Date: 12/12/19 8:04AM FFY 2019 Lancaster TIP FHWA Obligation Report Rpt # TIP302 Obligations 10/1/18 to 9/30/19

PROG. TOTAL PROJECT STATE OBLIGATION FFY2019 to FED FUNDS MPMS PROJECT TITLE PROJECT DESCRIPTION ADMINISTRATOR PHASE ROUTE * FFY 2019 2022 REMAINING 95714 E-town Ped/Bike Path Extension The project consists of Phase 3 of Elizabethtown's Pedestrian and Bicycle Pathway Extension Project that connects PENNDOT Construction $(26,890) $0 $0 Etown Area School District to Etown College via a trail with crosswalks and lighting. 101505 Centerville Road Widening Widen Centerville Road (T-408) to 5 lanes from PA 23 (Marietta Avenue) to PA 462 (Columbia Avenue) in East PENNDOT Preliminary $1,100,000 $1,100,000 $0 Hempfield Township, Lancaster County. Engineering 101505 Centerville Road Widening Widen Centerville Road (T-408) to 5 lanes from PA 23 (Marietta Avenue) to PA 462 (Columbia Avenue) in East PENNDOT Final Design $906,080 $1,200,893 $294,813 Hempfield Township, Lancaster County. 112411 Race Street Crossing RRX Safety Improvements on Race Street in Conoy Township, Lancaster County. PENNDOT Construction $427,443 $427,443 $0

19997 Eby Chiques Rd Bridge Bridge Replacement on Eby Chiques Road (T-364) over Big in Rapho and West Hempfield COUNTY OF Construction $(4,234) $0 $0 Townships. LANCASTER

106630 Charlotte St Two-Way Conversion Charlotte Street will be converted from a one-way southbound street to a two-way corridor from West James Street LANCASTER CITY Construction $166,265 $166,265 $0 to West King Street. Improvements will include the conversion from one-way to two-way traffic, resurfacing and pavement improvements, traffic signal and pedestrian signal upgrades ADA accessibility improvements including ramps and crosswalks, stormwater improvements and green infrastructure. 95716 Mulberry St Two-Way Conversion Mulberry Street will be converted from a one-way northbound street to a two-way corridor from West James Street PENNDOT Construction $(0) $0 $0 to West Vine Street. Improvements will include the conversion from one-way to two-way traffic, resurfacing and pavement improvements, traffic signal and pedestrian signal upgrades and improvements at seven major intersections (Mulberry with James, Lemon, Walnut, Chestnut, Orange, King and Vine, five of which are signalized) and four municipal roads, ADA accessibility improvements including ramps and crosswalks; stormwater improvements and green infrastructure.

89207 PA 23 TSM Improvements At the Intersection of PA-23 and Landis Valley Road, in Manheim and East Lampeter Townships, add eastbound PENNDOT Construction 23 $(103,106) $0 $0 left turn lane on PA 23, channelize the intersection and install a new traffic signal. Spot Intersection Improvements on PA23, shoulder widening and resurfacing on PA 23 (Main Street) Intersection with Hillcrest Avenue to Short Street in Manheim, East Lampeter, Upper Leacock, West Earl, Earl, and East Earl Townships and New Holland Borough. Demo ID PA417

94927 PA 23 Resurfacing Milling and Resurfacing on PA-23 (New Holland Pike) from Wilson Avenue to Kinzer Avenue in Upper Leacock, PENNDOT Construction 23 $(335,552) $0 $0 Earl and West Earl Townships and New Holland Borough. The scope of work includes milling and resurfacing of the existing roadway, ADA ramp updates, guiderail updates, drainage work, and selected tree trimming. Drainage work will consist of grate replacements inlet adjustments, pipe replacements, rock additions for stabilization, and pipe cleaning.

104473 PA 23 TSM Improvements 2 Install center turn lane, install curb and sidewalks and signal replacement on PA 23 (Main Street) from SR 1003 PENNDOT Construction 23 $4,963,025 $5,078,477 $115,452 (Hellers Church Road) to Granger Road in Upper Leacock Township, Lancaster County. 83168 Gap Bottleneck Improvement At the intersection of PA 41 and US 30, the project proposes to realign PA 41 to provide straight access via two PENNDOT Final Design 30 $(55,333) $0 $0 lanes to the new US 30 westbound alignment. PA 41 will be widened for approximately 1100 feet starting at the US 30 intersection before tapering back to the existing sections. At the intersection of PA 772 and US 30, improvements will widen PA 772 to accommodate a turning lane and connect the intersection to a planned development south of US 30. Slightly to the north on PA 772, a new intersection will be created at the proposed US 30 westbound alignment. The intersection will allow two lanes of US 30 westbound traffic to travel through the intersection and turning lanes to access north- and southbound PA 772. After the intersection of PA 772 and proposed US 30 westbound, the new US 30 westbound will tie back into US 30 mainline as a through movement. US 30 mainline will be widened to accommodate a four lane road before tapering back into the existing two-lane configuration with a center turning lane. Demo ID: TEA-21, PA ID#115 and PA ID#412. 91037 US30 Roadway Preservation Diamond Grinding on US 30 from PA-741 (Rohrerstown Road) to State Route 2043 (Oak View Road) in East PENNDOT Construction 30 $(302,395) $0 $0 Hempfield, Manheim, and East Lampeter Townships.

