Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in City Project

F O R M – 1

(I) BASIC INFORMATION

Sr. Item Details No. Name of the Project Construction of Flyover Bridge from 1 : Genda Circle to Manisha Cross Road in Vadodara City. 2 Sr. No. in the Schedule : 8 (a) Proposed capacity / area / length / Length of Flyover Bridge: 3511 m (3.511 tonnage to be handled / command Km) 3 : area / lease area/number of wells to 1. Built-up Area: 74,602.5 m2 be drilled 4 New/Expansion/Modernization : New Project 5 Existing capacity / Area etc. : Not applicable 6 Category of project .i.e. ‘ A’ or ‘B’ : ‘B’ Does it attract the general condition? No. 7 : If Yes please Specify. Does it attract the Specific No. 8 : condition? If Yes please Specify. Location Over the existing Old Padra ring road : from Genda Circle to Manisha Cross road Plot/Survey/Khasra No. : - 9 Village : - Tehsil : : Vadodara State : Nearest railway Station / air port Vadodara Railway station: @ 1.65 km (E) 10 : With Distance in kms. Vadodara Airport: @ 6 km (NE) Nearest Town, City, District Nearest Town: Headquarters along with distance in Undera Census Town: @ 5.5 km (NW) kms. Tarsali Census Town:@ 7.9 Km (SE) 11 : Padra Municipality Town:@ 11 Km (SW) Nearest City: City: @ 55.8 km (NW) District Headquarter

1 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

Sr. Item Details No. Vadodara Municipal corporation: @ 4 km (SE) Village Panchayat, Zilla Parishad, Municipal Corporation : Municipal Corporation, Local body Vadodara Municipal Corporation: @ 4 km 12 : (Complete postal Addresses with (SE) telephone nos. to be given.) 13 Name of the Applicant : Vadodara Municipal Corporation Registered Address Office of the Executive Engineer, Bridge Project Department, Vadodara Municipal Corporation, 14 : Khanderao Market Building, Raj Mahel Road, Vadodara-390209, Gujarat Address for correspondence : Name : Mr. Jitesh Trivedi Designation(Owner/Partner/CEO) : I/c Executive Engineer Address Office of the Executive Engineer Bridge Project Department : Vadodara Municipal Corporation 15 Khanderao Market Building, Raj Mahel Road, Vadodara Pin Code : 390209 E-Mail : [email protected] Telephone No. : 0265-2420338 Fax No. : 0265-2433060 Detail of alternative sites examined, No alternative site has been examined. if any. Location of these sites should The proposed FlyOver Bridge (FOB) will be shown on a topo sheet. be developed over the existing Old 16 : Padra Ring Road from Genda Circle to Manisha Cross road to reduce the traffic congestion. 17 Interlinked Projects : No Interlinked projects Whether Separate Application of No. 18 interlinked project has been : submitted? 19 If Yes, date of submission : Not Applicable

2 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

Sr. Item Details No. 20 If no, reason : Not Applicable Whether the proposal involves No. approval/clearance under: if yes details of the Same and their Status to be given. 21 a) The Forest (Conservation) Act, : Not Applicable 1980? b) The Wildlife (protection) Act, Not Applicable 1972? c) The C.R.Z Notification, 1991? Not Applicable Whether there is any Government Yes, the proposed FOB will be order/policy relevant/ relating to the developed under ‘Swarnim Jayanti 22 site? : Mukhya Mantri Shaheri Vikash Yojana (Chief Minister's Golden Jubilee Urban Development Scheme), Year 2017-18’. 23 Forest land involved (hectares) : No. Whether there is any litigation : No litigation pending against the Project pending against the project and or and/or land. land in Which the project is proposed to be set up? 24 (a) Name of the Court (b) Case no. (c) Order/directions of the court, if any and its relevance with the proposed project.

