CONCEPTUAL PLAN For “Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking , Road Works and other Allied Works under Station Precinct Improvement Project under Smart Mission on EPC mode for SKDCL” AT

KALYAN,

BY M/s SMART KALYAN CORPORATION LIMITED (SKDCL)

1

Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

INDEX

S. No. PARTICULATES POINTS PAGE

1. List of Tables, Figures and Annexures 1.0 2-3

2. QCI – NABET certificate valid till 23.01.2021 2.0 4

3. Introduction 3.0 5-7

4. Site location and surroundings 4.0 8

5. Project site connectivity 5.0 9-10

6. Area statement 6.0 10-15

7. Population details 7.0 16

8. Project cost 8.0 17

9. Water requirement 9.0 19

10. Rain water harvesting 10.0 20

11. Vehicle parking facilities 11.0 21

12. Power requirement & Details of DG Set 12.0 22

13. Solid waste generation 13.0 23-24

14. Green area 14.0 25-27

15. Details of construction material 15.0 28

16. List of machinery used during construction 16.0 29

2 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

1.0 LIST OF TABLES, FIGURES AND ANNEXURES

Tables/ Figures/ S. No. Particulate Page No. Annexures List of Tables 1. Site Surroundings & Connectivity Details Table 1 9-10 2. Area Statement for Buildings ( Terminal & Commercial) & MLCP Table 2 12-13 3. Area Statement for Improvement/ Redevelopment of Roads Table 3 13-14 4. Area Statement for Flyovers/Footover Bridges/Service Road Table 4 15 5. Total Built-up Area Table 5 15 6. Population Break up Table 6 16 7. Calculations for Daily Water Demand Table 7 17 8. Waste Water Calculations Table 8 18 9. Parking Details Table 9 21 10. Details of DG Sets Table 10 22 11. Solid Waste Generation Table 11 22 12. List of Existing Plants Table 12 25-26 13. List of Proposed Plants Table 13 27 List of Figures 14. Project Site Location Figure 1 8 15. Water Balance Diagram Figure 2 18 16. Solid Waste Management Scheme Figure 3 23 List of Annexures 17. 500 M Buffer Map on Topo Sheet Annexure I 18. 2 Km Buffer on Topo Sheet Annexure II 19. 10 Km Buffer on Topo Sheet Annexure III 20. 15 km Buffer on Topo Sheet Annexure IV 21. Layout Plan of Bus Stand Annexure V 22. Layout Plan of MLCP Annexure VI

3 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

2.0 QCI – NABET Certificate

4 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

CONCEPTUAL PLAN

3.0 INTRODUCTION

This project is proposed by M/s Smart Kalyan Dombivli Corporation Limited (SKDCL). Kalyan city and a municipal corporation with its headquarters located in Kalyan, , Maharashtra. Smart Kalyan-Dombivli Corporation Limited (SKDCL) has planned various area based development projects and plan city solutions for Kalyan smart city. The planning for the improvement & redevelopment of the Kalyan station precinct is proposed to improve the west side of the station. So, the major objective of this project is to redevelop the west side and to decongest the Kalyan Station precinct by improved pedestrian access, improved vehicular access through grade separation / rerouting of traffic etc. measures, improved parking, hawking zones and other civic amenities, application of urban design elements to improve accessibility to pedestrian users and other urban planning.

The main features of the master plan are as follows: 1. Development Plan objective are achieved by increasing the right of way. 2. 2 legged grade separators are proposed to reduce traffic volume in the precinct. 3. Proposed height of the grade is 12 M. 4. Proposed KDMC Bus stand at 12 M level in front of Railway Station, over the land of MSRTC. 5. Proposed MSRTC Bus stand at ground level in front of Railway Station. 6. Proposal of 2, one-way 9 M wide grade from Mahatma Phule Chowk to allow separate entry and exit to the bus stand area at 12 M level. 7. Proposal of 2, one-way 9 M wide grade from Bail Bazar Chowk to allow separate entry and exit to the bus stand area at 12 M level. 8. Bus from Shivaji Chowk will route towards bail bazaar Chowk to get access to grade. 9. 2 Bus Bays are proposed over MSRTC land to provide stoppage for buses from Gurudev Chowk (via Bail Bazar Chowk), Mahatma Phule Chowk and Bail Bazar Chowk with 7.5 M Carriage way for each bay.

