Trout Regulations

Total Page:16

File Type:pdf, Size:1020Kb

Trout Regulations TROUT REGULATIONS • Brown Trout: 1 per day, 24-inch minimum • Use or possession of any bait is prohibited. Statewide Regulations length limit. • Trout less than 14 inches may not be in Any combination of trout species: possession. Daily Limit: 7 Elk River: Tims Ford Dam to I-65 Bridge, including tributaries. Minimum Length Limit: None Polk County: Big Lost Creek, Goforth Creek, • Brown Trout: 20-inch minimum length limit, Spring Creek, Greasy Creek, and their tributaries Exceptions: 1 per day. in Polk County. • Only 2 trout in a creel may be lake trout • Total daily creel limit of all trout species in • Closed to fishing on Fridays from Mar 1 - Jun 1 • See the following specific regulations combination is 7 trout. except for state and federal holidays. • Only one single hook lure or baited single hook Norris Dam. downstream to Hwy. is permitted. Delayed Harvest Areas Clinch River: 61 bridge, including tributaries. • The use or possession of lures or baits with In the areas listed below, the harvest or possession • 14- to 20-inch protected length range on all multiple hooks is prohibited. trout. of trout is prohibited during the catch-and-release • Fishing is permitted from one-half hour before season. During the catch-and-release season, • 7 trout creel limit, only one trout may be official sunrise to one-half hour after official only artificial lures are permitted and the use or greater than 20 inches. sunset. possession of bait is prohibited. • Fishing equipment or tackle is prohibited on the tributary to Clinch River — Clear Creek: stream banks except during legal fishing hours. Hiwassee River: Appalachian Powerhouse Anderson Co. downstream to L&N Railroad Bridge. • Closed to fishing and minnow seining from • Catch-and-release season is Oct 1 - last day Hwy. 441 upstream to the second dam Horse Creek: Greene County, U.S. Forest Service of Feb. (adjacent to the city of Norris water tower), as Boundary Line upstream to the junction of • From Mar 1 - Sep 30, trout creel limit is 7 trout posted from Nov 1 - Mar 31. Squibb Creek. of all species combined and only 2 may be • Daily limit: 7 trout per day, except from May 1 - Sep 30 daily limit is 2 trout. brown trout. Hiwassee River: Appalachian Powerhouse downstream to L&N Railroad Bridge. Paint Creek: Paint Creek Campground • Mar 1 - Sep 30: 7 trout creel limit, only 2 may Slickrock Creek: That portion of Slickrock Creek downstream to mouth at French Broad River. be brown trout. which constitutes the boundary between the states of Tennessee and North Carolina. • Catch-and-release season is Oct 1 - last day • Oct 1 - last day of Feb: see delayed harvest areas. of Feb. • Appropriate licenses from TN or NC are valid. • Rainbow, brown and brook trout: Daily limit South Fork Holston River: South Holston Dam Piney River: Cumberland Trail State Park to Hwy. 37 Bridge at Bluff City. of 4 in combination with a 7-inch minimum downstream to Highway 27 Bridge. • 16- to 22-inch protected length range on all length limit. • Catch-and-release season is Nov 1 - last day trout. • Fishing permitted one half-hour before official of Feb. • 7 trout creel limit, only one trout may be sunrise to one half-hour after official sunset. • Only single-hook artificial lures are permitted. Mouth of North River upstream to greater than 22 inches. Tellico River: Use or possession of bait or multiple hook lures the Tennessee/North Carolina state line. • Closed to all fishing Nov 1 - Jan 31 in the is prohibited. One single-hook artificial lure • Catch-and-release season is Oct 1 - Mar 14. following areas: separated from a legal lure by a length of line 1. Hickory Tree Bridge upstream to the (for example, a dropper fly) is also permitted. Special Trout Regulations confluence with Bottom Creek. • Each angler permitted only one rod or pole. Caney Fork River: Center Hill Dam to 2. Downstream point of Boy’s Island (first Cumberland River, including tributaries. island downstream of Weaver Pike Bridge) • Total daily creel of all trout (rainbow, brown upstream to the top of the first island Dillard Ponds: and brook) in combination is 5 fish. above Webb Road Bridge. • 4 trout per day. • Each angler limited to one rod or pole. • Rainbow Trout: 5 per day, 14- to 20-inch protected length range, only one fish over Watauga River: Quality Trout Fishing Area • Fishing permitted from one half hour before 20 inches may be harvested. Smallings bridge downstream to CSX railroad official sunrise to one half hour after official bridges. sunset. • Brook Trout: 5 per day, 14- to 20-inch • 14-inch minimum length limit. protected length range, only one fish over 20 Great Smoky Mountains inches may be harvested. • 2 trout creel limit. National Park Most of the streams in the Great Smoky Mountains National Park provide trout fishing opportunities. For detailed fishing information and regulations, contact: Park Headquarters, Gatlinburg, TN 37738; phone (865) 436-1200. Fort Campbell Military Reservation Several streams on Fort Campbell Military Reservation including Dry Creek, Little West Fork and Fletcher’s Fork are stocked with rainbow and brown trout. Special fishing regulations apply and a Post Fishing Permit is required in addition to a valid Tennessee fishing license and trout stamp. For details, contact the Community Recreation Division, Hunting and Fishing Unit, Fort Campbell, KY 42223-5000; phone (270) 798-2175. 