HOUSE ...No. 4375
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Archives I A-6 BPC Arnold Arboretum and Boston Parks Commission Partnership Records, 1882
Archives I A-6 BPC Arnold Arboretum and Boston Parks Commission partnership records, 1882 - : Guide. The Arnold Arboretum of Harvard University © 2011 President and Fellows of Harvard College I A-6 BPC Arnold Arboretum and Boston Parks Commission partnership records, 1882 - : Guide Archives of the Arnold Arboretum of Harvard University 125 Arborway, Jamaica Plain, Massachusetts © 2012 President and Fellows of Harvard College Descriptive Summary Repository: Arnold Arboretum, Jamaica Plain, MA 02130 Call No.: I A-6 BPC Location: Archives Title: Arnold Arboretum and Boston Parks Commission partnership records, 1882- Dates: 1882- Creator(s): Arnold Arboretum; Boston Parks Commission Quantity: 4 linear inches Language of material: English Abstract: The Arnold Arboretum and Boston Parks Commission partnership records focus on the relations between the Arboretum and the city of Boston in administrating their shared responsibilities in the care and maintenance of the Arboretum. The bulk of the materials consist of correspondence from the office of the Director of the Arboretum to the Chairman of the Parks Commission. Note: Access to Finding Aid record in Hollis Classic or Hollis. Preferred Citation: Arnold Arboretum and Boston Parks Commission partnership records, 1882- . Archives of the Arnold Arboretum of Harvard University. Additional material: Sargent correspondence with the Boston Parks Department or the Chair’s designees may be found by searching the Arnold Arboretum Correspondence Database and the papers of the Arboretum’s subsequent directors: Oakes Ames (Supervisor) 1927-1935, Archives I B EDM Elmer Drew Merrill (1876- 1956) papers, 1920-1956 Karl Sax 1946-1954, Richard A. Howard, 1954-1978, Peter S. Ashton 1978-1987, Robert E. -
J. Matthew Bellisle, P.E. Senior Vice President
J. Matthew Bellisle, P.E. Senior Vice President RELEVANT EXPERIENCE Mr. Bellisle possesses more than 20 years of experience working on a variety of geotechnical, foundation, civil, and dam engineering projects. He has acted as principal-in-charge, project manager, and project engineer for assignments involving geotechnical design, site investigations, testing, instrumentation, and construction monitoring. His experience also includes over 500 Phase I inspections and Phase II design services for earthen and concrete dams. REGISTRATIONS AND Relevant project experience includes: CERTIFICATIONS His experience includes value engineering of alternate foundation systems, Professional Engineer – Massachusetts, ground improvement methodologies, and temporary construction support. Mr. Rhode Island, Bellisle has also developed environmental permit applications and presented at New Hampshire, New York public hearings in support of public and private projects. Dam Engineering PROFESSIONAL AFFILIATIONS Natural Resources Conservation Services (NRCS): Principal-in- American Society of Civil Charge/Project Manager for various stability analyses and reports to assess Engineers long-term performance of vegetated emergency spillways. Association of State Dam - Hop Brook Floodwater Retarding Dam – Emergency Spillway Safety Officials Evaluation - George H. Nichols Multipurpose Dam – Conceptual Design of an Armored Spillway EDUCATION - Lester G. Ross Floodwater Retarding Dam – Emergency Spillway University of Rhode Island: Evaluation M.S., Civil Engineering 2001 - Cold Harbor Floodwater Retarding Dam – Emergency Spillway B.S., Civil & Environmental Evaluation Engineering, 1992 - Delaney Complex Dams – Emergency Spillway Evaluation PUBLICATIONS AND Hobbs Pond Dam: Principal-in-Charge/Project Manager for the design PRESENTATIONS and development of construction documents of a new armored auxiliary spillway and new primary spillway to repair a filed embankment and Bellisle, J.M., Chopy, D, increase discharge capacity. -
DRAFT Northeast Regional Mercury Total Maximum Daily Load
