PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT

APPLICANT : M/s SRI L AKSHMI STONE CRUSHER 1

QUARRY PROJECT OF

M/s SRI LAKSHMI STONE CRUSHER

PROJECT FEASIBILITY REPORT ( PFR )

QUARRY SITE AT KANICHAR VILLAGE, TALUK, DISTRICT,

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Managing Director

APRIL , 2017 Mr. C. G. GEORGE

PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT

APPLICANT : M/s SRI LAKSHMI STONE CRUSHER 2

INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 4 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION 6 2.(i) Identification of project and project proponent 6 2.(ii) Brief description of the Nature of the project 6 2.(iii) Need for the project and its importance to the Country and or Region 7 2.(iv) Demand – Supply Gap 7 2.(v) Imports Vs. Indigenous Production 7 2.(vi) Export Possibility 7 2.(vii) Domestic / Export Markets 8 2.(viii) Employment generation (Direct & Indirect) due to the project 8 3.0 PROJECT DESCRIPTION 8 3.(i) Type of project including interlinked and interdependent projects 8 3.(ii) Location (map showing General Location, Specific Location & Project boundary & 8 Project site layout) with coordinates 3.(iii) Details of Alternate sites considered and the basis of selecting the proposed site, 9 particularly the environmental considerations 3.(iv) Size or magnitude of operation 9 3.(v) Project description with process details (a schematic diagram / flow chart showing 9 the project layout, components of the project etc should be given) 3.(vi) Raw material required along with estimated quantity, likely source, marketing area 12 of final products, mode of transport of raw materials and financial provisions 3.(vii) Resource optimization / recycling and reuse envisaged in the project 13 3.(viii) Availability of water its source, energy / power requirement & source 13 3.(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their 14 management / disposal 4.0 SITE ANALYSIS 15 4.(i) Connectivity 15 4.(ii) Land form, land use and land ownership 15 4.(iii) Topography (along with map) 16 4.(iv) Existing land use pattern (agriculture, non-agriculture, forest, water bodies 16 (including area under CRZ)), shortest distances from the periphery of project. 4.(v) Existing Infrastructure 16 4.(vi) Soil Classification 17 4.(vii) Climatic Data 17 4.(viii) Social Infrastructure Available 17 5.0 PLANNING BRIEF 18 5.(i) Planning Concept (Type of industries, facilities, transportation etc.) Town & 18 Country Planning / Development Authority Classification 5.(ii) Population Projection 18 5.(iii) Land Use Planning (Break-up along with green belt etc.) 18 5.(iv) Assessment of Infrastructure Demand (Physical & Social) 18 5.(v) Amenities / Facilities 18

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Managing Director

APRIL, 2017 Mr. C. G. GEORGE

PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT

APPLICANT : M/s SRI LAKSHMI STONE CRUSHER 3

6.0 PROPOSED INFRASTRUCTURE 19 6.(i) Industrial Area (Processing Area) 19 6.(ii) Residential Area (Non-processing area) 19 6.(iii) Green belt 19 6.(iv) Social Infrastructure 19 6.(v) Connectivity (Traffic & Transportation Road / Rail etc.) 19 6.(vi) Drinking Water Management (Source & Supply of water) 19 6.(vii) Sewerage system 19 6.(viii) Industrial Waste Management 19 6.(ix) Solid Waste Management 20 6.(x) Power Requirement & Supply / Source 20 7.0 Rehabilitation and Resettlement (R & R Plan) 20 7.(i) Policy to be adopted (Central / State) in respect of the project affected persons 20 including home oustees, land oustees and landless 8.0 PROJECT SCHEDULE AND COST ESTIMATES 20 8.(i) Likely date of start of production and likely date of completion (time schedule for 20 the project will be given) 8.(ii) Estimated project cost along with analysis of economic viability of project 21 9.0 ANALYSIS OF PROPOSAL 21 9.(i) Financial and Social Benefits with special emphasis on the benefits to the local 21 people including tribal population

