Securing our future

What matters most, Kāpiti?

Our proposed investment in infrastructure and facilities Our big issues Key decisions – should we: take a bigger role in housing? renew the Paekākāriki seawall a different way? set up a CCO (council- controlled organisation)? explore ways to have a role in the airport? Impact on rates DRAFTTell us what you think

Long-term Plan 2021-41 community consultation document April 2021 INTRODUCTION e 74 32

age 2

e Uruhi iti PAGE PAGE Waikanae Library Waikanae Kāp Newhanga Te centres Town Link road resilienc and safety Water upgrades Stormwater minimisation Waste Footpaths facilities community Ōtaki centre Indoor sports Reserve Ngā Manu Nature Playgrounds st upgrade Pool Ōtaki Park Maclean – T Kāpiti Gateway proposals Community Board Community Centre

MAJOR PROJECTS AND INITIATIVES • • • • • • • • • • • • • • • • ays ays ey part of the Costs and rates section is what 90

The k makes up our rates increase and how it affects different properties PAGE e in housing? ouncil-controlled ouncil-controlled ou think aekākāriki seawall seawall aekākāriki community consultation document for Long-term Plan 2021-41 | 3 Long-term document for consultation community Securing our future: Should Council take a bigger take Council Should rol the renew we Should P a different way? set up a CCO we Should (c organisation)? w Council explore Should to have a role in the airport? in the a role have to EY DECISIONS (or you (or can go online)

K • • • • stem

esponse ast section feedback is for Your Main topics for feedback sets out the big issues we’re Summary of topics us what y and tell find out more to How form Feedback COVID-19 COVID-19 r housing to Access climate to Responding change Managing growth our resilience Strengthening Government changes impacting Council    and recovery    Proposed changes to rating sy rating to changes Proposed and charges User fees Policies Impact on rates What rates help pay for for help pay What rates The focusing on, the main work we want do to andour four key decisions for consultation The l

• • • • • feedback Your 5: SECTION • • SECTION 3: Main topics Main for feedback 3: SECTION ISSUES BIG OUR • • Costs 4: SECTION rates and • • • • •

4

10

PAGE PAGE section the Mayor and Mana Whenua DRAFT Welcome Outline of the plan process Mana Whenua from Message the Mayor from Introduction In the Introduction perspectives their share Our direction and strategies key explains the work Council has done look to at the district’s needs and the our to contribute us help to developed community outcomes community’s wellbeing. That includes how we propose to manage our finances and assets for the benefit of the district

SECTION 1: Introduction SECTION 1: • • • •

To make it easy to find your way around, we’ve organised the document organised we’ve your way around, find it easy to make To sections. five into What’s in document this What’s as your what we is facing; our district document is about the big issues This consultation the important years; three do about them in the next planning to are members elected on. views your want decisions we key the four and way; under projects the had through input we’ve and the community plans our previous on It builds recent is based on the most proposed work most engagement. The matters What – including pandemic of the global ongoing impacts about likely have we information on councils. requirements – and new costs affected that’s how is making), and (with changes the Government nationally going on – globally, a lot There’s cover. to of information a lot so there’s do in our district; to want with what we locally astructure and facilities and astructure

Our proposed development of development Our proposed infr Our vision outcomes Our community Our kaupapa

• • • • SECTION 2: Our direction and key strategies key direction and Our 2: SECTION 1 | Kāpiti Coast District Council District 2 | Kāpiti Coast INTRODUCTION w s omment on any most matters ation (What ough this Securing our ors ors

osts for key district assets assets district key for osts    engagement)  document consultation community future ask questions, check out supporting information, with councill talk decisions and c on key views give other aspects give input to early prepar early input to give plan thr proposed review Sharp rises in replacement and maintenance maintenance and in replacement Sharp rises c cost insurance Higher inflation and and ho councils changes for Government respond we

COMMUNITY ROLE COMMUNITY Your opportunity to have a say have to opportunity Your • • • • • • • April 2021 From July 2021 July From May – June 2021 July 2020 – March 2021 2020 – March July SHARE AND CONSULT community consultation document for Long-term Plan 2021-41 | 5 Long-term document for consultation community Securing our future: DELIVER AGREED PLAN DELIVER AGREED ough ommunity What’s the process? the What’s onomy and preparing onomy and preparing CONSIDER FEEDBACK, REFINE AND FINALISE FEEDBACK, CONSIDER

eedback s ome more urgent ome more

GATHER VIEWS, SET STRATEGIC PRIORITIES AND PREPARE PROPOSED PLAN PROPOSED PLAN AND PREPARE PRIORITIES STRATEGIC VIEWS, SET GATHER  document consultation  and priorities, and requirements concerns on Council thr community plan to proposed present all f and consider review final plan and decide refine adopt plan and set rates consider all issues facing the district, c the district, facing all issues consider    growth expected for well Our district’s rebuild from COVID-19 and being COVID-19 from rebuild Our district’s impact future for ready change housing and climate like Priority issues bec which have ec our local Helping stimulate

COUNCIL ROLE COUNCIL • Our legislative responsibilities Our legislative • • • • Kāpiti Coast District Councillors District Kāpiti Coast What are we dealing with? with? dealing we What are • • • DRAFT most matters the What and in the year 2020. The final long- engagement in late by Council as the plan is decided term representatives elected community’s with the community. consultation after what this document is about. That’s The proposed plan has been prepared plan has been prepared The proposed needs, at our future by Council looking and the facing are we the challenges into It takes achieve. to want we outcomes with the agreed already priorities account throughout shared and views community Our long-term plan is the overarching 20-year what plan for overarching plan the is long-term Our every it produce district. three We our for will deliver Council years consulting with the community on priorities. How is the plan developed? plan is the developed? How Welcome | Kāpiti Coast District Council District 4 | Kāpiti Coast INTRODUCTION community consultation document for Long-term Plan 2021-41 | 7 Long-term document for consultation community Securing our future:

o know if you agree we should take a bigger role in improving the supply of housing – supply the in improving a bigger role take should we agree if you o know we need to ask your views on how we proceed now with the Paekākāriki seawall. We We seawall. with the Paekākāriki now proceed we on how views ask your need to we seawall:

 and becoming many in our community for of high concern is an area conscious are Councillors which your more urgent.  the do the right thing for to have some, but we will be disappointing for again at the wall that looking appreciate without further proceed to not be responsible so much that it would increased have The costs district. whole and consultation. consideration we want t want Housing: we Paekākāriki

• What are the explore to proposals key are and two projects of them are decisions. Two key on four views inviting your We’re decisions? new activity. • Our proposed plan which programme a specific recovery have pandemic. We the COVID-19 to on our response focus This plan has a strong to to make Council can contribution the biggest also determined have We and reviewing. monitoring invest will keep we in good impacts. the negative and reduce economy our local stimulate and activities to up our projects ramp is to recovery growth and resilience because Securing used the title our future have We years. few the next plan and budget for So, this is a stimulus that support projects – is about delivering programme works capital our expanded – especially plan our proposed for and be ready services core maintain need to we and upgrades renewals the infrastructure and provide recovery growth. expected our district’s Introduction from the Mayor katoa koutou Tēnā this consultation community in our with everyone share to I’m pleased members, elected On behalf of your 2021-41. Plan for our Long-term document for This COVID-19. to including responding facing are we the many challenges on reflects consulting are The plan we dealing with and are we complexities the with you share to want we because of information document has a lot our organisation from of the recommendations Also, one views. us your telling for the context have you ensure information more and share planning and operations of Council understanding improve need to that we was review about our progress. Our proposed community developed have plan. We long-term in the last with the community with the vision agreed sticking are We outcomes our thinking to who contributed everyone to Thank you face. we on the big issues our focus help keep to outcomes most. matters What through shared months and the ideas the past and engagement over including all the conversations can Council ways the best distil to hard worked have We district. about our wonderful passionate are people know We wellbeing. to contribute to and fulfil our responsibilities aspirations support our community’s I am and economy. environment our community, in strengthening our big issues reflect see that our outcomes will You said, on the As Rupene Waaka on our Council–Mana Whenua relationship. focus to an outcome have that we proud very development. of our district’s the future to is key partnership page, our strong previous DRAFT

| Kāpiti Coast District Council District 6 | Kāpiti Coast

Mana Whenua Message from from Message INTRODUCTION community consultation document for Long-term Plan 2021-41 | 9 Long-term document for consultation community Securing our future: t District mihi

K Gurunathan Kāpiti Coas Mayor, of the pandemic. Now, like a number of councils, we are looking at a higher rates increase. For 2021/22, we are are we 2021/22, For increase. rates at a higher looking are we of councils, a number like Now, of the pandemic. above, and, as I mention income on rates a high dependence have We of 7.8%. increase rates an average proposing burden. rates and ease the in the future this dependency reduce to might look we signals how the document Deciding on our this online (link) or in the feedback do can You views. your and share proposed what’s review time to take long-termPlease plan we before receive we all the comments review to undertake Council, we As your of this booklet. section at the back decide the final plan. Kāpiti. toitū tāngata, te toitū wai, te toitū whenua, te Toitū Ngā

Caption to come to Caption DRAFT our views on if we should investigate how there might be a role for the Council for might be a role there how investigate should on if we our views rates increase

average

cially and can generate a profit for our district which we as Council can’t do, so this may be a way to reduce reduce to a way be may do, so this can’t as Council we which our district for a profit generate and can cially we recommend we set up a CCO – council-controlled organisation – for future activities. CCOs operate operate activities. CCOs future – for organisation – council-controlled up a CCO set we recommend we

our fourth decision is to ask y decision is to Airport: our fourth commer CCO: you with consult would We effectively. very used by many councils are They income. on rates our dependence the CCO. for proposed about any activities in the future separately in the airport to keep services going. Again, your elected members are aware this is of high public interest. Looking Looking this is of high public interest. aware are members elected going. Again, your services keep in the airport to so owned in mind that the airport is privately keep need to we and in the airport will be complex role at a potential possibilities. explore to step the first taking about this is just

| Kāpiti Coast District Council District 8 | Kāpiti Coast some hard discussions. As you know, for the current year we limited the rates increase in response to the impacts the impacts to in response increase the rates limited we year the current for know, As you discussions. some hard Costs and proposed This has meant prices. material the pandemic to from effects – including flow-on on all fronts rising costs facing are We this is highlighted. this is highlighted. well as a consultation one. For some of these big issues there is also specific consultation coming up in the future, and up in the future, coming specific consultation is also there some of these big issues one. For as a consultation well and resilience. Your feedback will help us prioritise our actions. In this way, we see this as a ‘conversation document’ as see this as a ‘conversation we this way, will help us prioritise our actions. In feedback Your and resilience. You will see that we are asking questions about our direction on our big issues too – including climate change, growth, change, growth, – including climate too issues on our big our direction about asking questions are will see that we You Our big issues

• • OUR DIRECTION AND KEY STRATEGIES Manaakitanga NDPAreNT Supporting each other TŪPUNA Central government Central GrA

Pūkengatanga MĀTUA PAreNT Preserving, creating, creating, Preserving, Mana Whenua community consultation document for Long-term Plan 2021-41 | 11 Long-term document for consultation community Securing our future: eaching and knowledge t

rITo CHILDreN Connectedness Kāpiti community Kāpiti community Local stakeholders Local Whanaungatanga

(Council) MĀTUA PAreNT Kaunihera Kaunihera Identity Ūkaipōtānga | toitū Kāpiti | toitū

TŪPUNA Regional council GrANDPAreNT Kaitiakitanga Sustaining the Sustaining environment and the people environment DRAFT TE KAUPAPA MĀTUA KAUPAPA TE e is removed,

he tāngata! Maku e ki atu, he tāngata, he tāngata, reply, it is people, it is people, it is people! Ki mai ki ahau; He aha te mea nui o te Ao? thing in the world? I would be compelled to If the heart of the harakek Kei whaea te kōmako o ko? If I was asked; what was the most important This traditional saying, which may be familiar, be familiar, which may saying, This traditional but also of relationships, the strength reflects not nurtured are if they their vulnerability and sustained. Hutia te rito o te harakeke, Pā whakatauki harakeke Our native flax plant – pā harakeke – is used as a – is used harakeke plant – pā flax Our native whānau, and a model of protection for metaphor and wellbeing. whānau structure children, for the it is about strengthening As a philosophy whānau at the centre. the enduring show adopting this image to are We and Council Mana Whenua between relationship the community at the heart of our activities for us. It that surround and the wider relationships that nurtures the ‘eco-system’ for is a metaphor of hapori whānui the wellbeing and supports which this long-term (the wider community), to. contribute plan aims to the principles are of pā harakeke The roots and by representatives agreed and values together. guide our work to Councillors Our Mana Whenua–Council partnership to sustain our community sustain to partnership Whenua–Council Mana Our where will the bellbird sing? 2 | Kāpiti Coast District Council District 10 | Kāpiti Coast OUR DIRECTION AND KEY STRATEGIES

outcomes The community this our priorities for are plan. They’ll long-term our to help us respond our and keep challenges most what’s on focus important.

C I

M

O

N

O

C

E

L

A

T

they need they N

E M

and services and services

N

the resources the resources O

R

and can access access and can I S V

Everyone has a Everyone E N

and connected. and connected. E M sense of belonging d Counci healthy, thriving healthy,

n l economy Our local O a h in Kāpiti learn L

is prosperous with is prosperous community consultation document for Long-term Plan 2021-41 | 13 Long-term document for consultation community Securing our future: a a A

C u v R

are resilient, safe, safe, resilient, are e n opportunities ample T Our communities

e a U

U h T

for people to work and work to people for m L

O W U

u C Vibrant Vibrant a t Y economy

u n

T

L a

a

I

A l

I

toitū toitū

l M

Kāpiti N

Strong Strong

y C

. O U m

communities p S

i

a M

h

n

s Y

Thriving

a

M

r T

-

e I

environment e

O

n is the wellbeing focus Our ultimate in our district. of all the people n

t N

h r

C a a

n

p U STRONG COMMUNITIES STRONG c g i n M

R M |

U O O C low-carbon future low-carbon R transition to a to transition U

enhanced as we as we enhanced O

Our people have have Our people F is restored and is restored access to suitable suitable to access O housing in Kāpiti environment environment G so that they can can so that they

Our natural Our natural N live and thrive and thrive live I E LB EL W E TH VIBRANT ECONOMY VIBRANT |

Partnerships Community

OUR OUR CONTRIBUTION Infrastructure Infrastructure Corporate Planning and regulatory and priorities Our projects issues. Acting on important nancial strategy Our fi and services for pay we Managing how development. fund our community’s Our core services Our core services, efficient, reliable Delivering meet to and infrastructure facilities communities. the needs of our growing we need to need to we strategy In our financial in our district invest we how balance fund we done with how and get work much our activities, including how our community and how borrow we DRAFT rates. through contributes THRIVING ENVIRONMENT THRIVING toitū te whenua, toitū te wai, toitū te tāngata — toitū Kāpiti: the lifestyle choice Kāpiti: the lifestyle — toitū tāngata wai, toitū te whenua, toitū te te toitū OUR OUR CHALLENGES AND OPPORTUNITIES Liveability of Liveability our district and Rising costs income limited Managing well growth Being connected and resilient our Caring for environment OUR VISION: VISION: OUR

challenges and Our challenges opportunities reflect including our big issues what the community the said through most matters What engagement. the to Our services cover community all the activities we for. responsible are It includes all our such infrastructure supply as our water and roads and local all our facilities our pools and like libraries. We have kept the overall the overall kept have We with the vision agreed in the last community plan. long-term Our vision | Kāpiti Coast District Council District 12 | Kāpiti Coast OUR DIRECTION AND KEY STRATEGIES

The challenges and opportunities build on what and opportunities build The challenges with the community identified together have we long-term two of the past the development through combine They continuity. is strong plans so there of our community and aspirations the concerns in this tackle to sees as key Council and issues and support for COVID-19 to plan. Our response sits and rebuilding recovery the community’s as an additional focus. alongside three of the plan, and in the next the course Over the help address aim to we in particular, years in our scope do what’s to hard and work challenges benefit our district. to use the opportunities to community consultation document for Long-term Plan 2021-41 | 15 Long-term document for consultation community Securing our future:

Managing growthManaging well Liveability district of our Caring for our environment Being connected and resilient Rising costs income and limited Caption to come to Caption Our challenges and opportunities shown opportunities and these are which also present challenges some significant have we that Our plan recognises in our vision diagram.

DRAFT

The airport is an our of keeping on the importance Many commented asset to do more Council to for a plea was airport. There business. open for it remains ensure People can no longer many. for housing is a concern A lack of affordable afford who to those residents for concern is particular There live here the leave to forced here, live to afford no longer can active a more be playing Council could feel People district. iwi government, with central in working role and other parties in finding solutions. Parks, playgrounds and appreciated are and open spaces Our parks and open as well spaces, new for is a desire used. There well spaces of and protection maintenance as improvements, and open spaces. parks existing Connected communities and connectedness of community sense is a real There that responses through clear and it’s pride in our district Council to looking are People other. each for care people as well this connectedness, and foster help strengthen to resilience. community as build Infrastructure roading better to water, drinkable clean providing mattersFrom maintaining, feel people footpaths, accessible and more is what matters infrastructure managing and improving as our population grows. especially most, Plan for quality quality growth, plans for that Council It is important growth and housing stock increasing to in relation particularly with ensuring be balanced change. This needs to climate maintained, is effectively infrastructure our existing grow. as we managed and expanded

community for the community | Kāpiti Coast District Council District 14 | Kāpiti Coast effort especially in its response to climate change. climate to response in its especially effort many, with some wanting to see Council make a greater a greater see Council make to with some wanting many, Protecting our environment and wildlife is top of mind for of mind for is top and wildlife our environment Protecting multiple channels. multiple Our environment needs help, we need to act now with iwi, stakeholders and the wider community through through and the wider community with iwi, stakeholders open, and to communicate and consult more meaningfully meaningfully more and consult communicate open, and to There is a desire for Council to be more transparent and transparent be more Council to for is a desire There especially given the growth the district is experiencing. experiencing. is the district the growth given especially It is important that Council is cautious with spending, that Council is cautious It is important A smart and savvy Council that works with the community library in Waikanae. in Waikanae. library community themes across the four questions. the four questions. themes across a new demand for is strong There meet and connect. A wide range of issues and ideas was raised with key with key raised and ideas was of issues A wide range to people for space an essential provide they as books, haveyoursay.kapiticoast.govt.nz/what-matters-most As well our communities. to important are Libraries from more than 200 people. You can read them all here: them all here: read can You than 200 people. more from Libraries are more than just books we are experiencing. We received over 400 comments 400 comments over received We experiencing. are we future, our neighbourhoods, COVID-19, and the growth growth and the our neighbourhoods, COVID-19, future, community to share what mattered most for our district’s district’s our for most what mattered share to community in November and December 2020, we asked the the asked we 2020, and December in November In the lead-up to development of this long-term plan, long-term of this development to In the lead-up Council teams. meetings and service requests responded to by our to responded requests meetings and service Takutai Kāpiti climate summit, to public input at Council public input at Council to summit, climate Kāpiti Takutai covers a range of situations from special events like our like special events of situations from a range covers members and Council staff throughout the year. This the year. throughout Council staff and members and interaction between the community and elected and elected the community between and interaction Developing our strategic direction draws on engagement on engagement draws direction our strategic Developing

and aspirations Our community’s concernsOur community’s OUR DIRECTION AND KEY STRATEGIES

o actively promote existing local business and facilitate and facilitate business local existing promote o actively s that provide the most potential for economic wellbeing. for potential the most s that provide ail and air al government and others to deliver housing solutions deliver to and others al government community consultation document for Long-term Plan 2021-41 | 17 Long-term document for consultation community Securing our future: ommunities’ wellbeing ommunities’ ection through our stormwater network. our stormwater ection through sons. e practices in the community to see a reduction in carbon and waste and waste in carbon see a reduction to in the community e practices velopment of regional hubs of regional velopment es within Council service delivery delivery es within Council service ough dune restoration and native planting and native ough dune restoration ommunity projects and initiatives ommunity projects s available to it to facilitate increased supply increased facilitate it to to s available ough reducing Council’s carbon emissions to zero within the term of the plan within the term zero to emissions carbon Council’s ough reducing s, and promoting the district as a destination the district s, and promoting and learn Kāpiti in Vibrant economy Pūkengatanga/Whanaungatanga a low-carbon future Thriving environment Kaitiakitanga/Pūkengatanga Kāpiti suitable access in to housing peopleOur so can they have that live and thrive – Housing communities Strong Ūkaipōtānga Our local economy is local prosperousOur with economy ample opportunities for people to work as naturalOur is transition we restored environment and enhanced to partnering with iwi, local organisations, centr organisations, partnering with iwi, local power using the regulatory per older social housing for providing seeking government investment/de seeking government such as r connections transport our improving t and others organisations local partnering with iwi, event funding local our c benefits economy ensuring the local thr by example leading practic embedding sustainable c and empowering facilitating sustainabl and promoting educating thr our environment restoring quality and prot ensuring our freshwater and encourage new businesses to establish to businesses new and encourage growing skills and capability, and potential for jobs, especially for young people people young for jobs, especially for and potential skills and capability, growing of sector and promotion supporting the growth Do you think these us your views: go to the feedbackTell community section or online page 94 outcomes are the right priorities for Council at this time?

