020 16.1 2014 16.9 frontage roads (I-55/I-69 – Church Road Constrained) to MS-302) MS-NHPP-2006-01 Livability # 80. Interchange Modification at Crump Livability 2040 RTP (2017-20 Interchange 2020 74.3 2014 77.9 Blvd TIP) improvement TN-NHPP-2014-01 Livability #8 Improve Interchange at I-55 and TDOT Statewide Multimodal Interchange N/A 40.2 2016 40.9 McLemore Ave Freight Plan improvement TDOT W-19 Interchange at Holmes Road Livability 2040 RTP (Vision) New interchange 2041+ 78.4 2014 82.2 Livability # 53 Widen ramp to 2 lanes – (NB Ramp to I- Livability 2040 RTP (Vision) Ramp Widening 2041+ 42.3 2014 44.3 55) Livability # 87 Total 428.7 Source: Memphis MPO, TDOT

4-3 Greater Memphis Regional Freight Plan

4.1.1.4 Projects

Project Description Plan/Policy Project Type Estimated Year Estimate Cost Estimate Year $2017 Cost of Completion ($M) Estimate

Widen from 4 to 8 lanes and construct Livability 2040 RTP (Fiscally Interstate 2020 16.1 2014 16.9 frontage roads (I-55/I-69 – Church Road Constrained) widening to MS-302) MS-NHPP-2006-01 Livability # 80. Construct new overpass at Nail Road (I- Livability 2040 RTP (Existing New Overpass 2025 59.3 2014 62.1 69/I-55) and Committed) MS-LSTP-2014-06 Livability # 147 SR 304 and McIngvale Road Livability 2040 RTP (2017-20 New Interchange 2020 17 2014 17.8 Interchange (Future I-69) TIP) MS-NHPP-2016-02 Livability #333 Construct new interstate (From South Livability 2040 RTP (Fiscally New interstate 2020 58.2 2014 61.0 of SR-388/North Watkins Street to Constrained) construction South of Fite Road) Livability # 151 Construct new interstate (From 0.5 Mile Livability 2040 RTP (Fiscally New interstate 2025 151 2014 158.3 North of Woodstock-Cuba Road to 0.2 Constrained) construction Mile East of US-51) Livability # 152 Construct new interstate (From South Livability 2040 RTP (Fiscally New interstate 2040 121.6 2014 127.4 of Fite Road to 0.5 Miles North of Constrained) construction Woodstock-Cuba Road) Livability # 153 Construct new interstate (from I-69 at TDOT Statewide Multimodal New interstate N/A 959.3 2016 976.5 Memphis to I-155) Freight Plan construction TDOT W-19 TDOT W-44 Total 1,420 Source: Memphis MPO, TDOT

4-4 Greater Memphis Regional Freight Plan

4.1.2 Non-Interstate Corridors Project Groupings

4.1.2.1 Lamar Avenue/US78

Project Description Plan/Policy Project Type Estimated Year Estimate Cost Estimate Year $2017 Cost of Completion ($M) Estimate

Reconstruct and widen from four lanes Livability 2040 RTP (2017- Road widening 2020 42 2014 44.0 to six lanes (divided, State 2020 TIP) Line to South of Shelby Drive) following TN-NHPP-2014-02 a traffic assessment of operations and Livability # 43 infrastructure in the corridor Construct New Interchange (Lamar Ave Livability 2040 RTP (Fiscally New interchange 2020 145.7 2014 152.7 and Shelby Drive) Constrained) Livability # 143 Construct Interchange at Winchester TDOT Statewide Multimodal New interchange N/A 149.2 2016 151.9 Road and Lamar Ave Freight Plan TDOT W-29 Widen from 6 to 8 lanes (Raines Livability 2040 RTP (Fiscally New interchange 2025 116.4 2016 118.5 Road/Perkins Road Interchange to Constrained) Getwell Road/SR-176) Livability # 161 Also TDOT IMPROVE Act (Shelby County Projects) Widen from 5 to 7 lanes (S Parkway to Livability 2040 RTP (Vision) Road widening 2041+ 24.9 2016 25.3 Tresevant St) Livability #259 Modify interchange at Lamar and TDOT Statewide Multimodal Modify 2025 52.3 2016 53.2 Holmes Road Freight Plan interchange TDOT W-28. Livability 2040 RTP (Fiscally Constrained) Livability # 15 Widen 5 to 7 lanes (McLean to S Livability 2040 RTP (Vision) Road widening 2041+ 45.5 2014 47.7 Parkway) Livability# 282 Widen 2 to 5 lanes (Melrose to W Livability 2040 RTP (Vision) Road widening 2041+ 58.1 2014 60.9 Willets) Livability # 179 Source: Memphis MPO, TDOT Total 654.2

