18 Months Procurement Plan

I. General

Public Disclosure Authorized 1. Bank’s approval Date of the procurement Plan: January 19, 2016 2. Date of General Procurement Notice: August 5, 2016 3. Period covered by this procurement plan: June 2016 to December 2017 4. Implementing Agencies: • Component 1: Ministry of Agriculture, Forestry and Fisheries (MAFF): Fisheries Administration (FiA) • Component 2: Cambodian National Mekong Committee (CNMC) II. Goods and Works and non-consulting services.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement. Public Disclosure Authorized Procurement Method Prior Review Threshold Comments US$ 1. Each package estimated Goods to cost more than 2,000,000 2. Each package estimated Works to cost more than 10,000,000 3. (Non-Consultant Services) Each package estimated to cost more than 2,000,000

Public Disclosure Authorized 2. Prequalification. Not applicable.

3. Any Other Special Procurement Arrangements: Not Applicable

4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement)

Component 1: Fisheries and Aquatic Resources Management in Northern

1 2 3 4 5 6 7

Ref. Description Estimated Packages Domest Review Comments Public Disclosure Authorized No. Cost ic by Bank US$ Prefere (Prior / Post) nce (yes/no) Office equipment, office furniture, Shopping boats, and NCB Laboratory methods FiA- Aquatic life will be G001- and water 343,000 8 No Post followed to 008 quality procure monitoring these equipment , goods. Mapping Equipment, motorbikes, vehicles, Construction of Office for FiA Stung Shopping Treng and FiA- and NCB Kratie, CW00 660,000 3 No Post methods Hatchery 1-003 will be construction, followed and FiA office renovation

Component 2: Support for WRM in the Northern Cambodia and trans-boundary dialogue

1 2 3 4 5 6 7

Ref. No. Description Estimated Packages Domestic Review Comments Cost Preference by Bank US$ (yes/no) (Prior / Post) Office furniture, office equipment, Hydro- metrological equipment, Water and Shopping and hydrological NCB methods will G01-10 measurement 1,000,500 10 No Post be followed to (goods) equipment, procure these vehicles, goods. motorbikes, Supply and Installation of Meteorology measurement equipment, ect. Construction of W01a PDOWRAM 390,000 1 No Post NCB (Works) office building in Kratie, Steung Treng , Rattanakiri, and ( 4 buildings)

III. Selection of Consultants

1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comment 1. Each package estimated Selection of Consulting firms to cost more than 1,000,000 2. Each package estimated Selection of Individual Consultant to cost more than 300,000

2. Any Other Special Selection Arrangements: Not Applicable

3. Consultancy Assignments with Selection Methods

Component 1: Fisheries and Aquatic Resources Management in Northern Cambodia

1 2 3 4 5 6

Ref. No. Description of Estimated Packag Review Comments Assignment Cost es by Bank US$ (Prior / million Post) FiA-CS FM consultants, 001- 026 Procurement Consultants, International Fishery Resource Management Specialist, International 26 individual Community Fishery national and Specialist, National 1,873,000 26 Post international Lead Fishery consultants will be Resource Specialist, engaged. National Lead Community Fishery Specialist, National Environmental and Social (safeguards) specialist, National Gender Specialist, Regional Aquaculture Specialist, National Infrastructure Engineer, etc.

Component 2: Support for WRM in the Northern Cambodia and trans-boundary dialogue

1 2 3 4 5 6

Ref. No. Description of Estimated Packag Review Comments Assignment Cost es by Bank US$ (Prior / million Post) 2 FM consultants, 2 5 individual national Procurement and international CS 01-05 Consultants, Project 302,000 5 Post consultants will be accountant engaged. consultant. Bundled auditor selected by MEF. CS07 SSS method will be External audit firm 50,000 1 Post followed to engage the auditor for this project Technical Water QCBS method will CS08 Resource 2,500,000 1 Prior be followed. Management Firm NIS upgrading CS09 CQS method will be support consultant ( 50,000 1 Post followed. Firm) PROCUREMENT Cambodia : Mekong Integrated Water Resources Management Project- Phase III PLAN General Information

Country: Cambodia Bank’s Approval Date of the Original Procurement Plan: 2017-03-21 Revised Plan Date(s): (comma delineated, leave blank if none)2020-11-10 Project ID: P148647 GPN Date: Project Name: Mekong Integrated Water Resources Management Project- Phase III Loan / Credit No: IDA / 57770 Executing Agency(ies): Fisheries Administration

WORKS Bid Evaluation Activity Reference No. / Procurement Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification High SEA/SH Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Contract Description Component Review Type Method Document Amount Amount qualification Document / Signed Contract No. Approach Process (Y/N) Risk Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Completion Type (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

1. Fisheries and Aquatic FIA-CW-003 / Office Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 20,000.00 19,995.83 Signed 2017-07-26 2017-10-08 2017-08-24 2017-12-07 Renovation for FiA Quotations Envelope Northern Cambodia

FIA-CW-001 / Construction of New Office Buildings for 1. Fisheries and Aquatic PFiA Stung Treng and Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 140,000.00 247,481.42 Signed 2019-03-04 2019-04-23 2019-05-17 2019-10-20 Kratie (Including renovation Quotations Envelope Northern Cambodia of existing office of PFiA Kratie)

FIA-CW-074 / Natural Laterite Road Reconstruction (Length 690m Width 4m 1. Fisheries and Aquatic Community Earth Work Heigh t0.3m IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-02-08 2019-02-04 2019-02-13 2019-02-08 2019-03-04 2019-02-22 2019-06-02 Natural Gravel Height Northern Cambodia Development 0.1m) in Preaek Prasab Commune, Preaek Prasab District, Kratie Province

FIA-CW-075 / Natural Laterite Road Reconstruction (Length 630m Width 5m 1. Fisheries and Aquatic Community Earth Work Height 0.3m IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-02-08 2019-02-10 2019-02-13 2019-02-10 2019-03-04 2019-02-21 2019-06-02 Natural Gravel Height Northern Cambodia Development 0.15m) in Bos Leav Commune, , Kratie Province

FIA-CW-076 / Laterite Road Reconstruction (Length 1278m Width 6m, Earth 1. Fisheries and Aquatic Community Work Height 0.2m, Laterite IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-02-08 2019-02-10 2019-02-13 2019-02-10 2019-03-04 2019-02-22 2019-06-02 Height 0.15m) in Preah Northern Cambodia Development Rumkel Commune, Thalaborivat District,

FIA-CW-077 / Pipe Culverts Construction (4 Pipe Culverts Diameter of 1. Fisheries and Aquatic Community Pipe 1m, Length 6m) in IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-02-08 2019-02-10 2019-02-13 2019-02-10 2019-03-04 2019-02-22 2019-05-03 Koh Sampeay Commune, Northern Cambodia Development Siem Bouk District, Stung Treng Province

FIA-CW-078 / Pipe Culverts Construction and Earth Road 125m (Pipe 1. Fisheries and Aquatic Community Culverts and Double Pipe IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-02-08 2019-02-10 2019-02-13 2019-02-10 2019-03-04 2019-02-22 2019-06-02 Culvert, Diameter of Pipe Northern Cambodia Development 1m, Length 6m) in Sdao Commune, Se San District, Stung Treng Province

FIA-CW-079 / Natural Gravel Road Reconstruction (Length 690m, Width 4m, 1. Fisheries and Aquatic Community Earth Work Height 0.3m, IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-03-18 2019-03-29 2019-03-23 2019-03-29 2019-04-11 2019-04-08 2019-07-10 Natural Gravel Height Northern Cambodia Development 0.15m) in Ruseykeo Commune, Sambour District, Kratie Province

Page 1 FIA-CW-081 / Natural Gravel Road Reconstruction and Culvert (Length 1300m, Width 3m, Earth Work 1. Fisheries and Aquatic Community Height 0.2m, Natural Gravel IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-03-18 2019-03-29 2019-03-23 2019-03-29 2019-04-11 2019-04-08 2019-07-10 Height 0.15m, and Single Northern Cambodia Development Culvert Length 5m, Diameter 0.6m) in Sambour Commune, Sambour District, Kratie Province