DRAFT Northeast Regional Mercury Total Maximum Daily Load Connecticut Department of Environmental Protection Maine Department of Environmental Protection Massachusetts Department of Environmental Protection New Hampshire Department of Environmental Services New York State Department of Environmental Conservation Rhode Island Department of Environmental Management Vermont Department of Environmental Conservation New England Interstate Water Pollution Control Commission April 2007 DRAFT Contents Contents .......................................................................................................................................................ii Tables ..........................................................................................................................................................iv Figures.........................................................................................................................................................iv Acknowledgements .....................................................................................................................................v Executive Summary ...................................................................................................................................vi Abbreviations ...........................................................................................................................................xiii Definition of Terms..................................................................................................................................xvi -
Proposed Revisions to 314 CMR 4.00 (Tables and Figures, Clean)
Please see the 314 CMR 4.00 Summary and Notice to Reviewers document, as well as the Fact Sheets on particular topics for additional information and explanatory detail associated with these proposed regulatory changes. These documents are available on the MassDEP Website. 314 CMR: DIVISION OF WATER POLLUTION CONTROL 4.06: continued LIST OF TABLES AND FIGURES* TABLE & TABLE AND CORRESPONDING FIGURE TITLE Page # FIGURE # A (Figure only) River Basins and Coastal Drainage Areas TF-2 1 Blackstone River Basin TF-3 2 Boston Harbor Drainage Area (formerly Boston Harbor Drainage System and Mystic, Neponset and Weymouth & Weir River Basins) TF-8 3 Buzzards Bay Coastal Drainage Area TF-17 4 Cape Cod Coastal Drainage Area TF-22 5 Charles River Basin TF-30 6 Chicopee River Basin TF-34 7 Connecticut River Basin TF-40 8 Deerfield River Basin TF-49 9 Farmington River Basin TF-58 10 French River Basin TF-60 11 Housatonic River Basin TF-62 12 Hudson River Basin (formerly Hoosic, Kinderhook and Bashbish) TF-70 13 Ipswich River Basin TF-76 14 Islands Coastal Drainage Area (formerly Martha's Vineyard and Nantucket) TF-79 15 Merrimack River Basin TF-81 16 Millers River Basin TF-86 17 Narragansett Bay and Mount Hope Bay Drainage Area TF-90 18 Nashua River Basin TF-93 19 North Coastal Drainage Area TF-103 20 Parker River Basin TF-109 21 Quinebaug River Basin TF-113 22 Shawsheen River Basin TF-116 23 South Coastal Drainage Area TF-118 24 Sudbury, Assabet, and Concord (SuAsCo) River Basin (formerly Concord) TF-123 25 Taunton River Basin TF-128 26 Ten Mile River Basin TF-132 27 Westfield River Basin TF-134 28 (Table only) Site-Specific Criteria TF-144 29 (Table only) GenerallyApplicable Criteria: 29a. -
Fort Meadow Reservoir
FORM H . PARKS Af\i"D US(~S Quad Arca(s) Form No, Forms within LANDSCAPE FEATURES I Marlboro 1 l I I 914 ASSESSOR'S )-7, 16-1Y, 30-31 Massachusetts Historical Commission 80 Boylston Street Town Marlborough Place (neighborhood or village) ------ Address _ Historic Name Fort Meadow Reservoir Ownership: [X] private [X] public Type of Park or Landscape Feature (check one): ~~~~!:( [ ] park [ ] farm land [ ] green or common [ ] mine or quarry \ [ ] garden [ ] training field [ ] boulevard/parkway [X] other reservoir Sketch Map Date of Construction _ ....•.1.•.