3 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

(II) ACTIVITY

1. Construction, operation or decommissioning of the Project involving actions, which shall cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Details thereof (with approximate Sr. Yes / Information / Checklist confirmation quantities/rates, wherever possible) with No. No source of information data

Permanent or temporary change in land The proposed flyover bridge (FOB) shall be use, land cover or topography including developed on existing ring road from Genda increase in intensity of land use (with Circle to Manish Cross Road. There shall be no 1.1 respect to local land use plan) No change in land use, land cover or topography. The length of the FOB will be 3.51 Km. Proposed FOB Location on Google map is attached as Annexure – 1 of Conceptual Plan. Clearance of existing land, vegetation and Not envisaged 1.2 No buildings? 1.3 Creation of new land uses? No Not applicable Pre-construction investigations e.g. bore Geo technical investigations were carried out houses, soil testing? as a part of pre–construction civil activity and 1.4 Yes to confirm the soil bearing capacity. Report is enclosed as Annexure –4 of Conceptual Plan. 1.5 Construction works? Yes Following construction works will be carried out for proposed FOB project:  Length of Flyover Bridge: 3511 m (3.51 Km)  Built-up area: 74,602.5 m2  Total Proposed Landscape area –23,840 m2  Height of the bridge: 5.5 m  Lane & width of FOB: 1. Six Lane of 27.6 m span (Chainage -1231 to 1406)

2. Four Lane of 18.3 m span (Chainage: 0 to 1231, Chainage: 1406 to 3510)

3. Single-lane of 4.62 m span [Chainage: 671 to 896; Chainage: 1016 to 1256; Chainage: 1406to 1631; Chainage: 1996to 2246;] Up and Off loading lanes

General Arrangement Drawing Plan, Elevation (sheet 1 of 2) of FOB is attached as Annexure – 5 of Conceptual Plan. General Arrangement Drawing Plan, Elevation (sheet 2 of 2) of FOB is attached as Annexure – 6 of Conceptual Plan. 1.6 Demolition works? No No demolition work is required. 1.7 Temporary sites used for construction No Workers during construction phase were

4 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

Details thereof (with approximate Sr. Yes / Information / Checklist confirmation quantities/rates, wherever possible) with No. No source of information data

works or housing of construction workers? hired from nearby areas

Above ground buildings, structures or The construction of FOB will be above ground earthworks including linear structures, cut level. Above ground, Pillars, Bridge and its 1.8 and fill or excavations Yes approach roads filled about 15,600 m3. For bridge, 41,873 m3 soil had been excavated for providing foundation of Pillars. Underground works including mining or Not envisaged 1.9 tunneling? No

1.10 Reclamation works? No No reclamation work will be done 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable Production and Manufacturing Not applicable 1.13 No processes? Facilities for storage of goods or  During Construction phase: materials? Temporary storage of construction material like steel, cement, sand, stone aggregate bricks etc. at site during construction phase. o Separate temporary storage of construction material has been made at construction camps. 1.14 Yes o Cement has been separately stored under cover in Cement godown o Sand has been stacked nearby under tarpaulin cover. o Steel stored in covered space.  During Operation phase: o No such facilities will be required for proposed FOB. 1.15 Facilities for treatment or disposal of solid Yes  During Construction phase: waste or liquid effluents? o Sewage will be disposed by temporary drainage line connected to city drainage system in the area. o Excavated earth shall be used for back filling. Construction debris shall be re‐used at other sites for leveling, pavement etc. o Municipal Solid waste shall be disposed off to municipal solid waste disposal site.  During Operation phase: o No such facilities will be required for proposed FOB. Facilities for long term housing of No Not envisaged 1.16 operational workers? 1.17 New road, rail or sea traffic during No No new road/rail is required as the proposed

5 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

Details thereof (with approximate Sr. Yes / Information / Checklist confirmation quantities/rates, wherever possible) with No. No source of information data

construction or operation? FOB will be construction over the existing ring road from Genda Circle to Manisha Cross road. New road, rail, air waterborne or other No The area is well developed with all transport infrastructure including new or infrastructure facilities. 1.18 altered routes and stations, ports, airports etc? Closure or diversion of existing transport Yes There will be temporary diversion of existing 1.19 routes or infrastructure leading to changes transportation routes during construction in traffic movements? phase only. New or diverted transmission lines or No Not envisaged 1.20 pipelines? Impoundment, damming, culverting, No Not envisaged 1.21 realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable Abstraction or transfers of water form During construction and operation phase, 1.23 ground or surface waters? Yes tanker / VMC water shall be used during construction phase. Changes in water bodies or the land Not applicable 1.24 No surface affecting drainage or run-off? Transport of personnel or materials for During construction phase transport of construction materials shall be done by means 1.25 construction, operation or Yes decommissioning? of existing road network.