4-5 Greater Memphis Regional Freight Plan

4.1.2.2 Airways Boulevard

Project Description Plan/Policy Project Type Estimated Year Estimate Cost Estimate Year $2017 Cost Estimate of Completion ($M)

Reconstruct interchange of Livability 2040 RTP (Fiscally Reconstruct 2025 64.2 2014 67.3 Airways Blvd and I-240 Constrained) interchange Livability # 48 Widen from 5 to 6 lanes (From Livability 2040 RTP (Vision) Road widening 2041+ 20.8 2014 21.8 Lamar to S Parkway) Livability# 241 Widen from 5 to 6 lanes (Young Livability 2040 RTP (Vision) Road widening 2041+ 9.5 2014 10.0 Ave to S. Parkway) Livability# 242 Improve 3,000 feet along Plough- Livability 2040 RTP (2017-2020 Multimodal road 2020 30 2017 30.0 Airways Blvd. south from Brooks TIP) improvements Road and improve 3,000 feet STP-M-2006-04 (includes grade along Winchester east of original Livability # 59 separated at-grade section. The interchange) improvements will provide a grade-separated interchange to replace the existing at-grade condition at the Plough-Airways/ Winchester Rd. intersection. Total 129.0 Source: Memphis MPO, TDOT

4-6 Greater Memphis Regional Freight Plan

4.1.2.3 Winchester Road

Project Description Plan/Policy Project Type Estimated Year Estimate Cost Estimate Year $2017 Cost Estimate of Completion ($M) Construct Interchange at TDOT Statewide Multimodal New interchange N/A 149.2 2016 151.9 Winchester Road and Lamar Ave Freight Plan TDOT W-29 Improve 3,000 feet along Plough- Livability 2040 RTP (2017- Multimodal road 2020 30 2017 30.0 Airways Blvd. south from Brooks 2020 TIP) improvements Road and improve 3,000 feet STP-M-2006-04 (includes grade along Winchester east of original Livability # 59 separated at-grade section. The interchange) improvements will provide a grade-separated interchange to replace the existing at-grade condition at the Plough- Airways/Winchester Rd. intersection. Total 181.9 Source: Memphis MPO, TDOT

4-7 Greater Memphis Regional Freight Plan

4.1.2.4 Shelby Drive

Project Description Plan/Policy Project Type Estimated Year Estimate Cost Estimate Year $2017 Cost Estimate of Completion ($M)

Construct New Interchange Livability 2040 RTP (Fiscally New interchange 2020 145.7 2014 152.7 (Lamar Ave and Shelby Drive) Constrained) Livability # 143 Widen from 2 to 5 lane (S Livability 2040 RTP (Vision) Road widening 2041+ 54.2 2014 56.8 Byhalia to US72) Livability# 132 Widen from 2 to 4 lanes with Livability 2040 RTP (Fiscally Road widening/grade 2025 38.8 2014 40.7 grade separation at rail road Constrained) separation track (Sewanee Rd to Weaver Livability # 60 Rd) Shelby Drive Extension (Paul Livability 2040 RTP (2017-20 Road extension/grade 2025 92 2017 92.0 Lowry Rd to Sewanee Rd) New 4 TIP) separation lane road (divided) with grade Livability # 61 separation at rail crossing

