TENDER NOTICE (E-BIDDING) Tehsil Municipal Administration Tehsil Municipal Administration Abbottabad invites sealed Tenders / Bids from the eligible contractors / firms registered with Engineering Council, fresh enlisted with Local Council Board and KPPRA Revenue Authority, for the following works:-

Date & Time of Tender Forms Submission 27/04/2021 12:00 PM Date & Time of Tender Forms Opening 27/04/2021 2:00 PM Estimated S # Name of Schemes E/Money Cost ADP No.668 Regional Dev: Initiative for Achieving SDGs for the year of * 2019-20 (PK-38) Package No.22 Union Council Salhad (ADP No.668 "2019-20") PCC incld: Flood Protection Wall Moh: Sattar, Thela Kokhar Maira U/C Salhad 500000 1 Sewerage Line Moh: Abbassi Kokhar Maira U/C Salhad 500000 30000 Sewerage Line Lower Salhad U/C Salhad 500000 Total 1500000 Package No.23 Union Council Salhad (ADP No.668 "2019-20") F/P/Wall & Sewerage Line near H/O of Zahoor Ahmed, Alam Zaib U/C Salhad 500000 2 PCC Street Nasir Khan Gulzeb Thanda Maira U/C Salhad 1000000 30000 Total 1500000 Package No.24 Union Council Jhangi (ADP No.668 "2019-20") PCC Road Moh: Tanolian Jhangi Syedan U/C Jhangi 900000 3 PCC Path Arshad Khan Jhangi Khoja U/C Jhangi 800000 46000 Community Center Usman Abad U/C Jhangi (Remaining Work) 600000 Total 2300000 Package No.25 Union Council (ADP No.668 "2019-20") PCC Path Moh: Bandh Bandi Dundan U/C Banda Pir Khan 700000 4 PCC Street / Road Jabbar Lodhiabad U/C Banda Pir Khan 600000 26000 Total 1300000 Package No.26 Union Council Baldheri (ADP No.668 "2019-20") PCC Road Salar Colony Qalandarabad U/C Baldheri 1400000 5 PCC Road Village Tannan to Qudoos Khan House U/C Baldheri 1300000 54000 Total 2700000 Package No.27 Union Council Baldheri (ADP No.668 "2019-20") PCC Street Moh: Usman Nazir / Abdul Qadeer near Bridge Lodhiabad Dakhli Tannan 500000 U/C Baldheri 6 PCC Street Moh: Awan Qalandarabad U/C Baldheri 500000 46000 PCC Road KKH to Master Wali Hussain House Qalandarabad U/C Baldheri 800000 Const: of Culvert + FM Wall or PCC Gujjar basti Galli Tannan U/C Baldheri 500000 Total 2300000 Package No.28 Union Council Chamhad (ADP No.668 "2019-20") PCC Street & Shingle Road U/C Chamhad 500000 7 New Shingle Road Moh: Qayum Gorian U/C Chamhad 1000000 56000 Const: of Culvert i/c PCC Road Mangal Darra U/C Chamhad 1300000 Total 2800000 * ADP No.756/150180 SPDI "2015-16" (PK-36) Out of Savings 8 Removal of Sliding/Malba at Tangrral to Barri Kangrota Road u/c Nammel 180000 3600 9 Removal of Sliding/Malba at Nammal Harandi Khadala Link Road u/c Nammel 210000 4200 10 Const: of Janazagah and P/W of Graveyard Mohallah Dheri Sialkot 859000 17180 11 Widening & Removal of Sliding/Malba at Link Road V/C Sialkot 210000 4200 * ADP No.775/130605 DDI "2013-14" (PK-36) Out of Savings 12 Removal of Sliding/Malba at Kahoti to Tangrral Road u/c Nammal 121000 2420 * ADP No.771/40497 SPDI "2013-14" (PK-37) Out of Savings 13 Const: of Road Kundla Passala U/C Nathiagali. 1060000 21200 14 WSS / Hand Pump Moh: Siyalia U/C . 1000000 20000 15 Inst: of H/Pump Jharrian Road C/O Sardar Muhammad Pervaiz U/C Nawansher 168000 3360 * ADP No.762/150720 "2015-16" (PK-37) Out of Savings Shingle Road / Dozer Work at Moh: Choudrian Danna Baghan (200 Hours) U/C 16 1000000 20000 Nathiagali 17 Shingle Road / Dozer Work at Moh: Kalas U/C (100 Hours) 500000 10000

