M/S. M/S. K. R CONSTRUCTIONS RUCTIONS
Total Page:16
File Type:pdf, Size:1020Kb
SUBMISSION OF FORM – I & IA TOWARDS ENVIRONMENTAL CLEARANCE (EC) For M/s. K. R CONSTRUCTIONS (Construction of Residential High rise building) SY.NO. 125/P, Zone –II, East Point Colony, Near VUDA Park, G.V.M.C Limits VISAKHAPATNAM, Andhra Pradesh Prepared& Submitted by Enviro House, Block –B, B-1, IDA, Auto Nagar, Visakhapatnam – 530 012 Ph: 0891-2755528, Telex: 0891-2755529, E-mail: [email protected] Cell: 9440338628 QCI No – 141 & Recognized by MOEF&CC, New Delhi, Accredited by NABL FORM -1 (I) Basic Information Sl. No. Item Details 1. Name of the project(s) M/s. K. R. Constructions 2. S. No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage to Construction of Residential high rise building be handled/command area/lease in an area of 4453.81 Sq.mts and total built-up area/number of wells to be drilled. area is 29785.44 sq.mts. 4. New/Expansion/Modernization New Construction of Residential high rise building with Stilt -1 + Stilt 2 + First basement + Second basement + third basement + G + 16upper floors. 5. Existing Capacity/Area etc. NIL 6. Category of Project i.e. ‘A’ or ‘B’ Category – B 7. Does it attract the general condition? If No yes, please specify. 8. Does it attract the specific condition? If No yes, please specify. 9. Location Plot/Survey/Khasra No. Sy.No:125/P Village Zone-II, Tehsil East Point Colony, Near VUDA Park, G.V.M.C. Limits District Visakhapatnam District State Andhra Pradesh 10. Nearest Railway Station/Airport along Visakhapatnam Railway station at 5.40 kms with distance in kms. from the project site. Visakhapatnam Airport is at a distance of 12.30 kms from the project site. 11. Nearest Town, City, District Headquarters Visakhapatnam Town at 6.50 kms, along with distance in kms. 12. Village Panchayats, Zilla Parishad, GVMC Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/s. K. R. Constructions 14. Registered Address M/s. K. R. Constructions Sy.No:125/P Zone-II, East Point Colony, Near VUDA Park, G.V.M.C. Limits VISAKHAPATNAM DISTRICT ANDHRA PRADESH 15. Address for correspondence: D.No: 10-50-5/23, G-5, Sunny side homes, Waltair main Road, Visakhapatnam Name V. Koteswara Rao Designation (Owner/Partner /CEO) Managing Partner Pin code 530002 E-mail [email protected] Telephone No. 9848193123, 0891-2568350 Fax No. -- 16. Details of Alternative Sites examined, if NA any. Location of these sites should be shown on a Toposheet. 17. Interlinked Projects Nil 18. Whether separate application of NA interlinked project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, NA 1980? ii. The Wildlife (Protection) Act, NA 1972? Yes iii. The C.R.Z. Notification, 1991? APCZMA Lr. No: 70/APCZMA/CRZ/Bldgs/2017 658 Dt: 06.03.2018 22. Whether there is any Government No Order/Policy relevant /relating to the site? 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending against the project and/or land in which Nil the project is propose to be set up? a) Name of the Court b) Case No. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist confirmation Details thereof (with approximate quantities /rates, wherever Yes/No possible) with source of information data 1.1 Permanent or temporary change in Yes The land earmarked for construction land use, land cover or topography of residential high rise building including increase in intensity of land project with an site area of about use (with respect to local land use 4453.81 Sq.mts and the total built up plan) area is 29785.44 Sq.mts. This land is sufficient for construction of residential high rise building for 72 nos of flats. A total of 4453.81 Sq.mts of land is available and is sufficient for the construction activity. Total Built up area = 29785.44 sq.mts Further the above land is barren land. Therefore no change in land use / land cover / topography. 1.2 Clearance of existing land, vegetation No The land is barren and developed and buildings? land. No vegetation or building existing in this land for clearance. 1.3 Creation of new land uses? No No extra land will be used. The project is having 4453.81 sq.mts of land and the total built up area is 29785.44 sq.mts. In this land only the proposed project will be constructed. 1.4 Pre-Construction investigations e.g. Yes For the total area already ground bore houses, soil testing? water and soil testing carried. 1.5 Construction works? Yes To construct apartment block with 72 units (Stilt -1 + Stilt 2 + First basement + Second basement + third basement + G + 16upper floors). It is proposed stilt floor & basement for parking. 1.6 Demolition works? No The site is leveled one and not contains any temporary / permanent structures. Therefore no demolition works in the proposed area. 1.7 Temporary sites used for construction No Local manpower will be utilized for works Or housing of construction the construction work. Therefore no workers? temporary site used for construction works. 1.8 Above ground buildings, structures or Yes BUILDINGS earthworks including linear Building structures, cut and fill or excavations Sewage Treatment Plant Water park DG Set Room 1.9 Underground works including mining No No mining or tunneling activity. or tunneling? 1.10 Reclamation works? No No reclamation work 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Cement storage materials? Building materials storage 1.15 Facilities for treatment or disposal of Yes Liquid effluents The waste water generated from the solid waste or liquid effluents? proposed project will be in the form of sanitary waste water only and which will be routed to sewage treatment plant and thereby reuse and for firefighting if surplus to local municipal sewerage network. Waste Generation – 54.45 or say 54.50 KLD Solid Waste: Municipal waste – 224 Kg/day DISPOSAL: Convert to manure and reuse as manure for green belt development. 1.16 Facilities for long term housing of No Majority of manpower will be Operational workers? recruited from local people only. Therefore no housing scheme proposed. 1.17 New road, rail or sea traffic during No The site is well connected to Construction or operation? roadway. No new road or rail road development required. 1.18 New road, rail, air waterborne or N.A -- other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing N.A -- transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No -- pipelines? 1.21 Impoundment, damming, culverting, No -- realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 1.23 Abstraction or transfers of water form Yes Meet the water requirements from ground or surface waters? GVMC of 60.50KLD for drinking & domestic purpose. 1.24 Changes in water bodies or the land No -- surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes During construction activity, private for construction, operation or tippers will be used for supply of decommissioning? metal, sand, cement and iron & other building material. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes There would be a marginal influx of Temporarily or permanently? people since the construction consists of residential building. 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? Yes The proposed project will develop green belt all along the all sides of boundary wall. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): Details thereof (with approximate S.No. Information/Checklist confirmation Yes/No quantities / rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The present status of land is barren agricultural land (ha) and non-agricultural. 2.2 Water (expected source & competing Yes During construction users) unit: KLD Construction for domestic –30.0 m3/day During Operation Domestic – 60.50 KLD 2.3 Minerals (MT) No Not applicable 2.4 Construction material – stone, Yes Stone aggregates – 7000 m3 aggregates, sand / soil (expected (foundation work) source – MT) Soil - no soil will be lifted or excavated. Sand - 13500 m3 2.5 Forests and timber (source – MT) Yes The timber that is required is procured from the approved local contractors. 2.6 Energy including electricity and fuels Yes Electricity will be supplied by (source, competing users) Unit: fuel APEPDCL. (MT), energy (MW) Diesel for DG Sets – 50 Litres/Day 2.7 Any other natural resources (use No -- appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.