[ Key Plan Fig. TSUNG YUEN HA 12.2.2 BOUNDARY CONTROL Fig. 12.2.1 CHUK YUEN POINT SECTION

Fig. 12.2.3 Fig. 12.2.5 Fig. Fig. 12.2.6 Ta Kwa 12.2.4 Fig. WO KENG SHAN 12.2.7a Ling Fig. Fig.12.2.7b Fig. Key 12.2.8 12.2.9a NG Y Fig. CHIA Study Area A HA NDAR LIN M PING BO YEUNGU EEN REA 12.2.9b TW ED A Alignment of Future BCP and N BE LOS G TIO R C CHEUNGN SHAN MONASTERY SEC NTIE Fig. U Associated Road Works FRO E AND 12.2.9c Y Fig.G Works Area (Tunnel) IN 12.2.10a P N N E A Works Area (at Grade) E H TW S Fig. E G B N 12.2.10b E TAI TONG WU Border N K IO Fig. T O C W 12.2.10c Boundary E D S N Fig. A TUNNEL SECTION CHEUNG SHAN Fig. Fig. 12.2.11a Key Plan (NORTH TUNN12.2.12EL) 12.2.11b

SH A TAU KOK R Fig. LENG OPEIAD TSUEN S ECTIO Fig.12.2.13 N 12.2.14 Fig. 12.2.15 TAN CHUK HANG LO WAI

Fig. Rev Date Drawn Description Ch'k'd App'd 12.2.16 20/F Two Landmark East Fig. 100 How Ming Street Kwun Tong, 12.2.17 T +852 2828 5757 F +852 2827 1823 W www.mottmac.com.hk

Fanling Client CIVIL ENGINEERING AND DEVELOPMENT DEPARTMENT L AU ( S SO H Project U U AGREEMENT NO. CE45/2008(CE) TH I H T EU LIANTANG/ BOUNDARY U N Fig. N G CONTROL POINT AND ASSOCIATED WORKS N 12.2.18 E TU -- INVESTIGATION L) N N Fig. E Title Fig. L 12.2.19 S 12.2.20 E KEY PLAN FOR BUILT HERITAGE FAN C LIN KAUT LUNG HANG LO WAI G S Fig. IO ECT 12.2.21 N ION Fig. Kilometers KAU LUNG HANG SAN WAI Designed Eng. Chk. Fig. 12.2.22 JL NL NAM WA PO 0120.5 Drawn Coordination 12.2.23 JL NL Dwg. Chk. JL Approved NL Scale at A3 Project Status 1 : 35000 CAD file © Mott MacDonald Hong Kong Limited Drawing No Rev This document should not be relied on or used in circumstances other than those for which it was originally prepared and for which Mott MacDonald Hong Kong Limited was commissioned. Mott MacDonald Limited accepts no responsibility for this document to any other party other than the person by whom it was commissioned. © COPYRIGHT RESERVED FIGURE 12.2 A