LIST OF ANNEXURES Annexure No. Particulars 1. Copy of Letter of Intent ( LOI ) / Mine Lease 2. Photographs of the Site 3. Route Map showing location of the project site 4. Google map showing location of the project site 5. Key map of the project site 6. Topographical Contour Map 7. Production & Development Plan 8. Surface cum Geological Plan 9. Cluster Certificate

LIST OF TABLES Table No. Particulars 1. List of employees 2. Size or magnitude of operation 3. List of equipments used 4. Year wise production details 5. Land use of lease area 6. Social infrastructure around the project site 7. Expected time schedule for the project 8. Estimated project cost and economic viability

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Managing Director

APRIL, 2017 Mr. C. G. GEORGE

PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT

APPLICANT : M/s SRI LAKSHMI STONE CRUSHER 4

1.0 EXECUTIVE SUMMARY The building Stone Quarry (Minor Mineral) project of M/s Sri Lakshmi Stone Crusher is situated at Re-Survey No. 1561, Kanichar Village, Iritty Taluk, , Kerala in an area of 0.9898 hectares. The project proponent possess Letter of Intent (LOI) for the quarry project issued by Mining & Geology Department, Govt. of Kerala and copy of the same is attached as Annexure No. 1 . Mining projects of minor minerals with area less than 50 ha. of mining lease are categorized as category 'B'. As per O.M. dated 24/12/2013 by Ministry of Environment & Forests, Govt. of India, all projects with mining area less than 25 hectares is classified as Category B2. The Eco-friendly Mining Plan prepared by an Indian Bureau of Mine (IBM) approved Recognized Qualified Person (RQP) has been approved by Mining & Geology Department, Govt. of Kerala . This Mining plan is based on the requirements under the Kerala Minor Mineral Concession Rules, 2015. The land for the quarry project is private owned land and the land is possessed in name of M/s Sri Lakshmi Stone Crusher. The targeted production of mine will be 20,000 MTA. The estimated project cost is about Rs. 70 Lakhs. The expected life of mine estimated will be about 3 years. The mining operation will be carried out by opencast semi- mechanized method as per the approved Mining Plan.

1.1 SALIENT FEATURES & ENVIRONMENTAL SETTING OF THE PROJECT Particulars Details Geographical Location Latitude (N) 11 °50 '50 .41 "N to 11 °50 '53 .87 "N Longitude (E) 75°46 '54 .94 "E to 75 °46 '59 .15 "E

Total Mine Lease area 0.9898 hectare Total area owned by the proponent 13.8920 hectare Current status of the quarry Existing Quarry Project Local name of the project area 27 th Mile, Elambady Project Site Toposheet No. 19 M/13 Production 20,000 MTA Geological Reserves 3,06,348 MT Mineable Reserves 57,153 MT Life of Mine 3 years Estimated project cost Rs. 70 Lakhs Man Power 34 Persons Highest and lowest elevation 425m and 375m MSL Land use Private owned land with rocky area Nearest habitation About 176m towards West

ENVIRONMENTAL ENGINEERS & CONSULTANTS PVT. LTD. Managing Director

APRIL, 2017 Mr. C. G. GEORGE

PROJECT : Masonry Stone Mine (Quarry project) PRE - FEASIBILTY REPORT

APPLICANT : M/s SRI LAKSHMI STONE CRUSHER 5

Nearest Town , 9 km, NW Stone Crusher / M sand Available within the complex Width of access road to the site 7m wide road Nearest Airport Kannur Airport, 36 km, NW Nearest Highway / Major Roads NH- 17, about 40 km, West SH - 59, (Thalassery-Baveli Rd.) 220m, NW Nearest Railway Station Thalassery Station, 40 km, West Power supply The total power requirement will be 75 kW for compressors which will be operated by Diesel E ngine. Water and its Source The total water requirement is