FORM –1 & 1 A

”Urban Nest”

At

S.NO.58/2/1A+58/2/2A,58/2B,VillageUndri, Taluka Haveli , District , State - .

By

M/s. VTP & Mohite Associates

0 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 0 FORM –1

Urban Nest

At

S.NO.58/2/1A+58/2/2A,58/2B,VillageUndri, Taluka Haveli , District Pune, State - Maharashtra.

By

M/s. VTP & Mohite Associates

1 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 1 APPENDIX - I

(See paragraph - 6) FORM 1 (I) Basic Information Sr.No. Item Details 1. Name of the project/s “Urban Nest” at S.NO.58/2/1A+58/2/2A,58/2B,Village Undri, Taluka Haveli , District Pune, State - Maharashtra. 2. S. No. in the schedule 8 (B2) 3. Proposed capacity/area/length/tonnage to NA be handled/command area/lease area/number of wells to be drilled 4. New/Expansion/Modernization Expansion 5. Existing Capacity/ Area etc. Plot area – 35300 m2 6. Category of project i.e.’ A’ or ‘B’ 8 (B2) 7. Does it attract the general condition? If Not Applicable yes, please specify. 8. Does it attract the specific condition? If Not Applicable yes, please specify. 9. Location Undri, pune Plot/Survey/Khasra No. S.NO.58/2/1A+58/2/2A,58/2B Village Undri Tehsil Haveli District Pune State Maharashtra 10. Nearest railway station Pune railway station : 9.7 km Nearest airport , lohagaon: 15.15 km 11. Nearest Town, city, headquarters Along with distance in kms. 12. Village Panchayats, ZillaParishad, Town planning dept., Pune. Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. VTP Mohite Associates 14. Registered Address 318,Connaught place, band garden road Pune 15. Address for correspondence M/s. Kakade& VTP Associates 318, Connaught place, band garden road Pune. Name Mr.NileshPalresha Designation (Owner/Partner/CEO) Director Address M/s. VTP& Mohite Associates 318, Connaught place, band garden road Pune. Pin Code 411001 E-mail [email protected] Telephone No. 020 -40170000 Fax No. 020-40140003 16. Details of Alternative Sites examined, if Not Applicable any. Location of these sites should be

2 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 2 Sr.No. Item Details shown on a topo-sheet. 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. Not applicable (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22. Whether there is any Government Not applicable Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project.

(II)Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities Sr. Information/Checklist Yes / /rates, wherever possible) with source of No. confirmation No information data 1.1 Permanent or temporary change in No As per local land use plan, project falls under land use, land cover or topography residential zone. including increase in intensity of land use (with respect to local land Regional plan is attached inAnnexure -1 use plan) 1.2 Clearance of existing land, No vegetation and building? 1.3 Creation of new land uses? No --

1.4 Pre-construction investigation e.g. Yes Pre-construction investigation will be carried out bore houses, soil testing? as per relevant standards 1.5 Construction works? Yes 6 residential building and 2commercial buildings and 1 amenity buildings. 1.6 Demolition works? No -

1.7 Temporary sites used for Yes Temporary labour camp for construction workers construction works or housing of on site with security construction workers?

3 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 3 Details thereof (with approximate quantities Sr. Information/Checklist Yes / /rates, wherever possible) with source of No. confirmation No information data 1.8 Above ground building, structures Yes 6 residential building and 2commercial buildings or earthworks including linear and 1 amenity buildings. structures, cut and fill or excavations 1.9 Underground works including No --- mining or Tunneling? 1.10 Reclamation works? No. --- 1.11 Dredging? No. --- 1.12 Offshore structures? No. --- 1.13 Production and manufacturing No. --- processes? 1.14 Facilities for storage of goods or Yes During construction phase temporary storing materials? facilities will be created to store the construction raw material. 1.15 Facilities for treatment or disposal Yes Facilities will provided for collection treatment of solid waste or liquid effluents? and disposal for solid and liquid waste 1.16 Facilities for long term housing of No -- operational workers? 1.17 New road, rail, or sea traffic during No --- construction or operation? 1.18 New road, rail, air waterborne or No -- other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No --- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission lines No --- or pipelines? 1.21 Impoundment, damming, culverting, No --- realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No --- 1.23 Abstraction or transfers of water No --- from ground or surface waters? 1.24 Changes in water bodies or the land Yes By considering the runoff prior to development surface affecting drainage or run- and runoff after development there is some off? increment in runoff of storm water.

1.25 Transport of personnel or materials Yes There will be transport of construction materials. for construction, operation or Precautions will be taken to reduce the impact of decommissioning? the vehicular movement by trying to avoid the vehicular trips during peak hours. 1.26 Long-term dismantling or No --- decommissioning or restoration works?

4 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 4 Details thereof (with approximate quantities Sr. Information/Checklist Yes / /rates, wherever possible) with source of No. confirmation No information data 1.27 Ongoing activity during No --- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes There will be influx 2280 residential users & temporarily or permanently? 4736 commercial and amenity users in proposed project, which includes permanent & floating population. 1.29 Introduction of alien species? No --- 1.30 Loss of native species or genetic No --- diversity? 1.31 Any other actions? No ---

2.Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Sr. Information/checklist Yes / Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 2.1 Land especially The land is barren land. Yes undeveloped or Plot area –35300 m2 agricultural land (ha) 2.2 Water (expected Yes During construction: Potable water shall be supplied as per source & competing requirement. users) unit : KLD During Operation: Source of water: Local Body Quantity of water: About 324 KLD 2.3 Minerals (MT) No --- 2.4 Construction Yes List of raw materials used during construction phase is material – stone, referred as an Annexure - 2. aggregates, and / soil (expected source – MT) 2.5 Forests and timber No -- (source – MT) 2.6 Energy including Source: MSEDCL Yes electricity and fuels Connected load:4504.78KW (source, competing users) Unit: fuel (MT), Maximum demand :2608.3 KVA energy (MW)