28 2017-2018 Fishing Guide Gatlinburg Trout Fishing Children’s Streams From April 1 through November 30: • General Streams: The creel limit is 5 trout TWRA and the city of Gatlinburg offer a (May only be fished by children 12 and under, per day. Bait and artificial lures permitted. variety of trout fishing opportunities in four unless otherwise posted.) streams. All streams are closed on Thursday • Leconte Creek from Painters Branch • Children’s Streams: The creel limit is two each week and a Gatlinburg permit is required upstream to Park Boundary. per day. (page 4). Some areas are managed especially for • West Prong Little Pigeon River from 100 • Total possession limit shall not exceed twice children 12 and under. For more information yards above entrance of Herbert Holt Park the daily creel limit. contact the Gatlinburg Convention and Visitors downstream to Gatlinburg By-pass Bridge. • While fishing or when afield, possession Bureau, (800) 568-4748, or the Gatlinburg trout • Dudley Creek from Highway 441 Bridge to of more than the daily creel limit shall be facility at (865) 436-4558. West Prong Little Pigeon River. prohibited, regardless of whether the trout are fresh, stored in an ice chest, in a vehicle, The taking of trout using a Gatlinburg Permit or otherwise preserved. is allowed only within the designated streams, Season and Creel Limits designated times, and under the restrictions Fishing permitted year-round, except on listed in the following paragraphs. Thursday, from one half-hour before official official sunrise to one half-hour after official General Streams official sunset. Fishing is permitted with one hand-held rod and single hook only. • West Prong Little Pigeon River from Park Boundary to Gnatty Branch except those From December 1 through March 31 sections set aside as Children’s Streams. (all streams): • Dudley Creek from Park Boundary to West • Possession of any trout shall be prohibited. Prong Little Pigeon River, except those • All trout caught must be immediately sections set aside as Children’s Streams. returned to the water. • Roaring Fork from the Park Boundary to • Use or possession of bait is prohibited. Use or West Prong Little Pigeon River. possession of any artificial lures other than • Leconte Creek from Painter Branch to West single hook artificial flies, spinners, and spoons Prong Little Pigeon River. is prohibited. The use of one dropper fly having a single hook which is separated from a legal lure by a length of line is permissible. Cherokee's Annual Opening Day Fishing Tournament March 25–26, 2017 (Opening Day is March 25th) $11 entry fee and $20,000 in tagged fish Cherokee's Memorial Day Trout Tournament May 26–28, 2017 $11 entry fee and $10,000 in tagged fish The Tim Hill Memorial Trout Tournament July 15–16, 2017 $11 entry fee and $10,000 in tagged fish The Qualla Country Trout Tournament September 1–3, 2017 $11 entry fee and $20,000 in tagged fish Rumble in the Rhododendron Fly Fishing Tournament November 4–5, 2017 $225 entry fee and $10,000 in total prize money How Long is Your Trout? Ongoing. Bring your trout to the Cherokee Welcome Center and have it measured for the weekly contest which will run from Saturday to Sunday. Visit FishCherokee.com or call 828.359.6110 for fishing permit locations. Please visit FishCherokee.com for more up to date event details. 2017-2018 Fishing Guide 29 TROUT REGULATIONS Tellico-Citico Permit Areas Regulations TELLICO RIVER from its confluence with Turkey Creek upstream to the Tellico-Citico Permit required March 15 through September 15. Tennessee-North Carolina state line. Closed on Thursday and Friday during the period March 15 through CITICO CREEK from its confluence with Little Citico Creek upstream to the September 15 (except when national or state holidays fall on Thursday and confluence of North and South Forks of Citico Creek. Friday). From September 16 through March 14 fishing is allowed every day and Tellico-Citico Permit is not required. Daily creel limit of 7 trout, with no size limit. Fishing permitted from ½ hour before official sunrise to ½ hour after official sunset. The possession of fishing equipment and/or tackle is prohibited on stream banks except during legal fishing hours.