• by: The Council contributes • • • The Council contributes by: The Council contributes • • • • • • by: The Council contributes • • • • • •

t DRAFT Working with our iwi partners, we have developed a developed have we with our iwi partners, Working Māori Ao a Te which embraces framework comprehensive (proverb) with a whakatauki view) (Māori world perspective are The descriptions in the framework each outcome. for Ao Te – highlighting the underpinning summarised here of supporting our achievement Māori concepts/principles from expect can and what the community the outcomes, Council in each area. of the Mana the importance highlighting outcome The first to and contributes supports Whenua–Council relationship all the other outcomes. at URL… see the full framework can You e Ao Pākehā Strong communities – Thriving environmen communities Strong – Vibrant economy al government to coordinate and facilitate equitable distribution distribution equitable facilitate and coordinate to al government e Mana Whenua community wellbeing goals wellbeing e Mana Whenua community o engage with Council as partners. ork within government frameworks ork within government wledge of our communities to identify their needs identify to of our communities wledge s the community (groups and individuals) and between communities communities and individuals) and between (groups s the community acilities and services on behalf of our communities acilities and services ed initiatives. Our communities are resilient, safe, healthy, thriving and connected. resilient, are Everyone safe, healthy, communities hasOur a sense and can of belonging access resources and the services need they communities Strong Manaakitanga/Whanaungatanga Mana Whenua and Council mana-enhancing a mutually have partnership Pūkengatanga/Whanaungatanga

facilitating connectivity acros connectivity facilitating funding locally-l advocating for better f better for advocating kno our local using and improving partnering with iwi, local organisations, and centr organisations, partnering with iwi, local of resources strengthening capacity of Māori to w of Māori to capacity strengthening Mana Whenua t resourcing adequately supporting knowledge-sharing between Te Ao Māori and T Te between supporting knowledge-sharing and achiev identify iwi to partnering with local

| Kāpiti Coast District Council District 16 | Kāpiti Coast • • • • The Council contributes by: The Council contributes • • • • • The Council contributes by: The Council contributes image on pages 10-11). principles presented in Te Kaupapa Mātua (our harakeke Kaupapa Mātua (our harakeke in Te presented principles and strong communities which are underpinned by the underpinned which are communities and strong our vision of a thriving environment, vibrant economy economy vibrant our vision of a thriving environment, engagement. The community outcomes connect to to connect outcomes engagement. The community most matters in the What during 2020 and particularly the community – through a range of conversations of conversations a range – through the community The outcomes reflect input from our iwi partners and iwi partners our input from reflect The outcomes and spending. the community outcomes to help prioritise our activities help prioritise to outcomes the community and contribute to our community’s wellbeing. We’ll use We’ll wellbeing. our community’s to and contribute to guide our response to our challenges and opportunities our challenges to guide our response to outcomes Councillors have drafted for this long-term plan this long-term for drafted have Councillors outcomes shows the community the community on pages 12-13 shows The vision diagram Our community outcomes OUR DIRECTION AND KEY STRATEGIES community consultation document for Long-term Plan 2021-41 | 19 Long-term document for consultation community Securing our future:

Caption to come come to to Caption Caption DRAFT Our focus on responding to the effects of the COVID-19 of the COVID-19 effects the to on responding Our focus of wellbeing all the facets to links pandemic in this plan wellbeing. social and economic and particularly on the broad drawing are plan we this long-term For (formerly by Taituarā prepared definitions of wellbeing which Managers) Government the NZ Society of Local are using. many councils ation, health, the strength of community networks, financial and personal financial and personal networks, of community ation, health, the strength looks at whether the economy can generate the employment and wealth necessary to to necessary and wealth the employment generate can at whether the economy looks looks at the shared beliefs, values, customs, behaviours and identities reflected through through and identities reflected behaviours customs, values, beliefs, at the shared looks considers whether the natural environment can sustainably support the activities that support the sustainably can environment whether the natural ellbeing considers

constitute healthy community life, such as air quality, fresh water, uncontaminated land, and control of pollution. and control land, uncontaminated water, fresh such as air quality, life, community healthy constitute Economic Economic wellbeing Environmental Environmental w security, equity of opportunity, and rights and freedoms. and rights equity of opportunity, security, up our communities. that make and heritage ceremonies arts, visual and performing language, stories, and equity such as health, financial security, social wellbeing, for that make many of the requirements provide of opportunity. Cultural Cultural wellbeing Social to being able of communities iwi, and a range whanau, hapu, individuals, their families, involves wellbeing them, such as educ set goals and achieve

| Kāpiti Coast District Council District 18 | Kāpiti Coast

• • • which we welcome. welcome. which we • community is highlighted as a core purpose of Council, as a core is highlighted community cultural, environmental and economic wellbeing of our wellbeing and economic environmental cultural, legislation. This means that contributing to the social, the social, to This means that contributing legislation. into the Local Government Act 2002 – our governing our governing Act 2002 – Government the Local into the Government’s reintroduction of the four wellbeings wellbeings of the four reintroduction the Government’s Council’s focus on wellbeing has been reinforced with has been reinforced wellbeing on focus Council’s contribute to the wellbeing of our community. the wellbeing to contribute By working towards the community outcomes we we outcomes the community towards working By

of our community Our contribution to the wellbeing wellbeing the to contribution Our OUR DIRECTION AND KEY STRATEGIES Increased work programme in our work increase a substantial propose We programme. spent, on average, have we years three In the last three the first For works. $23.2 million on capital expenditure a capital propose of this plan, we years of $73.8 of $221.5 million – an average programme in our investment Increasing million in each year. of aging infrastructure, renewals will deliver assets in the and investment growth for plus preparation of our district. the liveability to that contribute facilities a strong make to intention Council’s This also reflects as it now economy the local stimulating to contribution take of the pandemic and to the impacts from rebuilds of borrowing. cost of the low advantage Right now, we can also take advantage of the advantage also take can we Right now, to (continuing of borrowing cost low historically Funding Government the Local our funds from source our borrowings, will increase Agency). This means we in invest this is ‘good debt’ – being used to however, needs. that our district infrastructure community consultation document for Long-term Plan 2021-41 | 21 Long-term document for consultation community Securing our future:

We want ‘growth to pay for growth’ so our development so our development growth’ for pay to ‘growth want We that ensure policy is designed to contributions help fund the additional infrastructure developers of the district infrastructure needed, but the complete of Council. We responsibility the overall remains has a mix of housing our district ensure to also want are people the housing pressures that addresses help to can will do what we and we experiencing supply. the housing increase and that see ‘good growth’, to want people know We our environment for our activities care into build we change. Council formally and action on climate have in 2019 and we emergency a climate declared adaption change on climate focus been integrating this extend to want We our work. and mitigation into programme. our work further across – and the issues these combined to Our response in a invest – is to also present opportunities they in this long-term programme work comprehensive 10 years. on the next focused plan particularly Caption to come to Caption DRAFT Investment focusInvestment this plan in our increase need to we at the point where now are We as we and facilities in our infrastructure investment the to respond also need to We for. been preparing have A substantial pandemic on our community. of the impacts is to rebuilding our district’s to part of our contribution spending, our capital our spending up’ especially ‘keep locally. rebound the economic to stimulate Managing growth and protecting our environment accelerated experience to likely mostly are we know We in the period of this long-term in our district growth and the ability by COVID-19, plan. This is exacerbated the increasing home potentially from work to people for have need to This means we of our district. desirability a larger accommodate to in place the infrastructure planned have we upgrades of asset population. The level this. reflect years five in the first previous long-term plans where the Council at that time plans where long-term previous fund depreciation. fully not to had opted endorsed as was has been successful Our strategy AA to grades two being increased rating by our credit & Poors Standard agency rating credit by international in 2019/20. in 2018/19 and maintained the pandemic Councillors to In 2020/21, in response than had been increase rates on a lower agreed that households the pressures recognise to projected down also slowed We experiencing. were and businesses some have This means we our funding of depreciation. maintained have we overall, do, however, up’ to ‘catching and our financial position is sound. approach our core

| Kāpiti Coast District Council District 20 | Kāpiti Coast and funding more depreciation. This was in response to response in This was depreciation. and funding more on reducing borrowings by limiting capital spending by limiting capital borrowings on reducing strategy as ‘living within our means’. Our approach focused focused Our approach as ‘living within our means’. strategy , we described our financial , we Kāpiti together a stronger In our last long-term plan consultation document, Building plan consultation long-term In our last in infrastructure when it was needed. when it was needed. in infrastructure in a strong financial position to be able to borrow to invest invest to borrow to be able position to financial in a strong our community. Our objective was to ensure that we were were that we ensure to was Our objective our community. and worked hard to keep rates increases manageable for for manageable increases rates keep to hard and worked limited our capital spending, stabilised our borrowings our borrowings spending, stabilised our capital limited the future. To do this, we managed our finances tightly, tightly, managed our finances do this, we To the future. social infrastructure. for our financial position and prepare improve needing to resilience in terms of our district’s physical and physical of our district’s in terms resilience by has been driven and the management of our finances pressures, it has also confirmed our focus on improving on improving our focus it has also confirmed pressures, programme our work to our approach years, In recent years. Though the pandemic has brought additional the pandemic has brought Though years. finances ofSuccessful our management high in our considerations and planning for several several and planning for high in our considerations recent focus, but all the other issues have been have but all the other issues focus, recent Our response to the pandemic is obviously a more a more the pandemic is obviously to Our response Government changes impacting Council. changes Government strengthening our resilience. There are also significant also significant are There our resilience. strengthening responding to climate change; managing growth; and change; managing growth; climate to responding rebuilding from COVID-19; improving access to housing; to access improving COVID-19; from rebuilding in the next section. We have identified these issues as: these issues identified have section. We in the next to deal with – and these are discussed in more detail detail in more discussed deal with – and these are to As noted by the Mayor, we have a number of big issues number of big issues a have we by the Mayor, As noted COVID-19 Responding to our big issues including

what we have achieved to date and secure a strong future for our whole community. whole community. our for future a strong secure and date to achieved we have what infrastructure and services in the coming years. It outlines how we intend to build on build to we intend how years. infrastructure outlines services It and coming the in we propose to take in this long-term plan to meet the needs of our district for our of needs the meet plan to long-term this in take to we propose our financial position, the gains we have made in recent years and the approach approach the years and recent in made we have gains the position, financial our It includes an overview of our financial and infrastructure strategies. It explains infrastructure explains It and strategies. overview an financial includes our It of This section sets out how we propose to manage the big issues facing our district. our facing issues big the manage to we propose section how setsThis out Our proposed development of infrastructure of facilities and development proposed Our Investing for resilience and growth for resilience Investing OUR DIRECTION AND KEY STRATEGIES Prioritising key to that our approach confident work are Although we that it the event in is robust, managing delivery any deliver to not able are we apparent becomes will review we proposed, timeframes the to work of Our approach and re-prioritise. other work multi-year and letting partnering with contractors us flexibility will give of work packages for contracts be prioritised. can work time-critical ensure to at the look risk, we delivery When considering in the programmed not progressing impact of projects link east-west our new like projects and for timeframes community or the new Library Waikanae the new road, at a lower operating mean potentially this would centre completed. are until these projects of services level we seawall, the Paekākāriki like other projects For rock emergency plans that include contingency have to respond depot to at our operational stored supply if the replacement wall in the current any failures is delayed. programme Implications for community our as the programme deliver to not able are If we of and levels costs for implications are there proposed, will manage. which we service our capital to linked is directly of borrowings Our level in investment Our proposed programme. works the for driver is the key and facilities infrastructure in this plan. and rates in borrowings increase proposed if delivery be lower would in both areas The increases This delayed. was programme capital of the expanded (on the in the financial strategy in the table is reflected for proposing are we the limits where pages) following spending and capital of borrowings, each of the areas set out. are increases rates We will explore opportunities to partner with partner opportunities to will explore We not are we ensure to authorities local neighbouring same contractor the same time for at the competing combine to will look we and, if possible, resource work programmes. community consultation document for Long-term Plan 2021-41 | 23 Long-term document for consultation community Securing our future: Finding alternative sources ofincome sources alternative Finding reduce can we at how looking are time, we At the same the rates and ease income on rates our dependence setting decision about Our on the community. burden is part (CCO) organisation up a council-controlled of a council- – in the form a CCO had of that. If we explore could – we organisation trading controlled which at the moment income generate opportunities to is discussed work would a CCO do. (How Council can’t decisionspage 58.) in Key in detail Delivering this work big programme an proposing are that we Council acknowledges of the aware are We programme. ambitious work ‘doability’ and the specific risks around challenge the expanded deliver To mitigate. will need to that we closely manage all aspects will need to we programme gearing up to are We and do some things differently. that. enable in a are identifies that we strategy Our infrastructure infrastructure completing for environment challenging and of materials on availability with pressures work are we the risks mitigate To contractors. specialist approach. a multi-faceted taking Strategies to manage project set up a dedicated recently have We delivery within Council and that will be management office projects. our multiple across in managing work key manage to expand will management office Our project of the an overview and maintain projects key certain programme. works capital entire that contracts multi-year in place have already We need if we available are resources contracting ensure projects Bundling multiple our programme. increase to is another strategy of work packages consolidated into Council provides will be using. This approach that we resolve can and means we with certainty and suppliers It also is undertaken. as work required any adjustments within projects across contractors move can means we slippage. with no overall of work, a programme of work major pieces set up for contracts have We and roading centres, ongoing such as town which are in setting progressed well are and we maintenance, water the Waikanae like projects of key delivery up for spending Not all of the increased plant. treatment some is for example things, for building involves land purchase.

0.9% 1.6% DRAFT 2.1% 3.2% Changes to work programme work Changes to funding gap the depreciation closing – due to Depreciation replacement costs asset increasing – due to Depreciation Inflation

Council’s view is that, while we would absolutely prefer prefer absolutely would we is that, while view Council’s need key the district’s increase, rates a lower have to recovery help stimulate to investment at this time is for remission our rates Through the future. for and prepare those assist to can do what we to continue will we policy, issues. affordability significant who have households about the proposed information is detailed there Note: on page 86. and the impact on properties increase rates Impact on rates rates on impacts borrowing increased The proposed interest for pay to income need rates we because and depreciation. a higher at looking are has outlined, we As the Mayor is Some of this increase – 7.8%. increase rates average spending, however, increased our proposed to related no have that we higher costs facing the Council is also see in the can as you example, on. For pass but to choice 3.2% (on average) for chart, inflation accounts following on our last consulted When we increase. of the proposed 2.1% for accounted plan in 2018, inflation long-term year for increase rates of the proposed (on average) one of that plan. Composition of the proposed rates increase for 2021/22 er treatment plant upgrades. plant er treatment eatment plant upgrade which eatment plant upgrade ojects, to increase vibrancy and vibrancy increase to ojects,

attract visitors and investment visitors attract and and resilience, safety water will increase wat and Ōtaki Hautere Waikanae water tr water Waikanae town centres pr centres town

| Kāpiti Coast District Council District 22 | Kāpiti Coast about this. The next section on our financial strategy explains more more explains section on our financial strategy The next the low cost of borrowing but remain within clear limits. limits. within clear but remain borrowing of cost the low proposed capital works. We want to take advantage of advantage take to want We works. capital proposed work programme as we need to borrow more to fund the to more borrow need to as we programme work • • fund our expanded we at how closely Council has looked Funding our investment • projects that we discuss later in the document, including: later discuss that we projects years of this plan includes other major capital works works this plan includes other major capital of years Our programme to provide stimulus in the first three three in the first stimulus provide to Our programme and population growth. generate significant retail activity to support business support business activity to retail significant generate including the office precinct. This will precinct. office including the Paraparaumu significant private sector development happening, happening, development sector private significant on it to ensure our community can benefit from the benefit from can our community ensure on it to for the link road is under way, and we want to move move to want and we is under way, link road the for gains in return for our investment. The design process The design process our investment. for gains in return best serve the wider community. serve best our district will also deliver in Paraparaumu road opportunity to think creatively about how a centre can can a centre about how creatively think opportunity to link such as the east-west other work Fast-tracking for the Te Newhanga Kāpiti Community Centre is an is Community Centre Kāpiti Newhanga the Te for Moving on key projects to benefit the district housing and commercial space. Likewise, the replacement the replacement Likewise, space. housing and commercial site we ultimately decide on could even accommodate accommodate even on could decide ultimately we site an opportunity to consider wider use of the facility. The wider use of the facility. consider an opportunity to For example, our project for Waikanae Library provides provides Library Waikanae for our project example, For facilities as much as we can. as much as we facilities to ‘build back better’ and future proof our community our community proof and future back better’ ‘build to and considering the importance of resilience, we want want we of resilience, the importance and considering reflects that as part of our response to the pandemic, the pandemic, to that as part of our response reflects to deliver more, sooner. Our increased investment also investment Our increased sooner. more, deliver to our proposed increased work programme we will be able able will be we programme work increased our proposed Many of these projects are in our current plan and with plan and our current in are projects Many of these Making the most of our investment OUR DIRECTION AND KEY STRATEGIES

n o

i

t

c

e

r

i

d

t

n

ls e

o m

o n

t r

d e

n v

a o

G

f

f

|

a

t

s y

- t i

g l

n i

i b

rc a

u s p

o e a c

s c

n r e s

e e

R i e

| u l

p

c f p

n n

o n u

i e

i S

t

i

u

n |

d

n o f

o i s

d

c t n

r

i

t a a

t e s z

s i a

s n h

n A e

a l a

r

g m

u

r t n

O a o

N

r

i |

v

e

t

n

a

E

m

i

l

Borrowings C

|

Investing for growth

9

1

-

D I

V O

Balancing elements core the of the a balance achieve aims to Our financial strategy of rates, – managing the affordability elements three best and making the and strategically, well borrowing spending. use of our capital These influences surround our triangle in the our triangle surround These influences the relationship which shows of the diagram centre – of our strategy elements core three the between the spending. These are and capital borrowings rates, of levels the desired deliver to adjust can we ‘levers’ the community. to service do their bit to councils has asked The Government – programmes their work through the economy, for spending. At the same time, capital such as increasing – such as projects a number of significant have we resilience. our water and strengthening link road this a good makes borrowing, for rates interest low in development. and invest borrow time to the Waikanae Library, the Paekākāriki seawall, the seawall, the Paekākāriki Library, the Waikanae with that the financial environment, fortunate are We C

Rates

Levels Levels

of service

community consultation document for Long-term Plan 2021-41 | 25 Long-term document for consultation community Securing our future:

y

m

o

Capital Capital s

n spending

e

o

c c

e

n l

a

e s

b

u e o

l

c

f

G

n n

| y i

t

e i

y l

c u i

i

m f b o a

m

n e

n v o

o i i

c

n L

e y

o

l t | c i

a

y

n

E n

t

o i

i

u l

t i

a m ib

N s

m s

|

o e

C c

y c

m A

o |

n

o y

c it e

l l i

a b

c a

o d

L r

o

Aff

Our financial strategy enables our investment and and our investment enables Our financial strategy of core our delivery and in the district development three every financial strategy our review We services. the plan. With the long-term as part of developing years planned, have we programme investment substantial to adjustments some significant proposing are we – our strategy of our financial the main elements support spending, to and capital borrowings; rates; our programme. in consider we the influences This section explains changes and our proposed our strategy determining and borrowings of rates, the main elements to capital spending. financialour strategyon Influences consider. we the main influences shows This diagram You can see detailed information about these factors these factors about information see detailed can You document. financial strategy online…. and in the full draft at copy online and in hard strategy see the draft can (You centres.) and service our libraries Our financial strategy –

2040/41

2039/40

2038/39

2037/38 2036/37

2035/36 DRAFT

2034/35

2033/34 2032/33

To act on our declaration of a climate emergency in 2019, emergency of a climate act on our declaration To change as comprehensively climate address to want we needs that in work capital more investing By can. as we and with greater sustainably do it more can doing we taking future, the us into that it will serve confidence change impacts. of climate account with the pandemic and the experience Our district’s on change putting pressure of climate effects increasing – network – such as our stormwater our infrastructure our accelerate not to be irresponsible would means we our resilience. strengthen to work manage our to years in recent hard worked have We our increase to afford to able are so we closely finances also climate financial The current spending now. capital so Council low is very of borrowing means that the cost is a in our future investment for that borrowing considers approach. sound strategic If we found we couldn’t deliver the full investment the full investment deliver couldn’t we found If we renewals prioritise would we proposed, programme the to of service levels maintain could we ensure to deferred. be would work New community. the planned for the mix of work shows The chart below and assets of existing renewal between 20 years next assets. of new development and upgrades 2031/32 assets/Upgrades New

2030/31

2029/30

2028/29 2027/28 Planned asset renewals and upgrades Planned asset renewals

Asset renewal

2026/27

2025/26

2024/25

2023/24

2022/23 2021/22

$0m

$20m $10m $60m $50m $40m $30m $80m $70m $90m $110m $100m

Capital spending Capital and that means being proactive. Council District 24 | Kāpiti Coast strongly from the community that we want ‘good growth’ ‘good growth’ want that we the community from strongly our growth, not have it ‘happen’ to us. We have heard heard have us. We it ‘happen’ to not have our growth, grow, we know we need to prepare. We want to manage to want We prepare. need to we know we grow, we take a conservative view of how quickly our district will our district quickly of how view a conservative take we growth than anticipated in our last long-term plan. Even if plan. Even long-term in our last than anticipated growth projected to reach around 85,000 by 2050, a higher level of a higher level 85,000 by 2050, around reach to projected We are growing. Our current population is around 55,500, around population is Our current growing. are We that local authorities are being encouraged to follow. to being encouraged authorities are that local with the approach the Government is taking nationally and nationally is taking the Government with the approach work to help stimulate the local economy. This is consistent This is consistent economy. the local help stimulate to work recover and the best way we can do this is to increase our increase to do this is can we way best and the recover We have committed to supporting our community to supporting our community to committed have We Our first consideration has been our response to COVID-19. COVID-19. to has been our response consideration Our first of not significantly increasing investment in our district. investment increasing of not significantly programme, Council has considered the consequences consequences the Council has considered programme, In proposing this substantial increase to our work our work to increase this substantial In proposing work programme? What would happen if we didn’t expand our What didn’t would we happen if costs only once they are incurred. are they once only costs they are completed over future years and to the finance the finance and to years future over completed are they to the depreciation of the new or upgraded assets once once assets or upgraded new of the depreciation the to delivered. Note, the rates impacts of borrowing are linked linked are of borrowing impacts rates the Note, delivered. project until we have the certainty that works can be can that works the certainty have until we project From a financial perspective, we won’t borrow for a for borrow won’t we a financial perspective, From OUR DIRECTION AND KEY STRATEGIES community consultation document for Long-term Plan 2021-41 | 27 Long-term document for consultation community Securing our future: This is a 30-year view of our capital spending, and it shows the high levels of expenditure required for renewals renewals for required of expenditure the high levels it shows spending, and of our capital view This is a 30-year have that we years, few the last about for talked have that we infrastructure This is the water years. in later of major in the table see the specific work can (You accommodate. to on a sound financial footing are we ensured on page 30.) proposed projects infrastructure Capital spending It will programme. work our expanded deliver as we increase significantly would spending capital Our proposed a retained have We this as noted. achieve to strategies of a range have this, but we manage to be a challenge years, done in other have and, as we our spending monitor will continuously We amount of headroom. conservative or needs arise urgent if other quickly respond us to That will also enable if necessary. work will reprioritise we our district. affecting of COVID-19 is a resurgence there Borrowings and in infrastructure invest using it to are we see this as ‘good debt’ as we however, more, borrow to propose We Agency limit, Funding Government than the Local lower a level also proposing are needs. We our district facilities some ‘headroom’ keep we will ensure We low. very is currently of borrowing the cost which is 300% and, as noted, under 200% more to return with the aim to years at future will look or opportunities; and we shocks future for to return would our borrowings proposed, programme capital with the larger Even budgeted. than is quickly years. those later through levels sustainable

2050/51 2050/51

income

operating operating $200m and 2048/49

The lesser of The lesser 240% of total 240% of total 2048/49

2046/47

2046/47

2044/45 2044/45 income < 200% of Rates IncreaseRates - remaining portion total operating operating total Rates Increase Rates - remaining portion