5 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

10. Separate Bay is provided for Taxi and Private Vehicles for all direction with 7.5 M Carriage way. 11. Bus stops are provided in front of railway station with 3 stop bays. 12. Separate Bay is provided for Taxi and Private Vehicles from Gurudev Chowk, Mahatma Phule Chowk with 3 M Carriage way. 13. A separate lane of 3.5 M is proposed for through Vehicle. 14. A 12 M wide New Road is proposed to get access to platform 1 via theatre area. 15. As per suggestions of the Stakeholders to cover the storm water Drain (Nallah) with concrete slab and construct Road / Vending zone over it, we have shown the draft lines on the drawing, but the same will only be considered once reviewed and approved by the competent authorities. We are of the opinion not to close the Nallah, instead we have suggested for the cleaning and barricading. 16. Proper circulation for all vehicles in all direction over Grade has been considered. 17. Commercial building is proposed with Bus stand with total 15188 square meters’ area. 18. 12 M wide road is proposed to connect Bail Bazar to the station allowing access to the auto and Private vehicles including 2 M Cycle Track on one side. 19. 15 M wide road is proposed to connect Mahatma Phule Chowk to the Station Area to allow access to the auto and private vehicles including 2 M Cycle Track on both sides. 20. 15 M wide and 9 M wide road is proposed to connect Gurudev Hotel Chowk to the Station Area to allow access to the auto and private vehicles. 21. 7.5 M wide road is proposed to connect MH Ali Chowk to the Station Area to allow access to the auto and private vehicles. 22. 2 M to 5M wide Footpath is proposed between Mahatma Phule Chowk to Bail Bazar Chowk in both directions. 23. 3M to 5M wide Footpath is proposed between station and Gurudev Chowk. 24. 1.5 M wide Divider with Green Plantation is proposed on the access road from Mahatma Phule Chowk to Bail Bazar Chowk. 25. 2 M Wide Divider is proposed with Green Plantation on the road in front of Railway station. 26. Proper circulation flow for all vehicles in all direction on ground is planned.

6 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

27. Separate conflict free circulation for auto and respective separate parking is proposed in front of railway station. 28. Footprints of Grade are placed so that it will be on the area proposed for divider throughout the road layout. 29. Vending Zones are provided along with the footpath on the roads of all three directions. 30. Vending Zone at level 7.5 connecting sky walk is proposed over Existing Badminton Court. 31. Waste collection bins are proposed in multiple points for waste free station precinct. 32. Seating Bench and Toilet are proposed at bus stand area and auto stand area. 33. Existing Sky Walk are removed from few stretch and new sky walk are proposed at several point with multiple dispersal point. 34. A new sky walk of 8 M width at level 7.5 M connecting Grade at 12 M with Escalator and Stairs is provided to enter the railway station. 35. Future extension of sky walks near Gurudev Chowk for connecting Metro. 36. Least dismantling of sky walk i.e. only 60 M is required. 37. To achieve the proposed layout a total of 2.70 hectare of land is required to be acquired from different stake holders.

7 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

4.0 SITE LOCATION AND SURROUNDINGS

The proposed project is located at Kalyan (West), District Thane, Maharashtra. All the roads towards the station and outwards in station precinct are included in the study. Site mark on toposheets (i.e. 500m, 2 Km, 10 Km & 15 Km respectively) is attached as Annexure I-IV.

Figure 1 Project Site Location

8 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

5.0 CONNECTIVITY

The site surroundings & connectivity details are given in Table 1. Table 1: Site Surroundings & Connectivity Details S.No. Particular Name Aerial Distance Direction (Km) 1. Nearest Railway Kalyan Station Adjacent to project site Station 2. Nearest Airport Chatrapati Shivaji Airport 41.9 South West 3. Nearest Habitation Bhanu Nagar 0.31 North West Joshibaug 0.42 North East Surgana Society 0.56 North Murarbaug 0.62 North East Manik Colony 0.74 North 4. Nearest Highway Kalyan Road 0.01 East and Roads Agra Road 0.22 West NH 222 1.38 North West 5. River/ Drain KDMC Bhoiwada lake 0.73 North West Ullas River 1.67 West