Recommended publications
  • POLK MONROE BRADLEY BLOUNT MEIGS RHEA Mcminn HAMILTON MARION ROANE LOUDON
    68 27 LOUDON Watts Bar 58 11 24" 72 SPRING Lake 411 Numbers in dark orange circles CITY ROANE LOUDON 89 Philadelphia correspond to numbered Points of Ten Mile Interest throughout this guide. Tellico 129 Chattanooga AREA Lake GREENBACK BLOUNT SELF-GUIDED DRIVING tour 68 1 Point of Interest 75 36" 68 87-88 72 Visitor Information SWEETWATER 82 81 80 72 Land Trust for Tennessee VONORE FOOTHILLS Great Find out more at PARKWAY Protected Property Fort Loudon Pumpkin Center Smoky TanasiTrail.com MEIGS 83 411 State Park Main Trail TennesseeRiver Mountains RHEA 11 86 National 8" Chilhowee Lake Off-Trail Highlight 30 27 107-109 90-91 84-85 Park 30 DECATUR 68 Little Tennessee River All locations on map are approximate. NIOTA Map is not to scale. MADISONVILLE 129 watch for these DAYTON signs along 30 305 93 99 307 the TANASI trail 303 60 92 Tellico River route. 58 94-98 MONROE 69 360 Cherokee GRAYSVILLE ENGLEWOOD I-24, mile marker 171.8, E bound 67-68 National Hiwassee ATHENS Hamilton Co. (Tiftonia), 423-821-2628 Wildlife 110 Mount Vernon Forest NORTH Refuge I-75, mile marker 0.7, N bound 411 CAROLINA 114 Big 39 112-113 68 TELLICO Hamilton Co. (Chattanooga), 423-894-6399 Spring PLAINS Cherohala Skyway Sale Creek National Scenic Byway Riceville 30 70-73 111 74 75 TANASI TRAIL EXTRAS: Page Birchwood 75 11 78 Farms ......................................... 17 39 76-77 165 Festivals & Events ........................ 18 McMINN 310 60 62-66 Tellico River Food & Wine ............................... 12 27 CALHOUN ETOWAH Great Outdoors ............................ 16 100-101 Lodging .....................................
    [Show full text]
  • Tennessee Fish Species
    The Angler’s Guide To TennesseeIncluding Aquatic Nuisance SpeciesFish Published by the Tennessee Wildlife Resources Agency Cover photograph Paul Shaw Graphics Designer Raleigh Holtam Thanks to the TWRA Fisheries Staff for their review and contributions to this publication. Special thanks to those that provided pictures for use in this publication. Partial funding of this publication was provided by a grant from the United States Fish & Wildlife Service through the Aquatic Nuisance Species Task Force. Tennessee Wildlife Resources Agency Authorization No. 328898, 58,500 copies, January, 2012. This public document was promulgated at a cost of $.42 per copy. Equal opportunity to participate in and benefit from programs of the Tennessee Wildlife Resources Agency is available to all persons without regard to their race, color, national origin, sex, age, dis- ability, or military service. TWRA is also an equal opportunity/equal access employer. Questions should be directed to TWRA, Human Resources Office, P.O. Box 40747, Nashville, TN 37204, (615) 781-6594 (TDD 781-6691), or to the U.S. Fish and Wildlife Service, Office for Human Resources, 4401 N. Fairfax Dr., Arlington, VA 22203. Contents Introduction ...............................................................................1 About Fish ..................................................................................2 Black Bass ...................................................................................3 Crappie ........................................................................................7
    [Show full text]
  • North Fork Holston River Report 2017
    North Fork Holston River 2017 From its origin in the southeast corner of Bland County, the North Fork of the Holston River flows more than 100 miles through Southwest Virginia before crossing the Tennessee State line near the community of Yuma. The river boasts an outstanding smallmouth bass population, and supports populations of many other fish species. Sport fish populations are sampled in the North Fork Holston River using boat- mounted electrofishing gear. This sampling equipment generates a controlled field of electricity around the boat that immobilizes the fish. The fish can then be collected with dipnets and placed in a livewell on the boat to recover. This method does not kill the fish, but only stuns the fish so that they can be collected, counted, measured and released. These population samples are typically conducted during April and May, when most fish are in shallow water. The relative abundance of each fish species is calculated as the number of fish collected per hour of sampling. This is also referred to as the catch rate or catch per unit of effort (CPE). The total length and weight of individual fish are measured to determine the condition of the fish and also to evaluate the size structure of the populations. A balanced size structure with representative numbers of both large and small fish is ideal. Mostly small fish in the population might mean that growth is slow or few fish are surviving to older ages. Mostly large fish in the population might mean that natural reproduction is lacking and there are not enough young fish being recruited to replace older fish that die.