2042/43 DRAFT 2042/43

2018-38 Long-term Plan 2018-38 Long-term

2040/41 2040/41 $Nil

$15m $25 – 35m $38m 2.90% 3.90% – 4.70% 5.50%

2038/39 2038/39 by category by by category by

-

-

2036/37 2036/37 As noted, we have a high dependence on rates on rates a high dependence have we As noted, can we at how seriously look to want and we income burden and ease the rates other income generate in the future. proposed projecting are we years three the next Over and 8.6% two one, 8.3% in year of 7.8% in year increases one will be set at year for increase The rates three. in year and two years For the same time as this plan is adopted. as part of will be reviewed increase the proposed three, those years. the annual plans for developing is 3.8%, the full 20 years over increase rates The average plan. If long-term with 2.6% in the previous compared out the smooth will try to we years, in coming can, we increases. of rates impacts with the current strategy set through the 2018-38 the set through strategy with the current Plan. Long-term local economy, we propose to increase the limits. increase to propose we economy, local compared limits the proposed shows below The table

Inflation (Average) per BERL report BERL per (Average) Inflation

Inflation (Average) per BERL report BERL per (Average) Inflation

2034/35 2034/35 income operating operating 280% of total 280% of total

2032/33 2032/33

2030/31 2030/31 income Increa se d de pr eciation

Increa se d de pr eciation Average Rates Increase % Increase Rates Average

< 250% of

Average Rates Increase % Increase Rates Average

2028/29 2028/29 total operating operating total

2021-41 Long-term Plan 2021-41 Long-term

2026/27 2026/27

3% – 6.90% 4.50% 9%

$Nil 2024/25 $30m $40 – 60m $80m 2024/25

Lower limitLower limit Preferred Upper limit limit Lower limit Preferred Upper limit

2022/23 2022/23

2020/21 2020/21

Closing the depreciation funding gap funding depreciation the Closing Closing the depreciation funding gap funding depreciation the Closing

2018/19 2018/19

Measure Borrowings spending Capital Rates increases Rates 1.00% 0.00% 4.00% 3.00% 2.00% 7.00% 6.00% 5.00% 9.00% 8.00% 2.00% 1.00% 0.00% 4.00% 3.00% 7.00% 6.00% 5.00% 9.00% 8.00% 10.00%

10.00% households on top of the current level of uptake. level of the current on top households potentially provide rates assistance to a further 167 to assistance rates provide potentially In household terms, this increase to our fund could our fund could to this increase terms, In household remission fund by an additional $50,000 per year. fund by an additional $50,000 per year. remission In this plan, Council is proposing to increase the rates the rates increase to In this plan, Council is proposing remission tools in a targeted way to assist with affordability. with affordability. assist to way in a targeted tools remission the Government’s rates rebates and use our own rates rates and use our own rebates rates the Government’s financial hardship. We will continue to help people access access help people to will continue We financial hardship. the median household income this is an indicator for for an indicator this is income the median household We recognise that where rates are more than 5% of than 5% more are rates that where recognise We mindful that affordability of increasing rates is a concern. is a concern. rates of increasing mindful that affordability are higher than in recent years. The Council is very years. higher than in recent are The proposed rates increases for the next three years years three the next for increases rates The proposed Rates income increase but would be restrained by our limits. by our limits. be restrained but would increase The proposed changes show that each ‘lever’ would would that each ‘lever’ show changes The proposed | Kāpiti Coast District Council District 26 | Kāpiti Coast *Projected rates increases beyond year three include inflation and the impact of increasing asset costs, offset by growth by offset costs, asset increasing and the impact of include inflation year three beyond increases rates *Projected For this plan, given the gains we have made in recent in recent made have gains we the plan, given this For according to the Council’s financial position and direction. and direction. financial position Council’s the to according We set targets and limits for each of these elements each of these elements for and limits set targets We years, and our intention to invest to stimulate our stimulate to invest to and our intention years, OUR DIRECTION AND KEY STRATEGIES

set

2050/51

2049/50

2048/49

2047/48

2046/47

ondition and 2045/46

al networks such al networks 2044/45

y areas such as Ōtaki such as Ōtaki y areas 2043/44

eases over several years years several eases over

2042/43

2041/42 2040/41

AssetRenewal

2039/40

2038/39 2037/38

and Waikanae water supply networks supply water and Waikanae and wastewater as water renew assets based on their c assets renew importance in ke capacity more build in all our as change is considered climate ensure upgrades. future and proposed management plans and in our stormwater critical This is especially assets coastal our critic into resilience build incr expenditure stage on borrowing. the impacts lessen to 2036/37

• • How we will we infrastructureHow our manage will: We • • • 2035/36

New Assets - Upgrades 2034/35

2033/34 2032/33

community consultation document for Long-term Plan 2021-41 | 29 Long-term document for consultation community Securing our future: 2031/32 2030/31

Operating expenditure 2029/30 2028/29

Total expenditure (for assets covered by the Infrastructure Strategy) Infrastructure the by covered assets (for expenditure Total

2027/28

2026/27

2025/26

2024/25

2023/24

2022/23 2021/22 $0m

$80m $60m $40m $20m

$260m $240m $220m $200m $180m $160m $140m $120m $100m Annual Expenditure ($) Expenditure Annual Challenges in completing infrastructureChallenges completing in work the challenges highlights strategy The infrastructure in the current infrastructure major in delivering specialist in certain such as shortages environment this can and the ways used in civil projects, contractors contracting using alternative example, be managed, for earlier. models, as discussed management project of a dedicated The development delivery project on capital solely with a focus office to within the organisation the capacity will provide programme. work increased manage this effectively enable to also proposed are support systems Dedicated manage multiple better to approach a programme financial and This will include dedicated projects. resources. procurement infrastructure costsTotal 2021-2051 spending, operating across of this strategy the course our planned spending over shows The chart below support needed to assets and new assets, of existing upgrading assets), existing (replacing renewals asset population growth. The chart shows the significant investment in asset upgrades in the first five years of this plan to reflect additional capacity needed for growth. growth. needed for additional capacity reflect this plan to of five years upgrades in the first in asset investment The chart shows the significant

Caption to come to Caption o ensure the new roads roads the new o ensure DRAFT – we recognise that growth, including including that growth, recognise – we – as with drinking water, we need to step step to need we water, – as with drinking e will likely face increasing frequency frequency increasing face e will likely ter Wastewa  Stormwater  runoff and stormwater increases developments, new capacity downstream increased for allow need to we t need – we Roading  – w Coastal  damage to causing events of weather and severity find affordable, will need to and we Council assets sustainable solutions. up performance of our operations and assets to meet to assets and of our operations up performance manage also need to We regime. regulatory the new climate with Government in accordance emissions change targets NZ Transport Kotahi us from to transferred of ownership take we once fit-for-purpose Agency are necessary. are growth service to roads them. Also, new

• • the delivery reviewing is currently The Government Note: services waters three authorities’ local mechanism for changes. future potential significant and proposing so this plan is no decision has been made yet, However, with no model continuing operating based on our current services waters three for change. (The changes proposed changes impacting outlined in the section Government are Council, page 46. • • ed to ed to ontext. opment e need to consider how we meet and we how consider e need to y chain, and

measure against new legislative drinking water drinking water legislative new against measure regulator the new to and reporting standards increase in frequency and intensity due to climate climate due to and intensity in frequency increase change – w Water the changing legislative and regulatory c and regulatory the changing legislative the impact of COVID-19, particularly on the global on the global particularly the impact of COVID-19, suppl growth and devel growth predict many of which are hazards, natural

| Kāpiti Coast District Council District 28 | Kāpiti Coast • • need to plan for and build into our work in these areas. in these areas. our work into and build plan for need to The following examples illustrate some of what we some of what we illustrate examples The following how these challenges apply to our core infrastructure. infrastructure. our core to apply these challenges how • about information comprehensive provides The strategy • • significant across infrastructure services including: including: services infrastructure across significant The strategy identifies the challenges that are most most that are the challenges identifies The strategy we must plan for. must we provides a long view of our core infrastructure needs that infrastructure of our core view a long provides our infrastructure strategy covers the next 30 years so it 30 years the next covers strategy our infrastructure While the long-term plan covers a 20-year timeframe, timeframe, a 20-year covers plan the long-term While both feed into the long-term plan and help enable it. plan and help enable the long-term into both feed The infrastructure strategy and the financial strategy the financial strategy and strategy The infrastructure Our infrastructure strategy OUR DIRECTION AND KEY STRATEGIES community consultation document for Long-term Plan 2021-41 | 31 Long-term document for consultation community Securing our future: TELL VIEWS US YOUR borrowing for the 2021-41 Long-term Plan given the extra costs that need to be met and the What do you think? Council to take at this time? Council has determined that it is appropriate to change the limits for rates, capital spending and challenges the district is facing – particularly to be able to replace vital infrastructure in the future. Do you think investing for resilience and growth, as outlined in this section, is the right approach for section page 94 or online… the feedback go to views: us your Tell Caption to come to Caption

2051

Reservoir Reservoir Renewals $88.0m 2046 2041 DRAFT Waikanae Waikanae River Recharge Bore Upgrade $9.7m 2036 Waikanae Waikanae River Recharge Bore Upgrade $3.3m 2031 Roading Districtwide Major Community Connectors $13.3m anae ($57m), Ōtaki ($46m), Paekākāriki ($14m) Paekākāriki ($46m), anae ($57m), Ōtaki 2026 Ōtaki Ōtaki New Reservoir $7.5m Wastewater Districtwide Upgrades Pump Station $24.6m

Roading Paraparaumu Ihakara-Arawhata Link Road $24.9m Roading Districtwide SH1 Revocation Wastewater Paraparaumu Works Inlet $2.6m $6.0m Water Districtwide Upgrades Network $36.8m $6.7m Water and Ōtaki Hautere Safety Water Upgrades Water Waikanae Plant Upgrade Treatment 2 ($12.3m), Stage 3 ($6.0m) Stage Coastal replacement seawall Raumati $17.2m Coastal seawall Paekākāriki replacement $17.1m Stormwater Stormwater Major projects ($94m), Waik Paraparaumu

You can see the draft infrastructure strategy at (weblink) or in hard copy at one of our libraries or service centres. or at one of our libraries copy or in hard at (weblink) strategy infrastructure see the draft can You Council District 30 | Kāpiti Coast assets well. assets wastewater assets. Recent audits by Waka Kotahi NZ Transport Agency also confirm we are managing our roading managing our roading are we Agency also confirm NZ Transport Kotahi by Waka audits Recent assets. wastewater assessments and network modelling mean we have a good understanding of the condition of our roading, water and water of our roading, of the condition a good understanding have modelling mean we and network assessments We are confident about the information we hold on the type and location of assets that we have. Ongoing condition Ongoing condition have. that we of assets on the type and location hold we about the information confident are We

long-term plan. long-term and the costs of those at this time. As the diagram indicates, there is significant work in the early years of this years the early in work is significant there indicates, time. As the diagram of those at this and the costs The diagram below shows the main work that is required across our core infrastructure broken down into projects projects into down broken infrastructure our core across that is required work the main shows below The diagram Our big infrastructure projects Major infrastructure projects proposed 2021 MAIN TOPICS FOR FEEDBACK

PAGES 64-73 PAGES 50-63 Key projects Key proposals Significant consulting we are Why on these decisions now? Footpaths facilities community Ōtaki centre Indoor sports Reserve Ngā Manu Nature Playgrounds 2 stage upgrade Pool Ōtaki Park Maclean Uruhi – Te Kāpiti Gateway proposals Community Board Waikanae Library Waikanae Kāpiti Newhanga Te Community Centre centres Town Link road Drinking water and resilience safety upgrades Stormwater minimisation Waste community consultation document for Long-term Plan 2021-41 | 33 Long-term document for consultation community Securing our future: KEY DECISIONS Major projects and initiatives

PAGES 34-49 COVID-19 response and recovery response COVID-19 housing to Access change climate to Responding Managing growth our resilience Strengthening changes impacting Council Government DRAFT

This section is about the main activities the Council activities Council the main the about section is This support Plan to Long-term the this in on will focus community outcomes. of the big issues an overview consultation, for decisions four are There work in our proposed projects and a summary of key is facing our district are begun and links already work continue Many of the items programme. information. find more can you where to given on any of the topics. feedback give to welcome are You parts. three into This section is organised What’s planned for the next years? planned the for three What’s Topics for feedbackTopics

3

| Kāpiti Coast District Council District 32 | Kāpiti Coast Our big issues big Our MAIN TOPICS FOR FEEDBACK

e change owth

s of climat s of  Building climate climate Building change mitigation everythinginto Council does

 equipped weThat are deal with gr to

 that Council leadership supportencourages to our vulnerable

 Greater resilience and resilience Greater to be able to connectivity just with not and cope adapt the pandemic, but the ongoing impact

 Affordable housing so that housing so that Affordable everyone has somewhere live…our is to community diverse more

, , t

e new e new

t looks at the at t looks community consultation document for Long-term Plan 2021-41 | 35 Long-term document for consultation community Securing our future:  Safety and security and people for both the environment

 Looking at how we do how can at Looking ensure to things differently people, for outcomes, better the environment

 A range differen of enable housing…to the get to people them suits home that and their whanau  people Help keep in jobs and creat opportunities

 but realistic A strong plan tha environment and a environment and younger growing population

Strengthening ourStrengthening resilience Responding to climate change climate to Responding Managing growth COVID-19 response and recovery COVID-19 Access housing to section (page 15), Kāpiti is 15), section (page DRAFT overy erlinked. As well as being significant in their own right, together they form a key a key form they right, together in their own as being significant As well erlinked. We have highlighted the community outcomes that are most relevant relevant most that are outcomes the community highlighted have We Mana Whenua outcome: by our first supported All are issue. each for mana-enhancing partnership. a mutually and Council have

Strengthening our resilience Strengthening impacting Council. changes Government Responding to climate change climate to Responding Managing growth COVID-19 response and rec response COVID-19 housing to Access

| Kāpiti Coast District Council District 34 | Kāpiti Coast We are not consulting on specific initiatives, but we want to know your views to guide our direction. to views your know to want but we on specific initiatives, not consulting are We In the following pages, we discuss these six issues and for each area we have some questions. some questions. have we each area and for these six issues discuss we pages, In the following pages highlight key themes voiced by our community about these issues. by our community themes voiced pages highlight key engagement. The quotes on these most engagement. The quotes matters What and the earlier consultation through ideas raised They are priorities Council has identified as the most critical at this time, and which reflect concerns and concerns at this time, and which reflect critical as the most priorities Council has identified are They These issues link strongly to our community outcomes (page 16) and are major contributors to wellbeing. wellbeing. to major contributors (page 16) and are outcomes our community to link strongly These issues part of the context for our planning. for part of the context

• int are These six issues • • • • We have identified the six big issues as: the six big issues identified have We • Our challenges and opportunities Our challenges the As in outlined Our big issues

Long-term Plan. facing some complex issues which have a big impact on our priorities for this this priorities for our impact on a big have which issues complex some facing MAIN TOPICS FOR FEEDBACK about how we can navigate through through navigate can we about how What matters most community consultation document for Long-term Plan 2021-41 | 37 Long-term document for consultation community Securing our future: response? The same things we didin previously?the community? Other things? If we experience a resurgence of COVID-19,What are the are positives there particular that have things come you out would of the like pandemic Council you to do would in like us to keep doing or support

QUESTIONS TO HELP GUIDE COUNCIL’S DIRECTION QUESTIONS TO HELP GUIDE COUNCIL’S We had good feedback about the support package we provided in May 2020 (you can see a summary see a summary can 2020 (you in May provided we the support package about had good feedback We ideas in shared people at X…..). As well, • section page 95 or online… feedback the go to views: us your Tell plan. recovery and updating of our review the ongoing to input will contribute Your the pandemic. • Caption to come to Caption own, own,

vents to enliven our enliven to vents ’ campaigns

cial investment opportunities cial investment DRAFT town centres centres town and the district, across housing affordable Council or iwi land) for development. build on existing promotions and e promotions on existing build commer new promote use surplus land (Cr opportunities to explore support and encourage ‘buy local support and encourage

• • • Investing for section – Investing for in the preceding As explained in rebuild we’re – right now, and growth resilience so economy local our stimulate mode and aiming to at know Based on what we back ‘better’. build can we impact for anticipating a two-year the moment, we’re based on spending assumptions made and have COVID-19 years. in three recovery sound, remain to Zealand economy the New expect We Kāpiti, we For fragile. be more to economy but the global to and our GDP return rebound see jobs growth should such as sectors certain However, levels. pre-COVID-19 will Borders find things tough. to will continue tourism extent, a limited to only at some point open, though likely Zealand and Kāpiti New to tourism meaning international will be limited. our in infrastructure, as our major investment As well a wide range includes years few in the next priority work 42 short- and are plan, there In our recovery of initiatives. such as: under way actions already medium-term • Rebuilding our local economy We are particularly concerned about looking after our most after about looking concerned particularly are We social existing as the pandemic exacerbated vulnerable to with our partners working will keep inequalities. We support so that and tailored is appropriate there ensure thrive. to the opportunity have all in our district to plan in mid-2021 our recovery be reviewing will We right things. on the focusing still are we ensure fe, healthy, thriving and connected: Manaakitanga/ thriving and connected: healthy, fe, osperous with ample opportunities for people to work in Kāpiti: to and learn opportunities people ample for with osperous

Pūkengatanga/Whanaungatanga – Vibrant – economy Pūkengatanga/Whanaungatanga Our local economy is pr economy Our local Our communities are resilient, sa resilient, are Our communities Whanaungatanga – Strong communities – Strong Whanaungatanga

Contribution community to outcomes particularly: our outcomes, to strongly links work recovery Our COVID-19 • •

businesses as we know we can’t do this alone. do this can’t we know as we businesses work with our iwi partners, community organisations and organisations community iwi partners, with our work sustainable, prosperous and resilient. We’ll continue to to continue We’ll and resilient. prosperous sustainable, Council District 36 | Kāpiti Coast work together to rebuild our communities to be more be more to our communities rebuild to together work for the future. Our recovery plan shows how we can can we how plan shows Our recovery the future. for experiences through COVID-19 and their concerns and their concerns COVID-19 through experiences organisations in our community to understand their understand to in our community organisations We’ve talked to a range of people, businesses and businesses of people, a range to talked We’ve and service centres. and service for us to respond to urgent needs. urgent to respond us to for at X and in our libraries find on our website can which you we will keep this within manageable levels that still allow allow that still levels this within manageable will keep we Plan – an initial plan – Kāpiti Recovery has developed 27), this investment does require us to borrow more, but more, borrow us to does require 27), this investment Council have. we information plan using the best to have infrastructure. As outlined in our financial strategy (page strategy As outlined in our financial infrastructure. change so we to the pandemic continues of The scope we’re proposing to spend $221.5 million on a range of a range spend $221.5 million on to proposing we’re planOur for recovery averaged $23.2 million per year. In the next three years, years, three In the next $23.2 million per year. averaged recent years, our capital expenditure programme has programme expenditure our capital years, recent Our economic stimulus for this plan is substantial. In this plan is substantial. for stimulus Our economic with partners, stakeholders and suppliers. stakeholders with partners, most of our knowledge and skills, and our relationships and skills, and our relationships of our knowledge most recovery efforts build on existing work, so we make the make so we work, on existing build efforts recovery the economy and support resilience. Our COVID-19 Our COVID-19 and support resilience. the economy our core roles because the work we do helps stimulate do helps stimulate we the work because roles our core The most valuable thing we can do as Council is focus on do as Council is focus can thing we valuable The most long-term plan. long-term prepare for future impacts – is a critical element of this element – is a critical impacts future for prepare had on our district, and what we need to do to rebuild and rebuild do to to need and what we had on our district, Our response to the pandemic – both the impacts it has the impacts the pandemic – both to Our response pandemic again in the future. rest of the world and may still be directly affected by the affected directly be still may and world of the rest as a small nation we are affected by the situation in the by the situation affected are as a small nation we In , we have been very fortunate, however, however, fortunate, been very have Zealand, we In New The COVID-19 pandemic continues to dominate headlines. dominate to continues pandemic The COVID-19 COVID-19 response and recovery and response COVID-19 MAIN TOPICS FOR FEEDBACK educe educe sions al change supporting sustainable transport options, and transport supporting sustainable r to with the community work our increasing footprint. carbon our district’s further reducing Council’s carbon emis carbon Council’s further reducing coast for preparing minimising waste

• • up all costs weigh need to we In each of these areas, resources use our limited we ensure to and impacts much we how consider to important It’s thoughtfully. have we where on Council as an organisation, focus where our activities in the district, versus control, most and influencing. in facilitating is more our role 77% emissions Council’s reduced have we As noted, them further, reduce could We 11 years. the past over do certain we changing the way mean but it would example, For expensive. be more things, which would with lower- of vehicles our fleet replace could we planned, than currently rapidly emitting options more more. cost but this would Where to next? change is part of all Council climate to Responding programmes. action are: for areas Our key • • • This work has reduced our carbon emissions by 77% emissions our carbon has reduced This work 2018/19. 2009/10 to from coastal our community-led on under way are We help Kāpiti – to – Takutai programme adaptation are We our coastline. changes to us for prepare minimisation by creating in waste our work increasing timber as (such district in the options recovery resource the community this is an area know as we recycling) on focused remain support on. We for is looking environment, our natural and conserving preserving with done in partnership with much of this work such as dune planting and groups community bush. of native restoration community consultation document for Long-term Plan 2021-41 | 39 Long-term document for consultation community Securing our future: ored and enhanced as we transition to a low-carbon future: future: a low-carbon to transition as we and enhanced ored Our natural environment is rest environment Our natural Kaitiakitanga/Pūkengatanga – Thriving environment Kaitiakitanga/Pūkengatanga Contribution community to outcomes support our outcome: change on climate Our efforts • Acting on climate change is a key driver for this long- for driver change is a key Acting on climate a changing adapt to and mitigate we plan. How term in response raised one of the main issues was climate change on our of climate impacts the increasing to In erosion. and coastal flooding – particularly district and set a emergency a climate 2019, Council declared by 2025, building neutral be carbon Council to goal for in 2012. adopted plan on our existing so far?What achieved we have made encouraging we’ve As an organisation, in reductions in emission a leader – we’re progress organisations for (and the country government local our where assess a good time to is our size) – and now directed. best are within the community ongoing efforts team and resilience a sustainability set up we year, Last management, waste and energy on carbon that focuses an overview management and minimisation. It has and mitigation across change adaptation of climate and embed good practices Council, helping our teams get things done. to ways find alternative change climate to contributions Some of our key under directly don’t come mitigation and adaptation our massive example, heading, for the ‘climate’ on consulted which we programme stormwater that plan. This recognises long-term in the last and storms in more is resulting change climate homes to the risk of flooding increasing heavy rains, the stormwater to Our improvements and businesses. that risk. reduce network our all reduce to hard been working have We our community lighting to street from emissions, changes implemented We’ve facilities. and leisure fuel use, increase fossil reduce energy, that conserve dispose we how and improve energy, use of renewable of waste. Responding to climate change change climate to Responding