PokhranTalab 1.03 North west Kala Talab 1.06 North

9 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

6. Nearest School KC Gandhi School 0.35 North West Smt. Kantaben Chandulal Gandhi 0.38 North English School West Meridian School 0.90 North East

7. Nearest Hospital Mura Hospital 0.28 South West Fortis Hospital 0.63 West City Critical Care Hospital 1.69 North East 8. Places of Worship Saibaba Temple 0.33 West Hanuman Shani Temple 0.38 North East Swami Narayan Mandir 0.47 North 9. Forest Forest 21.17 South West Chheda Nagar Reserved Forest 29.16 South West

6.0 AREA STATEMENT

Taking into consideration the volume of traffic and pattern of movement, for decongesting the Kalyan Station Precinct the grade separated flyover, retrofitting of foot over bridge, road widening, redevelopment of existing Kalyan bus stand, multi-level parking, ground parking, footpaths, drain and electrical lighting are proposed. The major component of improvement proposal includes the following:

1. Redevelopment of Kalyan Bus Stand 2. Multi-Level Parking and Ground Parking

10 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

3. Redevelopment & Improvement of Roads 4. Flyover from Bail Bazar to Phule Chowk

DESCRIPTION: 1. Redevelopment of Kalyan Bus Stand  All existing buildings and workshop in existing bus stand/depot to be dismantled and new bus stand facility to be built as per the proposed concept plan.  Commercial building (size 86 m X 40 m approx.) includes G+4 floor, ground floor as bus stand, first floor as vending zone, second floor as parking, 3rd and 4th floor shall be for commercial exploitation.  Rigid pavement is proposed for the bus stand.  In commercial building at bus stand three vertical lifts and three stair case, public utilities, connection from flyover to foot over bridge is proposed.  Suitable Bus bays, parking and other facilities are planned at ground level for buses and customers.  Administrative office, other office blocks, food plaza area, public amenities, rest area etc. are planned at ground level for passengers commuting from bus stand.  All the busses shall be allowed only to move on the flyover and enter/exit the bus stand via ramp.  No buses shall be allowed to enter or exit to bus stand through at grade roads, this will ease out the traffic congestion and also improve pedestrian movement. The layout plan of bus stand is attached as Annexure V. The area statement for buildings is given in Table 2. 2. Multi-level parking and ground parking  Three multi-level parking, one car parking in bus stand building (at 12 m level) and three ground level parking are proposed.  Multi-level parking (MLP) and Ground parking details are as below  MLP near Deepak hotel G+4 (Kalyan west)-The MLP plan area of building shall be approx. 70m x 40m with G+4 floor arrangement, Ground Floor – Auto parking, First Floor- Bike 11 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

Parking, Second floor – Bike Parking, Third Floor – Car parking, Fourth Floor – Car Parking  MLP near Cinema Hall (Kalyan west)-to be developed in future when the land parcel is available  Car parking at 12m in Bus stand Building (Kalyan west)  Two parking are proposed near station at ground level for Auto (Kalyan West)

For MLCP near Deepak Hotel G+4 (Kalyan west), the concrete structure is proposed for parking building, the parking shall be ramp based with automated car parking arrangement within the individual floors. Two-layer car parking can be accommodated in single floor with the help of steel frame with mechanized system. The RCC structure of the building shall be constructed under this project and the operation and maintenance shall be done by the parking operator. The steel frame and mechanized system shall have to be installed and maintained by the parking operator. The proposed layout plan is attached as Annexure VI . The area statement for MLCP is given in Table 2. Table 2: Area Statement for Buildings (Terminal & Commercial) & MLCP S.No. Particulars Area (sqm) Buildings I Total Plot Area for Terminal Building & Commercial Building 25450 a Proposed Ground Coverage 7320 b Total Proposed FAR 18966.58 1.1 Terminal Building Area Details i Ground Floor 1747 ii First Floor 541 iii Shop area 223 v Service Area 460 A Built-up Area (Terminal Building Area) 2971 1.2 Commercial Building Area Details i First Floor 5100 ii Second Floor 3880.8 iii Third Floor 3880.8 iv Fourth Floor 3880.8 16742.4 B Built-up Area (Commercial Building )

