Construct and Operate Glencassley Wind Farm At
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
North Sutherland Land Management Plan 2016-2026
North Sutherland Land Management Plan 2016-2026 North Highland Forest District North Sutherland Land Management Plan 2016 - 2026 Plan Reference No:030/516/402 Plan Approval Date:__________ Plan Expiry Date:____________ | North Sutherland LMP | NHFD Planning | North Sutherland Land Management Plan 2016-2026 Contents 4.0 Analysis and Concept 4.1 Analysis of opportunities I. Background information 4.2 Concept Development 4.3 Analysis and concept table 1.0 Introduction: Map(s) 4 - Analysis and concept map 4.4. Land Management Plan brief 1.1 Setting and context 1.2 History of the plan II. Land Management Plan Proposals Map 1 - Location and context map Map 2 - Key features – Forest and water map 5.0. Summary of proposals Map 3 - Key features – Environment map 2.0 Analysis of previous plan 5.1 Forest stand management 5.1.1 Clear felling 3.0 Background information 5.1.2 Thinning 3.1 Physical site factors 5.1.3 LISS 3.1.1 Geology Soils and landform 5.1.4 New planting 3.1.2 Water 5.2 Future habitats and species 3.1.2.1 Loch Shin 5.3 Restructuring 3.1.2.2 Flood risk 5.3.1 Peatland restoration 3.1.2.3 Loch Beannach Drinking Water Protected Area (DWPA) 5.4 Management of open land 3.1.3 Climate 5.5 Deer management 3.2 Biodiversity and Heritage Features 6.0. Detailed proposals 3.2.1 Designated sites 3.2.2 Cultural heritage 6.1 CSM6 Form(s) 3.3 The existing forest: 6.2 Coupe summary 3.3.1 Age structure, species and yield class Map(s) 5 – Management coupes (felling) maps 3.3.2 Site Capability Map(s) 6 – Future habitat maps 3.3.3 Access Map(s) 7 – Planned -
River Oykel Special Area of Conservation (Sac)
RIVER OYKEL SPECIAL AREA OF CONSERVATION (SAC) CONSERVATION ADVICE PACKAGE Image: © Lyn Wells, NatureScot Site Details Site name: River Oykel Site map: https://sitelink.nature.scot/site/8363 Location: Highlands and Islands Site code: UK0030261 Area (ha): 921.46 Date designated: 17 March 2005 Qualifying features Qualifying feature SCM assessed condition SCM visit UK overall on this site date Conservation Status Freshwater pearl mussel Unfavourable - No change 8 April 2015 Unfavourable – (Margaritifera bad margaritifera) [S1029] Atlantic salmon (Salmo Favourable – Recovered 7 July 2011 Unfavourable- salar) [S1106] Inadequate Notes: Assessed condition refers to the condition of the SAC feature assessed at a site level as part of NatureScot’s Site Condition Monitoring (SCM) programme. Conservation status is the overall condition of the feature throughout its range within the UK as reported to the European Commission under Article 17 of the Habitats Directive in 2019. Overlapping and linked Protected Areas The River Oykel SAC includes main stem of the River Oykel, which rises within Ben More Assynt Site of Special Scientific Interest (SSSI) https://sitelink.nature.scot/site/191 The river flows through Loch Ailsh, which is part of Inverpolly, Loch Urigill and nearby Lochs Special Protection Area (SPA) https://sitelink.nature.scot/site/8516 and Loch Awe and Loch Ailsh SSSI https://sitelink.nature.scot/site/1710. It also flows through Oykel Gorge SSSI https://sitelink.nature.scot/site/1264 Kyle of Sutherland Marshes SSSI https://sitelink.nature.scot/site/885 The River Oykel SAC also includes two principle tributaries of the River Oykel: the River Cassley which rises within a different part of Ben More Assynt SSSI https://sitelink.nature.scot/site/191 the River Einig which rises within Beinn Dearg SAC https://sitelink.nature.scot/site/8198 and Beinn Dearg SSSI https://sitelink.nature.scot/site/165 The seaward end of the River Oykel SAC meets the Dornoch Firth and Morrich More SAC https://sitelink.nature.scot/site/8242 at Bonar Bridge. -
The Scottish Government Energy Consents Unit Scoping Opinion On
The Scottish Government Energy Consents Unit Scoping Opinion on behalf of Scottish Ministers under the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017 Glencassley Wind Farm SSE Renewables Developments (UK) Limited On behalf of SSE Generation Ltd (SSEG) October 2019 CONTENTS 1 Introduction………………………………………………………………… Page 2 2 Consultation……………………………………………………………….. Page 3 3 The Scoping Opinion……………………………………………………... Page 4 4 Mitigation Measures………………………………………………………. Page 6 5 Conclusion…………………………………………………………………. Page 6 ANNEX A………………………………………………………………………...Page 8 1 1. Introduction This scoping opinion is issued by the Scottish Government Energy Consents Unit on behalf of Scottish Ministers to SSE Generation Ltd (SSEG), a company incorporated under the Companies Acts with company number 02310571 and having its registered office at No.1 Forbury Place, 43 Forbury Road, Reading, United Kingdom, RG1 3JH (“the company”). This is in response to a request dated 15 August 2019 for a scoping opinion under the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017 in relation to the proposed Glencassley Wind Farm (“the proposed development”). The scoping opinion request was accompanied by a scoping report which was prepared by Ash Design & Assessment Ltd on behalf of SSE Generation Ltd. The proposed Development is located on Glencassley and Glenrossal Estates, approximately 4 kilometres (km) north of the village of Rosehall and 9 km south-west of Lairg within the Highland region of Scotland. The proposed Development will consist of 26 wind turbines. The site lies on the east side of Glen Cassley, approximately 1.5 km from the River Cassley which runs parallel to the south-western part of the site. The ground cover of the site is predominately rough grassland and heather moorland, which forms part of a Highland Sporting estate. -
Glencassley Wind Farm Proposal Public Exhibition
Glencassley Wind Farm proposal Public Exhibition Welcome Glencassley Wind Farm proposal Welcome Thank you for taking time to come along to today’s exhibition on the proposed Glencassley Wind Farm. It is important to us that we hear and understand your views, so we welcome your feedback. Please feel free to chat with us or just take a feedback form if you prefer. Project Overview This exhibition presents proposals to construct and operate a wind farm on Glencassley and Glenrossal Estates (close to Achany), near Lairg, Sutherland. A previous application submitted in 2012 for a 26 turbine site with a tip height of 126.5m was supported by The Highland Council, but was ultimately refused by Scottish Ministers in 2015 due toimpactsontheNationalScenicAreaandWild Land. Due to increased demand for renewable energy and the requirement to reduce carbon emissions further, the opportunities for renewable energy generation at Glencassley are being revisited, taking into account previous concerns. Site Location Plan Key Distances: • 7 km north of Rosehall • 11.8 km to Oykel Bridge • 12 km west of Lairg • 22.5 km from Bonar Bridge • 23 km from Ardgay © Crown copyright and database rights 2019 Ordnance Survey 0100031673. Glencassley Wind Farm proposal The Project The site offers excellent potential for a wind farm development due to its wind resource and proximity to the neighbouring wind developments at Achany and Rosehall. The project team are in the process of reviewing the previous design to optimise the layout for the wind turbines which are currently available, whilst taking into consideration the concerns previously raised about the prominence and proximity of turbines in views from the nearby Assynt Coigach National Scenic Area (NSA) and to core areas of wild land. -
Kyle Fisheries Annual Report 2016
Kyle Fisheries Annual Report 2016 By Dr Keith L Williams, Director & Clerk Kyle of Sutherland District Salmon Fishery Board Kyle of Sutherland Fisheries Trust Bank Hosue Ardgay Sutherland IV24 3BG 01863 766 702 [email protected] [email protected] www.kylefisheries.org Kyle of Sutherland Fisheries Trust Chairman Robbie Douglas Miller Trustees Michael Brown John Green Tom Inglis Gregor Macleod Steven Mackenzie (River Workers Representative) Richard Sankey Kyle of Sutherland District Salmon Fisheries Board Chairman Robbie Douglas Miller, Lower River Shin Proprietors John Green, Lower Oykel Nicky Griffiths, Braelangwell Estate Gary Gruber, Skibo Estate Michael Hasson, Glenrossal Estate Alex Hunter, Dounie Estate Richard Sankey, Upper Oykel Co-optees William Paterson, Netsman George Skinner, Tennant Netsman Calvert Stinton, Kyle of Sutherland Angling Association Ashe Windham, Upper Oykel Clerk Dr Keith L Williams Staff Dr Keith L Williams, Director John Audsley, Bailiff Iain Gollan, Bailiff Philip Blowers, Bailiff 2 Chairman’s Foreword Many of you in the Kyle region and further afield in Scotland might be forgiven for thinking the Scottish Government have lost the plot. After 3 years of talking, endless meetings, a great deal of time planning and considerable cost incurred “Wild Fisheries Reform” was abandoned to all intents and purposes in early 2017. I guess we will all have a view as to whether this was an opportunity lost or a nightmare avoided but the process is something that the Scottish Government need to learn from. For nearly 4 years jobs have been as risk, investment stymied, confusion created, opportunities lost and normal business suspended. This is a great shame and I hope the Minister thinks twice before entering the fray again. -