FIA-CW-082 / Natural Gravel Road Reconstruction (Length 800m, Width 4m, 1. Fisheries and Aquatic Community Natural Gravel Height IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-03-18 2019-03-29 2019-03-23 2019-03-29 2019-04-11 2019-04-08 2019-07-10 0.2m) in Kampong Cham Northern Cambodia Development Commune, Sambour District, Kratie Province

FIA-CW-083 / Laterite Road Reconstruction (Length 930m, Width 5m, Earth 1. Fisheries and Aquatic Community Work Height 0.2m, Laterite IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-05-06 2019-05-07 2019-05-11 2019-05-07 2019-05-30 2019-05-17 2019-08-28 Height 0.15m) in Koh Pras Northern Cambodia Development Commune, Siem Bouk District, Stung Treng Province

FIA-CW-084 / 2 Culverts Construction and Fill Earth Works (Length 60m, Width 1. Fisheries and Aquatic Community 6m and Height 3m) in Ou IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-05-06 2019-05-07 2019-05-11 2019-05-07 2019-05-30 2019-05-17 2019-08-28 Mreah Commune, Ou Mreah Northern Cambodia Development District, Stung Treng Province

FIA-CW-085 / Laterite Road Reconstruction (Length 1,043m, Width 5m, Earth 1. Fisheries and Aquatic Community Work Height 0.5m, Laterite IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-05-06 2019-05-07 2019-05-11 2019-05-07 2019-05-30 2019-05-17 2019-08-28 Height 0.15m) in Kang Northern Cambodia Development Cham Commune, Thalaborivat District, Stung Treng Province

FIA-CW-080 / Natural Gravel Road Reconstruction and Culvert (Length 730m, Width 4m, Earth Work Height 0.2m, Natural Gravel 1. Fisheries and Aquatic Community Height 0.15m, and Single IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-03-18 2019-03-29 2019-03-23 2019-03-29 2019-04-11 2019-04-08 2019-07-10 Culvert Length 5m, Northern Cambodia Development Diameter 1.00m) in Voathonak Commune, Sambour District, Kratie Province

FIA-CW-086 / 4 Pipe 1. Fisheries and Aquatic Community Culverts Construction in Ou IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-07-17 2019-07-16 2019-07-22 2019-07-16 2019-08-10 2019-07-23 2019-11-08 Krieng Commune, Sambour Northern Cambodia Development District, Kratie Province

FIA-CW-087 / 2 Pipe Culverts Construction in 1. Fisheries and Aquatic Community Boeng Char Commune, IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-07-17 2019-07-17 2019-07-22 2019-07-17 2019-08-10 2019-07-23 2019-11-08 Sambour District, Kratie Northern Cambodia Development Province

FIA-CW-088 / Earth Work Road Construction (Length 500m, Width 4m, Height 1. Fisheries and Aquatic Community 0.5m) in Kaoh Sneng IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-09-30 2019-10-10 2019-10-05 2019-10-17 2019-10-24 2019-10-30 2020-01-22 Commune, Thalaborivat Northern Cambodia Development District, Stung Treng Province

FIA-CW-089 / Earth Work Road Construction (Length 1. Fisheries and Aquatic Community 610mm, Width 3m, Height IDA / 57770 Resources Management in Post Driven Direct 10,000.00 10,000.00 Signed 2019-09-30 2019-10-10 2019-10-05 2019-10-17 2019-10-24 2019-10-30 2020-01-22 0.6m) in Ou Svay Northern Cambodia Development Commune, Thalaborivat District, Stung Treng Province

Page 2 FIA-CW-012 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2019-12-01 2019-12-02 2019-12-06 2019-12-05 2019-12-26 2019-12-12 2020-06-23 Krala Peas Community Northern Cambodia Development Fisheries in Stung Treng province

FIA-CW-013 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2019-12-01 2019-12-02 2019-12-06 2019-12-05 2019-12-25 2019-12-12 2020-06-22 Pong Tuek Community Northern Cambodia Development Fisheries in Stung Treng province

FIA-CW-021 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2019-12-01 2019-12-02 2019-12-06 2019-12-05 2019-12-18 2019-12-12 2020-06-15 Damrei Phong Community Northern Cambodia Development Fisheries in Stung Treng province

FIA-CW-041 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2019-12-10 2019-12-10 2019-12-15 2019-12-13 2020-01-03 2019-12-25 2020-07-01 Tomnub Pak+A20 Northern Cambodia Development Community Fisheries in Kratie province

FIA-CW-042 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2019-12-10 2019-12-10 2019-12-15 2019-12-13 2020-01-03 2019-12-25 2020-07-01 Infrastructure (Cfi Office) in Northern Cambodia Development Kampong Roteh Community Fisheries in Kratie province

FIA-CW-043 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2019-12-10 2019-12-10 2019-12-15 2019-12-13 2020-01-03 2019-12-25 2020-07-01 Infrastructure (Cfi Office) in Northern Cambodia Development Damrae Community Fisheries in Kratie province

FIA-CW-045 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2019-12-10 2019-12-10 2019-12-15 2019-12-13 2020-01-03 2019-12-25 2020-07-01 Infrastructure (Cfi Office) in Northern Cambodia Development Koh Dambang Community Fisheries in Kratie province

FIA-CW033 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-03-06 2020-03-06 2020-03-11 2020-03-08 2020-03-28 2020-03-17 2020-09-24 Infrastructure (Cfi Office) in Northern Cambodia Development Khsach Leav Community Fisheries in Kratie province

FIA-CW034 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-03-06 2020-03-06 2020-03-11 2020-03-08 2020-03-28 2020-03-17 2020-09-24 Infrastructure (Cfi Office) in Northern Cambodia Development Koh Khnhaer Community Fisheries in Kratie province

FIA-CW035 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-03-06 2020-03-06 2020-03-11 2020-03-08 2020-03-28 2020-03-17 2020-09-24 Infrastructure (Cfi Office) in Northern Cambodia Development Pon Chea Community Fisheries in Kratie province

FIA-CW047 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-03-06 2020-03-06 2020-03-11 2020-03-08 2020-04-04 2020-03-17 2020-10-01 Infrastructure (Cfi Office) in Northern Cambodia Development Rusey Keo Community Fisheries in Kratie province

FIA-CW048 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-03-06 2020-03-06 2020-03-11 2020-03-08 2020-03-28 2020-03-17 2020-09-24 Infrastructure (Cfi Office) in Northern Cambodia Development Ou lung Community Fisheries in Kratie province

Page 3 FIA-CW006 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-03-18 2020-03-15 2020-03-23 2020-03-17 2020-04-07 2020-03-23 2020-10-04 Kaoh Sampeay Community Northern Cambodia Development Fisheries in Stung Treng province

FIA-CW014 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,000.00 Signed 2020-03-18 2020-03-15 2020-03-23 2020-03-17 2020-04-07 2020-03-23 2020-10-04 Anlong Svay 1 Community Northern Cambodia Development Fisheries in Stung Treng province

FIA-CW016 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-03-18 2020-03-15 2020-03-23 2020-03-17 2020-04-07 2020-03-23 2020-10-04 Kaoh Pnov Community Northern Cambodia Development Fisheries in Stung Treng province

FIA-CW018 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-03-18 2020-03-15 2020-03-23 2020-03-17 2020-04-07 2020-03-23 2020-10-04 Infrastructure (Cfi Office) in Northern Cambodia Development Thmei Community Fisheries in Stung Treng province

FIA-CW022 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-03-18 2020-03-15 2020-03-23 2020-03-17 2020-04-07 2020-03-23 2020-10-04 Anlong Svay 2 Community Northern Cambodia Development Fisheries in Stung Treng province

FIA-CW004 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-04-01 2020-04-06 2020-04-06 2020-04-09 2020-04-21 2020-04-22 2020-10-18 Infrastructure (Cfi Office) in Northern Cambodia Development Stao 2 Community Fisheries in Stung Treng province

