Estimated Expenditure For District Taluk Gram Panchayat Year Work Name Type Of Building Expenditure Work status Amount SC/ST Shahapur Anabi 2006-07 Construction of C.C. Road From gurulingasvar tempal ti Havaldar house. CC Road 46000 46000 11500 Completed Yadgir Shahapur Anabi 2006-07 Construction of C.C. Road From Chamanuru house to Yallamma tempal. CC Road 47000 47000 11750 Completed Yadgir Shahapur Anabi 2006-07 Construction of C.C. Road from Naganna badiger house to Jetteppa house. CC Road 47000 47000 11750 Completed Yadgir Shahapur Anabi 2006-07 Construction of C.C. Road From Tambaku doddi to School. CC Road 48000 48000 12000 Completed Yadgir Shahapur Anabi 2006-07 Construction of Slab road CC Road 48000 48000 12000 Completed Yadgir Shahapur Anabi 2006-07 Construction of Compund Form G.P.School (Ambetkar kaloni ). Compound wall 49000 49000 12250 Completed Yadgir Shahapur Anabi 2006-07 Construction of C.C. Road from Dobi mettilu to Sanna darga. CC Road 72000 72000 18000 Completed Yadgir Shahapur Anabi 2006-07 Construction of C.C. Road from Panchayat katte to Huded CC Road 98000 98000 24500 Completed Yadgir Shahapur Anabi 2006-07 Tha Functions of comuniction, Informetion & Education IEC 100000 70000 25000 Completed Yadgir Shahapur Anabi 2007-08 Houseing peshaliti other works 46000 26000 11500 Completed Yadgir Shahapur Anabi 2007-08 Construction of C.C. Raodd & Drainage From Men raod to Bassappa mingar house. CC Road and Drainage 114000 114000 28500 Completed Yadgir Shahapur Anabi 2007-08 Construction of C.C. Roadd & Drainage From Alipha patel house to Darga. CC Road and Drainage 115000 115000 28750 Completed Yadgir Shahapur Anabi 2007-08 Construction of Compund form G.P.H. School. Compound wall 115000 115000 28750 Completed Yadgir Shahapur Anabi 2007-08 Construction of C.C. Raod From Abibgouda house to CC Road 116000 116000 29000 Completed Yadgir Shahapur Anabi 2007-08 Construction of C.C. Road & Drainage From Yallamma tempal to Paramananda tempal. CC Road and Drainage 116000 116000 29000 Completed Yadgir Shahapur Anabi 2008-09 Communication & Information Education Programme IEC 31000 21000 7750 Completed Yadgir Shahapur Anabi 2008-09 Construction of Pinching Road From. Vishvaradhya matha to farm Pitching Work 44000 44000 11000 Completed Yadgir Shahapur Anabi 2008-09 Construction of C.C. Road & Drainage From Darktar house to Mallannagouda shahapur house. CC Road and Drainage 69000 69000 17250 Completed Yadgir Shahapur Anabi 2008-09 Construction of C.C. Road & Drainage From Ningayya tata tempal to Maremma. CC Road and Drainage 71000 71000 17750 Completed Yadgir Shahapur Anabi 2008-09 Construction of Drainage From School to Nala. Drainage 94000 94000 23500 Completed Yadgir Shahapur Anabi 2008-09 Construction of C.C. Road & Drainage From Girani katte to huded katte. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Anabi 2008-09 Construction of C.C. Road & Drainage From Ali patel house to Mahmad house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Anabi 2008-09 Construction of coumpand From G.P.S. school. School Compound and Buildings96000 96000 24000 Completed Yadgir Shahapur Anabi 2008-09 Construction of new anganavadi Anganavadi building 174000 174000 43500 Completed Yadgir Shahapur Anabi 2009-10 Construction of C.C. Road & Drainage From Bashumiya ingaligi house to Lalasab house. CC Road and Drainage 69000 69000 0 Completed Yadgir Shahapur Anabi 2009-10 Construction of Compound From urdu school. Compound wall 93000 93000 0 Completed Yadgir Shahapur Anabi 2009-10 Construction of C.C. Road & Drainage From Adda ruat toharijan tippanna house. CC Road and Drainage 118000 118000 0 Completed Yadgir Shahapur Anabi 2009-10 Tha Functions of comuniction, Informetion & Education IEC 30000 24000 7500 Completed Yadgir Shahapur Anabi 2009-10 Construction of Compound From School. Compound wall 70000 70000 17500 Completed Yadgir Shahapur Anabi 2009-10 Const of Animal Custudy animal Husbandry 90000 90000 22500 Completed Yadgir Shahapur Anabi 2009-10 Construction of C.C. Road & Drainage From Hanuman tempal to Namaj. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Anabi 2009-10 Construction of C.C. Road & Drainage From School to Dyavamma tempal. CC Road and Drainage 71000 0 71000 Completed Yadgir Shahapur Anabi 2010-11 Tha Functions of comuniction, Informetion & Education IEC 25000 0 0 Progress Yadgir Shahapur Anabi 2010-11 Tha Functions of comuniction, Informetion & Education IEC 25000 0 0 Progress Yadgir Shahapur Anabi 2010-11 Construction of C.C. Road from Yallamma tempal to Men road. CC Road 55000 0 0 Progress Yadgir Shahapur Anabi 2010-11 Construction of C.C. Road from Yallamma tempal to Men road. CC Road 55000 0 0 Progress Yadgir Shahapur Anabi 2010-11 Construction of C.C. Road & Drainage from gurulingeshvar tempal to Dyavamma tempal. CC Road and Drainage 74000 0 0 Progress

Yadgir Shahapur Anabi 2010-11 Construction of C.C. Road & Drainage from gurulingeshvar tempal to Dyavamma tempal. CC Road and Drainage 74000 0 0 Progress Yadgir Shahapur Anabi 2010-11 Construction of C.C. Road from Agasi to Shekhappa sahu house. CC Road 100000 10000 0 Completed Yadgir Shahapur Anabi 2010-11 Construction of C.C. Road & Drainage from somaldarga to Dongri house. CC Road and Drainage 73000 73000 0 Completed Yadgir Shahapur Anabi 2010-11 Construction of C.C. Road & Drainage from Maremma tempal badiger katte. CC Road and Drainage 83000 83000 0 Completed Yadgir Shahapur Anabi 2010-11 Construction of C.C. Road & Drainage from Sahu sharanappa house to Jir sangappa house. CC Road and Drainage 94000 0 94000 Completed Yadgir Shahapur Bendebembali 2006-07 Houseing peshaliti 1. Kadamma mareppa (S.C.) 2. Devamma Bhimashappa. other works 46000 46000 11500 Completed Yadgir Shahapur Bendebembali 2006-07 Construction of C.C. Road & Drainege From Anjanayya tempal to Matha CC Road and Drainage 47000 47000 11750 Completed Yadgir Shahapur Bendebembali 2006-07 Construction of C.C. Road & Drainege From Kulkarni house to Whater tyanka. CC Road and Drainage 48000 48000 12000 Completed Yadgir Shahapur Bendebembali 2006-07 Construction of C.C. Road & Drainege From Venkateshvar tempal to harijana mallappa house. CC Road and Drainage 48000 48000 12000 Completed Yadgir Shahapur Bendebembali 2006-07 Tha Functions of comuniction, Informetion & Education IEC 50000 28000 12500 Completed Yadgir Shahapur Bendebembali 2006-07 Construction of Staircase at bank of River the krishna other works 79000 79000 19750 Completed Yadgir Shahapur Bendebembali 2006-07 Construction of C.C. Road & Drainege From ambramma house to yankappa hirenor house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Bendebembali 2006-07 Construction of C.C. Road & Drainege From S.C. Boringaninda Maremma tempal. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Bendebembali 2006-07 Construction of C.C. Road & Drainege From Basana gouda house to yairaddi house. CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Bendebembali 2007-08 Houseing peshaliti 1. Moulanabhi w/o Hasanabi. other works 20000 20000 5000 Completed Yadgir Shahapur Bendebembali 2007-08 Const of Kondadagi other works 71000 71000 17750 Completed Yadgir Shahapur Bendebembali 2007-08 Tha Functions of comuniction, Informetion & Education IEC 85000 74000 21250 Completed Yadgir Shahapur Bendebembali 2007-08 Construction of C.C. Road & Drainage From Masadi to CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Bendebembali 2007-08 Construction of C.C. Road & Drainage From Hanamanta house to Sangama raod. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Bendebembali 2007-08 Construction of C.C. Road & Drainage From Polisegouda house to CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Bendebembali 2007-08 Construction of C.C. Road & Drainage From Sadashiva house to Virapannagouda house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Bendebembali 2007-08 Construction of C.C. Road & Drainage From Agasi to Bhiamaray adori hpuse. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Bendebembali 2007-08 Reconstruction of Whater. other works 96000 96000 24000 Completed Yadgir Shahapur Bendebembali 2007-08 Construction of Road & Drainage From Virabhadreshvara tempal to Mathapati house. CC Road and Drainage 121000 121000 30250 Completed Yadgir Shahapur Bendebembali 2007-08 Construction of C.C. Road & Drainage From Abbasali house to polisteshan. CC Road and Drainage 146000 146000 36500 Completed Yadgir Shahapur Bendebembali 2008-09 Communication & Information Education Programme IEC 75000 64000 18750 Completed Yadgir Shahapur Bendebembali 2008-09 Construction of C.C. Road & Drainage From Basavanna tempal to Jaraki bande. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Bendebembali 2008-09 Construction of C.C. Road & Drainage From Isrim prabhu house to Nagappa house. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Bendebembali 2008-09 Const Ledies Toilet near Mati House Construction of Toilet 144000 144000 36000 Completed Yadgir Shahapur Bendebembali 2008-09 Construction of C.C. Road & Drainage From agasi to Mallappa house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Bendebembali 2008-09 Construction of C.C. Road & Drainage From Mareteppa house to Maremma house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Bendebembali 2008-09 Construction of C.C. Road & Drainage From Sidramappagouda house to Amimasab house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Bendebembali 2008-09 Construction of Compunda From G.P.S. school. Compound wall 145000 145000 36250 Completed Yadgir Shahapur Bendebembali 2008-09 Construction of C.C. Road & Drainage From Hubballi ningappa house to Anjanaya tempal. CC Road and Drainage 146000 146000 36500 Completed Yadgir Shahapur Bendebembali 2008-09 Construction of Compunda From G.P.S. school. Compound wall 146000 146000 36500 Completed Yadgir Shahapur Bendebembali 2009-10 Tha Functions of comuniction, Informetion & Education IEC 20000 11000 5000 Completed Yadgir Shahapur Bendebembali 2009-10 Construction of C.C. Road & Drainage From Babu house to usman house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Bendebembali 2009-10 Drinkin Water Supply Meterial & Facility in Tumkur Village Drinking Water Supply 94000 94000 23500 Completed Yadgir Shahapur Bendebembali 2009-10 Drinkin Water Supply Meterial & Facility in Habsihal Village Drinking Water Supply 94000 94000 23500 Completed Yadgir Shahapur Bendebembali 2009-10 Construction of C.C. Road & Drainage From Ayyalappa house to Mullasaidan house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Bendebembali 2009-10 Drinkin Water Supply Meterial & Facility in Kadrapur Village Drinking Water Supply 95000 95000 23750 Completed Yadgir Shahapur Bendebembali 2009-10 Construction of C.C. Road & Drainage From School. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Bendebembali 2009-10 Construction of C.C. Road & Drainage From School. CC Road and Drainage 173000 173000 43250 Completed Yadgir Shahapur Bendebembali 2010-11 Const of Animel Custudy animal Husbandry 55000 55000 0 Completed Yadgir Shahapur Bendebembali 2010-11 Const of Animel Custudy animal Husbandry 55000 55000 0 Completed Yadgir Shahapur Bendebembali 2010-11 Const of Animel Custudy animal Husbandry 60000 60000 0 Completed Yadgir Shahapur Bendebembali 2010-11 Construction of C.C. Road from dyavamma tempal to Bapugouad house. CC Road 66000 66000 0 Completed Yadgir Shahapur Bendebembali 2010-11 Construction of C.C. Road from Nagareddeppagouda house to Malakanna gouda house. CC Road 75000 75000 0 Completed Yadgir Shahapur Bendebembali 2010-11 Construction of Grama panchayat. Construction of Gram Panchayat170000 Building 170000 0 Completed Yadgir Shahapur Bendebembali 2010-11 Tha Functions of comuniction, Informetion & Education IEC 26000 19000 5000 Completed Yadgir Shahapur Bendebembali 2010-11 Construction of C.C. Road from Men road to Mallamma house. CC Road 95000 0 95000 Completed Yadgir Shahapur Bilar 2006-07 Construction of C.C. Road & Braj From Rajahekhar goudara house. CC Road 47000 47000 11750 Completed Yadgir Shahapur Bilar 2006-07 Construction of C.C. Road From Giriyappa house to Divasya house CC Road 48000 48000 12000 Completed Yadgir Shahapur Bilar 2006-07 Construction of C.C. Road & Drainege From Bassayya svami house to Rachayya house. CC Road and Drainage 48000 48000 12000 Completed Yadgir Shahapur Bilar 2006-07 Construction of C.C. Road & Drainege From Peddamma House to Arjunigi. CC Road and Drainage 48000 48000 12000 Completed Yadgir Shahapur Bilar 2006-07 Reconstruction of G.P.School Room School Compound and Buildings48000 48000 12000 Completed Yadgir Shahapur Bilar 2006-07 Construction of C.C. Road From Sharanamma house to Whater tyanka S.C. Varda. CC Road 49000 49000 12250 Completed Yadgir Shahapur Bilar 2006-07 Reconstruction of Olda gram panchayt. Construction of Gram Panchayat71000 Building 71000 17750 Completed Yadgir Shahapur Bilar 2006-07 Construction of C.C. Road & Drainege From Policegoudar house to agasi CC Road and Drainage 72000 72000 18000 Completed Yadgir Shahapur Bilar 2006-07 Construction of C.C. Road & Drainege From School to house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Bilar 2006-07 Tha Functions of comuniction, Informetion & Education IEC 108000 85000 27000 Completed Yadgir Shahapur Bilar 2007-08 Tha Functions of comuniction, Informetion & Education IEC 95000 60000 23750 Completed Yadgir Shahapur Bilar 2007-08 Construction of compunda From grama pnchayat. Compound wall 158000 158000 39500 Completed Yadgir Shahapur Bilar 2007-08 Construction of New grama panchayt. Construction of Gram Panchayat593000 Building 593000 148250 Completed Yadgir Shahapur Bilar 2008-09 Communication & Information Education Programme IEC 48000 35000 12000 Completed Yadgir Shahapur Bilar 2008-09 Construction of C.C. Road & Drainage From anjaneya tempal to Bilhar road. CC Road and Drainage 94000 94000 23500 Completed Construction of C.C. Road & Drainage From Basalingappa madara house to Lingamma halagi Yadgir Shahapur Bilar 2008-09 CC Road and Drainage 94000 94000 23500 Completed house. Yadgir Shahapur Bilar 2008-09 Construction of C.C. Road & Drainage From Shilantara house to Sidramappa gouda house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Bilar 2008-09 Construction of C.C. Road & Drainage From Angadi to Anjanaya tempal. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Bilar 2008-09 Construction of C.C. Road & Drainage From Shankaralinga tempal to pujari house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Bilar 2008-09 Construction of Savaskrat bhavan From S.C. ariya. Community Hall 95000 95000 23750 Completed Yadgir Shahapur Bilar 2008-09 Construction of C.C. Road & Drainage From Hanamanta pujari house to Maremma tempal. CC Road and Drainage 96000 96000 24000 Completed

Yadgir Shahapur Bilar 2008-09 Construction of C.C. Road & Drainage From Mareppa ninganna house to Narasayya angawi. CC Road and Drainage 124000 124000 31000 Completed Yadgir Shahapur Bilar 2008-09 Construction of C.C. Road & Drainage From Raheman sab house to Usman sab house. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Bilar 2009-10 Tha Functions of comuniction, Informetion & Education IEC 25000 14000 6250 Completed Yadgir Shahapur Bilar 2009-10 Construction of C.C. Road & Drainage From Kandalli grama to Agasi. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Bilar 2009-10 Const of Dobhi Ghat and Drinking water facilites Drinking Water Supply 94000 94000 23500 Completed Yadgir Shahapur Bilar 2009-10 Const of Stone Picthing & Road in near river CC Road 119000 119000 29750 Completed Yadgir Shahapur Bilar 2009-10 Const of Animels Kustudy animal Husbandry 120000 120000 30000 Completed Yadgir Shahapur Bilar 2009-10 Drinkin Water Supply Meterial & Facility in Budanal Village Drinking Water Supply 121000 121000 30250 Completed Yadgir Shahapur Bilar 2009-10 Construction of C.C. Road & Drainage From Shankaralinga tempal to Police gouda house. CC Road and Drainage 143000 143000 35750 Completed Yadgir Shahapur Bilar 2010-11 Const of 1 room building near Darga other works 165000 165000 0 Completed Yadgir Shahapur Bilar 2010-11 New Pipline from Pump house to Water Tank Water Tank 240000 240000 0 Completed Yadgir Shahapur Bilar 2010-11 Tha Functions of comuniction, Informetion & Education IEC 42000 42000 3750 Completed Yadgir Shahapur Bilar 2010-11 Drinking Water Facilites to public Drinking Water Supply 94000 0 115000 Completed Yadgir Shahapur Chamnal 2006-07 Construction of Drainege From Melin tanda. Drainage 47000 47000 11750 Completed Yadgir Shahapur Chamnal 2006-07 Construction of Anganavadi. Anganavadi building 67000 67000 16750 Completed Yadgir Shahapur Chamnal 2006-07 Tha Functions of comuniction, Informetion & Education IEC 75000 40000 18750 Completed Yadgir Shahapur Chamnal 2006-07 Completed of L.P.S. School Room. School Compound and Buildings94000 94000 23500 Completed Yadgir Shahapur Chamnal 2006-07 Construction of Drainege From School to Baskar sir house. Drainage 95000 95000 23750 Completed Yadgir Shahapur Chamnal 2006-07 Water facilites to dobhi ghat Drinking Water Supply 96000 96000 24000 Completed Yadgir Shahapur Chamnal 2006-07 completed By Shopigh complekse from near Devi tempal. Shopping mall 96000 96000 24000 Completed Yadgir Shahapur Chamnal 2007-08 Tha Functions of comuniction, Informetion & Education IEC 51000 34000 12750 Completed Yadgir Shahapur Chamnal 2007-08 Construction of Drainage From Bhimappa tata tempal to borivel. Drainage 74000 74000 18500 Completed Yadgir Shahapur Chamnal 2007-08 Construction of C.C. Road & Drainage From Shranappagouda house to Anganavadi. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Chamnal 2007-08 Water facilites to dobhi ghat Drinking Water Supply 95000 95000 23750 Completed Yadgir Shahapur Chamnal 2007-08 Construction of C.C. Road & Drainage From Harijan vada to Men road. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Chamnal 2007-08 Lighting facilites to internal Roads New Area CC Road 96000 96000 24000 Completed Yadgir Shahapur Chamnal 2007-08 Construction of Drainage From Mallayya to Drainage 114000 114000 28500 Completed Yadgir Shahapur Chamnal 2007-08 Lighting facilites to internal Roads CC Road 115000 115000 28750 Completed Yadgir Shahapur Chamnal 2008-09 Construction of C.C. Road & Drainage From Men road to open wall. CC Road and Drainage 74000 74000 18500 Completed Yadgir Shahapur Chamnal 2008-09 Const of Dobhi Katta near water tank Water Tank 75000 75000 18750 Completed Yadgir Shahapur Chamnal 2008-09 Construction of C.C. Road & Drainage From Munnunayak house to Tempal. CC Road and Drainage 76000 76000 19000 Completed Yadgir Shahapur Chamnal 2008-09 Lighting facilites to internal roads CC Road 94000 94000 23500 Completed Yadgir Shahapur Chamnal 2008-09 Communication & Information Education Programme IEC 95000 82000 23750 Completed Yadgir Shahapur Chamnal 2008-09 Construction of C.C. Road & Drainage From Madarakal house to tempal in agasi. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Chamnal 2008-09 Construction of C.C. Road & Drainage From School to Amblappa house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Chamnal 2008-09 Construction of C.C. Road & Drainage From Sharanagouda open ples to Yallappa harijan house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Chamnal 2008-09 Construction of C.C. Road & Drainage From Men road to Chaturnayak house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Chamnal 2008-09 Construction of C.C. Road & Drainage From Basannagouda house to Parasanalli house. CC Road and Drainage 124000 124000 31000 Completed Yadgir Shahapur Chamnal 2009-10 Construction of C.C. Road & Drainage From Chandu house to Karevar house. CC Road and Drainage 56000 56000 0 Completed Yadgir Shahapur Chamnal 2009-10 Construction of C.C. Road & Drainage From School beck said to Loku nayak house. CC Road and Drainage 74000 74000 0 Completed Yadgir Shahapur Chamnal 2009-10 Construction of C.C. Road & Drainage From Telar siddanna house to Men road. CC Road and Drainage 96000 96000 0 Completed Yadgir Shahapur Chamnal 2009-10 Construction of C.C. Road & Drainage From Hanamappa house to Ghemu houae. CC Road and Drainage 44000 44000 11000 Completed Yadgir Shahapur Chamnal 2009-10 Construction of C.C. Road & Drainage From Kishan house to Sidrama house. CC Road and Drainage 45000 45000 11250 Completed Yadgir Shahapur Chamnal 2009-10 Const of Dobhi Ghat near Hanuman Temple Dhobi Ghat 45000 45000 11250 Completed Yadgir Shahapur Chamnal 2009-10 Tha Functions of comuniction, Informetion & Education IEC 53000 41000 13250 Completed Yadgir Shahapur Chamnal 2009-10 Construction of C.C. Road & Drainage From Gurutat men road to Malappa Alagur house. CC Road and Drainage 65000 65000 16250 Completed Yadgir Shahapur Chamnal 2009-10 Impli of Pipeline & Drinking Water facilites Drinking Water Supply 93000 93000 23250 Completed Yadgir Shahapur Chamnal 2009-10 Construction of C.C. Road & Drainage From Kannikeri house to Gogi road. CC Road and Drainage 133000 133000 33250 Completed Yadgir Shahapur Chamnal 2009-10 Construction of Drainage From Ashraya kaloni (S.C. warda) Drainage 74000 0 74000 Completed Yadgir Shahapur Chamnal 2010-11 Tha Functions of comuniction, Informetion & Education IEC 25000 0 0 Progress Yadgir Shahapur Chamnal 2010-11 Tha Functions of comuniction, Informetion & Education IEC 25000 0 0 Progress Yadgir Shahapur Chamnal 2010-11 Land leveling & Pipe line near Water Tank Water Tank 50000 0 0 Progress Yadgir Shahapur Chamnal 2010-11 Land leveling & Pipe line near Water Tank Water Tank 50000 0 0 Progress Yadgir Shahapur Chamnal 2010-11 Construction of Room from panchayat. Construction of Gram Panchayat55000 Building 0 0 Progress Yadgir Shahapur Chamnal 2010-11 Construction of Room from panchayat. Construction of Gram Panchayat55000 Building 0 0 Progress Yadgir Shahapur Chamnal 2010-11 Construction of C.C. Road & Drainage from Bhimu house to Bhagappa house. CC Road and Drainage 64000 0 0 Progress Yadgir Shahapur Chamnal 2010-11 Construction of C.C. Road & Drainage from Bhimu house to Bhagappa house. CC Road and Drainage 64000 0 0 Progress Yadgir Shahapur Chamnal 2010-11 Repair Works to Anganwadi Building Building Repair 70000 0 0 Progress Yadgir Shahapur Chamnal 2010-11 Repair Works to Anganwadi Building Building Repair 70000 0 0 Progress Yadgir Shahapur Chamnal 2010-11 Construction Drainage from School to Karabari house. Drainage 85000 85000 0 Completed Yadgir Shahapur Chamnal 2010-11 Repair Works to IPEP Building Repair Works 95000 95000 0 Completed Yadgir Shahapur Chamnal 2010-11 Construction of C.C. Road & Drainage from Dyavamma tempal to Chennappa sahu house. CC Road and Drainage 96000 96000 0 Completed Yadgir Shahapur Chamnal 2010-11 Construction of C.C. Road & Drainage from Chandrashekhar house to Ghemu house. CC Road and Drainage 80000 0 80000 Completed Yadgir Shahapur Chatnalli 2006-07 Tha Functions of comuniction, Informetion & Education IEC 42000 25000 10500 Completed Yadgir Shahapur Chatnalli 2006-07 Construction of C.C. Road & Drainege From Bhajantri house to Nagaraj House. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Chatnalli 2006-07 Riperi from Anganavadi. Building Repair 47000 47000 11750 Completed Yadgir Shahapur Chatnalli 2006-07 Construction of C.C. Road & Drainege From Hanuman tempal to Maremma tempal. CC Road and Drainage 47000 47000 11750 Completed Yadgir Shahapur Chatnalli 2006-07 Construction of Public Toilet Construction of Toilet 47000 47000 11750 Completed Yadgir Shahapur Chatnalli 2006-07 Construction of C.C. Road & Drainege From Bhagamma tempal to Open Walla CC Road and Drainage 48000 48000 12000 Completed Yadgir Shahapur Chatnalli 2006-07 Construction of C.C. Road & Drainege From Hadapad house to Shivaraya tempal. CC Road and Drainage 68000 68000 17000 Completed Yadgir Shahapur Chatnalli 2006-07 Construction of C.C. Road & Drainege From Maremma tempal to Maligoudar house. CC Road and Drainage 72000 72000 18000 Completed Yadgir Shahapur Chatnalli 2006-07 Construction of C.C. Road & Drainege From Masudi to Bhimanalli goudar house. CC Road and Drainage 73000 73000 18250 Completed Housing facility. 1. Mallamma wo/ Ningappa 2. Sabavva wo/ Timmayya 3. Siddalingamma wo/ Yadgir Shahapur Chatnalli 2006-07 other works 97000 97000 24250 Completed Ayyappa 4. Mallamma wo/ Nagayya Yadgir Shahapur Chatnalli 2007-08 Tha Functions of comuniction, Informetion & Education IEC 30000 22000 7500 Completed Yadgir Shahapur Chatnalli 2007-08 Houseing peshaliti 1. alisamma mallappa 2. tayamma sabanna S.C. other works 45000 45000 11250 Completed Yadgir Shahapur Chatnalli 2007-08 Construction of C.C. Road & Drainage From Road to Dodapadada tata house. CC Road and Drainage 74000 74000 18500 Completed Yadgir Shahapur Chatnalli 2007-08 Construction of C.C. Road & Drainage From Siddappa kuri house to Agasi. CC Road and Drainage 85000 85000 21250 Completed Yadgir Shahapur Chatnalli 2007-08 Construction of C.C. Road & Drainage From Kambar house to Men road. CC Road and Drainage 86000 86000 21500 Completed Yadgir Shahapur Chatnalli 2007-08 Construction of C.C. Road & Drainage From Mahmad choudri house to Nagappa enganer house. CC Road and Drainage 86000 86000 21500 Completed Yadgir Shahapur Chatnalli 2007-08 Construction of C.C. Road & Drainage From Ramappa house to Maremma tempal. CC Road and Drainage 86000 86000 21500 Completed Yadgir Shahapur Chatnalli 2007-08 Construction of C.C. Road & Drainage From Mallanna house to Dalapati gouda house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Chatnalli 2007-08 Construction of C.C. Road & Drainage From Gudesab house to Whater taynk. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Chatnalli 2007-08 Construction of C.C. Road & Drainage From Malingaraya tempal to Bhimaraya tuler house. CC Road and Drainage 95000 95000 23750 Completed Construction of C.C. Road & Drainage From Marthandappa pujari house to Benakappa Vadagera Yadgir Shahapur Chatnalli 2007-08 CC Road and Drainage 96000 96000 24000 Completed house. Yadgir Shahapur Chatnalli 2008-09 C.D. Works to near Mallappa Vadagera House Check dam 46000 46000 11500 Completed Yadgir Shahapur Chatnalli 2008-09 Communication & Information Education Programme IEC 48000 37000 12000 Completed Yadgir Shahapur Chatnalli 2008-09 Construction of C.C. Road & Drainage From Maremma tempal to Balun house. CC Road and Drainage 75000 75000 18750 Completed Yadgir Shahapur Chatnalli 2008-09 Construction of C.C. Road & Drainage From Ambamaheshvari tempal to Yadagiri styand. CC Road and Drainage 84000 84000 21000 Completed Yadgir Shahapur Chatnalli 2008-09 Construction of C.C. Road & Drainage From Janata kaloni. CC Road and Drainage 84000 84000 21000 Completed Yadgir Shahapur Chatnalli 2008-09 Construction of C.C. Road & Drainage From Bavar sidrama house to Bambai basappa house. CC Road and Drainage 85000 85000 21250 Completed

