Information about an available premise (property)

1. General information 1.1 Name non-residential building 1.2 Location: 1.2.1  region Chornobay 1.2.2  city, street Chornobay village, 2 Cherkaska Str. 1.2.3  geographical coordinates 1.3 Form of tenure private 1.4 Information about the owner: 1.4.1  name private entrepreneur Talan Volodymyr Grygorovych 1.4.2  National State Registry of Ukrainian 2585611215 Enterprises and Organizations code 1.4.3  legal address 19853, , Drabiv region, Boikivshchyna village 1.4.4  post address 19853, , Drabiv region, Boikivshchyna village 1.4.5  telephone number, fax, e-mail (+38067) 473-37-37, [email protected] 1.5 Conditions to attract investments (sale, rent, starting of co-venture, etc): 1.5.1  sale price, thousand grn. 700,0 1.5.2  rental price per 1 m2, grn. 20,0 2. Premise characteristic 2.1 Commissioning year 1980 2.2 Functionality: 2.2.1  previous bus station 2.2.2  current not used 2.3 Total area, including (m2): 2.3.1  manufacturing premises - 2.3.2  storing premises - 2.3.3  administration premises - 2.3.4  other 437,2 2.4 Number of floors 1 2.5 Land plot size, hectares 0,35 2.6 Land plot form of tenure municipal 2.7 Right to use the land plot for rent 3. Transport infrastructure 3.1 Distance to main roads/ highway (indicating Н-08 Boryspil-Dnipro-Zaporizha, 0,5 the name), km 3.2 Name of a railway freight station and station-І, 30,0 distance from it to the land plot using a road, km 3.3 Existence of an access railway (yes/no) no 3.4 Name of an airport and distance from it to «Boryspil», 180,0 the land plot using a road, km 3.5 Name of a river (sea) port and distance from Cherkasy city, 60,0 it to the land plot using a road, km 3.6 Distance to the nearest regional center, km Cherkasy city, 60,0 3.7 Name of the nearest locality and distance Mali Kanivtsi village, 4,0 from it to the land plot using a road, km 4. Engineer infrastructure 4.1 Information about energy supply: 4.1.1  Energy supply (yes/no) yes 4.1.2  Distance to the functioning electricity - line, km 4.1.3  Voltage, KV - 4.1.4  Distance to the functioning - transformative substation, km 4.1.5  transformative substation voltage, KV - 4.2 Information about gas supply: 4.2.1  Gas supply (yes/no) yes 4.2.2  Distance to the functioning gas line, km - 4.2.3  Reserve margin of the possible place of - connection to the gas line, m3/h. 4.2.4  Distance to the functioning gas - distribution station, km 4.2.5  Reserve margin of the gas distribution - station (m3/h.) 4.3 Information about water supply: 4.3.1  Way of water supply can be provided 4.3.2  Distance to a possible place of - connection to a functioning water pipe, km 4.3.3  Diameter of the water pipe , mm 100,0 4.3.4  Reserve margin of the possible place of - connection to the water pipe, m3/h. 4.4 Information about waste water disposal: 4.4.1  Way of waste water disposal can be provided 4.4.2  Distance to a possible place of - connection to a functioning waste water pipe, km 4.4.3  Diameter of the waste water pipe - (collector) in the possible place of connection to the waste water pipe, mm 4.4.4  Reserve margin of the possible place of - connection to the waste water pipe, m3/h. 4.5 Functioning central heating existence no (yes/no) 5. Contacts 5.1 Enterprise, company private entrepreneur 5.2 Telephone number/fax - 5.3 Web-site, e-mail - 5.4 Name and surname of a contact person Talan Volodymyr Grygorovych 5.5 Position private entrepreneur 5.6 cell (+38067) 473-37-37 5.7 E-mail [email protected]