N :Clogging Point
Bacoor 17 4 18 5 Kawit 7 12 9 Noveleta 10 8 11 19
IRRIGATION CANAL 13
6 IRRIGATION CANAL 14 3 20 Rosario 2
IRRIGATION CANAL 15
16 Imus 1
Tanza
General Trias
Dasmarinas
:River(Main) :River(Trib.Other) :Municipal Boundary :Main Irrigation Canal :Study Area
THE STUDY ON Fig. 9.1 COMPREHENSIVE FLOOD MITIGATION FOR CAVITE LOWLAND AREA Critical Bottle-neck Section CTI Engineering International Co., Ltd Clogged by Drifting Materials Nippon Koei Co., Ltd
F - 9 - 1
THE STUDY ON Fig. 9.2 (1/3) COMPREHENSIVE FLOOD MITIGATION River Area and Encroachment of Houses FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. (Imus River, Bacoor River, Julian River) Nippon Koei Co., Ltd
F - 9 - 2
THE STUDY ON Fig. 9.2 (2/3) COMPREHENSIVE FLOOD MITIGATION River Area and Encroachment of Houses FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. (San Juan River) Nippon Koei Co., Ltd
F - 9 - 3
THE STUDY ON Fig. 9.2 (3/3) COMPREHENSIVE FLOOD MITIGATION River Area and Encroachment of Houses FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. (Canas River) Nippon Koei Co., Ltd
F - 9 - 4
COMPREHENSIVE FLOOD MITIGATION FLOOD COMPREHENSIVE CTI EngineeringInternationa Co., Ltd. FOR CAVITE LOWLAND AREA Nippon Koei Co., Ltd THE STUDY ON F -95 Fig. 9.3 and Existing/Proposed Flood Evacuation Center Flood Risk Area
THE STUDY ON Fig. 11.1 COMPREHENSIVE FLOOD MITIGATION Master Plan on Structural Measures for FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. River Overflow Flood Damage Mitigation Nippon Koei Co., Ltd
F - 11 - 1
THE STUDY ON Fig. 11.2 COMPREHENSIVE FLOOD MITIGATION Master Plan on Structural Measures for FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. Inland Drainage Flood Mitigation Nippon Koei Co., Ltd
F - 11 - 2 Retarding Basin
Daan Bukid Creek
(50)(50) (75) (50) (100) 35 50 70 20 70 Bacoor River
Habay Bridge Palico Bridge
Muntino Bridge
(65) 65 Triburary NIA Canal
Triburary Island Cove Banalo Bridge Bridge (80) 50 Balsahan Bridge Imus Bridge Anabu Dam
470 470 390 250 430 Taclong II Bridge Imus River 95 110 110 180 120 Bacoor Bay (120) (130) (130) (180) (140) (15) 15 Julian River
(35) 30 Bacoor River : 2-year return period Triburary Julian River : 5-year return period ( ) : Simulated discharge under 10-year returnperiod with river overflow
NIA Canal
Ylang-Ylang River Pasong Kastila Bacoor Bay Dam Panamitan Bridge 240 430
Panamitan River 280 San Juan Ilang-Ilang Bridge Bridge 240 Bayan Diversion Dam 460 460 260 140 340 Diversion San Juan River point
THE STUDY ON Fig. 11.3 COMPREHENSIVE FLOOD MITIGATION FOR CAVITE LOWLAND AREA Design Discharge Distribution of OptimumPlan CTI Engineering International Co., Ltd. Nippon Koei Co., Ltd F - 11 - 3
COMPREHENSIVE FLOOD MITIGATION FLOOD COMPREHENSIVE
CTI EngineeringInternational Co., Ltd. Member of Flood
FOR CAVITE LOWLAND AREA Mitigation Committee JICA Study PPDC Team Chairman Nippon Koei Co., Ltd THE STUDY ON
District Engineer. Head of PEO Head of Head of District Engineer Provincial of DPWH PHUDO PG-ENRO of DENR Director of PNP
Organizations to be coordinated by FMC
Task Force for DPWH Central PEO, MEOs & PPDO, CPDO, Members of PDCC, CDCC/ Relocation of Oplan Linis MDCC & F -11 -4 Office of /Project Resident MPDO Informal Cavite BDCC Office Association Dwellers Fig. 11.4 Proposed Organization Structure ofFlood
Principal Works to be
Mitigation Committee coordinated by FMC
Construction of Land Acquisition IEC on Cleanup Execution and O&M of Flood Cleanup of Control of Flood for Flood of Waterway IEC of Flood Mitigation Encroachment Excessive Land Mitigation Mitigation and Removal of Warning and Structures in River Area Development Structures Structures Garbage Evacuation
THE STUDY ON Fig. 11.5 COMPREHENSIVE FLOOD MITIGATION
FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. Potential Resettlement Sites Nippon Koei Co., Ltd
F - 11 - 5 THE STUDY ON Fig. 11.6 COMPREHENSIVE FLOOD MITIGATION Proposed Strategic Resettlement Framework FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. Comprehensive Flood Mitigation for Cavite Nippon Koei Co., Ltd Lowland Areas
F - 11 - 6