DRAFT Key decision Key addressing further to contribute Council could How key is set out in our first and affordability housing access in housing? a bigger role Council take decision: Should Our work in planning for growth, such as reviewing such as reviewing growth, in planning for Our work National Policy the to responding strategy, our growth the to and contributing on Urban Development Statement the improving to is also key Framework Growth Regional that includes development appropriate opportunities for , page 42.) housing. (See Managing growth affordable more the Council has certified role, regulatory As part of its of which will June 2018, the majority since lots 654 new be a housing. This number needs to for be developed encourage need to so we years, higher in coming lot do their bit. to landowners in partnering with organisations explore need to also We housing options. more deliver to as a way the community where considering change includes climate Adapting to to placed is best of housing development our future include some to example, living, for support sustainable hubs. transport to medium density housing with good access ess to suitable housing in Kāpiti so that they can live can and thrive: – they Ūkaipōtānga in Kāpiti so that housing suitable to ess

Our people have acc Our people Strong communities Strong

TELL VIEWS US YOUR If you have other comments about housing, go to the feedback section page 95 or online… the feedback about housing, go to other comments have If you See our Key decisions, Key project 1: Should Council take a bigger role in housing? (page 52) a bigger role Council take 1: Should project decisions, Key See our Key Contribution community to outcomes supports our outcome: directly Our housing programme •

Access to housing

| Kāpiti Coast District Council District 38 | Kāpiti Coast for affordable housing. affordable for Council is exploring opportunities to use surplus land opportunities to Council is exploring exacerbated by COVID-19. As part of our recovery plan, As part of our recovery COVID-19. by exacerbated securing housing is severe – a situation that has been – a situation that has securing housing is severe housing. For some in our community, the challenge of the challenge our community, some in housing. For in the district and make it easier for people to access access to people it easier for and make in the district can be done to increase the supply of affordable homes of affordable the supply increase be done to can Over the past year, Council has been exploring what has been exploring Council year, the past Over other major issuesother major Housing access and affordability links with highlights how it connects to our other big issues. our other big issues. to it connects how highlights will remain a priority for Council and this section Council and a priority for will remain Irrespective of the outcome of the decision, housing of the outcome Irrespective key decisions for this long-term plan, see page 52. plan, see page this long-term decisions for key Council’s role in housing is the focus of one of our in housing is the focus role Council’s for both social and emergency housing. social and emergency both for nationally. There is also increasing demand in the district the district demand in increasing is also There nationally. or buy compared to the rest of the region and region of the Wellington the rest to or buy compared also harder for people in our community to afford to rent rent to afford to in our community people for also harder is a significant and worsening problem in the district. It is in the district. problem and worsening is a significant as one of our community outcomes. Housing accessibility Housing accessibility outcomes. as one of our community Housing is so important it has been prioritised by Council it has been prioritised Housing is so important MAIN TOPICS FOR FEEDBACK sen ogrammes ogrammes oposed actions, es opportunities to es opportunities to e, and climate change- e, and climate oposed action will address will address oposed action ouncils; and inequity or compromise future generations; future inequity or compromise How effectively a pr effectively How hand; at any issues might wor any actions that avoid to A desire feedback, community Mana whenua advice, alignment with neighbouring and potential c of pr effectiveness Long-term or trends or future of current regardless pressures. vernment reforms of national policy and of reforms vernment

g. f. e. h. legislation – particularly in relation to climate climate to in relation – particularly legislation and the Resource change mitigation, adaptation Management Act (RMA). projects community and empower facilitate lead, sustainability, build that aim to and initiatives innovation. and green resilience, Sustainability, resilienc Sustainability, and coordinated is integrated work related across Council. in participate to opportunities Council takes go policies and pr for Council advocates Kāpiti vision, and actively that support the Toitū opportunities. funding for canvasses and tak for Council looks    

8. 7. 9. 6. community consultation document for Long-term Plan 2021-41 | 41 Long-term document for consultation community Securing our future: ecommendations; ecommendations;

ation and consultation ation and consultation ong and effective ong and effective en; o-benefits to the four wellbeings; the four to o-benefits  Best practice guidance and r guidance practice Best broader including benefits, and Costs c is not if an action of risk, particularly Level tak at hand; of any issues Urgency

s partnership with mana whenua, and s partnership tatutory obligations. tatutory leadership on climate change mitigation and change mitigation climate on leadership effect and give Kāpiti support Toitū to adaptation this includes emergency; change the climate to of uncertainty act in the face to a commitment available. information scientific using the best of value the significant acknowledges through learned (lessons māramatanga manaakitanga, of kaitiakitanga, centuries and whanaungatanga). b. c. d. Council demonstrates str Council demonstrates and o Waitangi Tiriti Te Council honours it change-related climate Council will meet all of its s and transparent, Decision making is inclusive, based on ongoing collabor social businesses, with the wider community, from sectors and key organisations, service and science. industry Decision making will consider: a.

QUESTIONS TO HELP GUIDE COUNCIL’S DIRECTION QUESTIONS TO HELP GUIDE COUNCIL’S we’ve got it right. (See framework principles above.) impacts become more severe and costs to respond increase, how do we ensure equity across the district? We have developed a strategic framework to guide our decision making and we want to know if you think for our coastal communities and infrastructure such as the seawall in Paekākāriki. As climate change more. Should we continue to prioritise emissions reduction for Council? The effects of climate change are being experienced in different ways across the district, for example, We have made good progress on reducing Council’s emissions, however, achieving further gains will cost section page 95 or online… the feedback go to views: us your Tell decisions. make we funded and how things are how input will help us determine Your climate to relating proposals on any substantial the community with consult to continue would we Note, seawall. the Paekākāriki doing in this plan for are change as we 2. 3. Strategic framework1. principles 4. 5. You can see the full framework online at… see the full framework can You

Caption to come to Caption DRAFT Strategic frameworkStrategic Council guide to decision making for embed consideration consistently we ensure To all our into change mitigation and adaptation climate guide to framework a strategic developed have we work, our decision making. which is based on a set of principles The framework years in past received have we the feedback reflect other stakeholders. and businesses, iwi, residents, from set out in the panel on the facing are (The principles to this framework apply actively to intend page.) We and delivery as our projects all our planning as well of core services. Similarly, we can facilitate and support initiatives in our support initiatives and facilitate can we Similarly, Council our regular as continuing as well community, places in the right growth for such as planning work our adaption into change climate and building projects. infrastructure aki, a community aki, a community o Waste Ōtaki for a building a building for Ōtaki o Waste e energy initiatives that are that are initiatives e energy

We have leased land to Zer land to leased have We We support renewabl We We worked with Energise Ōt with Energise worked We to production, energy on clean focused organisation the for of solar panels installation support the group’s plant. treatment wastewater Ōtaki consistent with our direction such as the wind turbine with our direction consistent Paekākāriki. for proposal in which station the transfer to next initiative recycling landfill. from waste wood divert they

| Kāpiti Coast District Council District 40 | Kāpiti Coast • decarbonisation. For example: For decarbonisation. • and support to drive behaviour change towards change towards behaviour drive and support to Council can be a strong advocate and deliver education education deliver and advocate be a strong Council can communities and those in flood-prone areas. those in flood-prone and communities in different ways. This is particularly apparent in our coastal in our coastal apparent This is particularly ways. in different • our district where the impacts of climate change will be felt change climate of the impacts where our district change mitigation and adaptation to ensure equity across equity across ensure to and adaptation change mitigation We also need to consider how we spread the costs of climate the costs spread we how consider also need to We MAIN TOPICS FOR FEEDBACK Community consultation on the draft Wellington Wellington on the draft consultation Community first will happen in the Framework Growth Regional the draft view and to information more For half of 2021. wrgf.co.nz visit framework, Resource of the reform The Government’s our management for be key Management Act will is summarised reform of the scope The of good growth. Governmentchanges discussion in our big issue impacting Council, page 47. community consultation document for Long-term Plan 2021-41 | 43 Long-term document for consultation community Securing our future: QUESTIONS TO HELP GUIDE COUNCIL’S DIRECTION QUESTIONS TO HELP GUIDE COUNCIL’S Upcoming consultation on Council’s growth strategy 2021 – July-August Council’s on consultation Upcoming on this from be consulting We’ll our district. for growth of future the shape and form reviewing We’re this year. mid-August to mid-July As our district grows, section page 96 or online… the feedback go to views: us your Tell what do you think good strategy. our growth to will contribute input Your growth looks like? Caption to come to Caption As well as infrastructure and transport links, the links, and transport as infrastructure As well of choice a greater help provide to aims framework and and liveable, affordable more it make housing to In Kāpiti, development. for areas suitable explore amongst intensity greater for with allowing along and centres our town housing and around existing where areas greenfield two are there hubs, transport – be investigated houses would new for the potential and Peka Horo Te and in the broader south of Waikanae our aim to to is key growth plan for So, our areas. Peka housing. affordable to access increase

DRAFT Wellington Regional Growth Regional Framework Wellington ensure to in the region with other districts working We’re the region. do ties in with changes throughout what we is a plan for Framework Growth Regional The Wellington and Horowhenua Wairarapa the Wellington, across growth and iwi in by councils It has been developed districts. north and south – alongside partners – our the region for objectives on the Government’s deliver to Government, the supply to barriers remove This aims to urban growth. cities for room and create of land and infrastructure to grow. Managing growth the right way will help maintain what help maintain will the right way Managing growth benefit can we as how about Kāpiti as well value people of Council and involves role This is a core growth. from to infrastructure future-proofing from all our services permits. building processing its through of growth the nature influence Council can ongoing conversation policies and plans, which means an see. to want about what we with the community Statement the National Policy to respond need to also We plan for to councils that requires on Urban Development including providing urban environments, well-functioning This will help us in our ‘up and out’. grow to district the for housing to and accessible support affordable to efforts population. this growing homes for provide fe, healthy, thriving and connected: Manaakitanga/Whanaungatanga – Manaakitanga/Whanaungatanga thriving and connected: healthy, fe, t is restored and enhanced as we transition to a low-carbon future: Kaitiakitanga/Pūkengatanga Kaitiakitanga/Pūkengatanga future: as weand enhanced transition a low-carbon to t is restored ess to suitable housing in Kāpiti so that they can live and thrive: Ūkaipōtānga – Strong communities live can and thrive: – Strong Ūkaipōtānga they housing in Kāpiti so that suitable to ess Our communities are resilient, sa resilient, are Our communities Strong communities Strong Our people have acc Our people Our natural environmen – Thriving environment Our local economy is prosperous with ample opportunities for people to work and learn in Kāpiti: Pūkengatanga/ in Kāpiti: work to and learn opportunities people with ample for is prosperous economy Our local – Vibrant economy Whanaungatanga

• to all our outcomes: to Contribution community to outcomes contributes well grows district our how Planning and managing • • •

| Kāpiti Coast District Council District 42 | Kāpiti Coast our environment are both part of achieving ‘good growth’. ‘good growth’. both part of achieving are our environment 2021. on in July-August will consult infrastructure and our focus on preserving and restoring and restoring on preserving and our focus infrastructure we which strategy, as part of our growth being reviewed pressure on our environment. Our expanded investment in investment Our expanded on our environment. pressure is the district for growth of future The shape and form for all Council infrastructure and services, and growing and growing and services, all Council infrastructure for Growing sustainably As our population increases, we will see greater demand will see greater we As our population increases, district grow. south. This, and our attractive lifestyle, will help our lifestyle, south. This, and our attractive to Horowhenua to the north and Wellington to the to the north and Wellington to Horowhenua to Transmission Gully motorway will bring Kāpiti closer will bring Kāpiti closer motorway Gully Transmission forthcoming Peka Peka to Ōtaki section, as well as the section, as well Ōtaki to Peka Peka forthcoming The development of the expressway, including the of the expressway, The development term plan. term higher level of growth than anticipated in our last long- in our last than anticipated of growth higher level district is projected to reach around 85,000 by 2050 – a around reach to is projected district growth in the whole region is accelerating again and our is accelerating region in the whole growth although it’s been lower in recent times. Now, population times. Now, in recent been lower although it’s around 55,500. That’s an average of about 3% per year, of about 3% per year, an average 55,500. That’s around 40 years. In 1981, it was just over 26,000 and today it is 26,000 and today over just In 1981, it was 40 years. Increasing population past the over than doubled Our population has more are shared across the community. across shared are how it happens so growth is sustainable and the benefits and the benefits is sustainable it happens so growth how for more growth. We need to plan for that and manage plan for need to We growth. more for Our district has been growing steadily and we are poised are and we steadily has been growing Our district Managing growth MAIN TOPICS FOR FEEDBACK community consultation document for Long-term Plan 2021-41 | 45 Long-term document for consultation community Securing our future: reduce our cover/increaseself-insure our more/increase excess? our reserves?

QUESTIONS TO HELP GUIDE COUNCIL’S DIRECTION QUESTIONS TO HELP GUIDE COUNCIL’S What else can Council do to help build community resilience? • • section page 96 or online… the feedback go to views: us your Tell How can Council encourage households’ emergency preparedness? Should we explore different options for how we insure our assets? We could: Caption to come to Caption

dings to a dings to e some assets, e some assets,

o self-insure more, by setting more, o self-insure DRAFT

higher resilience level so they are designed to to designed are so they level higher resilience be and still earthquake a significant withstand more. cost that would However, usable. and reserves. in our parks or footpaths such as walls showed post-quake in The experience and reinstatement a priority for not these were be done could of those areas the redevelopment ways. in different One way could be t could One way and having a higher excess. aside some reserves $10 million be at least need to likely would A reserve over gradually put in place only could which we period. a long Council buil also construct can We insur choose not to could We

• Considering protect we how assets our the in change of climate face resilience. change on our climate hard also working We’re about this on page 39.) more read can (You climate our environment, to as the impacts As well This will our assets. to effect change has a flow-on plan for some decisions as we make need to mean we the future. such as extreme of events number With the increasing insure to expensive more damage, it is becoming weather at look to have so we such as our infrastructure assets district’s assets. our protecting options for different options: Future • • fe, healthy, thriving and connected: healthy, fe, t is restored and enhanced as we transition to a low-carbon future: future: as we transition and enhanced a low-carbon to t is restored Manaakitanga/Whanaungatanga – Strong communities Strong – Manaakitanga/Whanaungatanga Our communities are resilient, sa resilient, are Our communities Our natural environmen Kaitiakitanga/Pūkengatanga – Thriving environment Kaitiakitanga/Pūkengatanga

• Contribution community to outcomes particularly: our outcomes across links resilience on strengthening Our focus •

| Kāpiti Coast District Council District 44 | Kāpiti Coast

information about tsunami zones. about tsunami information has a role in educating, for example, ensuring there is clear ensuring there example, for in educating, has a role individuals and households need to prepare directly, Council directly, prepare need to individuals and households and where our district has some significant needs. has some significant district our and where While be ready. to help all residents to want kit), but we education which we know are key issues for our community for issues key are know we which education plan and an emergency have 80% of households survey to strengthen, particularly in relation to health, housing and to in relation particularly strengthen, to opinion (based on our 2019/20 residents’ in our community of our pandemic response and this is another area we want we and this is another area of our pandemic response Being ready for emergencies emergency for of preparedness good levels have we Overall, We worked closely with central government agencies as part government with central closely worked We engagement. Most Matters in the What strongly through and building neighbourhood and community resilience came resilience neighbourhood and community and building And, the themes of connection, looking out for each other out for looking And, the themes of connection, connections and being able to respond to needs quickly. to respond to and being able connections very practical ways of reaching out to people, making people, out to of reaching ways practical very key role in fostering community resilience, including in resilience, community in fostering role key confirmed that iwi and community organisations play a play organisations that iwi and community confirmed Partnering with others is vital. Again, the pandemic Again, the pandemic is vital. with others Partnering on page 36.) section recovery see the COVID-19 more, (For reconnect. campaign or supporting events that help the community that help the community or supporting events campaign working to reactivate our economy through our Love Local Local our Love through our economy reactivate to working emphasises resilience across our district – whether we’re – whether we’re our district across emphasises resilience medium-term actions for the Council and our partners, and our partners, the Council actions for medium-term Our COVID-19 recovery plan, which sets out 42 short- and sets plan, which recovery Our COVID-19 experience showed there are things we can strengthen. can things we are there showed experience Importance of community resilience was hard for the most vulnerable in our community and that in our community vulnerable the most for hard was together and adapted to deal with the pandemic. However, it deal with the pandemic. However, to and adapted together resilience in a way we haven’t encountered before. We came We before. encountered haven’t we in a way resilience Our experience of the pandemic demonstrated the need for of the pandemic demonstrated Our experience Strengthening our resilience our resilience Strengthening MAIN TOPICS FOR FEEDBACK Future of local government Future changes, the Government’s these specific In addition to The increasing. authorities are of local expectations widen the is seeking to sector government local the about how government with central conversation central believe We sustained. be can expectations our activities, especially funding for government the part of be an important needs to infrastructure, on deliver to our capacity Support for conversation. our response for expectations increased Government’s also needs to the social needs of our communities to be considered. The RMA review also recommends a new law to law to a new also recommends The RMA review and managed change adaptation climate oversee Māori Advisory A National at-risk areas. from retreat advise on resource to is also suggested, Board mana whenua perspective. a management from d s Act – community consultation document for Long-term Plan 2021-41 | 47 Long-term document for consultation community Securing our future:

What’s important forWhat you should about weCouncil’s advocate role? for?

QUESTIONS TO HELP GUIDE COUNCIL’S DIRECTION QUESTIONS TO HELP GUIDE COUNCIL’S water, wastewater and stormwater): With the changes the Government is• making to regulation• and supply for until such time as any services waters the three plan for and provide to is continuing Council Note: waters services made. national changes are (drinking section page 96 or online… the feedback go to views: us your Tell reforms. the Government’s to respond we input will help us plan how Your Find out more out Find dia.govt.nz/three-waters-reform-programme kapiticoast.govt.nz/your-council/projects/three-waters-reform-programme 2021 – late consultation Upcoming include This may reform. on water and Council in 2021 the Government will be engagement by both There process. participating in the reform continue should on whether Council with the community consulting continue Council responsibilities including planning and budgeting for as usual – with business continue obliged to are all councils now, For the across of work programme our significant progressing are plan we – so in this long-term these services waters. three  a release to intends by mid-2021 the Government and elements, of key draft  plan, development 30-year a combined put forward plans. local councils’ consolidating a regulatory Natural and Built Environment and Natural a regulatory woul Planning Act, in which each region a Strategic

• Resource ManagementResource Act reform the replacing to has committed The Government a Government- Management Act (RMA) after Resource the repealing of the Act proposed review commissioned again. RMA and starting is too the system been concerns have there years For protected and has not adequately long too takes costly, the Government this, address To the environment. of legislation: pieces two proposes •

DRAFT What happens next? policy decisions in make plans to The Government and local government 2021 and both central April/May will engage with the authorities – including our Council – what the as to advise everyone 2021 to in late community will be. steps and what the next has decided Government What would these has the potential programme reform waters The three changes mean and infrastructure water change the way significantly to for Kāpiti? in our district. delivered are services management, security in our water heavily invested have We the benefit of – our on behalf of – and for and infrastructure 10 years, the last Over and our environment. community Our water- projects. $90 million on capital spent over we’ve $342 million, which of a value have together assets related under land (excluding assets total 38% of Council’s is around the for expenditure annual operating Our average roads). the period of this plan, which is $36 million over waters three expenditure. is about 24% of our total positioned for well are we investment, of this Because Managing the report A 2018 Auditor-General’s the future. that the shows drinking water demand for and of supply future- strategic, in our Council is setting a good example drinking water. supplying to approach focused for our responsibility remove could Amalgamation For and services. infrastructure waters three maintaining delivering for be responsible no longer Council may example, standards Increasing households. supplies to drinking water on our freshwater and the inputs services, water for the All across area. focus a Government are catchments, meet these standards to increases will be cost there country, be delivered best these would believes and the Government organisations. water multi-region by large, Councillors agreed that we will participate in the initial, will participate we that agreed Councillors us a This gives of the programme. stage non-committal and regional with Government together table’, at the ‘seat of the Government’s impacts local the explore to partners, granted were participation, we for In exchange proposal. stormwater and wastewater water, $6.26 million for and services. infrastructure

| Kāpiti Coast District Council District 46 | Kāpiti Coast water standards. been working to ensure compliance with the drinking compliance ensure to been working of wastewater and stormwater networks. We have have We networks. and stormwater of wastewater a regulatory framework for drinking water, with oversight with oversight drinking water, for framework a regulatory delivery. services water for arrangements water services regulator, Taumata Arowai, to enforce enforce to Arowai, Taumata regulator, services water of reform further explore and to infrastructure, waters already resulted in legislation and the creation of a and the creation in legislation resulted already three and improve maintain authorities to local for The Government review, which began in 2017, has review, The Government a funding package announced 2020, Government In July numbers of consumers. of consumers. numbers 2020 developments smaller communities, by sharing the costs across large large across costs by sharing the communities, smaller and help make services more affordable, especially for for especially affordable, more services and help make approach is designed to improve capacity and capability capacity improve is designed to approach local authorities; privatisation has been ruled out. This new out. This has been ruled privatisation authorities; local a preference that entities will be in shared ownership of ownership that entities will be in shared a preference holding the assets and debt for those services. There is There those services. debt for and the assets holding Island). These groups would manage water as well as as well manage water would Island). These groups of multi-regional groups (for example lower North lower example (for groups of multi-regional supply arrangements, neighbouring councils will be part neighbouring councils arrangements, supply enquiry, was the catalyst for this change. for the catalyst was enquiry, water managing their own of individual councils Instead standard. The Havelock North event, and subsequent North event, The Havelock standard. What’s proposed? infrastructure so the Government is aiming to raise the raise is aiming to so the Government infrastructure other councils have faced issues with water services services with water issues faced have other councils Although services in our district are in good shape, are in our district Although services services’ – drinking water, wastewater and stormwater. and stormwater. wastewater water, – drinking services’ arrangements for what are known as the ‘three waters waters as the ‘three known what are for arrangements The Government is changing regulation and supply and supply is changing regulation The Government recent information available. information recent watersChanges three to services big areas of change are summarised here with the most the most with summarised here of change are big areas impact for communities and the role of councils. The of councils. and the role communities impact for the local government sector which will have a significant a significant have which will sector government the local Central government is making some major changes in is making some major government Central Government changes impacting Council MAIN TOPICS FOR FEEDBACK esilience? es? ’s role? ’s community consultation document for Long-term Plan 2021-41 | 49 Long-term document for consultation community Securing our future: ds’ emergency preparedness? emergency ds’ e for? er/increase our excess? er/increase e different options for how we insure our assets? We could: We our assets? insure we how options for e different