12 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

II Multi Level Car Parking (MLCP) a Total Plot Area for MLCP 2852.73 b Total Proposed FAR 14057.05 1.3 MLCP Area Details i Ground Floor 2852.73 ii First Floor 2852.73 iii Second Floor 2852.73 iv Third Floor 2852.73 v Fourth Floor 2852.73 C. Built-up Area (MLCP) 14263.65 Total Built- up Area for Buildings in Precinct Area (A+B+C) 33977.05

3. Roads widening and new road construction  At grade roads are redesigned as per the available development plan lines, suitable footpaths, drainage, utility box, electrical lighting and other public amenities are proposed.  For Kalyan west, existing road are widened with concrete pavement. The area statement for roads is given in Table 3.

Table 3: Area Statement for Improvement/ Redevelopment of Roads

Width Length Area S.No. Roads Location (From-To) Chainage (m) (m) (sqm)

Shivaji Chowk to Kalyan 1 RD-1 15 640 9600 Shilpata Road 0 to +840 2 RD-2 Shivaji Chowk to Phule Chowk 0 to +460 12 450 5520 0 to +200 13 200 2600 Shivaji Chowk to Railway 3 RD-3 200 to Station 10 274 2740 +474 4 RD-4 Shivaji Chowk to Station Road 0 to +260 8 260 2080 5 RD-5 Shivaji Chowk to Station Road 0 to +259 6.5 259 1683 Bali Bazaar Chowk to Railway 6 RD-6 0to +236 7 288 2016 Station Md. Ali Chowk to Railway 7 RD-7 0to +256 7.5 266 1920 Station 8 RD-8 Shivaji Chowk to Agra Road 0 to +160 15 160 2400 9 RD-9 Shivaji Chowk to Agra Road 0 to +138 15 436 2040

13 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

Bali Bazaar Chowk to Balipur 10 RD-10 0 to +140 15 140 2100 Road 11 RD-11 Shivaji Chowk to Phule Chowk 0to +154 7 154 1078 12 RD-12 0 to +140 7 140 980 13 RD-13 Shivaji Chowk to Kalyan Station 0to +173 7 173 1211 14 RD-14 Road 0 to +96 7 95 665 15 RD-15 0 to +60 7 60 420 Total Built-up Area for Roads 39053

4. Flyover from Bail Bazar to Phule Chowk  The elevated flyover is kept at 12m height to utilize the existing foot over bridge which is at 7.5m level. The existing foot over bridge shall be connected to the flyover for pedestrian movement.  The two separate lanes are proposed for up and down movement, however in central part flyover is common with a roundabout.  For bus stand a separate ramp 15m wide (single ramp for both up and down) are proposed for entry and exit for buses only.  Width of flyover shall be 2X 9 m =18 m, left and right lane flyovers are separate in part of length and common in central part. For each side flyover (up and down ramps) the 8 m carriageway and 5m crash barrier on both sides are provided.  The total length of flyover shall be 1110 m, individual typical span is 30m, 25m, 15m to 20m, 10m are proposed.  The flyover is on structure except for a small length on either ends. Earthen ramps with earth retaining structures on sides are proposed beyond the abutments on either side. Minimum vertical clearance of 5.5m is proposed from the at grade road top to the bottom of deck at the obligatory span locations at all junctions.  At grade road of 7.0 m width is proposed on either side of the flyover as service road for local and turning traffic. The area statement for Flyovers/Foot Over Bridges/Service Road is given in Table 4.

14 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

Table 4: Area Statement for Flyovers

Flyover & Service Width Length Height S.No. Chainage Area (sqm) Road Below Flyover (m) (m) (m) 0 to +520 (RE Wall 0 to 17.6 520 12.5 9152 +100) 520 to +700 20 180 3600 1 Flyover A 700 to +1120 (RE Wall 9 420 3780 1000 to +1120) 2 Flyover A - Rotary 15.6 to 212 12.5 5512 Path 26 0 to +260 3 Flyover C (RE Wall 160 9 260 12.5 2340 to +260) 0 to +250 4 Flyover D (RE Wall 15 170 12.5 2550 2500 to +360) 5 Service Road 0 to +1166 13 1166 NA 15158 Total Built-up Area for Flyovers 42092