Item 4. Economy and Infrastructure Capital
Agenda 4 Item Report ECI/13/2021 No HIGHLAND COUNCIL Committee: Economy and Infrastructure Date: 5 May 2021 Report Title: Economy and infrastructure Capital Programme Update Report By: Executive Chief Officer Infrastructure and Environment 1. Purpose/Executive Summary 1.1 This report updates members on progress on the Economy and Infrastructure projects in the approved Capital Programme. 1.2 Approval is sought to allocate capital funding from the Bridges Retaining Walls and Culverts budget to Tordarroch Bridge to effect repairs following an unknown bridge strike. 1.3 Uig ferry terminal tenders have been returned following agreement of the scope of works and procurement strategy with Transport Scotland. Tenders are in line with the pretender estimate. A submission for funding has been made to Transport Scotland and approval is anticipated on the 25 May 2021. This paper seeks delegated power to accept the grant funding and award the contract to the Executive Chief Officer Infrastructure and Environment in consultation with the Chair and Vice Chair of Economy and Infrastructure Committee, this to achieve the programme constraints associated with the planned cessation of ferry operations at Uig between 12 September 2022 to 3 February 2023. 1.4 Finally, the report provides an update on the Strategic Timber Transport Fund bids. 2. Recommendations 2.1 Members are asked to:- 1. Note the progress made during the current financial year with the Economy and Infrastructure projects in the Council’s Capital programme; 2. Approve that Tordarroch Bridge is added to the list of structures to be funded from the Bridges Retaining Walls and Culverts line of the approved Capital Programme included in appendix 1 of Report ECI/38/20; 3. -
Roads Capital Update
Agenda 7 Item Report RB/13/21 No HIGHLAND COUNCIL Committee: Recovery, Improvement and Transformation Board Date: 23 August 2021 Report Title: Roads Capital Update Report By: Executive Chief Officer Infrastructure, Environment and Economy 1. Purpose/Executive Summary 1.1 The purpose of this report is to update the Board on the work being undertaken as part of the Roads and Transport Transformation Programme as well as providing the Board with an overview on the additional roads capital spend agreed by Council. Appendix 1 provides information on what will covered by a report to the forthcoming Economy and Infrastructure Committee on 2 September, and supplements the information already covered elsewhere on this agenda. 2. Recommendations 2.1 Members are asked to note the updates provided. 3. Implications 3.1 Resource - as detailed in the attached report. The additional capital funding supports the key priority of the Council to ‘maintain the current funding for our local road network and continue to make the case for additional resources in recognition of the unique challenges and costs of maintaining the largest road network in the UK’. 3.2 Legal - The Council, as Roads Authority, has a duty under the Roads (Scotland) Act 1984 to manage and maintain the adopted road network. 3.3 Community (Equality, Poverty and Rural) - There is a risk that if road conditions deteriorate, access to low trafficked roads in rural areas and urban streets may become more restrictive as precedence is given to maintaining the strategic road network. However, the majority of the Strategic H1 network is rural and provides vital links between communities and transport hubs. -
Site Description Developer