What else can Council do to help build community r help build Council do to What else can househol encourage Council can How explor we Should ― our cov reduce ― our reserv more/increase self-insure What’s important for you about Council you for important What’s advocat we What should

• Strengthening our resilience (page 44) (page resilience our Strengthening • • Government changes impacting Council (page 46) (drinking services waters three for and supply regulation is making to With the changes the Government wastewater): stormwater, water, • • Caption to come to Caption ou would like us to keep keep us to like ou would DRAFT eviously? Other things? eviously? owth looks like? like? looks owth xperienced in different ways across the district, for for the district, across ways different in xperienced d we continue to prioritise emissions reduction for Council? for reduction prioritise emissions to continue d we oped a strategic framework to guide our decision making and we want to know if you think we’ve think we’ve if you know to want guide our decision making and we to framework oped a strategic As highlighted below, our community outcomes link strongly to our big issues. All of the All of the our big issues. to link strongly outcomes our community below, As highlighted a mutually and Council have Mana Whenua outcome: by our first supported are issues mana-enhancing partnership.  As our district grows, what do you think good gr what do you grows, As our district got it right. What are your views? your got it right. What are We have devel have We The effects of climate change are being e change are of climate The effects We have made good progress on reducing Council’s emissions, however, achieving further gains further achieving however, emissions, Council’s on reducing made good progress have We Shoul more. will cost See Key decisions, Key project 1, page 52. 1, project decisions, Key See Key Any other comments.  What are the positives that have come out of the pandemic y come that have the positives What are doing or support in the community? As climate in Paekākāriki. such as the seawall and infrastructure communities our coastal for example, equity across ensure do we how increase, respond to and costs severe more become change impacts the district? If we experience a resurgence of COVID-19, are there particular things you would like like would particular things you there are of COVID-19, a resurgence experience If we did pr The same things we do in response? Council to

Managing growthManaging 42) (page • • Responding to climate change (page 39) (page change climate to Responding • • • • 38) (page housing Access to • • COVID-19 response and recovery 36) (page COVID-19

| Kāpiti Coast District Council District 48 | Kāpiti Coast

or online… are summarised below. Check out the issues on pages 34-47 and tell us your views. Go to the feedback section page 95 section page the feedback Go to views. us your on pages 34-47 and tell Check out the issues summarised below. are an opportunity to help shape how we respond to the challenges and opportunities these issues present. Our questions Our questions present. issues and opportunities these the challenges to respond we help shape how an opportunity to We want to know the community’s views as we determine our direction on the big issues facing our district. This is our district. facing on the big issues our direction determine as we views the community’s know to want We Our big issues – summary of questions questions of – summary issues big Our MAIN TOPICS FOR FEEDBACK community consultation document for Long-term Plan 2021-41 | 51 Long-term document for consultation community Securing our future: community consultation document for Long-term Plan 2021-41 | 51 Long-term document for consultation community Securing our future:

erest to to erest

w concerned people are about are people w concerned e to repair the wall, but the costs for for but the costs the wall, repair e to DRAFT o set up a structure now to be able be able to now o set up a structure we want t want we we hav we Seawall: CCO: the airport is of high int know Airport: we would if you know need to and we our community potentially could we how explore Council to like a role. have we know ho know Housing: we  and we significantly increased plan have the current our approach. review need to  in the future, the district manage activities for to to income generate that could including initiatives on rates. our dependence reduce   increased have We in the district. housing pressures think we if you know to want but we our activity already, involved. actively get more should

Over the following pages, we explain these issues. these issues. explain pages, we the following Over recommendation options and a are each one there For all will consider members elected Council. Your from on proceed to how deciding before the input received these matters. these on Why consulting we are decisions now? • • • • e renew the the e renew

The second two decisions involve only operational operational only decisions involve two The second decisions are as they budgets existing spending from activities. explore to to have a role in the airport? the in a role have to Should Council explore ways Should we set up a CCO up set we Should organisation)? (council-controlled Significant proposals The first two decisions involve capital spending capital decisions involve two The first set out. are impacts and rates and the costs different way? Should w Should Paekākāriki seawall a bigger role in housing? Should Council take a take Council Should and two significant proposals. Key projects In this long-term plan we are asking your views on four decisions – two projects key decisions views four your on plan asking we are long-term this In Key decisions | Kāpiti Coast District Council District 50 | Kāpiti Coast MAIN TOPICS FOR FEEDBACK sons’ housing sons’ view of our district plan to plan to of our district view e to central government about government central e to s and community organisations promoting promoting organisations s and community maintain our existing older per older our existing maintain re moderate do a more the need and reflect meet national policy direction and more housing development for scope more for developers for flexibility advocat to continue of our iwi and support the work endorse to continue partner housing solutions. the housing challenges in Kāpiti the housing challenges

• Review of district policies in the and the rules review further could We plan change add or could we example, plan. For district of wider range a support and incentivise to provisions the right housing – in affordable housing – including by the do this will be enhanced to Our scope places. the proposed policy changes including Government’s Act (see page 47.) Management the Resource changes to Review of development our review could we at whether look could We contributions more incentivise policy to contributions development policy the increasing housing without unduly affordable on ratepayers. burden could maintain our currentWe role This as currently. our role keep could we Alternatively, would: means we • • •

community consultation document for Long-term Plan 2021-41 | 53 Long-term document for consultation community Securing our future: Caption to come to Caption We have budgeted $631,000 over the first three years of years three the first over $631,000 budgeted have We budget), and advisory part of our research this plan (as and investigate housing partnerships potential explore to suitable identified we If work. could they how in detail of the nature depending on opportunities, partnership with the consult would Council, we for role the proposed an be through likely would about this. This community plan. long-term next annual plan or the supply the influencing in role our Increasing of affordable housing Opening up more land supply by expanding growth help enable could We land for housing in suitable development higher-density and incentivising closely work need to did this, Council would If we areas. and is sustainable, the growth ensure to with developers for and facilities infrastructure is appropriate that there be that partnering on housing It may developments. new supply boost option to is an effective developments the land Council been reviewing have of homes. We suitable be few may there it is possible however, holds, active A more housing development. opportunities for land for Council acquiring involve may therefore, role, housing. the purpose of providing for our budget increase to proposing are In this plan, we the for by $1 million per year land purchases strategic our increases of the plan. A higher budget 10 years first housing. for suitable be land that could consider to scope

ole in social housing ole of in influencing the supply ole we could increase our r increase could we our r increase could we housing. affordable DRAFT 

Partnering opportunities housing increased at providing look also could We with iwi or community example, for a partnership, through housing providers. Increasing social role in our housing housing and persons’ in older our role expand could We wider social housing. at providing look older for units is 118 housing portfolio Our existing been have We the district. across in 10 locations people of this and refurbishment our maintenance increasing of are they ensure to of years couple the last housing over tenants. for a good standard Review of older housing to persons’ all our older review to propose persons’We housing of units number the current maintaining see if – while potentially could – we persons older for have that we in of units the number expand the housing to redevelop housing or persons’ additional older – either for total other social housing. $158,000 budgeted have plan, we In this long-term after (2022/23). If, two in year out this review carry to consider to were we the review, conducted have we consult would housing we persons’ the older redeveloping on a detailed proposal. and community with the residents How could we approachHow could it? the actions we In addition to a bigger role. take could We our activity increase could we to, committed already have areas: key in two • • While there are multiple factors affecting the supply of the supply affecting factors multiple are there While if country; the entire facing issue housing and it is an and increased role, active more an even Council took being the pressures help address spending, it could in our district. now experienced e development e development d to see if there’s see if there’s d to ould be used for be used for ould e social housing built

potential for redevelopment for potential and other land on Māori-owned housing. relocatable temporary looking into opportunities with the public housing opportunities with the public housing into looking get mor to sector land that c suitable seeing if there’s engaging with our iwi partners to explor to engaging with our iwi partners assessing the residential land we hol land we the residential assessing

• • • • We have increased our focus and over the past year year the past and over our focus increased have We that includes a programme work a housing developed such as: of initiatives range Council activity in role Council has not had a significant In the past, persons’ of older provision housing other than our current plan with our district roles housing, and our regulatory building. for consents and issuing The Government has set some recent direction, such direction, some recent has set The Government for parking requirements of residential as the removal affordable for the scope which will expand dwellings new amend our can we be further ways may housing. There policy to contributions plan and our development district homes. This would of affordable development encourage specific consultation. require New government requirements are likely to result in result to likely are requirements government New in and including higher buildings intensification, increased help hubs. This may and transport centres our town around diverse the kinds of homes for and different more provide term, term/medium in the longer population in our district term. need in the shorter pressing is also a more but there There are significant and growing housing access and housing access and growing significant are There as rising rents. as well district, in the issues affordability will be more there grow, to continues As our population and being felt This is already housing. on existing pressure out of the district, move having to are some of our families seeking are in our community people and increasingly on housing. The numbers access support to government 2020. 169 as at October are list the public housing waiting What’s the issue? the What’s role in housing? Key project1 Should Council a take bigger | Kāpiti Coast District Council District 52 | Kāpiti Coast MAIN TOPICS FOR FEEDBACK The existing wall is in extremely poor condition condition poor is in extremely wall The existing The ongoing maintenance. significant and requires and surge 2016 storm the July in badly failed seawall was 2018. The wall in early Gita again during Cyclone design life, built in the 1970s with a 25-year originally longer. lasted have though some sections the to access improving to Council is also committed also We users. all for the Parade beach and along This is the Parade. for calming traffic consider need to on work alongside be done but can funded separately, the wall. of the village both is a feature The beach at Paekākāriki opens, Gully When Transmission and visitors. locals for beach so an improved the village will be bypassed and help the economic will be a drawcard frontage in the village centre. of businesses stability How did we get here? we did How engagement community has been extensive There options. 2013 on replacement since and consultation and had the seawall replace Council had planned to consents and building both resource been granted then construction since However, project. the for escalated. have costs progress other options to Council has explored April 2020, the Council applied In the project. the Government’s funding support from for scheme, part of the projects ready’ ‘shovel 2020, In May response. COVID-19 Government’s but ultimately shortlisted, was the application support it. chose not to the Government community consultation document for Long-term Plan 2021-41 | 55 Long-term document for consultation community Securing our future: Caption to come to Caption Key project 2 Paekākāriki the renew we Should seawall a different way? Why need we do this? 1 kilometre the almost renewing to Council is committed protects The seawall in some way. seawall (930 metre) foreshore on the Paekākāriki infrastructure community Council which the for assets and water such as roads is responsible. What’s the issue? the What’s with the community undertaken was consultation Since Paekākāriki Plan about the the 2018-38 Long-term for wall, the replacing for and a plan developed seawall, changed. have and conditions costs option and rock concrete of the cost The estimated and substantially has increased planned currently the wall how explore to it necessary Council considers the district. to cost reasonable at a more be renewed can Council also mean across in other areas costs Increased of this high cost at the relatively closely look need to we on our debt. have and the impact it would project change will be of climate the impacts know We of the parts in different ways in different experienced needs seawall deal with the Paekākāriki we How district. our equity across ensure to widely more be considered to assessing for an approach provide and to communities At the same time, we needs in the district. similar future Beach Paekākāriki to access improved provide need to such as the Council assets for and ongoing protection ensure to also want We piping beneath the Parade. water elements core the retain we as possible, that as far on with the design option worked of the concrete and the Community Design Group Seawall Paekākāriki community. with the Paekākāriki in consultation Board

Council should not Council should a bigger role take in housing NO DRAFT om borrowings; that will result in <0.1% rates in <0.1% rates that will result om borrowings; ship, for example, with iwi or community housing providers housing providers with iwi or community example, ship, for ordable housing. ordable

e proposing to increase our budget for strategic land purchases by $1 million land purchases strategic our budget for increase to e proposing o support a wider range of housing, including affordable housing including affordable of housing, o support a wider range s to see if we could expand this for additional older persons’ housing or other social housing persons’ additional older this for expand could see if we s to Council should take a bigger role in housing, exploring how we could: we how in housing, exploring a bigger role – Council should take ordable housing (as described) ordable elopment contributions policy to incentivise more affordable housing. affordable more incentivise policy to contributions elopment increase our role in social housing our role increase (as described), and in influencing the supply our role increase of aff

Council should take a bigger role in housing: a bigger role take Council should • • review our district plan t our district review our dev review partner on housing developments partner on housing developments ar housing (we land for acquire of this plan) years ten the first for per year do more to expand land supply and incentivise higher-density development in suitable areas in suitable development higher-density and incentivise supply land expand to do more housing ($158,000 budgeted for this review) for budgeted housing ($158,000 look at providing social housing through a partner housing through social at providing look expand our role in older persons’ housing and look at providing wider social housing. We propose reviewing reviewing propose wider social housing. We at providing look housing and persons’ older in our role expand unit persons’ our older partnerships). identify and investigate to $631,000 budgeted have (we

KEY POINTS POINTS KEY • • • • • Increasing our role• in influencing the supply of affordable housing – we could: We would consult on any proposals arising from this work. arising from on any proposals consult would We Increasing our role• in social housing – we could: Taking a bigger role in housing in role bigger a Taking increase our role in social housing, and our role increase of aff in influencing the supply our role increase $1 million for land purchase is capital spending. This is funded fr is capital land purchase $1 million for increase for year 1, and 0.06% rates increase in year 2. There will be no rates impact on depreciation from year 2 year from impact on depreciation will be no rates 2. There in year increase 1, and 0.06% rates year for increase as the $1 million is land purchase.

Tell us your views: go to the feedback section page 97 or online… the feedback go to views: us your Tell Council District 54 | Kāpiti Coast of serious concern in our district and it is timely for Council’s role to be strengthened. to role Council’s for and it is timely in our district of serious concern Access to housing and affordability of housing have been identified as matters been identified as matters have of housing housing and affordability to Access • • We recommend: Yes recommend: We What do we recommend? • year 3, 0.26%. Note: The $158,000 is not incurred until year 2. until year The $158,000 is not incurred 3, 0.26%. Note: year $158,000 and $631,000 are operating spending. The rates impact is: year 1, 0.29%, year 2, 0.48%, 1, 0.29%, year impact is: year The rates spending. operating impact – $158,000 and $631,000 are Rates an increase to our budget for strategic land purchases of $1 million per year for the first ten years of this plan. years ten the first for of $1 million per year land purchases strategic our budget for to an increase $631,000 to identify potential housing partnerships and investigate in detail how they could work. This plan also includes This plan work. could they how in detail and investigate housing partnerships potential identify $631,000 to We have budgeted $158,000 to review our older persons’ housing for further development opportunities and further development housing for persons’ our older review $158,000 to budgeted have – We Cost three years of this plan: 2021/22 to 2023/24. of this plan: 2021/22 to years three YES in the first place take would partnerships our social housing and investigate review to Timing – our initial work What the are options? MAIN TOPICS FOR FEEDBACK

oup to see how see how oup to actor oved tarting in 2021/22 tarting or walking and biking or walking we could include art and cultural elements include art and cultural could we 25-year life 25-year borrowings) from $17 million (funded s programme 5-year contr use local Opportunity to the beach impr to Access f Improvements of design gr involvement Further

– recommended Timber (like-for-like replacement)• • • • • • • community consultation document for Long-term Plan 2021-41 | 57 Long-term document for consultation community Securing our future: enge oved

tarting in 2021/22 tarting orking group

 50-year life 50-year borrowings) from $27 million (funded s programme 2-year be a chall may Finding a contractor the beach impr to Access and biking walking path for Shared with as agreed as part of the project Artwork w community

KEY POINTS POINTS KEY – current plan Options for renewing the Paekākāriki seawall Concrete and rock wall • • • • • • • Caption to come to Caption DRAFT

Tell us your views: go to the feedback section page 97 or online… the feedback go to views: us your Tell Climate change is also an important part of our considerations and a shorter design life gives some flexibility in the some flexibility gives design life and a shorter part of our considerations is also an important change Climate the Parade. management options for hazard of further coastal and extent the nature reconsider to future This is the more affordable option and the most realistic given the already significantly-increased cost of the existing of the existing cost significantly-increased the already given realistic most option and the affordable This is the more a have We be improved. would and beach access life, as is, with a 25-year be rebuilt would planned option. The wall this project. deliver to the capability that have contractors number of local We recommend: We in 2021/22. starting programme in a 5-year life, with a 25-year replacement Like-for-like What do we recommend? $17 million funded from borrowings. – $17 million funded from Cost 3, 0.34%. 2, 0.17%; year year 1, 0.04%; impact – year Rates completion, ensure in 2021/22. To starting programme this as a 5-year deliver to propose would Timing – we that are approach of this The advantages in stages. be delivered to project, the entire for be let would a contract contractor. use a local and potentially time of the year be done at the best could work The work involved in this option is much simpler and lower risk providing more certainty of delivery. There are many are There of delivery. certainty more risk providing and lower in this option is much simpler involved The work contractors. including local out the work carry who could with the right expertise contractors We would involve the community to ensure we got the best outcome we could for improving access to the beach for all for the beach to access improving for could we outcome got the best we ensure to the community involve would We the art and cultural incorporate could we at how and look with the design group work to also continue would We users. plan. of the current part which are elements Council is aware of how important it is to maintain and improve access to the beach, so this option could use timber this option could the beach, so to access and improve maintain it is to important of how Council is aware for the Parade along access safe ensure also would We and ramps. steps for and concrete bulk of the wall the for and biking. walking We would rebuild the seawall mainly with timber as it is currently, though with a higher specification, that is, longer, more more that is, longer, though with a higher specification, it is currently, with timber as mainly seawall the rebuild would We also last (It could affordable. – but is more – 25 years life and palings. The timber option has a shorter posts deeply-set has.) wall as the current than 25 years, longer Timber (like-for-like replacement) with a 25-year life $27 million funded from borrowings. – $27 million funded from Cost 3, 1.51%. 2, 1.11%; year 1, 0.31%; year – year impact Rates 2022/23. to through with work in 2021/22, construction and start works physical tender would Timing – we Finding a contractor available for a project this size may also be a challenge. The scale and complexity of the works make make of the works and complexity The scale also be a challenge. this size may a project for available Finding a contractor this option. for consents and building resource have do already we risk, however, construction this option a greater The increased cost is due to a number of factors. The scale of roading projects in the region has put pressure on put pressure has in the region projects roading of The scale a number of factors. is due to cost The increased rates. on market pressure significant – and placed resource a scarce is now supplies – rock This is the existing planned option, which would be a full replacement of the seawall built with concrete and rear and rear with concrete built of the seawall replacement be a full which would planned option, This is the existing construction is complex and rock concrete Interlinking life. a 50-year have to and designed revetment, rock raised consulted first $17.7 million in 2018 when we from million. This has increased be $27 to projected now are and costs on the seawall. What the are options? Concrete and rock wall with a 50-year life | Kāpiti Coast District Council District 56 | Kāpiti Coast MAIN TOPICS FOR FEEDBACK

We should not set up a CCO not should We NO xcluding regional councils) have one or more (57%). one or more have councils) regional xcluding COs (51%) COs

community consultation document for Long-term Plan 2021-41 | 59 Long-term document for consultation community Securing our future: – We should set up a CCO. – We We should set up a CCO set should We

27 of 53 district councils have one or more C more one or have councils 27 of 53 district ― (47%) more one or in the have councils 16 of 34 district ― (57%) more one or in the have councils 11 of 19 district e and city, authorities (district 38 of all 67 territorial

• How a CCOHow works 50% of has at least The council or controlled. 50% council-owned is at least (CCO) organisation A council-controlled expectations out sets a council Each year or trustees. half of the directors appoint at least can and rights the voting it. to reports and the CCO a CCO for sources from funding attract It can otherwise. access easily to not be able may that a council expertise bring can CCOs activities that is its from a profit generate can organisation trading and a council-controlled other than ratepayers a profit.) generate to is not allowed itself a council legislation, governing (Under its the council. to returned the council’s into be consolidated to required are financial accounts All CCO the community. to accountable are CCOs as part of the usual independent process. and audited annual report in its accounts Act 2002. Government in the Local CCOs for requirements legal specific are There CCOs: have councils Zealand’s About half of New • in which Agency, Funding Government agencies or the Local services shared don’t include of CCOs the numbers Note: authorities participate. many local Find out more out Find at oag.parliament.nz/2015/cco-governance about CCOs find out more can You

What do we recommend? Yes recommend: We in the most assets run commercial to way be the best of activities. It would a range be used for could A CCO way us a secure also give would of a CCO structure legal The accountable manner. efficient and cost-effective on rates. our dependence reduce to other income generating opportunities for explore to section page 97 or online… the feedback go to views: us your Tell – the costs involved in setting up the legal structure of a CCO are minor as it is only an administrative process. process. an administrative it is only minor as are of a CCO structure in setting up the legal Cost involved – the costs It would be funded from the Council’s existing operational budget. operational existing the Council’s be funded from It would in 2021/22. the process start aim to would we a CCO, establish Timing – If Council decides to What the are options? YES

DRAFT How could a CCO could How work for Kāpiti? the form in of a CCO the establishment proposing We’re an independent board have It would company. of a holding to operate Council and would to reporting of directors Council requirements. consider that we had specific activities and when, we If, undertake would we be managed by this company, could that on with the community a specific consultation taken. any action was before proposal that is about setting up a structure This decision now consultation. subject to use in the future could we housing is managed, under lease, by the Ōtautahi by the Ōtautahi under lease, housing is managed, City The Christchurch Trust. Community Housing be that social housing policy requires Council’s rates. from self-supporting and not funded financially has had a successful Council North District The Far on high-priority focused 20 years past the for CCO delivering in instrumental It has been infrastructure. their district. for facilities community and improved new Airport, District run Whangarei is used to A CCO a joint venture between Council District Whangarei between a joint venture The Council has overall of Transport. and the Ministry while and governance, management for responsibility management of the airport is controlled operational Limited. with Northland Aviation a contract through is part of a CCO. District in the Waitaki The hospital ectors reporting to Council to reporting ectors ouncil-controlled trading organisation – could be used for activities that be used for – could organisation trading ouncil-controlled ommunity on any activities that could be managed by the CCO ommunity on any activities that could orm of a holding company orm of a holding We would consult with the c consult would We Goal is to set up a structure now that we could activate in the future in the future activate could that we now set up a structure Goal is to be in the f could A CCO of dir an independent board have It would – a c objective with a profit A CCO generated income for the district for income generated

KEY POINTS POINTS KEY • Setting organisation) up a CCO (council-controlled • • • •