•8=47-=4••.8-------- Draw a map of the area indicating properties within it. Number each property for which individual Source MDC records; town histories inventory forms have been completed. Label streets, including route numbers, if any. Attach a separate Landscape architect unknown sheet if space is not sufficient here. Indicate north. Location of Plans lluknmVD Alterations/Intrusions (with dates) _ • D along shores of reservoir fairlgood Acreage ca 308 acres Setting At N central border of Marlborongh Organization for Marlboro Hist Comm extending NE into Hlldson Crossed by three Date 7/14/95 c3mcways, ringed with woods and cottages PARKS AND LANDSCAPES FORM VISUAL/DESIGN ASSESSMENT [] see continuation sheet Describe topography and layout. Note structures such as bandstands, gazebos, sheds, stone walls, monuments, and fountains. Note landscaping features such. as formal plantings, agricultural plantings, and bodies of water. If possible, compare current appearance with original. This "capacious reservoir" (Hudson, 230), nearly fifty years older than Marlborough's Millham Reservoir and the Metropolitan District Commission's Sudbury Reservoir, is a long, ca. 308-acre body of water on what was formerly a large wetland area on Fort Meadow Brook. -
Cyanobacteria Monitoring Perspectives from Region 1
Cyanobacteria Monitoring Perspectives from Region 1 NWQMC WEBINAR SERIES TUESDAY, FEBRUARY 23, 2016 HILARY SNOOK USEPA REGION 1 LABORATORY Today’s Talk Basic approach Methods and tools employed Addressing data Why the Need? A request from states No clear picture A moving target A need at multiple levels Educational Data need/modeling Resource management tool Risk/vulnerability UNH What Must it Encompass Multi-tiered with ability for technical expansion Low budget but technically sound Easily implemented Regionally consistency (standardized methods) New information at multiple levels Educational/Informative Utility for resource management applications Address ambient waters (preemptive) and bloom conditions Commensurate QA Workgroup Participants VTDEC Massachusetts Charles River Watershed Association Lake Champlain Basin Monitoring Program University of Rhode Island Watershed Watch NHDES Volunteer Monitoring Network Partnership NHDES Beaches/Lakes Program New England Interstate Water Pollution Control Commission NHDES Drinking Water Program USEPA Atlantic Ecology Division University of New Hampshire CFB CTDEEP Ambient Monitoring Program University of New Hampshire Extension Office CT Federation of Lakes Lebanon NH PWS USEPA Mid-Continent Ecology Division Manchester NH PWS USGS Merideth NH PWS Lim-Tex, LLC Pennichuck Water Works NH Eastern Analytical, Inc. Wakefield New Hampshire Lakes Collaborative Penobscot Nation Maine DEP Lakes Program Individual Citizen Scientists Maine Dover-Foxcroft Water -
Massachusetts Ocean Management Plan
Massachusetts Ocean Management Plan Volume 2 Baseline Assessment and Science Framework December 2009 Introduction Volume 2 of the Massachusetts Ocean Management Plan focuses on the data and scientific aspects of the plan and its implementation. It includes these two separate documents: • Baseline Assessment of the Massachusetts Ocean Planning Area - This Oceans Act-mandated product includes information cataloging the current state of knowledge regarding human uses, natural resources, and other ecosystem factors in Massachusetts ocean waters. • Science Framework - This document provides a blueprint for ocean management- related science and research needs in Massachusetts, including priorities for the next five years. i Baseline Assessment of the Massachusetts Ocean Management Planning Area Acknowledgements The authors thank Emily Chambliss and Dan Sampson for their help in preparing Geographic Information System (GIS) data for presentation in the figures. We also thank Anne Donovan and Arden Miller, who helped with the editing and layout of this document. Special thanks go to Walter Barnhardt, Ed Bell, Michael Bothner, Erin Burke, Tay Evans, Deb Hadden, Dave Janik, Matt Liebman, Victor Mastone, Adrienne Pappal, Mark Rousseau, Tom Shields, Jan Smith, Page Valentine, John Weber, and Brad Wellock, who helped us write specific sections of this assessment. We are grateful to Wendy Leo, Peter Ralston, and Andrea Rex of the Massachusetts Water Resources Authority for data and assistance writing the water quality subchapter. Robert Buchsbaum, Becky Harris, Simon Perkins, and Wayne Petersen from Massachusetts Audubon provided expert advice on the avifauna subchapter. Kevin Brander, David Burns, and Kathleen Keohane from the Massachusetts Department of Environmental Protection and Robin Pearlman from the U.S. -