Total 342.2 Source: Memphis MPO, TDOT

4-8 Greater Memphis Regional Freight Plan

4.1.2.5 Holmes Road

Project Description Plan/Policy Project Type Estimated Year Estimate Cost Estimate Year $2017 Cost Estimate of Completion ($M)

Widen from 2 to 5 lanes (Weaver Livability 2040 RTP (Fiscally Road widening 2025 33.7 2014 35.3 Road to Horn Lake Road, along W Constrained) Holmes Road) Livability # 6 Widen 2 to 7 lanes (Malone Road Livability 2040 RTP (Existing and Road widening 2020 N/A 2014 N/A to Lamar Ave) Committed) STP-M-2006-09 Widen from 2 to 5 lanes (From Livability 2040 RTP (Vision) Road widening 2041+ 47.6 2014 49.9 Horns Lake to Tulane) Livability # 44 New Interchange at Holmes Road Livability 2040 RTP (Vision) New interchange 2041+ 78.4 2014 82.2 and I-55. Livability # 53 Widen from 2 to 5 lanes with Livability 2040 RTP (Fiscally Road widening 2040 16.1 2014 16.9 intersection improvements at US Constrained) 61 and Holmes Road. Livability # 31 Widen from 2 to 5 lanes (Tulane Livability 2040 RTP (Vision) Road widening 2041+ 33.8 2014 35.4 Road to Elvis Presley Blvd) Livability # 85 Modify interchange at Lamar and TDOT Statewide Multimodal Modify 2025 52.3 2016 53.2 Holmes Road Freight Plan interchange TDOT W-28. Livability 2040 RTP (Fiscally Constrained) Livability # 15 Widen 2 to 4 lanes (From Kirby TDOT Statewide Multimodal Road widening N/A 8.8 2016 9.0 Pkwy to Riverdale Road ) Freight Plan TDOT W-9 Widen 2 to 4 lanes (From TDOT Statewide Multimodal Road widening N/A 17.9 2016 18.2 Riverdale Road to Hacks Cross Freight Plan Road) TDOT W-10 Widen 2 to 4 lanes (From Hacks TDOT Statewide Multimodal Road widening N/A 31.6 2016 32.2 Cross Road to Reynolds Rd ) Freight Plan

4-9 Greater Memphis Regional Freight Plan

TDOT W-11 Widen 2 to 4 lanes (From TDOT Statewide Multimodal Road widening N/A 24.2 2016 24.6 Reynolds Rd to Byhalia Rd) Freight Plan TDOT W-12 Widen 2 to 4 lanes (From Byhalia TDOT Statewide Multimodal Road widening N/A 3.4 2016 3.5 Rd to US 72) Freight Plan TDOT W-13 Total 360.3 Source: Memphis MPO, TDOT

4-10 Greater Memphis Regional Freight Plan

4.1.2.6 Poplar Avenue/US72/SR57

Project Description Plan/Policy Project Type Estimated Year Estimate Cost Estimate Year $2017 Cost Estimate of Completion ($M)