    [Show full text]
  • 2018-19 Annual Report Donor Roll Mr
    McCLUNG MUSEUM 2018-2019 ANNUAL REPORT director As I write this, the museum is preparing for the arrival of the new director, Claudio Gómez, the first to serve as the Jefferson Chapman vision Executive Director. As announced in our newsletter, Claudio has been The McClung Museum of Natural History and Culture will be one of the top university museums in the country. the director of the National Museum of Natural History in Santiago, Chile. A highlight of this transition for me was a retirement fund– raising dinner at Cherokee Country Club in June. I have been truly mission honored and moved by wonderful letters, poems, and pictures that The McClung Museum of Natural History and Culture complements and embraces the mission of the University of Tennessee, Knoxville. have been generated by my retirement. The McClung Museum of Natural History and Culture seeks to advance understanding and appreciation of the earth and its natural Exhibitions this year—a history of mind-altering drugs, visual culture wonders, its peoples and societies, their cultural and scientific achievements, and the boundless diversity of the human experience. of the Civil Rights movement, art from indigenous communities in The museum is committed to excellence in teaching, scholarship, community service, and professional practice. India, and recent acquisitions—reflect both our broad educational mission and the talents of our staff. Concomitant with our exhibits, both temporary and long term, were strong education programs attendance comprising experiences for PreK-12, families, the community, and The museum continues to serve visitors from Knoxville and nearby communities, tourists, and university students, and faculty.
    [Show full text]
  • Fifth Five Year Review Report
    FIFTH FIVE-YEAR REVlEW REPORT FOR SALTVILLE WASTE DISPOSAL PONDS SUPERFUND SITE SMYTH COUNTY, VlRGINIA SEPTEMBER 2017 Prepared by U.S. Environmental Protection Agency Region 3 Philadelphia, Pennsylvania SEP 2 6 2017 Karen Melvin, Director Date Hazardous Site Cleanup Division U.S. EPA, Region III Table of Contents LIST OF ABBREVIATIONS & ACRONYMS .........................................................................................................2 I. INTRODUCTION...................................................................................................................................................3 Site Background .....................................................................................................................................................3 FIVE-YEAR REVIEW SUMMARY FORM ........................................................................................................6 II. RESPONSE ACTION SUMMARY ......................................................................................................................6 Basis for Taking Action .........................................................................................................................................6 Response Actions ...................................................................................................................................................7 Status of Implementation .......................................................................................................................................8
    [Show full text]
  • Watauga River Water Quality Management Plan (2002)
    WATAUGA RIVER WATERSHED (06010103) OF THE TENNESSEE RIVER BASIN WATER QUALITY MANAGEMENT PLAN TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF WATER POLLUTION CONTROL WATERSHED MANAGEMENT SECTION August 13, 2002 WATAUGA RIVER WATERSHED WATER QUALITY MANAGEMENT PLAN TABLE OF CONTENTS Glossary Chapter 1. Watershed Approach to Water Quality Chapter 2. Description of the Watauga River Watershed Chapter 3. Water Quality Assessment of the Watauga River Watershed Chapter 4. Point and Nonpoint Source Characterization of the Watauga River Watershed Chapter 5. Water Quality Partnerships in the Watauga River Watershed Chapter 6. Future Plans Appendix I Appendix II Appendix III Appendix IV Appendix V Glossary GLOSSARY 1Q20. The lowest average 1 consecutive days flow with average recurrence frequency of once every 20 years. 30Q2. The lowest average 3 consecutive days flow with average recurrence frequency of once every 2 years. 7Q10. The lowest average 7 consecutive days flow with average recurrence frequency of once every 10 years. 303(d). The section of the federal Clean Water Act that requires a listing by states, territories, and authorized tribes of impaired waters, which do not meet the water quality standards that states, territories, and authorized tribes have set for them, even after point sources of pollution have installed the minimum required levels of pollution control technology. 305(b). The section of the federal Clean Water Act that requires EPA to assemble and submit a report to Congress on the condition of all water bodies across the Country as determined by a biennial collection of data and other information by States and Tribes. AFO. Animal Feeding Operation.