Yadgir Shahapur Chatnalli 2008-09 Construction of C.C. Road & Drainage From Nagappa bavar house to Siddappa pradani house. CC Road and Drainage 86000 86000 21500 Completed Yadgir Shahapur Chatnalli 2008-09 Construction of C.C. Road & Drainage From Ayakur ningappa house to Kambar gadde. CC Road and Drainage 87000 87000 21750 Completed Yadgir Shahapur Chatnalli 2008-09 Construction of C.C. Road & Drainage From Ningayya karanal house to Tippanna house. CC Road and Drainage 93000 93000 23250 Completed Yadgir Shahapur Chatnalli 2008-09 Construction of C.C. Road & Drainage From Men road to Badiger amblappa house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Chatnalli 2008-09 Construction of C.C. Road & Drainage From Vakilraddi house to Men road. CC Road and Drainage 94000 94000 23500 Completed Construction of C.C. Road & Drainage From Sahebagouda dalapati house to Mallanna maji Yadgir Shahapur Chatnalli 2008-09 CC Road and Drainage 95000 95000 23750 Completed membar house. Yadgir Shahapur Chatnalli 2009-10 Tha Functions of comuniction, Informetion & Education IEC 28000 28000 0 Completed Yadgir Shahapur Chatnalli 2009-10 Bavar sodramav house to Bambai basappa house. other works 95000 95000 0 Completed Yadgir Shahapur Chatnalli 2009-10 Repair Works to GP Choudi Katta Repair Works 95000 95000 0 Completed Yadgir Shahapur Chatnalli 2009-10 Construction of C.C. Road & Drainage From Malappa jogi house to Nagalingappa badager house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Chatnalli 2009-10 Construction of C.C. Road & Drainage From Open wall to Men road. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Chatnalli 2009-10 Construction of C.C. Road & Drainage From Yadagiri road. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Chatnalli 2009-10 Construction of C.C. Road & Drainage From Hanuman tempal to Basappa biradar house. CC Road and Drainage 143000 143000 35750 Completed

Yadgir Shahapur Chatnalli 2009-10 Construction of C.C. Road & Drainage From Basavaraj angadi to Jalagar khandappa house. CC Road and Drainage 94000 0 94000 Completed Yadgir Shahapur Chatnalli 2010-11 Construction of whater taynk & paipa lain from G.P.S. school. Pipeline 80000 0 0 Progress Yadgir Shahapur Chatnalli 2010-11 Construction of whater taynk & paipa lain from G.P.S. school. Pipeline 80000 0 0 Progress Yadgir Shahapur Chatnalli 2010-11 Construction of C.C. Road & Drainage from Hanuman tempal to Devaji house. CC Road and Drainage 70000 75000 0 Completed Yadgir Shahapur Chatnalli 2010-11 Tha Functions of comuniction, Informetion & Education IEC 75000 75000 0 Completed Yadgir Shahapur Chatnalli 2010-11 Construction of C.C. Road from Gopalappa house to Hadapad house. CC Road 90000 90000 0 Completed Yadgir Shahapur Chatnalli 2010-11 Construction of C.C. Road & Drainage from Hotpetha aminappa house to Kallayya tata house. CC Road and Drainage 94000 94000 0 Completed Yadgir Shahapur Chatnalli 2010-11 Construction of C.C. Road from Ningayya house to Hembaligar khandappa house. CC Road 115000 115000 0 Completed Yadgir Shahapur Chatnalli 2010-11 Construction of C.C. Road & Drainage from Nagappa vathar house to Sanna bhimaraya house. CC Road and Drainage 95000 0 95000 Completed Yadgir Shahapur Doranhalli 2006-07 Construction of C.C. Road & Drainege From Mallappa pujari house to Iranna house CC Road and Drainage 48000 48000 12000 Completed Yadgir Shahapur Doranhalli 2006-07 Construction of C.C. Road & Drainege From Nilankara Sharanappa house to Klyanarrav desayi. CC Road and Drainage 70000 70000 17500 Completed Yadgir Shahapur Doranhalli 2006-07 Construction of Metal Road & Drainege From Tayamma tempal to Masidi. CC Road 71000 71000 17750 Completed Yadgir Shahapur Doranhalli 2006-07 Construction of C.C. Road & Drainege From Irappa kuduri house to Siddappa rastapur. CC Road and Drainage 72000 72000 18000 Completed Yadgir Shahapur Doranhalli 2006-07 Construction of Compund Form whater tyanka Compound wall 72000 72000 18000 Completed Yadgir Shahapur Doranhalli 2006-07 Tha Functions of comuniction, Informetion & Education IEC 79000 35000 19750 Completed Yadgir Shahapur Doranhalli 2006-07 Construction of ranga mandir niyar Hanuman tempal. Drama Theater 97000 97000 24250 Completed Yadgir Shahapur Doranhalli 2006-07 Construction of Pablic tolyt Neyar by Hanuman tempal. Construction of Toilet 144000 144000 36000 Completed Construction of Metal Road & Drainage From Bhimanna drayvar house to Ramanna hotpet Yadgir Shahapur Doranhalli 2007-08 CC Road 95000 95000 23750 Completed house. Yadgir Shahapur Doranhalli 2007-08 Construction of C.C. Road & Drainage From Ramanna kuduri house to Kallappa juti house. CC Road and Drainage 96000 96000 24000 Completed

Yadgir Shahapur Doranhalli 2007-08 Construction of C.C. Road & Drainage From Doddamareddi house to Ambabhavani tempal. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Doranhalli 2007-08 Construction of C.C. Road & Drainage From Hirematha to men road. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Doranhalli 2007-08 Construction of C.C. Road & Drainage From Vaddar house Nabhisab shahapur house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Doranhalli 2007-08 Construction of C.C. Road & Drainage From Koni ningappa house to Ishvar tempal. CC Road and Drainage 146000 146000 36500 Completed Yadgir Shahapur Doranhalli 2007-08 Construction of C.C. Road & Drainage From Shahapur Yadagir road to Kambar gangappa house. CC Road and Drainage 146000 146000 36500 Completed Yadgir Shahapur Doranhalli 2007-08 Construction of C.C. Road From Karajar farm to Butanur house. CC Road 146000 146000 36500 Completed Yadgir Shahapur Doranhalli 2007-08 Construction of shopping complex. Shopping mall 345000 345000 86250 Completed Yadgir Shahapur Doranhalli 2008-09 Communication & Information Education Programme IEC 68000 59000 17000 Completed Construction of C.C. Road & Drainage From Channappa ourad house to Devindrappa hosmani Yadgir Shahapur Doranhalli 2008-09 CC Road and Drainage 94000 94000 23500 Completed house. Yadgir Shahapur Doranhalli 2008-09 Construction of C.C. Road & Drainage From Manappa house to Sanganna mallagonda house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Doranhalli 2008-09 Construction of C.C. Road & Drainage From Chapat house to Men road. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Doranhalli 2008-09 Construction of Urdu school ruom. School Compound and Buildings119000 119000 29750 Completed Yadgir Shahapur Doranhalli 2008-09 Construction of C.C. Road & Drainage From Sanganna desayi house to Men road. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Doranhalli 2008-09 Construction of School compund. Construction of School Building144000 144000 36000 Completed Yadgir Shahapur Doranhalli 2008-09 Construction of Anganavadi. Anganavadi building 145000 145000 36250 Completed Yadgir Shahapur Doranhalli 2008-09 Construction of C.C. Road & Drainage From Nagayya stavar matha to Ishvar koti house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Doranhalli 2008-09 Construction of Bayali ranga mandir From School. School Compound and Buildings146000 146000 36500 Completed Yadgir Shahapur Doranhalli 2008-09 Const of Grup Ladies Toilet Construction of Toilet 169000 169000 42250 Completed Yadgir Shahapur Doranhalli 2008-09 Construction of Compund From S.P.S. school. Compound wall 194000 194000 48500 Completed Yadgir Shahapur Doranhalli 2008-09 other works other works 195000 195000 48750 Completed Yadgir Shahapur Doranhalli 2009-10 Construction of C.C. Road & Drainage From Halleraya tempal to Basanna tempal. CC Road and Drainage 94000 94000 0 Completed Yadgir Shahapur Doranhalli 2009-10 Construction of C.C. Road & Drainage From Hanuman tempal to Maremma tempal. CC Road and Drainage 94000 94000 0 Completed Yadgir Shahapur Doranhalli 2009-10 Construction of C.C. Road & Drainage From Hugara house to Hudeda house. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Doranhalli 2009-10 Construction of C.C. Road & Drainage From Tayamma tempal to Masidi. CC Road and Drainage 96000 96000 0 Completed Yadgir Shahapur Doranhalli 2009-10 Construction of C.C. Road & Drainage From Chikka matha to Men road. CC Road and Drainage 44000 44000 11000 Completed Yadgir Shahapur Doranhalli 2009-10 Tha Functions of comuniction, Informetion & Education IEC 46000 31000 11500 Completed Yadgir Shahapur Doranhalli 2009-10 Construction of Drainage From Nala to Kanni road. Drainage 94000 94000 23500 Completed Construction of C.C. Road & Drainage From Mareppa halabavi house to Marilinagappa kakasal Yadgir Shahapur Doranhalli 2009-10 CC Road and Drainage 95000 95000 23750 Completed house. Yadgir Shahapur Doranhalli 2009-10 Construction of C.C. Road & Drainage From Borivel to Nala. (S.C. & S.T. warda) CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Doranhalli 2009-10 Construction of C.C. Road & Drainage From Hanamanta house to Tayamma tempal. CC Road and Drainage 94000 0 94000 Completed Yadgir Shahapur Doranhalli 2010-11 Tha Functions of comuniction, Informetion & Education IEC 30000 30000 0 Completed Yadgir Shahapur Doranhalli 2010-11 Construction of C.C. Road & Drainage from Nilakantha desayi house to Men road. CC Road and Drainage 55000 55000 0 Completed Yadgir Shahapur Doranhalli 2010-11 Construction of C.C. Road & Drainage from Tangadagi ayyamma house to andeli sabanna house. CC Road and Drainage 80000 80000 0 Completed

Yadgir Shahapur Doranhalli 2010-11 Construction of C.C. Road & Drainage from Kallur govindappa house to Revanasiddappa house. CC Road and Drainage 90000 90000 0 Completed Yadgir Shahapur Doranhalli 2010-11 Construction of Drainage from Borivel to Tempal. Drainage 90000 90000 0 Completed Yadgir Shahapur Doranhalli 2010-11 Construction of C.C. Road & Drainage from Basanna tempal to Tayamma tempal. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Doranhalli 2010-11 Construction of C.C. Road & Drainage from Gatnur basanna house to Hayyalappa gatnur houae. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Doranhalli 2010-11 Construction of C.C. Road & Drainage from School to Hanuman tempal. CC Road and Drainage 85000 0 85000 Completed Yadgir Shahapur Gogikona 2006-07 Construction of grama panchayat compound Compound wall 48000 48000 12000 Completed Yadgir Shahapur Gogikona 2006-07 Construction of C.C. Road & Drainege From Basayya dodmani to Nagappa house. CC Road and Drainage 71000 71000 17750 Completed Yadgir Shahapur Gogikona 2006-07 Construction of C.C. Road & Drainege From Nagappa bandalli house to Men Rood. CC Road and Drainage 72000 72000 18000 Completed Yadgir Shahapur Gogikona 2006-07 Tha Functions of comuniction, Informetion & Education IEC 97000 45000 24250 Completed Yadgir Shahapur Gogikona 2006-07 Construction of C.C. Road & Drainege From Nijagappa gorek house to Sharanabasappa house. CC Road and Drainage 97000 97000 24250 Completed Construction of C.C. Road & Drainege From Sharanabasappa pameti house to Kanchanakavi men Yadgir Shahapur Gogikona 2006-07 CC Road and Drainage 98000 98000 24500 Completed rood. Yadgir Shahapur Gogikona 2006-07 Construction of Womens toilet Vard No. 1 Construction of Toilet 122000 122000 30500 Completed Yadgir Shahapur Gogikona 2007-08 Construction of C.C. Road & Drainage From Maralappa halagi house to Padasali house. CC Road and Drainage 44000 44000 11000 Completed Yadgir Shahapur Gogikona 2007-08 Construction of C.C. Road & Drainage From Hulagamma tempal to Mallinatha house. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Gogikona 2007-08 Tha Functions of comuniction, Informetion & Education IEC 69000 59000 17250 Completed Yadgir Shahapur Gogikona 2007-08 Construction of C.C. Road & Drainage From Hotapetha house to tammagol house. CC Road and Drainage 71000 71000 17750 Completed Construction of C.C. Road & Drainage From Chandrappa New house to Channappa badager Yadgir Shahapur Gogikona 2007-08 CC Road and Drainage 96000 96000 24000 Completed house. Yadgir Shahapur Gogikona 2007-08 Construction of C.C. Road & Drainage From Maligoud house to Nasi house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Gogikona 2007-08 Construction of C.C. Road & Drainage From Jayaguru matha to Bhimappa hosamani house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Gogikona 2007-08 Reconstruction of Gov.housepatl & Ashraya kaloni. Hospital work 145000 145000 36250 Completed Yadgir Shahapur Gogikona 2007-08 Construction of C.C. Road & Drainage From Chandrayya diggi house to Kashinatha angadi. CC Road and Drainage 244000 244000 61000 Completed Yadgir Shahapur Gogikona 2008-09 Construction of C.C. Road & Drainage CC Road and Drainage 44000 44000 11000 Completed Yadgir Shahapur Gogikona 2008-09 Const of Compound Wall to Govt H.P. School Compound wall 45000 45000 11250 Completed Yadgir Shahapur Gogikona 2008-09 Construction of C.C. Road & Drainage From Chandapasha house to Nala. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gogikona 2008-09 Construction of C.C. Road & Drainage From Jaiguru matha to Bhimappa hosmani house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gogikona 2008-09 Construction of C.C. Road & Drainage From Tangadigi house to Bairaddi house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gogikona 2008-09 Const of Ladies toilet in Harijan Wada Construction of Toilet 94000 94000 23500 Completed Yadgir Shahapur Gogikona 2008-09 Communication & Information Education Programme IEC 95000 84000 23750 Completed Construction of C.C. Road & Drainage From Channareddi malhar house to Bhimanna kondikar Yadgir Shahapur Gogikona 2008-09 CC Road and Drainage 95000 95000 23750 Completed house. Yadgir Shahapur Gogikona 2008-09 Construction of C.C. Road & Drainage From Mallappa sitini house to Shankrappa house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Gogikona 2008-09 Construction of C.C. Road & Drainage From Men road to Basaveshvar kaloni. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Gogikona 2008-09 Const of Ladies toilet near kere Construction of Toilet 95000 95000 23750 Completed Yadgir Shahapur Gogikona 2008-09 Construction of C.C. Road & Drainage From Yalagurappa house to Amblappa mantol house. CC Road and Drainage 96000 96000 24000 Completed

Yadgir Shahapur Gogikona 2008-09 Construction of C.C. Road & Drainage From Bushetti house to Mahadevappa kollur house. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Gogikona 2009-10 Construction of C.C. Road & Drainage From Ramanayak tempal to Men road. CC Road and Drainage 44000 44000 0 Completed Yadgir Shahapur Gogikona 2009-10 Construction of C.C. Road & Drainage From Nurun house to Ramappa house. CC Road and Drainage 615000 615000 0 Completed Yadgir Shahapur Gogikona 2009-10 Tha Functions of comuniction, Informetion & Education IEC 45000 32000 11250 Completed Yadgir Shahapur Gogikona 2009-10 Construction of Drainage From Goudar agasi to Kanchana kavi kras. Drainage 600000 600000 150000 Completed Yadgir Shahapur Gogikona 2010-11 Const of judicial katte Community Hall 50000 0 0 Progress Yadgir Shahapur Gogikona 2010-11 Const of judicial katte Community Hall 50000 0 0 Progress Yadgir Shahapur Gogikona 2010-11 Construction of C.C. Road & Drainage from open wall to Men road. CC Road and Drainage 100000 0 0 Progress Yadgir Shahapur Gogikona 2010-11 Construction of C.C. Road & Drainage from open wall to Men road. CC Road and Drainage 100000 0 0 Progress Yadgir Shahapur Gogikona 2010-11 Const of Grama Panchayat fist floor building Construction of Gram Panchayat450000 Building 450000 0 Completed Yadgir Shahapur Gogikona 2010-11 Tha Functions of comuniction, Informetion & Education IEC 16000 0 16000 Progress Yadgir Shahapur Gogikona 2010-11 Tha Functions of comuniction, Informetion & Education IEC 16000 0 16000 Progress Yadgir Shahapur Gogipeth 2006-07 Tha Functions of comuniction, Informetion & Education IEC 57000 39000 14250 Completed Yadgir Shahapur Gogipeth 2006-07 Construction of Tolyt from neyar Ramayya doddi. Construction of Toilet 142000 142000 35500 Completed Yadgir Shahapur Gogipeth 2006-07 Construction of C.C. Road & Drainege From Grama panchayat to Siledar house. CC Road and Drainage 146000 146000 36500 Completed Yadgir Shahapur Gogipeth 2006-07 Construction of C.C. Road & Drainege From Agi house to Kashipati sir house. CC Road and Drainage 194000 194000 48500 Completed Yadgir Shahapur Gonal 2006-07 Tha Functions of comuniction, Informetion & Education IEC 41000 26000 10250 Completed Yadgir Shahapur Gonal 2006-07 Construction of C.C. Road & Drainege From Men rood to CC Road and Drainage 47000 47000 11750 Completed Yadgir Shahapur Gonal 2006-07 Implimantation of Agasi Main Gate other works 48000 48000 12000 Completed Yadgir Shahapur Gonal 2006-07 Construction of C.C. Road & Drainege From Mallayya house to Anjanayya house. CC Road and Drainage 71000 71000 17750 Completed Yadgir Shahapur Gonal 2006-07 Construction of Womens toilet behind school Construction of Toilet 71000 71000 17750 Completed Yadgir Shahapur Gonal 2006-07 Construction of Womens toilet at S.C. area Construction of Toilet 71000 71000 17750 Completed Yadgir Shahapur Gonal 2006-07 Construction of C.C. Road & Drainege From Mallannagouda house to gundamma hadapad house. CC Road and Drainage 72000 72000 18000 Completed Yadgir Shahapur Gonal 2006-07 Construction of Womens toilet near Bada's road Construction of Toilet 72000 72000 18000 Completed Yadgir Shahapur Gonal 2006-07 Construction of Womens toilet at S.C. area Construction of Toilet 73000 73000 18250 Completed Yadgir Shahapur Gonal 2007-08 Tha Functions of comuniction, Informetion & Education IEC 52000 34000 13000 Completed Yadgir Shahapur Gonal 2007-08 Construction of C.C. Road & Drainage From Sujnanappa house to Doddam house. CC Road and Drainage 69000 69000 17250 Completed Yadgir Shahapur Gonal 2007-08 Construction of C.C. Road & Drainage From Ambuja house to Nagappa vadi house. CC Road and Drainage 70000 70000 17500 Completed Yadgir Shahapur Gonal 2007-08 Construction of C.C. Road & Drainage From Agasi to Ramakka tempal. CC Road and Drainage 71000 71000 17750 Completed Yadgir Shahapur Gonal 2007-08 Construction of C.C. Road & Drainage From Harijan vada to Masidi. CC Road and Drainage 71000 71000 17750 Completed Yadgir Shahapur Gonal 2007-08 Construction of C.C. Road & Drainage From School to Nala. CC Road and Drainage 71000 71000 17750 Completed Yadgir Shahapur Gonal 2007-08 Construction of C.C. Road & Drainage From Dodda mareppa house to tippanna house. CC Road and Drainage 72000 72000 18000 Completed Yadgir Shahapur Gonal 2007-08 Construction of C.C. Road & Drainage From Malleshi house to Agasi. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gonal 2007-08 Construction of C.C. Road & Drainage From Chandasa house to Goravar house. CC Road and Drainage 119000 119000 29750 Completed Yadgir Shahapur Gonal 2008-09 Communication & Information Education Programme IEC 48000 33000 12000 Completed Yadgir Shahapur Gonal 2008-09 Construction of C.C. Road & Drainage From Hanamanta house to Durgappa house. (S.C. warda) CC Road and Drainage 84000 84000 21000 Completed Yadgir Shahapur Gonal 2008-09 Construction of C.C. Road & Drainage From Men road to Iranngouda house. CC Road and Drainage 84000 84000 21000 Completed Yadgir Shahapur Gonal 2008-09 Const of Business Complex near hanuman temple Shopping mall 85000 85000 21250 Completed Yadgir Shahapur Gonal 2008-09 Construction of C.C. Road & Drainage From Sanjivappa angadi to Kalamma tempal. CC Road and Drainage 85000 85000 21250 Completed Construction of C.C. Road & Drainage From Mahadevappa s/o basappa (S.C.) house to Durgadevi Yadgir Shahapur Gonal 2008-09 CC Road and Drainage 96000 96000 24000 Completed tempal Yadgir Shahapur Gonal 2008-09 Construction of C.C. Road & Drainage From Panchayat to Hanamanta house. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Gonal 2008-09 Construction of C.C. Road & Drainage From Kandalli ellamma house to Kanapur ningayya house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Gonal 2008-09 Construction of C.C. Road & Drainage From Police gouda house to Sugur men road. CC Road and Drainage 194000 194000 48500 Completed Yadgir Shahapur Gonal 2009-10 Tha Functions of comuniction, Informetion & Education IEC 60000 44000 15000 Completed Yadgir Shahapur Gonal 2009-10 Const of Cement Concrete near Tayamma Temple other works 75000 75000 18750 Completed Yadgir Shahapur Gonal 2009-10 Construction of C.C. Road & Drainage From Gaddada bhimappa house to Yallappa ashappa house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gonal 2009-10 Construction of C.C. Road & Drainage From Gudusab house to Agasi. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gonal 2009-10 Construction of C.C. Road & Drainage From Harijan nagappa house to Harijan sangamma house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gonal 2009-10 Construction of C.C. Road & Drainage From Maligoudar house to Shekhappa house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gonal 2009-10 Construction of C.C. Road & Drainage From Men road borivel to Suznanappa houae. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Gonal 2009-10 Construction of C.C. Road & Drainage From Paravattappa house to Nala road. CC Road and Drainage 103000 103000 25750 Completed Yadgir Shahapur Gonal 2009-10 Construction of C.C. Road & Drainage From Ramalingappa sahu house to Svami house. CC Road and Drainage 114000 114000 28500 Completed Yadgir Shahapur Gonal 2009-10 Construction of C.C. Road & Drainage From Goravar katte to Maremma tempal. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Gonal 2010-11 Construction of C.C. Road from Gaddeppa house to School. CC Road 55000 0 0 Progress Yadgir Shahapur Gonal 2010-11 Construction of C.C. Road from Gudusabhouse to Nala. CC Road 55000 0 0 Progress Yadgir Shahapur Gonal 2010-11 Construction of C.C. Road from Gaddeppa house to School. CC Road 55000 0 0 Progress Yadgir Shahapur Gonal 2010-11 Construction of C.C. Road from Gudusabhouse to Nala. CC Road 55000 0 0 Progress Yadgir Shahapur Gonal 2010-11 Tha Functions of comuniction, Informetion & Education IEC 26000 15000 0 Progress Yadgir Shahapur Gonal 2010-11 Tha Functions of comuniction, Informetion & Education IEC 26000 15000 0 Progress Yadgir Shahapur Gonal 2010-11 Construction of C.C. Road from Angadi to Doddadurgappa house. CC Road 55000 55000 0 Completed Yadgir Shahapur Gonal 2010-11 Construction of C.C. Road from Nagappa house to Men road. CC Road 60000 60000 0 Completed Yadgir Shahapur Gonal 2010-11 Construction of C.C. Road from Sunnad Durgappa House to Nalha road CC Road 65000 65000 0 Completed Yadgir Shahapur Gonal 2010-11 Construction of C.C. Road from Agasi to Tayamma tempal. CC Road 66000 66000 0 Completed Yadgir Shahapur Gonal 2010-11 Construction of C.C. Road from School to Hampayya house. CC Road 110000 110000 0 Completed Yadgir Shahapur Gonal 2010-11 Construction of C.C. Road from Agasi to Choudi. CC Road 95000 0 95000 Completed Yadgir Shahapur Gulsaram 2006-07 Tha Functions of comuniction, Informetion & Education IEC 65000 48000 16250 Completed Yadgir Shahapur Gulsaram 2006-07 Construction of C.C. Road & Drainege From Oppan wall to Anjanayya tempal. CC Road and Drainage 68000 68000 17000 Completed Yadgir Shahapur Gulsaram 2006-07 Construction of C.C. Road & Drainege From Ambedkar bhavan to Chappar house. CC Road and Drainage 78000 78000 19500 Completed Yadgir Shahapur Gulsaram 2006-07 Construction of C.C. Road & Drainege From Danada kondadagi to Latapa sab house. CC Road and Drainage 87000 87000 21750 Completed Yadgir Shahapur Gulsaram 2006-07 Construction of C.C. Road & Drainege From Chitta jalal house to Kemppa khaja house. CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Gulsaram 2006-07 Construction of Womens toilet at harijan ward Construction of Toilet 97000 97000 24250 Completed Yadgir Shahapur Gulsaram 2006-07 Construction of C.C. Road & Drainege From School to Pampannagouda house. CC Road and Drainage 98000 98000 24500 Completed Yadgir Shahapur Gulsaram 2007-08 Construction of Drainage From Anganavadi to Bhiamappa house. Drainage 65000 65000 16250 Completed Yadgir Shahapur Gulsaram 2007-08 Construction of C.C. Road & Drainage From Anjanappa house to Dyavamma tempal. CC Road and Drainage 66000 66000 16500 Completed Yadgir Shahapur Gulsaram 2007-08 Construction of C.C. Road & Drainage From Korevar house to Taravar house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gulsaram 2007-08 Construction of Compunda From Anganavadi. Compound wall 94000 94000 23500 Completed Yadgir Shahapur Gulsaram 2007-08 Construction of Anganavadi. Anganavadi building 95000 95000 23750 Completed Yadgir Shahapur Gulsaram 2007-08 Construction of C.C. Road & Drainage From mulla wall to Gouda house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Gulsaram 2007-08 Construction of C.C. Road & Drainage From S.C. Borivel to Mahadevappa chikka house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Gulsaram 2007-08 Construction of Drainage From School to Durga tempal. Drainage 98000 85000 24500 Completed Yadgir Shahapur Gulsaram 2008-09 Communication & Information Education Programme IEC 48000 36000 12000 Completed Yadgir Shahapur Gulsaram 2008-09 Drinking water facilites with new borewell Drinking Water Supply 70000 70000 17500 Completed Yadgir Shahapur Gulsaram 2008-09 Construction of C.C. Road & Drainage From Goudara yallamma house to Hanumantraya house. CC Road and Drainage 94000 94000 23500 Completed