87500 Lincoln Hwy Bridge # 3 Bridge improvements on US Route 30 (Lincoln Highway) over Houston Run, just east of Brackbill Road in PENNDOT Preliminary 30 $316,000 $316,000 $0 Salisbury Township, Lancaster County. Engineering

87535 US 30 Bridge Bridge replacement on US Route 30 (Lincoln Highway) over tributary to in East Lampeter Township, PENNDOT Preliminary 30 $312,000 $312,000 $0 Lancaster County, apprximately 700 east of. N./S. Soudersburg Road. Engineering

80119 PA 72 Intersection Corridor This project involves PA 72 from Dillerville Road to Graystone Road. The project involves 11 signalized PENNDOT Final Design 72 $(67,885) $0 $0 Improvements intersections along PA Route 72 and the intersection of State Street (PA 722) and Lemon Street in the Borough of East Petersburg. Improvements to these intersections range from signal timing and coordination to new signal equipment (new signal poles and mast arms) and minor lane additions (through/right turn lane) at the Commerce Drive/Granite Run Road intersection. 80119 PA 72 Intersection Corridor This project involves PA 72 from Dillerville Road to Graystone Road. The project involves 11 signalized PENNDOT Construction 72 $32,596 $32,596 $0 Improvements intersections along PA Route 72 and the intersection of State Street (PA 722) and Lemon Street in the Borough of East Petersburg. Improvements to these intersections range from signal timing and coordination to new signal equipment (new signal poles and mast arms) and minor lane additions (through/right turn lane) at the Commerce Drive/Granite Run Road intersection.

89107 Lancaster TSM Corridors 7-12 Traffic Signal Coordination and Management Improvements on 3rd Street (State Route 441), Buch Avenue to PENNDOT Final Design 72 $984 $984 $0 Manheim Pike (State Route 72) and Keller Avenue in Lancaster City and Manheim Township, Main Street (State Route 72/772) and High Street (State Route 772) in Manheim Borough, Manor Avenue (State Route 999) and George Street (State Route 3029) in Millersville Borough, New Holland Avenue (State Route 1063) from Plum Street to US 30 Ramps in Lancaster City, Manheim Township and Lancaster Township, and Oregon Pike (State Route 272/US 222) from Landis Valley Road (State Route 1014) to Lititz Pike (State Route 501) in Manheim Township. 89107 Lancaster TSM Corridors 7-12 Traffic Signal Coordination and Management Improvements on 3rd Street (State Route 441), Buch Avenue to PENNDOT Construction 72 $(103,428) $0 $0 Manheim Pike (State Route 72) and Keller Avenue in Lancaster City and Manheim Township, Main Street (State Route 72/772) and High Street (State Route 772) in Manheim Borough, Manor Avenue (State Route 999) and George Street (State Route 3029) in Millersville Borough, New Holland Avenue (State Route 1063) from Plum Street to US 30 Ramps in Lancaster City, Manheim Township and Lancaster Township, and Oregon Pike (State Route 272/US 222) from Landis Valley Road (State Route 1014) to Lititz Pike (State Route 501) in Manheim Township. 19461 Lititz Pike Bridge Replacement Replace bridge and realign US 222 with City Street System on US-222 (Lititz Pike) Bridge over AMTRAK in the PENNDOT Construction 222 $(112,000) $0 $0 City of Lancaster. 87547 Beaver Valley Pike Br. #3 Bridge Replacement on US 222 (Beaver Valley Pike) over Beaver Creek just north of Main Street in Strasburg & PENNDOT Construction 222 $(76,094) $0 $0 Providence Twps. 104370 District Cable Median Bar Install Cable median guiderail at various locations, districtwide. PENNDOT Construction 222 $(40,448) $0 $0

