CURRICULUM VITAE

1. PERSONAL PARTICULARS

Name : Mohammad Ismail b. Yaziz (Associate Prof. Dr.) I/C No. : 510712-07-5159 Date of Birth : 12th July 1951 Contact No. : +6019 368 1026 Email : [email protected]

2. QUALIFICATIONS

a) B. Sc. (University of Adelaide, South Australia) b) Cert. Advanced Immunology (Chelsea College, University of London, UK) c) Ph. D. Environmental Sanitation - Sewage Treatment (University of Surrey, UK) d) Registered DOE Consultant : No. CS0396

3. PUBLICATIONS AND SUPERVISION

Has published 16 papers in refereed international Journals and more than 50 papers in seminars, conferences and training workshops on topics related to pollution control, water and wastewater treatment and environmental sciences.

Has supervised more than 120 undergraduate student research projects, 6 Ph.D and 11 MSc research thesis on topics related to environmental management, water and wastewater treatment and environmental sciences.

4. CONSULTANCY EXPERIENCE

1. An Evaluation of the Performance of the Wastewater Treatment System and Waste Management in Petrol Service Stations in and the Federal Territory. June 1985. ESSO (M) Inc.

2. Establishment of a Focalized Network Service Program - Establishing Drinking Water Quality Surveillance Procedures for Small Water Supply Systems. Feb 1986. WHO

3. Development of National Planning Guidelines for Community Participation in Rural Water Supply and Sanitation Projects. Feb 1987. Min. of Health,

1 4. Development of Standards for Air Quality and Water Quality - Phase II. Air Quality Criteria and Standards. August 1988. Min. of Science, Technology and Environment/Syed Muhammad, Binnie and Partners

5. A Comparative Study of Liquid Versus Dehydrated Bacteriological Media for the Detection and Enumeration of Fecal Coliforms and Coliforms in Contaminated Waters. July 1990. Millipore Corp. USA/Singapore

6. Preliminary EIA for the Kelana Mas Waterfront Development (Phase 1 Extension) Project, Kuah, , for Trimula Development Sdn. Bhd. 1992

7. Preliminary EIA of the Proposed Petroleum Refinery, Bintulu, , Malaysia. BHP Pacific Resources Inc. with Environmental Technologies International Inc., Honolulu, Hawaii, USA and UKM. June 1992

8. Waste Management at Source for Small and Medium Scale Industries: Reduction of Wastes in Automotive Service Stations for Min. of Science, Technology and Environment Malaysia. July 1992

9. Port Dredging/Reclamation. EIA Supplementary Study, Bintulu, Sarawak. BHP Pacific Resources with Environmental Technologies International Inc., Hawaii, USA and UKM. August 1992

10. Kajian Penutupan Ladang-ladang Ternakan Khinzir Negeri Melaka, Kerajaan negeri Melaka. 1992

11. KLIA ( International Airport) - Environmental Impact Study. Kementerian Pengangkutan Malaysia with EEC, Ranhill Bersekutu and ERL U. K. November 1992

12. Impact of Wastewater Discharge from the F&N Factory in Kuala Lumpur on the Sg. Kerayong. Fraser & Neave (M) Sdn. Bhd. January 1993

13. Preliminary EIA of the Proposed APR Petroleum Refinery, Pulau Kerengga, Marang, for APR Sdn. Bhd. With UKM. December 1993

14. Impact of Wastewater Discharge from the ICI Paints Factory in Jalan 205, Petaling Jaya on the Water Quality in Receiving Waterways and in the Sg. Pencala. ICI Malaysia. June 1993

15. An Effluent Survey in the Fraser & Neave Factory in Jalan Foss, Sg. Besi, Kuala Lumpur. September 1993

2 16. Preliminary EIA of the LKIM Aquaculture Project at Tanah Timbul, , Lembaga Kemajuan Ikan Malaysia. February 1994

17. Preliminary EIA of the Proposed MSW Steel Mill Project, Klang Industrial Estate, Selangor. Malaysia Steel Works Sdn. Bhd. October 1994

18. Impact of Wastewater Discharges from Airod Sdn. Bhd. Facilities in Subang on the Water Quality in Sg. Damansara. April 1994

19. Impact of Wastewater Discharges from the Armitage Shanks Factory in Petaling Jaya on the Water Quality in the Surrounding Waterways and in the Sg. Pencala. April 1994

20. Evaluation of Technical Proposals for the Construction and Operation of Wastewater Treatment Plants to Treat Cleaning/Electroplating Wastes and Paint Stripping Wastes. January 1995

21. Preliminary EIA of the LKIM Aquaculture Project at Kesang-Sebatu, Melaka. Lembaga Kemajuan Ikan Malaysia. 1995

22. Petroleum Refinery Wastewater Treatability Studies - Port Dickson Refinery for ESSO (M) Sdn. Bhd. February-May 1995

23. Preliminary EIA of the Proposed Administrative Centre in Perang Besar, Sepang. Government of Malaysia. May 1995

24. Preliminary EIA for the PKNS Mixed Development Project in Ulu Yam and Mukim Serendah, Ulu Selangor, Selangor. September-November 1995

25. A Feasibility Study of Solid Waste Management and Sewerage Systems for the Tasik Kenyir Recreational Area, Terengganu for Ketengah/Perunding GEA Sdn. Bhd. March-May 1996

26. Treatment of Groundwater for Iron Removal - Laboratory Studies and Concept Design for a Full Scale Treatment Plant for Samsung Corning (M) Sdn. Bhd. April/May 1996

27. EIA APR’s Petroleum Refinery Project in Pulau Kerengga, Marang, Terengganu for Asia Pacific Refinery Sdn. Bhd. (completed in July, 1997);

28. Pre EIA Assam Jawa-Templer Park Highway, for PDI Consultant Services, Kuala Lumpur (completed in August 1997);

29. Pre EIA for Mixed Development Nilai, Negara Properties Berhad and Golden Hope Berhad (completed in June 1997);

3

30. Pre EIA Lukut Resort, in Lukut, for Customax Sdn Bhd. in association with UPM Serdang (completed in September, 1997);

31. Detailed EIA for Independent Power Plant (2100mgw)/ Port Development on Pulau Bunting, Kedah Darul Aman. SKS Ventures Sdn Bhd. (Completed in February 1998)

32. A Preliminary Environmental Impacts Assessment for The Proposed Centrifugal Recovery of Spent Coolant Factory of the Wire and Metal Work Industries in Shah Alam (completed in November 1998)

33. A Preliminary Environmental Impacts Assessment for The Proposed Oil Palm Plantation in Chiku, Gua Musang, (completed in April 1999);

34. Preliminary EIA Penor Mixed Development Project, in Penor, (completed in August, 1999)

35. A Preliminary Environmental Impact Assessment for the Proposed Land, Survey and Mapping Instiute in Behrang, . Kementerian Tanah dan Koperasi Malaysia (completed in November, 1999)

36. A Preliminary Environmental Impact Assessment for the Proposed Fruit Plantation, Sg. Wangi Estate, Perak Darul Ridzuan (completed in October 2001)

37. EIA for the Proposed Parit Jawa Sanctuary Village, Muar, Darul Takzim;

38. EIA for Mixed Development of Semenyih Estate, Ulu Langat, Selangor for Golden Hope Development Sdn. Bhd.;

39. EIA for Melaka Heritage Theme Park, Marina and Menara Taming Sari, Tanjung Kelebang, Melaka for WRA Global Group;

40. Detailed Environmental Impact Assessment on the Proposed Resource Recovery Centre – Waste to Energy, At Lot 3041 and Lot 3042, Mukim Ulu Semenyih, Ulu Langat District, Selangor Darul Ehsan.

41. EIA for Proposed Mixed Development on Semenyih Estate, Mukim Semenyih & Beranang, District of Ulu Langat, Selangor for Golden Hope Development Sdn. Bhd.

42. Pre-EIA of Integrated Boarding School, Mukim of , District of Bentong, Pahang for Ministry of Education.

4 43. EIA of Proposed Agriculture Land, Mukim Endau, District of Rompin, Pahang Darul Makmur.