Yadgir Shahapur Gulsaram 2008-09 Construction of C.C. Road & Drainage From Maligoudar house to Nagappa bander house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gulsaram 2008-09 Construction of C.C. Road & Drainage From S.C. borivel to Men road. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gulsaram 2008-09 Construction of C.C. Road & Drainage From Siddappa allalli house to Tayamma madival house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gulsaram 2008-09 Construction of C.C. Road & Drainage From Badiger house to lingaraddi house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Gulsaram 2008-09 Construction of C.C. Road & Drainage From Kamanna house to Talavar house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Gulsaram 2008-09 Construction of C.C. Road & Drainage From Mallikarjun badad house to School. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Gulsaram 2008-09 Construction of C.C. Road & Drainage From Sidramappa sahu house to School. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Gulsaram 2008-09 Const of Group Toilet Construction of Toilet 114000 114000 28500 Completed Yadgir Shahapur Gulsaram 2009-10 Tha Functions of comuniction, Informetion & Education IEC 40000 31000 10000 Completed Yadgir Shahapur Gulsaram 2009-10 Construction of C.C. Road & Drainage From Old school to New school. CC Road and Drainage 44000 44000 11000 Completed Yadgir Shahapur Gulsaram 2009-10 Construction of C.C. Road & Drainage From Basavaraj vangera house. CC Road and Drainage 45000 45000 11250 Completed Yadgir Shahapur Gulsaram 2009-10 Construction of C.C. Road & Drainage From Honnamma house to Svami basappa house. CC Road and Drainage 73000 73000 18250 Completed Yadgir Shahapur Gulsaram 2009-10 Const of Animal Custudy animal Husbandry 74000 74000 18500 Completed Yadgir Shahapur Gulsaram 2009-10 Construction of C.C. Road & Drainage From Bhimanna goudar angadi to Mallanna gouda house. CC Road and Drainage 83000 83000 20750 Completed Yadgir Shahapur Gulsaram 2009-10 Construction of C.C. Road & Drainage From Daval sab house to Hiregouda open wall. CC Road and Drainage 85000 85000 21250 Completed Yadgir Shahapur Gulsaram 2009-10 Construction of C.C. Road & Drainage From Kumara svami haspetal to Avvamma house. CC Road and Drainage 86000 86000 21500 Completed Yadgir Shahapur Gulsaram 2009-10 Construction of C.C. Road & Drainage From Masidi to Khasim patel house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gulsaram 2009-10 Construction of C.C. Road & Drainage From Nagappa pira tat house to Hotal. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Gulsaram 2010-11 Tha Functions of comuniction, Informetion & Education IEC 54000 54000 0 Completed Construction of C.C. Road & Drainage from Malavva chappar house to Hanamantraya kiriyal Yadgir Shahapur Gulsaram 2010-11 CC Road and Drainage 90000 90000 0 Completed house. Yadgir Shahapur Gulsaram 2010-11 Construction of C.C. Road & Drainage from Devappa badager house to School. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Gulsaram 2010-11 Construction of C.C. Road & Drainage from Bhimappa house to Open wall. CC Road and Drainage 100000 100000 0 Completed Yadgir Shahapur Gulsaram 2010-11 Construction of C.C. Road & Drainage from Siddappa bavur house to Mallappa agasar house. CC Road and Drainage 105000 105000 0 Completed Yadgir Shahapur Gulsaram 2010-11 Construction of C.C. Road & Drainage from Mallamma iliger house to School. CC Road and Drainage 50000 0 50000 Completed Yadgir Shahapur Gulsaram 2010-11 Construction of C.C. Road & Drainage from Ashraya kaloni. CC Road and Drainage 85000 0 85000 Completed Yadgir Shahapur Haiyyal.b. 2006-07 Tha Functions of comuniction, Informetion & Education IEC 68000 46000 17000 Completed Yadgir Shahapur Haiyyal.b. 2006-07 Construction of Womens toilet Construction of Toilet 72000 72000 18000 Completed Yadgir Shahapur Haiyyal.b. 2006-07 Construction of C.C. Road & Drainege From Hulagamma tempal to Pirappa house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Haiyyal.b. 2006-07 Construction of C.C. Road & Drainege From Devappa padmanna house to Dyavamma tempal. CC Road and Drainage 97000 97000 24250 Completed

Yadgir Shahapur Haiyyal.b. 2006-07 Construction of C.C. Road & Drainege From Shairajappa gouda house to Maruti tempal. CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Haiyyal.b. 2006-07 Construction of C.C. Road & Drainege From Nabisab House to school CC Road and Drainage 98000 98000 24500 Completed Yadgir Shahapur Haiyyal.b. 2006-07 Construction of C.C. Road & Drainege From Shankramma house to Hanuman tempal. CC Road and Drainage 98000 98000 24500 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Tha Functions of comuniction, Informetion & Education IEC 53000 42000 13250 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Construction of C.C. Road & Drainage From Holi katte to Desayi house. CC Road and Drainage 104000 104000 26000 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Construction of C.C. Road & Drainage From Karepp tata tempal to road. CC Road and Drainage 104000 104000 26000 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Construction of C.C. Road & Drainage From Malappa house to Hasubandi. CC Road and Drainage 104000 104000 26000 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Construction of C.C. Road & Drainage From Timmanna house to Kattegar house. CC Road and Drainage 104000 104000 26000 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Construction of C.C. Road & Drainage From Basavanna katte to Hanuaman tempal. CC Road and Drainage 105000 105000 26250 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Construction of C.C. Road & Drainage From Dori Ningappa house to Ramappa house. CC Road and Drainage 105000 105000 26250 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Construction of C.C. Road & Drainage From Hanumanta house to Open wall. CC Road and Drainage 105000 105000 26250 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Construction of C.C. Road & Drainage From Nagamma kurubar house to Birappa tempal. CC Road and Drainage 105000 105000 26250 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Construction of C.C. Road & Drainage From Hayyal road to Tambakadaddi. CC Road and Drainage 106000 106000 26500 Completed Yadgir Shahapur Haiyyal.b. 2007-08 Construction of C.C. Road & Drainage From Ningayya katti to Virupakxappa house. CC Road and Drainage 106000 106000 26500 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Communication & Information Education Programme IEC 48000 33000 12000 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Construction of Anganavadi. Anganavadi building 94000 94000 23500 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Construction of C.C. Road & Drainage From Flourmill to Agasi. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Construction of C.C. Road & Drainage From Siddayya house to Flourmill CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Construction of C.C. Road & Drainage From Agasi to Dyavamma tempal. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Construction of C.C. Road & Drainage From Hanumanta house to Maremma tempal. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Const of Dobhi Ghat & Drinkin Water Facilites to Cows Drinking Water Supply 95000 95000 23750 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Construction of C.C. Road & Drainage From Marilingappa house to Bhirappa tempal. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Construction of C.C. Road & Drainage From School back siad to Huligemm tempal. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Construction of compund from G.P.S.school . Compound wall 119000 119000 29750 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Construction of compund from G.P.S.school . Compound wall 144000 144000 36000 Completed Yadgir Shahapur Haiyyal.b. 2008-09 Construction of C.C. Road & Drainage From Channaraddi house to Kumbara ninganna house. CC Road and Drainage 243000 243000 60750 Completed Yadgir Shahapur Haiyyal.b. 2009-10 Construction of C.C. Road & Drainage From Koravar shankrappa house to Hasu bande. CC Road and Drainage 68000 68000 0 Completed Yadgir Shahapur Haiyyal.b. 2009-10 Construction of C.C. Road & Drainage From Channamallappa hotal to Karikal house. CC Road and Drainage 69000 69000 0 Completed Yadgir Shahapur Haiyyal.b. 2009-10 Construction of C.C. Road & Drainage From Gurunatharaddi house to Whater taynk. CC Road and Drainage 69000 69000 0 Completed Yadgir Shahapur Haiyyal.b. 2009-10 Tha Functions of comuniction, Informetion & Education IEC 69000 69000 0 Completed Construction of C.C. Road & Drainage From Channareddi desayi house to Kumbar ninganna Yadgir Shahapur Haiyyal.b. 2009-10 CC Road and Drainage 70000 70000 0 Completed house. Yadgir Shahapur Haiyyal.b. 2009-10 Construction of C.C. Road & Drainage From Gram,adevate tempal to Bajar. CC Road and Drainage 69000 69000 17250 Completed Yadgir Shahapur Haiyyal.b. 2009-10 Construction of C.C. Road & Drainage From Ramalinagapp tempal to Ningappa house. CC Road and Drainage 70000 70000 17500 Completed Yadgir Shahapur Haiyyal.b. 2009-10 Construction of C.C. Road & Drainage From Siddanna house to Marigouda house. CC Road and Drainage 70000 70000 17500 Completed Yadgir Shahapur Haiyyal.b. 2009-10 Construction of C.C. Road & Drainage From Mallayya tempal to Nagayya house. CC Road and Drainage 71000 71000 17750 Completed Yadgir Shahapur Haiyyal.b. 2009-10 Construction of C.C. Road & Drainage From Mareppa house to Ramappa house. CC Road and Drainage 71000 71000 17750 Completed Yadgir Shahapur Haiyyal.b. 2009-10 Construction of C.C. Road & Drainage From Hanumanta house to Open wall. CC Road and Drainage 69000 0 69000 Completed Yadgir Shahapur Haiyyal.b. 2010-11 Tha Functions of comuniction, Informetion & Education IEC 30000 30000 0 Completed Yadgir Shahapur Haiyyal.b. 2010-11 Construction of C.C. Road & Drainage from Maremma tempal Agasi. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Haiyyal.b. 2010-11 Construction of C.C. Road & Drainage from Basanna angadi to School CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Haiyyal.b. 2010-11 Construction of C.C. Road & Drainage from Hayalappa house to Sabanna house. CC Road and Drainage 100000 100000 0 Completed Yadgir Shahapur Haiyyal.b. 2010-11 Construction of C.C. Road & Drainage from Open wall to Piroja house. CC Road and Drainage 100000 100000 0 Completed Yadgir Shahapur Haiyyal.b. 2010-11 Construction of C.C. Road & Drainage from Kenchamma tempal to Sannappa house. CC Road and Drainage 160000 160000 0 Completed Yadgir Shahapur Haiyyal.b. 2010-11 Construction of C.C. Road & Drainage from Bagalingappa house to V.A. kvatarsa. CC Road and Drainage 90000 0 90000 Completed Yadgir Shahapur Halgera 2006-07 Construction of C.C. Road & Drainege From Kumanur Rut to rood. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Halgera 2006-07 Construction of C.C. Road & Drainege From Dobighatto Vannappa house. CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Halgera 2006-07 Construction of C.C. Road & Drainege From Mallamma tempal to Rachayya svami haouse. CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Halgera 2006-07 Construction of C.C. Road & Drainege From School to Dobi ghat CC Road and Drainage 98000 98000 24500 Completed Yadgir Shahapur Halgera 2006-07 Construction of C.C. Road & Drainege From School to Men Road. CC Road and Drainage 98000 98000 24500 Completed Yadgir Shahapur Halgera 2006-07 Tha Functions of comuniction, Informetion & Education IEC 111000 82000 27750 Completed Yadgir Shahapur Halgera 2007-08 Tha Functions of comuniction, Informetion & Education IEC 21000 14000 5250 Completed Yadgir Shahapur Halgera 2007-08 Construction of C.C. Road & Drainage From Maremma tempal to Ladde bandayya house. CC Road and Drainage 124000 124000 31000 Completed Construction of C.C. Road & Drainage From Prahladarava kulkarni house to Rachayya svami Yadgir Shahapur Halgera 2007-08 CC Road and Drainage 144000 144000 36000 Completed house. Yadgir Shahapur Halgera 2007-08 Construction of C.C. Road & Drainage From Sundrappan house to Mullasab house. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Halgera 2007-08 Construction of C.C. Road & Drainage From Devindrappa house to Nagappa godihal house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Halgera 2007-08 Construction of C.C. Road & Drainage From School to Bavasab darga. CC Road and Drainage 146000 146000 36500 Completed Yadgir Shahapur Halgera 2007-08 Construction of Anganavadi. Anganavadi building 166000 166000 41500 Completed Yadgir Shahapur Halgera 2008-09 Communication & Information Education Programme IEC 48000 34000 12000 Completed Yadgir Shahapur Halgera 2008-09 Construction of C.C. Road & Drainage From Agasi to Devindrappa badiger houae. CC Road and Drainage 123000 123000 30750 Completed Yadgir Shahapur Halgera 2008-09 Const of Grama Panchayat Building Construction of Gram Panchayat124000 Building 124000 31000 Completed Yadgir Shahapur Halgera 2008-09 Const of Group Toilet Construction of Toilet 124000 124000 31000 Completed Yadgir Shahapur Halgera 2008-09 Const of Group Toilet Construction of Toilet 164000 164000 41000 Completed Yadgir Shahapur Halgera 2008-09 Const of Comp Wall & Land leveling to Veternary Hospital Compound wall 174000 174000 43500 Completed Yadgir Shahapur Halgera 2008-09 Construction of C.C. Road & Drainage From School to Babasab house. CC Road and Drainage 194000 194000 48500 Completed Construction of C.C. Road & Drainage From Pralahad kulkarni house to Kamalappa karakalli & Yadgir Shahapur Halgera 2008-09 CC Road and Drainage 195000 195000 48750 Completed Bhoju gouda house. Yadgir Shahapur Halgera 2009-10 Construction of C.C. Road & Drainage From Basanna tempal to Sadar katte. CC Road and Drainage 144000 144000 0 Completed Yadgir Shahapur Halgera 2009-10 Construction of C.C. Road & Drainage From Basavann tempal to Hanuman tempal. CC Road and Drainage 144000 144000 0 Completed Yadgir Shahapur Halgera 2009-10 Tha Functions of comuniction, Informetion & Education IEC 53000 40000 13250 Completed Yadgir Shahapur Halgera 2009-10 Construction of C.C. Road & Drainage From Japhar ptel house to Nagappa S.C. house. CC Road and Drainage 143000 143000 35750 Completed Yadgir Shahapur Halgera 2009-10 Construction of C.C. Road & Drainage From Nilamma Ayi tempal to Mallappa ganga house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Halgera 2009-10 Construction of C.C. Road & Drainage From Men road to Agasar house. CC Road and Drainage 143000 0 143000 Completed Yadgir Shahapur Halgera 2010-11 Tha Functions of comuniction, Informetion & Education IEC 29000 0 0 Progress Yadgir Shahapur Halgera 2010-11 Tha Functions of comuniction, Informetion & Education IEC 29000 0 0 Progress Yadgir Shahapur Halgera 2010-11 Construction of C.C. Road & Drainage from agasi tempal to Nala. CC Road and Drainage 95000 0 0 Progress Yadgir Shahapur Halgera 2010-11 Construction of C.C. Road & Drainage from agasi tempal to Nala. CC Road and Drainage 95000 0 0 Progress Yadgir Shahapur Halgera 2010-11 Construction of C.C. Road & Drainage from Agasi to Basavanna tempal. CC Road and Drainage 110000 0 0 Progress Yadgir Shahapur Halgera 2010-11 Construction of C.C. Road & Drainage from Agasi to Basavanna tempal. CC Road and Drainage 110000 0 0 Progress Yadgir Shahapur Halgera 2010-11 Construction of C.C. Road & Drainage from Pakirappa house to Laxman bendebembali house. CC Road and Drainage 125000 0 0 Progress

Yadgir Shahapur Halgera 2010-11 Construction of C.C. Road & Drainage from Pakirappa house to Laxman bendebembali house. CC Road and Drainage 125000 0 0 Progress Yadgir Shahapur Halgera 2010-11 Construction of Compound from School. Compound wall 150000 150000 0 Progress Yadgir Shahapur Halgera 2010-11 Construction of Compound from School. Compound wall 150000 150000 0 Progress Yadgir Shahapur Halgera 2010-11 Construction of C.C. Road & Drainage from Lokanna house to Matha. CC Road and Drainage 95000 0 95000 Completed Yadgir Shahapur 2006-07 Construction of C.C. Road & Drainege From Bhimappa membar house to Madarakal root. CC Road and Drainage 47000 47000 11750 Completed Yadgir Shahapur Hattigudur 2006-07 Construction of C.C. Road From School to Hanuman tempal. CC Road 52000 52000 13000 Completed Yadgir Shahapur Hattigudur 2006-07 Construction of C.C. Road Neyar by katagar choudri house. CC Road 57000 57000 14250 Completed Yadgir Shahapur Hattigudur 2006-07 Construction of Drainege From Goudar angadi to Bhimaraya house. Drainage 57000 57000 14250 Completed Yadgir Shahapur Hattigudur 2006-07 Construction of Drainege From Masali bhimappa house to Bhimanna house. Drainage 58000 58000 14500 Completed Yadgir Shahapur Hattigudur 2006-07 Construction of Drainege From Sanna pujappa house to Guttedar house. Drainage 58000 58000 14500 Completed Yadgir Shahapur Hattigudur 2006-07 Construction of Drainege From Siddappa hirekuruba house to Badoger house. Drainage 58000 58000 14500 Completed Yadgir Shahapur Hattigudur 2006-07 Construction ofDrainege From Savukar house to Hanuman tempal. Drainage 58000 58000 14500 Completed Yadgir Shahapur Hattigudur 2006-07 C.C. Rood & Drainege From Kenchamma tempal to Haleppa dasar houae. CC Road and Drainage 67000 67000 16750 Completed Yadgir Shahapur Hattigudur 2006-07 Tha Functions of comuniction, Informetion & Education IEC 98000 54000 24500 Completed Yadgir Shahapur 2006-07 Construction of C.C. Road& Drainege From Sanjivappa house to Borvel. CC Road and Drainage 77000 77000 19250 Completed Yadgir Shahapur Hoskera 2006-07 Construction of compound around the god's well Compound wall 77000 77000 19250 Completed Yadgir Shahapur Hoskera 2006-07 Tha Functions of comuniction, Informetion & Education IEC 78000 40000 19500 Completed Yadgir Shahapur Hoskera 2006-07 Construction of C.C. Road & Drainege From Mallappa house to School. CC Road and Drainage 78000 78000 19500 Completed Yadgir Shahapur Hoskera 2006-07 Construction of C.C. RoadC.C. Rood & Drainege From School to Desayi house. CC Road 78000 78000 19500 Completed Yadgir Shahapur Hoskera 2006-07 Construction of C.C. Road& Drainege From Ningayya tempal to Hanuman tempal. CC Road and Drainage 97000 97000 24250 Completed housing facility. 1. Nagamma wo/ Rachappa 2. Ningamma wo/ Amalayya 3. Gouramma wo/ Yadgir Shahapur Hoskera 2006-07 other works 97000 97000 24250 Completed Bhimaraya 4. Sabamma wo/ Somanna Yadgir Shahapur Hoskera 2007-08 Tha Functions of comuniction, Informetion & Education IEC 42000 28000 10500 Completed Yadgir Shahapur Hoskera 2007-08 Houseing peshaliti 1. Bhimavva w/o Mahadevappa gouda 2. Sangamma w/o Sadashiva. other works 45000 45000 11250 Completed Yadgir Shahapur Hoskera 2007-08 Construction of C.C. Road & Drainage From Lingayya tempal to Kenchamma tempal. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Hoskera 2007-08 Houseing peshaliti 1. Shankaramma w/o Revanasiddappa 2. Kantamma w/o Devindrappa other works 46000 46000 11500 Completed Yadgir Shahapur Hoskera 2007-08 Construction of C.C. Road & Drainage From Parasuram hpuse to Shankar house. CC Road and Drainage 65000 65000 16250 Completed Yadgir Shahapur Hoskera 2007-08 Construction of C.C. Road & Drainage From Mallappa kilari house to Ankalagi gundi. CC Road and Drainage 69000 69000 17250 Completed Yadgir Shahapur Hoskera 2007-08 Construction of C.C. Road & Drainage From Sirasagi house to Yankappa house. CC Road and Drainage 71000 71000 17750 Completed Yadgir Shahapur Hoskera 2007-08 Construction of C.C. Road & Drainage From Sevalal tempal to Maremma tempal. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Hoskera 2007-08 Construction of Anganavadi. Anganavadi building 184000 184000 46000 Completed Yadgir Shahapur Hoskera 2008-09 Communication & Information Education Programme IEC 68000 59000 17000 Completed Yadgir Shahapur Hoskera 2008-09 Construction of C.C. Road & Drainage From Mallappa house to Vanadurga road. CC Road and Drainage 69000 69000 17250 Completed Yadgir Shahapur Hoskera 2008-09 Construction of C.C. Road & Drainage From Ningappa house to Karkalli road. CC Road and Drainage 69000 69000 17250 Completed Yadgir Shahapur Hoskera 2008-09 Construction of C.C. Road & Drainage From Police gpud house to agasi. CC Road and Drainage 70000 17500 17500 Completed Yadgir Shahapur Hoskera 2008-09 Construction of C.C. Road & Drainage From Kavaldara shivanna house to Hanuman tempal. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Hoskera 2008-09 Construction of C.C. Road & Drainage From Haiyalappa house to Kakkasgera road. CC Road and Drainage 114000 114000 28500 Completed Yadgir Shahapur Hoskera 2008-09 Construction of C.C. Road & Drainage From Kambar house to Gangappa house. CC Road and Drainage 123000 123000 30750 Completed Yadgir Shahapur Hoskera 2008-09 Const of Complex near hanuman temple Shopping mall 143000 35750 35750 Completed Yadgir Shahapur Hoskera 2008-09 Construction of C.C. Road & Drainage From Mahadevappa house to Amblappgouda house. CC Road and Drainage 203000 50750 50750 Completed Yadgir Shahapur Hoskera 2009-10 Tha Functions of comuniction, Informetion & Education IEC 66000 0 0 Progress Yadgir Shahapur Hoskera 2009-10 Tha Functions of comuniction, Informetion & Education IEC 66000 0 0 Progress Yadgir Shahapur Hoskera 2009-10 Const of Protection Wall to Ningayya Temple Compound wall 73000 0 0 Progress Yadgir Shahapur Hoskera 2009-10 Const of Protection Wall to Ningayya Temple Compound wall 73000 0 0 Progress Yadgir Shahapur Hoskera 2009-10 Construction of Compound From Open wall. Compound wall 74000 0 0 Progress Yadgir Shahapur Hoskera 2009-10 Construction of Compound From Open wall. Compound wall 74000 0 0 Progress Construction of C.C. Road & Drainage From Kalasappa gouda Po.pa. house to Gouramma talavar Yadgir Shahapur Hoskera 2009-10 CC Road and Drainage 94000 0 0 Progress houae. Construction of C.C. Road & Drainage From Kalasappa gouda Po.pa. house to Gouramma talavar Yadgir Shahapur Hoskera 2009-10 CC Road and Drainage 94000 0 0 Progress houae. Yadgir Shahapur Hoskera 2009-10 Construction of C.C. Road & Drainage From School to Gram. CC Road and Drainage 95000 0 0 Progress Yadgir Shahapur Hoskera 2009-10 Construction of C.C. Road & Drainage From School to Gram. CC Road and Drainage 95000 0 0 Progress Yadgir Shahapur Hoskera 2009-10 Construction of C.C. Road & Drainage From Nagamma house to Bhimaraya badiger house. CC Road and Drainage 96000 0 0 Progress

