Implementation Status & Results 4th Northwest Mountainous & Forested Areas Development Project (PNO4) (P119140)

Operation Name: 4th Northwest Mountainous & Forested Areas Development Project Stage: Implementation Seq.No: 10 Status: ARCHIVED Archive Date: 29-Nov-2014 Project (PNO4) (P119140)

Public Disclosure Authorized Country: Tunisia Approval FY: 2011 Product Line:IBRD/IDA Region: MIDDLE EAST AND Lending Instrument: Specific Investment Loan Implementing Agency(ies): ODESYPANO (Northwest Sylvo-pastoral Development Office under MAHRP) Key Dates Public Disclosure Copy Board Approval Date 20-Dec-2010 Original Closing Date 30-Jun-2017 Planned Mid Term Review Date 02-Dec-2014 Last Archived ISR Date 13-Jul-2014 Effectiveness Date 24-Jun-2011 Revised Closing Date 30-Jun-2017 Actual Mid Term Review Date

Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objectives (PDOs) are to improve the socio-economic conditions of the rural population and promote better protection and management of natural resources in the project area using an integrated participatory approach to community-based development. Has the Project Development Objective been changed since Board Approval of the Project?

Public Disclosure Authorized Yes No

Component(s)

Component Name Component Cost 1. Institutional support and technical assistance for Community Development Plan preparation and 4.97 implementation in the project area 2. Support for agricultural and pastoral production and income-generating activities in the project area 4.71 3. Consolidation, protection and management of natural resources in the project area 26.50 4. Improvement of basic rural infrastructure in the project area 20.98

Overall Ratings Previous Rating Current Rating Public Disclosure Authorized Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate

Public Disclosure Copy Implementation Status Overview 1. This update is prepared to comply with the Regional requirements of not exceeding 6 months between two consecutive ISRs. The Mid-Term Review (MTR) is scheduled for December 2-12, 2014; and will provide an opportunity for a more comprehensive update of the ISR, including ratings based on findings and further progress at the time of the

Page 1 of 9 Public Disclosure Authorized The World Bank Report No: ISR16984

upcoming mission. The last full-fledged supervision mission took place in May 2014.

2. In preparation of the MTR, the implementing agency (ODESYPANO) recently sent to the Bank for review preliminary reports of a set of six thematic studies conducted by independent consultants to inform the MTR.

Locations Country First Administrative Division Location Planned Actual Tunisia Not Entered Tunisia ✔

Tunisia Not Entered Mu‘tamadiyat Tabursuq

Tunisia Gouvernorat de Gouvernorat de Siliana ✔ Public Disclosure Copy Tunisia Not Entered Mu‘tamadiyat Saqiyat Sidi Yusuf

Tunisia Not Entered Mu‘tamadiyat Majaz al Bab

Tunisia Gouvernorat de Gouvernorat de Jendouba ✔

Tunisia Gouvernorat de Gouvernorat de Bizerte ✔

Tunisia Gouvernorat de Beja Gouvernorat de Beja ✔

Tunisia Not Entered Mu‘tamadiyat ‘Ayn ad Darahim

Tunisia Gouvernorat de Kef Gouvernorat de Kef ✔

Tunisia Not Entered Ghazala

Tunisia Not Entered

Tunisia Not Entered

Tunisia Not Entered Kef Quest

Tunisia Not Entered Es Sers

Tunisia Not Entered Siliana Nord

Results

Project Development Objective Indicators Public Disclosure Copy

Page 2 of 9 The World Bank Report No: ISR16984

Indicator Name Core Unit of Measure Baseline Current End Target Improvement in a composite index of socio- Percentage Value 100.00 122.00 economic indicators at the sector level. Date 16-Jul-2010 12-Nov-2014 31-Dec-2016 Comments The initial value is 56,7%, Kept unchanged.To be which is translated into the updated based 100% for the index. on the findings of the mid-term review rescheduled in Dec 2014 Direct project beneficiaries Number Value 0.00 278980.00 318432.00 Date 16-Jul-2010 12-Nov-2014 31-Dec-2016 Comments

Public Disclosure Copy Kept unchanged.To be updated based on the findings of the mid-term review rescheduled in Dec 2014 Female beneficiaries Percentage Value 0.00 140885.00 160808.00 Sub Type Supplemental Increase in the percentage of land under soil/ Percentage Value 30.90 33.60 38.60 water conservation management Date 16-Jul-2010 12-Nov-2014 31-Dec-2016 Comments The % is calculated with Kept unchanged. To be reference to the area of updated based intervention of the project on the findings of the (604 653 ha), and the mid-term review rescheduled baseline value for land under in Dec 2014 soil/water conservation management was 187 000 ha. Increase in the percentage of land covered by Percentage Value 30.80 31.80 33.50 perennial plantations and improved pasture Date 16-Jul-2010 05-Nov-2014 31-Dec-2016 Comments The % is calculated with Kept unchanged. To be reference to the area of updated based intervention of the project on the findings of the (604 653 ha), and the mid-term review rescheduled baseline value for perennial in Dec 2014 plantations and improved pasture was 186 478 ha. Public Disclosure Copy

Page 3 of 9 The World Bank Report No: ISR16984

Number of sectors involved in the project that Number Value 37.00 113.00 113.00 have their population organized in GDAPs or Date 16-Jul-2010 12-Nov-2014 31-Dec-2016 CDs and have prepared their PDC which isbeing implemented in collaboration with Comments 37 PDC were elaborated Kept unchanged. To be partners during project preparation updated based (2010). on the findings of the mid-term review rescheduled in Dec 2014

Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Percentage of sectors with a GDAP Percentage Value 40.00 62.00 75.00 Public Disclosure Copy Date 16-Jul-2010 12-Nov-2014 31-Dec-2016 Comments The % is calculated with Kept unchanged. To be To be considered for reference to the 113 sectors updated based adjustments at during the of the project. on the findings of the upcoming MTR. 70 mid-term review rescheduled administrative sectors have in Dec 2014 GDAP. The remaining sectors have opted to keep the current structure of their functioning Development Committees (CD) in the aftermath of the 2011 Revolution. Accordingly,these numbers (62% of GDAP and 38% of CD for a total of 100%) are expected to remain unchanged until the end of the project. Percentage of households in project areas Percentage Value 30.00 30.00 50.00 adhering to a GDAP Date 16-Jul-2010 12-Nov-2014 31-Dec-2016 Comments The % is calculated with To be updated based reference to the 67 000 on the findings of the households of the project. mid-term review rescheduled in Dec 2014 Among the members of GDAP, the % of Percentage Value women, the % of young people, and the % of Date 16-Jul-2010 12-Nov-2014 31-Dec-2016 landless Comments For information purposes only For information purposes For information purposes only only. To be updated based on the findings of the Public Disclosure Copy mid-term review rescheduled in Dec 2014

Page 4 of 9 The World Bank Report No: ISR16984

Percentage of cash or in-kind contributions to Percentage Value 10.00 10.00 10.00 investments by project target groups Date 16-Jul-2010 12-Nov-2014 31-Dec-2016 Comments To be updated based on the findings of the mid-term review rescheduled in Dec 2014 Percentage of CPA investments fully Percentage Value 65.00 90.00 80.00 committed or exe