Table 5: Total Built-up Area/Covered area S.No. Particulars Area (sqm) A Built- up Area for Buildings & MLCP (Multilevel Car Parking) 33977.05 B Redevelopment/Improvements of Roads 39053

C Built-up Area for Flyovers 42092

D Total Built up Area (A+B+C) 115122.05

E Green Area Proposed (Peripheral Plantation + Avenue Plantation) 10,000 F Number of Proposed Trees 7224

15 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

7.0 POPULATION DETAIL

Total population of the proposed project will be 32,722 which include the main passenger load per day, staff & visitors. Breakup of the population is given in Table-6. Table 6: Population Details

S.No. Particulars Area/Number Unit* Total

60 passengers per 1 Passenger Load per Day 500 Trips per day 30000 bus

2 Terminal Building

Ground Floor a 2430 sqm 3sq m per person 810 (Office/Shops) Staff (10%) in 3 Shifts 81 x 3= 243 Visitors (90%) 729 First Floor b 541 sqm 6sqm per person 90 (Office/Shops) Staff (10%) in 3 Shifts 9 x 3=27 Visitors (90%) 81 3 Commercial Building a First Floor ( Shops) 5100 sqm 6 sqm per person 307 Staff (10%) in 3 Shifts 30x3=60

Visitors (90%) 276 Second Floor b NA (Car parking) Third Floor 3880.80sqm 6sqm per person 233 (Retail/Commercial) c Staff (90%) 210x3=630 Visitors (10%) 23 Fourth Floor d 3880.80sqm 6 sqm per person 233 (Retail/Commercial) Staff (90%) in 3 Shifts 210x3=630 Visitors (10%) 23 TOTAL 32722

16 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

8.0 PROJECT COST

The total estimated cost of the proposed project is Approx. 400 crores which includes the developmental cost.

9.0 WATER REQUIREMENT

The water requirement for the Kalyan Station Precinct Improvement is as given in Table-7

Table 7: Water Requirement Details

Rate of Water Total Water Area (in m2) / Total Occupancy/ S.No. Description Demand Requirement Number Population (lpcd)* (KLD) 1. Passengers 500 Trips per day 30000 15 450 2. Staff ( Shops/Offices) 1590 45 72 3. Visitors (Shops/ Offices) 1132 15 17 4. Cleaning of 50 buses/day 300 liters/day 15 Buses 5 Landscaping 10000 3 liters/sqm 30 6. Platform Floor Terminal building including commercial 14 7. Total 598 8 Fire Fighting (One Time) 1 lakh liters 1000 *Source: CGWA, GOI

17 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

Table 8: Wastewater Calculations

S. No. Particulars Total (KLD) Freshwater required for platform cleaning 14 Freshwater required for flushing (70% of domestic i.e. 377.3 539 KLD) Wastewater / Sullage generated a. 384.3 (50% platform cleaning + 100 % flushing)

18 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

Daily Fresh Water Requirement (1598 KLD)

Domestic Water Fire Fighting (1000 KLD) Requirement (One Time) (598 KLD)

Landscaping Potable Water Platform Floor Cleaning Flushing Cleaning of Buses 30 KLD (161.7 KLD) 14 KLD (377.3 KLD) (15 KLD)

(30% of Domestic i.e. 539 KLD) (70% of Domestic i.e. 539 KLD)

@50% @ 100%

Fresh Water Effluent Treatment Sullage Generated Plant Waste Water (384.3 KLD) @ 90% of 15 KLD Reuse = 13.5 KLD

Septic Tank Storage Tank (13.5 KLD)

Public Sewer

Figure 2: Water Balance Diagram 19 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

10.0 RAIN WATER HARVESTING

The storm water disposal system for the premises is self-sufficient to avoid any collection/stagnation and flooding of water. The amount of storm water run-off depends upon many factors such as intensity and duration of precipitation, characteristics of the tributary area and the time required for such flow to reach the drains. The drains are located near the carriage way along either side of the roads. Taking the advantage of road camber, the rainfall run off from roads shall flow towards the drains. Storm water from various blocks is connected to adjacent drain by a pipe through catch basins. As the ground water level in the area is below approx. 3.5 meters bgl. So, according to the CGWA norms Rainwater Harvesting tanks (1m dia & 6 m depth) has been proposed on the site. No. of proposed RWH Tanks - 4 in Bus Station (Terminal Building) & 2 in Multi Level Car parking (MLCP)

20 M/s Smart Kalyan Dombivli Corporation Limited (SKDCL) Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

11.0 PARKING DETAIL

The parking requirement for the proposed project is given in Table-9.