Yadgir Shahapur Hoskera 2009-10 Construction of C.C. Road & Drainage From Nagamma house to Bhimaraya badiger house. CC Road and Drainage 96000 0 0 Progress

Yadgir Shahapur Hoskera 2009-10 Construction of C.C. Road & Drainage From Mallappa kilari house to Adappa kilari house. CC Road and Drainage 114000 0 0 Progress

Yadgir Shahapur Hoskera 2009-10 Construction of C.C. Road & Drainage From Mallappa kilari house to Adappa kilari house. CC Road and Drainage 114000 0 0 Progress Yadgir Shahapur Hoskera 2009-10 Construction of C.C. Road & Drainage From Sayibanna house to Bandeppa house. CC Road and Drainage 144000 0 0 Progress Yadgir Shahapur Hoskera 2009-10 Construction of C.C. Road & Drainage From Sayibanna house to Bandeppa house. CC Road and Drainage 144000 0 0 Progress Yadgir Shahapur Hoskera 2010-11 Construction of Compound from Grama panchayat. Compound wall 165000 0 0 Progress Yadgir Shahapur Hoskera 2010-11 Construction of Compound from Grama panchayat. Compound wall 165000 0 0 Progress Yadgir Shahapur Hoskera 2010-11 Const of Grama Panchayat Meeting Hall Construction of Gram Panchayat395000 Building 0 0 Progress Yadgir Shahapur Hoskera 2010-11 Const of Grama Panchayat Meeting Hall Construction of Gram Panchayat395000 Building 0 0 Progress Yadgir Shahapur Hoskera 2010-11 Tha Functions of comuniction, Informetion & Education IEC 39000 0 6000 Progress Yadgir Shahapur Hoskera 2010-11 Tha Functions of comuniction, Informetion & Education IEC 39000 0 6000 Progress Yadgir Shahapur Hotpet 2006-07 Construction of C.C. Road & Drainege From S.T. warda to Jakkana opean wall. CC Road and Drainage 52000 52000 13000 Completed Yadgir Shahapur Hotpet 2006-07 Tha Functions of comuniction, Informetion & Education IEC 64000 38000 16000 Completed Yadgir Shahapur Hotpet 2006-07 housing facility. 1. Kamalibayi / Tukarama 2. Sharadabayi / Gopala 3. Nilamma / Jummanna other works 71000 71000 17750 Completed Yadgir Shahapur Hotpet 2006-07 Construction of C.C. Road & Drainege From Dyavamma tempal to Malledar house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Hotpet 2006-07 Construction of C.C. Road & Drainege From Kumbar house to Gavhar chandappa house. CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Hotpet 2006-07 Construction of C.C. Road & Drainege From S.C. opean wall to School. CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Hotpet 2006-07 Construction of C.C. Road& Drainege From Basanna house to Agasi. CC Road and Drainage 142000 142000 35500 Completed Yadgir Shahapur Ibrahimpur 2006-07 Tha Functions of comuniction, Informetion & Education IEC 59000 46000 14750 Completed Yadgir Shahapur Ibrahimpur 2006-07 Construction of C.C. Road & Drainege From Dyavamma tempal to Musttur house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Ibrahimpur 2006-07 Construction of C.C. Road & Drainege From Men rood to Palakamma tempal. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Ibrahimpur 2006-07 Construction of C.C. Road & Drainege From CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Ibrahimpur 2006-07 Construction of C.C. Road & Drainege From Adekatte to imama sab bommanalli house. CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Ibrahimpur 2006-07 Construction of Compund form G.p.h. School. Compound wall 98000 98000 24500 Completed Yadgir Shahapur Ibrahimpur 2006-07 Construction of Whater tyanka & Paypa layn. Water Tank 98000 98000 24500 Completed Yadgir Shahapur Ibrahimpur 2007-08 Tha Functions of comuniction, Informetion & Education IEC 5000 3000 1250 Completed Construction of C.C. Road & Drainage From Malleshappa hadapada house to Eligar kharimsab Yadgir Shahapur Ibrahimpur 2007-08 CC Road and Drainage 104000 104000 26000 Completed house. Construction of C.C. Road & Drainage From Rayappa kamanalli house to Sangappa kamanalli Yadgir Shahapur Ibrahimpur 2007-08 CC Road and Drainage 104000 104000 26000 Completed house. Yadgir Shahapur Ibrahimpur 2007-08 Construction of C.C. Road & Drainage From School to Outsaid in grama. CC Road and Drainage 104000 104000 26000 Completed Yadgir Shahapur Ibrahimpur 2007-08 Construction of C.C. Road & Drainage From Maktubasab house to Sibar katte. CC Road and Drainage 104000 104000 26000 Completed Yadgir Shahapur Ibrahimpur 2007-08 Construction of C.C. Road & Drainage From Meremma tempal to S.T.varda borivel. CC Road and Drainage 105000 105000 26250 Completed Yadgir Shahapur Ibrahimpur 2007-08 Water facilites to dobhi ghat Drinking Water Supply 105000 105000 26250 Completed Yadgir Shahapur Ibrahimpur 2007-08 Construction of C.C. Road & Drainage From Bhajantri house to Bhimanna mukhanalli house. CC Road and Drainage 106000 106000 26500 Completed Yadgir Shahapur Ibrahimpur 2007-08 Construction of C.C. Road & Drainage From Muttayyana house to Peddana house. CC Road and Drainage 106000 106000 26500 Completed Yadgir Shahapur Ibrahimpur 2008-09 Construction of C.C. Road & Drainage From Ishvar tempal to huded. CC Road and Drainage 93000 93000 23250 Completed Construction of C.C. Road & Drainage From Sharanappa ranganna house to Basappa melgal Yadgir Shahapur Ibrahimpur 2008-09 CC Road and Drainage 94000 94000 23500 Completed house. Yadgir Shahapur Ibrahimpur 2008-09 Construction of C.C. Road & Drainage From Karanagi Sab house to muttavva house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ibrahimpur 2008-09 Const of Village Accountant Qtrs other works 94000 94000 23500 Completed Yadgir Shahapur Ibrahimpur 2008-09 Construction of C.C. Road & Drainage From Svamiji house to Raddi house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Ibrahimpur 2008-09 Construction of C.C. Road & Drainage From Gurapadayyaswami house to Raheman phajal house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Ibrahimpur 2008-09 Construction of C.C. Road & Drainage From Shibara katte to Nala road. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Ibrahimpur 2008-09 Communication & Information Education Programme IEC 104000 94000 26000 Completed Yadgir Shahapur Ibrahimpur 2008-09 Construction of Coumpand from G.H.S. urdu school. School Compound and Buildings144000 144000 36000 Completed Yadgir Shahapur Ibrahimpur 2008-09 Construction of compund From G.H.S. School. Compound wall 145000 145000 36250 Completed Yadgir Shahapur Ibrahimpur 2009-10 Tha Functions of comuniction, Informetion & Education IEC 29000 29000 0 Completed Construction of C.C. Road & Drainage From Mallappa betegar house to Doddasabanna tangadagi Yadgir Shahapur Ibrahimpur 2009-10 CC Road and Drainage 94000 94000 0 Completed house. Construction of C.C. Road & Drainage From Halabavi siddappa house to drinking whater open Yadgir Shahapur Ibrahimpur 2009-10 CC Road and Drainage 95000 95000 0 Completed wall. Yadgir Shahapur Ibrahimpur 2009-10 Construction of C.C. Road & Drainage From Muttur house to Dankayi nalli. CC Road and Drainage 114000 114000 0 Completed Yadgir Shahapur Ibrahimpur 2009-10 Construction of C.C. Road & Drainage From Maktub sab to Nala ruat. CC Road and Drainage 93000 93000 23250 Completed Yadgir Shahapur Ibrahimpur 2009-10 Construction of C.C. Road & Drainage From Ishvar tempal to Hudeda. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ibrahimpur 2009-10 Construction of C.C. Road & Drainage From Karimasab baliger house to Mustur house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ibrahimpur 2009-10 Construction of C.C. Road & Drainage From Malleshi kavaladar house to Kambar laxmana hous. CC Road and Drainage 96000 96000 24000 Completed

Yadgir Shahapur Ibrahimpur 2009-10 Construction of C.C. Road & Drainage From Manashappa danakayi house to Whomen tollyt. CC Road and Drainage 95000 0 95000 Completed Yadgir Shahapur Ibrahimpur 2010-11 Tha Functions of comuniction, Informetion & Education IEC 28000 0 0 Progress Yadgir Shahapur Ibrahimpur 2010-11 Tha Functions of comuniction, Informetion & Education IEC 28000 0 0 Progress Yadgir Shahapur Ibrahimpur 2010-11 Construction of C.C. Road from Ayyappa badiger house to Basayya house. CC Road 65000 0 0 Progress Yadgir Shahapur Ibrahimpur 2010-11 Construction of C.C. Road from Ayyappa badiger house to Basayya house. CC Road 65000 0 0 Progress Yadgir Shahapur Ibrahimpur 2010-11 Construction of C.C. Road & Drainage from Gangamma house to toyalt. CC Road and Drainage 94000 0 0 Progress Yadgir Shahapur Ibrahimpur 2010-11 Construction of C.C. Road & Drainage from Gangamma house to toyalt. CC Road and Drainage 94000 0 0 Progress Yadgir Shahapur Ibrahimpur 2010-11 Construction Paipa lain & Sstaynda posta. Pipeline 25000 25000 0 Completed Yadgir Shahapur Ibrahimpur 2010-11 Construction of Paipa lain. Pipeline 45000 45000 0 Completed Yadgir Shahapur Ibrahimpur 2010-11 Construction of C.C. Road from Bhimaraya haouse to Basavaraj house. CC Road 94000 94000 0 Completed Yadgir Shahapur Ibrahimpur 2010-11 Construction of C.C. Road & Drainage from Nagayya house to Hampayya svami house. CC Road and Drainage 192000 192000 0 Completed Yadgir Shahapur Ibrahimpur 2010-11 Construction of C.C. Road & Drainage from Suganna sahu angadi to Mallanna gouda house. CC Road and Drainage 95000 0 95000 Completed

Yadgir Shahapur Kadamgera 2006-07 Construction of C.C. Road & Drainege From Kunnu basayya house to Nagappa marganur house. CC Road and Drainage 44000 44000 11000 Completed Yadgir Shahapur Kadamgera 2006-07 Construction of C.C. Road & Drainege From Daval sab house to Dyavamma tempal. CC Road and Drainage 45000 45000 11250 Completed Yadgir Shahapur Kadamgera 2006-07 Construction of C.C. Road & Drainege From Sabanna Bhimanna house to Somubayi house. CC Road and Drainage 45000 45000 11250 Completed Yadgir Shahapur Kadamgera 2006-07 Construction of C.C. Road & Drainege From Huchcha house to chennumiyasab house. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Kadamgera 2006-07 Construction of C.C. Road & Drainege From Venkaraddi house to Dyavamma tempal. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Kadamgera 2006-07 Construction of C.C. Road & Drainege From Bhimappa house to Mallamma gundalli house. CC Road and Drainage 47000 47000 11750 Completed Yadgir Shahapur Kadamgera 2006-07 Tha Functions of comuniction, Informetion & Education IEC 82000 51000 20500 Completed Yadgir Shahapur Kadamgera 2006-07 Construction of C.C. Road & Drainege From Shankrappa house to Bhimaraya polisgouda house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kadamgera 2006-07 Construction of Womens toilet. Construction of Toilet 96000 96000 24000 Completed Yadgir Shahapur Kadamgera 2007-08 Tha Functions of comuniction, Informetion & Education IEC 22000 16000 5500 Completed Yadgir Shahapur Kadamgera 2007-08 Construction of C.C. Road & Drainage From Dyavamma tempal house to Anur mallayya house. CC Road and Drainage 104000 104000 26000 Completed Yadgir Shahapur Kadamgera 2007-08 Construction of C.C. Road & Drainage From Mallappa vadigera house to School. CC Road and Drainage 104000 104000 26000 Completed Yadgir Shahapur Kadamgera 2007-08 Construction of C.C. Road & Drainage From Angadi mareppa house to Yallamma tempal. CC Road and Drainage 105000 105000 26250 Completed Yadgir Shahapur Kadamgera 2007-08 Construction of C.C. Road & Drainage From Bhimaraya house to Hanamantraya house. CC Road and Drainage 105000 105000 26250 Completed Construction of C.C. Road & Drainage From Chandramappa badiger house to Yangetayappa Yadgir Shahapur Kadamgera 2007-08 CC Road and Drainage 105000 105000 26250 Completed house. Yadgir Shahapur Kadamgera 2007-08 Construction of C.C. Road & Drainage From Grama panchayat to Bhimanna goshi house. CC Road and Drainage 106000 106000 26500 Completed Yadgir Shahapur Kadamgera 2008-09 Communication & Information Education Programme IEC 51000 41000 12750 Completed Yadgir Shahapur Kadamgera 2008-09 Construction of C.C. Road & Drainage From Grama pnchayat to Bhimanna goshi house. CC Road and Drainage 93000 93000 23250 Completed Yadgir Shahapur Kadamgera 2008-09 Construction of C.C. Road & Drainage From Dyavamma housae to Anur mallayya house. CC Road and Drainage 94000 94000 23500 Completed

Yadgir Shahapur Kadamgera 2008-09 Construction of C.C. Road & Drainage From Angadi mareppa house to Yallamma tempal. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kadamgera 2008-09 Construction of C.C. Road & Drainage From Bhimaraya house to Hanumanta house. CC Road and Drainage 94000 94000 23500 Completed Construction of C.C. Road & Drainage From Chandramappa badiger house to Yangetayappa Yadgir Shahapur Kadamgera 2008-09 CC Road and Drainage 95000 95000 23750 Completed house. Yadgir Shahapur Kadamgera 2008-09 Construction of C.C. Road & Drainage From Mallappa vadager houae to School. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kadamgera 2008-09 Construction of C.C. Road & Drainage From Angadi mareppa house to Yallamma tempal. CC Road and Drainage 96000 96000 24000 Completed

Yadgir Shahapur Kadamgera 2008-09 Construction of C.C. Road & Drainage From Siddalingappa agasar house to Balayya katte. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kadamgera 2009-10 Tha Functions of comuniction, Informetion & Education IEC 41000 41000 0 Completed Yadgir Shahapur Kadamgera 2009-10 Construction of C.C. Road & Drainage From Hanuman tempal to Dyavappa house. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Kadamgera 2009-10 Construction of C.C. Road & Drainage From Huchchappa mulla house to Kumbar house. CC Road and Drainage 95000 95000 0 Completed

Yadgir Shahapur Kadamgera 2009-10 Construction of C.C. Road & Drainage From Bhimappa dodmani house to Kambiya house. CC Road and Drainage 94000 94000 23500 Completed

Yadgir Shahapur Kadamgera 2009-10 Construction of C.C. Road & Drainage From Ningappa doddayallapur house to Mareppa house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kadamgera 2009-10 Construction of C.C. Road & Drainage From Masidi to Agasi. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kadamgera 2009-10 Construction of C.C. Road & Drainage From New house to Souraj house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kadamgera 2009-10 Construction of C.C. Road & Drainage From Siddeshvar tempal to Venkatareddi house. CC Road and Drainage 94000 0 94000 Completed Yadgir Shahapur Kadamgera 2010-11 Tha Functions of comuniction, Informetion & Education IEC 57000 0 0 Progress Yadgir Shahapur Kadamgera 2010-11 Tha Functions of comuniction, Informetion & Education IEC 57000 0 0 Progress Construction of C.C. Road & Drainage from Bhimaray hanchanal house to Basavaraj kanavar Yadgir Shahapur Kadamgera 2010-11 CC Road and Drainage 125000 0 0 Progress house. Construction of C.C. Road & Drainage from Bhimaray hanchanal house to Basavaraj kanavar Yadgir Shahapur Kadamgera 2010-11 CC Road and Drainage 125000 0 0 Progress house. Yadgir Shahapur Kadamgera 2010-11 Construction of C.C. Road & Drainage from Bandegal to diddi. CC Road and Drainage 130000 0 0 Progress Yadgir Shahapur Kadamgera 2010-11 Construction of C.C. Road & Drainage from Bandegal to diddi. CC Road and Drainage 130000 0 0 Progress Yadgir Shahapur Kadamgera 2010-11 Construction of C.C. Road & Drainage from Honnayya sadu house to Tempal. CC Road and Drainage 135000 135000 0 Completed Yadgir Shahapur Kadamgera 2010-11 Construction of C.C. Road & Drainage from Ningappa dodayya house to Mareppa house. CC Road and Drainage 110000 0 110000 Completed Yadgir Shahapur Kakkasgera 2006-07 Construction of Dyanida traing hol. other works 46000 46000 11500 Completed Yadgir Shahapur Kakkasgera 2006-07 Construction of Anganavadi. Anganavadi building 47000 47000 11750 Completed Yadgir Shahapur Kakkasgera 2006-07 Construction of Womens toilet Construction of Toilet 47000 47000 11750 Completed Yadgir Shahapur Kakkasgera 2006-07 Construction of Womens toilet Construction of Toilet 47000 47000 11750 Completed Yadgir Shahapur Kakkasgera 2006-07 Construction of C.C. Road & Drainege From Devaki tempal to Kenchamma house. CC Road and Drainage 50000 50000 12500 Completed Yadgir Shahapur Kakkasgera 2006-07 Construction of Womens toilet in Kadamgera thanda. Construction of Toilet 76000 76000 19000 Completed Yadgir Shahapur Kakkasgera 2006-07 Construction of C.C. Road & Drainege From Agasi to Masidi road. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kakkasgera 2006-07 Devolopment of Drinking whater. Drainage 97000 97000 24250 Completed Yadgir Shahapur Kakkasgera 2006-07 Tha Functions of comuniction, Informetion & Education IEC 98000 66000 24500 Completed Yadgir Shahapur Kakkasgera 2007-08 Tha Functions of comuniction, Informetion & Education IEC 34000 22000 8500 Completed Yadgir Shahapur Kakkasgera 2007-08 Construction of C.C. Road & Drainage From Jannappa sahu house to Vaddar house. CC Road and Drainage 55000 55000 13750 Completed Yadgir Shahapur Kakkasgera 2007-08 Construction of C.C. Road & Drainage From Bangareppa house to Virupanna house. CC Road and Drainage 85000 85000 21250 Completed Yadgir Shahapur Kakkasgera 2007-08 Construction of C.C. Road & Drainage From Harijan varda to Gouramma vaddar house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kakkasgera 2007-08 Construction of C.C. Road & Drainage From Sevalal house to Kopanna house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kakkasgera 2007-08 Construction of C.C. Road & Drainage From Shankara house to Jatteppa house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kakkasgera 2007-08 Construction of C.C. Road & Drainage From Camanal road to Ninganna kambar house. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Kakkasgera 2007-08 Construction of shopping complex. Shopping mall 194000 194000 48500 Completed Yadgir Shahapur Kakkasgera 2008-09 Construction of C.C. Road & Drainage From Giriyappa house to Chamanal road. CC Road and Drainage 44000 44000 11000 Completed Yadgir Shahapur Kakkasgera 2008-09 Construction of C.C. Road & Drainage From Revanasiddeshvara tempal to Bapunayak house. CC Road and Drainage 70000 70000 17500 Completed Yadgir Shahapur Kakkasgera 2008-09 Construction of C.C. Road & Drainage From Kamiti hal to Goudagera bhimanna house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kakkasgera 2008-09 Improvements to Grama Panchayat Building Construction of Gram Panchayat95000 Building 95000 23750 Completed Yadgir Shahapur Kakkasgera 2008-09 Communication & Information Education Programme IEC 117000 103000 29250 Completed Yadgir Shahapur Kakkasgera 2008-09 Construction of C.C. Road & Drainage From Mahantayya svami house to Malkanna kotagi house. CC Road and Drainage 144000 144000 36000 Completed

Yadgir Shahapur Kakkasgera 2008-09 Construction of C.C. Road & Drainage From Sopannahouse to Devondrappa makashi house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Kakkasgera 2008-09 Const of Busness Complex - 3 Shopping mall 292000 292000 73000 Completed Yadgir Shahapur Kakkasgera 2009-10 Construction of C.C. Road & Drainage From grama panchayat to open wall. CC Road and Drainage 50000 44000 12500 Completed Yadgir Shahapur Kakkasgera 2009-10 Const of Dobhi Ghat near Somibai Goudti open place Dhobi Ghat 70000 64000 17500 Completed Yadgir Shahapur Kakkasgera 2009-10 Tha Functions of comuniction, Informetion & Education IEC 87000 85000 21750 Completed Yadgir Shahapur Kakkasgera 2009-10 Repair Works to Anganwadi Building Building Repair 100000 95000 25000 Completed Yadgir Shahapur Kakkasgera 2009-10 Construction of C.C. Road & Drainage From Bhimappa dodmani house to Menroad. CC Road and Drainage 100000 95000 25000 Completed Yadgir Shahapur Kakkasgera 2009-10 Construction of C.C. Road & Drainage From Gundagurti house to Venkatappa house. CC Road and Drainage 100000 95000 25000 Completed Yadgir Shahapur Kakkasgera 2009-10 Const of Panchayat Room Construction of Gram Panchayat316000 Building 308000 79000 Completed Yadgir Shahapur Kakkasgera 2010-11 Repair Works to Anganwadi Building Building Repair 46000 46000 0 Completed Yadgir Shahapur Kakkasgera 2010-11 Repair Works to Old GP Building Repair Works 45000 50000 0 Completed Yadgir Shahapur Kakkasgera 2010-11 Construction of C.C. Road & Drainage from Open wall to Men road. CC Road and Drainage 54000 54000 0 Completed Yadgir Shahapur Kakkasgera 2010-11 Const of Dobhi Ghat Dhobi Ghat 55000 55000 0 Completed Yadgir Shahapur Kakkasgera 2010-11 Construction of C.C. Road & Drainage from Ramanna kumbar house to Men road. CC Road and Drainage 60000 60000 0 Completed Yadgir Shahapur Kakkasgera 2010-11 Tha Functions of comuniction, Informetion & Education IEC 68000 68000 0 Completed Yadgir Shahapur Kakkasgera 2010-11 Improvements to Chavadi Katte near Agasi Community Hall 94000 94000 0 Completed Yadgir Shahapur Kakkasgera 2010-11 Construction of C.C. Road & Drainage from Agasi to Nala. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Kakkasgera 2010-11 Construction of C.C. Road & Drainage from Sharagouda house to Somubayi goudati house. CC Road and Drainage 45000 0 45000 Completed Yadgir Shahapur Kakkasgera 2010-11 Const of Community Hall in SC Area Community Hall 50000 11250 50000 Completed Yadgir Shahapur Kannekollur 2006-07 Construction of C.C. Road & Drainege From Anjanaya tempal to Umalanayk house. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Kannekollur 2006-07 Construction of C.C. Road & Drainege From Dodda nagendra house to CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Kannekollur 2006-07 Construction of C.C. Road & Drainege From Tarasinga house to Nala. CC Road and Drainage 47000 47000 11750 Completed Yadgir Shahapur Kannekollur 2006-07 Construction of C.C. Road & Drainege FromMahmad house to Mashakha pujari house. CC Road and Drainage 47000 47000 11750 Completed Yadgir Shahapur Kannekollur 2006-07 Construction of C.C. Road From Kuruba Warda anganavadi to Hanamanta dudali. CC Road 47000 47000 11750 Completed Construction of C.C. Road & Drainege From Mallappa bairaddi house to Siddalingappagouda Yadgir Shahapur Kannekollur 2006-07 CC Road and Drainage 56000 56000 14000 Completed house. Yadgir Shahapur Kannekollur 2006-07 Construction of C.C. Road & Drainege From Hanumanta donganavar house Manappa kalegar. CC Road and Drainage 57000 57000 14250 Completed