Widen from 2 to 5 lanes (SR 385 TDOT Statewide Multimodal Road widening N/A 9.5 2016 9.7 to SR 196) Freight Plan TDOT W-40 Widen from 2 to 5 lanes (From SR TDOT Statewide Multimodal Road widening N/A 37.1 2016 37.8 57 at Collierville Arlington Rd to Freight Plan SR196) TDOT W-27 Widen from 5 to 7 lanes (Byhalia Livability 2040 RTP (Vision) Road widening 2041+ 54.2 2014 56.8 Rd to US 78 ) Livability # 253 Widen from 5 to 7 lanes (Bedford Livability 2040 RTP (Vision) New interchange 2041+ 12.6 2014 13.2 Lane to South Houston Levee ) Livability # 251 Widen from 5 to 7 lanes Livability 2040 RTP (Vision) Road widening 2041+ 9.2 2014 9.6 (Ashmont to Forest Hill-Irene) Livability # 255 Widen from 5 to 7 lanes Livability 2040 RTP (Vision) Road widening 2041+ 15.9 2014 16.7 (Brachton to Ashmont) Livability # 254 Widen from 5 to 7 lanes Livability 2040 RTP (Vision) Road widening 2041+ 49 2014 51.4 (Dogwood Rd to Brachton Ave) Livability # 178 Replacement of overhead bridges Livability 2040 RTP (Fiscally Modify 2025 33.9 2014 35.5 (2) Constrained) interchange TN-NHPP-2014-01 New bridge over Cypress Creek TDOT IMPROVE Act (Shelby New bridge N/A 2.2 2016 2.2 County Projects) Total 232.9 Source: Memphis MPO, TDOT

4-11 Greater Memphis Regional Freight Plan

4.2 Project Groupings by Type

4.2.1 Interstate Interchanges

Project Description Plan/Policy Project Type Estimated Year Estimate Estimate $2017 Cost of Completion Cost ($M) Year Estimate

I40 Interchange at Canada Road Livability 2040 RTP (Existing and New interchange 2018 25 2014 26.2 Committed) NHS-2002-004 Interchange for I-40 at Chambers Livability 2040 RTP (Existing and New interchange 2025 19.6 2014 20.5 Chapel Rd Committed) Livability #276 Widen from 6 to 8 lanes (I-55 to I-40 Livability 2040 RTP (Fiscally Constrained) New interchange 2025 58.6 2014 61.4 interchange along I-240 at Midtown) Livability #116 Reconstruct interchange of Airways Livability 2040 RTP (Fiscally Constrained) Reconstruct 2025 64.2 2014 67.3 Blvd and I-240 Livability # 48 interchange SR 304 and McIngvale Road Livability 2040 RTP (2017-20 TIP) New Interchange 2020 17 2017 17.0 Interchange (Future I-69) MS-NHPP-2016-02Livability #333 Interchange at Nail Road and I- Livability 2040 RTP (Fiscally Constrained) New overpass 2025 59.3 2014 62.1 55/69 Livability # 147 I-55 At Commerce Street (MS) Livability 2040 RTP (Fiscally Constrained) New interchange 2020 24.4 2014 25.6 MS-NHPP-2016-02 Livability # 332. Improve Interchange at I-55 and TDOT Statewide Multimodal Freight Plan Interchange N/A 40.2 2016 40.9 McLemore Ave TDOT W-19 improvement Interchange at Holmes Road Livability 2040 RTP (Vision) New interchange 2041+ 78.4 2014 82.2 Livability # 53 Total 403.3 Source: Memphis MPO, TDOT

4-12 Greater Memphis Regional Freight Plan

4.2.2 Construction and/ or Widening of Interstates

Interstate Project Description Plan/Policy Project Type Estimated Year Estimate Estimate $2017 Cost of Completion Cost ($M) Year Estimate

