Unstarred Question No.92 tabled by Shri Glen Ticlo, MLA () to be answered on 29.07.2015.

Sub: Work carried out by RDA in the Panchayat Areas.

Question Answer

Will the Minister for Rural Development By Shri Laxmikant Y. Parsekar, be pleased to state: Minister for Rural Development.

(a) the number of works carried out by the Rural Development Agency in the Village Panchayat area of , Moira, , Aldona, and from 01/04/2012 till Sir, the details pertaining to Gram date; Samrudhi Yojana (GGSY) and Mahatma Gandhi National Rural (b) the nature of works carried out in each Employment Guarantee Scheme village; and (MGNREGS) are given in Annexure I & II respectively.

(c) whether all the works have been completed; if not, the present status of the works undertaken?

Unstared LAQ No. 92 Annexure-I

Details of the Projects received under Goa Gram Samrudhi yojana(GGSY) scheme from 1st April 2014 till date in Aldona Constituency

Village Sr.no Name of the Project Status Panchayat

Construction of retaining wall from 1 Premanand N. Naik house to Suhas Volvoikar Work Cancelled house in Ward no.11, Porio Pomburpa

Construction of community hall at Panari, 2 60% Work Completed Aldona in Taluka

Pending because of 3 Construction of crematorium documents from the Aldona Village Panchayat

Construction of community hall near Laxmi 4 Narayan Temple at survey no.228/23-A at Work Tendered carona -Aldona

Document received but Construction of compund wall at Ranoi- Estimate and R.C.C 5 Aldona drawing awaited from the Consultant

Construction of community hall for Ravalnath Pending because of 6 Moira Panchayatan at V.P Moira in Aldona documents from the constituency Village Panchayat

Palmar- Construction of crematorium in property Work done by Other 7 Pomburpa surveyed under no. 60/1 at palmar. Pomburpa Depeartment

Document received but Construction of community hall at Bandhar Estimate and R.C.C 8 Bastora Boa-Vista, Bastora drawing awaited from the Consultant

Construction of mini hall on 1st floor of existing market shopping complex, and constuction of overhead excess for 9 Nachinola 60% Work Completed Panchayat building hall to propsed mini hall on 1st floor for exising Market complex V.P Nachinola of Bardez Taluka MGNREGS ANNEXURE II

From 1/04/2012 till date

2012-13 – Nil

2013-14

Village Status Panchayat Name of the Work (Ongoing/Completed) Bastora 1. Desilting of nallah from Glen Albuquer house upto field at Birmottem in V.P. Bastora of Bardez Taluka. Complete 2. Desilting of Nallah from at A) Brazinho house upto cementry, main PWD road at Boa Vista, Bastora, B) Dattaram Korgaonkar house upto Narayan Karapurkar house Birmottem, Bastora. C) Anant Prabhu house upto main nallah behind Cristopher Menezes house at Menezes vaddo. Complete Moira Nil Nachinola Nil Aldona Nil Ucassaim Nil Pomburpa Nil

2014-15

Village Status Panchayat Name of the Work (Ongoing/Completed) 1. Desilting of nallah from Ramesh Matkar Complete house upto main PWD road in V.P. Bastora of Bardez Taluka. 2. Desilting of Nallah from Rohidas Kambli Complete field upto NH 17 in V.P. jurisdiction of V.P. Bastora Bastora, Bardez Goa. 1. Kaccha road from Vishram Shetye house Complete to Poi (river) at Bambordem in V.P Moira of Bardez Taluka. 2. Desilting and repair of existing nallah Complete from Gulav to Furtado house at Calizor Moira, Moira in V.P. Moira of Bardez Taluka. Nachinola Nil 1. Desilting of talab of Goljuem Khazan at Complete Goljuem and road joining the field at Bailo Akh at Goljuem, in V.P Aldona of Bardez Taluka (Phase I) Aldona Nil Ucassaim Nil Pomburpa

2015-16

Village Status Panchayat Name of the Work (Ongoing/Completed) Bastora Complete 1.Desilting of nallah near from St.Cajetan church upto river mouth in phases at balbot in V.P. Bastora of Bardez Taluka. Moira NIL Nachinola Nil Aldona 1.Desilting of talab of Goljuem Khazan at On going Goljuem and road joining the field at Bailo Akh at Goljuem, in V.P Aldona of Bardez Taluka (Phase II)

Ucassaim Nil Pomburpa Nil