FIA-CW019 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-04-01 2020-04-06 2020-04-06 2020-04-09 2020-04-21 2020-04-22 2020-10-18 Infrastructure (Cfi Office) in Northern Cambodia Development Stao 1 Community Fisheries in Stung Treng province

FIA-CW-090 / Natural Gravel Road Reconstruction (Length 1250m, Width 4m, 1. Fisheries and Aquatic Community Earth Work Height 0.25m, IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-04-06 2020-04-06 2020-04-11 2020-04-09 2020-04-26 2020-04-21 2020-10-23 Natural Gravel Height Northern Cambodia Development 0.15m) in Voadthonak Commune, Sambour District, Kratie

FIA-CW-091 / Natural Gravel Road Reconstruction and Culvert (Length 820m, Width 4m, Earth Work 1. Fisheries and Aquatic Community Height 0.35m, Natural IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-04-06 2020-04-06 2020-04-11 2020-04-09 2020-04-26 2020-04-21 2020-10-23 Gravel Height 0.15m, and 2 Northern Cambodia Development Single Culvert Length 6m, Diameter 0.60m) in Sambour Commune, Sambour District, Kratie

FIA-CW-092 / Natural Gravel Road Reconstruction (Length 1250m, Width 4m, 1. Fisheries and Aquatic Community Earth Work Height 0.25m, IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-04-06 2020-04-06 2020-04-11 2020-04-09 2020-04-26 2020-04-21 2020-10-23 Natural Gravel Height Northern Cambodia Development 0.15m) in Russey Keo Commune, Prek Prasab District, Kratie

Page 4 FIA-CW-093 / Natural Gravel Road Reconstruction (Length 1250m, Width 4m, 1. Fisheries and Aquatic Community Earth Work Height 0.25m, IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-04-06 2020-04-06 2020-04-11 2020-04-13 2020-04-26 2020-04-21 2020-10-23 Natural Gravel Height Northern Cambodia Development 0.15m) in Ta Mao Commune, Prek Prasab District, Kratie

FIA-CW-094 / Natural Gravel Road Reconstruction and Culvert (Length 820m, Width 4m, Earth Work 1. Fisheries and Aquatic Community Height 0.35m, Natural IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-04-06 2020-04-06 2020-04-11 2020-04-09 2020-04-26 2020-04-21 2020-10-23 Gravel Height 0.15m, and 2 Northern Cambodia Development Single Culvert Length 6m, Diameter 0.60m) in Preak Prasab Commune, Prek Prasab District, Kratie

FIA-CW-095 / Natural Gravel Road Reconstruction (Length 1250m, Width 4m, 1. Fisheries and Aquatic Community Earth Work Height 0.25m, IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-04-06 2020-04-06 2020-04-11 2020-04-09 2020-04-26 2020-04-21 2020-10-23 Natural Gravel Height Northern Cambodia Development 0.15m) in Saob Commune, Prek Prasab District, Kratie

FIA-CW029 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-04-06 2020-04-06 2020-04-11 2020-04-09 2020-04-26 2020-04-22 2020-10-23 Infrastructure (Cfi Office) in Northern Cambodia Development Koh Phdau Community Fisheries in Kratie province

FIA-CW030 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-04-06 2020-04-06 2020-04-11 2020-04-09 2020-04-26 2020-04-22 2020-10-23 Infrastructure (Cfi Office) in Northern Cambodia Development Ampil Teuk Community Fisheries in Kratie province

FIA-CW031 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-04-06 2020-04-06 2020-04-11 2020-04-09 2020-04-26 2020-04-22 2020-10-23 Infrastructure (Cfi Office) in Northern Cambodia Development Kampong Krabei Community Fisheries in Kratie province

FIA-CW032 / Demarcation of CFi Fishery Boundary 1. Fisheries and Aquatic Community (Poles, Signboard) and IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-04-06 2020-04-06 2020-04-11 2020-04-09 2020-04-26 2020-04-22 2020-10-23 Infrastructure (Cfi Office) in Northern Cambodia Development Somphen Community Fisheries in Kratie province

FIA-CW096 / Natural Gravel Road Reconstruction (Length 1300m, Width 4m, 1. Fisheries and Aquatic Community Earth Work(900m) Height IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-04-27 2020-05-01 2020-05-02 2020-05-04 2020-05-19 2020-05-13 2020-11-15 0.3m, Natural Gravel Height Northern Cambodia Development 0.15m) in Bos Leav Commune, Chetr Borei District, Kratie

FIA-CW097 / Natural Gravel Road Reconstruction (Length 1250m, Width 4m, 1. Fisheries and Aquatic Community Earth Work Height 0.25m, IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-04-27 2020-05-01 2020-05-02 2020-05-04 2020-05-19 2020-05-13 2020-11-15 Natural Gravel Height Northern Cambodia Development 0.15m) in Kanhchor Commune, Chhlong District, Kratie

FIA-CW098 / Natural Gravel Road Reconstruction (Length 1000m, Width 5m, 1. Fisheries and Aquatic Community Earth Work Height 0.3m, IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-04-27 2020-05-01 2020-05-02 2020-05-04 2020-05-19 2020-05-13 2020-11-15 Natural Gravel Height Northern Cambodia Development 0.15m) in Preak Saman Commune,, Chhlong District, Kratie

FIA-CW099 / The Earth Work Road Reconstruction 1. Fisheries and Aquatic Community (Length 900m,Width 3m and IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-05-21 2020-05-21 2020-05-26 2020-05-22 2020-06-10 2020-05-29 2020-12-07 Height 0.6m) in OuSvay Northern Cambodia Development Commune, Thalaborivat District, Stung Treng

Page 5 FIA-CW100 / The Earth Work Road Reconstruction 1. Fisheries and Aquatic Community (Length 760m,Width 4m and IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-05-21 2020-05-21 2020-05-26 2020-05-22 2020-06-10 2020-05-29 2020-12-07 Height 0.6m) in KoahSneng Northern Cambodia Development Commune, Thalaborivat District, Stung Treng

FIA-CW011 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-08 2020-06-08 2020-06-13 2020-06-10 2020-06-26 2020-06-17 2020-12-23 Koh Sneng Commune, Borei Northern Cambodia Development OuSvay San Chey District, Stung Treng province

FIA-CW015 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-08 2020-06-08 2020-06-13 2020-06-10 2020-06-26 2020-06-17 2020-12-23 Kang Cham Commune, Northern Cambodia Development Thalaborivat District, Stung Teng province

FIA-CW017 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-08 2020-06-08 2020-06-13 2020-06-10 2020-06-26 2020-06-17 2020-12-23 Thalaborivat Commune, Northern Cambodia Development Thalaborivat District, Stung Teng province

FIA-CW020 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-08 2020-06-08 2020-06-13 2020-06-10 2020-06-26 2020-06-17 2020-12-23 Phlouk Commune, Sesan Northern Cambodia Development District, Stung Teng province

FIA-CW023 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-08 2020-06-08 2020-06-13 2020-06-10 2020-06-26 2020-06-17 2020-12-23 Kang Cham Commune, Northern Cambodia Development Thalaborivat District, Stung Teng province

FIA-CW101 / Earth work road reconstruction (Length 1. Fisheries and Aquatic Community 1000m, Width 6m, Height IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-06-08 2020-06-12 2020-06-13 2020-06-15 2020-06-26 2020-06-23 2020-12-23 0.5m) in Thmar Kreae Northern Cambodia Development Commune, Chetr Borei District, Kratie

FIA-CW102 / Natural Gravel Road Reconstruction 1. Fisheries and Aquatic Community (Length 1900m, Width 5m, IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-06-08 2020-06-12 2020-06-13 2020-06-15 2020-06-26 2020-06-23 2020-12-23 Height 0.25m) in Sambok Northern Cambodia Development Commune, Chetr Borei District, Kratie