1.26 Long-term dismantling or Yes There will be dismantling of bricks/stone decommissioning or restoration works? masonary, PCC Kerb median, concrete structure, scarifying existing approached flexible pavement and stacking of electric, telephone poles and cable. Ongoing activity during decommissioning Not applicable 1.27 which could have an impact on the No environment? Influx of people to an area in either During construction phase, daily approx. 125 temporarily or permanently? nos. of skilled and unskilled local construction 1.28 Yes workers shall be hired. Influx of people will remain during construction phase only. 1.29 Introduction of alien species No Not applicable Loss of native species or genetic There will be no loss of native species. 1.30 No diversity? 1.31 Any other actions? No Not applicable

6 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Details thereof (with approximate Sr. Yes Information/checklist confirmation quantities/rates, wherever possible) with No. / No source of information data Land especially undeveloped or The flyover is being constructed on existing agricultural land (ha). roads and full ROW is available with VMC. 2.1 No This bridge is a part of city Development plan to reduce the congestion of traffic on other roads in the city. Water (expected source & competing  During Construction Phase : users) unit: KLD o Source: Tanker /VMC water supply o Construction work: 30 KLD o Domestic purpose: 5.6 KLD 2.2 Yes  During Operation Phase : o Source : Tanker water supply o Greenbelt maintenance: 3.2 KLD 3. 2.3 Minerals (MT) No Not applicable Construction material: stone, All the construction materials will be aggregates, sand / soil (expected source procured locally at prevent market rates and 2.4 – MT) Yes transported by road. The construction material expected quantity are given in Annexure -3 of Conceptual Plan. 2.5 Forests and timber (source – MT) No Not applicable Energy including electricity and fuels  During Construction phase: (source, competing users) Unit: fuel o Source: Madhya Gujarat Vij Company (MT), energy (MW) Limited (MGVCL) o Power Demand: 100 KVA o Power Back up: 1 x125 KVA DG Set o Diesel for DG Set: 35 LPH 2.6 Yes  During Operation Phase: o Power demand: 135 KW (lighting) D. G. Set will be used on need basis. Mainly it will be used for cutting/welding/bending related work within construction premises and will be used only during construction phase. Any other natural resources (use --- 2.7 No appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approximate Sr. Yes / Information/Checklist confirmation quantities/rates, wherever possible) with No. No source of information data 3.1 Use of substances or materials, No Not envisage

7 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

Details thereof (with approximate Sr. Yes / Information/Checklist confirmation quantities/rates, wherever possible) with No. No source of information data which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, & water supplies) Changes in occurrence of disease or There shall be no chance of occurrence affect disease vectors (e.g. insect or of diseases as the domestic waste 3.2 No water borne diseases) generated shall be managed as per Solid Waste Management Rules, 2016. Affect the welfare of people e.g. by During construction phase, temporary changing living conditions? employment opportunity shall be generated for local workers from nearby areas. 3.3 Yes During operation phase, there will be reduction in traffic congestion and will be smooth movement of vehicle due to proposed flyover at various junctions in VMC areas. Vulnerable groups of people who --- could be affected by the project e.g. 3.4 No hospital patients, children, the elderly etc., 3.5 Any other causes No --- 4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details thereof (with approximate Sr. Information / Checklist Yes / quantities/rates, wherever possible) with No. confirmation No source of information data 4.1 Spoil, overburden or mine wastes No Not Applicable Municipal waste (domestic and or Solid waste generation will be approx. 20 commercial wastes) kg/day which will be disposed off at municipal solid waste site. Construction waste will be utilized in construction or embankment filling. 4.2 Yes Dismantling of structures and Sorting of the dismantled material, disposal of unserviceable material and stacking serviceable materials will be managed not only as per specification but also as per site requirements. Hazardous wastes (as per There will be minor quantity of used oil Hazardous Waste Management as hazardous material will be generated 4.3 Yes Rules) which will be sold to authorized recyclers.

