2015 Invasive Spartina Project Treatment Schedule

Updated: 6/17/15

Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2015? vehicle Broadcast and/or Covering

01a Channel Mouth X

Lower Channel (not including 01b X mouth)

01c Upper Channel X Alameda Flood 1 Control Channel Upper Channel - Union City Blvd to 01d X I-880

01e Strip Marsh No. of Channel Mouth X

01f Pond 3-AFCC X

02a.1a Belmont Slough Mouth X X X

02a.1b Belmont Slough Mouth South X X X

Upper Belmont Slough and 02a.2 X X Redwood Shores

02a.3 Bird Island X X

02a.4 Redwood Shores Mitigation Bank X

02b.1 Corkscrew Slough X X

Steinberger Slough South, 02b.2 X X Redwood Creek Northwest

02c.1a B2 North Quadrant West X X

02c.1b B2 North Quadrant East X

02c.2 B2 North Quadrant South X X

02d.1a B2 South Quadrant West X X

02d.1b B2 South Quadrant East X X

02d.2 B2 South Quadrant (2) X X 2 Bair/Greco Islands

02d.3 B2 South Quadrant (3) X

02e West Point Slough NW X

02f Greco Island North X X

02g West Point Slough SW and East X

02h Greco Island South X X

02i Ravenswood Slough & Mouth X X X

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 1 of 11 2 Bair/Greco Islands

2015 Invasive Spartina Project Treatment Schedule

Ravenswood Open Space Preserve 02j.1 X X (north Hwy 84)

Ravenswood Open Space Preserve 02j.2 X (south Hwy 84)

Redwood Creek and Deepwater 02k X X Slough

02l Inner Bair Island Restoration X

Pond B3 - Middle Bair Island 02m X Restoration

02n SF2 X

02o Central Bair X

03a Blackie's Creek (above bridge) 6/2 (COI) X X 3 Blackie's Pasture 03b Blackie's Creek Mouth 6/2 (COI) X X

Corte Madera Ecological Reserve 04a 6/8 (COI) X X (CMER)

College of Marin Ecology Study 04b 6/5 (COI) X Area

04c Piper Park East 6/3 (COI) X

04d Piper Park West 6/3 (COI) X

04e Larkspur Ferry Landing Area 6/10 (COI) X X

04f Riviera Circle 6/1 (COI) X X

04g Creekside Park 6/22-6/23 X X Corte Madera 4 Creek Complex Upper Corte Madera Creek (Above 6/5 (COI); 6/22- 04h X X Bon Air Road) 23

Lower Corte Madera Creek 04i 6/5 & 6/9 (COI) X X (between Bon Air Rd & HWY 101)

Corte Madera Creek Mouth - North 04j.1 6/10 (COI) X X Bank

Corte Madera Creek Mouth - South 04j.2 X X Bank

04k Boardwalk No. 1 (Arkites) 6/9 (COI) X

No invasive 04l Murphy Creek Spartina 2013 or 2014

05a.1 Mowry Marsh & Slough X X

05a.2 Calaveras Marsh X X X

05b Dumbarton/Audubon X X

05c.1 Newark Slough West X X

05c.2 Newark Slough East X X

Coyote 5 Creek/Mowry 05d LaRiviere Marsh X Complex

05e Mayhew's Landing X

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 2 of 11 Coyote 5 Creek/Mowry Complex 2015 Invasive Spartina Project Treatment Schedule

4 years with no 05f Coyote Creek- Alameda County invasive Spartina (2011-2014)

05g Cargill Pond (W Hotel) X

05h Plummer Creek Mitigation X

05i Island Ponds X

06a Emeryville Crescent East 7/22 X Emeryville 6 Crescent 06b Emeryville Crescent West 7/22; 10/5 (R2) X

07a Oro Loma Marsh-East 9/3-9/4 X X 7 Oro Loma Marsh 07b Oro Loma Marsh-West 9/3-9/4 X X

8 Palo Alto Baylands 8 Palo Alto Baylands X X

No invasive 9 Tiscornia Marsh 9 Tiscornia Marsh Spartina 2015

10a Whittel Marsh 6/1 (COI) X

Point Pinole 10 10b Southern Marsh Marshes 6/1 (COI); 9/2 X X

10c Giant Marsh 9/2 X

Southampton 11 11 Southampton Marsh 5/6 X X Marsh

12a Pier 94 X

12b Pier 98/Heron's Head X

No Invasive 12c India Basin Spartina 2014 No invasive 12d Hunters Point Naval Reserve Spartina 2013 or 2014 Southeast San 12 Franciso 12e Yosemite Channel X