Yadgir Shahapur Kannekollur 2006-07 Construction of C.C. Road & Drainege From viripaxappagoda house to Ambanna house. CC Road and Drainage 57000 57000 14250 Completed Yadgir Shahapur Kannekollur 2006-07 Tha Functions of comuniction, Informetion & Education IEC 64000 37000 16000 Completed Yadgir Shahapur Kannekollur 2006-07 Construction of C.C. Road & Drainege From School to out sayd men Road. CC Road and Drainage 66000 66000 16500 Completed Yadgir Shahapur Kannekollur 2006-07 Drainege From Grama panchayat to Mababi house. Drainage 71000 71000 17750 Completed Yadgir Shahapur Kannekollur 2007-08 Tha Functions of comuniction, Informetion & Education IEC 40000 21000 10000 Completed Yadgir Shahapur Kannekollur 2007-08 Construction of C.C. Road & Drainage From Mallu nayak house to Tarasinga house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kannekollur 2007-08 Construction of C.C. Road & Drainage From Old school to Anjaneya tempal. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kannekollur 2007-08 Construction of C.C. Road & Drainage From Devati tempal to Sangappa house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kannekollur 2007-08 Construction of C.C. Road & Drainage From Husensab house to Nagalinga house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kannekollur 2007-08 Construction of C.C. Road & Drainage From Nagappa reddevadi house to Devati tempal. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kannekollur 2007-08 Construction of C.C. Road & Drainage From Dyavamma house to Opan wall. CC Road and Drainage 104000 104000 26000 Completed Yadgir Shahapur Kannekollur 2007-08 Construction of C.C. Road & Drainage From Lingappa banatihal house to Shivappa gali house. CC Road and Drainage 105000 105000 26250 Completed Yadgir Shahapur Kannekollur 2007-08 Construction of C.C. Road & Drainage From Sannamma house to Rangappa house. CC Road and Drainage 114000 114000 28500 Completed Yadgir Shahapur Kannekollur 2007-08 Construction of C.C. Road & Drainage From Rangappa house to Mallappa house. CC Road and Drainage 115000 115000 28750 Completed Yadgir Shahapur Kannekollur 2007-08 Construction of C.C. Road & Drainage From Tayamma tempal to Basava baler house. CC Road and Drainage 122000 122000 30500 Completed Yadgir Shahapur Kannekollur 2008-09 Communication & Information Education Programme IEC 31000 27000 7750 Completed Yadgir Shahapur Kannekollur 2008-09 Construction of C.C. Road & Drainage From Iliger house to Basavagoudappa house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kannekollur 2008-09 Construction of C.C. Road & Drainage From Maremma tempal to Agasi. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kannekollur 2008-09 Construction of C.C. Road & Drainage From open wall to Devati tempal, CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kannekollur 2008-09 Construction of C.C. Road & Drainage From Mabusab dodmani house to Manasa house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kannekollur 2008-09 Construction of C.C. Road & Drainage From Agasi to Tola house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kannekollur 2008-09 Construction of C.C. Road & Drainage From Karikeri house to Narayan svami house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kannekollur 2008-09 Construction of Kitchin room From G.P.S. school. School Compound and Buildings123000 123000 30750 Completed Yadgir Shahapur Kannekollur 2008-09 Const of Group Toilets Construction of Toilet 143000 143000 35750 Completed Yadgir Shahapur Kannekollur 2008-09 Construction of Gram panchayat karyalaya sabha bhavan & computer room. Construction of Gram Panchayat491000 Building 491000 122750 Completed Yadgir Shahapur Kannekollur 2009-10 Tha Functions of comuniction, Informetion & Education IEC 64000 56000 16000 Completed Yadgir Shahapur Kannekollur 2009-10 Construction of C.C. Road & Drainage From Basavaraj house to Open wall. CC Road and Drainage 93000 93000 23250 Completed Yadgir Shahapur Kannekollur 2009-10 Construction of C.C. Road & Drainage From Bhimappa kollur house to Men road. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kannekollur 2009-10 Construction of C.C. Road & Drainage From Nurun house to Dopunayak house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kannekollur 2009-10 Construction of C.C. Road & Drainage From Mahibub sab house to Mahmad house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kannekollur 2009-10 Construction of C.C. Road & Drainage From Men road to Mallappa taggin house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kannekollur 2009-10 Construction of C.C. Road & Drainage From Sharabanna house to Mantagouda house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kannekollur 2009-10 Construction of C.C. Road & Drainage From Open wall to Anjaneya tempal. CC Road and Drainage 142000 142000 35500 Completed Yadgir Shahapur Kannekollur 2010-11 Tha Functions of comuniction, Informetion & Education IEC 23000 23000 0 Completed Yadgir Shahapur Kannekollur 2010-11 Construction of C.C. Road & Drainage from Maremma tempal to Borivel. CC Road and Drainage 90000 90000 0 Completed Yadgir Shahapur Kannekollur 2010-11 Construction of Compuond from Gov. school. School Compound and Buildings95000 95000 0 Completed Yadgir Shahapur Kannekollur 2010-11 Construction of C.C. Road & Drainage from Bhimappa koulur house to Road. CC Road and Drainage 105000 105000 0 Completed Yadgir Shahapur Kannekollur 2010-11 Construction of C.C. Road & Drainage from Men road to Mallappa uappar house. CC Road and Drainage 115000 115000 0 Completed Yadgir Shahapur Kannekollur 2010-11 Construction of C.C. Road & Drainage from Nagappa harijan house to Tippanna house. CC Road and Drainage 90000 23250 90000 Completed Yadgir Shahapur Kannekollur 2010-11 Construction of Anganavadi from S.C. wara. Anganavadi building 95000 23750 95000 Completed Yadgir Shahapur Khanapur 2006-07 Construction of C.C. Road & Drainege From Yaddareppa S.C. house to Chandrama house. CC Road and Drainage 56000 56000 14000 Completed Yadgir Shahapur Khanapur 2006-07 Construction of Drainege From Mallikarjun tempal to Doddaningappa house. Drainage 76000 76000 19000 Completed Yadgir Shahapur Khanapur 2006-07 Construction of C.C. Road & Drainege From Balappa nayaka house to Chandrama house. CC Road and Drainage 77000 77000 19250 Completed Yadgir Shahapur Khanapur 2006-07 Construction of C.C. Road & Drainege From Mahadevappa CC Road and Drainage 87000 87000 21750 Completed Yadgir Shahapur Khanapur 2006-07 Construction of Men Road Basavaraj Baregal house to Shahapur. CC Road 88000 88000 22000 Completed Yadgir Shahapur Khanapur 2006-07 Construction of C.C. Road & Drainege From Davud khureshi house to Mahadevappa kavali house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Khanapur 2006-07 Tha Functions of comuniction, Informetion & Education IEC 105000 89000 26250 Completed Yadgir Shahapur Kollur 2006-07 Construction of C.C. Road & Drainege From Shekhappa house to Adavi house. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Kollur 2006-07 Tha Functions of comuniction, Informetion & Education IEC 77000 61000 19250 Completed Yadgir Shahapur Kollur 2006-07 Construction of C.C. Road & Drainege From Chandasab house to CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kollur 2006-07 Construction of C.C. Road & Drainege From Dyavamma tempal to Bandayya house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kollur 2006-07 Construction of C.C. Road & Drainege From Devindrappa house to rood. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kollur 2006-07 Construction of C.C. Road & Drainege From Rajesha house to Sabanna house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kollur 2006-07 Construction of C.C. Road & Drainege From Amatayyara tempal to Men rood. CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Kollur 2007-08 Tha Functions of comuniction, Informetion & Education IEC 40000 24000 10000 Completed Yadgir Shahapur Kollur 2007-08 Construction of C.C. Road & Drainage From Shivappa house to Mareppa house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kollur 2007-08 Water facilites to dobhi ghat Drinking Water Supply 95000 95000 23750 Completed Yadgir Shahapur Kollur 2007-08 Water facilites to dobhi ghat Drinking Water Supply 96000 96000 24000 Completed Yadgir Shahapur Kollur 2007-08 Construction of Coumpand from G.H.P. school School Compound and Buildings144000 144000 36000 Completed Yadgir Shahapur Kollur 2007-08 Construction of C.C. Road & Drainage From Svami house to Lachamanna house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Kollur 2007-08 Implimantation of G.H.S. school Ruam. School Compound and Buildings194000 194000 48500 Completed Yadgir Shahapur Kollur 2007-08 Construction of New Lebreri. Construction Of Library 195000 195000 48750 Completed Yadgir Shahapur Kollur 2008-09 Drinking water facilites to new area Drinking Water Supply 94000 94000 23500 Completed Yadgir Shahapur Kollur 2008-09 Construction of C.C. Road & Drainage From Bhimappa house to Kenchamma tempal. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kollur 2008-09 Construction of C.C. Road & Drainage From durgayya house to Mareppa kabber house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kollur 2008-09 Communication & Information Education Programme IEC 101000 87000 25250 Completed Yadgir Shahapur Kollur 2008-09 Construction of C.C. Road & Drainage From Ramalingappa house to Gov. haspetal. CC Road and Drainage 143000 143000 35750 Completed Yadgir Shahapur Kollur 2008-09 Construction of Compound From G.P.S. school. Compound wall 143000 143000 35750 Completed Construction of C.C. Road & Drainage From Mallayya jangunayak house to Durgayya gangankal Yadgir Shahapur Kollur 2008-09 CC Road and Drainage 144000 144000 36000 Completed house. Yadgir Shahapur Kollur 2008-09 Construction of C.C. Road & Drainage From Amblayya house to Masidi. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Kollur 2008-09 Construction of C.C. Road & Drainage From Mahadevappa house to Jagajivan rav katte. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Kollur 2008-09 Const of Dobhi Ghat & Drinking Water Facilites to Cows Drinking Water Supply 145000 145000 36250 Completed Yadgir Shahapur Kollur 2009-10 Construction of C.C. Road & Drainage From Mahadevappa house to Jagajivanaram katte. CC Road and Drainage 109000 109000 0 Completed Yadgir Shahapur Kollur 2009-10 Construction of C.C. Road & Drainage From Devindrappa sadasya house to Debries. CC Road and Drainage 143000 143000 0 Completed Yadgir Shahapur Kollur 2009-10 Tha Functions of comuniction, Informetion & Education IEC 48000 32000 12000 Completed Yadgir Shahapur Kollur 2009-10 Construction of C.C. Road & Drainage From Bagamma house to Chandasab house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kollur 2009-10 Construction of C.C. Road & Drainage From Mareppa house to Bandeppa pira house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kollur 2009-10 Construction of C.C. Road & Drainage From Rayappa harijan house to Nal ruat. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Kollur 2009-10 Construction of C.C. Road & Drainage Fromdyavamma tempal to Shantagouda house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kollur 2009-10 Construction of Compound From G.P.S school. Compound wall 130000 130000 32500 Completed Yadgir Shahapur Kollur 2009-10 Drinking Water Facilites to SC Area Drinking Water Supply 94000 0 94000 Completed Yadgir Shahapur Kollur 2010-11 Tha Functions of comuniction, Informetion & Education IEC 30000 0 0 Progress Yadgir Shahapur Kollur 2010-11 Tha Functions of comuniction, Informetion & Education IEC 30000 0 0 Progress Yadgir Shahapur Kollur 2010-11 Construction of C.C. Road & Drainage from Sanna manappa house to Men road. CC Road and Drainage 148000 0 0 Progress Yadgir Shahapur Kollur 2010-11 Construction of C.C. Road & Drainage from Sanna manappa house to Men road. CC Road and Drainage 148000 0 0 Progress Yadgir Shahapur Kollur 2010-11 Construction of Compound from G.P.S. school. Compound wall 150000 0 0 Progress Yadgir Shahapur Kollur 2010-11 Construction of Compound from G.P.S. school. Compound wall 150000 0 0 Progress Yadgir Shahapur Kollur 2010-11 Improvements to Grama Panchayat Building Construction of Gram Panchayat290000 Building 290000 0 Completed Yadgir Shahapur Kollur 2010-11 Construction of C.C. Road & Drainage from Jambanna house to Tirupati house. CC Road and Drainage 100000 0 100000 Completed Yadgir Shahapur Konkal 2006-07 Development of public platform (Harali kette) Community Hall 46000 46000 11500 Completed Yadgir Shahapur Konkal 2006-07 Yankappa lachapur house to kambar akulame other works 46000 46000 11500 Completed Yadgir Shahapur Konkal 2006-07 Development of village helper room. IEC 47000 47000 11750 Completed Yadgir Shahapur Konkal 2006-07 Construction of C.C. Road & Drainege From Bhagamma temple. CC Road and Drainage 48000 48000 12000 Completed Yadgir Shahapur Konkal 2006-07 Tha Functions of comuniction, Informetion & Education IEC 88000 78000 22000 Completed Yadgir Shahapur Konkal 2006-07 Construction of C.C. Road & Drainege From Gopalasvami tempal to Basalingappa harijan house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Konkal 2006-07 Development of agsi room. other works 95000 95000 23750 Completed Yadgir Shahapur Konkal 2006-07 Development of drinking water pump house and pipeline Drinking Water Supply 96000 96000 24000 Completed Yadgir Shahapur Konkal 2007-08 Implimantation of Hanuman tempal Agasi Gate other works 45000 45000 11250 Completed Yadgir Shahapur Konkal 2007-08 Const of C.D. Works near Ambedkar Bhawan Check dam 46000 46000 11500 Completed Yadgir Shahapur Konkal 2007-08 Construction of Drainage From Ayyappa house to Basanna house. Drainage 94000 94000 23500 Completed Yadgir Shahapur Konkal 2007-08 Construction of C.C. Road & Drainage From Villej baksaid to Jambayya gadduge. CC Road and Drainage 97000 79000 24250 Completed Yadgir Shahapur Konkal 2007-08 Construction of public lebreri. Construction Of Library 134000 134000 33500 Completed Yadgir Shahapur Konkal 2007-08 Construction of C.C. Road & Drainage From Basappa dale house to Haspetl. CC Road and Drainage 141000 141000 35250 Completed Yadgir Shahapur Konkal 2007-08 Construction of Womens tolyt from lodken Nala. Drinking Water Supply 144000 144000 36000 Completed Yadgir Shahapur Konkal 2008-09 Communication & Information Education Programme IEC 68000 55000 17000 Completed Yadgir Shahapur Konkal 2008-09 Construction of C.C. Road & Drainage From Avantegar house to School. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Konkal 2008-09 Construction of C.C. Road & Drainage From Basalingappa house to Haspetal. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Konkal 2008-09 Construction of C.C. Road & Drainage From Hallikatte to Surupur farm. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Konkal 2008-09 Construction of C.C. Road & Drainage From Hanuman tempal to Kurubar ninganna house. CC Road and Drainage 114000 114000 28500 Completed

Yadgir Shahapur Konkal 2008-09 Construction of C.C. Road & Drainage From agasar ayyappa house to Kambar siddappa house. CC Road and Drainage 122000 122000 30500 Completed Yadgir Shahapur Konkal 2008-09 Construction of C.C. Road & Drainage From Agasi to Sabanna yadagiri house. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Konkal 2008-09 Construction of C.C. Road & Drainage From Ambedkar bhavan to Hnuman tempal. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Konkal 2009-10 Tha Functions of comuniction, Informetion & Education IEC 85000 71000 21250 Completed Yadgir Shahapur Konkal 2009-10 Construction of C.C. Road & Drainage From Bas stop to Agasar ningappa house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Konkal 2009-10 Construction of C.C. Road & Drainage From Basayya tat house to Hugara nagappa house. CC Road and Drainage 95000 95000 23750 Completed

Yadgir Shahapur Konkal 2009-10 Construction of C.C. Road & Drainage From Hanuman tempal to Kuruba ninganna house. CC Road and Drainage 95000 95000 23750 Completed

Yadgir Shahapur Konkal 2009-10 Construction of C.C. Road & Drainage From Jir bhimanna house to Mallayya svami house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Konkal 2009-10 Construction of C.C. Road & Drainage From Mander house to Dyavamma Ayi tempal. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Konkal 2009-10 Construction of C.C. Road & Drainage From Old haspetal to T.C. CC Road and Drainage 194000 194000 48500 Completed Yadgir Shahapur Konkal 2010-11 Tha Functions of comuniction, Informetion & Education IEC 41000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Tha Functions of comuniction, Informetion & Education IEC 41000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from Jerabandi basavaraj house to Vishvanatha house. CC Road and Drainage 44000 0 0 Not Started

Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from Jerabandi basavaraj house to Vishvanatha house. CC Road and Drainage 44000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from School to Hanamantrayagouda house. CC Road and Drainage 45000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from School to Hanamantrayagouda house. CC Road and Drainage 45000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from Basappa house to Jambayya gadduge. CC Road and Drainage 93000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from Gov.haspetal to Mullara house. CC Road and Drainage 93000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from Basappa house to Jambayya gadduge. CC Road and Drainage 93000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from Gov.haspetal to Mullara house. CC Road and Drainage 93000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from Men road to Anganavadi. CC Road and Drainage 94000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from Men road to Anganavadi. CC Road and Drainage 94000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from Ninganna pujari house to Ibrahimsab hotal. CC Road and Drainage 144000 0 0 Not Started Yadgir Shahapur Konkal 2010-11 Construction of C.C. Road & Drainage from Ninganna pujari house to Ibrahimsab hotal. CC Road and Drainage 144000 0 0 Not Started Yadgir Shahapur Kurkunda 2006-07 Tha Functions of comuniction, Informetion & Education IEC 0 0 0 Completed Yadgir Shahapur Kurkunda 2006-07 Construction of public platform near Halkatte. Community Hall 46000 46000 11500 Completed Yadgir Shahapur Kurkunda 2006-07 Construction of women's toilet beside hill. Construction of Toilet 61000 61000 15250 Completed Yadgir Shahapur Kurkunda 2006-07 under progress of drianage and concrete from police goudru house to Choudi katte. Drainage 145000 145000 36250 Completed Yadgir Shahapur Kurkunda 2006-07 Construction of C.C road in Vani Bhimappa ward. CC Road 195000 195000 48750 Completed Yadgir Shahapur Kurkunda 2006-07 Construction of road and drianage from Gouramma Maggad to Mareppa Prayati's house. CC Road and Drainage 195000 195000 48750 Completed Yadgir Shahapur Kurkunda 2007-08 Tha Functions of comuniction, Informetion & Education IEC 27000 16000 6750 Completed Yadgir Shahapur Kurkunda 2007-08 Construction of Compund from H.P.S. school. Compound wall 94000 94000 23500 Completed Yadgir Shahapur Kurkunda 2007-08 Construction of Drainage From Hadapada house to Agasara house. Drainage 94000 94000 23500 Completed Yadgir Shahapur Kurkunda 2007-08 Construction of Womens tolyt from Kamiri hal Construction of Toilet 95000 95000 23750 Completed Yadgir Shahapur Kurkunda 2007-08 Water facilites to dobhi ghat Drinking Water Supply 95000 95000 23750 Completed Yadgir Shahapur Kurkunda 2007-08 Electricity Facilites to 60 pols in internal roads CC Road 96000 96000 24000 Completed Yadgir Shahapur Kurkunda 2008-09 Communication & Information Education Programme IEC 10000 6000 2500 Completed Yadgir Shahapur Kurkunda 2008-09 Construction of Concrete Road & Drainage From Gurupadappa house to Men road. CC Road and Drainage 44000 44000 11000 Completed Yadgir Shahapur Kurkunda 2008-09 Picthing to Halakatte to Darga Pitching Work 94000 94000 23500 Completed Yadgir Shahapur Kurkunda 2008-09 Const of Anganwadi Buildng Anganavadi building 144000 144000 36000 Completed Construction of Concrete Road & Drainage From Shekappa house to Malardde shivappa gourda Yadgir Shahapur Kurkunda 2008-09 CC Road and Drainage 145000 145000 36250 Completed house. Yadgir Shahapur Kurkunda 2008-09 Construction of Concrete Road & Drainage From Joshi house to Siddanna house. CC Road and Drainage 193000 193000 48250 Completed Yadgir Shahapur Kurkunda 2009-10 Tha Functions of comuniction, Informetion & Education IEC 21000 10000 5250 Completed Yadgir Shahapur Kurkunda 2009-10 Construction of C.C. Road & Drainage From Shivappa gouda house to Halakatte. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Kurkunda 2009-10 Const of Basaveshwara Katte & Slab Flooring BS Slabs flooring 95000 95000 23750 Completed Yadgir Shahapur Kurkunda 2009-10 Construction of C.C. Road & Drainage From Sharanappa house to Danakayiyavar house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kurkunda 2009-10 Construction of C.C. Road & Drainage From Sharanappa payti house to Gorakatte. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Kurkunda 2009-10 Construction of C.C. Road & Drainage From Basaveshvar chouka to Huliyappa house. CC Road and Drainage 114000 114000 28500 Completed Yadgir Shahapur Kurkunda 2009-10 Construction of C.C. Road & Drainage From Maragamma tempal to Durgamma tempal. CC Road and Drainage 122000 122000 30500 Completed Yadgir Shahapur Kurkunda 2010-11 Tha Functions of comuniction, Informetion & Education IEC 33000 0 0 Progress Yadgir Shahapur Kurkunda 2010-11 Tha Functions of comuniction, Informetion & Education IEC 33000 0 0 Progress Yadgir Shahapur Kurkunda 2010-11 Const of Roof Slab to Agasi Katte BS Slabs flooring 130000 130000 0 Completed Yadgir Shahapur Kurkunda 2010-11 Drinking Water Facilites in Vallage Drinking Water Supply 250000 250000 0 Completed Yadgir Shahapur Kurkunda 2010-11 Const of Drain from Ayyammana House to Gopayya House Drainage 90000 0 90000 Progress Yadgir Shahapur Kurkunda 2010-11 Const of Drain from Ayyammana House to Gopayya House Drainage 90000 0 90000 Progress Yadgir Shahapur Mudbool 2006-07 Construction of Anganavadi. Anganavadi building 45000 45000 11250 Completed Yadgir Shahapur Mudbool 2006-07 housing facility. 1. Prabavati / Sanganna 2. Basamma / Ningappa other works 46000 46000 11500 Completed Yadgir Shahapur Mudbool 2006-07 Tha Functions of comuniction, Informetion & Education IEC 78000 66000 19500 Completed Yadgir Shahapur Mudbool 2006-07 construction of women public toilet in harijana ward. Construction of Toilet 122000 122000 30500 Completed Yadgir Shahapur Mudbool 2006-07 Construction of C.C. Road & Drainege From Marutappa house to Hanuman tempal. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Mudbool 2006-07 Construction of C.C. Road & Drainege From Biral sopanna house to CC Road and Drainage 146000 146000 36500 Completed Yadgir Shahapur Mudbool 2007-08 Houseing peshaliti 1. Mallamma Bhimashankar 2. Mallamma Devindrappa saladapur. other works 45000 45000 11250 Completed Yadgir Shahapur Mudbool 2007-08 Houseing peshaliti 1. Gouramma Sahebgouda 2. Shantamma Sharanappa pujari. other works 46000 46000 11500 Completed Yadgir Shahapur Mudbool 2007-08 Tha Functions of comuniction, Informetion & Education IEC 58000 37000 14500 Completed Yadgir Shahapur Mudbool 2007-08 Reconstruction of G.P.School Room School Compound and Buildings94000 94000 23500 Completed Yadgir Shahapur Mudbool 2007-08 Construction of C.C. Road & Drainage From Saiyad chanda fram to Laxmi tempal. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Mudbool 2007-08 Construction of C.C. Road & Drainage From Hanuman tempal to Darga. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Mudbool 2007-08 Construction of C.C. Road & Drainage From Marutappa house to Agasi. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Mudbool 2007-08 Construction of C.C. Road & Drainage From Chousri house to Bhandari house. CC Road and Drainage 183000 183000 45750 Completed Yadgir Shahapur Mudbool 2008-09 Communication & Information Education Programme IEC 60000 49000 15000 Completed Yadgir Shahapur Mudbool 2008-09 Improvements to Anganwadi Building Anganavadi building 94000 94000 23500 Completed Yadgir Shahapur Mudbool 2008-09 Drinking Water Facilites & Improvements Drinking Water Supply 95000 95000 23750 Completed Yadgir Shahapur Mudbool 2008-09 Construction of C.C. Road & Drainage From Nala to Sabavva house. CC Road and Drainage 193000 193000 48250 Completed Yadgir Shahapur Mudbool 2008-09 Construction of C.C. Road & Drainage From Sayabanna house to School. CC Road and Drainage 193000 193000 48250 Completed Construction of C.C. Road From Bhimashankar house to Nagamma goudagera house & tempal. Yadgir Shahapur Mudbool 2008-09 CC Road 194000 194000 48500 Completed (S.C. warda) Yadgir Shahapur Mudbool 2008-09 Construction of C.C. Road & Drainage From Sabanna house to Somaraya house. CC Road and Drainage 195000 195000 48750 Completed Yadgir Shahapur Mudbool 2009-10 Construction of C.C. Road & Drainage From Sahebagouda malagi house to Darga. CC Road and Drainage 145000 145000 0 Completed Yadgir Shahapur Mudbool 2009-10 Construction of C.C. Road & Drainage From Kodachi siddappa house to Maradanappa house. CC Road and Drainage 193000 193000 0 Completed Yadgir Shahapur Mudbool 2009-10 Tha Functions of comuniction, Informetion & Education IEC 38000 0 38000 Completed Construction of C.C. Road & Drainage From Harijan warda kenchamma tempal to Hanuman Yadgir Shahapur Mudbool 2009-10 CC Road and Drainage 193000 193000 48250 Completed tempal. Yadgir Shahapur Mudbool 2009-10 Construction of C.C. Road & Drainage From Sabavva house Darga. CC Road and Drainage 194000 194000 48500 Completed Yadgir Shahapur Mudbool 2010-11 Tha Functions of comuniction, Informetion & Education IEC 51000 0 0 Progress Yadgir Shahapur Mudbool 2010-11 Tha Functions of comuniction, Informetion & Education IEC 51000 0 0 Progress Yadgir Shahapur Mudbool 2010-11 Construction of C.C. Road & Drainage from Hanuman tempal to Itagi road. CC Road and Drainage 230000 0 0 Progress Yadgir Shahapur Mudbool 2010-11 Construction of C.C. Road & Drainage from Hanuman tempal to Itagi road. CC Road and Drainage 230000 0 0 Progress Yadgir Shahapur Mudbool 2010-11 Repair Works to Primary School (2Room0 Repair Works 180000 180000 0 Completed Yadgir Shahapur Mudbool 2010-11 Improvements to Street Light Solar System 46000 0 130000 Completed Yadgir Shahapur Mudriki 2006-07 Tha Functions of comuniction, Informetion & Education IEC 53000 38000 13250 Completed Yadgir Shahapur Mudriki 2006-07 Construction of C.C. Road & Drainege From Open well to Parasapur mallappa house. CC Road and Drainage 71000 71000 17750 Completed Yadgir Shahapur Mudriki 2006-07 Construction of coumpend from grama panchayat. Construction of Gram Panchayat85000 Building 85000 21250 Completed Yadgir Shahapur Mudriki 2006-07 Construction of Bayalu ranga mandir in Madhigara oni. Drama Theater 85000 85000 21250 Completed Yadgir Shahapur Mudriki 2006-07 Construction of Coumpend from G.P.H. School. School Compound and Buildings86000 86000 21500 Completed Yadgir Shahapur Mudriki 2006-07 construction of women public toilet beside Kanchakavi road. Construction of Toilet 95000 95000 23750 Completed Yadgir Shahapur Mudriki 2006-07 construction of women public toilet beside Gogi road. Construction of Toilet 96000 96000 24000 Completed Yadgir Shahapur Mudriki 2007-08 Tha Functions of comuniction, Informetion & Education IEC 10000 6000 2500 Completed Yadgir Shahapur Mudriki 2007-08 Construction of C.C. Road & Drainage From Bhimappa house to Mallappa kollur house. CC Road and Drainage 115000 115000 28750 Completed Yadgir Shahapur Mudriki 2007-08 Construction of C.C. Road & Drainage From Janata kaloni to Gurulingayya gadduge. CC Road and Drainage 116000 116000 29000 Completed Yadgir Shahapur Mudriki 2007-08 Construction of Womens tolyt from Kanchanakavi Road said. Construction of Toilet 144000 144000 36000 Completed Yadgir Shahapur Mudriki 2007-08 Construction of Womens tolyt from Gogi road said. Construction of Toilet 145000 145000 36250 Completed Yadgir Shahapur Mudriki 2007-08 Construction of C.C. Road & Drainage From Grama panchayat to Janata kaloni. CC Road and Drainage 259000 259000 64750 Completed Yadgir Shahapur Mudriki 2008-09 Communication & Information Education Programme IEC 85000 72000 21250 Completed Yadgir Shahapur Mudriki 2008-09 Improvements to Anaganwadi Building Anganavadi building 94000 94000 23500 Completed Yadgir Shahapur Mudriki 2008-09 Construction of Coumpound From G.P.S. school. School Compound and Buildings96000 96000 24000 Completed Yadgir Shahapur Mudriki 2008-09 Construction of C.C. Road & Drainage From Shantagouda house to Manrasvami house. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Mudriki 2008-09 Construction of C.C. Road & Drainage From Bhudanura sabanna house to Tanda. CC Road and Drainage 173000 173000 43250 Completed Yadgir Shahapur Mudriki 2008-09 Construction of C.C. Road & Drainage From Gachchi house to Shankrappa open wall. CC Road and Drainage 392000 392000 98000 Completed Yadgir Shahapur Mudriki 2009-10 Tha Functions of comuniction, Informetion & Education IEC 70000 40000 17500 Completed Yadgir Shahapur Mudriki 2009-10 Construction of C.C. Road & Drainage From Basavanna tempal to Sevalal tempal. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Mudriki 2009-10 Construction of C.C. Road & Drainage From G.P.S school to Harijan open wall. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Mudriki 2009-10 Construction of C.C. Road & Drainage From Paramanna house to Nagappa house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Mudriki 2009-10 Construction of C.C. Road & Drainage From Rajanna house to Guranna angadi. CC Road and Drainage 183000 183000 45750 Completed Yadgir Shahapur Mudriki 2009-10 Construction of C.C. Road & Drainage From S.C. Eriya pillappa house to Janata kaloni. CC Road and Drainage 184000 184000 46000 Completed Yadgir Shahapur Mudriki 2010-11 Tha Functions of comuniction, Informetion & Education IEC 26000 0 0 Progress Yadgir Shahapur Mudriki 2010-11 Tha Functions of comuniction, Informetion & Education IEC 26000 0 0 Progress Yadgir Shahapur Mudriki 2010-11 Construction of School grdan. Construction of School Building80000 0 0 Progress Yadgir Shahapur Mudriki 2010-11 Construction of School grdan. Construction of School Building80000 0 0 Progress Yadgir Shahapur Mudriki 2010-11 Construction of Compound from G.H.S. school. Compound wall 485000 280000 0 Progress Yadgir Shahapur Mudriki 2010-11 Construction of Compound from G.H.S. school. Compound wall 485000 280000 0 Progress Yadgir Shahapur Naganatagi 2006-07 Construction of Drainege From Devalanayak house to Nala. Drainage 45000 45000 11250 Completed Yadgir Shahapur Naganatagi 2006-07 Construction of C.C road and Drainegefrom tanda borwell to Hubballi Hanumanta's house. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Naganatagi 2006-07 Construction of Drainege From Whater tyanka to Nala. Drainage 95000 95000 23750 Completed housing facility. 1. Basamma wo/ Bhimappa 2. Gangamma wo/ Kanakappa 3. Taribayi wo/ Yadgir Shahapur Naganatagi 2006-07 other works 95000 95000 23750 Completed Tukarama 4. Laxmi wo/ Lakxmana saydapur Yadgir Shahapur Naganatagi 2006-07 Tha Functions of comuniction, Informetion & Education IEC 96000 78000 24000 Completed Yadgir Shahapur Naganatagi 2006-07 Construction of C.C road and Drainegefrom Bavigatte Somappa's house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Naganatagi 2006-07 construction of public toilet. Construction of Toilet 121000 121000 30250 Completed Yadgir Shahapur Naganatagi 2007-08 Const of CC Road from Putrappa House to Old CD Check dam 64000 64000 16000 Completed Yadgir Shahapur Naganatagi 2007-08 Construction of & Drainage From Drainage 65000 65000 16250 Completed Yadgir Shahapur Naganatagi 2007-08 Construction of C.C. Raod & Drainage From Sevalal tempal to road CC Road and Drainage 66000 66000 16500 Completed Yadgir Shahapur Naganatagi 2007-08 Construction of C.C. Raod & Drainage From Chandappa house to Road. CC Road and Drainage 68000 53000 17000 Completed Yadgir Shahapur Naganatagi 2007-08 Construction of C.C. Raod & Drainage From Hanuman tempal to Siddappa house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Naganatagi 2007-08 Drinkin water & Pipeline ficiliety Pipeline 97000 97000 24250 Completed Yadgir Shahapur Naganatagi 2007-08 Construction of C.C. Raod & Drainage From Bhimanna gouda house to School. CC Road and Drainage 115000 115000 28750 Completed Yadgir Shahapur Naganatagi 2007-08 Construction of Pablic tolyt Construction of Toilet 193000 193000 48250 Completed Yadgir Shahapur Naganatagi 2007-08 Protection wall from Babu house to Nalha Compound wall 194000 194000 48500 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of Drainage From Shantamma house to Samuda bhavan. Drainage 44000 44000 11000 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of C.C. Road & Drainage From Sahebgouda house to chandappa house. CC Road and Drainage 69000 69000 17250 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of C.C. Road & Drainage From Bhimappa house to Dandappa house. CC Road and Drainage 74000 74000 18500 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of C.C. Road & Drainage From Giriyappa imandar house to Goudappa gouda house. CC Road and Drainage 75000 75000 18750 Completed Yadgir Shahapur Naganatagi 2008-09 Communication & Information Education Programme IEC 94000 79000 23500 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of C.C. Road & Drainage From Amblappa rayachur house to Kharim sab house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of Drainage From Pillamma tempal to Road. Drainage 94000 94000 23500 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of C.C. Road & Drainage From Sopanna hadapa house to Agasi. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of Compound From G.P.S. school. Compound wall 96000 96000 24000 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of C.C. Road & Drainage From Bas stop to Tempal. CC Road and Drainage 113000 113000 28250 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of C.C. Road & Drainage From Sharanappa sannati house to Hosamani. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Naganatagi 2008-09 Construction of C.C. Road & Drainage From Basappa harijan house to Men road. CC Road and Drainage 193000 193000 48250 Completed Yadgir Shahapur Naganatagi 2009-10 Construction of Drainage From Hanuman tempal to Men road. Drainage 74000 74000 18500 Completed Yadgir Shahapur Naganatagi 2009-10 Tha Functions of comuniction, Informetion & Education IEC 79000 50000 19750 Completed Yadgir Shahapur Naganatagi 2009-10 Construction of C.C. Road From Mallappa house to School. CC Road 84000 84000 21000 Completed Yadgir Shahapur Naganatagi 2009-10 Construction of C.C. Road From Devindrappa house to Nela. CC Road 85000 85000 21250 Completed Yadgir Shahapur Naganatagi 2009-10 Construction of Drainage From Harijan vada subhas house to Men roat. Drainage 86000 86000 21500 Completed Yadgir Shahapur Naganatagi 2009-10 Construction of Drainage From Panchayat to Hastal. Drainage 93000 93000 23250 Completed Yadgir Shahapur Naganatagi 2009-10 Construction of C.C. Road From Piddappa gouda house to Bhimbayi marakal house. CC Road 173000 173000 43250 Completed Yadgir Shahapur Naganatagi 2009-10 Repair Works to Govt Primary School at Saidapur Repair Works 174000 174000 43500 Completed Yadgir Shahapur Naganatagi 2010-11 Tha Functions of comuniction, Informetion & Education IEC 31000 31000 0 Completed Yadgir Shahapur Naganatagi 2010-11 Construction of C.C. Road & Drainage from Shekhar house to Hanuman tempal. CC Road and Drainage 75000 75000 0 Completed Yadgir Shahapur Naganatagi 2010-11 Construction of C.C. Road & Drainage from Devati tempal to Siddanna badiger house. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Naganatagi 2010-11 Construction of C.C. Road & Drainage from Bas stop to Irannagouda house. CC Road and Drainage 105000 105000 0 Completed Yadgir Shahapur Naganatagi 2010-11 Construction of C.C. Road & Drainage from Hanuman tempal to Men road. CC Road and Drainage 195000 195000 0 Completed Yadgir Shahapur Naganatagi 2010-11 Construction of C.C. Road & Drainage from Hanuman tempal to Kenal. CC Road and Drainage 70000 0 70000 Completed Yadgir Shahapur Naganatagi 2010-11 Construction of C.C. Road & Drainage from Hanuman tempal to Kenal. CC Road and Drainage 96000 0 96000 Completed Yadgir Shahapur 2006-07 Tha Functions of comuniction, Informetion & Education IEC 66000 41000 16500 Completed Yadgir Shahapur Naikal 2006-07 Construction of C.C. Road & Drainege From Maligouda hpuse to Rakkasagi house. CC Road and Drainage 115000 115000 28750 Completed Yadgir Shahapur Naikal 2006-07 Construction of C.C. Road & Drainege From Iauba house to New rood. CC Road and Drainage 125000 125000 31250 Completed Yadgir Shahapur Naikal 2006-07 Construction of C.C. Road & Drainege From Dodda choudri house to Devindrappa frent house. CC Road and Drainage 126000 126000 31500 Completed Yadgir Shahapur Naikal 2006-07 Construction of C.C. Road & Drainege From Bhimarayan goudar Hause to L. Tolyt. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Naikal 2007-08 Construction of C.C. Road & Drainage From Virabhadra tempal to Agasi. CC Road and Drainage 95000 80000 23750 Completed Yadgir Shahapur Naikal 2007-08 Protection wall from Kumbar House to Hugar House Compound wall 96000 96000 24000 Completed Yadgir Shahapur Naikal 2007-08 Construction of C.C. Road & Drainage From Hanamanta house to Bhimappa house. CC Road and Drainage 114000 114000 28500 Completed Yadgir Shahapur Naikal 2007-08 Construction of Womens tolyt Construction of Toilet 134000 134000 33500 Completed Yadgir Shahapur Naikal 2007-08 Construction of C.C. Road & Drainage From Bhagappa yadagir house to Charcha. CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Naikal 2007-08 Construction of Pablic tolyt Construction of Toilet 199000 199000 49750 Completed Yadgir Shahapur Naikal 2008-09 Construction of Drainage From Men road to Juble sab bendebembali house. Drainage 94000 94000 23500 Completed Yadgir Shahapur Naikal 2008-09 Communication & Information Education Programme IEC 95000 81000 23750 Completed Yadgir Shahapur Naikal 2008-09 Construction of Compound From G.P.S. school. Compound wall 132000 132000 33000 Completed Yadgir Shahapur Naikal 2008-09 Construction of C.C. Road & Drainage From Moulali kaloni. CC Road and Drainage 144000 144000 36000 Completed Construction of C.C. Road & Drainage From Ayyamma anusur house to Huchchappa natekar Yadgir Shahapur Naikal 2008-09 CC Road and Drainage 163000 163000 40750 Completed house. Yadgir Shahapur Naikal 2008-09 Construction of C.C. Road & Drainage From Ningappa rotnadagi house to Philipa Doni. CC Road and Drainage 173000 173000 43250 Completed Yadgir Shahapur Naikal 2008-09 Construction of C.C. Road & Drainage From Shekhareddi mayi house to Siddannagouda house. CC Road and Drainage 174000 174000 43500 Completed Yadgir Shahapur Naikal 2009-10 Construction of C.C. Road & Drainage From Agasi to Sabayya iligar house. CC Road and Drainage 94000 94000 0 Completed Construction of C.C. Road & Drainage From Ramanna midate house to Sannasabanna badager Yadgir Shahapur Naikal 2009-10 CC Road and Drainage 121000 121000 0 Completed house. Yadgir Shahapur Naikal 2009-10 Construction of C.C. Road & Drainage From Birappa tempal to Tayamma tempal. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Naikal 2009-10 Construction of C.C. Road & Drainage From Mahadevappa kakxajji house to Kamanna katte. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Naikal 2009-10 Tha Functions of comuniction, Informetion & Education IEC 100000 71000 25000 Completed Yadgir Shahapur Naikal 2009-10 Construction of C.C. Road & Drainage From Alis house to Sharanappa agasar house. CC Road and Drainage 119000 119000 29750 Completed Yadgir Shahapur Naikal 2009-10 Construction of C.C. Road & Drainage From Malleshappa house to Hosmani. CC Road and Drainage 98000 0 98000 Completed Yadgir Shahapur Naikal 2010-11 Tha Functions of comuniction, Informetion & Education IEC 20000 0 0 Progress Yadgir Shahapur Naikal 2010-11 Tha Functions of comuniction, Informetion & Education IEC 20000 0 0 Progress Yadgir Shahapur Naikal 2010-11 Construction of Gram panchayat. Construction of Gram Panchayat545000 Building 545000 0 Completed Yadgir Shahapur Rastapur 2006-07 housing facility. 1. Manamma / Suresha 2. Manamma / Ambranna 3. Rehamanabi / Sopisaba other works 70000 70000 17500 Completed Yadgir Shahapur Rastapur 2006-07 Tha Functions of comuniction, Informetion & Education IEC 97000 80000 24250 Completed Yadgir Shahapur Rastapur 2006-07 construction of womens toilet. Construction of Toilet 145000 145000 36250 Completed Yadgir Shahapur Rastapur 2006-07 construction of womens toilet near Yallamma temple. Construction of Toilet 166000 166000 41500 Completed Yadgir Shahapur Rastapur 2006-07 Construction of C.C. Road & Drainege From Birappa tempal to Honnappa house. CC Road and Drainage 174000 174000 43500 Completed Yadgir Shahapur Rastapur 2007-08 Tha Functions of comuniction, Informetion & Education IEC 5000 5000 1250 Completed Yadgir Shahapur Rastapur 2007-08 Houseing peshaliti 1. Bassamma Sharabanna 2. Rajeshri Bhimayya other works 46000 46000 11500 Completed Yadgir Shahapur Rastapur 2007-08 Construction of C.C. Road & Drainage From Naykodi house to Agasi. CC Road and Drainage 217000 217000 54250 Completed Yadgir Shahapur Rastapur 2007-08 Construction of C.C. Road & Drainage From Open wall to Nala. CC Road and Drainage 217000 217000 54250 Completed Yadgir Shahapur Rastapur 2007-08 Construction of C.C. Road & Drainage From Bas stop to School. CC Road and Drainage 218000 218000 54500 Completed Yadgir Shahapur Rastapur 2007-08 Construction of C.C. Road & Drainage From Lachamappa kuri house to Kongandi road. CC Road and Drainage 218000 218000 54500 Completed Yadgir Shahapur Rastapur 2007-08 Construction of C.C. Road & Drainage From N.H. road to Hanumanta house. CC Road and Drainage 218000 218000 54500 Completed Yadgir Shahapur Rastapur 2007-08 Construction of C.C. Road & Drainage From Ramanna kavali house to Paramanna kuri house. CC Road and Drainage 219000 219000 54750 Completed Yadgir Shahapur Rastapur 2008-09 Communication & Information Education Programme IEC 44000 32000 11000 Completed Yadgir Shahapur Rastapur 2008-09 Construction of C.C. Road & Drainage From Yallamma tempal to Bandenavaj. CC Road and Drainage 143000 143000 35750 Completed Yadgir Shahapur Rastapur 2008-09 Const of Dobhi Ghat & Drining water ficilites Drinking Water Supply 163000 163000 40750 Completed Yadgir Shahapur Rastapur 2008-09 Construction of C.C. Road & Drainage From Birappa tempal to Girini. CC Road and Drainage 203000 203000 50750 Completed Yadgir Shahapur Rastapur 2008-09 Construction of C.C. Road & Drainage From dyavamma tempal to Amarappa house. CC Road and Drainage 214000 214000 53500 Completed Yadgir Shahapur Rastapur 2008-09 Construction of C.C. Road & Drainage From Maremma tempal to Rayappa tempal. CC Road and Drainage 214000 214000 53500 Completed Yadgir Shahapur Rastapur 2008-09 Construction of C.C. Road & Drainage From agasara manappa house to Rastapur road. CC Road and Drainage 215000 215000 53750 Completed Yadgir Shahapur Rastapur 2008-09 Construction of C.C. Road & Drainage From Smashan to S.C. open wall. CC Road and Drainage 233000 233000 58250 Completed Yadgir Shahapur Rastapur 2008-09 Construction of C.C. Road & Drainage From Open wall to house. CC Road and Drainage 254000 254000 63500 Completed Yadgir Shahapur Rastapur 2009-10 Const of Dobhi Ghat and Drinking water facilites Drinking Water Supply 193000 193000 0 Completed Yadgir Shahapur Rastapur 2009-10 Construction of C.C. Road & Drainage From Sopamma house to Susayiti. CC Road and Drainage 194000 194000 0 Completed Yadgir Shahapur Rastapur 2009-10 Tha Functions of comuniction, Informetion & Education IEC 49000 22000 12250 Completed Yadgir Shahapur Rastapur 2009-10 Construction of C.C. Road & Drainage From Agasi to vaggayya house. CC Road and Drainage 144000 144000 36000 Completed Houseing peshaliti. 1. Manamma w/o Suresha 2. Manamma w/o SaMbanna 3. Rahamanabi w/o Yadgir Shahapur Rastapur 2009-10 other works 158000 158000 39500 Completed Sopisab 4. Bassamma w/o Sayibanna 5. Sri. Bhimayya. Yadgir Shahapur Rastapur 2009-10 Construction of C.C. Road & Drainage From Yallamma tempal to Bandenavaj house. CC Road and Drainage 70000 0 70000 Completed Yadgir Shahapur Rastapur 2010-11 Tha Functions of comuniction, Informetion & Education IEC 38000 0 0 Progress Yadgir Shahapur Rastapur 2010-11 Tha Functions of comuniction, Informetion & Education IEC 38000 0 0 Progress Yadgir Shahapur Rastapur 2010-11 Construction of C.C. Road & Drainage from Iramma house to S.C. Somalingappa house. CC Road and Drainage 90000 0 0 Progress Yadgir Shahapur Rastapur 2010-11 Construction of C.C. Road & Drainage from Maremma tempal to kamiti hal. CC Road and Drainage 90000 0 0 Progress Yadgir Shahapur Rastapur 2010-11 Construction of C.C. Road & Drainage from Iramma house to S.C. Somalingappa house. CC Road and Drainage 90000 0 0 Progress Yadgir Shahapur Rastapur 2010-11 Construction of C.C. Road & Drainage from Maremma tempal to kamiti hal. CC Road and Drainage 90000 0 0 Progress Yadgir Shahapur Rastapur 2010-11 Construction of C.C. Road & Drainage from Tippanna jalapi house to Charcha. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Rastapur 2010-11 Construction of C.C. Road from Mukappa house to Shankarappa house. CC Road 105000 105000 0 Completed Yadgir Shahapur Rastapur 2010-11 Construction of C.C. Road & Drainage from Kurabar amblappa house to Krishnapur road. CC Road and Drainage 110000 110000 0 Completed Yadgir Shahapur Rastapur 2010-11 Construction of C.C. Road & Drainage from Ambedkar bhavan to Bhimappa tempal. CC Road and Drainage 100000 0 100000 Completed Yadgir Shahapur Sagar 2006-07 Construction of C.C. Road & Drainege From virapur villge in sitamma house to school. CC Road and Drainage 45000 45000 11250 Completed Yadgir Shahapur Sagar 2006-07 Construction of C.C. Road & Drainege From Hoslli doddi Hanuman tempal to Men rood. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Sagar 2006-07 Tha Functions of comuniction, Informetion & Education IEC 56000 39000 14000 Completed Yadgir Shahapur Sagar 2006-07 Construction of C.C. Road & Drainege From timmapur villge School to Bhagappa house. CC Road and Drainage 56000 56000 14000 Completed Yadgir Shahapur Sagar 2006-07 Construction of C.C. Road & Drainege From Lingasugur house to Bhagamma tempal. CC Road and Drainage 64000 64000 16000 Completed Yadgir Shahapur Sagar 2006-07 Construction of C.C. Road & Drainege From Dr// Abida house to Sanna masidi. CC Road and Drainage 65000 65000 16250 Completed Construction of C.C. Road & Drainege From & Drainage From Hurar hanamntra house to Yadgir Shahapur Sagar 2006-07 CC Road and Drainage 65000 65000 16250 Completed Mahadevappa house. Yadgir Shahapur Sagar 2006-07 Construction of Drainage from Mallamma mastani house to Men rood. Drainage 65000 65000 16250 Completed Yadgir Shahapur Sagar 2006-07 Construction of C.C. Road & Drainege From Kalam open wall to Niungamma tempal. CC Road and Drainage 66000 66000 16500 Completed Yadgir Shahapur Sagar 2006-07 Drainege From Birappa tempal to Ganganna sayi house. Drainage 66000 66000 16500 Completed Yadgir Shahapur Sagar 2007-08 Tha Functions of comuniction, Informetion & Education IEC 22000 16000 5500 Completed Yadgir Shahapur Sagar 2007-08 Construction of C.C. Road & Drainage From Hosalli devati tempal to Whater tyank. CC Road and Drainage 49000 49000 12250 Completed Yadgir Shahapur Sagar 2007-08 Construction of C.C. Road From Devate tempal to Hanuman tempal. CC Road 49000 49000 12250 Completed Yadgir Shahapur Sagar 2007-08 Construction of C.C. Road & Drainage From Samudaya bhavan to Lachamappa house. CC Road and Drainage 50000 50000 12500 Completed Yadgir Shahapur Sagar 2007-08 Construction of C.C. Road & Drainage From Nimbevva bhajantri house to Nagappa house. CC Road and Drainage 98000 98000 24500 Completed Yadgir Shahapur Sagar 2007-08 Construction of C.C. Road & Drainage From Koravar open wall to Patri matha. CC Road and Drainage 99000 99000 24750 Completed Yadgir Shahapur Sagar 2007-08 Construction of C.C. Road & Drainage From Basanna tempal to Sharanamma matha. CC Road and Drainage 134000 134000 33500 Completed Yadgir Shahapur Sagar 2007-08 Construction of C.C. Road & Drainage From Basavarajppa pagad house to Sanganna marsa house. CC Road and Drainage 135000 135000 33750 Completed Yadgir Shahapur Sagar 2007-08 Construction of C.C. Road & Drainage From Baba nayakodi house to Saragar house. CC Road and Drainage 138000 138000 34500 Completed Yadgir Shahapur Sagar 2007-08 Construction of C.C. Road & Drainage From Kallappa hundanur house to Basavanna tempal. CC Road and Drainage 139000 139000 34750 Completed