8 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

Details thereof (with approximate Sr. Information / Checklist Yes / quantities/rates, wherever possible) with No. confirmation No source of information data 4.4 Other industrial process wastes No Not applicable 4.5 Surplus product No Not applicable Sewage sludge or other sludge from Not envisaged 4.6 No effluent treatment 4.7 Construction or demolition wastes Yes The construction waste shall consist of excavated earth and construction debris i.e. broken bricks, waste concrete, cement bags, steel in bits and packaging materials etc. Excavation: 41,873 m3 Back filling: 15,600 m3 Additional earth shall be arranged outside / in nearby area for backfilling and area dressing. Due care shall be taken during transportation of the earth. Construction debris shall be either utilized in the road, construction, back filling or shall be disposed suitably as per norms. Cement bags, and packing material shall be sold off to recyclers. Unusable steel scrap shall also be collected at site and sold to authorized recyclers. 4.8 Redundant machinery or equipment No Not applicable Contaminated soils or other Not applicable 4.9 No materials 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate Sr. Information/Checklist Yes / quantities/rates, wherever possible) with No. confirmation No source of information data Emissions from combustion of fossil There shall be flue gas emission from fuels from stationary or mobile diesel operated machinery during sources construction phase. 5.1 Yes During operation phase, there will be significant reduction in almost all pollutants by provision of flyover bridge connecting two areas. Emissions from production Not envisaged 5.2 No processes. 5.3 Emissions from materials handling Yes There shall be chances of dust

9 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

Details thereof (with approximate Sr. Information/Checklist Yes / quantities/rates, wherever possible) with No. confirmation No source of information data including storage or transport generation during loading and unloading of construction material during construction phase. However, adequate control measures like water sprinkling, covered storage etc. shall be adopted to reduce the chances of dust emission. The precast materials and premix concrete will be used. Emissions from construction Fugitive emission shall be generated due activities including plant and to construction activities and vehicular equipment emission which shall be mitigated by 5.4 Yes implementing adequate control measures like water sprinkling, covered storage area etc. Dust or odours from handling of Dust shall be generated due to unloading materials including construction of construction material, which shall be materials, sewage and waste controlled by sprinkling water in surrounding area. There will be no odour of sewage and waste. Sewage will be 5.5 Yes disposed by temporary drainage line connected to city drainage system in the area. Solid waste generation will be disposed off at municipal solid waste site. 5.6 Emissions from incineration of waste No Not applicable Emissions from burning of waste in Burning of waste in open air shall not be 5.7 open air (e.g. slash materials, No allowed within premises. construction debris) 5.8 Emissions from any other sources No Not envisaged

6. Generation of Noise and Vibration and Emissions of Light and Heat:

Details thereof (with approximate Sr. Information/Checklist Yes / quantities/rates, wherever possible) with No. confirmation No source of information data From operation of equipment e.g. Noise shall be generated from operation engines, ventilation plant, crushers of construction machineries/equipment. 6.1 Yes It shall be restricted to daytime only and shall comply with GPCB/CPCB norms. 6.2 From industrial or similar processes No --

10 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

Details thereof (with approximate Sr. Information/Checklist Yes / quantities/rates, wherever possible) with No. confirmation No source of information data From construction or demolition Noise shall be generated during construction and transportation activities but it shall be for short term & limited up 6.3 Yes to construction phase only. Some dismantling work will be required which shall be not generated any noise. 6.4 From blasting or piling No Not applicable From construction or operational During construction phase, noise shall traffic be generated due to vehicular movement which shall be within the prescribed norms. During operation phase, the main source 6.5 Yes of noise generation shall be vehicular movements on Flyover Bridge. Greenbelt area shall be developed with tree plantation sides of the bridge to mitigate noise generated due to operational traffic. 6.6 From lighting or cooling systems No Not envisaged 6.7 From any other sources No Not envisaged

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate Sr. Information/Checklist Yes / quantities/rates, wherever possible) with No. confirmation No source of information data From handling, storage, use or No hazardous materials and/or chemicals 7.1 No spillage of hazardous materials. shall be used. From discharge of sewage or other During Construction phase, sewage will effluents to water or the land be disposed by temporary drainage line 7.2 No (expected mode and place of connected to city drainage system in the discharge) area By deposition of pollutants emitted There will be favourable reduction in air to air into the land or into water pollutants which may be achieved by developing the flyover bridge like 7.3 No infrastructure facilities. There shall be reduction in traffic congestion and shall be sufficient dispersion of air pollutants effectively in the atmosphere. 7.4 From any other sources No Not envisaged 7.5 Is there a risk of long term build up No Not envisaged

11 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

Details thereof (with approximate Sr. Information/Checklist Yes / quantities/rates, wherever possible) with No. confirmation No source of information data of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment.