Continuous Forest Inventory 2014
Manual for Continuous Forest Inventory Field Procedures Bureau of Forestry Division of State Parks and Recreation February 2014 Massachusetts Department Conservation and Recreation Manual for Continuous Forest Inventory Field Procedures Massachusetts Department of Conservation and Recreation February, 2014 Preface The purpose of this manual is to provide individuals involved in collecting continuous forest inventory data on land administered by the Massachusetts Department of Conservation and Recreation with clear instructions for carrying out their work. This manual was first published in 1959. It has undergone minor revisions in 1960, 1961, 1964 and 1979, and 2013. Major revisions were made in April, 1968, September, 1978 and March, 1998. This manual is a minor revision of the March, 1998 version and an update of the April 2010 printing. TABLE OF CONTENTS Plot Location and Establishment The Crew 3 Equipment 3 Location of Established Plots 4 The Field Book 4 New CFI Plot Location 4 Establishing a Starting Point 4 The Route 5 Traveling the Route to the Plot 5 Establishing the Plot Center 5 Establishing the Witness Trees 6 Monumentation 7 Establishing the Plot Perimeter 8 Tree Data General 11 Tree Number 11 Azimuth 12 Distance 12 Tree Species 12-13 Diameter Breast Height 13-15 Tree Status 16 Product 17 Sawlog Height 18 Sawlog Percent Soundness 18 Bole Height 19 Bole Percent Soundness 21 Management Potential 21 Sawlog Tree Grade 23 Hardwood Tree Grade 23 Eastern White Pine Tree Grade 24 Quality Determinant 25 Crown Class 26 Mechanical Loss -
Open Space Plan 2009-2016
CityCity of ofSomerville Somerville ZONING OVERHAUL www.somervillezoning.com December 04, 2018 We were asked to do two things for today: 1. Present the roadmap to 125 acres 2. Review the zoning petition Mayor Joseph A Curtatone Office of Strategic Planning & Community Development Executive Summary • The City is launching a SomerVision update: • We are committed to putting a stronger focus on planning for public space. • We need additional indicators of success for future planning; The adequacy and validity of using acreage alone for our specific situation and objectives is questionable. • About 20 acres of public space has been created since 2010. Another 11.75 acres is in planning stages right now. 88.25 acres is still needed. • Sites for the remaining 88.25 acres will be hard to find and will cost an estimated $550+ million dollars to acquire, design, and construct. • This cost is too much for the City of Somerville or for development to bear alone. How much each party should provide remains unanswered. • The City is forming a task force to answer these questions by weighing costs/benefits in relation to other objectives. • Interim zoning was prepared, but long term zoning solutions are needed. Mayor Joseph A Curtatone Office of Strategic Planning & Community Development Agenda • Planning for public space • The roadmap to 125 acres • Financing the 125 acre goal • Zoning petition review and next steps Mayor Joseph A Curtatone Office of Strategic Planning & Community Development Planning for Public Space Mayor Joseph A Curtatone Office of Strategic Planning & Community Development Mayor Joseph A Curtatone Office of Strategic Planning & Community Development We all agree… There is NOT enough public space in Somerville. -
OUR MISSION DCR’S Universal Access Program Is Dedicated to Providing Outdoor Recreation Opportunities in Massachusetts State Parks for Visitors of All Abilities
DCR UAP Program Schedule Summer/FallAccess News 2019Page 1 OUR MISSION DCR’s Universal Access Program is dedicated to providing outdoor recreation opportunities in Massachusetts State Parks for visitors of all abilities. Accessibility is achieved through site improvements, specialized adaptive recreation equipment, and accessible recreation programs. Pre-registration is required for all programs. To pre-register, contact the providing organization. Get into the activity sooner by bringing your release form filled out: mass.gov/dcr/universal-access/release Our structured programs feature adaptive equipment, professional staff, and instruction and