    [Show full text]
  • Integrated Assessment of Watershed Health in the Clinch and Powell River System a Report on the Aquatic Ecological Health of the Clinch and Powell River System
    June 2015 Integrated Assessment of Watershed Health in the Clinch and Powell River System A Report on the Aquatic Ecological Health of the Clinch and Powell River System Prepared for— Prepared by— US Environmental Protection Kimberly Matthews, Michele Eddy, Agency and Phillip Jones (RTI) Healthy Watersheds Program Mark Southerland, Brenda Morgan, William Jefferson Clinton Building and Ginny Rogers (Versar) 1200 Pennsylvania Avenue, N.W. RTI International Washington, DC 20460 3040 E. Cornwallis Road Research Triangle Park, NC 27709 RTI Project Number 0213541.004.001.003 Integrated Assessment of Watershed Health in the Clinch and Powell River System June 2015 Prepared by RTI International for the U.S. Environmental Protection Agency Support for this project was provided by the EPA Healthy Watersheds Program (http://www.epa.gov/healthywatersheds) Disclaimer The information presented in this document is intended to support screening-level assessments of watershed protection priorities and is based on modeled and aggregated data that may have been collected or generated for other purposes. Results should be considered in that context and do not supplant site-specific evidence of watershed health. At times, this document refers to statutory and regulatory provisions, which contain legally binding requirements. This document does not substitute for those provisions or regulations, nor is it a regulation itself. Thus, it does not impose legally binding requirements on EPA, states, authorized tribes, or the public and may not apply to a particular situation based on the circumstances. Reference herein to any specific commercial products, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the U.S.
    [Show full text]
  • John Muir's Walk Across the Appalachians
    John Muir’s Walk Across the Appalachians by Dan Styer [email protected] 15 November 2011 Submitted for publication in The John Muir Newsletter, W. R. (Bill) Swagerty, Editor, University of the Pacific [email protected] On 14 through 22 September, 1867, John Muir walked across the Appalachian Mountains in Tennessee, North Carolina, and Georgia, as part of his thousand-mile walk from Louisville, Kentucky, to Cedar Key, Florida. Muir recorded the story of his journey in a notebook [1], which was edited and published posthumously as A Thousand-Mile Walk To the Gulf [2]. As one would expect, Muir the aesthete exalted in “Most glorious billowy mountain scenery. Made many a halt at open places to take breath and to admire. … The scenery is far grander than any I ever before beheld. … Such an ocean of wooded, waving, swelling mountain beauty and grandeur is not to be described.” And Muir the naturalist delighted in ferns, asters, Liatris, and holly. But in addition, Muir the inventive young millwright (29 years old) made incisive observations concerning the mills and mines and technology of the region. Through study of Muir’s writings and of Civil War-era and other historical maps, and through two visits to the area, I have been able to retrace Muir’s overmountain route with relative certainty. Historical maps Muir’s journal provides only a sketchy outline of his route. During his entire thousand- mile journey Muir wrote only two extant letters – one on 9 September to Jeanne C. Carr, and one on 15 October to his brother David – neither of which sheds significant additional light on his route [3].
