Capital Investment Plan Appendix B Fiscal Years 2016-2020

APPENDIX B

DETAILED PROGRAM PLAN DATA

Appendix B provides detailed information about planned capital investments in the 5 year window of the plan. Each year, these details are updated to reflect any program changes.

ACTIVITIES AND BUDGET LINES The structure of Appendix B follows the structure presented in the FY 2016 President’s Budget Request. Budget Activities group together budget line items (BLI) with similar objectives. There are 6 budget activities in the FAA Facilities & Equipment (F&E) account for capital spending including engineering development, air traffic investments, other FAA investments, support contracts, personnel costs, and subscription and other services. Activity 5, personnel costs, is not discussed. The BLI shown within each budget activity provide a detailed description for each program. In some BLIs, related programs are shown and described together within a single write-up. This occurs when individual programs have the same overall objective (e.g. data communications) but each addresses a different aspect of the solution. Note that programs with planned funding beginning after FY 2016, while not included in the President’s Budget, are included in the CIP and are designated with an “X” in the BLI number or before the CIP title.

PROGRAM DESCRIPTION The program scope and purpose is provided in this section. Some programs may have distinctly different activities included within the overall program write-up. In this case, each program activity will be separately described and have its own Performance Output Goals.

ALIGNMENT OF PROGRAM TO FAA STRATEGIC PRIORITY AND PERFORMANCE METRIC Each program in the CIP is aligned with a single Strategic Priority and Performance Metric. The Strategic Priorities are part of the new framework for strategic planning and the metrics are based on the approved Agency Organization Success Indicators (OSI). The FAA specific metrics in the DOT strategic plan are included in the OSI metrics. To align all programs to an appropriate metric, some business planning metrics have also been included. Some programs, as a bi-product, may contribute to other metrics, but to maintain focus on the single performance metric these secondary contributions are not described.

RELATIONSHIP TO PERFORMANCE METRIC This section describes how the new system, service or capability provided by this program contributes to the selected Performance Metric. If available, quantifiable information has been provided. This section may also highlight how NAS safety or operations will change as a result of the new system, service or capability.

PERFORMANCE OUTPUT GOALS Output goals are the specific accomplishments, deliverables or work products that will be delivered for each year within the 5 year window of the plan. “None” indicates that no funding is planned for that year. Programs baselined for cost, schedule and performance have specific approved Acquisition Program Baseline (APB) milestones that are tracked for accomplishment and included as output goals. The FAA F&E appropriation can be obligated for up to 2 years after the year appropriated (funds available for 3 years). Program milestones and deliverables shown as output goals beyond the last year of planned funding are marked as “prior year funding”.

SYSTEM IMPLEMENTATION SCHEDULE A schedule is provided for programs deploying systems or upgrades into the NAS. When available, other information will also be provided to indicate how long the system will be in operation or when a system will be decommissioned. The schedule legend is as follows: