CHARTER TOWNSHIP OF ORION MECHANICAL FEE SCHEDULE

REGISTRATION / LICENSES Heating / Cooling Licenses – Contractor ...... $ 15.00 Fire Suppression Contractor ...... $ 15.00

MINIMUM PERMIT FEE ...... $ 75.00

BASE FEE ...... $ 60.00

FURNACE / GENERATOR (Replacement includes gas line) Heat < 250,000 BTU ...... $ 60.00 Heat > 251,000 BTU ...... $ 90.00 Generator < 15,000 KW ...... $ 75.00 Generator > 15,000 KW ...... $ 90.00

GAS LINE DISTRIBUTION / PROCESSED PIPNG (Pressure Test required if more than 6 fittings or 10 feet of piping) First 200 feet ...... $ 30.00 Each additional 50 feet...... $ 15.00 Pressure Test ...... $ 35.00

DISTRIBUTION SYSTEMS Air (ducts) or hydronic heat, cooling and ventilation – each system ...... $ 40.00

OIL BURNERS (installation or replacement) All Oil Burners ...... $ 60.00

GAS FIRED EQUIPMENT Barbeques ...... $ 20.00 ...... $ 20.00 Cook Top ...... $ 20.00 Gas Grill...... $ 20.00 Gas Logs ...... $ 20.00 Incinerator ...... $ 20.00 Range ...... $ 20.00 Water Heater ...... $ 20.00

REFRIGERATION SYSTEMS A/C or 5 ton or less...... $ 60.00 Each additional ton over 5 ton ...... $ 10.00

STORAGE / PROPANE TANKS Tanks 550 gallons or less ...... $ 40.00 Tanks 5,000 gallons or less ...... $ 60.00 Tanks 20,000 gallons or less ...... $120.00 Tanks 50,000 gallons or less ...... $220.00

HEATING & COOLING ITEMS B-Vent ...... $ 30.00 Base Board Heat ...... $ 30.00 Electric Air Cleaner ...... $ 35.00 Exhaust (residential-includes work) ...... $ 15.00 Exhaust Fan (commercial- includes duct work) ...... $ 60.00 Geo Thermal ...... $110.00 ...... $ 25.00 Hood (residential) ...... $ 40.00 Kitchen Make-up (commercial) ...... $ 60.00 & Duct (commercial) ...... $180.00 Portable Heater ...... $ 40.00 Pre-fab ...... $ 40.00 Radiant Floor Heating...... $ 40.00 Solar Equipment ...... $ 40.00 Unit Heater 200,000 BTU or less ...... $ 40.00 Well Water ...... $ 40.00 Wood ...... $ 40.00

MANUFACTURED HOME Tie-in ...... $ 75.00

FIRE SUPPRESSION (residential / commercial) 1 – 20 Heads ...... 100.00 Over 21 Heads (each) ...... $ 5.00

WET CHEMICAL SUPPRESSION SYSTEM (requires 2 mechanical permits) *Separate mechanical permit required for kitchen hood and fire inspection *Kitchen Hood (commercial only) ...... $180.00 *Fire Inspection (commercial only) ...... $180.00

CLEAN AGENT SUPPRESSION / DRY CHEMICAL SYSTEM 1 – 50 Pounds of Agent ...... $275.00 51 – 100 Pounds of Agent ...... $325.00 101 – 200 Pounds of Agent ...... $350.00 201 – 300 Pounds of Agent ...... $375.00 301 - 400 Pounds of Agent ...... $400.00 401 – 500 Pounds of Agent ...... $425.00 501 – 750 Pounds of Agent ...... $500.00 751 – 1,000 Pounds of Agent ...... $575.00 Each additional Pound of Agent over 1,000 ...... $ .20

PLAN REVIEW FEES Plan Review Fee (in house) ...... $100.00 When review of construction documents is performed by outside consultants, the fee shall be charged at 1.2 times the actual cost plus shipping.

INSPECTION FEES Additional Inspection ...... $ 60.00 Special Inspection ...... $ 60.00

RE-INSPECTIONS If any schedule inspection is not ready when the inspector arrives on site or the inspector is unable to enter the site, a re-inspection fee of $60.00 will be charged.

CANCELLATIONS AND REFUNDS No refund after 6 months from the date of issuance. Upon written request, prior to commencement of any work, permits may be cancelled by the holder and 70% of the permit fee will be refunded, except not less than $50.00 will be retained by the Township to cover administrative expenses. In cases where work has commenced and a request for cancellation is received a fee of $50.00 shall be charged for each inspection. Refund shall be based on 70% of the remainder of the permit fee, except as otherwise provided above.

RENEWAL FEES Mechanical permits shall be valid for 180 days. However, an additional 180 day renewal may be obtained by the original permit holder in writing by payment of a $60.00 renewal fee.

UNSECURED PERMITS When work is started for which a permit is required, before a permit is secured, the permit fee shall be doubled. In cases where special investigation is required, an additional fee for an on-site inspection prior to the building permit review will be charged.

3-16-2015