WELCOME TO OUR PUBLIC CONSULTATION EVENT Stock photography Welcome to the public consultation for Site description the proposed ESB Chleansaid Wind The proposed development site is on the Farm on the Dalnessie Estate located Dalnessie Estate, off the A836 and about 13 km to 13 km to the north-east of Lairg. the north-east of Lairg in the Scottish Highlands. Utilising the natural environment to harness The site lies in the North, West and Central clean, zero-carbon energy, the Chleansaid Wind Sutherland ward of The Highland Council area. Farm project will, if consented, support local The proposed site is currently a shooting estate construction companies along with local supply with rough grazing land for sheep. chains during its operation; offer community benefit and shared ownership opportunities; and, support the long-term management of the estate. Developer The proposed development site benefits from ESB is developing Chleansaid Wind Farm. ESB good wind speeds, existing site access and a is Ireland’s premier energy company and a nearby grid connection point, and has no on-site leading independent power generator in the UK environmental designations. market. The company has a track record of over 20 years as a successful investor in the UK since commissioning one of the first independent power generation plants at Corby in Northamptonshire in 1994. ESB owns and operates wind farms across the UK and Ireland with a total installed capacity of 600 MW. CHLEANSAID WIND FARM THE PROPOSED DEVELOPMENT Stock photography 259000 260000 261000 262000 263000 264000 265000 Legend: ESB wishes to construct a new onshore The Project Area (! Proposed Turbines wind farm with up to 16 turbines that aims 0 0 0 9 16 1 (! 9 15 to deliver energy generation in excess (! 10 (! of 50 MW. -
Site Gazetteer
Site Gazetteer Site Number 1 Site Name Shin Railway Viaduct Type of Site Listed Building NMRS Number LB279 HER Number Status Category A Easting 257893 Northing 895274 Parish Creich (Highland) Council Highland Description Shin Railway Viaduct Category A: Listed Building Joseph Mitchell and Murdoch Paterson, 1867. Iron-truss bridge with 2 tall semicircular arched approach spans at south, and 3 at north linked by wide cast-iron lattice girder bridge in 10 sections. Coursed rubble, tooled rubble dressings and arched rings; tooled rubble coped approach parapets. Some later repair rendering to arched rings on north side. Statement of Special Interest Built 1867 for The Sutherland Railway. Polished granite plaque on north side reads; "Erected 1867 by The Sutherland Railway Co. mainly promoted by George Cramville William Third Duke and Twenty-first Earl of Sutherland". Iron portion of bridge measures 230' (70.1m) South bank of Kyle of Sutherland in Kincardine Parish. Site Number 2 Site Name Invernauld Bridge Type of Site Listed Building NMRS Number LB266 HER Number Status Category B Easting 249129 Northing 900497 Parish Creich (Highland) Council Highland Description Invernauld Bridge Category B: Listed Building Earlier 19th century, high single span bridge; coursed rubble, polished ashlar keystoned arched ring, string course and parapet cope; arched ring flanked by shallow pilasters with terminal caps; similar terminal detailing to splayed approach parapets. Site Gazetteer Site Number 3 Site Name Rosehall House Type of Site Listed Building NMRS Number LB275 HER Number Status Category B Easting 247487 Northing 901585 Parish Creich (Highland) Council Highland Description Rosehall House and walled garden Category B: Listed building 1818-25, dated 1822 but probably incorporating earlier fabric, 'improvements' by Alexander Ross, 1873 (see Notes). -
Chapter 10: Hydrology and Hydrogeology Environmental Impact Assessment Report
Achany Extension Wind Farm Chapter 10: Hydrology and Hydrogeology Environmental Impact Assessment Report CHAPTER 10: HYDROLOGY AND HYDROGEOLOGY 10.1 Executive Summary 10-1 10.2 Introduction 10-2 10.3 Scope of Assessment 10-2 10.4 Legislation, Policy and Guidance 10-12 10.5 Methodology 10-13 10.6 Baseline 10-16 10.7 Potential Effects 10-19 10.8 Mitigation 10-24 10.9 Residual Effects 10-27 10.10 Cumulative Effects 10-27 10.11 Monitoring 10-27 10.12 Conclusion 10-28 10.13 References 10-32 Figures (Volume 3) Figure 10.1: Surface Water Features Figure 10.2: Private Water Supplies Figure 10.3: Hydrogeology Figure 10.4: High GWDTEs based on NVC survey Figure 10.5: GWDTE classification based on hydrological analysis Technical Appendices (Volume 4) Technical Appendix 10.1: Groundwater Dependent Terrestrial Ecosystem (GWDTE) Assessment Technical Appendix 10.2: Watercourse Crossing Assessment July 2021 10-i Achany Extension Wind Farm Chapter 10: Hydrology and Hydrogeology Environmental Impact Assessment Report 10. Hydrology and Hydrogeology 10.1 Executive Summary 10.1.1 The Proposed Development is located within the River Cassley hydrological catchment which forms part of the River Oykel Special Area of Conservation (SAC). Several smaller named and unnamed watercourses flow directly from the Site to the River Cassley. 