I-40 Widen from 6-8 Lanes (From Livability 2040 RTP (Vision) Interstate 2041+ 32.7 2014 34.3 Jackson to Chelsea) Livability # 117 widening I-40 Widen from 6-8 Lanes (From Livability 2040 RTP (Vision) Interstate 2041+ 49 2014 51.4 Chelsea to SR 300) Livability # 118 widening I-40/I-240 Widen from 6-8 Lanes (From Livability 2040 RTP (Vision) Interstate 2041+ 56.7 2014 59.4 Covington Rd to I-240) Livability # 158 widening I-240 Widen from 2 to 3 lanes (I-55 to I- Livability 2040 RTP (Fiscally Interstate 2025 26.5 2014 27.8 240) Constrained) widening Livability # 7 I-55/69 Widen from 4 to 8 lanes and Livability 2040 RTP (Fiscally Interstate 2020 16.1 2014 16.9 construct frontage roads (I-55/I-69 Constrained) widening – Church Road to MS-302) MS-NHPP-2006-01 Livability # 80. I-69 Construct new interstate (From Livability 2040 RTP (Fiscally New interstate 2020 58.2 2014 61.0 South of SR-388/North Watkins Constrained) construction Street to South of Fite Road) Livability # 151 I-69 Construct new interstate (From 0.5 Livability 2040 RTP (Fiscally New interstate 2025 151 2014 158.3 Mile North of Woodstock-Cuba Constrained) construction Road to 0.2 Mile East of US-51) Livability # 152 I-69 Construct new interstate (From Livability 2040 RTP (Fiscally New interstate 2040 121.6 2014 127.4 South of Fite Road to 0.5 Miles Constrained) construction North of Woodstock-Cuba Road) Livability # 153 I-69 Construct new interstate (from I-69 TDOT Statewide Multimodal New interstate N/A 959.3 2016 976.5 at Memphis to I-155) Freight Plan construction TDOT W-19 TDOT W-44 Total 1,513 Source: Memphis MPO, TDOT

4-13 Greater Memphis Regional Freight Plan

4.2.3 Widening and Interchange Improvements/Modifications on Non-Interstate Roads

Location Project Description Plan/Policy Project Type Estimated Estimat Estimat $2017 Year of e Cost e Year Cost Completio ($M) Estimat n e Lamar Avenue Reconstruct and widen from four lanes to six Livability 2040 RTP (2017-2020 TIP) Road widening 2020 42 2017 42.0 lanes (divided, Mississippi State Line to South TN-NHPP-2014-02 of Shelby Drive) Livability # 43 Lamar Avenue Construct New Interchange (Lamar Ave and Livability 2040 RTP (Fiscally Constrained) New 2020 145.7 2014 152.7 Shelby Drive) Livability # 143 interchange Lamar Avenue Construct Interchange at Winchester Road TDOT Statewide Multimodal Freight Plan New N/A 149.2 2016 151.9 and Lamar Ave TDOT W-29 interchange Lamar Avenue Widen from 6 to 8 lanes (Raines Road/Perkins Livability 2040 RTP (Fiscally Constrained) New 2025 116.4 2014 122.0 Road Interchange to Getwell Road/SR-176) Livability # 161 interchange Also TDOT IMPROVE Act (Shelby County Projects) Lamar Avenue Widen from 5 to 7 lanes (S Parkway to Livability 2040 RTP (Vision) Road widening 2041+ 24.9 2014 26.1 Tresevant St) Livability #259 Lamar Avenue Modify interchange at Lamar and Holmes TDOT Statewide Multimodal Freight Plan Modify 2025 52.3 2016 53.2 Road TDOT W-28. interchange Livability 2040 RTP (Fiscally Constrained) Livability # 15 Lamar Avenue Widen 5 to 7 lanes (McLean to S Parkway) Livability 2040 RTP (Vision) Road widening 2041+ 45.5 2014 47.7 Livability# 282 Lamar Avenue Widen 2 to 5 lanes (Melrose to W Willets) Livability 2040 RTP (Vision) Road widening 2041+ 58.1 2014 60.9 Livability # 179 Winchester Construct Interchange at Winchester Road TDOT Statewide Multimodal Freight Plan New N/A 60.5 2016 61.6 Road and Lamar Ave TDOT W-29 interchange Airways Reconstruct interchange of Airways Blvd and Livability 2040 RTP (Fiscally Constrained) Reconstruct 2025 64.2 2014 67.3 Boulevard I-240 Livability # 48 interchange Airways Widen from 5 to 6 lanes (From Lamar to S Livability 2040 RTP (Vision) Road widening 2041+ 20.8 2014 21.8 Boulevard Parkway) Livability# 241