FIA-CW103 / Natural Gravel Road Reconstruction 1. Fisheries and Aquatic Community (Length 1200m, Width 4m, IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-06-08 2020-06-12 2020-06-13 2020-06-15 2020-06-26 2020-06-23 2020-12-23 Height 0.30m) in Kaoh Northern Cambodia Development Khnhaer Commune, Sambour District, Kratie

FIA-CW104 / Natural Gravel Road Reconstruction 1. Fisheries and Aquatic Community (Length 1400m, Width 4m, IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-06-08 2020-06-12 2020-06-13 2020-06-15 2020-06-30 2020-06-23 2020-12-27 Height 0.30m) in Ou Krieng Northern Cambodia Development Commune, Sambour District, Kratie

FIA-CW105 / Triple Pipe Culvert (1mx10m) and Single Pipe Culvert 1. Fisheries and Aquatic Community (1mx10m) in Samki IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-06-15 2020-06-19 2020-06-20 2020-06-25 2020-07-03 2020-07-08 2020-12-30 Commune, Stung Treng Northern Cambodia Development District, Stung Treng Province

Page 6 FIA-CW007 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-12 2020-06-19 2020-06-17 2020-06-25 2020-06-30 2020-07-08 2020-12-27 Ou Mreah Commune, Siem Northern Cambodia Development Bouk District, Stung Teng province

FIA-CW008 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-12 2020-06-19 2020-06-17 2020-06-25 2020-06-30 2020-07-08 2020-12-27 Ou Mreah Commune, Siem Northern Cambodia Development Bouk District, Stung Teng province.

FIA-CW009 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-12 2020-06-19 2020-06-17 2020-06-25 2020-06-25 2020-07-08 2020-12-22 Ou Mreah Commune, Siem Northern Cambodia Development Bouk District, Stung Teng province.

FIA-CW010 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-12 2020-06-19 2020-06-17 2020-06-25 2020-06-30 2020-07-08 2020-12-27 Kaoh Preah Commune, Siem Northern Cambodia Development Bouk District, Stung Teng province.

FIA-CW027 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-12 2020-06-19 2020-06-17 2020-06-25 2020-06-30 2020-07-08 2020-12-27 Samaki Sangkat, Stungn Northern Cambodia Development Treng City, Stung Teng province.

FIA-CW005 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-15 2020-06-19 2020-06-20 2020-06-25 2020-07-03 2020-07-08 2020-12-30 Talat Commune, Sesan Northern Cambodia Development District, Stung Treng province.

FIA-CW024 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-15 2020-06-19 2020-06-20 2020-06-25 2020-07-03 2020-07-08 2020-12-30 Koh Snaeng Commune, Northern Cambodia Development Borei Ou Svay Sen Chey District, Stung Treng province.

FIA-CW025 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-15 2020-06-19 2020-06-20 2020-06-25 2020-07-03 2020-07-08 2020-12-30 Koh Snaeng Commune, Northern Cambodia Development Borei Ou Svay Sen Chey District, Stung Treng province

FIA-CW026 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-15 2020-06-19 2020-06-20 2020-06-25 2020-07-03 2020-07-08 2020-12-30 Koh Snaeng Commune, Northern Cambodia Development Borei Ou Svay Sen Chey District, Stung Treng province.

FIA-CW028 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-06-15 2020-06-19 2020-06-20 2020-06-25 2020-07-03 2020-07-08 2020-12-30 Samaki Sangkat, Stung Northern Cambodia Development Treng City, Stung Teng province.

Page 7 FIA-CW038 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-07-25 2020-07-23 2021-01-21 Sambour Commune, Kratie Northern Cambodia Development District, Kratie Province, CFi: Voadthonak

FIA-CW039 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-17 2020-07-25 2020-07-23 2021-01-21 Sambour Commune, Kratie Northern Cambodia Development District, Kratie Province, CFi: Anlong Preah Kou

FIA-CW040 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-17 2020-07-25 2020-07-23 2021-01-21 Sambour Commune, Kratie Northern Cambodia Development District, Kratie Province, CFi: Prek Krieng

FIA-CW051 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-07-25 2020-07-23 2021-01-21 Sambour Commune, Kratie Northern Cambodia Development District, Kratie Province, CFi: Ta Nguon

FIA-CW053 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-07-25 2020-07-23 2021-01-21 Sambour Commune, Kratie Northern Cambodia Development District, Kratie Province, CFi: Kampong Kboeng

FIA-CW037 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-07-25 2020-07-23 2021-01-21 Kaoh Khnhaer Commune, Northern Cambodia Development Sambour District, Kratie province, CFi: Takikhlastu

FIA-CW044 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-07-25 2020-07-23 2021-01-21 Boeng Char Commune, Northern Cambodia Development Sambour District, Kratie Province, CFi: O Krasaang

FIA-CW046 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-07-25 2020-07-23 2021-01-21 Bos Leav Commune , Chetr Northern Cambodia Development Borei district and Kratie Province, CFi: Prek Ta Am

FIA-CW049 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-07-20 2020-07-23 2021-01-16 Soab Commune, Preaek Northern Cambodia Development Prasab District, Kratie Province, CFi: Saob Leu

FIA-CW050 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-08-12 2020-07-23 2021-02-08 Sombok Commune, Chetr Northern Cambodia Development Borei District, Kratie Province, CFi: Kampi

Page 8 FIA-CW052 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-07-25 2020-07-23 2021-01-21 Sambour Commune, Northern Cambodia Development Sambour District, Kratie province, CFi: Koh Sam

FIA-CW106 / Drilled 2 Wells with Afridev Pump 1. Fisheries and Aquatic Community and 3 Latrines 2 Rooms in IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-07-25 2020-07-23 2021-01-21 Ou Rie commune, Northern Cambodia Development Thalaborivate District, Stung Teng Province

FIA-CW107 / The Construction of Single 4 1. Fisheries and Aquatic Community Pipe Culverts (0.6mx7m) in IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-07-07 2020-07-13 2020-07-12 2020-07-15 2020-07-25 2020-07-23 2021-01-21 Thalaborivate Commune, Northern Cambodia Development Thalaborivate District, Stung Teng Province

FIA-CW-002RE / 1. Fisheries and Aquatic Under Construction of Fish Single Stage - One IDA / 57770 Resources Management in Post Request for Bids Open - National 1,731,110.31 0.00 Implementa 2020-07-07 2020-07-13 2020-07-12 2020-08-21 2020-08-14 2020-09-30 2020-09-30 2020-10-21 2021-10-21 Hatchery in Stung Treng Envelope Northern Cambodia tion Province, Cambodia

FIA-CW-002 / Construction 1. Fisheries and Aquatic Single Stage - One of Fish Hatchery in Stung IDA / 57770 Resources Management in Post Request for Bids Open - National 1,501,073.00 0.00 Canceled 2020-03-09 2020-03-23 2020-03-14 2020-04-23 2020-04-23 2020-05-23 2020-05-22 2020-06-20 2021-04-16 Envelope Treng Province, Cambodia Northern Cambodia

FIA-CW036 / Demarcation of CFi Fishery Boundary (Poles, Signboard) and 1. Fisheries and Aquatic Community Infrastructure (Cfi Office) in IDA / 57770 Resources Management in Post Driven Direct 9,000.00 9,500.00 Signed 2020-07-07 2020-07-20 2020-07-12 2020-07-22 2020-07-25 2020-07-31 2021-01-21 Kaoh Khnhaer Commune, Northern Cambodia Development Sambour District Kratie province, CFi:Anlong Kamnob

FIA-CW108 / Natural Gravel Road 1. Fisheries and Aquatic Community (1300mx5mx0.15m) in IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-07-30 2020-07-30 2020-08-04 2020-07-31 2020-08-23 2020-08-06 2021-02-19 Kangcham Commune, Northern Cambodia Development Thalaborivate District in Stung Treng Province

FIA-CW109 / Earth Work Road (520mx4mx0.5m) and 1. Fisheries and Aquatic Community Pipe Culvert (0.8mx6m) in IDA / 57770 Resources Management in Post Driven Direct 15,000.00 15,000.00 Signed 2020-07-30 2020-07-30 2020-08-04 2020-07-31 2020-08-19 2020-08-06 2021-02-15 Ou Mreah Commune, Siem Northern Cambodia Development Bouk District, Stung Treng Province.