44. Preliminary EIA of The Proposed Sungai Batu Oil Palm Plantation on Lot 1018 (Sebahagian), Mukim of Ulu , District of Kuantan, Pahang Darul Makmur for Far East Holdings Berhad (APPROVED ON 20TH JULY 2004)

45. A Supplementary Environmental Impact Assessment Project Jalanraya Simpang Pulai-- Gua Musang-Kuala Berang Pakej 6-Aring to Jambatan Pasir Pulau (APPROVED ON 5th NOVEMBER 2004)

46. Preliminary EIA of The Proposed Rubber Forest Plantation in Kuala Kuantan, Mukim of Kuala Kuantan, District of Kuantan, Pahang Darul Makmur for Lembaga Getah Malaysia (APPROVED ON 17TH OCTOBER 2005)

47. Preliminary EIA of The Proposed GAMBANG Oil Palm Plantation on lot 30976, in Mukim Kuala Kuantan, Pahang Darul Makmur for Y.P Plantation Sdn Bhd (APPROVED ON 18TH OCTOBER 2005)

48. Preliminary EIA of The Proposed CHEGAR PERAH Oil Palm Plantation, in Mukim Batu Yon, District of Lipis, Pahang Darul Makmur for Syarikat Ladang LKPP Sdn Bhd (APPROVED ON 20TH OCTOBER 2005)

49. Preliminary EIA for The Proposed of “Projek Menaiktaraf Jalan Seremban-Kuala Pilah (dari Simpang Senawang ke Hospital Kuala Pilah), Negeri Sembilan” for JKR Malaysia (APPROVED ON 8TH FEBRUARY 2006)

50. Preliminary EIA for The Proposed of Trans Eastern Kedah Interland Highway from Durian Burung to Kupang, Kedah for JKR Malaysia (APPROVED ON 19TH JULY 2006)

51. Preliminary EIA for The Proposed Oil Palm Plantation at Sri Chengal, Mukim Keratong, District of Rompin, Pahang Darul Makmur (APPROVED ON 15th JANUARY 2007

52. Preliminary EIA for The Proposed of Simpang Pulai-Lojing-Gua Musang-Kuala Berang Road Project, Package 8 - Kg. Teris to Kuala Telemung, Terengganu (APPROVED ON 6TH JUN 2007)

53. Preliminary EIA for The Proposed Rubber and Oil Palm Forest Plantation Kg. Ganoh Ibam, Mukim Keratong District of Rompin, Pahang (APPROVED ON 16th JULY 2007)

54. Preliminary EIA for The Proposed of “Cadangan Membina dan Menyiapkan Projek Pembangunan Bercampur di atas Plot 2-23, Plot B&C, Mukim Rawang, Daerah Gombak, Selangor Darul Ehsan” (APPROVED ON 11th MAY 2007)

5 55. Preliminary EIA for The Proposed of “Cadangan Membina & Menyiapkan Pulapol Ayer Itam di atas Lot 159, Mukim Serting Ilir, Daerah Jempol, Negeri Sembilan” (APPROVED ON 28th MAY2007)

56. Preliminary EIA of “Cadangan Merekabentuk 20 Tingkat Felda Business Residence Di atas Tapak Pejabat Felda Wilayah Terngganu, Lot 1731, Jalan Hiliran, Kuala Terengganu, Terengganu”(APPOVED ON 13th APRIL 2008)

57. Preliminary EIA of The Proposed Oil Palm Plantation Sri Telang, Mukim Telang, District of Lipis, Pahang (APPROVED ON 28 MARCH 2008)

58. Preliminary EIA of The Proposed Oil Palm Plantation in Mukim Bebar, Distict of Pekan, Pahang (APPROVED ON 29 JANUARY 2008)

59. Preliminary EIA of The Proposed Oi Palm Plantation at Sg Lembing, Mukim Ulu Kuantan, Pahang (APPROVED ON 29 JANUARY 2008)

60. Preliminary EIA of The Proposed Polytechnic At Jeli, Kelantan (2008 On going)

61. Detailed Environmental Impact Assessment and Socio Economic Study for the Construction of Paya Peda Dam Besut, Terengganu Darul Iman (2008 On going).