Christchurch City Council uses a CCO to manage its manage its to City Council uses a CCO Christchurch social The city’s social housing portfolio. extensive How canHow a CCO be used? or leverage manage services be useful to can A CCO can This major projects. delivering opportunities for wants (if the community such as housing be in areas with example for resources, combine that) or to such as services deliver to authority, another local infrastructure projects. Sometimes they are an ‘umbrella’ for several activities. several for an ‘umbrella’ are Sometimes they Council has Regional Wellington Greater example, For of their that includes ownership company a holding and their (trains); stock rolling rail in Centreport, interests buildings). (office property commercial CCOs have been part of the local government sector for for sector government of the local been part have CCOs authorities and about half of all local 20 years, almost a for set up CCOs councils Sometimes a CCO. have up for set are particular activity and sometimes they the future. What’s the issue? the What’s to the country throughout councils used by are CCOs housing and transport run activities from independently used are They and events. development economic to commercial a more where services run to particularly and assets also hold can They is required. focus is known objective with a profit A CCO generate income. (CCTO). organisation trading as a council-controlled

(council-controlled organisation)? Should we set up a CCO a CCO up set we Should Significantproposal 1 | Kāpiti Coast District Council District 58 | Kāpiti Coast MAIN TOPICS FOR FEEDBACK s are fulfilled to to fulfilled s are erm outcomes, erm outcomes, y identified and of an y identified and of e sector. Council should not explore ways ways not explore Council should in the airport a role have to atepayer funding atepayer the extent possible the extent acceptable type and scale acceptable operation should be self-funding, requiring little or little requiring be self-funding, should operation no r be clearl should risks operating right and historical iwi aspirations on longer-t focus options should both for prospects the growth particularly the airport and how the region, and Kāpiti Coast contributes of partnering such as with iwi, the desirability the privat government,

NO • • • • In exploring options, we would look to set principles set principles to look would options, we In exploring include: These could decisions. guide future that would • e decisions

community consultation document for Long-term Plan 2021-41 | 61 Long-term document for consultation community Securing our future: osts, risks and opportunities risks osts, e how various scenarios could work for Kāpiti for work could scenarios various e how ample under a lease under ample ess in 2021/22 in 2021/22 ess d need the agreement of the airport’s owners and full consultation with the community and full consultation owners of the airport’s d need the agreement Council should explore ways to have a role in the airport. a role have to ways Council should explore – tatus quo) tatus Council should explore ways ways explore Council should in the airport a role have to Council would investigat Council would the c understand Need to guide any futur to set principles Council would this proc start Aim to woul steps Any future

e may be other options that emerge if we do go if we be other options that emerge e may KEY POINTS POINTS KEY Exploring airport the in a role ways have to • • • • • not take a role (s a role not take ex the airport, for operate and in partnership), the airport (potentially own ― it, or operate ― the operations. outsource

– costs involved in exploring options would come from the Council’s existing operational budget. operational existing the Council’s from come options would in exploring Cost involved – costs process. be a lengthy that it could this in 2021/22 noting start to aim would options, we explore to were Timing – If we Future consultation of the owners on the agreement be reliant would steps any future work, could believed identified an option that we If we on detailed costs. including about any proposal full information providing proposal with the community consult would of the airport. We What do we recommend? Yes recommend: We by our years three the last over support that has been expressed the significant This recognises our district. for be achieved that could of benefits and the range air services retain to community section page 97 or online… the feedback go to views: us your Tell

What would exploring airport the in a role entail? would the airport, we in a role having did explore If we work could these how options and various investigate risks costs, the understand need to would Kāpiti. We for scenarios. various for and opportunities are: explore could of options we The sorts • • • What the are options? YES Ther could we how options. Exploring ahead and explore with the discussions include need to would a role have area. about the Kapiti Landing retail owners

Caption to come to Caption DRAFT What need consider we to ownership Private owned. is privately The airport in Kāpiti with small, particularly Zealand, is unusual in New have similar airports All such as ours. airports regional with other income services air traffic supplement to in the Airport has done much as streams, hub to Kapiti Landing as a retail by developing past subsidise the airport operations. in by councils, owned are airports regional Generally, Examples with government. in partnership some cases Whanganui, Taupo, Whakatane, North, include the Far and . Marlborough role any future the airport is privately-owned, Because support. the owners’ happen with only could Council for engaged with the Council and have owners The current with us, collaboratively work to a desire expressed have be. may of their asset the future whatever be to sufficient information don’t have we At this stage, we’re why That’s options robustly. all the consider to able should on whether we guidance community for looking to in order in the airport a role have to ways explore ongoing operation. its ensure There may be a role for the Council and government government the Council and for be a role may There of their As representatives Airport. in Kapiti Coast best are government and central local communities, that flow benefits the economic capture to placed from airports.

Our Council has been active in keeping air services and air services in keeping Our Council has been active the ensure to can doing what we to committed remain we in operation. airport remains There is significant economic benefit in having the airport benefit in having the economic is significant There in 2018, conservatively undertaken A study in our region. be $4.3 million per to the district to the benefits estimated with time savings compared travel due to primarily year, from Wellington. flying There is widespread community support for retaining air retaining support for community is widespread There in 2018 and 2020, completed in Kāpiti. Surveys services , show most matters What through received and feedback an important remain airport to the support for strong in our district. asset Responding community to support Ownership of Kāpiti Coast Airport changed in late 2019, Airport changed in late of Kāpiti Coast Ownership owners things, the new assess time to taking and after not sustainable are that the airport operations concluded of of the ongoing provision The vulnerability them. for in the immediate- has also been heightened air services the COVID-19 due to of travel levels by the lower term pandemic. What’s the issue? the What’s in our asset is an important Airport Kapiti Coast contribute a thriving airport would and community, of our wellbeing economic the social and to strongly is uncertain. of the airport the future However, district.

to have a role in the airport? the in role a have to Should Council explore ways ways explore Council Should Significantproposal 2 | Kāpiti Coast District Council District 60 | Kāpiti Coast MAIN TOPICS FOR FEEDBACK We should not set up a CCO should We Council should not explore ways ways not explore Council should in the airport a role have to NO NO NO community consultation document for Long-term Plan 2021-41 | 63 Long-term document for consultation community Securing our future:

– We should set up a CCO. – We in the airport. a role have ways to – Council should explore Council should take a bigger take Council should in housing role Council should explore ways ways explore Council should in the airport a role have to We should set up a CCO should We What options? the are YES Note: If Council proceeds to explore a role in the airport, we would prepare a detailed proposal on any viable option identified, on any viable proposal a detailed prepare would in the airport, we a role explore to If Council proceeds Note: be subject made. It would any final decisions were on that before separately with the community and consult including costs, of the airport owners. the agreement to What do we recommend? Yes recommend: We Should we set up a CCO (council-controlled organisation)? (page 58) (page organisation)? set a CCO we up (council-controlled Should What do we recommend? Yes recommend: We airport? the in 60) a role (page ways have to explore Council Should What options? the are YES What options? the are YES

year 1, 0.04%; year 2, 0.17%; 1, 0.04%; year year 3, 0.34% year DRAFT Council should not take a bigger not take Council should in housing role AND RATES IMPACT RATES AND COST $17 million funded from borrowings – $17 million funded from Cost impact – Rates NO Renew with a like-for-like replacement with a replacement with a like-for-like Renew 25-year life 25-year

– Council should take a bigger role in housing. a bigger role – Council should take year 1, 0.31%; year 2, 1.11%; 1, 0.31%; year year 3, 1.51% year Council should take a bigger take Council should in housing role

COST AND RATES IMPACT RATES AND COST What do we recommend? life with a 25-year replacement with a like-for-like Renew recommend: We Note: both options include retaining the usable beach area and improving access. and improving beach area the usable retaining both options include Note: 50-year life 50-year What do we recommend? Yes recommend: We year 3, 0.26%. Note: The $158,000 is not incurred until year 2. until year The $158,000 is not incurred 3, 0.26%. Note: year in <0.1% of rates result that will borrowings; spending. This is funded from is capital $1 million land purchase 2 year from impact on depreciation will be no rates 2. There in year increase 1, and 0.06% rates year for increase as the $1 million is land purchase. Cost and rates impact and rates Cost opportunities and $631,000 further development housing for persons’ our older review to $158,000 budgeted have We This plan also includes an work. could they how in detail and investigate housing partnerships identify potential to of this plan. years ten the first for of $1 million per year land purchases strategic our budget for to increase $158,000 and $631,000 operating spending. 2, 0.48%, year 1, 0.29%, is: year impact The rates $27 million funded from borrowings – $27 million funded from Cost impact – Rates What options? the are with a wall and rock with a concrete Rebuild Should we renew the Paekākāriki the seawall renew we way? a different Should 55) (page What options? the are YES Should Council take a bigger role in housing? (page 52) (page housing? in role a bigger take Council Should

We want to know the community’s views on four key decisions for this long-term plan. The decisions and options – including plan. The this long-term decisions for key on four views the community’s know to want We us 50-61 and tell of options on pages presentation the full Read below. summarised – are recommendations Council’s section page 97 or online… the feedback Go to views. your Key decisionsKey –summary of options | Kāpiti Coast District Council District 62 | Kāpiti Coast MAIN TOPICS FOR FEEDBACK Kāpiti Gateway – Te Uruhi Kāpiti Gateway – Te Community Board proposals Ōtaki communityfacilities sportsIndoor centre Ngā Reserve Manu Nature Playgrounds Ōtaki upgrade Pool stage 2 Maclean Park community consultation document for Long-term Plan 2021-41 | 65 Long-term document for consultation community Securing our future:

Community Centre

Waikanae Library Newhanga Kāpiti Te centres Town Link road Drinking water safety and resilience Stormwater upgrades Waste minimisation Footpaths DRAFT You are welcome to comment on any of the items. on any of the items. comment to welcome are You and Library the Waikanae like projects, some As well, input community dedicated have already centres, town know to like If you’d continue. which will processes you highlight where we about any of this work, more find information. can

started on some new initiatives. started initiatives. new some on and resilience section Investing for As outlined in the a substantial developed have , page 20, we growth our local so it will help stimulate programme work the pandemic. of the impacts from as it rebuilds economy identified as high priority and already It includes work some new projects. the community – like Waikanae Library get upgrades. And stormwater Waikanae we’ll our and – like community the In this long-term plan, we’ll do more work on projects we know are high priority work more projects do on high are we know plan, we’ll for long-term this In Major projects and initiatives | Kāpiti Coast District Council District 64 | Kāpiti Coast MAIN TOPICS FOR FEEDBACK Link road been we’ve centres, in town with our investment Along get around to people for on making it easier working our the expressway, between and move the district, and bus and train and shopping centres business priority action regionally This has been a stations. a number of years. for $25 million budgeted we’ve years, three the next Over in Street Ihakara and Road link Arawhata to connection east–west a strong provide to Paraparaumu, in the area. growth to and respond centre, the town for and take on Rimu Road congestion This will reduce as providing as well streets, off residential traffic which we Kāpiti Road, for future-proofing extra traffic. with increased deal widened in 2020 to our and grow will help revitalise Easier connections towards and in Paraparaumu businesses community’s . plans, development aligns with commercial The road get to investors with those private work so Council can the community. for outcome the best in a this link road build an opportunity to have We and cycling for provide to way and sustainable creative centre and the town this road and make pedestrians, users. vulnerable for safer the funding support from Council applied for fund, with an ‘shovel-ready’ Government’s funding from of six months date start estimated unsuccessful. was but the project being granted, the link case, business a successful Subject to Kotahi funded by Waka will be jointly project road Agency. NZ Transport community consultation document for Long-term Plan 2021-41 | 67 Long-term document for consultation community Securing our future:

Town centres Town $41 million 14-year, our through half-way We’re town Waikanae and of Paraparaumu transformation our to contribution is a key investment This centres. wellbeing. economic social and community’s with our been working we’ve years, seven the past For and Kāpiti businesses our iwi partners communities, that are and thriving centres diverse vibrant, create to of each area. the unique flavour and reflect accessible, and visitors attract has been to of this work The focus higher-paid jobs. and more investment, come to Caption road, a local 1 becoming Highway With State and our focus nearing completion, Gully Transmission as our as well COVID-19, from recovery on economic and developing Link Road on the Paraparaumu work time this is a great Library, Waikanae a new plans for our future review again to our communities to talk to improvements centre at other town priorities, and look term. the longer for to kapiticoast.govt.nz/town- go find out more To centreskapiticoast.govt.nz/your-council/projects/town- centres-transformation/ DRAFT Te Newhanga Kāpiti Community CentreTe connectedness community in supporting Our role to response in the highlighted was and resilience the pandemic. in Kāpiti Community Centre Newhanga Our Te services of community a range is a hub for Paraparaumu fit is no longer the building and activities. Unfortunately, needs the future for provide to purpose and is unable for with water issues It has significant of the community. it. or replace rebuild need to We in and mould. coming for design process will see Council begin the This project consider need to We in 2021/22. centre community a new community’s our to contribute best can a centre how what this means, and what it might include. wellbeing, 2021/22 and 2022/23. million over $5 budgeted have We Caption to come to Caption To find out more… To We have budgeted $13.8 million for 2021/22 to 2024/25. 2021/22 to million for $13.8 budgeted have We We will develop a detailed proposal for consultation with consultation for proposal a detailed develop will We the community. This new, multi-use space could become an anchor become could multi-use space This new, of regeneration the to contributing Place Mahara in facility community greater by encouraging centre town Waikanae and acting as a social businesses with local connection an it also provides Potentially, the community. hub for housing. activity and commercial support opportunity to Engagement and consultation is already under way to to under way is already Engagement and consultation with purpose of libraries the future determine broadly and design of on scope consultation further detailed one of the project. in year be undertaken to this facility they expressed already have that users do know We take to want and we space flexible a generous, want a have could if the facility consider the opportunity to use. broader Our four district libraries are highly valued by our by valued highly are libraries district Our four is a library important how know we and communities a long-term prioritising We’re people. Waikanae for centre, and service Library the Waikanae solution for Place. in Mahara Waikanae LibraryWaikanae | Kāpiti Coast District Council District 66 | Kāpiti Coast MAIN TOPICS FOR FEEDBACK Footpaths and shared footpaths and renewing Maintaining and Council, for ongoing investment paths is an Our metres. thousands of renew we each year as satisfied with the state has not been community the low reflecting like, would as we of our footpaths of investment previously. level and at the same our budget, increased In 2019/20, we its Agency changed NZ Transport Kotahi time Waka This saw our footpath begin co-funding. policy to renewed and in 2019/20 we treble, almost investment paths. and shared of footpaths 3,475 metres to approach changing our we’re As part of this plan, of full stretches longer and complete patching, do less In 2021/22, effective. cost which will be more renewals as we of footpaths a similar length renew to expect we improvements maintain did in 2019/20 (3,475m); and to as the at the same rate years three next the for last three. and in path renewals investment Our proposed of this plan years three the first over maintenance 51% secure to continue to expect is $4.6 million. We Agency. NZ Transport Kotahi Waka of that from find out more… To Caption to come to Caption community consultation document for Long-term Plan 2021-41 | 69 Long-term document for consultation community Securing our future:

Waste minimisation use emissions, reduce helps waste Minimising so our environment, and protect efficiently resources us. a high priority for it’s information in providing play to role Council has a key our budget increased and in 2020/21 we and education, This years. three the next over this work expand to and time in the community spend more can means we out work helping people with schools and businesses, and recycle. reuse waste, reduce can they ways cost-efficiency and affordability consider to have We consistent ensure and services our when delivering at the look us to This led the district. across services users Most site. and recycling waste green Waikanae recycling kerbside also have station of this recycling from this site close to proposing so we’re services, of service levels make 2021. This would 1 August other urban areas similar to residents Waikanae for waste in more invest us to and allow of the district minimisation initiatives. our in making a 30% reduction to committed We’re on how landfill by 2026, with a focus to waste district’s organic and reduce recovery resource improve can we landfill. to waste including clean and demolition waste, Construction waste. of our proportion a significant for fill, accounts three-quarters that half to estimated In Kāpiti, it’s will be is of this type. We waste of the district’s recovery resource and supporting investigating of the transfer including the development alternatives, the community provide to at Otaihanga, site station landfill. from materials diverting with options for significant up a also make waste and garden Food will continue landfill and we to waste of our proportion encourage to and education incentives offer to home subsidies for behaviour change through bin services. and green composting through supported recently Community programmes Ōtaki Waste fund include Zero Grants Levy the Waste and Maoriland PaeCycle timber, waste recovering electronic for and containers initiatives, composting our focus years, three the next For recycling. waste recovery resource options for better on education, will help meet the composting and encouraging Minimisation the Waste from recommendations to and support our community review Taskforce waste. reduce find out more… To

Caption to come to Caption DRAFT Stormwater upgrades in of properties number a significant affects Flooding with climate increasing are risks and the the district, with stormwater deal should we How change impacts. long-term in the last issues one of the key was flooding approach a comprehensive take decided then to plan. We minimise to assets stormwater our or renew upgrade to buildings, homes, commercial and protect flooding street a long-term developed We properties. and garages 240 projects. comprising programme about completed have we years, three the last Over including the upgrade programme, of the 15 projects Margaret in William Street, capacity asset of stormwater catchment. Kena in Kena renewals and major asset Road 2 Beach stage including Ōtaki Some major projects, start to due are upgrades stormwater Street and Riwai of stormwater capacity 2021. The increased in March in a has resulted with heavy rain cope better to assets 709 (from complaints in flooding reduction substantial 344 in 2019/20). to in 2015/16 down we the amounts further increased have In this plan, we Based on the pressures. cost reflect spending to are a better have now we years, three the past over delivery of stormwater and costs of the scale understanding spend to expected we Previously, projects. upgrade years, three the next for $3.6 million each year around $6.4 million per year. this to increased have and we plan is this long-term for proposed investment The total funding as part applied for We 20 years. $178 million over fund, but were projects ‘shovel-ready’ of the Government’s not successful. for and efficiently effectively programme this deliver To procurement at different looking are we the district, being and work contracts term including approaches minimise delays. to done in stages find out more… To To find out more… To The Ōtaki Water Treatment Plant’s equipment is Plant’s Treatment Water The Ōtaki and needs life operational also nearing the end of its resilience, improve to bore drill one new We’ll upgrading. high- provide consistently it can us confidence and give quality water. We’ll drill new bores for the Hautere water supply, supply, water the Hautere for bores new drill We’ll it can and ensure resilience the plant’s increase to high-quality water. provide consistently We will continue our upgrade of the Waikanae Water Water of the Waikanae our upgrade will continue We spend a further $12 million plant and will Treatment $21 million. to investment total bring the in 2021/22 to aging equipment, bringing the This includes replacing a new and building modern standards clarifier plant up to functioning clarifiers, fully end up with two We’ll clarifier. also We’re our risk in an earthquake. which will decrease pumps and dosing equipment and upgrading renewing useful life. the end of their getting to that are To make sure we can maintain a reliable and resilient and resilient a reliable maintain can we sure make To water and renewing upgrading we’re supply, water and Hautere. Ōtaki in Waikanae, infrastructure treatment of years three the first for this is a focus Progressing this plan. Supplying safe drinking water is one of Council’s of Council’s is one water drinking safe Supplying a core It’s community. our to services important most the alongside and will continue Council responsibility, of the three supply planned changes for Government’s (see page 46). waters Drinking water safety and resilience | Kāpiti Coast District Council District 68 | Kāpiti Coast MAIN TOPICS FOR FEEDBACK Caption to come to Caption Maclean Park as a Park Maclean improve to be continuing We’ll park that all, an intergenerational for destination our district. of pride for is a point will be spending $2 million we years, two the next Over plan implementation. of the development two on stage modern provide to the toilets will upgrade We and new toilets including more facilities accessible has park, that skate much-loved the while showers, will also be of Kāpiti Coasters, generations served with the community. in consultation improved upgrades future for the ground also be preparing We’ll and area persons’ an older (including spaces the play to come). to plaza in years water the skate improve to budgeted Council had already Community Board park. The Paraparaumu-Raumati the of advancing the value promoted strongly proposal include to of the park and Council agreed development facilities. and shower of the toilet the upgrade find out more… To community consultation document for Long-term Plan 2021-41 | 71 Long-term document for consultation community Securing our future:

Playgrounds enjoying around revolves of the Kāpiti lifestyle Part and and reserves – our parks spaces our outdoor playgrounds 49 maintain currently We playgrounds. and maintenance for and costs district, our across look to want rising. We equipment keep replacing the future. manage this for best can we at how better provide could we how consider to want We practice, best for allowing while money, for value age and for allow equipment to and replacing the same number of keep we Should safety. or do costs, and incur increasing playgrounds investing the number and reducing consider we to ways the best in those? And what are more of our with the areas and communicate consult affected? most community the community will be specific opportunities for There to This is likely the process. input throughout give to be in 2022/23. Ōtaki Pool upgrade stage 2 one stage successful the opening of the very After move time to in 2017, it’s Pool the Ōtaki to upgrades the heat This will include increasing two. stage to footprint, carbon its reducing efficiency of the building, the changing rooms. and upgrading planned as a result was The heat efficiency upgrade get the full us to enable To one rebuild. of the stage also the changing rooms benefit of the heat recovery, be upgraded. need to change These activities support our climate will The work response. declaration emergency and three. two years over $3.4 million spread cost emissions help deliver This includes $1 million to operation. building’s in the reductions

Caption to come to Caption DRAFT Ngā Reserve Manu Nature is a superb conservation Reserve Ngā Manu Nature Kāpiti’s The 14-hectare our district. for drawcard and visitor initiative lowland of coastal remnants is one of the largest reserve native for a haven and provides on our coast, forest swamp Kāpiti Island and between flying birds and a link for birds, the Tararuas. a develop has plans to that runs the reserve The trust the applied to they support, With Council’s centre. visitor were in 2020, but unfortunately Fund Growth Provincial not successful. our to a unique contribution Ngā Manu makes outcomes, development and economic environmental their visitor to contribute $266,000 to budgeted and we’ve of and three two years over spread development, centre this plan. we could manage alone. The Ministry of Education is keen is keen of Education The Ministry manage alone. could we used by the community. better school assets see to sport a multi-purpose to be in addition would This venue With Park. north, in Otaraua further facility and recreation will facilities these two Kāpiti is experiencing, the growth amenities for excellent other and provide each complement community. our growing with consult be to would years three the next for Our focus the need, and how we believe on what they our community then would be funded. We might costs ongoing operating a specific develop to the College and with the Ministry work plan in 2024. include in our long-term to proposal year year ‑ enance of this facility. of this facility. enance commitment to co-fund maint co-fund to commitment the future, for this arrangement update to hope We facility an indoor sports develop us to allowing potentially much earlier than 2–3 courts) (say scale of an appropriate Council is already involved with the Paraparaumu College College with the Paraparaumu involved Council is already a 50 through way a long currently are hall, and we Indoor sportsIndoor centre an for been discussed ideas have various the years, Over our outdoor complement in Kāpiti, to venue indoor sports up with team could we how be exploring We’ll facilities. to College and Paraparaumu of Education the Ministry both for centre a sports hall into the college’s redevelop our use – a similar model to school and community Raukura Te venue the community to contributions at Kāpiti College. Centre Arts ki Kāpiti Performing We have set aside budget of $9.9 million over three years years three budget of $9.9 million over set aside have We 2024/25. from We want to start exploring options in the first three years years three options in the first exploring start to want We be done to is likely any major work of this plan, though in start would agreed of the plan. Work in the term later four. year Ōtaki is growing, and good quality local facilities are are facilities quality local and good is growing, Ōtaki need to we This means the community. for important Our in Ōtaki. facilities community our current reshape need hall, but we and memorial is the library main focus needed in the community are what facilities understand to in our planning. and this will be included Ōtaki community facilities | Kāpiti Coast District Council District 70 | Kāpiti Coast MAIN TOPICS FOR FEEDBACK community consultation document for Long-term Plan 2021-41 | 73 Long-term document for consultation community Securing our future:

Caption to come to Caption

Caption to come to Caption DRAFT Community board proposals plan, our community the proposed preparing As part of of the proposals A number proposals. submitted boards as Waikanae prioritised such already work supported and more Park Maclean centre, the community Library, by considered was proposed work New action on housing. priorities programme work of the overall Council in terms been included have projects and budget. The following in the reflected are plan so the costs in the proposed rates increase. proposed each for – $20,540 per year funding Community board and and engagement initiatives local put towards to Board with their communities. communication building – seed Surf Club replacement Paekākāriki clubhouse a new develop to project the Club’s funding for 2). $52,993 in year 1, and ($51,600 in year facilities and shower of the toilet – upgrade Park Maclean two the next over (as part of $2 million of development page 71. on detailed as years) the park as a redevelop – funding to Park Waikanae 3 and $578,000 in year 4). park ($444,000 in year destination of these – a full upgrade Beach pavilion toilets Ōtaki already was 1. $500,000 ($1 million in year facilities and a further strengthening earthquake for budgeted a full upgrade.) enable $500,000 has been added to 5 for also $570,000 in year is In this plan, there of the beach park. development all that the park promote – signage to Park Haruatai 1). ($15,000 in year offers To find out more… To Following a Council decision in February 2021 to proceed proceed 2021 to in February a Council decision Following on completing under way is now work with the Gateway, Engagement will consent. the design and the resource cost project estimated The stakeholders. with key continue the half with is $4.46 million of which Council has budgeted the other half. providing to committed Government Te Uruhi will enable us to tell the Kāpiti Island story, as well Island story, the Kāpiti tell us to Uruhi will enable Te and activities in ouras those of the many other attractions biosecurity threats the island from protect and to district, ants. and Argentinian rust such as myrtle The project involves the development of a small multi- of the development involves The project with expansive facility gateway purpose and accessible on Park end of Maclean decking at the northern-most the enhance It would Stream. Tikotu the south side of the the stream restoring of the area, and biodiversity ecology The the beach. from and to public access and providing Mana Whenua by gifted Uruhi has been generously name Te the building. as the name for Improving the departure point to Kāpiti Island and providing and providing Kāpiti Island point to the departure Improving point for has been a discussion experience visitor an iconic on during consulted It was years. many for our community a Plan and funding for Development Park the 2017 Maclean Plan. in the 2018–38 Long-term signalled was gateway Kāpiti Gateway – Te Uruhi Kāpiti Gateway – Te | Kāpiti Coast District Council District 72 | Kāpiti Coast COSTS AND RATES $ 5.91 $ 0.80 $ 2.12 $ 0.91 $ 1.13 $ 1.08 $ 0.97 $ 1.26 $ 2.67 $ 4.11 $ 3.44 $ 1.49 $ 0.65 $ 0.28 $ 3.18 $ 3.22 community consultation document for Long-term Plan 2021-41 | 75 Long-term document for consultation community Securing our future: $ 33.21 per week per resident per resident Average cost cost Average Coastal management Coastal Community facilities Community wellbeing Corporate planning Districtwide development Economic Governance and open spaces Parks and leisure Recreation services Regulatory management Stormwater and resilience Sustainability whenua Tangata management Wastewater management Water Activities and services we provide provide we Activities and services our community to and transport Access What rates help pay for for pay help rates What and parks, and swimming pools libraries from of Council services use a range in our district people Each day and roading. such as water as infrastructure as well consents, and building dog registration to through residents’ found our main survey In 2020, about our services. feel people how the year check throughout We to ask residents Our surveys year. 80%, up on the previous was overall with Council services satisfaction lighting to street and from foothpaths, quality to water from of services with a range their satisfaction rate support and waste such as community services of about awareness beaches. It also asks for points access and education. minimisation advice at URL… online results opinion survey resident see the latest can You population of estimated based on our current per resident services of providing the costs shows This table 55,500. approximately Costs of services

Caption to come to Caption You are welcome to comment on any of the items on any of the items comment to welcome are You the feedback in find them listed will and you section (pages 98-100). DRAFT

This section provides information about Council’s about Council’s information This section provides system, our rating changes to for proposals this and policies for and charges user fees plan. long-term up the proposed It outlines what makes it affects 2021/22 and how for increase rates different properties. Costs and rates Costsand 4 | Kāpiti Coast District Council District 74 | Kāpiti Coast COSTS AND RATES Utility alue rate to the to alue rate esidential ratepayers ratepayers esidential es requirement and new and new es requirement oading rate to capital value. capital to oading rate Rural Proposed rating system change system Proposed rating districtwide general land v general districtwide r 2021/22) land value commercial rate to promote economic economic promote to rate commercial the district in development Residential

Change proposed Change proposed ― the a further $225,000 from transition ― 20% ($2.513 million for the remaining transition Status quo – based on 2020/21 rates requirement requirement quo – based on 2020/21 rates Status r valuations, rating and new would pay $450,000 more in rates; commercial, commercial, in rates; $450,000 more pay would $450,000 pay would and utility properties rural lifestyle, in rates less The combined impacts of both proposed changes of both proposed impacts The combined (based on the 2020/21 rat rating valuations) would see residential ratepayers ratepayers see residential would valuations) rating with compared in rates more $250,000 paying system. rating $450,000 under the current Tell us your views: go to the feedback section the feedback go to views: us your Tell page 98 or online…

What options? the are • • This would help to alleviate some affordability issues issues affordability some alleviate help to This would proposed system rating the target to closer and move land value through collected rates in 2017, by reducing collected rates 34% and increase 37% to from charges 18%. 15% to from charges value capital through on the views hear the community’s to want We system. the rating changes to proposed • Other (excluding annual rates increases) annual rates (excluding community consultation document for Long-term Plan 2021-41 | 77 Long-term document for consultation community Securing our future: oading Current rating sysytem Current rating ering the 2020/21 Impact of revaluation on rates share vs proposed rating system change system rating vs proposed share on rates Impact of revaluation Commercial Lifestyle 0 500,000 300,000 100,000 400,000 200,000 (100,000) (200,000) (300,000) al rate to the commercial targeted rate (total (total rate targeted the commercial to al rate $650,000). The recent revaluation of properties saw of properties revaluation $650,000). The recent from with some $450,000 moving a shift in rates proposing We’re residential. types to other property a further this impact, by transitioning reduce to based districtwide value the land $225,000 from rate. the commercial to rate general economic of Council’s proportion the Increasing the be funded from to costs development of the level reflects rate, targeted commercial from sector by the commercial received benefits slightly be paying will still Commercial the activity. less overall. r 20% land value the remaining Transition value. capital 2021/22) to ($2.513 million for rate our have to confusing that it’s Council recognises rates separate two through collected costs roading the one rate it all to transition to proposing so we’re of a property. value based on the capital changes, recov With the proposed result would using the 2020 values requirement rates an additional $250,000 paying ratepayers in residential made $450,000 if no changes were to compared rates. including GWRC increases annual rates (before Transition a further $225,000 from the districtwide districtwide the from a further $225,000 Transition gener

• • Changes proposed rating to system some is proposing the Council review, of its As a result to: changes are key The equity. improve small changes to •

43% 18%

5% 34% Capital value-based rates value-based Capital charges Fixed rates Land valued-based Variable DRAFT Proposed rating system mix 43% 15% We have reviewed our rating system to ensure ensure to system our rating reviewed have We aligned with all ratepayers, to it is equitable understand to vision and simple strategic Council’s and administer. made up of 15 rating is system our rating Currently, is heavily shows, as the chart below mechanisms and, and 43% value set on land of rates land-based with 37% charges. on fixed in review rating Changes made as part of the last roading districtwide charge the fixed 2017/18 moved and a new rate based targeted value a capital to rate based also introduced was rate commercial targeted value. on capital of the districtwide the impacts Council has considered system the rating left we in 2020. If revaluation would of the revaluation the effect as currently, an additional pay would ratepayers mean residential and utility rural lifestyle, $450,000, with commercial, any – not including $450,000 less paying properties Council and Greater from increases annual rates Council (GWRC). Regional Wellington 5% 37% Variable Capital value-based rates value-based Capital charges Fixed rates Land valued-based

Current rating system mix 32% 30% 6% 32%

Land valued-based rates Land valued-based Variable Capital value-based rates value-based Capital charges Fixed

Target rating system system rating and equitable In 2017, a fair mix be as follows: deemed to Kāpiti was for Rating system review across allocated are rates is about how system Our rating and residential example for types of ratepayers, different and and land values, capital and between commercial, allocated are rates the How charges. and variable fixed required income rates amount of doesn’t change the total each year. by Council and collected Rising property values in the district don’t affect the don’t affect in the district values Rising property do affect they however collect, we amount of rates total of your If the value shared. are contributions rates how across than the average by more has increased property will go up, and of the rates ‘share’ then your the district, versa. vice Impact of increased propertyvalues revalued were in the district properties 2020, all In August and years) three (this happens every Value by Quotable valuations of their new notices received will have owners of the with the rest Along 2020. November in early in value. significantly risen have properties our country, This section explains what changes Council proposes to to what changes Council proposes This section explains affordable and is equitable system that our rating ensure ratepayers. for Proposed changes to rating system rating to changes Proposed | Kāpiti Coast District Council District 76 | Kāpiti Coast COSTS AND RATES community consultation document for Long-term Plan 2021-41 | 79 Long-term document for consultation community Securing our future:

Caption to come to Caption DRAFT Help with rates a number of policy includes remission Our rates for relief rates for policies which allow individual Depending on individual situations. different rates qualify for may ratepayers circumstances, in postponement or rates (remission) assistance circumstances. financial extreme the policy to some changes to Council is proposing $50,000 of and an increase the help provided expand fund. See Our policies remission the rates for per year page 82. our fund could to this increase terms, In household a further to assistance rates provide potentially of uptake. level of the current on top 167 households Long-term policy in our existing see the current can You 2, pages 83-92 and on our 2018-38 Part Plan (LTP at kapiticoast.govt.nz.rates-remission-policy website government access Council also helps residents in our community many for which apply rebates rates on lower incomes. income home and your own in your and live own If you assistance qualify for may $45,000, you around is below scheme. the government through rates your towards $655. is up to rebate the rates year, the 2020/21 rating For be to have the rebate for applications be considered, To by Council by 30 June 2021. received might applied, and think you already haven’t If you ‘getting and search www.govt.nz go online to qualify, at one of our pick up a form can or you rebate’ a rates centres. service osts related to to related osts osts related to events events to related osts developing workforce skills and capability, and skills and capability, workforce developing example, (for attraction support and business/industry school, business support, pop-up capability business and attraction); visitor c development 50% of economic activities, and promotion marketing and sponsorships, strategy development of an economic and the provision district. the for 100% of economic development c development 100% of economic

To help address affordability, both the Government and both the Government affordability, help address To on a ratepayers lower-income support for Council offer rebate rates the government basis through case-by-case policy (remission) assistance rates scheme and Council’s section. next in the discussed The latest affordability statistics provided by economic by economic provided statistics affordability The latest – some areas indicate firm Infometrics consultancy still – are Central and Paraparaumu Ōtaki West, Waikanae income 5% of household over rates have to likely more in the district. elsewhere than households Concerns about affordability government local into the 2007 Shand report to According 5% of household than be more shouldn’t rates rates, as part of at affordability Council looks income. its considerations. The specific rates individual businesses pay will be pay individual businesses The specific rates as valuations by changes in their property impacted described at the beginning of this section. • are of costs proportion that a fair This change ensures activities that benefit for ratepayers funded by commercial sector. the business • We propose increasing the commercial targeted rate rate targeted commercial the increasing propose We a total collecting be would means we by $225,000. This of (instead this rate through of $650,000 per annum to: contributes $425,000). This rate The commercial targeted rate pays for activities where activities where for pays rate targeted The commercial the by received are of the benefits proportion a higher and revenue in the Council’s (identified sector business financing policy). Change proposed to commercial targeted rate proposedChange commercial to | Kāpiti Coast District Council District 78 | Kāpiti Coast COSTS AND RATES Tell us your views: go to the feedback section the feedback go to views: us your Tell page 99 or online… Levels of service maintain to intending are plan, we long-term this For such as the community, to of service our levels of frequency and pool opening hours swimming change. one specific with only mowing, roadside 69), section (page in our Major projects As explained and Greenwaste the Waikanae close to propose we make 2021. This would 1 August from site Recycling other similar to residents Waikanae for of service levels of the district. parts as we of service will be lifting our levels we Overall, programme the bigger work for our resources increase of the the recommendations to and respond propose we review. organisation community consultation document for Long-term Plan 2021-41 | 81 Long-term document for consultation community Securing our future: oval/non-regulatory) oval/non-regulatory) osts of chemicals and and of chemicals osts s associated with easement s associated applications. The application fee will be $326 which will fee The application applications. at and then charged hours, two includes the first $163 per hour thereafter. An increase in laboratory fees of between 5% to 5% to between of fees in laboratory An increase the higher c reflect 10% to drinking private for example, shipping, for overseas testing. water – new/changes/ easements for fee New appr (landowner cancellations cost Additional external at cost. charged will be processes

• come to Caption Laboratory services• Across-organisation• charges would and charges fees to adjustments The proposed adopted 2021. (Some are 1 July from apply generally fit with the to fees, such as dog registration earlier, process.) registration and charges fees of proposed see our full list can You at kapiticoast.govt.nz/kapiti2041 on our website

ed to ed to e-application and e-application or club and learn-to-swim parents/ or club and learn-to-swim DRAFT ompete the application after five hours. five after the application ompete building building and GoGet ee of $51.75 per application A new fee for planner/engineer time relat for fee A new and pre-application and attending for preparing no fee, hours two meetings. First start-up business $163 per hour thereafter. A new spectator charge of $1.00 for all swimming all swimming of $1.00 for charge spectator A new f pools (except of and non-swimming parents/caregivers caregivers some other under eight). This is similar to children charges. aquatic centre region Wellington of $1 per An additional swimming pool charge activities that club or group swimmer attending hire lanes. time additional LIMs for for charge hourly A new c to required online application consent GoCouncil building f of $23 per fee processing online application consent and GoGet that GoCouncil proposed It is application. than rather the applicant, on to passed are fees currently. which is the case funded by ratepayers with other councils. is consistent This approach to time related administration for fee A new pr and attending coordinating no fee, hours two meetings. First start-up business $108 per hour thereafter.

• • Building consents• • Resource consents• • Housing for older a and for low housing are persons’ older for Our rents persons of providing the costs reflected not have time they long to increased are that rents proposes this housing. Council in increases to equate which would of our costs 80% cover $16-$76 per week. of the range individual to apply would increase the proposed How basis out on a case-by-case be worked would tenancies with this proposal. proceed if a decision is made to the proposed explain to all tenants contacted have We their with them about talk to change and will continue also advising community are We individual circumstances. in our community people who support older organisations change. of the proposed aware are they ensure to Swimming pools There are some new fees and specific changes proposed. fees some new are There d om $2,003 to om $2,003 to om $323 to $335. om $323 to $335. d change from $97 to $100 $97 to d change from d change from $783 to $811, and $783 to d change from

$2,075 for a residential new building/alteration building/alteration new a residential $2,075 for $250,000 and $500,000 between a LIM request would change fr would a LIM request minor building work between $5,000-$10,000 between work minor building woul a building consent would change fr would consent a building the cost of an adult swimming pool entry fee woul of an adult swimming pool entry fee the cost woul dog registration dog standard a neutered/speyed for change from $5.20 to $5.40 $5.20 to change from

• • • • Changes proposed for 2021/22 are we services, of providing costs increased reflect To of 3.6% (which is the Local increase a general proposing this of how Examples (LGCI). Index Cost Government applies are: • We aim to have a balance between making it easy for for making it easy between a balance have to aim We and ‘user community of the in the life participate to people in and charges fees increase we each year Generally, pays’. use We (LGCI). Index Cost Government line with the Local because Index) than the CPI (Consumer Price this rather In the face. councils costs to specifically refers the LGCI and user fees to no increases made we 2020/21 year, of COVID-19. of the impacts in recognition charges However, the costs of providing services increase each increase services of providing the costs However, we year our plans, every and as part of developing year at the This includes looking and charges. our fees review as any changes to as well services of delivering cost real hours. such as extended provided, are the services how remain special rates that any sure make to want also We and of Community Services holders for reasonable cards. SuperGold Many services we provide, such as our swimming pools, such provide, we Many services some of the full cost. pay only subsidised so users are our like facilities, popular for rates reduced also offer We is paid for The rest incomes. on limited people pools, for income budget and is part of what rates out of the Council use facilities to people for Making it affordable is used for. wellbeing. our community’s to contribute we is a major way The Council receives about 11% of its income from fees fees from income about 11% of its The Council receives from everything cover and charges Fees and charges. hall hire. to consents building User fees and charges | Kāpiti Coast District Council District 80 | Kāpiti Coast COSTS AND RATES e apply to help to e apply sessing significance? sessing work for determining work determining for how and when we seek community feedback on feedback and when wehow seek community key activities? Do you agree with our criteria for as for with our criteria Do you agree w with the thresholds Do you agree be significant? may a matter if determine our frame Do you understand Tell us your views: go to the feedbackTell section page 99 or online

• • Your views are important to us and we invite you to tell tell to you invite us and we to important are views Your policy. about the draft think us what you • You can see our full draft policies on our website at policies on our website see our full draft can You kapiticoast.govt.nz/longtermplan part of our published in the second The policies are plan. long-term community consultation document for Long-term Plan 2021-41 | 83 Long-term document for consultation community Securing our future: Caption to come to Caption Significance and engagement with communities engaging to Council is committed work. participation in its community and increasing out how and engagement policy sets Our significance be engaged to expect can and when our communities or other assets, issues, different in decisions about of significance. level depending on their matters, at the Council is informed It also helps ensure about the process beginning of a decision-making is expected of any public engagement that extent is made, and the form a particular decision before and type of engagement that is required. and our significance reviewed recently have We some minor proposed engagement policy and have and better accessible the policy more make changes to which and clarify our engagement framework, reflect here practice best considered the IAP2 model reflects of a the significance assess we How and overseas. and assets issues, to or decisions in relation proposal unchanged. remains other matters

2 o 500m

or excess or excess s development s development o ensure that people that people o ensure ). etirement, visitor, visitor, etirement, 2 s in ranges of 5-10% where of 5-10% where s in ranges ect forecast changes in household changes in household ect forecast DRAFT alculation to 2.5 people per household (from 2.3) (from per household 2.5 people to alculation gross floor area (from 450m (from area floor gross c and group and shared living, supported and accommodation,

Updates to ensure that the Council’ ensure to Updates based maps are and catchment charges contribution and assumptions forecasts expenditure on the capital plan. 2021-41 long-term in the draft Adjustments to refl to Adjustments Kāpiti Coast and size based on BERL’s occupancy projections, population and dwelling District to: specifically 2020, September ― (HUE) unit equivalent’ the ‘household increase ― r for the HUE slightly reduce ― t units non-residential the size for increase Increasing the income threshold t threshold the income Increasing than 5% of their income bills greater rates who have remission. a rates for apply still can policy f remission a new Introducing a from resulting charges rates water volumetric has been repaired. the leak where leak water private Expressing funding target Expressing appropriate, rather than specific % targets. This is in than specific % targets. rather appropriate, guidelines. practice best government line with local

• Development contributions Development the Council policy provides contributions The development of specific growth the costs with a means of recovering development, new for that is required infrastructure in demand an increase in results the development where infrastructure. on the district’s of component a key are contributions Development capital work. funding growth-related for strategy Council’s the policy are: to proposing are The main changes we • Rates remission Council provides out how sets policy remission Our rates difficulty paying significant face who people to assistance their rates. and propose policy our remission reviewed have We some changes: • • fund by remission the rates increasing propose also We $50,000 per year. • onomic ome) and public (rates) funding targets for for funding targets ome) and public (rates)

While there are some changes to funding targets, funding targets, some changes to are there While the to been proposed changes have no significant from recovered currently that are of costs proportion sources. public income versus private Updating the private (fees and user charges and and user charges (fees Updating the private other inc our Council changes in how reflect all activities, to created have we example, For structured. activities are which activity, and resilience sustainability a new management and emergency solid waste, comprises activities. sustainability environmental development costs to be funded from the commercial the commercial be funded from to costs development of the level which reflects system, rating targeted the from sector by the commercial received benefits This means an additional $225,000 (including activity. income the rates per annum will be funded through GST) than from rather ratepayers commercial from received the district. across ratepayers rural and residential Increasing the proportion of Council’s ec of Council’s proportion the Increasing

• • The main changes we are proposing to the policy are: to proposing are The main changes we The policy also looks at who benefits from an activity from at who benefits The policy also looks it. For for paying to contribute who should and therefore benefit – such as community does the whole example, user such is it a single – or of drinking water supply from consent. a building for applying as a homeowner This policy describes how our spending – operating and our spending – operating This policy describes how For from). comes the money – is funded (where capital such (CAPEX), expenditure capital of our most example, funded by is partly network, on our stormwater as work services (OPEX), for expenditure Operating borrowing. funded from is largely libraries, and such as our parks income. rates Revenue and financingRevenue We review these policies at least once every three years years three every once these policies at least review We some proposing are plan we this long-term and for the following policies. changes to Our main policies (described below) are: revenue and revenue are: (described below) Our main policies contributions; development remission; financing; rates and engagement. and significance All councils are required to have specific policies for specific policies for have to required are All councils These policies ensure of their activities. aspects key government with local is consistent work we that how for and transparent clear actions are laws and that our our communities. Policies | Kāpiti Coast District Council District 82 | Kāpiti Coast COSTS AND RATES ome. The Council ees and charges. ees and charges. (Generally, we increase them only to reflect reflect to them only increase we (Generally, of service, the levels Like increases.) cost that feeling community has been strong there our like subsidise facilities to continue should we to make they of the contribution pools because our community. in wellbeing We could increase user f increase could We of inc seek other forms could We (council-controlled set up a CCO to recommendation decisions in this key – one of the four organisation) explore to us a way give plan (page 58) – would activities. income-generating potential Do you support Council exploring other ways to other ways to support Council exploring Do you income? generate section the feedback go to views: us your Tell page 100 or online…

• • community consultation document for Long-term Plan 2021-41 | 85 Long-term document for consultation community Securing our future: vide. However, when this vide. However, ently identified as having the ently has been raised previously, we’ve received received we’ve previously, has been raised that our communities from feedback strong increases, rates lower prefer would people while and facilities see services do not wish to they rates. reduce to cut in order We could reduce spending by cutting back on reduce could We pro we the services consist We’re of delivery, our service for cost lowest second – so authorities in the country all 67 territorial us stop won’t That cost-effective. already we’re find to but it will be hard ways, better for looking significant improvements.