2.7 Any other natural No -- resources (use appropriate standard units)

5 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 5 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sr. Information/Checklist Yes / Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data 3.1 Use of substances or No -- materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No -- disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people No -- e.g. by changing living conditions? 3.4 Vulnerable groups of people No -- who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No ---

4. Production of solid wastes during construction or operation or decommissioning (MT/month): Sr. Information/Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data 4.1 Spoil, overburden or mine No --- wastes 4.2 Municipal waste (domestic Yes Total solid waste Generation:1381 Kg/Day and or commercial wastes)

4.3 Hazardous wastes (as per No Being a construction project, no Hazardous Waste is Hazardous waste Management expected. Rules)

4.4 Other industrial process No --- wastes 4.5 Surplus product No --- 4.6 Sewage sludge or other sludge Yes Dried sludge from STP will be used as manure for the from effluent treatment. plants. 4.7 Construction or demolition No -- wastes. 4.8 Redundant machinery or No --- equipment. 4.9 Contaminated soils or other No --- materials.

6 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 6 Sr. Information/Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data 4.10 Agriculture wastes. No --- 4.11 Other solid wastes. No --- 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) :

Sr. Information/Checklist Yes / No Details thereof (with approximate quantities/rates, No. confirmation wherever possible) with source of information data 5.1 Emissions from Yes D.G. Sets as per CPCB norms will be used during combustion of fossil fuels power failure. from stationary or mobile sources 5.2 Emissions from No -- production processes 5.3 Emissions from materials No -- handling including storage or transport 5.4 Emissions from Yes The project may cause rise in dust levels during construction activities construction phase. Precautions would be taken to reduce including plant and dust generation during construction phase: equipment  Use of RMC will eliminate the handling of cement, sand and concrete thus dust emission will be minimized.  Water sprinkling will be done at regular intervals to reduce control of dust generation. 5.5 Dust or odours from Yes Dust generation will be controlled as described above. handling of materials Proper ventilation will be provided around STP. including construction materials, sewage and waste 5.6 Emissions from No -- incineration of waste 5.7 Emissions from burning No --- of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No --- sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sr. Information/Checklist Yes / No Details thereof (with approximate quantities/rates, No. confirmation wherever possible) with source of information data 6.1 From operation of Yes During construction phase vibration & noise equipment e.g. engines, pollution may occur, necessary precaution shall be ventilation plant, crushers. taken at source, along path & at receptor.

6.2 From industrial or similar No --- processes.

7 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 7 Sr. Information/Checklist Yes / No Details thereof (with approximate quantities/rates, No. confirmation wherever possible) with source of information data 6.3 From construction or Yes During construction phase vibration & noise pollution demolition. may occur, necessary precaution shall be taken at source, along path & at receptor 6.4 From blasting or piling. Yes Piling works 6.5 From construction or Yes operational traffic. 6.6 From lighting or cooling No --- systems.

6.7 From any other sources. No --

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,surface waters, groundwater, coastal waters or the sea :

Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use No -- or spillage of hazardous materials. 7.2 From discharge of sewage No Waste water will be reused to maximum extent; or other effluents to water surplus treated water shall be disposed off as per or the land (expected mode direction given by State Pollution Control Board. and place of discharge). 7.3 By deposition of pollutants No -- emitted to air into the land or into water. 7.4 From any other sources. No --- 7.5 Is there a risk of long term No --- build up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health orthe environment : Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, No -- fires etc from storage, handling, use or production of hazardous substances 8.2 From any other causes. No --- 8.3 Could the project be Yes On site/ Off site Emergency Plan shall be affected by natural disasters prepared in consultation with Local body, NGO’s, causing environmental Stakeholders.

8 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 8 damage (e.g. floods, earthquakes, landslides, and cloudburst)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality: Sr. Information/Checklist Yes / Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data Lead to development of supporting 9.1 facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: •Supporting infrastructure (roads, power supply, waste or waste water Yes Project will help for Infrastructure treatment, etc.) augmentation. • housing development • extractive industries • supply industries • other 9.2 Lead to after-use of the site, which No --- could have an impact on the environment 9.3 Set a precedent for later Yes -- developments 9.4 Have cumulative effects due to No - proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) fromProposed project location boundary

9 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 9 Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) fromProposed project location boundary 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or lake 5.4 km sensitive for ecological reasons - Jambulwadi lake 7.6 km Wetlands, watercourses or other Autadewadi lake 1.33 km water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important - None within 15 km. or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or - None within 15 km. underground waters

5 State, National boundaries - None within 15 km. 6 Routes or facilities used by the NH4 9.01 km public for access to recreation or other tourist, pilgrim areas 7 Defence installations Pune cantonment 6.5 km 8 Densely populated or built-up area - None within 15 km. 9 Areas occupied by sensitive man- Pune - made land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high - quality or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution - None within 15 km. or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard - None within 15 km. which could cause the project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

10 FORM – 1 Urban Nest by M/s. VTP Mohite Associates atUndri 10

LIST OF RAW MATERIALS

Sr.No. Name Units

1 Cement bags

2 White Cement bags

3 Steel Metal tonnes

4 Metal cuft

5 Sand cuft

6 Bricks/siporex no.

7 Binding wire kg.

8 Tiles Granite/Marble sq.ft

9 Paint lts

10 Plaster sq.mtrs

11 Wood kg.

12 Aluminium kg.