APPENDIX I (See paragraph – 6) FORM 1 I. Basic Information S.No Item Details 1 Name of the Project Waghali Sand Ghat Auction 2 S. No. in the schedule 1(a) 3 Proposed capacity/area/ length Capacity – 6201 Brass, /tonnage To handled /command Area – 3 H 51 R area/lease area/number of wells to be drilled 4 New/expansion/modernization New 5 Existing capacity, area, etc Capacity – 6201 Brass, Area – 3 H 51 R

6 Category of the project i.e. A or B B 7 Does it attract the general condition? if N/A yes, please specify 8 Does it attract the specific condition? N/A if yes, please specify 9 Location Mauza – Waghali, Annexure 1 Plot/survey/Khasra No. Adjacent Gat No. 39 Village Waghali Tehsil District State 10 Nearest railway station/ airport along Chalisgaon Approx. 10 KM with distance in kms. Airport Jalgaon 80 KM 11 Nearest town, city, district headquarters Chalisgaon 11 KM approx. along with distance in kms.

12 Village Panchayats, Zilla Parishad, Village Panchayats - Waghali, Municipal Corporation, Local body Tehsil – Chalisgaon , Zilha (Complete postal address with parishad- Jalgaon. telephone numbers to be given) 13 Name of the applicant Collector Jalgaon 14 Registered address Collector office Jalgaon Jalgaon 425001. 15 Address for correspondence As above Name Collector Jalgaon Designation (Owner/ Partner/ CEO) Collector Jalgaon

1 Address Collector office Jalgaon Jalgaon 425001. Pin Code 425 001 E-mail [email protected] Telephone Number 0257-2220800 Fax number 0257- 2220500 16 Details of alternative sites examined, if N/A however, the land is alread y in any. Location of these sites should be possession of the applicant shown on a topo sheet.

17 Interlinked projects Nil 18 Whether separate application of Question does not arise. interlinked project has been submitted? 19 If yes, date of submission NA 20 If no, reason NA 21 Whether the proposal involves No approval/clearance under: If yes, details of the same and their status to be given. a) The Forest (Conservation) Act, 1980? b) The Wildlife (Protection) Act, 1972? c) The C.R.Z. notification, 1991? 22 Whether there is any Government Government Resolution in Revenue order/Policy relevant/relating to the & Forest Department No. . MÉÉèJÉÊxÉ- sites? 10/0512/|É.GÆò.300/JÉ, ÊnùxÉÉÆEò 12 ¨ÉÉSÉÇ 2013 23 Forest land involved (hectares) No 24 Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the court (b) Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project. II. Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/no Details thereof (with

2 No. confirmation approximate quantities/ rates, wherever possible) with source of information data 1.1 Permanent or temporary change No Temporary use of river in land use, land cover or bed. topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, No vegetation and buildings? 1.3 Creation of new land uses? No 1.4 Pre-construction investigations No e.g. bore houses, soil testing? 1.5 Construction works? No 1.6 Demolition works? No NA 1.7 Temporary sites used for No construction works or housing of construction workers? 1.8 Above ground buildings, No structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No mining or tunneling? 1.10 Reclamation works? No During rainy season due to flooding reclamation work is naturally done. 1.11 Dredging? No NA 1.12 Offshore structures? No NA 1.13 Production and manufacturing No processes? 1.14 Facilities for storage of goods or No materials? 1.15 Facilities for treatment or d