Table 9: Parking Details of the Proposed Project

No. of Bays/Type Area S.No. Particulars /Floor Capacity Units* ECS of Parking (Sq. m) 1 Departure Platform 10 30 2 Arrival Platform 10 30

3 Idle Bus Parking 20 (City Buses) 60 Multi Level Auto Parking @ 30 ECS 1 Ground Floor Auto 2852.73 66 per sqm 95 @ 30 ECS 2 First Floor 2- Wheeler 2852.73 334 per sqm 95 @ 30 ECS 3 Second Floor 2- Wheeler 2852.73 334 per sqm 95 @ 30 ECS 4 Third Floor 4- Wheeler 2852.73 63 per sqm 95 @ 30 ECS 5 Fourth Floor 4- Wheeler 2852.73 63 per sqm 95 Proposed Auto Parking @ 25 ECS 1 Auto Parking 1 Surface 1539.6 128 per sqm 62 @ 25 ECS 2 Auto Parking 2 Surface 1107 91 per sqm 44 701 Total Parking Proposed ECS

*1 ECS= 2.5 x 5m (Source: National Building code of ,2016)

21

Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

12.0 POWER REQUIREMENT & DETAILS OF D.G SETS

The power supply shall be supplied by Maharashtra State Electricity Board (MSEB). The Power requirement is estimated as 2880 KVA.

DETAILS OF D.G SETS

There is provision of 2 no. of DG sets of 1000 KVA capacity each for power back up in the Project. The DG sets will be equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion. The details of D.G sets are given in Table 10.

Table 10: Details of D.G Sets S. No. Description Capacity 1 Power back-up 2000 KVA (2 X 1000)

13.0 SOLID WASTE GENERATION

 The project will adopt a systematic approach for solid waste collection and disposal. Solid waste generated from the project will be collected properly and will be managed as per Solid Waste Management Rule, 2016.It is estimated that maximum solid waste generation would be about 567.3 kg/day. Solid waste generation rate considered is given in Table-11.

Table 11: Solid Waste Generation

Waste Generated Total Waste S. No. Particulars Occupancy/Area (Kg per capita per Generated day) Staff ( Terminal, 1 1590 0.25 397.5 Commercial) 2 Visitors 1132 0.15 169.8 Total Solid Waste Generation 567.3

22

Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

 Collection and Segregation of waste 1. A door to door collection system will be provided for collection of domestic waste in plastic bags from household units. 2. The local vendors will be hired to provide separate colored bins for dry recyclables and Bio-Degradable waste. 3. For commercial waste collection, adequate number of colored bins (Green, Blue, and Dark Grey bins separate for Bio-degradable and Non Bio-degradable) are proposed to be provided at the strategic locations of the commercial area. 4. Litter bin will also be provided in open areas like parks etc.  Treatment of waste

 Bio-Degradable wastes 1. Bio-degradable waste will be subjected to Organic Waste Converter and the compost/resultant will be used as manure. 2. Horticultural Waste is proposed to be composted and will be used for gardening purposes.  Recyclable wastes 1. Grass Recycling – The cropped grass will be spread on the green area. It will act as manure after decomposition. 2. Recyclable wastes like paper, plastic, metals etc. will be sold off to recyclables.  Non-Recyclable wastes Non-Recyclable wastes will be disposed through Govt. approved agency. Hence, the Municipal Solid Waste Management will be conducted as per the guidelines of Municipal Solid Wastes (Management and Handling) Rules, 2000 and amended Rules, 2016.  E- waste E-waste management will be conducted as per the guidelines of E-waste (Management) Amendment Rules, 2018

23

Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

 Battery Waste Battery waste management will be conducted as per the guidelines of Batteries (Management & Handling) Amendment Rules, 2010

Solid Waste

Biodegradable Waste Non-Biodegradable Waste

Recyclable Non-Recyclable

Green Bins Blue Bins Dark Grey Bins

Final disposal through a Final disposal through a Through Municipal Govt. approved agency / Govt. approved agency corporation authorized vendor /authorized vendor

Figure 3: Solid Waste Management Scheme

24

Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

14.0 GREEN AREA

The total landscape area (including green belt) for the proposed project is 10,000 m2. Evergreen tall and ornamental trees and ornamental shrubs have been proposed to be planted inside the premises. List of the Existing & Proposed plants at the project site are given in Table 12&13 respectively.