10.1.2 Following the implementation of appropriate mitigation measures managed through the Construction Environmental Management Plan (CEMP), Pollution Prevention Plan (PPP) and adherence to regulatory guidance, there would be no significant effects on the hydrology or hydrogeology of the Site associated with the construction, operation and decommissioning of the Proposed Development. -
Salmonquest Guide to Salmon Fishing on the Nc500
Version 1.3 clockwise Table of Contents Introduction ........................................................................................................................................... 3 The West Coast ...................................................................................................................................... 6 River Carron ....................................................................................................................................... 6 Badachro System ................................................................................................................................ 6 River Ewe ............................................................................................................................................ 7 Ullapool River ..................................................................................................................................... 8 River Kanaird ...................................................................................................................................... 8 River Kirkaig ........................................................................................................................................ 8 River Inver .......................................................................................................................................... 9 Laxford System ................................................................................................................................. 10 Rhiconich -
Lairg to Loch Buidhe 132 Kv Overhead Line at Land 1000 M SE of Dalchork
Agenda 3.3 Item Report HC/52/19 No HIGHLAND COUNCIL Highland Council Committee: Date: 12 September 2019 19/01236/S37: Scottish and Southern Electricity Works Report Title: Land 1000M SE Of Dalchork House, Lairg Report By: Acting Head of Development Management – Highland 1. Purpose/Executive Summary 1.1 Description: Lairg to Loch Buidhe 132kV overhead line Ward: 1 – North, West and Central Sutherland 1.2 Development category: National Reason referred to Committee: National development in association with application ref: 19/00374/FUL which requires full Council referral All relevant matters have been taken into account when appraising this application. It is considered that the proposal accords with the principles and policies contained within the Development Plan and is acceptable in terms of all other applicable material considerations. 2. Recommendations 2.1 Members are asked to agree the recommendation to Raise No Objection as set out in section 11 of the report. 3. PROPOSED DEVELOPMENT 3.1 This application comes under the category of “National Development” as set out in the Scottish Government’s third National Planning Framework Plan (NPF3). The Council is a consultee to the Section 37 application under the Electricity Act which will ultimately be determined by Scottish Ministers. The proposed development comprises the construction of a new double circuit 132kV transmission line will start at a proposed new substation 3km north of Lairg (applied for under planning reference 19/00374/FUL) running south for 16km and an underground cable to connect to the existing Loch Buidhe substation. A further 1km section of OHL is proposed from the proposed new substation in a northerly direction to connect into the existing Cassley to Shin 132kV overhead line.