FIA-CW-110 / Natural Gravel Road (300m x 6m x 1. Fisheries and Aquatic Community Pending 0.15m) and Double Culvert IDA / 57770 Resources Management in Post Driven Direct 15,000.00 0.00 Implementa 2020-08-10 2020-08-15 2020-08-30 2021-02-26 (0.8m x 8m) in Sdoa Northern Cambodia Development tion Commune, , Stung Treng Province

FIA-CW-111 / Natural Gravel Road (1230mx5m x 0.15m) and Earth Work 1. Fisheries and Aquatic Community Pending Road (100m x 5m x 0.5m) IDA / 57770 Resources Management in Post Driven Direct 15,000.00 0.00 Implementa 2020-08-10 2020-08-15 2020-08-25 2021-02-21 in Talat Commune, Sesan Northern Cambodia Development tion District, Stung Treng Province

FIA-CW-112 / Natural Gravel Road (1150m x 3m) 1. Fisheries and Aquatic Community Pending and Single Culvert (0.8m x IDA / 57770 Resources Management in Post Driven Direct 15,000.00 0.00 Implementa 2020-08-10 2020-08-15 2020-08-30 2021-02-26 13m) in Kampong Cham Northern Cambodia Development tion Commune, Sambour District, Kratie Province.

FIA-CW-113 / Natural Gravel Road (1150m x 4m) 1. Fisheries and Aquatic Community Pending in Boeng Char Commune, IDA / 57770 Resources Management in Post Driven Direct 15,000.00 0.00 Implementa 2020-08-10 2020-08-15 2020-09-08 2021-03-07 Sambour District, Kratie Northern Cambodia Development tion Province.

Page 9 FIA-CW-114 / Natural Gravel Road (1350m x 5.5m x 0.15m) and Earth Worth 1. Fisheries and Aquatic Community Pending Road (100m x 6m x 0.5m) IDA / 57770 Resources Management in Post Driven Direct 15,000.00 0.00 Implementa 2020-08-10 2020-08-15 2020-08-30 2021-02-26 in Kam Phun Commune, Northern Cambodia Development tion Sesan District, Stung Treng Province.

FIA-CW-115 / Natural Gravel Road (1230m x 5m x 0.15m) and Earth Worth 1. Fisheries and Aquatic Community Pending Road (100m x 5m x 0.5m) IDA / 57770 Resources Management in Post Driven Direct 15,000.00 0.00 Implementa 2020-08-10 2020-08-15 2020-08-30 2021-02-26 in Phluk Commune, Sesan Northern Cambodia Development tion District, Stung Treng Province.

FIA-CW-116 / Natural Gravel Road (835m x 5m x 1. Fisheries and Aquatic Community Pending 0.15m) in Preas Romkel IDA / 57770 Resources Management in Post Driven Direct 15,000.00 0.00 Implementa 2020-08-10 2020-08-15 2020-08-30 2021-02-26 Commune, Borei OuSvay Northern Cambodia Development tion San Chey Ddistrict, Stung Treng Province.

FIA-CW-117 / 2 Single Culverts (1m x 8m) and 1 1. Fisheries and Aquatic Community Pending Double Culvert (1m x 13m) IDA / 57770 Resources Management in Post Driven Direct 15,000.00 0.00 Implementa 2020-08-10 2020-08-15 2020-08-30 2021-02-26 in Koah Preas Commune, Northern Cambodia Development tion Siembouk District, Stung Treng Province.

FIA-CW-118 / 2 Lines Natural Gravel Road (430m x 4m x 0.15m) and Double 1. Fisheries and Aquatic Community Pending Culvert (1m x 7m) in Koah IDA / 57770 Resources Management in Post Driven Direct 15,000.00 0.00 Implementa 2020-08-10 2020-08-15 2020-08-30 2021-02-26 Sampeay Commune, Siem Northern Cambodia Development tion Bouk District, Stung Treng Province.

GOODS Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

FIA-G-001 / Supply, 1. Fisheries and Aquatic Request for Single Stage - One Delivery and Installation of IDA / 57770 Resources Management in Post Open - National 35,000.00 32,723.90 Completed 2017-04-12 2017-04-12 2017-06-28 2017-06-06 2017-08-09 2017-08-02 Quotations Envelope Office Equipment Northern Cambodia

FIA-G-007 / Supply and 1. Fisheries and Aquatic Single Stage - One Delivery of 5 Pick Up IDA / 57770 Resources Management in Post Request for Bids Open - National 150,000.00 136,500.00 Signed 2017-04-20 2017-04-06 2017-04-25 2017-04-12 2017-06-06 2017-05-17 2017-07-06 2017-05-26 2017-08-10 2017-06-13 2017-10-05 Envelope Trucks Northern Cambodia

1. Fisheries and Aquatic FIA-G-009 / Office Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 8,000.00 0.00 Canceled 2017-04-24 2017-07-10 2017-09-04 Furniture for FiA Quotations Envelope Northern Cambodia

FIA-G-004 / Supply and 1. Fisheries and Aquatic Delivery of 12 Motorcycles Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 24,000.00 0.00 Canceled 2017-04-25 2017-07-04 2017-08-29 for FiA/IFReDI and PFiA Quotations Envelope Northern Cambodia Kratie/Stung Treng

FIA-G-010 / Supply and 1. Fisheries and Aquatic Installation of 6 Licensed Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 9,000.00 0.00 Canceled 2017-05-24 2017-08-09 2017-10-08 Accounting Software with 6 Quotations Envelope Northern Cambodia Desktop Computers

FIA-G-004RE / Supply and 1. Fisheries and Aquatic Delivery of 12 Motorcycles Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 24,000.00 16,560.00 Completed 2017-06-17 2017-08-26 2017-07-13 2017-09-23 2017-08-09 for FiA/IFReDI and PFiA Quotations Envelope Northern Cambodia Kratie/Stung Treng

FIA-G-009RE / Supply and 1. Fisheries and Aquatic Request for Single Stage - One Delivery of Office Furniture IDA / 57770 Resources Management in Post Open - National 8,000.00 7,949.70 Completed 2017-06-17 2017-08-26 2017-07-19 2017-10-07 2017-09-15 Quotations Envelope for FiA Northern Cambodia

FIA-G-010RE / Supply and 1. Fisheries and Aquatic Request for Single Stage - One Installation of Licensed IDA / 57770 Resources Management in Post Open - National 9,000.00 4,600.00 Completed 2017-06-17 2017-08-26 2017-07-13 2017-10-07 2017-09-01 Quotations Envelope Accounting Software Northern Cambodia

FIA-G-002 / Office 1. Fisheries and Aquatic Request for Single Stage - One Furniture for PFiA, IDA / 57770 Resources Management in Post Open - National 10,000.00 9,820.00 Completed 2018-01-20 2018-03-17 2018-05-11 2018-04-30 2018-06-11 Quotations Envelope Kratie/Stung Treng Northern Cambodia

Page 10 FIA-G-011 / Printing and 1. Fisheries and Aquatic Delivery of Training Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 10,500.00 11,322.30 Completed 2018-09-19 2018-11-14 2019-01-21 2018-12-28 2019-03-04 Documents of Cfi Co- Quotations Envelope Northern Cambodia Management

1. Fisheries and Aquatic FIA-G-015 / Supply and UN Agencies IDA / 57770 Resources Management in Post Direct 30,000.00 39,670.50 Completed 2019-03-01 2019-04-02 2019-03-08 2019-04-02 2019-04-12 2019-08-14 2019-08-10 2020-03-27 Delivery of One (1) Vehicle (Direct) Northern Cambodia

FIA-G-008 / Supply, 1. Fisheries and Aquatic Request for Single Stage - One Delivery and Installation of IDA / 57770 Resources Management in Post Open - National 8,000.00 7,549.30 Completed 2019-04-03 2019-05-17 2019-05-07 2019-06-14 2019-06-28 Quotations Envelope Mapping Equipment Northern Cambodia