Yadgir Shahapur Sagar 2007-08 Construction of C.C. Road & Drainage From Yadagir mallappa house to Sopanna bhagur house. CC Road and Drainage 139000 139000 34750 Completed Yadgir Shahapur Sagar 2008-09 Construction of Drainage From Timmapur doddi yallappa jouse to borivel. Drainage 24000 24000 6000 Completed Yadgir Shahapur Sagar 2008-09 Construction of 2 said Drainage From Piddappa house to Road in hosalli doddi. Drainage 74000 74000 18500 Completed Yadgir Shahapur Sagar 2008-09 Construction of C.C. Road & Drainage From Virapapur sabanna house to Hanumanta house. CC Road and Drainage 75000 75000 18750 Completed Yadgir Shahapur Sagar 2008-09 Repair Works to Drainage from Post office to Sharnamma Devi Math Drainage 77000 67000 19250 Completed Yadgir Shahapur Sagar 2008-09 Construction of Drainage From Lachamanna house to Sangappa house in harijan vada. Drainage 78000 78000 19500 Completed Yadgir Shahapur Sagar 2008-09 Const of Ladies Toilet near Holi Katta Construction of Toilet 123000 123000 30750 Completed Yadgir Shahapur Sagar 2008-09 Construction of C.C. Road & Drainage From Janardana house to Mallayya badiger house. CC Road and Drainage 133000 133000 33250 Completed Yadgir Shahapur Sagar 2008-09 Const of Group Toilet At Kslur area Construction of Toilet 133000 133000 33250 Completed Yadgir Shahapur Sagar 2008-09 Construction of C.C. Road & Drainage From Katagar badesab house to Najirasab house. CC Road and Drainage 134000 134000 33500 Completed Yadgir Shahapur Sagar 2008-09 Construction of Drainage From Mahantesha house to Malkanna house malled eriya. Drainage 134000 134000 33500 Completed Construction of C.C. Road & Drainage From Amateppa pagad house to Sharanappa halagera Yadgir Shahapur Sagar 2008-09 CC Road and Drainage 135000 135000 33750 Completed house. Yadgir Shahapur Sagar 2008-09 Construction of Drainage From Mailarappa house to Petrol banka. Drainage 193000 193000 48250 Completed Construction of C.C. Road & Drainage From Amblappa pujari house to Hanamanta satyan petha Yadgir Shahapur Sagar 2009-10 CC Road and Drainage 64000 64000 0 Completed house. Yadgir Shahapur Sagar 2009-10 Construction of C.C. Road & Drainage From Bassamma house to Badager house. CC Road and Drainage 65000 65000 0 Completed Yadgir Shahapur Sagar 2009-10 Construction of C.C. Road & Drainage From Da: Iptakar hous to Phiraji oni. CC Road and Drainage 65000 65000 0 Completed Yadgir Shahapur Sagar 2009-10 Construction of C.C. Road & Drainage From Bhimashankar house to Phirsab bevin gida. CC Road and Drainage 66000 66000 0 Completed Yadgir Shahapur Sagar 2009-10 Tha Functions of comuniction, Informetion & Education IEC 22000 11000 5500 Completed Yadgir Shahapur Sagar 2009-10 Construction of C.C. Road & Drainage From Kandushen house to Ismayil loyid house. CC Road and Drainage 64000 64000 16000 Completed Yadgir Shahapur Sagar 2009-10 Construction of C.C. Road & Drainage From Shivanna jayi house to Bagamma tempal. CC Road and Drainage 64000 64000 16000 Completed Yadgir Shahapur Sagar 2009-10 Construction of C.C. Road & Drainage From Sanganna gaggar house to Open wall. CC Road and Drainage 64400 64400 16100 Completed Yadgir Shahapur Sagar 2009-10 Construction of C.C. Road & Drainage From Yadrami house to Karim vanadurga house. CC Road and Drainage 65000 65000 16250 Completed Yadgir Shahapur Sagar 2009-10 Construction of C.C. Road & Drainage From Bajar to Karnal shivayya house. CC Road and Drainage 66000 66000 16500 Completed Yadgir Shahapur Sagar 2009-10 Construction of C.C. Road & Drainage From Devamma tempal to Gouramma channur house. CC Road and Drainage 66000 66000 16500 Completed Yadgir Shahapur Sagar 2009-10 Const of Ladies Toilet at Harijan Wada Construction of Toilet 93000 0 93000 Completed Yadgir Shahapur Sagar 2010-11 Tha Functions of comuniction, Informetion & Education IEC 21000 0 0 Progress Yadgir Shahapur Sagar 2010-11 Tha Functions of comuniction, Informetion & Education IEC 21000 0 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of Drainage from Virupapur sakamma house to Gouramm house. Drainage 45000 0 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of Drainage from Virupapur sakamma house to Gouramm house. Drainage 45000 0 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of C.C. Road & Drainage from Timmapur lachamanna house to road. CC Road and Drainage 50000 0 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of C.C. Road & Drainage from Timmapur lachamanna house to road. CC Road and Drainage 50000 0 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of Drainage from Hosallidoddi bhagappa house to Road. Drainage 55000 55000 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of Drainage from Hosallidoddi bhagappa house to Road. Drainage 55000 55000 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of Drainage from Kadleppa house to Ali appaji house. Drainage 80000 80000 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of Drainage from Kadleppa house to Ali appaji house. Drainage 80000 80000 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of Drainage from Khanasab house to Amajada sab dhakani houae. Drainage 85000 85000 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of Drainage from Khanasab house to Amajada sab dhakani houae. Drainage 85000 85000 0 Progress Yadgir Shahapur Sagar 2010-11 Construction of C.C. Road & Drainage from Bhasi house to ajim sab house. CC Road and Drainage 95000 95000 0 Completed Construction of C.C. Road & Drainage from Basappa yalavar house to Hanamanta chamanal Yadgir Shahapur Sagar 2010-11 CC Road and Drainage 100000 100000 0 Completed house. Construction of C.C. Road & Drainage from Mallappa kanagutti house to Ganapati chouagundi Yadgir Shahapur Sagar 2010-11 CC Road and Drainage 85000 0 85000 Completed house Yadgir Shahapur Sirval 2006-07 Construction of C.C. Road & Drainege From Samudaya bhan to Sangapgol house. CC Road and Drainage 45000 45000 11250 Completed Yadgir Shahapur Sirval 2006-07 Construction of C.C. Road & Drainege From Matha to Bajar. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Sirval 2006-07 Tha Functions of comuniction, Informetion & Education IEC 61000 55000 15250 Completed housing facility. Chandamma wo/ Siddalingappa 2. Bhimavva wo/ Shivappa 3. Nilamma wo/ Yadgir Shahapur Sirval 2006-07 other works 70000 70000 17500 Completed Sidramappa Yadgir Shahapur Sirval 2006-07 Construction of Drainege From Channamallayya angadi to Mahanta gouda kollur house. Drainage 94000 94000 23500 Completed Yadgir Shahapur Sirval 2006-07 Construction of C.C. Road & Drainege From Charcha to Nala. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Sirval 2006-07 Construction of C.C. Road & Drainege From Old bas stop to Shantalinga tempal. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Sirval 2006-07 Construction of C.C. Road & Drainege From Pirsa katte to Nala CC Road and Drainage 97000 97000 24250 Completed Yadgir Shahapur Sirval 2007-08 Tha Functions of comuniction, Informetion & Education IEC 30000 22000 7500 Completed Yadgir Shahapur Sirval 2007-08 Construction of C.C. Road & Drainage From Siddappa kurubar house to Muslim house. CC Road and Drainage 44000 44000 11000 Completed Yadgir Shahapur Sirval 2007-08 Construction of C.C. Road & Drainage From Piragol house to Mareppa myageri house. CC Road and Drainage 45000 45000 11250 Completed Yadgir Shahapur Sirval 2007-08 Construction of C.C. Road & Drainage From Mahantagouda kollur house to Ramachandra house CC Road and Drainage 114000 114000 28500 Completed

Yadgir Shahapur Sirval 2007-08 Construction of C.C. Road & Drainage From ShantaliNgeshvar tempal to Anjaneya tempal. CC Road and Drainage 115000 115000 28750 Completed Yadgir Shahapur Sirval 2007-08 Repair Works to Veternary Hospital Repair Works 116000 116000 29000 Completed Yadgir Shahapur Sirval 2007-08 Const of Grama Panchayat Meeting Hall Construction of Gram Panchayat204000 Building 204000 51000 Completed Yadgir Shahapur Sirval 2007-08 Const of Busuness Complex opp Grama Panchayat Building Shopping mall 393000 393000 98250 Completed Yadgir Shahapur Sirval 2008-09 Construction of C.C. Road & Drainage From Mallayya tempal to Parameshvar house. CC Road and Drainage 74000 74000 18500 Completed Yadgir Shahapur Sirval 2008-09 Construction of C.C. Road & Drainage From Parameshvar tempal to Palis house. CC Road and Drainage 75000 75000 18750 Completed Yadgir Shahapur Sirval 2008-09 Construction of C.C. Road & Drainage From Chandasaba malli hotsl to ammappa tempal. CC Road and Drainage 76000 76000 19000 Completed Yadgir Shahapur Sirval 2008-09 Construction of C.C. Road & Drainage From Biralinga tempal to Yankatapur Khasmin. CC Road and Drainage 93000 93000 23250 Completed Yadgir Shahapur Sirval 2008-09 Construction of C.C. Road & Drainage From Kamana katte to Anjanaya tempal. CC Road and Drainage 93000 93000 23250 Completed Yadgir Shahapur Sirval 2008-09 Construction of C.C. Road & Drainage From Irappa kambar house to Manappa pujari house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Sirval 2008-09 Construction of C.C. Road & Drainage From School to Masadi CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Sirval 2008-09 Const of Kichen Room to Ambedkar P.School School Compound and Buildings95000 95000 23750 Completed Yadgir Shahapur Sirval 2008-09 Construction of C.C. Road & Drainage From Sanna Bhimappa house to Basappa hosageri hpuse. CC Road and Drainage 118000 118000 29500 Completed Yadgir Shahapur Sirval 2008-09 Communication & Information Education Programme IEC 139000 122000 34750 Completed Yadgir Shahapur Sirval 2008-09 Construction of Anganavadi From Pujari eriya. Anganavadi building 163000 163000 40750 Completed Yadgir Shahapur Sirval 2008-09 Construction of Publik bas stop. Bus Stand 193000 193000 48250 Completed Yadgir Shahapur Sirval 2009-10 Construction of C.C. Road & Drainage From Naykal ningappa house to Mareppa hosmani. CC Road and Drainage 44000 44000 0 Completed Yadgir Shahapur Sirval 2009-10 Tha Functions of comuniction, Informetion & Education IEC 50000 50000 0 Completed Yadgir Shahapur Sirval 2009-10 Construction of C.C. Road & Drainage From Ramasvami house to Men road. CC Road and Drainage 80000 80000 0 Completed Yadgir Shahapur Sirval 2009-10 Const of Community Toilet block behine school building Construction of Toilet 178000 178000 0 Completed Yadgir Shahapur Sirval 2009-10 Construction of C.C. Road & Drainage From Ato sabanna house to Dyavappa kamballi house. CC Road and Drainage 45000 45000 11250 Completed Yadgir Shahapur Sirval 2009-10 Construction of C.C. Road & Drainage From Anjaneya tempal to Pirsan katte. CC Road and Drainage 79000 79000 19750 Completed Yadgir Shahapur Sirval 2009-10 Construction of C.C. Road & Drainage From Maremma tempal to Koli chandappa. CC Road and Drainage 79000 79000 19750 Completed Yadgir Shahapur Sirval 2009-10 Const of Bus Stand near Sannat (Bhima) river Bus Stand 144000 144000 36000 Completed Construction of C.C. Road & Drainage From Manappa gangavati house to Manappa madnal Yadgir Shahapur Sirval 2009-10 CC Road and Drainage 79000 0 79000 Completed house. Yadgir Shahapur Sirval 2010-11 Tha Functions of comuniction, Informetion & Education IEC 61000 0 0 Progress Yadgir Shahapur Sirval 2010-11 Tha Functions of comuniction, Informetion & Education IEC 61000 0 0 Progress Yadgir Shahapur Sirval 2010-11 Construction of C.C. Road & Drainage from Naykal ningappa house to Shiraval road. CC Road and Drainage 90000 0 0 Progress Yadgir Shahapur Sirval 2010-11 Construction of C.C. Road & Drainage from Naykal ningappa house to Shiraval road. CC Road and Drainage 90000 0 0 Progress Construction of C.C. Road & Drainage from Mallikrjun pujaro house to Sannamani hanamantappa Yadgir Shahapur Sirval 2010-11 CC Road and Drainage 95000 0 Completed house. Yadgir Shahapur Sirval 2010-11 Construction of C.C. Road & Drainage from Ramanna katte to Virabhadreshvar tempal. CC Road and Drainage 110000 110000 0 Completed Yadgir Shahapur Sirval 2010-11 Construction of C.C. Road & Drainage from piragola house to Bajar bhimaraya house. CC Road and Drainage 150000 150000 0 Completed Yadgir Shahapur Sirval 2010-11 Construction of C.C. Road & Drainage from Sumitramma house to Mallamma chapate house. CC Road and Drainage 105000 0 105000 Completed Yadgir Shahapur T.wadagera 2006-07 Construction of Drainege From Ayyamma house to Iaramma hola. Drainage 45000 45000 11250 Completed Yadgir Shahapur T.wadagera 2006-07 Development sabara platform. other works 45000 45000 11250 Completed Yadgir Shahapur T.wadagera 2006-07 Construction of C.C. Road & Drainege From School to Basavanna tempal. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur T.wadagera 2006-07 Construction of C.D. from New badavana road. Check dam 46000 46000 11500 Completed Yadgir Shahapur T.wadagera 2006-07 development of drinking water. Drinking Water Supply 46000 46000 11500 Completed Yadgir Shahapur T.wadagera 2006-07 Construction of women's toilet Construction of Toilet 70000 70000 17500 Completed Yadgir Shahapur T.wadagera 2006-07 Tha Functions of comuniction, Informetion & Education IEC 90000 58000 22500 Completed housing facility. 1. Sabamma wo/ Mallappa 2. Chandamma wo/ Sabanna 3. Sivappa wo/ Mareppa Yadgir Shahapur T.wadagera 2006-07 other works 95000 95000 23750 Completed 4. Balamma wo/ Shivappa Yadgir Shahapur T.wadagera 2006-07 Construction of C.C. Road & Drainege From Akabar hotal to Bande hola. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur T.wadagera 2007-08 Construction of C.C. Road & Drainage From Devate tempal to Men road. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur T.wadagera 2007-08 Construction of C.C. Road & Drainage From Badada mallappa house to Mallayya tempal. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur T.wadagera 2007-08 development of drinking water. Drinking Water Supply 144000 144000 36000 Completed Yadgir Shahapur T.wadagera 2007-08 development of drinking water. Drinking Water Supply 145000 145000 36250 Completed Yadgir Shahapur T.wadagera 2007-08 development of drinking water from Harijan vada. Drinking Water Supply 182000 182000 45500 Completed Yadgir Shahapur T.wadagera 2007-08 development of drinking water. Drinking Water Supply 194000 174000 48500 Completed Yadgir Shahapur T.wadagera 2008-09 Communication & Information Education Programme IEC 68000 54000 17000 Completed Yadgir Shahapur T.wadagera 2008-09 Improvements to Drinking Water Pipeline Drinking Water Supply 95000 95000 23750 Completed Yadgir Shahapur T.wadagera 2008-09 Construction of C.C. Road & Drainage From Sharanappa kalal house to frawell. CC Road and Drainage 193000 193000 48250 Completed Construction of C.C. Road & Drainage From S.C. Basalingappa dodmani house to Hanuman Yadgir Shahapur T.wadagera 2008-09 CC Road and Drainage 194000 194000 48500 Completed tempal. Yadgir Shahapur T.wadagera 2008-09 Construction of C.C. Road & Drainage From Kenchamma tempal to Yadagiri road. CC Road and Drainage 194000 194000 48500 Completed Yadgir Shahapur T.wadagera 2008-09 Construction of C.C. Road & Drainage From to Biredar house. CC Road and Drainage 195000 195000 48750 Completed Yadgir Shahapur T.wadagera 2008-09 Construction of C.C. Road & Drainage From Mallanna sahu angadi to Ganjappa pujari house. CC Road and Drainage 196000 196000 49000 Completed Yadgir Shahapur T.wadagera 2009-10 Tha Functions of comuniction, Informetion & Education IEC 44000 28000 11000 Completed Yadgir Shahapur T.wadagera 2009-10 Const of C.D. Works to Eshwara Temple Check dam 94000 94000 23500 Completed Yadgir Shahapur T.wadagera 2009-10 Improvents to Street Light Solar System 95000 95000 23750 Completed Yadgir Shahapur T.wadagera 2009-10 Construction of C.C. Road & Drainage From Men road to Muslim badavane. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur T.wadagera 2009-10 Construction of C.C. Road & Drainage From Men road to School. CC Road and Drainage 143000 143000 35750 Completed Yadgir Shahapur T.wadagera 2009-10 Construction of C.C. Road & Drainage From Whater taynka to framell. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur T.wadagera 2009-10 Const of Protection wall from Agasi to Akbar form Compound wall 144000 144000 36000 Completed Yadgir Shahapur T.wadagera 2010-11 Construction of Drainage from Open wall to Hadapad house. Drainage 95000 95000 0 Completed Yadgir Shahapur T.wadagera 2010-11 Construction of C.C. Road & Drainage from Narasanna sahu angadi to Bhimanna hotal. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur T.wadagera 2010-11 Construction of C.C. Road & Drainage from Kalyana house to Sanganna maski house. CC Road and Drainage 110000 110000 0 Completed Yadgir Shahapur T.wadagera 2010-11 Construction of C.C. Road & Drainage from Nadakal to Halameghad. CC Road and Drainage 175000 175000 0 Completed Yadgir Shahapur T.wadagera 2010-11 Tha Functions of comuniction, Informetion & Education IEC 27000 20000 7000 Completed Yadgir Shahapur T.wadagera 2010-11 Construction of C.C. Road & Drainage from Men road to Somappa house. CC Road and Drainage 93000 0 93000 Completed Yadgir Shahapur Tadabidi 2006-07 Tha Functions of comuniction, Informetion & Education IEC 79000 53000 19750 Completed Yadgir Shahapur Tadabidi 2006-07 Construction of C.C. Road & Drainege From Gogi house to Hanuman angadi. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Tadabidi 2006-07 Construction of C.C. Road & Drainege From Kenchamma tempal to Men Road. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Tadabidi 2006-07 Construction of Drainege From Ramappa talavar house to Pampanna gouda gadde. Drainage 95000 95000 23750 Completed Yadgir Shahapur Tadabidi 2006-07 Construction of C.C. Road & Drainege From Chunnusaheb house to Madivalamma house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Tadabidi 2006-07 Construction of women's toilet neyar. Construction of Toilet 96000 96000 24000 Completed Yadgir Shahapur Tadabidi 2007-08 Implimantation of G.P.H. school. Ruam. School Compound and Buildings72000 61000 18000 Completed Yadgir Shahapur Tadabidi 2007-08 Construction of C.C. Road & Drainage From Maremma tempal to Mutyan kakxi. CC Road and Drainage 104000 104000 26000 Completed Yadgir Shahapur Tadabidi 2007-08 Construction of C.C. Road & Drainage From Menroad to Girijamma tempal. CC Road and Drainage 105000 105000 26250 Completed Yadgir Shahapur Tadabidi 2007-08 Construction of C.C. Road & Drainage From Agasi to Mukkanna house CC Road and Drainage 106000 106000 26500 Completed Yadgir Shahapur Tadabidi 2007-08 Construction of C.C. Road & Drainage From Dyavamma tempal to Ishvar tempal. CC Road and Drainage 118000 118000 29500 Completed Yadgir Shahapur Tadabidi 2007-08 Implimantation of Anganavadi. Anganavadi building 124000 124000 31000 Completed Yadgir Shahapur Tadabidi 2008-09 Communication & Information Education Programme IEC 79000 60000 19750 Completed Yadgir Shahapur Tadabidi 2008-09 Improvements to Bus Stant Bus Stand 94000 94000 23500 Completed Yadgir Shahapur Tadabidi 2008-09 Construction of C.C. Road & Drainage From Somappa gouda house to Basira katte. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Tadabidi 2008-09 Construction of Compound From G.H.S. school Compound wall 94000 94000 23500 Completed Yadgir Shahapur Tadabidi 2008-09 Construction of C.C. Road & Drainage From Channappa sahukara house to Hugar house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Tadabidi 2008-09 Construction of C.C. Road & Drainage From Mena road to Basaveshvara tempal. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Tadabidi 2008-09 Construction of C.C. Road & Drainage From Harijan vada to Road. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Tadabidi 2009-10 Tha Functions of comuniction, Informetion & Education IEC 50000 33000 12500 Completed Construction of C.C. Road & Drainage From Chandramappa shahapur house to Bhimaraya gogi Yadgir Shahapur Tadabidi 2009-10 CC Road and Drainage 143000 143000 35750 Completed house. Yadgir Shahapur Tadabidi 2009-10 Construction of C.C. Road & Drainage From Reddi house to Men road. CC Road and Drainage 143000 143000 35750 Completed Construction of C.C. Road & Drainage From Bhagappa mdnala house to Chandramappa shapur Yadgir Shahapur Tadabidi 2009-10 CC Road and Drainage 144000 144000 36000 Completed house. Yadgir Shahapur Tadabidi 2009-10 Construction of C.C. Road & Drainage From Maremma tempal to Harijan open wall. (S.C. warda) CC Road and Drainage 145000 145000 36250 Completed Yadgir Shahapur Tadabidi 2009-10 Const of Ladies Toilet Near Kallayya Math Construction of Toilet 242000 242000 60500 Completed Yadgir Shahapur Tadabidi 2010-11 Tha Functions of comuniction, Informetion & Education IEC 15000 0 0 Progress Yadgir Shahapur Tadabidi 2010-11 Tha Functions of comuniction, Informetion & Education IEC 15000 0 0 Progress Yadgir Shahapur Tadabidi 2010-11 Construction of C.C. Road & Drainage from Battara house to kenchamma tempal. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Tadabidi 2010-11 Construction of C.C. Road & Drainage from Kenchamma tempal to Ambedkar bhavan. CC Road and Drainage 100000 100000 0 Completed Yadgir Shahapur Tadabidi 2010-11 Construction of C.C. Road & Drainage from Sharanamma svami house to Basavanna tempal. CC Road and Drainage 105000 105000 0 Completed Yadgir Shahapur Tadabidi 2010-11 Construction of C.C. Road & Drainage from Ningappa house to Kajappa house. CC Road and Drainage 110000 110000 0 Completed Yadgir Shahapur Ukkinal 2006-07 Construction of Drainege From Khesuraya house to Nala. Drainage 45000 45000 11250 Completed Yadgir Shahapur Ukkinal 2006-07 Riperi of anganavadi. Building Repair 46000 46000 11500 Completed Yadgir Shahapur Ukkinal 2006-07 Construction of C.C. Road From whater tyamk to honnappa house. CC Road 46000 46000 11500 Completed Construction of C.C. Road & Drainege From Bhimaraya pujari house to channabasappa pujari Yadgir Shahapur Ukkinal 2006-07 CC Road and Drainage 54000 54000 13500 Completed house. Yadgir Shahapur Ukkinal 2006-07 Construction of Drainege From Men Road to Nala. Drainage 71000 71000 17750 Completed Yadgir Shahapur Ukkinal 2006-07 Tha Functions of comuniction, Informetion & Education IEC 75000 68000 18750 Completed Yadgir Shahapur Ukkinal 2006-07 Construction of Drainege From Samudaya bhavan to Nala. Drainage 75000 75000 18750 Completed Yadgir Shahapur Ukkinal 2006-07 Construction of C.C. Road & Drainege From Vanakerappa house to Maremma tempal. CC Road and Drainage 76000 76000 19000 Completed Yadgir Shahapur Ukkinal 2006-07 Construction of C.C. Road & Drainege From Polisa goudar house to Hanuman tempal. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ukkinal 2007-08 Tha Functions of comuniction, Informetion & Education IEC 24000 17000 6000 Completed Yadgir Shahapur Ukkinal 2007-08 Construction of C.C. Road & Drainage From Chandragol house to Maji cherman house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ukkinal 2007-08 Construction of C.C. Road & Drainage From Shantakumar house to Tavaru house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ukkinal 2007-08 Construction of C.C. Road & Drainage From Shantayya tata house to Rajada bhimana house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ukkinal 2007-08 Construction of C.C. Road & Drainage From Krishna house to Tirumala house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Ukkinal 2007-08 Construction of C.C. Road & Drainage From Men road to Hemana house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Ukkinal 2007-08 Construction of C.C. Road & Drainage From Panchayat to Basavanna tempal. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Ukkinal 2007-08 Construction of C.C. Road & Drainage From Borivel to Chandapur ruat. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Ukkinal 2007-08 Construction of Drainage From Khemunayak house to Menroad. Drainage 96000 96000 24000 Completed Yadgir Shahapur Ukkinal 2007-08 Construction of Compund From G.H.P. school. Compound wall 144000 144000 36000 Completed Yadgir Shahapur Ukkinal 2008-09 Repair Works to oled grama pancha. Repair Works 44000 44000 11000 Completed Yadgir Shahapur Ukkinal 2008-09 Construction of C.C. Road & Drainage From Shankar house to Mounesha house. CC Road and Drainage 74000 74000 18500 Completed Yadgir Shahapur Ukkinal 2008-09 Construction of C.C. Road & Drainage From Men road to Sevalal tempal. CC Road and Drainage 76000 76000 19000 Completed Yadgir Shahapur Ukkinal 2008-09 Communication & Information Education Programme IEC 88000 68000 22000 Completed Yadgir Shahapur Ukkinal 2008-09 Construction of C.C. Road & Drainage From Mallanna house to Dashranapur road. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ukkinal 2008-09 Construction of C.C. Road & Drainage From Hanuman tempal to Douvalasab house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Ukkinal 2008-09 Construction of C.C. Road & Drainage From Maligouda house to Sharanayya svami house. CC Road and Drainage 143000 143000 35750 Completed Yadgir Shahapur Ukkinal 2008-09 Construction of C.C. Road & Drainage From Men road to Nilunayak house. CC Road and Drainage 165000 165000 41250 Completed Yadgir Shahapur Ukkinal 2008-09 Construction of C.C. Road & Drainage From Hanuman tempal to S.C. warda. CC Road and Drainage 193000 193000 48250 Completed Yadgir Shahapur Ukkinal 2008-09 Construction of C.C. Road & Drainage From Bas stop to Hanuman tempal. CC Road and Drainage 194000 194000 48500 Completed Yadgir Shahapur Ukkinal 2009-10 Improvements to Grama Panchayat Building Construction of Gram Panchayat49000 Building 49000 0 Completed Yadgir Shahapur Ukkinal 2009-10 Construction of C.C. Road & Drainage From Pomu house to Vasu nayak house. CC Road and Drainage 94000 94000 0 Completed Yadgir Shahapur Ukkinal 2009-10 Construction of C.C. Road & Drainage From Mahantappa house to Smudaya bhavan. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Ukkinal 2009-10 Construction of C.C. Road & Drainage From Rayappa hipparagi house to Basaveshvar tempal. CC Road and Drainage 144000 144000 0 Completed Yadgir Shahapur Ukkinal 2009-10 Tha Functions of comuniction, Informetion & Education IEC 10000 6000 2500 Completed Yadgir Shahapur Ukkinal 2009-10 Construction of C.C. Road & Drainage From Dasar house to Kenchappa house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ukkinal 2009-10 Construction of C.C. Road & Drainage From Whater taynk to Basavaraj hugar house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ukkinal 2009-10 Construction of C.C. Road & Drainage From Shankara mastar house to Polisings house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Ukkinal 2009-10 Construction of C.C. Road & Drainage From Sitaram house to Shankaer house. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Ukkinal 2009-10 Construction of C.C. Road & Drainage From Pnchayat C.C. ruat to madivalapp ivare house. CC Road and Drainage 96000 0 96000 Completed Yadgir Shahapur Ukkinal 2010-11 Tha Functions of comuniction, Informetion & Education IEC 24000 0 0 Progress Yadgir Shahapur Ukkinal 2010-11 Tha Functions of comuniction, Informetion & Education IEC 24000 0 0 Progress Yadgir Shahapur Ukkinal 2010-11 Const of Protection Wall from Main Road to Genu chatrya house CC Road 65000 0 0 Progress Yadgir Shahapur Ukkinal 2010-11 Const of Protection Wall from Main Road to Genu chatrya house CC Road 65000 0 0 Progress Yadgir Shahapur Ukkinal 2010-11 Const of Drain & C.D. Works from Anil Govind House to Shankar Revunaik House Check Dam and Drainage 75000 0 0 Progress Yadgir Shahapur Ukkinal 2010-11 Const of Drain & C.D. Works from Anil Govind House to Shankar Revunaik House Check Dam and Drainage 75000 0 0 Progress Yadgir Shahapur Ukkinal 2010-11 Construction of C.C. Road & Drainage from Rayappa house c.c.road to Madivalappa house. CC Road and Drainage 80000 0 0 Progress