support. Friends, family, and companions are welcome to take part in our programs alongside participants with disabilities. Visit our website to keep up-to-date with our activities! mass.gov/dcr/universal-access Donations welcome! DCR’s Conservation Trust and Urban Parks Trust Fund accepts contributions to support and enhance outdoor recreation in Massachusetts for people of all abilities. Your tax-deductible donation will help provide access to our parks. Ask us about matching funds! To learn more, visit: mass.gov/dcr/universal-access/donate Checks should be made out to The Commonwealth of Massachusetts, noting that the funds are for the Universal Access Program (UAP), and sent to: DCR’s Universal Access Program P.O. Box 484 Amherst, MA 01004 Access News Page 2 Hiking program that travels around the state! Take a gentle hike with Stavros Outdoor Access. Date Location Adaptive equipment and staff assistance provided. June 20 George’s Island, Bring a lunch and enjoy nature activities, Boston Harbor scavenger hunts, letterboxing, and more. June 27 Great Brook Farm State Park, Carlisle Cost: $3/person, $12/family, $25/group July 11 Walden Pond State Reservation, Concord July 18 Mt. -
District Journal for Jun 29, 2021 - Jun 30, 2021, District: ALL
District Journal for Jun 29, 2021 - Jun 30, 2021, District: ALL Date: Reported Record Count: 212 Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:21:24 AM 212044094-00 6/28/2021 11:18:00 PM 055238 BRIAN DELAHANTY Location of Occurrence 38 WARREN ST Nature of Incident ASSAULT - AGGRAVATED Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:38:36 AM 212044098-00 6/28/2021 11:26:00 PM 132064 SEAN L. O'BRIEN Location of Occurrence 162 MAGNOLIA ST Nature of Incident ASSAULT - SIMPLE Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:45:15 AM 212044097-00 6/28/2021 11:39:00 PM 056354 KEVIN DONAHUE Location of Occurrence 51 THOMAS PARK Nature of Incident THREATS TO DO BODILY HARM Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 12:59:35 AM 212044102-00 6/29/2021 12:25:00 AM 144304 ADILSON ROSA Location of Occurrence 412 POPLAR ST Nature of Incident INVESTIGATE PERSON Report Date & Time Complaint # Occurrence Date & Time Officer 6/30/2021 3:02:32 PM Boston Police Department 6/29/2021 1:59:26 AM 212044107-00 6/29/2021 1:41:00 AM 140305 JASON HESSLER Location of Occurrence 1850 SOLDIERS FIELD RD Nature of Incident ASSAULT - SIMPLE Report Date & Time Complaint # Occurrence Date & Time Officer 6/29/2021 2:21:29 AM 212044108-00 6/29/2021 12:58:00 AM 103536 NORMAN TEXERIA Location of Occurrence 120 CRAWFORD ST Nature of Incident VAL - OPERATING AFTER REV/SUSP. -
Improved Soldiers Field Road Crossings
Improved Soldiers Field Road Crossings DCR Public Meeting Monday, November 19th – 6:00pm-7:30pm Josephine A. Fiorentino Community Center Charlesview Residences 123 Antwerp Street Extension, Brighton, MA 02135 Commonwealth of Massachusetts Governor Charles D. Baker Lieutenant Governor Karyn E. Polito Energy and Environmental Secretary Matthew A. Beaton Department of Conservation and Recreation Commissioner Leo P. Roy DCR Mission Statement To protect, promote and enhance our common wealth of natural, cultural and recreational resources for the well-being of all. Purpose of Public Meeting • Project Overview • Overview of Public Input from Previous Outreach Efforts • Design Options for Telford Street Crossing • Proposed Concept • Input from Public Soldiers Field Road Crossings 1. Public Input after Meeting #1 – why revisit the design concept? 2. At-Grade Crossing at Telford Street – what will this look like? 3. Design and Construction Methods – how will changes to design affect construction? Project Partners Harvard’s Total Contribution: $ 3,500,000 Feasibility Study: -$ 150,000 Total Project Allocation: $ 3,350,000 Initial Improvements Concept Initial Improvements Concept Initial Improvements Concept Public Input from Meeting #1 Overall support for the project, but with comments Connections to the river should accommodate cyclists, pedestrians, and disabled users Bridge rehabilitation will leave bridge too narrow and ramp switchbacks too difficult to accommodate bicycles, strollers, and pedestrians Desire for more landscaping throughout