FIA-G-014 / Supply and 1. Fisheries and Aquatic Delivery of 6 Motorcycles Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 10,500.00 10,662.00 Completed 2019-04-03 2019-05-17 2019-05-07 2019-06-14 2019-05-24 for FiA/IFReDI and PFiA Quotations Envelope Northern Cambodia Kratie/Stung Treng

FIA-G-018 / Supply, 1. Fisheries and Aquatic Delivery and Installation of Single Stage - One IDA / 57770 Resources Management in Post Request for Bids Open - National 175,000.00 132,200.00 Completed 2019-04-12 2019-04-22 2019-04-19 2019-05-29 2019-05-24 2019-06-19 2019-06-14 2019-07-10 2019-06-27 2019-10-02 2019-08-30 Boats with Engines for 50 Envelope Northern Cambodia Community Fisheries

FIA-G-013 / Supply, 1. Fisheries and Aquatic Delivery and Installation of Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 10,000.00 9,827.40 Completed 2019-04-17 2019-06-07 2019-05-28 2019-07-05 2019-06-12 Laptops and Quotations Envelope Northern Cambodia Color Laser Printers

FIA-G-012 / Supply and 1. Fisheries and Aquatic Request for Single Stage - One Delivery of Fisheries IDA / 57770 Resources Management in Post Open - National 15,000.00 14,557.76 Completed 2019-07-06 2019-08-26 2019-08-08 2019-10-07 2019-08-16 Quotations Envelope Monitoring Equipment Northern Cambodia

FIA-G-017 / Supply and 1. Fisheries and Aquatic Request for Single Stage - One Delivery of Equipment for IDA / 57770 Resources Management in Post Open - National 9,500.00 7,889.20 Completed 2019-06-04 2019-07-16 2019-07-16 2019-09-10 2019-08-19 Quotations Envelope Engineering Works Northern Cambodia

FIA-G-019 / Supply and 1. Fisheries and Aquatic Delivery of Monitoring Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 50,000.00 47,421.00 Completed 2020-02-08 2020-03-28 2020-03-27 2020-05-09 2020-06-08 Equipment and Kits for 50 Quotations Envelope Northern Cambodia Cfis

FIA-G-003 / Supply, Delivery and Installation of 1. Fisheries and Aquatic Request for Single Stage - One 2 Boats with Engines for IDA / 57770 Resources Management in Post Open - National 50,000.00 59,200.00 Completed 2020-02-22 2020-04-16 2020-03-27 2020-04-22 2020-05-08 Quotations Envelope PFiA-Kratie and PFiA-Stung Northern Cambodia Treng

FIA-G-021 / Supply and 1. Fisheries and Aquatic Delivery of Office Furniture Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 14,000.00 15,213.00 Completed 2020-05-15 2020-07-10 2020-06-19 2020-08-21 2020-07-24 for New Office Buildings in Quotations Envelope Northern Cambodia Kratie and Stung Treng

1. Fisheries and Aquatic FIA-G-023 / Supply and Request for Single Stage - One IDA / 57770 Resources Management in Post Open - National 5,000.00 5,445.00 Completed 2020-07-06 2020-08-18 2020-08-05 2020-09-29 2020-09-04 Delivery of Server for FiA Quotations Envelope Northern Cambodia

NON CONSULTING SERVICES Bid Evaluation Activity Reference No. / Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalification Estimated Actual Amount Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and Description Component Review Type Method qualification Document / Signed Contract Contract Completion No. Approach Process (Y/N) Amount (US$) (US$) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit Market Contract Type Estimated Actual Expression of Short List and Draft Request for Proposals Opening of Technical Evaluation of Description Component Review Type Method Process Status Terms of Reference Report and Draft Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Interest Notice Request for Proposals as Issued Proposals / Minutes Technical Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

FIA-CS-024 / Engineering Design and Construction 1. Fisheries and Aquatic Consultant Supervision for a fish IDA / 57770 Resources Management in Post Qualification Open - National 75,000.00 82,128.00 Signed 2018-04-02 2018-04-12 2018-04-19 2018-06-18 2018-12-24 2018-07-18 2019-03-26 2018-08-18 2019-04-04 2019-02-18 hatchery in Stung Treng Northern Cambodia Selection Province, Cambodia

INDIVIDUAL CONSULTANTS

Page 11 Activity Reference No. / Invitation to Loan / Credit Market Contract Type Estimated Actual Draft Negotiated Description Component Review Type Method Process Status Terms of Reference Identified/Selected Signed Contract Contract Completion No. Approach Amount (US$) Amount (US$) Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual

FIA-CS-008 / International 1. Fisheries and Aquatic Individual Fishery Resource IDA / 57770 Resources Management in Post Consultant Open 200,000.00 224,327.44 Signed 2016-11-01 2016-12-22 2017-02-09 2017-03-23 2017-03-02 2017-03-30 2017-04-06 2017-04-12 2021-04-05 Management Specialist Northern Cambodia Selection

FIA-CS-009 / International 1. Fisheries and Aquatic Individual Community Fishery IDA / 57770 Resources Management in Post Consultant Open 200,000.00 198,746.05 Signed 2016-11-01 2016-12-22 2017-02-09 2017-03-23 2017-03-02 2017-03-30 2017-04-06 2017-04-12 2021-04-05 Specialist Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-010 / National IDA / 57770 Resources Management in Post Consultant Open 108,000.00 127,468.24 Signed 2016-11-01 2016-12-22 2017-02-09 2017-03-23 2017-03-02 2017-03-30 2017-04-06 2017-04-12 2021-04-05 Component Coordinator Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-014 / National IDA / 57770 Resources Management in Post Consultant Open 30,000.00 53,992.94 Signed 2016-11-01 2016-12-22 2017-02-09 2017-03-23 2017-03-02 2017-03-30 2017-04-06 2017-04-12 2021-04-05 Gender Specialist Northern Cambodia Selection

FIA-CS-013 / National 1. Fisheries and Aquatic Individual Lead Community Fishery IDA / 57770 Resources Management in Post Consultant Open 90,000.00 107,985.88 Terminated 2016-11-01 2016-12-22 2017-02-09 2017-03-23 2017-03-02 2017-03-30 2017-04-06 2017-04-12 2021-04-05 Specialist Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-001 / National IDA / 57770 Resources Management in Post Consultant Open 90,000.00 141,176.00 Terminated 2016-07-01 2016-08-25 2016-11-08 2017-01-06 2016-11-29 2017-01-09 2017-01-03 2017-02-01 2021-01-02 Procurement Consultant Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-002 / National IDA / 57770 Resources Management in Post Consultant Open 90,000.00 110,552.94 Signed 2016-07-01 2016-08-25 2016-11-08 2017-01-06 2016-11-29 2017-01-10 2017-01-03 2017-02-01 2021-01-02 Financial Consultant Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-003 / National IDA / 57770 Resources Management in Post Consultant Open 60,000.00 65,094.12 Terminated 2016-07-01 2016-08-25 2016-11-08 2017-01-06 2016-11-29 2017-01-09 2017-01-03 2017-02-06 2021-01-02 Project Accountant Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-025 / Regional IDA / 57770 Resources Management in Post Consultant Open 50,000.00 0.00 Canceled 2016-11-01 2017-02-23 2017-02-09 2017-03-02 2017-04-06 2021-04-05 Aquaculture Specialist (RAS) Northern Cambodia Selection

FIA-CS-012 / National 1. Fisheries and Aquatic Individual Lead Fishery Resource IDA / 57770 Resources Management in Post Consultant Open 90,000.00 0.00 Canceled 2016-11-01 2016-12-22 2017-02-09 2017-03-23 2017-03-02 2017-03-30 2017-04-06 2021-04-05 Specialist Northern Cambodia Selection