Yadgir Shahapur Ukkinal 2010-11 Construction of C.C. Road & Drainage from Rayappa house c.c.road to Madivalappa house. CC Road and Drainage 80000 0 0 Progress Yadgir Shahapur Ukkinal 2010-11 Improvements to Street Light Solar System 90000 0 0 Progress Yadgir Shahapur Ukkinal 2010-11 Improvements to Street Light Solar System 90000 0 0 Progress Yadgir Shahapur Ukkinal 2010-11 Construction of C.C. Road & Drainage from Bhimanna myageri house to Hanamanta house. CC Road and Drainage 75000 75000 0 Completed Yadgir Shahapur Ukkinal 2010-11 Construction of C.C. Road & Drainage from Men road to Ramadevi tempal. CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Ukkinal 2010-11 Construction of C.C. Road & Drainage from Men road to Devati tempal. CC Road and Drainage 110000 110000 0 Completed Yadgir Shahapur Ukkinal 2010-11 Construction of C.C. Road & Drainage from S.C. warda to Mallayya svami house. CC Road and Drainage 110000 0 110000 Completed Yadgir Shahapur Ulle Sugoor 2006-07 Construction of C.C. Road & Drainege From Siddappa house to Devappa house. CC Road and Drainage 45000 45000 11250 Completed Yadgir Shahapur Ulle Sugoor 2006-07 Construction of C.C. Road & Drainege From Chandunayak house to Balun house. CC Road and Drainage 46000 46000 11500 Completed Yadgir Shahapur Ulle Sugoor 2006-07 Construction of C.C. Road & Drainege From Jalalasab house to Devindrappa house. CC Road and Drainage 75000 75000 18750 Completed Yadgir Shahapur Ulle Sugoor 2006-07 Construction of C.C. Road & Drainege From T.C. to Jalagoudar house. CC Road and Drainage 75000 75000 18750 Completed Yadgir Shahapur Ulle Sugoor 2006-07 Construction of C.C. Road & Drainege From Devindrappa house to Hanamanta mahadi. CC Road and Drainage 76000 76000 19000 Completed Yadgir Shahapur Ulle Sugoor 2006-07 Construction of C.C. Road & Drainege From Iranna tempal to Chaparesi house. CC Road and Drainage 76000 76000 19000 Completed Yadgir Shahapur Ulle Sugoor 2006-07 Construction of C.C. Road & Drainege From Bhimappa godekar house to Durgamma tempal. CC Road and Drainage 77000 77000 19250 Completed Yadgir Shahapur Ulle Sugoor 2006-07 Tha Functions of comuniction, Informetion & Education IEC 89000 54000 22250 Completed Yadgir Shahapur Ulle Sugoor 2007-08 Tha Functions of comuniction, Informetion & Education IEC 28000 19000 7000 Completed Yadgir Shahapur Ulle Sugoor 2007-08 Construction of C.C. Road & Drainage From Manappa house to Husen sab house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ulle Sugoor 2007-08 Construction of C.C. Road & Drainage From Rajakumar house to Flourmill. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ulle Sugoor 2007-08 Construction of C.C. Road & Drainage From Sharanappa muttur house to Nagappa . CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ulle Sugoor 2007-08 Construction of C.C. Road & Drainage From Raphi house to Anganavadi. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Ulle Sugoor 2007-08 Construction of C.C. Road & Drainage From Sanna nagappa house to Men road. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Ulle Sugoor 2007-08 Construction of C.C. Road & Drainage From Dharmanna house to Tarunayak house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Ulle Sugoor 2007-08 Construction of C.C. Road & Drainage From Flourmill to Men road. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Ulle Sugoor 2008-09 Communication & Information Education Programme IEC 31000 22000 7750 Completed Yadgir Shahapur Ulle Sugoor 2008-09 Repair Road works to Bhimshya house to Main Road CC Road 45000 45000 11250 Completed Yadgir Shahapur Ulle Sugoor 2008-09 Construction of C.C. Road & Drainage From Hanamanti house to Bagappa house (S.T. eriya) CC Road and Drainage 84000 84000 21000 Completed Yadgir Shahapur Ulle Sugoor 2008-09 Construction of C.C. Road & Drainage From Kambar eriya to Mahibub saba house. CC Road and Drainage 86000 86000 21500 Completed Yadgir Shahapur Ulle Sugoor 2008-09 Construction of C.C. Road & Drainage From Basavaraj house to Malahalli road. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ulle Sugoor 2008-09 Construction of C.C. Road & Drainage From Dhalapati house to Mallalli road. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ulle Sugoor 2008-09 Construction of C.C. Road & Drainage From Tayappa uppar house to Gyanappa house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Ulle Sugoor 2008-09 Const of Drin from UKP Canal to Main Road Drainage 146000 146000 36500 Completed Yadgir Shahapur Ulle Sugoor 2008-09 Construction of C.C. Road & Drainage From Chandu nayak house to Valu nayak house. CC Road and Drainage 193000 193000 48250 Completed Yadgir Shahapur Ulle Sugoor 2009-10 Tha Functions of comuniction, Informetion & Education IEC 54000 32000 13500 Completed Yadgir Shahapur Ulle Sugoor 2009-10 Construction of C.C. Road & Drainage From Bakxasab house to Hadapad bhimaraya house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Ulle Sugoor 2009-10 Const Public Toilet Blcok at Kaliger Area Construction of Toilet 94000 94000 23500 Completed Yadgir Shahapur Ulle Sugoor 2009-10 Construction of C.C. Road & Drainage From Agasi to Bassappa / Mareppa house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Ulle Sugoor 2009-10 Construction of Copound From G.P.S. school. School Compound and Buildings95000 95000 23750 Completed Yadgir Shahapur Ulle Sugoor 2009-10 Construction of C.C. Road & Drainage From Bhimaraya house to Masadi. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Ulle Sugoor 2009-10 Construction of Anganavadi From kuruba eriya. Anganavadi building 163000 163000 40750 Completed Yadgir Shahapur Ulle Sugoor 2010-11 Const of C.D. Works near Basanna Temple Check dam 55000 55000 0 Completed Yadgir Shahapur Ulle Sugoor 2010-11 Construction of C.C. Road & Drainage from Sharanappa pujari house to Basappa naykodi ouse. CC Road and Drainage 80000 80000 0 Completed Yadgir Shahapur Ulle Sugoor 2010-11 Construction of Anganavadi. Anganavadi building 165000 165000 0 Completed Yadgir Shahapur Ulle Sugoor 2010-11 Tha Functions of comuniction, Informetion & Education IEC 48000 0 Progress Yadgir Shahapur Ulle Sugoor 2010-11 Tha Functions of comuniction, Informetion & Education IEC 48000 0 Progress Yadgir Shahapur Ulle Sugoor 2010-11 Construction of C.C. Road & Drainage from Ningayya house to Hembalager khandappa house. CC Road and Drainage 50000 0 Progress

Yadgir Shahapur Ulle Sugoor 2010-11 Construction of C.C. Road & Drainage from Ningayya house to Hembalager khandappa house. CC Road and Drainage 50000 0 Progress Yadgir Shahapur Ulle Sugoor 2010-11 Repair works to Veternary Hospital Repair Works 165000 0 165000 Completed Yadgir Shahapur Vadagera 2006-07 Construction of C.C. Road & Drainege From Shivalingappa house to Lachamayya house. CC Road and Drainage 44000 44000 11000 Completed Yadgir Shahapur Vadagera 2006-07 Construction of C.C. Road From Prasad house to Anganavadi. CC Road 44000 44000 11000 Completed Yadgir Shahapur Vadagera 2006-07 Construction of Drainege From Men road to Endhouse. Drainage 45000 45000 11250 Completed Yadgir Shahapur Vadagera 2006-07 Construction of Road & Drainege From Blak No. 1 CC Road and Drainage 45000 45000 11250 Completed Yadgir Shahapur Vadagera 2006-07 Construction of Compunda from S.P.P. School. Compound wall 45000 45000 11250 Completed Yadgir Shahapur Vadagera 2006-07 Construction of C.C. Road From School to tempal. CC Road 46000 46000 11500 Completed Yadgir Shahapur Vadagera 2006-07 Construction of Drinking whater. Drainage 46000 46000 11500 Completed Yadgir Shahapur Vadagera 2006-07 Construction of Drinking whater. Drainage 46000 46000 11500 Completed Yadgir Shahapur Vadagera 2006-07 Construction of Drinking whater. Drainage 46000 46000 11500 Completed Yadgir Shahapur Vadagera 2006-07 Tha Functions of comuniction, Informetion & Education IEC 65000 45000 16250 Completed Yadgir Shahapur Vadagera 2006-07 construction of public toilet Neyar Gov. Haspatal. Construction of Toilet 114000 114000 28500 Completed Yadgir Shahapur Vadagera 2007-08 Construction of C.C. Road & Drainage From Basavanna tempal to Shambanna ganiga house. CC Road and Drainage 94000 94000 23500 Completed

Yadgir Shahapur Vadagera 2007-08 Construction of C.C. Road & Drainage From Uppar saidanna house to Mallanna goruvar house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Vadagera 2007-08 Construction of C.C. Road & Drainage From Men road toKulkarni house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Vadagera 2007-08 Construction of compund from G.P.H. school. Compound wall 95000 95000 23750 Completed Yadgir Shahapur Vadagera 2007-08 Construction of C.C. Road & Drainage From Narasayya house to Devappa house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Vadagera 2007-08 Tha Functions of comuniction, Informetion & Education IEC 99000 81000 24750 Completed Yadgir Shahapur Vadagera 2007-08 Construction of Pablic tolyt & Whater. Construction of Toilet 123000 123000 30750 Completed Yadgir Shahapur Vadagera 2007-08 development of drinking water. Drinking Water Supply 124000 124000 31000 Completed Yadgir Shahapur Vadagera 2007-08 Construction of Sanskrat bhavan from Dyavamma tempal. Community Hall 244000 244000 61000 Completed Yadgir Shahapur Vadagera 2008-09 Business Comples in Ward No 1 Shopping mall 72000 72000 18000 Completed Yadgir Shahapur Vadagera 2008-09 Improvements to Kondadagi other works 94000 94000 23500 Completed Yadgir Shahapur Vadagera 2008-09 Construction of C.C. Road & Drainage From Nayikodi house to Mallanna goruvar house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Vadagera 2008-09 Improvements to Mini Water Suplly Drinking Water Supply 95000 95000 23750 Completed Yadgir Shahapur Vadagera 2008-09 Construction of C.C. Road & Drainage From Kunta bhimappa house to Kumbara house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Vadagera 2008-09 Communication & Information Education Programme IEC 98000 76000 24500 Completed Yadgir Shahapur Vadagera 2008-09 Construction of bayalu ranga mandira From Ward No. 2 Drama Theater 194000 194000 48500 Completed Yadgir Shahapur Vadagera 2008-09 Business Comples in Block No 1 Shopping mall 293000 293000 73250 Completed Yadgir Shahapur Vadagera 2008-09 Construction of Compound From School. Compound wall 294000 294000 73500 Completed Yadgir Shahapur Vadagera 2009-10 Tha Functions of comuniction, Informetion & Education IEC 27000 15000 6750 Completed Yadgir Shahapur Vadagera 2009-10 Sinking of Borewell and hand pump Borewell Work 44000 44000 11000 Completed Yadgir Shahapur Vadagera 2009-10 Drinking Water Facilities near Gangamma Temple Drinking Water Supply 45000 45000 11250 Completed Yadgir Shahapur Vadagera 2009-10 Construction of Bas stop From Kolekar gumpu kras. Bus Stand 94000 94000 23500 Completed Yadgir Shahapur Vadagera 2009-10 Drinking Water Supply Meterial & Facility in Birnkal Village Drinking Water Supply 96000 96000 24000 Completed Yadgir Shahapur Vadagera 2009-10 Construction of C.C. Road & Drainage From School to Devappa house. CC Road and Drainage 118000 118000 29500 Completed Yadgir Shahapur Vadagera 2009-10 Improvements to Grama Panchayat Builidng Construction of Gram Panchayat119000 Building 119000 29750 Completed Yadgir Shahapur Vadagera 2009-10 Const of Ladies Toilet Block Construction of Toilet 143000 143000 35750 Completed Yadgir Shahapur Vadagera 2009-10 Const Panchat President & Wise President Room other works 218000 218000 54500 Completed Yadgir Shahapur Vadagera 2010-11 Tha Functions of comuniction, Informetion & Education IEC 19000 0 0 Progress Yadgir Shahapur Vadagera 2010-11 Tha Functions of comuniction, Informetion & Education IEC 19000 0 0 Progress Yadgir Shahapur Vadagera 2010-11 Drinking Water Facilites Drinking Water Supply 50000 0 0 Progress Yadgir Shahapur Vadagera 2010-11 Drinking Water Facilites Drinking Water Supply 50000 0 0 Progress Yadgir Shahapur Vadagera 2010-11 Construction of Room from Neyar hanuman tempal. other works 140000 0 0 Progress Yadgir Shahapur Vadagera 2010-11 Construction of Room from Neyar hanuman tempal. other works 140000 0 0 Progress Yadgir Shahapur Vadagera 2010-11 Construction of Pablic Kichan room from Bayck said in kalyana mantappa. Kitchen Room 210000 210000 0 Completed Yadgir Shahapur Vadagera 2010-11 Construction of Drainage from Bas stop to Konalli ruat in borivel. Drainage 195000 0 Completed Yadgir Shahapur Vadagera 2010-11 Construction of Compound from Ranga mandir in B. tanda. Compound wall 100000 0 100000 Completed Yadgir Shahapur Vanadurg 2006-07 Tha Functions of comuniction, Informetion & Education IEC 35000 18000 8750 Completed Yadgir Shahapur Vanadurg 2006-07 Construction of C.C. Road & Drainege From Dippin to channur road. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Vanadurg 2006-07 Construction of C.C. Road & Drainege From Devindrappa angadi to masadi CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Vanadurg 2006-07 Construction of C.C. Road & Drainege From Devati tempal to Aldal road. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Vanadurg 2006-07 Construction of C.C. Road & Drainege From Ningayya house to Baganna bajaladar house. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Vanadurg 2006-07 Construction of women's toilet Construction of Toilet 195000 195000 48750 Completed Yadgir Shahapur Vanadurg 2007-08 Tha Functions of comuniction, Informetion & Education IEC 22000 16000 5500 Completed Yadgir Shahapur Vanadurg 2007-08 Construction of C.C. Road & Drainage From Devindrappa angadi to Masudi. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Vanadurg 2007-08 Construction of C.C. Road & Drainage From Devati tempal to Aldal road. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Vanadurg 2007-08 Construction of C.C. Road & Drainage From Ningayya tempal to Bhaganna panadan house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Vanadurg 2007-08 Construction of C.C. Road & Drainage From Dippi to Channur road. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Vanadurg 2007-08 Construction of Womens tolyt Construction of Toilet 194000 194000 48500 Completed Yadgir Shahapur Vanadurg 2008-09 Communication & Information Education Programme IEC 51000 38000 12750 Completed Yadgir Shahapur Vanadurg 2008-09 Construction of C.C. Road & Drainage From Polisa steshan to Babu badiger house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Vanadurg 2008-09 Construction of C.C. Road & Drainage From Tayamma tempal to Venkoba house. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Vanadurg 2008-09 Construction of C.C. Road & Drainage From Gundamma house to Subhas house. CC Road and Drainage 95000 95000 23750 Completed Yadgir Shahapur Vanadurg 2008-09 Construction of C.C. Road & Drainage From Sahukar house to Channu rosd. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Vanadurg 2008-09 Construction of C.C. Road & Drainage From Kashiraj house to Jagiradar house. CC Road and Drainage 143000 143000 35750 Completed Yadgir Shahapur Vanadurg 2008-09 Construction of C.C. Road & Drainage From Maremma tempal to Samudaya bhavan. CC Road and Drainage 144000 144000 36000 Completed Yadgir Shahapur Vanadurg 2008-09 Drinking Water Facilites in New Extention Area Drinking Water Supply 145000 145000 36250 Completed Yadgir Shahapur Vanadurg 2008-09 Implimantation of Anganavadi. Anganavadi building 163000 163000 40750 Completed Yadgir Shahapur Vanadurg 2008-09 Construction of Anganavadi From warda no. - 3 Anganavadi building 163000 163000 40750 Completed Yadgir Shahapur Vanadurg 2009-10 Construction of C.C. Road & Drainage From Badihal house to Gogi ruat. CC Road and Drainage 94000 94000 0 Completed Yadgir Shahapur Vanadurg 2009-10 Construction of C.C. Road & Drainage From Men road to T.C. Warda no. 3 CC Road and Drainage 95000 95000 0 Completed Yadgir Shahapur Vanadurg 2009-10 Construction of C.C. Road & Drainage From Karigudda eriya tayamma tempal to Laggappa house. CC Road and Drainage 144000 144000 0 Completed Yadgir Shahapur Vanadurg 2009-10 Tha Functions of comuniction, Informetion & Education IEC 26000 16000 6500 Completed Yadgir Shahapur Vanadurg 2009-10 Construction of C.C. Road & Drainage From Buchchayya house to Kattagar house. CC Road and Drainage 93000 93000 23250 Completed Yadgir Shahapur Vanadurg 2009-10 Construction of C.C. Road & Drainage From Talavar house to Devate tempal. CC Road and Drainage 93000 93000 23250 Completed Yadgir Shahapur Vanadurg 2009-10 Construction of C.C. Road & Drainage From Gogi ruat to Kashiraj oni. CC Road and Drainage 94000 94000 23500 Completed Yadgir Shahapur Vanadurg 2009-10 Construction of C.C. Road & Drainage From Dadan katte to Lakki hotal. CC Road and Drainage 96000 96000 24000 Completed Yadgir Shahapur Vanadurg 2009-10 Construction of C.C. Road & Drainage From Haldal ruat to Chandappa harijan house. CC Road and Drainage 94000 0 94000 Completed Yadgir Shahapur Vanadurg 2010-11 Tha Functions of comuniction, Informetion & Education IEC 52000 0 0 Progress Yadgir Shahapur Vanadurg 2010-11 Tha Functions of comuniction, Informetion & Education IEC 52000 0 0 Progress Yadgir Shahapur Vanadurg 2010-11 Construction of C.C. Road from Nala to sittakalla. CC Road 0 0 Progress Yadgir Shahapur Vanadurg 2010-11 Construction of C.C. Road from Nala to sittakalla. CC Road 0 0 Progress Yadgir Shahapur Vanadurg 2010-11 Construction of C.C. Road from Gogi road to Nurandappa dudakondi house. CC Road 195000 195000 0 Completed Yadgir Shahapur Vanadurg 2010-11 Construction of C.C. Road from Huchayya house to Katagar borivel. CC Road 120000 0 120000 Completed