83791 PA 230 Traffic Signal Retime & interconnect traffic signals on PA-230 (Main Street) in Mount Joy Borough and Rapho Township. PENNDOT Construction 230 $(32,086) $0 $0 Improvements 87503 Bainbridge Rd Bridge 2 Bridge Replacement on PA-241 over (at Masonic Village) in West Donegal Township. PENNDOT Preliminary 241 $(53,425) $0 $0 Engineering

90490 PA 272 Intersection Improvement Construction of intersection improvements at the intersection of Pennsy Road and PA-272 and at the intersection of PENNDOT Final Design 272 $306,742 $306,742 $0 Byerland Church Road and PA-272 in Providence Township, Lancaster County. 99179 PA 283 Lancaster Bridge Bridge preservations at several locations on PA 283 in Mount Joy Township, Lancaster County. PENNDOT Construction 300 $983 $983 $0 Preservations 90491 US222/322 Interchange Diverging Diamond Interchange at the US Route 222/322 Interchange in Ephrata and West Earl Townships, Ephrata PENNDOT Final Design 322 $126,109 $126,109 $0 Improvement Borough, Lancaster County. 90491 US222/322 Interchange Diverging Diamond Interchange at the US Route 222/322 Interchange in Ephrata and West Earl Townships, Ephrata PENNDOT Construction 322 $4,512,026 $11,287,328 $6,775,302 Improvement Borough, Lancaster County. 19457 PA324 Pequea Creek Bridge Replace Pequea Blvd. bridge over Pequea Creek in Martic and Conestoga Townships PENNDOT Final Design 324 $(354) $0 $0

63220 Christiana Pike Bridges Two bridge Replacements on PA 372 (Christiana Pike) over Buck Run in Sadsbury Township, Lancaster County. PENNDOT Final Design 372 $(37,732) $0 $0

64827 PA-441 Corridor-Columbia Relocate PA-441 from US 30 to Front Street in Columbia Borough and West Hempfield Township. Demo ID: PENNDOT Final Design 441 $(994,640) $0 $0 SAFETEA-LU, PA ID#588. 64827 PA-441 Corridor-Columbia Relocate PA-441 from US 30 to Front Street in Columbia Borough and West Hempfield Township. Demo ID: PENNDOT Right of Way 441 $(1,195,075) $0 $0 SAFETEA-LU, PA ID#588. 78861 River Road Bridge over Chiques Bridge Replacement on PA 441 over Chiques Creek, just south of Long Lane in East Donegal Township, Lancaster PENNDOT Preliminary 441 $(40,315) $0 $0 Creek County. Engineering 78861 River Road Bridge over Chiques Bridge Replacement on PA 441 over Chiques Creek, just south of Long Lane in East Donegal Township, Lancaster PENNDOT Construction 441 $(183,618) $0 $0 Creek County.

112668 Lancaster Co Flood Damage Restoration of weather related roadway damage on various state roads in Lancaster County. PENNDOT Construction 441 $25,536 $0 $(25,536)

64829 State Rd Interchange and Amtrak The State Road Interchange project consists of widening and improving PA 722 (State Road) from near Yellow PENNDOT Construction 722 $19,821,040 $20,831,573 $1,010,533 Bridge Goose Road to approximately 1,000 feet north of the PA 722 / PA 283 Interchange, including the PA 722 / PA 283 Interchange, to correct operational deficiencies and safety issues. Will widen and replace the bridge over PA-283 and the locally owned bridge over Amtrak. East Hempfield Township, Lancaster County. 82899 Hershey Road Bridge Bridge Replacement on PA-743 over north of Beverly Road in Mount Joy Township. Demo IDs PENNDOT Preliminary 743 $(13,641) $0 $0 PA317, PA489, PA129 Engineering 82899 Hershey Road Bridge Bridge Replacement on PA-743 over Conewago Creek north of Beverly Road in Mount Joy Township. Demo IDs PENNDOT Construction 743 $(151,685) $0 $0 PA317, PA489, PA129 95715 Mount Joy Pedestrian Safety The project is on PA 772, Marietta Avenue in Mount Joy Borough from School Lane to New Haven Street, PENNDOT Construction 772 $969,087 $1,570,523 $601,436 Lancaster County. Project will construct curb and sidewalks and associated roadway improvements to provide pedestrian connectivity between residences, businesses, library, public park. 89185 PA 896 and Rockvale Rd. Additional turn lanes for WB/SB approaches at 896/Rockvale, Add a new traffic signal at PA-896/ Rockvale Road PENNDOT Preliminary 896 $(8,085) $0 $0 Intersection Improvement Intersection and synchronize with the existing signal at US 30 and PA 896 in East Lampeter Township. Demo ID: Engineering SAFETEA-LU, PA ID#497 & 590.