Table 12:- List of Existing Plants

SI. No. Botanical Name Local name 1. Acacia auriculiformis Australian wattle 2. Adina cordifolia Kadam 3. Alstonia schloaris Chitwan 4. Antocephalous chinesis Kadam 5. Areca catechu Beetle nut 6. Azadirachta indica Neem 7. Bassia latifolia Mahua 8. Bauhinia acuminata Kanchan 9. Bauhinia purpurea Kachnar 10. Caesalpinia Bonduc Sagargota 11. Callistemon lanceolatus Bottle brush 12. Cassia fistula Amaltas 13. Chandani Chandani 14. Citrus aurantifolia Lime 15. Cocos nucifera Coconut palm 16. Dalbergia sisoo Sisam 17. Delonix regia Gulmohar 18. Delonix regia Gulmohar

25

Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

19. Duabanga grandiflora Duabanga 20. Ficus benjamina Chilubor 21. Ficus glomerata Gular 22. Ficus indica Cactus 23. Ficus religiosa Peepal 24. Grevillea robusta Silver Oak 25. Hibbiscus hirusta Godhal 26. Nerium indicum Kaner 27. Phoenix dactylifera Date Palm 28. Polyathia longifolia Ashoka 29. Samanea saman Rain Tree 30. Saraca indica Ashoka 31. Sesbania grandiflora August (Sesbania) 32. Spathodea campanulata Fountain Tree 33. Tectona grandis Teak 34. Terminalia arjuna Arjuna 35. Thuja occidentalis White cedar 36. Ziziphus jujuba Jujube

26

Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

Table 13:- List of Proposed Plants

S.No. Names Ground Cover Plants- 4791 Nos. 1. Clerodendrum inerme (Glorybower, Bagflower)

Trees- 12 Nos. 2. Azadirachta indica (Neem)

3. Hyophorbe lagenicaulis (Bottle Palm)

Shrubs – 1525 Nos. 4. Cassia biflora

Creepers- 896 Nos.

5. Bougainvillea (Different Varieties) a Butania b Lady Mary Baring c Mahara d Scarlet queen e Varigata f Glabra Formosa g Peruviana Odissi h Partha i Subhra j Thimma k Spectabilis L.N Birla l Refulgens Total No. of Proposed Plants- 7224

27

Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

15.0 DETAILS OF CONSTRUCTION MATERIALS

List of building materials being used at site: 1. Coarse sand 2. Fine sand 3. Stone aggregate 4. Stone for masonry work 5. Cement 6. Reinforcement steel 7. Pipe scaffolding (cup lock system) 8. Bricks 9. CLC fly ash blocks 10. Crazy (white marble) in grey cement 11. P.V.C. conduit 12. MDS, MCBs 13. PVC overhead water tanks 14. 2 1/2'’ thick red colour paver tiles 15. PPR (ISI marked) 16. PVC waste water lines 17. S.W. sewer line up to main sewer 18. PVC rain water down take 19. Stainless steel sink in kitchen 20. Joinery hardware- ISI marked

28

Construction (Improvement & Redevelopment) of Flyover, Foot over Bridge, Bus Stand Buildings including Commercial Building, Multi level Car Parking, Road Works and other Allied Works under Kalyan Station Precinct Improvement Project under Smart City Mission on EPC mode for SKDCL CONCEPTUAL PLAN

16.0 TENTATIVE LIST OF MACHINERY USED DURING CONSTRUCTION

(i) Dumper (ii) Concrete mixer with hopper (iii) Excavator (iv) Concrete Batching Plant (v) Cranes (vi) Road roller (vii) Bulldozer (viii) RMC Plant (ix) Tower Cranes (x) Hoist (xi) Labor Lifts (xii) Pile Boring Machines (xiii) Concrete pressure pumps (xiv) Mobile transit mixer

29

EXIT

ENTRY