4-14 Greater Memphis Regional Freight Plan

Airways Widen from 5 to 6 lanes (Young Ave to S. Livability 2040 RTP (Vision) Road widening 2041+ 9.5 2014 10.0 Boulevard Parkway) Livability# 242 Hacks Cross Wide from 2 to 7 lanes (Shelby Drive to TDOT Statewide Multimodal Freight Plan, Road Widening 2025 19.1 2016 19.4 Road Stateline) W-8 Shelby Drive Construct New Interchange (Lamar Ave and Livability 2040 RTP (Fiscally Constrained) New 2020 145.7 2014 152.7 Shelby Drive) Livability # 143 interchange Shelby Drive Widen from 2 to 5 lane (S Byhalia to US72) Livability 2040 RTP (Vision) Road widening 2041+ 54.2 2014 56.8 Livability# 132 Shelby Drive Widen from 2 to 4 lanes with grade Livability 2040 RTP (Fiscally Constrained) Road 2025 38.8 2014 40.7 separation at rail road track (Sewanee Rd to Livability # 60 widening/grad Weaver Rd) e separation

Shelby Drive Shelby Drive Extension (Paul Lowry Rd to Livability 2040 RTP (Fiscally Constrained) Road 2025 92 2014 96.4 Sewanee Rd) New 4 lane road (divided) with Livability # 61 extension/grad grade separation at rail crossing e separation

Holmes Road Widen from 2 to 5 lanes (Weaver Road to Livability 2040 RTP (Fiscally Constrained) Road widening 2025 33.7 2014 35.3 Horn Lake Road, along W Holmes Road) Livability # 6 Holmes Road Widen 2 to 7 lanes (Malone Road to Lamar Livability 2040 RTP (Existing and Road widening 2020 N/A 2014 N/A Ave) Committed) STP-M-2006-09 Holmes Road Widen from 2 to 5 lanes (From Horns Lake to Livability 2040 RTP (Vision) Road widening 2041+ 47.6 2014 49.9 Tulane) Livability # 44 Holmes Road New Interchange at Holmes Road and I-55. Livability 2040 RTP (Vision) New 2041+ 78.4 2014 82.2 Livability # 53 interchange Holmes Road Widen from 2 to 5 lanes with intersection Livability 2040 RTP (Fiscally Constrained) Road widening 2040 16.1 2014 16.9 improvements at US 61 and Holmes Road. Livability # 31

Holmes Road Widen from 2 to 5 lanes (Tulane Road to Elvis Livability 2040 RTP (Vision) Road widening 2041+ 33.8 2014 35.4 Presley Blvd) Livability # 85 Holmes Road Modify interchange at Lamar and Holmes TDOT Statewide Multimodal Freight Plan Modify 2025 52.3 2016 53.2 Road TDOT W-28. interchange Livability 2040 RTP (Fiscally Constrained)