• come to Caption What options are there for reducing ourWhat for reducing there options are dependence on rates? •

0.9% 1.6% 2.1% DRAFT 3.2% Changes to work programme work Changes to funding gap the depreciation closing – due to Depreciation replacement costs asset increasing – due to Depreciation Inflation

inflation accounts for 3.2% of the proposed rates rates 3.2% of the proposed for accounts inflation increase of 7.8% consulted 2021/22. When we for in 2018, inflation accounted plan long-term last our on increase rates of the proposed (on average) 2.1% for 1 of that plan. year for Composition of the proposed rates increase for 2021/22 How capital spending and borrowing affect rates in more invest to proposing are As outlined, we our local stimulate help in this plan to works capital is spread created of the assets cost The economy. or be 40 years – which may lives their estimated over depreciation. – through assets infrastructure for more fund the on to on debt taken plus interest Depreciation, income. by rates is paid for programme, works capital proposed the What up rates increase makes us in this long-term facing issues One of the significant including inflation, our base costs to plan is the increase have These costs and depreciation. premiums insurance years. in recent been increasing chart, see in the following can as you example, For

We review growth projections as part of confirming as part of confirming projections growth review We – and the so growth each year required the rates – by each ratepayer contributed of rates share plan. during this long-term different might look For this long-term plan, we have taken a conservative a conservative taken have plan, we this long-term For the for in the number of ratepayers of growth view one, 1% in of this plan (0.9% in year years three first 1.5% in year rising to three, and 1.3% in year two, year this plan period). for thereafter year and every four predict, to be hard can patterns growth This is because by the pandemic. caused with the uncertainty particularly In recent years, some areas in the country have have in the country some areas years, In recent base has increased so their rating faster grown will need we grows, district As our quickly. more will also be more but there infrastructure, more contribute – to and commercial – residential ratepayers services. provide to required income the rates to Kāpiti has many natural advantages, but we don’t but we advantages, Kāpiti has many natural that other local assets the income-generating have some councils example, on. For draw to authorities have power of local sale the or funds set up from ports have other substantial don’t have we Unfortunately, suppliers. is heavily as these so our district such streams income dependent on rates. Why rates is needed fund services to income (our operating services providing for Our costs our from come mainly expenditure) costs/operating income. rates This section outlines how Council uses rates income income Council uses rates how This section outlines mean for plan would long-term and what the proposed in 2021/22. rates on rates on rates Impact of proposed long-term plan plan long-term proposed of Impact | Kāpiti Coast District Council District 84 | Kāpiti Coast COSTS AND RATES community consultation document for Long-term Plan 2021-41 | 87 Long-term document for consultation community Securing our future: Caption to come to Caption

288 7.9%

3,671 3,959 $5.54 Commercial per year. 3

135

6.9% 1,963 2,098 $2.60 Rural

337 2,552 2,889 DRAFT $6.48 Ōtaki 13.2%

128 3.9% 3,298 3,426 $2.46 Waikanae Details of proposed rates property for your property your for rates see the proposed can You property that your the difference with along changes has made and the proposed revaluation year. the coming for Visit kapiticoast.govt.nz/proposedrates Proposed rates increase impacts across the district rates average the proposed how shows This table across median properties to apply would increase the district. We’re sending letters to all ratepayers explaining explaining all ratepayers to sending letters We’re website. on our information this and putting the 251 7.9% 3,167 3,418 $4.83 670,000370,000 690,000 365,000 485,000 240,000 1,010,000 560,000 850,000 500,000 Raumati Paraparaumu/ Paraparaumu/ er last year’s year’s er last stem outlined on outlined stem

236 7.7% 3,042 3,278 $4.53 om Greater om Greater 755,000 430,000 alue, type and location Paekākāriki

revaluation by Quotable Value (done every three years) three (done every Value by Quotable revaluation the proposed increase in rates fr in rates increase the proposed Council (GWRC). Regional Wellington the changes in your property’s value aft value property’s the changes in your sy our rating changes to the proposed differences in properties – v in properties differences pages 76-78

Tell us your views: go to the feedbackTell section page or online 100

% Change Increase/Decrease per week Increase/Decrease Increase/(Decrease) Current Rates Current Rates Proposed Land Value Land Value Median Property Values Median Property Capital Value Value Capital Note: All rates figures include GST. They do not include GWRC rates. do not include GWRC They include GST. figures All rates Note: , figures include water rates for typical water usage (fixed and volumetric) of 255m and volumetric) usage (fixed water typical for rates include water , figures urban properties For •

The new rates for 2021/22 are decided by Council when 2021/22 are for rates The new in June 2021 Plan 2021-41 adopt the Long-term they on received all the feedback considered have they after of the instalment rates changes. The first the proposed 2021. out in August will be sent rates new would affect properties • However, the rates increase will vary for different different for will vary increase the rates However, of: This is because the district. across properties • As explained, Council is proposing an average rates rates an average Council is proposing As explained, 2021/22. for of 7.8 percent increase How the proposed rates increase increase rates proposed the How • figures include fixed water charge. water include fixed figures properties commercial For | Kāpiti Coast District Council District 86 | Kāpiti Coast COSTS AND RATES

community consultation document for Long-term Plan 2021-41 | 89 Long-term document for consultation community Securing our future: DRAFT Independent auditor’s report Independent auditor’s | Kāpiti Coast District Council District 88 | Kāpiti Coast FEEDBACK 74-86 64-73

Impact on rates Playgrounds Town centresTown PAGES PAGES Stormwater upgrades Kāpiti Uruhi Gateway – Te Ōtaki community facilities

Policies Footpaths Maclean Park and resilienceand Community Centre Te Newhanga Te Kāpiti Drinking water safety Ngā Manu Nature Reserve community consultation document for Long-term Plan 2021-41 | 91 Long-term document for consultation community Securing our future: User fees and charges

Link road Link Waikanae LibraryWaikanae Waste minimisation Indoor sportsIndoor centre to ratingto system Ōtaki Pool upgrade stage 2 Proposed changes Community Board proposals Major projects and initiatives Costs rates and

09

12-31 34-49 50-63 PAGE

explore waysexplore to haveto a role in the airport? Should Council Should strategy Responding to to Responding climate change climate impacting Council Our infrastructure Government changes Our financial strategy PAGES PAGES PAGES controlled DRAFT

organisation)? a CCO (council- Should we set up housing facilities Access to resilience

Strengthening our Strengthening of infrastructure and Our proposedOur development seawall a different way? the Paekākārikithe Should we renew

growth Managing Managing outcomes

and recoveryand housing? COVID-19 response COVID-19 a bigger role in Our visionOur community and Should Council take take Council Should

Key decisionsKey for consultation Our big issues Our direction and key strategies key and direction Our There’s a lot happening for our district in the next three years and there’s a lot in this a lot and there’s years three in the next our district for happening a lot There’s good use us – and make facing challenges on the big move need to plan. We long-term the things that people delivering keep to want At the same time, we of the opportunities. wellbeing. to important and are in their communities value in housing, the a bigger role on: taking consulting are decisions we key four are There and of setting up a CCO the possibility seawall, the Paekākāriki renew to now way best about specific questions on views asking your also are in the airport. We a role exploring the content. on any of comment to welcome are You is facing. our district the big issues feedback. for summary of all the topics a Here’s Summary of topicsfor feedback 5 | Kāpiti Coast District Council District 90 | Kāpiti Coast FEEDBACK t District Council, Private Bag 60601, Paraparaumu 5254 Bag 60601, Paraparaumu Council, Private t District entres entres community consultation document for Long-term Plan 2021-41 | 93 Long-term document for consultation community Securing our future: @kapiticoast.govt.nz ongtermplan ategy: July-August 2021 July-August ategy: es reform: late 2021 late es reform: drop it in to one of our libraries or service c or service one of our libraries it in to drop Kāpiti Coas submissions, plan Long-term it to: post l and email it to scan Regional growth str growth Regional servic waters Three

• • •

Other consultation and major projects: some of our big issues up for coming consultation is other document, there in the As noted • • and initiatives page 64. in Major projects as highlighted specific work for Engagement will continue What views? your are most. you things that interest decisions, or the key or just on all the topics, us feedback give can You Proposals and requests email it to please consider, Council to for or request proposal a separate have If you @kapiticoast.govt.nz longtermplan include additional proposals to scope is limited there is facing the district with the challenges note, Please rates. to without further increases Online and use the online form kapiticoast.govt.nz/kapiti2041 Go to On paper and either: at the back of this booklet Fill out the form In person and places. dates page for – see facing member at one of our chat stops an elected to Talk form. at the end of the feedback a Council meeting – tick the box speak to to also arrange can You

8am – 12pm 10am – 12pm 8am – 12:30pm 10am – 12pm DRAFT

Saturday 10 April 2021 Saturday 10 April 2021 Saturday 17 April 2021 Saturday 24 April 2021 Saturday

et

04 296 4700 or 0800 486 486 @kapiticoast.govt.nz longtermplan kapiticoast.govt.nz/kapitit2041 kapiticoast.govt.nz/kapitit2041

We have put together supporting information about most of the topics in this document. See in this our website of the topics most about supporting information put together have We Waikanae Community Market Waikanae We’ll be hosting ‘pop ups’ in different parts of the district. parts in different ‘pop ups’ be hosting We’ll You can talk with councillors and community board members about the plan. members board and community with councillors talk can You Want to chat? to Want Village Hall) (outside St Peter’s Paekākāriki Mark Beach Saturday Paraparaumu (outside library) Ōtaki If you have a question about the proposed plan, or want to clarify something in this document, email us at clarify something to plan, or want about the proposed a question have If you Want more information? more Want

what you think you what How to find out more and tell us us tell and more out find to How

or phone or you can view copies at our libraries and service centres. and service at our libraries copies view can or you Have a question? Have | Kāpiti Coast District Council District 92 | Kāpiti Coast FEEDBACK ) page X community consultation document for Long-term Plan 2021-41 | 95 Long-term document for consultation community Securing our future: X-X PAGES OUR BIG ISSUES BIG OUR We want to know your views to guide our direction on these big issues. guide our direction to views your know to want We If you have views any on please access housing generally, here: to comment change climate to Responding have made goodWe progress achieving further emissions, on reducing Council’s however, will gains cost prioritise more. to Should we continue emissions reduction within Council? COVID-19 response and recovery COVID-19 are there particular do in you Council would things to If we experience like a resurgence COVID-19, of The sameresponse? we previously? things did Other things? What are positives the doing or support have pandemic come the out keep that you of us would to like in the community? Access housing to commentsFor plans on our address project to 1 ( key decisions, housing, see Key

.

ored ored ous with ample ous with ample s to suitable quality suitable s to PAGES X-X PAGES DRAFT Our local economy is prosper economy Our local and learn work to people opportunities for in Kāpiti is rest environment Our natural a to transition as we and enhanced future low-carbon acces have Our people and thrive live can housing in Kāpiti so they

challenges the district is facing – particularly to be to – particularly is facing the district challenges in the future. infrastructure vital replace to able think? What do you • • • y, y, PAGES X-X PAGES

Our communities are resilient, safe, health safe, resilient, are Our communities Mana Whenua and Council have a mutually a mutually Mana Whenua and Council have mana-enhancing partnership thriving and connected. Everyone has a sense Everyone thriving and connected. the resources access and can of belonging need they and services

OUR FINANCIAL AND INFRASTRUCTURE STRATEGIES STRATEGIES INFRASTRUCTURE AND FINANCIAL OUR INVESTING FOR RESILIENCE AND GROWTH: OUR PROPOSED DEVELOPMENT OF OF DEVELOPMENT PROPOSED OUR GROWTH: AND RESILIENCE FOR INVESTING X-X PAGES AND FACILITIES INFRASTRUCTURE OUR DIRECTION OUR Council has determined that it is appropriate to to that it is appropriate Council has determined spending capital rates, for change the limits plan long-term the 2021-41 for and borrowing be met and the that need to costs the extra given • Council has developed community outcomes outcomes community Council has developed wellbeing: our community’s to contribute to • Do you think investingDo you think resilience for and growth right is the time? approach this at take Council for to Do you have comment? any Do you think theseDo you think are right the priorities time? this Council for at We need to receive your feedback by 5pm Monday 10 May 2021 May 10 feedback 5pm by Monday your receive need to We below and get it to us – see to it get and below page previous for options. Give your feedback online at kapiticoast.govt.nz/kapiti2041 or fill out the the formout fill or at kapiticoast.govt.nz/kapiti2041 feedbackGive online your Your feedback on our proposed plan proposed our on feedback Your | Kāpiti Coast District Council District 94 | Kāpiti Coast FEEDBACK community consultation document for Long-term Plan 2021-41 | 97 Long-term document for consultation community Securing our future: e our cover/increasee our excess? our nsure more/increase reserves?our

reduc self-i

What’s importantWhat’s you for role? about Council’s What should we advocate for? How can Council encourageemergency households’ preparedness? Should we explore different how options for we could: insure assets? our We • • Government changes impacting Council: three waters services With changes the Government the regulation is making to three for and supply waters services (drinking wastewaterwater, and stormwater):

DRAFT Strengthening ourStrengthening resilience What else can help Council do build to community resilience? As district our grows, what good do you think growth looks like? Managing growth We have developedWe a strategicframework decision our making guide and we to want know to if you think it right. got What are your views?we’ve The effects change are climate being experienced of different in ways across district, the example, for for coastalour communities andinfrastructure as such seawall the Paekākāriki. in As change impacts climate become more severe and costs respondto increase, how do we ensureequity across district?the | Kāpiti Coast District Council District 96 | Kāpiti Coast FEEDBACK ntres ommunity facilities water upgrades rounds i Gateway – Te Uruhii Gateway – Te Town ce Town Storm Ōtaki c Playg Kāpit

).

page X

u Nature Reserve anga Kāpiti Community Centre an Park aths ing water safety and resilience community consultation document for Long-term Plan 2021-41 | 99 Long-term document for consultation community Securing our future: Te Newh Te Drink Footp Ngā Man Macle

MAJOR PROJECTS AND INITIATIVES PAGES 64-73 PAGES INITIATIVES AND PROJECTS MAJOR 76-78 PAGES SYSTEM RATING TO CHANGES CHANGES TO THE HELP COUNCIL PROVIDES WITH RATES PAGE 78 PAGE RATES WITH PROVIDES COUNCIL HELP THE TO CHANGES Ōtaki Pool upgrade stage 2 Our proposed long-term plan includes progressing work projects: on key Waikanae Library Waste minimisation Community Board proposals If you have views any on these, please here: comment are proposingWe some changes rating our to system. If you have views any on these changes, please here: comment Link road Indoor sports centre We are proposingWe some changes rates our to remission policy ( If you have views any on thesechanges, please here: comment

DRAFT PAGES 50-61 PAGES Yes – Council should explore ways Yes have a role to airport the in No – Council should explore not ways have a role to airport the in No – we a CCO should set up not Yes – we should a CCO set up Yes No – proceed with design the already agreed, revised the at estimated cost $27 of million Yes – replace it like-for-like in timber at an estimated cost of $17 million – replace estimated an cost at timber $17 in of it like-for-like Yes No – Council should not take a bigger role No – Council should take housing not in Yes – Council bigger a should role take housing in Yes KEY DECISIONS KEY Significant proposal 2: Should Council explore ways to have a role in the airport? PAGES 60-61 airport?PAGES in the role explore a Should Significant proposal2: 60-61 have to Council ways one) Do you agree tick with recommended (please Council’s the option: Significant proposal 1: Should we set up a CCO (council-controlled organisation)? PAGES 58-59 organisation)? (council-controlled we Should up a 1: set CCO Significant proposal one) Do you agree tick with recommended (please Council’s the option: (please tick one) Do you agree tick with recommended (please Council’s the option: Key project 2: Should we renew the Paekākāriki the renew project we Should Key 2: seawall a different way? 55-57 PAGES (please tick one) Do you agree tick with recommended (please Council’s the option: Key project 1: Should Council take a bigger role in housing? PAGES 52-54 52-54 PAGES housing? in role a bigger Council take Should projectKey 1: Here is a summary of our key decisions and each Council recommendation for your feedback. You can find full detail full detail find can You feedback. your for recommendation and each Council decisions key is a summary of our Here . pages X-X decisions section, in the Key costs including If you have views any on this, please here: comment If you have views any on this, please here: comment If you have views any on this, please here: comment If you have views any on this, please here: comment | Kāpiti Coast District Council District 98 | Kāpiti Coast FEEDBACK community consultation document for Long-term Plan 2021-41 | 101 Long-term document for consultation community Securing our future:

I accept it and I support I accept proposals the it, but I will I accept find it hard manage to Council should that find it a different and I think accept way deal with to costdon’t I increases Yes No RATES FOR 2021/22 PAGES 84-86 FOR 2021/22 PAGES RATES FEEDBACK OTHER If you feedback have other any about proposed the long-term plan, please here: comment can send us extra You pagesNeed more if space? you wish. needWe to receive your feedback May by 2021 5pm Monday 10 If the long-termIf the plan is by adopted Council with work the programme and proposals recommended, wouldthis mean average an 2021/22. for rates increase7.8% of Which below the of best one) tick indicates your views? (Please Do you support one) tick Council exploring (Please ways other generate to income? If you have views any on this, please here: comment If you have views any on this, please here: comment

DRAFT CHANGES TO POLICIES PAGES 82-83 PAGES POLICIES TO CHANGES CHANGES TO LEVELS OF SERVICE PAGES XX-XX PAGES SERVICE OF LEVELS TO CHANGES CHANGES TO USER FEES AND CHARGES PAGES 80-81 PAGES CHARGES AND FEES USER TO CHANGES Do you understand framework our how determining for and when we seek community feedback on key activities? Do you agree with thresholds the help we determine to if apply a matter may be significant? Do you agree with criteria our assessing for significance? Significance and engagement policy specific questions If you have views any on these, please here: comment Revenue and financing Rates remission Development contributions Significance and engagement remission Significance Development contributions and Rates financing Revenue We are proposingWe some policies: our changes of four to We are proposingWe service one change to levels. If you have views any please change, on this here: comment Aspart increased managing of costs, we are proposing some changes fees to and charges. If you have views any on these, please here: comment | Kāpiti Coast District Council District 100 | Kāpiti Coast YOUR DETAILS Te Reo Māori in our consultation document Kāpiti is rich in Māori heritage and we are proud that we have a high number of speakers of Te Reo Māori First name in our district. The Council shares our iwi partners’ aspirations to promote Te Reo Māori to everyone in the community, so we are using more Te Reo Māori words and names and phrases in our activities Last name and documents.

Address The list below provides meanings and information about terms we’ve incorporated in the document – some of which are familiar, and some less so.

Email Te Ao Māori principles/values in our Iwi affiliation (optional) Iwi Te Kaupapa Mātua (pā harakeke illustration) Extended kinship group, tribe, nation, large group If you identify as Māori, would you like to state the iwi with which you identify? and community outcomes framework of Māori descended from a common ancestor and If so, please tick all that apply. associated with a distinct territory. We have three Kaitiakitanga Ngāti Raukawa ki te Tonga Te Ātiawa ki Whakarongotai Ngāti Toa Rangatira iwi in our district considered as Mana Whenua: Sustaining the environment and the people Other iwi or hapū (please state) Te Āti Awa ki Whakarongotai, Ngāti Raukawa ki te Tonga and Ngāti Toa Rangatira. Manaakitanga Individual or organisation feedback (please tick one) Supporting each other Are you providing feedback: Mana Whenua Pūkengatānga as an individual on behalf of an organisation or group The local tribes which have authority over the land. Preserving, creating, teaching and knowledge Territorial rights associated with possession and Please state organisation name Ūkaipōtanga occupation of tribal lands. Publishing feedback Identity The feedback – or a summary – may be published on the Council website and provided in hard copy in Whanaungatanga Tangata whenua our libraries. Connectedness People of the land, a general term given to the If you are providing feedback as an individual and you do not wish to have your name included when indigenous people of Aotearoa New Zealand. feedback is published, please tick below. I do not want my name published with my feedback. The whakatauki that is part of the Council logo: If the feedback is from an organisation, the organisation name will be included. Me huri whakamuri, ka titiro whakamua Speaking at a Council meeting (hearing) (optional) Drawing from our past to inform our future If you wish to speak to a Council meeting about your feedback, please provide your contact details so we can The phrase the Council has chosen to describe the vision arrange a time on the 17th, 18th or 19th of May 2021. of our long-term plan: Toitū te whenua, toitū te wai, toitū te tangata, toitū Kāpiti Phone Permanence of the land, water, people, Kāpiti district Email Or, you can come along and hear what others are saying.

WHAT HAPPENS TO MY FEEDBACK AND PERSONAL DETAILS?

Your feedback will be reviewed by Councillors and considered as they make final decisions on the content of the long-term plan and on setting the rates for 2021/22. Personal information will only be used for administration of the consultation process such as providing a response or notifying you about decisions. As part of our contribution to sustainability, this document is produced on paper from well managed New Zealand forests. Knowing that many people in our community prefer to access information online, we have limited the number of copies printed. Designed and printed in Kāpiti. 102 | Kāpiti Coast District Council DRAFT Long-term plan 2021-2041 community consultation document

What do you think? Is a bigger role in housing something the Council should pursue? Considering costs and climate change impacts, how should we renew the Paekākāriki seawall? Does it make sense to set up a CCO (council-controlled organisation)? Do you want Council to explore how it could have a role in the airport? See a summary of all the topics for feedback on page X or go to kapiticoast.govt.nz/kapiti2041

Want to chat? You can talk to Councillors and Community Board members directly, see page XX.

Got a question? Email us atDRAFT [email protected] or phone 04 296 4700 or 0800 486 486

Produced by Council For more information, or to download this document, see our website kapiticoast.govt.nz/kapiti2041