12f Candlestick Cove X

No Invasive 12g Crissy Field Spartina 2014 No Invasive 12h Yerba Buena Island Spartina 2014 No Invasive 12i Mission Creek Spartina 2014

13a Old North Bank X

13b Old Alameda Creek Island X

13c Old Alameda Creek South Bank X

13d Whale's Tail North Fluke X

13e Whale's Tail South Fluke X

13f Cargill Mitigation Marsh X

Whale's Tail 13 Complex

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 3 of 11 2015 Invasive Spartina Project Treatment Schedule

Whale's Tail No Invasive 13 13g Upstream of 20 Tide Gates Complex Spartina 2014

13h Eden Landing-North Creek X

13i Eden Landing-Pond 10 X

13j Eden Landing-Mt Eden Creek X

Eden Landing Reserve South- 13k X North Creek Marsh

Eden Landing Reserve North- Mt 13l X Eden Creek Marsh

Eden Landing - Pond E8A, E9, and 13m 7/23 X X E8X

Charleston Slough to 15a.1 X X Mountainview Slough

15a.2 Stevens Ck to Guadalupe Sl X X

15a.3 Guadalupe Slough X X

15a.4 Alviso Slough X X 15 South Bay Marshes 15a.5 Coyote Creek to Artesian Slough X X

15a.6 Knapp Tract (Pond A6) X

15b Faber/Laumeister Marsh X

15c Shoreline Regional Park X

Cooley Landing 16.1 Cooley Landing Central X X X 16 Salt Pond Restoration 16.2 Cooley Landing East X X X

Alameda Island South (Elsie 17a Roemer Bird Sanctuary, Crown 8/4-8/5 X Memorial State Beach, Crab Cove)

17b Bay Farm Island 8/4-8/5 X

17c.1 Arrowhead Marsh West 9/21-9/22 X X

17c.2 Arrowhead Marsh East WILL NOT BE TREATED IN 2015

MLK Regional Shoreline - Fan 17d.1 7/22-7/23 X Marsh Shoreline

17d.2 Airport Channel - MLK Shoreline 7/22-7/23 X

17d.3 East Creek -MLK Shoreline 7/22-7/23 X

MLK Regional Shoreline-Damon 17d.4 WILL NOT BE TREATED IN 2015 Marsh

Damon Sl/Elmhurst Cr - MLK 17d.5 7/22-7/23 X Shoreline Alameda/ 17 San Leandro Bay 17e.1 San Leandro Creek North 7/22-7/23 X Complex

17e.2 San Leandro Creek South X

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 4 of 11 Alameda/ 17 San Leandro Bay Complex 2015 Invasive Spartina Project Treatment Schedule

17f Oakland Inner Harbor X X

17g Coast Guard Island X

17h MLK New Marsh WILL NOT BE TREATED IN 2015

17i Coliseum Channels X

17j Fan Marsh WILL NOT BE TREATED IN 2015

17k Airport Channel 7/22-7/23 X X

17l Doolittle Pond 7/22-7/23 X

Alameda Island (East: Aeolian 17m 8/4-8/5 X Yacht Club & Eastern Shoreline)

18a Colma Creek X

18b Navigable Slough X

No invasive 18c Old Shipyard Spartina 2014 No invasive 18d Inner Harbor Colma Creek/ Spartina 2014 18 San Bruno Marsh Complex 18e Sam Trans Peninsula X X

18f Confluence Marsh X

18g San Bruno Marsh X X

18h San Bruno Creek X

19a Brisbane Lagoon X

19b Sierra Point X

19c Oyster Cove X

19d Oyster Point Marina X

19e Oyster Point Park X

19f Point San Bruno X

19g Seaplane Harbor X

19h SFO X X

19i Mills Creek Mouth X X

19j Easton Creek Mouth X X

West San 19 Francisco Bay 19k Sanchez Marsh 6/4 (COI); 8/4 X X X

19l Burlingame Lagoon 8/4 X

3 years with no 19m Fisherman's Park invasive Spartina (2012-2014)

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 5 of 11 West San 19 Francisco Bay

2015 Invasive Spartina Project Treatment Schedule

19n Coyote Point Marina / Marsh X

San Mateo Creek / 19o X Ryder Park

Seal Slough Mouth - 19p.1 X X Central Marsh

Seal Slough Mouth - 19p.2 X X Peripheral Marshes No invasive 19q Foster City Spartina 2014 No invasive 19r Anza Lagoon Spartina 2014 No invasive 19s Maple Street Channel Spartina 2014 or 2015

20a Oyster Bay Regional Shoreline 7/21; 10/1 (R2) X X

20b Oakland Metropolitan Golf Links X

20c Dog Bone Marsh X

20d.1 Citation Marsh South X

20d.2 Citation Marsh North WILL NOT BE TREATED IN 2015

20e East Marsh X

20f.1 North Marsh North WILL NOT BE TREATED IN 2015

20f.2 North Marsh South WILL NOT BE TREATED IN 2015

20g Bunker Marsh WILL NOT BE TREATED IN 2015

20h.1 San Lorenzo Creek & Mouth North WILL NOT BE TREATED IN 2015

20h.2 San Lorenzo Creek & Mouth South X

20i Bockmann Channel X

No invasive 20j Sulphur Creek Spartina 2014 20 San Leandro / Hayward Shoreline 20k Hayward Landing X

20l Johnson's Landing X

20m Cogswell Marsh, Quadrant A 7/21; 10/19 (R2) X

20n Cogswell Marsh, Quadrant B WILL NOT BE TREATED IN 2015

20o Cogswell Marsh, Quadrant C WILL NOT BE TREATED IN 2015

20p Hayward Shoreline Outliers X

20q San Leandro Shoreline Outliers X

Oakland Airport Shoreline and 20r X Channels

20s H.A.R.D. Marsh 8/19 X

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 6 of 11 20 San Leandro / Hayward Shoreline

2015 Invasive Spartina Project Treatment Schedule

20t San Leandro Marina X

20u Estudillo Creek Channel X

20v Hayward Landing Canal X

20w Triangle Marsh X

21a Ideal Marsh North X 21 Ideal Marsh 21b Ideal Marsh South X X

22a X X

22b.1 San Pablo Marsh East X X

22b.2 San Pablo Marsh West X X

Two Points / 22 22c 9/2 X Complex Breuner Marsh

22d X

No invasive 22e Spartina 2014

Richmond/ Albany /Pinole 22f X Shoreline No invasive 23a Spartina 2014 or 2015

23b Beach Drive X

No invasive 23c Loch Lomond Marina X Spartina 2015 No invasive 23d.1 San Rafael Canal Mouth East X Spartina 2015

23d.2 San Rafael Canal Mouth West X

23e Muzzi & Martas Marsh 6/8 (COI) X X

No invasive 23f Paradise Cay X Spartina 2015

23 Marin Outliers 23g Greenwood Cove 6/3 (COI) X

23h Strawberry Point 6/3 (COI) X

23i Strawberry Cove X

23j Bothin Marsh X

23k Sausalito X

No invasive 23l Starkweather Park Spartina 2015 No invasive 23m Novato Spartina 2014

23n Triangle Marsh & shoreline X X

3 years with no 23o China Camp invasive Spartina (2012-2014)

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 7 of 11 2015 Invasive Spartina Project Treatment Schedule

Upper Petaluma River- Upstream 24a X X of Grey's Field 4 years with no 24 Petaluma River 24b Grey's Field invasive Spartina (2011-2014)

24c Petaluma Marsh X X

25a Tom's Point (Tomales Bay) 6/10 (COI) X

3 years with no 25b Limantour Estero invasive Spartina (2012-2014) No invasive 25 Outer Coast 25c Drakes Estero Spartina 2013 or 2014

25d Bolinas Lagoon north X

No invasive 25e Bolinas Lagoon south Spartina 2013 or 2014

4 years with no 26a White Slough / Napa River invasive Spartina (2011-2014)

26b NWR & Mare Island 6/19 (COI) X X North San Pablo 26 Bay 26c Sonoma Creek X

4 years with no 26d Sonoma Baylands invasive Spartina (2011-2014)

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 8 of 11 2015 Invasive Spartina Project Treatment Schedule

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 9 of 11 2015 Invasive Spartina Project Treatment Schedule

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 10 of 11 2015 Invasive Spartina Project Treatment Schedule

* Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 11 of 11