4-15 Greater Memphis Regional Freight Plan

Livability # 15 Holmes Road Widen 2 to 4 lanes (From Kirby Pkwy to TDOT Statewide Multimodal Freight Plan Road widening N/A 8.8 2016 9.0 Riverdale Road ) TDOT W-9 Holmes Road Widen 2 to 4 lanes (From Riverdale Road to TDOT Statewide Multimodal Freight Plan Road widening N/A 17.9 2016 18.2 Hacks Cross Road) TDOT W-10 Holmes Road Widen 2 to 4 lanes (From Hacks Cross Road TDOT Statewide Multimodal Freight Plan Road widening N/A 31.6 2016 32.2 to Reynolds Rd ) TDOT W-11 Holmes Road Widen 2 to 4 lanes (From Reynolds Rd to TDOT Statewide Multimodal Freight Plan Road widening N/A 24.2 2016 24.6 Byhalia Rd) TDOT W-12 Holmes Road Widen 2 to 4 lanes (From Byhalia Rd to US TDOT Statewide Multimodal Freight Plan Road widening N/A 3.4 2016 3.5 72) TDOT W-13 Poplar Avenue Widen from 2 to 5 lanes (SR 385 to SR 196) TDOT Statewide Multimodal Freight Plan Road widening N/A 9.5 2016 9.7 TDOT W-40 Poplar Avenue Widen from 2 to 5 lanes (From SR 57 at TDOT Statewide Multimodal Freight Plan Road widening N/A 37.1 2016 37.8 Collierville Arlington Rd to SR196) TDOT W-27 Poplar Avenue Widen from 5 to 7 lanes (Byhalia Rd to US 78 Livability 2040 RTP (Vision) Road widening 2041+ 54.2 2014 56.8 ) Livability # 253 Poplar Avenue Widen from 5 to 7 lanes (Bedford Lane to Livability 2040 RTP (Vision) New 2041+ 12.6 2014 13.2 South Houston Levee ) Livability # 251 interchange Poplar Avenue Widen from 5 to 7 lanes (Ashmont to Forest Livability 2040 RTP (Vision) Road widening 2041+ 9.2 2014 9.6 Hill-Irene) Livability # 255 Poplar Avenue Widen from 5 to 7 lanes (Brachton to Livability 2040 RTP (Vision) Road widening 2041+ 15.9 2014 16.7 Ashmont) Livability # 254 Poplar Avenue Widen from 5 to 7 lanes (Dogwood Rd to Livability 2040 RTP (Vision) Road widening 2041+ 49 2014 51.4 Brachton Ave) Livability # 178 Poplar Avenue Replacement of overhead bridges (2) Livability 2040 RTP (Fiscally Constrained) Modify 2025 33.9 2014 35.5 TN-NHPP-2014-01 interchange Total 1,774 Source: Memphis MPO, TDOT

4-16 Greater Memphis Regional Freight Plan

4.2.4 Improving Freight Mobility around Memphis International Airport

Project Description Plan/Policy Project Type Estimated Year Estimate Estimate $2017 Cost of Completion Cost ($M) Year Estimate

Reconstruct interchange of Airways Blvd and I-240 Livability 2040 RTP Reconstruct 2025 64.2 2014 67.3 (Fiscally Constrained) interchange Livability # 48 Improve 3,000 feet along Plough-Airways Blvd. south Livability 2040 RTP Multimodal road 2020 26.9 2014 28.2 from Brooks Road and improve 3,000 feet along (Fiscally Constrained) improvements Winchester east of original at-grade section. The STP-M-2006-04 (includes grade improvements will provide a grade-separated Livability # 59 separated interchange to replace the existing at-grade condition interchange) at the Plough-Airways/Winchester Rd. intersection.

Widen from 5 to 6 lanes (From Lamar to S Parkway) Livability 2040 RTP Road widening 2041+ 20.8 2014 21.8 (Vision) Livability# 241 Widen from 5 to 6 lanes (Young Ave to S. Parkway) Livability 2040 RTP Road widening 2041+ 9.5 2014 10.0 (Vision) Livability# 242 Total 127.2 Source: Memphis MPO, TDOT

4-17 Greater Memphis Regional Freight Plan

4.2.5 Intelligent Transportation Systems Projects

ITS Project Project Description Plan/Policy Project Type Estimated Estimate Estimate $2017 Location Year of Cost Year Cost Completion ($M) Estimate SR-385/I-269 ITS expansion on SR-385/I-269 from the I-40 TDOT IMPROVE Act ITS N/A 9 2016 9.2 Southward to the Mississippi State Line (Shelby County Projects) Expansion SR-385/I-269 ITS expansion on SR-385/I-269 from MM7 to TDOT IMPROVE Act ITS N/A 4 2016 4.1 MM15 (Shelby County Projects) Expansion

MS SR 302 Access management study and geometric Livability 2040 RTP Access N/A N/A 2014 N/A improvements/ equipment upgrades at five (Existing and Committed) Management signalized intersections along MS 302 – Southcrest MS-HSIP-2015-02 Parkway, Tchulahoma Road, Getwell Road, Craft Road, and Center Hill Road. Total 13.2 Source: Memphis MPO, TDOT