18 Shingle Road / Dozer Work at Noshera to Naddi Haro and Moh: Blochabad U/C Tajwal 700000 14000

19 Imp: of Road & R/Wall Kholiyan to Masjid U/C Nagri Bala 690000 13800 * ADP No.757/150182 "2015-16" (PK-37) Out of Savings PCC Road Dehra to Abdur Rehman House Gali Baniyan C/O Hafeez Abbassi U/C 20 600000 12000 Kuthwal 21 Imp: / PCC / R/Wall of Road Chanatti Makool Bala C/O Munsif U/C Nagri Bala 780000 15600 * ADP No.756/150180 "2015-16" (PK-37) Out of Savings 22 Const: of Water Tank Moh: Kotla U/C Tajwal 500000 10000 23 Const: of Culvert Janroti Moh: Jalsi U/C Tajwal 500000 10000 24 Const: of Road / R/Wall Bata Keri Road U/C Nagri Bala 500000 10000 25 PCC Road Pehlwan Road Jhaffar U/C Birangali 799000 15980 26 Const: of Road Okhreela Tarhat (150 Hours) U/C Birangali 500000 10000 * ADP No.713/40497 "2014-15" (PK-38) Out of Savings 27 Construction of Link Road from Pawa Road to Airan U/C Pawa 220819 4416.38 28 Construction of Jinaza Gah Jhangi Syedan U/C Jhangi 1641246 32824.92 * ADP No.703/140796 "2014-15" (PK-38) Out of Savings 29 New Shingle Road, Kasakki Khurd to Kasakki Kalan U/C Chamhad 2215334 44306.68 * ADP No.757/150182 "2015-16" (PK-38) Out of Savings PCC Street incld: Drainage, Alama Towan, opp: Small Industry Masjid, Mandian U/C 30 999420 19988.4 Jhangi * ADP No.762/150720 "2015-16" (PK-38) Out of Savings 31 PCC Street no.5 / Road, Usman-Bin-Affan, Gohar Ayub Town U/C Jhangi 771604 15432.08 32 PCC Street Usmania Part, Usmanabad, U/C Jhangi 500000 10000 * ADP No.775/130605 DDI "2013-14" (PK-38) Out of Savings 33 Inst: of H/Pump Moh: Ali Asghar, Basit Habiba U/C Chamhad 150000 3000 34 Inst: of H/Pump Moh: Danna Chhari, U/C 150000 3000 35 PCC Rehman Street No.04 near Utility Store Jhangi Qazian U/C Jhangi 555500 11110 36 Inst: of H/Pump Moh: Masjid, Jarral U/C Jarral 150000 3000 37 Inst: of H/Pump Moh: Zarraq Khan, Jhangi Khoja U/C Jhangi 150000 3000 * ADP No.771/40497 SPDI "2013-14" (PK-38) Out of Savings Package No.1 Union Council Baldheri "ADP 771 2013-14" (Out of Savings) Inst: of H/Pump Moh: Shamraiz Khan Tannan U/C Baldheri 150000 Inst: of H/Pump Moh: Daud Mangal U/C Baldheri 150000 38 Inst: of H/Pump Moh: Farooq Mangal U/C Baldheri 150000 12000 Inst: of H/Pump Moh: Zaffar Khan Mangal U/C Baldheri 150000 Total 600000 Package No.2 Union Council Chamhad "ADP 771 2013-14" (Out of Savings) Inst: of H/Pump Moh: Aurangzeb Kasakki Kalan U/C Chamhad 150000 39 Inst: of H/Pump Moh: Kala Khan Danna Kasakki U/C Chamhad 150000 9000 Inst: of H/Pump Moh: Sadiq Kasakki Khurd U/C Chamhad 150000 Total 450000 Package No.3 Union Council Banda Pir Khan "ADP 771 2013-14" (Out of Savings) Inst: of H/Pump Moh: Rustam Maira Khattak U/C Banda Pir Khan 150000 40 PCC Path Moh: Niaz Katha Bandi Dhundan U/C Banda Pir Khan 300000 9000 Total 450000 * ADP No.856/170357 SPDI "2017-18" (PK-39) Out of Savings 41 Construction of Latreen for Boys High School No.3 U/C Central Urban 714000 14280 * ADP No.756/150180 SPDI "2015-16" (PK-39) Out of Savings 42 Uplift of Sports Hall Choona Kari U/C Cantt 1600000 32000 43 PCC Street / Sewerage Line Near Allai Masjid Kaghan Colony U/C Cantt: 1000000 20000 * ADP No.757/150180 PP "2015-16" (PK-39) Out of Savings 44 PCC Street / Sewerage Line H/O Waseem U/C Cantt 250000 5000 * ADP No.762/150720 "2015-16" (PK-39) Out of Savings 45 Uplifting of Double Stories Building Sports Hall in Kunj U/C Kehal 2488000 49760 * ADP No.713/40497 "2014-15" (PK-39) Out of Savings 46 Remaining Work of Sports Hall Near Bilal Masjid Ward No.13 U/C Kehal 2000000 40000 47 PCC Street / Sewerage Line near H/O Rizwan Ward No.12 U/C Kehal 200000 4000 * ADP Scheme DDI "2014-15" (PK-39) Out of Savings 48 Construction of Sports Hall Nardubba U/C Kakul 1100000 22000 * ADP No.775/130605 DDI "2013-14" (PK-39) Out of Savings PCC Street / Sewerage Line Near H/O Gul Khan to Muhammad Umer Oresh Colony 49 778000 15560 U/C Nawansher * ADP No.771/40497 SPDI "2013-14" (PK-39) Out of Savings 50 PCC Street / Sewerage Line Near H/O Shakeel U/C Malikpura 235000 4700 * ADP No.713/40497 "2014-15" (PK-37) Change of Schemes 51 WSS / R/Wall V/C Jhansa U/C Nathiagali 650000 13000 52 Const: of Link Road Takorian V/C Bagan U/C Nathiagali 500000 10000 * District Fund Sector Discretion (Out of Savings) 53 Repair & Renovation of District Administration Offices and Residences Abbottabad 2500000 50000 * District Fund for the year of 2016-17 Sector Agr: / Youth / Sports / Women 54 Remaining Work of Sports Hall Opp: Imam Bargah U/C City Urban 1100000 22000 * PFC Fund Sector Discretion for year of 2018-19 55 Remaining Work of PCC Road at Bagh Nakkar / Telemar U/C Nagri Bala 500000 10000 56 Remaining Work of PCC / Imp: of Jandar Road U/C Nagri Bala 308000 6160 * PFC Fund for year of 2016-17 (Out of Savings) 57 Const: of Water Tank Moh: Kheitran Kassala U/C Nagri Bala 100000 2000 * Uplift & Beautification 58 Remaining Works at different chowks in Abboottabad City 800000 16000 Terms & Conditions: 1 The award of contract shall be on the basis of above/below engineer estimate on MRS instead of item rate basis. 2 The percentage of bid security shall be 2% of the engineer estimate. 3 In case of bid / rate quoted by the bidder more than 10% below engineer estimate, the additional bid security shall be sought from the successful bidder only to the extent of bid more than 10% below the engineer estimate in the form of percentage. The amount of additional bid security shall be equal to the impact of financial difference occurring in the quoted rates beyond 10% below engineer estimate. 4 In such eventuality, the successful bidder shall be bound to produce the additional bid security within three (03) working days from the issuance of Letter of Acceptance failing which the procuring entity shall forfeit the bid security of successful bidder and may also initiate legal proceeding against the bidder who repudiated the contract under KPPRA procurement rules. 5 The procuring entity may offer the contract to next lowest bidder after due diligence in the context of financial difference between such two bids and the market analysis in order to discourage cartel making and to protect public interest at large. 6 Any such effert to conspire to cartel making shall be considered as violaion of Rule 44 and shall be attributed towards mis-procurement undere Rule 54 of Procurement Rules ibid.

7 The following documents are compulsory with tender form: i. The fresh Registration of LCB. ii. The fresh Registration of KPPRA Revenue. iii. The downloaded BOQ, Terms & Conditions and 2% security must be attached. 8 Those schemes which are exceed from 2.00 million, then the contractor must be adhered to install concrete batching plant at the site. 9 After issuing the work order, if the contractor / firm is not commence the work in one week, then the tender will be cancelled including forfeiting of security. 10 According to the Government Laws, all the taxes will be deducted. 11 Incase of receiving equal offers / tie, the award of contract shall be decided through a free toss which shall be final. 12 All those contractor which have incompleted / pending works, to avoid to participate in the tenders and to concentrate / priority on completion of previous incompleted schemes. 13 Work order will be issued on the availability of funds with Tehsil Municipal Administration, Abbottabad. 14 Tender form and BOQ, can be downloaded after two days of wide publicity on the website www.lgkp.gov.pk.

TMO / Administrator TMA, Abbottabad