FIA-CS-015 / National 1. Fisheries and Aquatic Individual Environmental Safeguards IDA / 57770 Resources Management in Post Consultant Open 15,000.00 34,432.95 Signed 2017-06-01 2017-05-31 2017-08-17 2017-11-28 2017-08-31 2017-12-20 2017-09-28 2018-01-12 2021-09-27 Specialist Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-027 / National IDA / 57770 Resources Management in Post Consultant Open 15,000.00 23,169.00 Terminated 2017-06-01 2017-05-31 2017-08-17 2017-08-30 2017-08-31 2017-09-06 2017-09-28 2017-12-27 2021-09-27 Social Safeguards Specialist Northern Cambodia Selection

FIA-CS-006 / National 1. Fisheries and Aquatic Individual Finance Consultant at IDA / 57770 Resources Management in Post Consultant Open 60,000.00 60,223.52 Terminated 2017-06-09 2017-05-31 2017-08-25 2017-08-30 2017-09-08 2017-09-06 2017-10-06 2017-10-12 2021-10-05 PFiA Kratie Northern Cambodia Selection

FIA-CS-007 / National 1. Fisheries and Aquatic Individual Finance Consultant at IDA / 57770 Resources Management in Post Consultant Open 60,000.00 60,223.52 Terminated 2017-06-09 2017-05-31 2017-08-25 2017-08-30 2017-09-08 2017-09-06 2017-10-06 2017-10-12 2021-10-05 PFiA Stung Treng Northern Cambodia Selection

FIA-CS-017 / Kratie 1. Fisheries and Aquatic Individual National Community Fishery IDA / 57770 Resources Management in Post Consultant Open 60,000.00 0.00 Canceled 2017-08-01 2017-07-25 2017-10-17 2018-01-08 2017-11-07 2017-12-05 2021-12-04 Specialist Northern Cambodia Selection

FIA-CS-018 / Kratie 1. Fisheries and Aquatic Individual National Livelihood IDA / 57770 Resources Management in Post Consultant Open 60,000.00 81,871.00 Terminated 2017-08-01 2017-07-25 2017-10-17 2017-11-28 2017-11-07 2017-12-20 2017-12-05 2018-01-12 2021-12-04 Specialist Northern Cambodia Selection

FIA-CS-019 / Kratie 1. Fisheries and Aquatic Individual National Community IDA / 57770 Resources Management in Post Consultant Open 60,000.00 68,341.00 Signed 2017-08-01 2017-07-25 2017-10-17 2018-01-08 2017-11-07 2018-01-22 2017-12-05 2018-01-29 2021-12-04 Facilitator Northern Cambodia Selection

FIA-CS-021 / Stung Treng 1. Fisheries and Aquatic Individual National Community Fishery IDA / 57770 Resources Management in Post Consultant Open 60,000.00 58,871.00 Signed 2017-08-01 2017-07-25 2017-10-17 2017-11-28 2017-11-07 2017-12-20 2017-12-05 2018-01-12 2021-12-04 Specialist Northern Cambodia Selection

FIA-CS-022 / Stung Treng 1. Fisheries and Aquatic Individual National Livelihood IDA / 57770 Resources Management in Post Consultant Open 60,000.00 72,738.00 Signed 2017-08-01 2017-07-25 2017-10-17 2017-11-28 2017-11-07 2017-12-20 2017-12-05 2018-01-12 2021-12-04 Specialist Northern Cambodia Selection

Page 12 FIA-CS-023 / Stung Treng 1. Fisheries and Aquatic Individual National Community IDA / 57770 Resources Management in Post Consultant Open 60,000.00 74,125.00 Terminated 2017-08-01 2017-07-25 2017-10-17 2017-11-28 2017-11-07 2017-12-20 2017-12-05 2018-01-12 2021-12-04 Facilitator Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-028 / National IDA / 57770 Resources Management in Post Consultant Open 90,000.00 131,662.00 Signed 2017-08-01 2017-07-25 2017-10-17 2017-11-28 2017-11-07 2017-12-20 2017-12-05 2018-01-12 2021-12-04 M&E Specialist Northern Cambodia Selection

FIA-CS-025RE / 1. Fisheries and Aquatic Individual International Aquaculture IDA / 57770 Resources Management in Post Consultant Open 152,000.00 147,819.00 Signed 2017-08-01 2017-07-25 2017-10-17 2018-01-08 2017-11-07 2018-01-18 2017-12-05 2018-02-19 2021-12-04 Specialist Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-001RE / National IDA / 57770 Resources Management in Post Consultant Open 36,000.00 40,949.81 Terminated 2017-08-10 2017-08-08 2017-10-26 2017-10-05 2017-11-09 2017-10-16 2017-12-07 2017-10-19 2019-12-07 Procurement Consultant Northern Cambodia Selection

FIA-CS-012RE / National 1. Fisheries and Aquatic Individual Lead Fisheries Resources IDA / 57770 Resources Management in Post Consultant Open 90,000.00 0.00 Canceled 2017-05-19 2017-05-31 2017-08-04 2017-08-18 2017-09-15 2021-09-14 Specialist Northern Cambodia Selection

FIA-CS-016 / Kratie 1. Fisheries and Aquatic Individual National Fishery Resource IDA / 57770 Resources Management in Post Consultant Open 60,000.00 0.00 Canceled 2017-08-01 2017-07-25 2017-10-17 2017-11-07 2017-12-05 2021-12-04 Specialist Northern Cambodia Selection

FIA-CS-020 / Stung Treng 1. Fisheries and Aquatic Individual National Fishery Resource IDA / 57770 Resources Management in Post Consultant Open 60,000.00 0.00 Canceled 2017-08-01 2017-07-25 2017-10-17 2017-11-07 2017-12-05 2021-12-04 Specialist Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-030 / Sampling IDA / 57770 Resources Management in Post Consultant Open 2,800.00 0.00 Canceled 2017-08-01 2017-10-17 2017-11-07 2017-12-05 2017-12-13 Framework Design Specialist Northern Cambodia Selection

FIA-CS-026 / National 1. Fisheries and Aquatic Individual Infrastructure Engineer IDA / 57770 Resources Management in Post Consultant Open 20,000.00 76,980.00 Signed 2018-01-15 2018-01-15 2018-03-05 2018-03-09 2018-03-26 2018-03-16 2018-04-30 2018-04-02 2021-04-30 Consultant Northern Cambodia Selection

FIA-CS-032 / National 1. Fisheries and Aquatic Individual Community Development IDA / 57770 Resources Management in Post Consultant Open 8,000.00 14,706.00 Signed 2018-01-15 2018-01-17 2018-03-05 2018-03-20 2018-03-26 2018-03-22 2018-04-30 2018-03-23 2018-08-31 Training Specialist Northern Cambodia Selection

FIA-CS-033 / National 1. Fisheries and Aquatic Individual Specialist on Geographic IDA / 57770 Resources Management in Post Consultant Open 76,000.00 195,664.00 Signed 2018-01-15 2018-01-17 2018-03-05 2018-03-09 2018-03-26 2018-03-16 2018-04-30 2018-04-02 2021-04-30 Information System and Northern Cambodia Selection Database Management

FIA-CS-012RE2 / National 1. Fisheries and Aquatic Individual Lead Fishery Resource IDA / 57770 Resources Management in Post Consultant Open 90,000.00 234,040.00 Signed 2018-01-15 2018-01-15 2018-03-05 2018-03-09 2018-03-26 2018-03-16 2018-04-30 2018-04-02 2021-04-30 Specialist Northern Cambodia Selection

FIA-CS-016RE / Kratie 1. Fisheries and Aquatic Individual National Fishery Resource IDA / 57770 Resources Management in Post Consultant Open 60,000.00 0.00 Canceled 2018-01-15 2018-01-15 2018-03-05 2018-03-26 2018-04-30 2021-04-30 Specialist Northern Cambodia Selection

FIA-CS-020RE / Stung 1. Fisheries and Aquatic Individual Streng National Fishery IDA / 57770 Resources Management in Post Consultant Open 60,000.00 0.00 Canceled 2018-01-15 2018-01-15 2018-03-05 2018-03-09 2018-03-26 2018-04-30 2021-04-30 Resource Specialist Northern Cambodia Selection

