TRAIN ALTERATION ADVICE NO: 1028-2021 AMENDMENT 1

INTERSTATE NETWORK TO NARROMINE & CORRIDOR HARDEN TO GALONG 20TH AUGUST 2021

UNLOAD RAILSET IN GALONG TO HARDEN SECTION

APPROVED TRACK POSSESSIONS

FROM TO FROM BOUNDARY TRACKS TO BOUNDARY

1210 1730 GALONG DOWN HARDEN 1 20/08/2021 20/08/2021 364.9 SIGNAL MAIN HN15 SIGNAL

ARTC PROJECT CONTACT: ADRIAN UNWIN

TO FACILITATE THE ABOVE TRACK POSSESSION THE BELOW ALTERED WORKING ARRANGEMENTS WILL BE INTRODUCED AS REQUIRED TO FACILITATE DOWN RAIL TRAFFIC MOVEMENTS.

PILOT STAFF WORKING (AS PER RULE ANSY 516)

PILOT STAFF WORKING SECTION

FROM BOUNDARY TO BOUNDARY TRACK

HARDEN GALONG UP MAIN HN12 & HN10 SIGNALS 369.4 SIGNAL

YARD WORKING GALONG YARD TO FACILITATE THE ABOVE ARRANGEMENTS THE INTERLOCKING AT GALONG WILL BE MANUALLY OPERATED BY A QUALIFIED SAFE WORKER

TAA 1028-2021 ISSUED 18TH AUGUST 2021 (JH) PAGE 1 OF 3

TRAIN ALTERATION ADVICE NO: 1028-2021 AMENDMENT 1

OPERATOR IMPACT

TRAIN PATH ALTERATIONS

2 LATE MANDATORY TRAINS WILL BE DELAYED TOTAL NO AD HOC SERVICES ARE PERMITTED POSSESSION NO MOVEMENTS TO/FROM CUNNINGAR SILOS PERMITTED

THE FOLLOWING TRAIN ALTERATIONS WILL APPLY: NSW TRAINLINK ST24 ON THU 19/08/2021 WILL RUN AS TIMETABLED, ARRIVE HARDEN 1514 DEPART 1515, ARRIVE CUNNINGAR 1522 DEPART 1526, ARRIVE GALONG 1541 DEPART 1545, PASS BINALONG 1554, ARRIVE YASS JCT 1619 DEPART 1621, PASS JERRAWA 1636, ARRIVE GUNNING 1650 DEPART 1651, PASS FISH RIVER 1657, JOPPA JUNCTION 1722, ARRIVE GOULBURN 1728 DEPART 1730, ARRIVE MOSS VALE 1816 DEPART 1818, PASS MACARTHUR 1921

QUBE LOGISTICS 1311N ON THU 19/08/2021 WILL RUN AS TIMETABLED, ARRIVE GALONG 1359 DEPART 1411, ARRIVE CUNNINGAR 1436 DEPART 1446, PASS HARDEN 1455, WALLENDBEEN 1518, NORTH JCT 1534, COOTAMUNDRA 1536, FRAMPTON 1546, BETHUNGRA 1558, 1605, WEST JCT 1618, ARRIVE JUNEE 1621 DEPART 1701, ARRIVE HAREFIELD 1713 TERMINATE 1311N ON FRI 20/08/2021 WILL DEPART COOKS RIVER 0800, PASS MARRICKVILLE JUNCTION 0804, CANTERBURY 0812, CAMPSIE 0814, ENFIELD SOUTH 0818, ENFIELD 0819, ENFIELD NORTH JUNCTION 0822, CHULLORA JCT SOUTH 0824, SOY 0829, SEFTON PARK DIVE 0835, ARRIVE LEIGHTONFIELD (ARTC) 0842 DEPART 0901, PASS MOOREBANK JUNCTION 0913, GLENFIELD LOOP 0914, ARRIVE MENANGLE 0934 DEPART 0939, PASS PICTON 0957, MOSS VALE 1059, EXETER 1109, WINGELLO 1124, MEDWAY JUNCTION 1132, GOULBURN 1156, JOPPA JUNCTION 1201, ARRIVE GALONG 1419 DEPART 1429, ARRIVE CUNNINGAR 1452 DEPART 1501, PASS HARDEN 1507, WALLENDBEEN 1530, COOTAMUNDRA NORTH JCT 1546, COOTAMUNDRA 1548, FRAMPTON 1558, BETHUNGRA 1610, ILLABO 1617, JUNEE WEST JCT 1630, ARRIVE JUNEE 1633 DEPART 1713, ARRIVE HAREFIELD 1725 TERMINATE

PACIFIC NATIONAL 4YN2 ON WED 18/08/2021 WILL RUN AS TIMETABLED, ARRIVE CUNNINGAR 1549 DEPART 1556 THU 19/08/2021, ARRIVE GALONG 1615 DEPART 1623, ARRIVE YASS JCT 1714 DEPART 1718, THENCE AS TIMETABLED

TAA 1028-2021 ISSUED 18TH AUGUST 2021 (JH) PAGE 2 OF 3

TRAIN ALTERATION ADVICE NO: 1028-2021 AMENDMENT 1

9327N ON THU 19/08/2021 WILL RUN AS TIMETABLED, ARRIVE GALONG 1610 DEPART 1634, ARRIVE CUNNINGAR 1656 DEPART 1703, ARRIVE HARDEN 1710 DEPART 1738, PASS WALLENDBEEN 1802, COOTAMUNDRA NORTH JCT 1818, ARRIVE COOTAMUNDRA 1821 TERMINATE

6MW2 ON FRI 20/08/2021 WILL RUN AS TIMETABLED, ARRIVE JUNEE 0922 DEPART 0930, PASS COOTAMUNDRA 1028, WALLENDBEEN 1052, HARDEN 1112, ARRIVE JOPPA JUNCTION 1342 DEPART 1348, THENCE AS TIMETABLED

END OF DOCUMENT

TAA 1028-2021 ISSUED 18TH AUGUST 2021 (JH) PAGE 3 OF 3