Details thereof (with approximate Sr. Information/Checklist Yes / quantities/rates, wherever possible) with No. confirmation No source of information data From explosions, spillages, fires etc Hazardous substance shall not be used 8.1 from storage, handling, use or No during construction phase & during production of hazardous substances operation phase. 8.2 From any other causes No --- Could the project be affected by Project area is categorized in the seismic natural disasters causing zone – III, which is classified as having a environmental damage (e. g. Floods, low probability of earthquake shocks. 8.3 earthquakes, landslides, cloudburst Yes The structure design shall be as per etc)? codes to negate the threat of environmental, flood, earthquake and other damages. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate Sr. Information/Checklist Yes / quantities/rates, wherever possible) with No. confirmation No source of information data 9.1 Lead to development of supporting No Local workers (Skilled & unskilled) shall facilities, ancillary development or be employed which will have a positive development stimulated by the impact towards social upliftment of the project which could have impact on surrounding areas. the environment e.g.: • Supporting infrastructure (roads, power supply, waste or wastewater treatment, etc.) • Housing development • Extractive industries • Supply industries • Others Lead to after-use of the site, which Not applicable 9.2 could have an impact on the No environment 9.3 Set a precedent for later No Not applicable

12 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

developments. Have cumulative effects due to Not applicable 9.4 proximity to other existing or No planned projects with similar effects

13 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

III. ENVIRONMENTAL SENSITIVITY

Aerial distance (within 15 Sr. Name / Areas km.) Proposed project No. Identity location boundary Areas protected under international --- conventions, national/local legislation for 1 No their ecological, landscape, cultural or other related value. Areas which are important or sensitive for Mahi River ~ 10.4 km in West direction. ecological reasons - Wetlands, Vishwamitri ~ 2 km in East direction watercourses or other water bodies, River coastal zone, biospheres, mountains, forests Canal ~ 3.9 Km West direction Sursagar Lake ~ 3.9 Km in East direction 2 Champaner – @~ 42.3 Km in NE direction Pavagarh Archeological Park @ ~48.38 Km in East Jambughoda direction Areas used by protected, important or --- sensitive species of flora or fauna for 3 No breeding, nesting, foraging, resting, over wintering, migration Inland, coastal, marine or underground --- 4 No waters 5 State, National boundaries No --- Routes or facilities used by the public for National ~ 9.1 Km in East direction access to recreation or other tourist, Highway - 8 6 pilgrim areas National ~ 7 Km in NE direction Expressway-1 7 Defense installations No --- Densely populated or built-up area The bridge is in the city Vadodara city itself Khanpur ~ 4.9 Km in West Direction village 8 Samiyala ~ 7 Km in SW direction village Ankodia ~ 6.3 Km in NW direction village Areas occupied by sensitive man-made SSG Hospital ~ 2.69 km in East direction 9 land uses (hospitals, schools, places of Baroda high ~ 0.68 km in NE direction worship, community facilities) school Areas containing important, high quality or --- 10 No scarce resources (ground water

14 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

Aerial distance (within 15 Sr. Name / Areas km.) Proposed project No. Identity location boundary resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) Areas already subjected to pollution or --- environmental damage. (Those where 11 No existing legal environmental standards are exceeded) Areas susceptible to natural hazard which All possible measures & could cause the project to present precautions will be environmental problems (earthquakes, considered and shall be 12 No subsidence, landslides, erosion, flooding implemented to overcome or extreme or adverse climatic conditions) the issues of hazards due to any Natural Calamity.

15 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

I hereby give undertaking that the data and information given in the application. And enclosures are true to the best of my knowledge and belief. I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 04.12.2017

Place: Vadodara

Signature of Applicant : Jitesh Trivedi

Designation : I/c Executive Engineer

Address : Office of the Exe. Engineer Bridge Project Department, Vadodara Municipal Corporation, Khanderao Market Building, Raj Mahal Road, Vadodara - 390209 Gujarat Tel: 0265-2420338 Fax: 0265-2433060 Email: [email protected]

16 Form – 1 for Construction of Flyover Bridge from Genda Circle to Manisha Cross Road in Vadodara City Project

I V. PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

As per EIA Notification SO:1533 dated 14/09/2006 of MoEF, New , further amended till date, no Environmental Impact Assessment study is required for the proposed construction of Flyover Bridge from Genda Circle to Manisha Cross Road [category 8(a)].

Date : 04.12.2017 Signature :

Place : Vadodara Name of Applicant : Jitesh Trivedi Designation : I/c Executive Engineer