FORM 1 I. Basic Information S.No Item Details 1 Name of the Project Waghali Sand Ghat Auction 2 S
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX I (See paragraph – 6) FORM 1 I. Basic Information S.No Item Details 1 Name of the Project Waghali Sand Ghat Auction 2 S. No. in the schedule 1(a) 3 Proposed capacity/area/ length Capacity – 6201 Brass, /tonnage To handled /command Area – 3 H 51 R area/lease area/number of wells to be drilled 4 New/expansion/modernization New 5 Existing capacity, area, etc Capacity – 6201 Brass, Area – 3 H 51 R 6 Category of the project i.e. A or B B 7 Does it attract the general condition? if N/A yes, please specify 8 Does it attract the specific condition? N/A if yes, please specify 9 Location Mauza – Waghali, Annexure 1 Plot/survey/Khasra No. Adjacent Gat No. 39 Village Waghali Tehsil Chalisgaon District Jalgaon State Maharashtra 10 Nearest railway station/ airport along Chalisgaon Approx. 10 KM with distance in kms. Airport Jalgaon 80 KM 11 Nearest town, city, district headquarters Chalisgaon 11 KM approx. along with distance in kms. 12 Village Panchayats, Zilla Parishad, Village Panchayats - Waghali, Municipal Corporation, Local body Tehsil – Chalisgaon , Zilha (Complete postal address with parishad- Jalgaon. telephone numbers to be given) 13 Name of the applicant Collector Jalgaon 14 Registered address Collector office Jalgaon Jalgaon 425001. 15 Address for correspondence As above Name Collector Jalgaon Designation (Owner/ Partner/ CEO) Collector Jalgaon 1 Address Collector office Jalgaon Jalgaon 425001. Pin Code 425 001 E-mail [email protected] Telephone Number 0257-2220800 Fax number 0257- 2220500 16 Details of alternative sites examined, if N/A however, the land is alread y in any. Location of these sites should be possession of the applicant shown on a topo sheet. 17 Interlinked projects Nil 18 Whether separate application of Question does not arise. interlinked project has been submitted? 19 If yes, date of submission NA 20 If no, reason NA 21 Whether the proposal involves No approval/clearance under: If yes, details of the same and their status to be given. a) The Forest (Conservation) Act, 1980? b) The Wildlife (Protection) Act, 1972? c) The C.R.Z. notification, 1991? 22 Whether there is any Government Government Resolution in Revenue order/Policy relevant/relating to the & Forest Department No. MÉÉèJÉÊxÉ- sites? 10/0512/|É.GÆò.300/JÉ, ÊnùxÉÉÆEò 12 ¨ÉÉSÉÇ 2013 23 Forest land involved (hectares) No 24 Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the court (b) Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project. II. Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/no Details thereof (with 2 No. confirmation approximate quantities/ rates, wherever possible) with source of information data 1.1 Permanent or temporary change No Temporary use of river in land use, land cover or bed. topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No vegetation and buildings? 1.3 Creation of new land uses? No 1.4 Pre-construction investigations No e.g. bore houses, soil testing? 1.5 Construction works? No 1.6 Demolition works? No NA 1.7 Temporary sites used for No construction works or housing of construction workers? 1.8 Above ground buildings, No structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No mining or tunneling? 1.10 Reclamation works? No During rainy season due to flooding reclamation work is naturally done. 1.11 Dredging? No NA 1.12 Offshore structures? No NA 1.13 Production and manufacturing No processes? 1.14 Facilities for storage of goods or No materials? 1.15 Facilities for treatment or disposal No of solid waste or liquid effluents? 1.16 Facilities for long term housing of No operational workers? 1.17 New road, rail or sea traffic No during construction or operation? 1.18 New road, rail, air waterborne or No 3 other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No lines or pipelines? 1.21 Impoundment, damming, No culverting, realignment or other changes to the hydrology of water courses or aquifers? 1.22 Stream crossings? No 1.23 Abstraction or transfers of water No form ground or surface waters? 1.24 Changes in water bodies or the No land surface affecting drainage or run-off? 1.25 Transport of personnel or No materials for construction, operation or decommissioning? 1.26 Long-term dismantling or No N/A decommissioning or restoration works? 1.27 On going activity during No N/A decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in No There are 3 to 4 people either temporarily or involved during lifting of permanently? sand. So temporarily influx of people is negligible. 1.29 Introduction of alien species? No NA 1.30 Loss of native species or genetic No diversity? 1.31 Any other actions? No NA 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply) Sr. Information/Checklist Yes/No? Details thereof (with 4 No. confirmation approximate quantities/ rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No agricultural land (ha) 2.2 Water (expected source & No competing users) unit: KLD 2.3 Minerals (MT) No N / A 2.4 Construction material – stone, No N / A aggregates, sand / soil (expected source – MT) 2.5 Forests and timber (source – MT) No N / A 2.6 Energy including electricity and NO fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use No N / A appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr. Information/Checklist Yes/No? Details thereof (with No. confirmation approximate quantities/ rates, wherever possible) with source of information data 3.1 Use of substances or materials, No which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No N / A or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. No by changing living conditions? 3.4 Vulnerable groups of people who No N / A could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No N/A 5 4. Production of solid wastes during construction or operation or decommissioning (MT/month) Sr. Information/Checklist Yes/No? Details thereof (with No. confirmation approximate quantities/ rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No 4.2 Municipal waste (domestic and or No commercial wastes) 4.3 Hazardous wastes (as per No N / A Hazardous Waste Management Rules) 4.4 Other industrial process wastes No N / A 4.5 Surplus product No N / A 4.6 Sewage sludge or other sludge No N / A from effluent treatment 4.7 Construction or demolition No N / A wastes 4.8 Redundant machinery or No N / A equipment 4.9 Contaminated soils or other No N / A materials 4.10 Agricultural wastes No N / A 4.11 Other solid wastes No N / A 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Sr. Information/Checklist Yes/No? Details thereof (with No. confirmation approximate quantities/ rates, wherever possible) with source of information data 5.1 Emissions from combustion of No fossil fuels from stationary or mobile sources 5.2 Emissions from production No processes 5.3 Emissions from materials handling No including storage or transport 5.4 Emissions from construction No activities including plant and 6 equipment 5.5 Dust or odours from handling of Yes Dust will be generated materials including construction mainly during material materials, sewage and waste handling, transportation etc. odors are developed during operations and plying of Trucks due to fossil fuel. The intensity is very low. 5.6 Emissions from incineration of No waste 5.7 Emissions from burning of waste No in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No 6. Generation of Noise and Vibration, and Emissions of Light and Heat Sr. Information/Checklist Yes/No? Details thereof (with No. confirmation approximate quantities/ rates, wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes There will be generation of engines, ventilation plant, crushers noise during transportation of trucks and other vehicles. The effect is temporary and occasional. No other equipment is used during operation. 6.2 From industrial or similar No NA processes 6.3 From construction or demolition No NA 6.4 From blasting or piling No NA 6.5 From construction or operational Yes Small amount of noise will traffic take place. However, only those vehicles shall allow in the river bed which are having valid PUC certificate. 6.6 From lighting or cooling systems No NA 6.7 From any other sources No NA 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or 7 the sea Sr.