89185 PA 896 and Rockvale Rd. Additional turn lanes for WB/SB approaches at 896/Rockvale, Add a new traffic signal at PA-896/ Rockvale Road PENNDOT Final Design 896 $(158,671) $0 $0 Intersection Improvement Intersection and synchronize with the existing signal at US 30 and PA 896 in East Lampeter Township. Demo ID: SAFETEA-LU, PA ID#497 & 590.

89185 PA 896 and Rockvale Rd. Additional turn lanes for WB/SB approaches at 896/Rockvale, Add a new traffic signal at PA-896/ Rockvale Road PENNDOT Utility 896 $(25,000) $0 $0 Intersection Improvement Intersection and synchronize with the existing signal at US 30 and PA 896 in East Lampeter Township. Demo ID: SAFETEA-LU, PA ID#497 & 590.

101015 North Third Street Bridge Bridge rehabilitation on State Route 1032 (North Third Street) over Little at Locust Street in Denver PENNDOT Construction 1032 $1,201,124 $1,237,701 $36,577 Borough, Lancaster County.

74959 Clay Road Bridge Bridge Replacement on State Route 1035 (Clay Road) over Middle Creek north of W. Church Road in Clay PENNDOT Final Design 1035 $(26,180) $0 $0 Township.

78906 Little Muddy Creek Bridge Bridge improvements on SR 1044 (Red Run Road) over Little Muddy Creek west of S. Muddy Creek Rd. in PENNDOT Preliminary 1044 $211,735 $211,735 $0 Brecknock Township, Lancaster County. Engineering 87504 South 4th Street Bridge Bridge replacement on SR 1045 (South 4th Street) over Cocalico Creek east of Washington Street in Denver PENNDOT Construction 1045 $140,900 $140,900 $0 Borough, Lancaster County. 87379 Cocalico Road Bridge Bridge replacement on SR 1047 (Cocalico Road) over Cocalico Creek north of Furnace Hill Rd in West Cocalico PENNDOT Preliminary 1047 $(45,946) $0 $0 Township, Lancaster County. Engineering 73946 Muddy Creek Road Bridge Bridge Rehabilitation on State Route 1059 (South Muddy Creek Road) over Little Muddy Creek north of Kramer PENNDOT Construction 1059 $(1) $0 $0 Mill Rd in East Cocalico Township. 19864 Pine Grove Bridge Rehabilitation of Pine Grove Covered Bridge on Ashville Road over the in Little Britain Township, PENNDOT Final Design 2006 $(485) $0 $0 Lancaster County. 78965 Br Rpl SR 2009 over WB Bridge improvements on Noble Road over West Branch of Octoraro Creek north of Wesley Road in Colerian PENNDOT Preliminary 2009 $184,439 $184,439 $0 Octor.Ck Township, Lancaster County. Engineering 87375 Walnut Hill Road Bridge Bridge replacement on State Route 3027 (Walnut Hill Road) over Indian Run just north of Creek Road in Manor PENNDOT Preliminary 3027 $(69,000) $0 $0 Township, Lancaster County. Engineering

87375 Walnut Hill Road Bridge Bridge replacement on State Route 3027 (Walnut Hill Road) over Indian Run just north of Creek Road in Manor PENNDOT Utility 3027 $(20,000) $0 $0 Township, Lancaster County. 78995 Kinderhook Rd over Little Bridge improvements on Kinderhook Road over Chiques Creek in West Hempfield Township, Lancaster County. PENNDOT Preliminary 4003 $199,093 $199,093 $0 Chiques Crk Engineering

74955 Meadowview Road Bridge #3 The project will consist of replacing the deteriorated four adjacent corrugated metal pipes that carry SR 4033, PENNDOT Preliminary 4033 $(9,152) $0 $0 Section 001 (Meadow View Road) over Little Chiques Creek north of Risser Mill Road in Mount Joy and Rapho Engineering Townships, Lancaster County, . The proposed structure will be a single span composite P/S concrete spread box beam bridge. Minor approach work will also be necessary to tie in the new bridge to the existing roadway. 79004 Meadowview Rd Bridge #2 This project will consist of a bridge rehabilitation which includes the replacement of the structurally deficient PENNDOT Construction 4033 $(2,388) $0 $0 superstructure that carries SR 4033, Section 003 (Meadowview Road) over Brubaker Run south of Echo Valley Road in Rapho Township. Minor repairs to the abutments and wingwalls are anticipated. The existing concrete abutments will remain in place. 20149 Meadow View Rd Bridge Bridge improvements on SR 4033 (Milton Grove Road) over Little Chickies Creek south of Meadow View Road in PENNDOT Preliminary 4033 $10,000 $341,000 $331,000 Mount Joy and Rapho Townships, Lancaster County. Engineering