FIA-CS-029 / Provincial 1. Fisheries and Aquatic Individual Project Engineer Consultant IDA / 57770 Resources Management in Post Consultant Open 54,000.00 55,488.00 Terminated 2018-01-26 2018-01-23 2018-03-16 2018-06-19 2018-04-06 2018-06-28 2018-05-11 2018-07-05 2021-05-11 for Kratie Northern Cambodia Selection

FIA-CS-035 / Provincial 1. Fisheries and Aquatic Individual Project Engineer Consultant IDA / 57770 Resources Management in Post Consultant Open 54,000.00 59,336.00 Terminated 2018-01-26 2018-01-23 2018-03-16 2018-03-20 2018-04-06 2018-03-27 2018-05-11 2018-04-10 2021-05-11 for Stung Treng Northern Cambodia Selection

FIA-CS-017RE / Kratie 1. Fisheries and Aquatic Individual National Community IDA / 57770 Resources Management in Post Consultant Open 60,000.00 74,480.00 Terminated 2018-02-12 2018-04-02 2018-04-02 2018-06-19 2018-04-23 2018-07-16 2018-05-28 2018-07-23 2021-06-01 Fisheries Specialist Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-034 / National IDA / 57770 Resources Management in Post Consultant Open 30,000.00 27,191.00 Signed 2018-04-02 2018-04-02 2018-05-21 2018-06-19 2018-06-11 2018-07-07 2018-07-16 2018-07-13 2021-06-01 Internal Audit Consultant Northern Cambodia Selection

FIA-CS-020RE2 / Stung 1. Fisheries and Aquatic Individual Streng National Fishery IDA / 57770 Resources Management in Post Consultant Open 60,000.00 64,005.00 Signed 2018-04-30 2018-04-27 2018-06-18 2018-06-19 2018-07-09 2018-06-28 2018-08-13 2018-07-09 2021-06-01 Resource Specialist Northern Cambodia Selection

FIA-CS-016RE2 / Kratie 1. Fisheries and Aquatic Individual National Fishery Resource IDA / 57770 Resources Management in Post Consultant Open 60,000.00 53,550.00 Signed 2018-04-30 2018-04-27 2018-06-18 2018-06-19 2018-07-09 2018-07-16 2018-08-13 2018-07-27 2021-06-01 Specialist Northern Cambodia Selection

Page 13 1. Fisheries and Aquatic Individual FIA-CS-027RE / National IDA / 57770 Resources Management in Post Consultant Open 15,000.00 24,628.24 Signed 2018-07-03 2018-08-01 2018-08-21 2018-11-15 2018-09-11 2018-11-20 2018-10-16 2018-12-24 2019-04-14 Social Safeguards Specialist Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-001RE1 / National IDA / 57770 Resources Management in Post Consultant Open 36,000.00 82,924.05 Signed 2018-07-03 2018-08-01 2018-08-21 2018-11-15 2018-09-11 2018-11-20 2018-10-16 2018-12-12 2019-04-14 Procurement Consultant Northern Cambodia Selection

FIA-CS-013RE / National 1. Fisheries and Aquatic Individual Lead Community Fisheries IDA / 57770 Resources Management in Post Consultant Open 62,000.00 58,427.50 Signed 2018-08-01 2018-09-25 2018-09-19 2018-11-15 2018-10-10 2018-11-20 2018-11-14 2018-12-17 2021-05-13 Specialist Northern Cambodia Selection

FIA-CS-023RE / Stung 1. Fisheries and Aquatic Individual Treng National Community IDA / 57770 Resources Management in Post Consultant Open 45,000.00 56,367.64 Signed 2018-10-01 2018-09-25 2018-11-17 2018-11-15 2018-11-24 2018-11-20 2018-12-03 2018-12-19 2021-05-13 Facilitator Northern Cambodia Selection

FIA-CS-006RE / National 1. Fisheries and Aquatic Individual Finance Consultant at IDA / 57770 Resources Management in Post Consultant Open 29,000.00 35,180.00 Terminated 2018-12-10 2018-12-27 2019-01-28 2019-02-04 2019-03-07 2019-02-11 2019-03-13 2021-06-30 PFiA Kratie Northern Cambodia Selection

FIA-CS-035RE / Provincial 1. Fisheries and Aquatic Individual Project Engineer Consultant IDA / 57770 Resources Management in Post Consultant Open 40,000.00 52,462.35 Terminated 2019-01-12 2019-01-17 2019-03-02 2019-03-09 2019-03-06 2019-03-16 2019-03-11 2021-07-03 for Stung Treng Northern Cambodia Selection

FIA-CS-003RE / Project 1. Fisheries and Aquatic Individual Accountant Consultant IDA / 57770 Resources Management in Post Consultant Open 32,500.00 39,603.53 Terminated 2019-01-28 2019-01-28 2019-03-18 2019-03-25 2019-03-25 2019-04-01 2019-04-04 2021-05-20 (PAC) Northern Cambodia Selection

FIA-CS029RE / Provincial 1. Fisheries and Aquatic Individual Project Engineer Consultant IDA / 57770 Resources Management in Post Consultant Open 30,000.00 32,941.18 Signed 2019-07-01 2019-07-02 2019-08-12 2019-08-27 2019-08-17 2019-08-30 2019-08-24 2019-09-06 2021-05-15 for Kratie Northern Cambodia Selection

FIA-CS017RE1 / Kratie 1. Fisheries and Aquatic Individual National Community IDA / 57770 Resources Management in Post Consultant Open 35,000.00 36,452.94 Signed 2019-08-01 2019-08-05 2019-09-19 2019-10-28 2019-10-10 2019-10-30 2019-11-14 2019-11-27 2020-05-12 Fisheries Specialist Northern Cambodia Selection

1. Fisheries and Aquatic Individual FIA-CS-003RE1 / Project IDA / 57770 Resources Management in Post Consultant Open 22,100.00 21,573.34 Signed 2019-10-23 2019-10-23 2019-12-13 2020-01-06 2019-12-20 2020-02-06 2020-01-01 2020-02-10 2021-05-25 Accountant Consultant Northern Cambodia Selection

FIA-CS-006RE1 / National 1. Fisheries and Aquatic Individual Finance Consultant at PFiA- IDA / 57770 Resources Management in Post Consultant Open 20,400.00 0.00 Canceled 2019-10-23 2019-10-23 2019-12-13 2020-01-02 2019-12-20 2020-01-13 2020-01-01 2021-05-25 Kratie Northern Cambodia Selection

FIA-CS-020RE3 / Stung 1. Fisheries and Aquatic Individual Treng National Fisheries IDA / 57770 Resources Management in Post Consultant Open 16,100.00 20,200.00 Signed 2020-01-01 2020-01-17 2020-02-26 2020-03-10 2020-03-04 2020-03-17 2020-03-25 2020-03-27 2021-05-19 Resources Specialist Northern Cambodia Selection

FIA-CS-007RE / National 1. Fisheries and Aquatic Individual Finance Consultant at PFiA- IDA / 57770 Resources Management in Post Consultant Open 18,200.00 21,800.00 Signed 2020-01-21 2020-02-01 2020-03-17 2020-04-13 2020-03-24 2020-04-20 2020-04-07 2020-04-24 2021-06-01 Stung Treng Northern Cambodia Selection

FIA-CS-006RE2 / National 1. Fisheries and Aquatic Individual Finance Consultant at PFiA- IDA / 57770 Resources Management in Post Consultant Open 18,200.00 18,280.46 Signed 2020-01-21 2020-02-01 2020-03-19 2020-04-13 2020-04-02 2020-04-20 2020-04-16 2020-04-28 2021-06-10 Kratie Northern Cambodia Selection

FIA-CS-035RE1 / Provincial 1. Fisheries and Aquatic Individual Project Engineer Consultant IDA / 57770 Resources Management in Post Consultant Open 19,600.00 0.00 Canceled 2020-02-01 2020-03-21 2020-03-28 2020-04-04 2021-05-29 for Stung Treng Northern Cambodia Selection

Page 14