62. Wastewater Characterization Study and Basic Engineering for Wastewater Treatment Plant (WWTP) Upgrading at Gas Processing Plant Complex A (GPP-A) for Petronas (in association with Veolia Water (M) Sdn Bhd) Aug.- Nov. 2008

 Industrial Effluent Characterisation Study (IECS)  Kajian Kejuruteraan Rekabentuk Asas (Basic Engineering)  Permohonan Kebenaran Bertulis bagi cadangan tersebut  Kajian Kejuruteraan Rekabentuk Terperinci (Detailed Engineering)  Pembinaan, Perlaksanaan dan Ujian Prestasi Operasi (Engineering, Procurement, Construction and Commissioning)

63. Wastewater Treatment on Land Application for Tabung Haji Plantation Holdings Sdn Bhd at Kota Bahagia, Muadzam Shah, Pahang Darul Makmur (2009)

64. EIA for “Pemerolehan Kembali Minyak Terpakai Di Atas Lot PT.14319, Mukim Klang, Kawasan Perusahaan 24, Pendamar, 42000 Port Klang, Selangor Darul Ehsan” for SP Metro (M) Sdn. Bhd. (2009)

65. EIA for “Projek Agropolitan Chemomoi, Mukim Pelangai, Bentong, Pahang” for RISDA (2009)

6 66. EIA for “Cadangan Pembangunan Ladang Kelapa Sawit Seluas 4770 ekar di Mukim Ganchong, Pekan, Pahang” for Perbadanan Negeri Pahang (2009)

67. EIA for Proposed Fertilizer Compaction Plant for United Compound Fertilizers Sdn Bhd in Kuantan, Pahang (2009)

68. EIA for “Projek Pembangunan Ladang Tanaman Getah Seluas 400 Hektar di TSK OA RPS Banun, Grik, Perak” for RISDA Plantation. (2009)

69. EMP for The Proposed Integrated Transport Terminal at Bandar Tasik Selatan, Kuala Lumpur for Ministry of Transport for Maju Holdings Sdn. Bhd. (on going)

70. EMP for Menaiktaraf Jalan Pasir Puteh/Gong Kulim, Tok Bali, Pasir Puteh, Kelantan Darul Naim for Aneka Prestij Sdn. Bhd.

71. EMP for “Memperelok Jalan Kuala Terengganu/. KM29-KM34 Kampung Lekor, Pakoh Jaya, Laluan 3, Setiu Terengganu” for Kumpulan Liziz Sdn. Bhd.

72. EMP for “Projek Menaiktaraf Laluan Persekutuan 3, KM-KM Jalan Kuala Terengganu – Kota Bharu, Terengganu” for Rancangan Kita Sdn. Bhd.

4. AFFILIATIONS

a) Alternate Council Member, National Environmental Quality Council (EQC) Malaysia. Min. of Science, Technology and Environment Malaysia. April 1982 - April 1983 and January 1994 – 1996.

b) Ahli Jawatankuasa Pemeliharaan Kualiti Alam Sekitar Kawasan Pentadbiran MPPJ (Majlis Perbandaran Petaling Jaya), Selangor. Ogos 1994 - sekarang

c) Committee Member - Council for Public Interaction (Majlis Perhubungan Masyarakat), Area ‘E’ Petaling Jaya, Selangor, Prime Minister’s Department. January 1982 - December 1983

d) Council Member, Environmental Management and Research Association of Malaysia (ENSEARCH). April 1983 - December 1987

e) Advisor and Member, Planning Committee for the Development of the Faculty of Applied Science, International Islamic University (UIA), Jalan Universiti, Petaling Jaya, Selangor. February 1990

f) Member in a Panel of Judges for the ‘Better Environment’ Award by ENSEARCH. 1990

7 g) Assessor/Supervisor for Trainee Teacher’s Programme, Faculty of Education, UPM, Serdang h) Committee Member - Environmental Awareness and Education Campaign in Selangor. Min. of Science, Technology and Environment. 1986 i) Examiner for the Malaysian Examinations Council. SPM and STPM Examinations (Biology and Chemistry Papers) 1980 - 1086 j) Editorial Committee, ENSEARCH Journal. 1983 - 1990 k) Member, Society for Applied Bacteriology l) Member, Malaysian Society for Microbiology m) Affiliate Member, Water Research Association n) Member, Malaysian Water Association

8