89288 Rohrerstown Rd Bridge Bridge replacement on Rohrerstown Road over just south of PA283 in Manheim Township, PENNDOT Final Design 7101 $178,900 $338,900 $160,000 Lancaster County. 89288 Rohrerstown Rd Bridge Bridge replacement on Rohrerstown Road over Little Conestoga Creek just south of PA283 in Manheim Township, PENNDOT Utility 7101 $20,200 $36,200 $16,000 Lancaster County. 19799 Conestoga Creek Rd Bridge The project is located on T-848 over the , approximately 1.1 mi southeast of the Borough of Terre PENNDOT Final Design 7213 $(128,608) $0 $0 Hill in East Earl Township, Lancaster County, Pennsylvania. The project consists of replacement of the existing one- lane I-beam bridge on a slightly improved alignment downstream and realign Conestoga Creek Road to the bridge approaches. The total length of the project is approximately 900 feet along and adjacent to Conestoga Creek Road and will disturb approximately two acres during construction. The bridge is to be relocated to Central Penn College in Cumberland County for use as a pedestrian bridge. 19799 Conestoga Creek Rd Bridge The project is located on T-848 over the Conestoga River, approximately 1.1 mi southeast of the Borough of Terre PENNDOT Construction 7213 $(31,659) $0 $0 Hill in East Earl Township, Lancaster County, Pennsylvania. The project consists of replacement of the existing one- lane I-beam bridge on a slightly improved alignment downstream and realign Conestoga Creek Road to the bridge approaches. The total length of the project is approximately 900 feet along and adjacent to Conestoga Creek Road and will disturb approximately two acres during construction. The bridge is to be relocated to Central Penn College in Cumberland County for use as a pedestrian bridge.

94753 S Ronks Rd over Pequea Creek Bridge Replacement/Rehabilitation on South Ronks Road over Pequea Creek south of S. Soudersburg Road in East PENNDOT Preliminary 7215 $39,887 $80,800 $40,913 Lampeter Township, Lancaster County. Engineering 94754 Peters Creek Road over Peters Bridge Replacement on Peters Creek Road over Peters Creek approximately 1,200 north of Stubbs Mill Road in PENNDOT Preliminary 7219 $141,600 $141,600 $0 Creek Fulton Township, Lancaster County. Engineering 92395 Pequea Lane Bridge Bridge replacement on Pequea Lane over Pequea Creek in Leacock and Paradise Townships, Lancaster County. COUNTY OF Final Design 7226 $(126,393) $0 $0 LANCASTER 92395 Pequea Lane Bridge Bridge replacement on Pequea Lane over Pequea Creek in Leacock and Paradise Townships, Lancaster County. COUNTY OF Construction 7226 $(86,246) $0 $0 County owned bridge Pequea #5. LANCASTER

94751 Pequea Valley Road over Pequea Bridge improvement on Pequea Valley Road over Pequea Creek in Paradise Township, Lancaster County. County PENNDOT Preliminary 7226 $64,000 $64,000 $0 Creek owned bridge Pequea #5. Engineering 85394 North Locust St Bridge Bridge Replacement on North Locust Street over Santo Domingo Creek at E. New Street in Lititz Borough. PENNDOT Utility 7409 $(50,000) $0 $0 Municipal owned bridge. 85394 North Locust St Bridge Bridge Replacement on North Locust Street over Santo Domingo Creek at E. New Street in Lititz Borough. PENNDOT Right of Way 7409 $(22,001) $0 $0 Municipal owned bridge. 85394 North Locust St Bridge Bridge Replacement on North Locust Street over Santo Domingo Creek at E. New Street in Lititz Borough. PENNDOT Construction 7409 $(12,961) $0 $0 Municipal owned bridge. 94747 N. Cedar St over Bridge improvement on N. Cedar Street over Lititz Run north of North Lane in Lititz Borough, Lancaster County. PENNDOT Preliminary 7409 $81,600 $84,000 $2,400 Engineering 19828 S. Jacob St Bridge Removal Remove S. Jacob Street Bridge over Amtrak in Mount Joy Borough, Lancaster County. PENNDOT Construction 7413 $285,350 $285,350 $0

* Negative amounts in the obligation column are a result of de-obligating unused funds for a project.