    [Show full text]
  • Draft Environmental Assessment for Transmission System
    Document Type: EA-Administrative Record Index Field: Draft Environmental Assessment Project Name: FY22 & FY23 Transmission System Vegetation Management Project Number: 2020-22 TRANSMISSION SYSTEM ROUTINE PERIODIC VEGETATION MANAGEMENT FISCAL YEARS 2022 AND 2023 DRAFT ENVIRONMENTAL ASSESSMENT Prepared by: TENNESSEE VALLEY AUTHORITY Chattanooga, Tennessee July 2021 To request further information, contact: Anita E. Masters NEPA Program Tennessee Valley Authority 1101 Market St., BR2C Chattanooga, Tennessee 37402 E-mail: [email protected] This page intentionally left blank Contents Table of Contents CHAPTER 1 – PURPOSE AND NEED FOR ACTION ......................................................................... 1 1.2 Introduction and Background ................................................................................................... 1 1.2.1 TVA’s Transmission System .............................................................................................. 1 1.2.2 The Need for Transmission System Reliability .................................................................. 2 1.2.3 TVA’s Vegetation Management Program .......................................................................... 2 1.2.4 Vegetation Management Practices ................................................................................... 5 1.2.5 Emphasis on Integrated Vegetation Management ............................................................ 7 1.2.6 Selection of Vegetation Control Methods .........................................................................
    [Show full text]
  • Freshwater Mussel Survey of Clinchport, Clinch River, Virginia: Augmentation Monitoring Site: 2006
    Freshwater Mussel Survey of Clinchport, Clinch River, Virginia: Augmentation Monitoring Site: 2006 By: Nathan L. Eckert, Joe J. Ferraro, Michael J. Pinder, and Brian T. Watson Virginia Department of Game and Inland Fisheries Wildlife Diversity Division October 28th, 2008 Table of Contents Introduction....................................................................................................................... 4 Objective ............................................................................................................................ 5 Study Area ......................................................................................................................... 6 Methods.............................................................................................................................. 6 Results .............................................................................................................................. 10 Semi-quantitative .................................................................................................. 10 Quantitative........................................................................................................... 11 Qualitative............................................................................................................. 12 Incidental............................................................................................................... 12 Discussion........................................................................................................................
    [Show full text]
  • Reporting Requirements Under the Inspector General Act
    1 TVA Power Generation and Purchased Power Six Months Ended March 31, 2017 (in millions of kilowatt hours) Purchased power Natural gas (non-renewable) and/or oil-fired • Coal-fired - 18,264 Purchased power 1 Hydroelectric (renewable) • Nuclear - 30,185 • Hydroelectric - 4,780 Coal-fired • Natural gas and/or oil-fired - 11,220 • Purchased power (non-renewable) - 5,8672 Nuclear • Purchased power (renewable) - 3,6243 1 The nuclear amount for the six months ended March 31, 2017, includes approximately 799 million kWh of pre-commercial generation at Watts Bar Nuclear Plant Unit 2 and Paradise Combined Cycle Plant. 2 Purchased power (non-renewable) includes generation from Caledonia Combined Cycle Plant, which is currently a leased facility operated by TVA. 3 Purchased power (renewable) includes power purchased from the following renewable sources: hydroelectric, solar, wind, and cogenerations. 2 TABLE OF CONTENTS Message from the Inspector General. .....................................................4 Noteworthy Undertaking...............................................................7 Executive Overview ...................................................................9 Organization ....................................................................... 13 Audits ............................................................................ 17 Evaluations ........................................................................23 Investigations ...................................................................... 27 Legislation and Regulations
    [Show full text]
  • Take It to the Bank: Tennessee Bank Fishing Opportunities Was Licenses and Regulations
    Illustrations by Duane Raver/USFWS Tennessee Wildlife Resources Agency ke2it2to2the2nkke2it2to2the2nk TennesseeTennessee bankbank fishingfishing opportunitiesopportunities Inside this guide Go fish!.......................................................................................1 Additional fishing opportunities and information..........6 Take it to the Bank: Tennessee Bank Fishing Opportunities was Licenses and regulations........................................................1 Additional contact agencies and facilities.....................6 produced by the Tennessee Wildlife Resources Agency and Tennes- Bank fishing tips........................................................................2 Water release schedules..........................................................6 see Technological University’s Center for the Management, Utilization Black bass..................................................................................2 Fishing-related Web sites.................................................... ....6 and Protection of Water Resources under project 7304. Development Sunfish (bream).........................................................................2 How to read the access tables.................................................7 of this guide was financed in part by funds from the Federal Aid in Sportfish Restoration Crappie..................................................................3 Access table key........................................................................7 (Public Law 91-503) as documented
    [Show full text]