A) PROFILE OF THE DEPARTMENT. :---- i) Year of Establishment :--- The P.W.D. Building with its Office at Nalbari was established in the year-1979 and from the very beginning, the Division has been performing Construction, Repairing & Maintenance works of different buildings of different department of Greater in addition to the works of Rangia Civil Sub-Division and some major works of Baska District. In the year-2005 Building Division was merged with Nalbari Building Division with all work load of . ii) Location of Office:----- The Nalbari Building Division discharging departmental functions with its three Sub-Divisions namely - 1. Nalbari Building Sub-Division with H.Q at Nalbari discharging departmental functions for Nalbari District & Baska District. 2. Mukalmua Building Sub-Division with H.Q at Mukalmua discharging departmental functions for Nalbari District. 3. Barpeta Building Sub-Division with H.Q at Barpeta discharging departmental functions for Barpeta District Schematic Chart of Office Organisation Structures under Civil Administrative District :----

PWD Barpeta - Nalbari

Baska. Nalbari Building Division. - - Nalbari. Civil Administrative District District District Civil Administrative Civil Administrative

PWD PWD PWD Barpeta Building Nalbari Building Mukalmua Building Sub-Division. Barpeta Sub-Division. Sub-Division. Nalbari. Mukalmua

The P.W.D. Building Wing of Public Works Department in generally deals with the Construction of Civil works including Sanitary & Water supply and Electrical works of almost all Govt. Buildings in the State of Assam. The main objective of the department are: -----  As the State of Assam is in seismic Zone-V, Seismic Hazard is the main vulnerability & risk to the building structures in the district. More over the district is flooded by river Brahmaputra and its tributaries at different places causing major threat to the buildings in the district.  The main objective of the department is to construct earthquake resistant building as mandated by the National Building Code-2005, Earthquake Resistant Building Code and other relevant safety code so that the building in the district may get severely damaged but would not collapse during strong earthquake and assures safety to the people and contents in it and disaster is avoided.  Secondly necessary adequate measures is to be taken so that the buildings are not overtopped during flood and erosion & damages to the building structures is avoided..  To have response system in place to face any eventuality related damages to buildings.  To ensure active participation by the Government administration , communities , NGOs, CBOs and volunteers at all levels making optional utilization of available human resources for prevention, mitigation, response for a probable disaster. Staff Details:-----

List of Employees of the Nalbari P.W.D. Building Division, Nalbari

Sl. No. Name of Employees Designation Date of joining Mobile No. in the Division 1 Sri Dipak Kumar Executive 26-04-2013 9435114856 Barman Engineer 2 Sri Ajoy Kr. Das A.E.E. (T/C) 24-02-2014 9435082586 3 Dhajendra Nath A.E. 10-03-2014 9435145479 4 Narendra Nr. Dutta J.E. 14-05-2014 (Attached to the 9435311375 Division) 5 Khalilur Rahman J.E. 31-10-2000 9435310108 6 Gautam Kr. Sarma Dy. A.O. 11-07-2012 9435510807 7 Pralay Kr. Deka Dy. A.O. 07-11-2013 9435325258 8 Nirupam Talukdar A.A.O. 25-02-2014 9864146804 9 Abanish Bhattacharjjya A.A.O. 12-02-2015 9864190573 List of Employees of the Nalbari P.W.D. Building Sub-Division, Nalbari

Sl. Name of Employees Designation Date of joining Mobile No. N in the Division o. 1 Sri Madhusudhan Das Assistant 07-03-2014 9435043632 Executive Engineer 2 Kashab Narayan S.O. 27-05-1994 9435323044 Baruah 3 Pramod Kalita S.O 01-12-1979 9435202351 4 Dipak Ch. Baishay S.O 22-08-2002 9707627391 5 Dipak Bharaly S.O 05-03-2014 9571197831 6 Gokul Ch. Patowary Head Asstt. 13-03-1980 9859034332 7 Nabajyoti Patowary Jr. Asstt. 31-12-2008 9508071571 8 Jonali Barman Jr. Asstt 01-02-1995 9864113703 9 Shohida Begum Jr. Asstt 07-03-1995 9957500676 10 Nilima Dutta Section Asstt. 09-04-1982 9706406622 11 Dipali Devi Section Asstt 22-10-1982 94O1334143 12 Jutika Dutta Baruah Section Asstt 22-10-1982 8751963430 13 Anowar Hussain Section Asstt. 08-03-1995 8876295724 14 Chitra Lekha Das Tracer 14-08-1992 9859210736 15 Sri Joychandra Section Asstt 06-05-1986 9864334203 Rajbongshi 16 Faznor Ali Sub-Eng. Gr.II 24-07-1980 9707092056 17 Matir Ali Sub-Eng. Gr.II 11-04-1980 9707092016 18 Mukul Ali Sub-Eng. Gr.II 29-11-1979 9954321583 19 Arjun Sarma Sub-Eng. Gr.II 01-06-1987 9954973554 20 Birendra Kumar Sub-Eng. Gr.II 24-07-1980 9707973255 Talukder 21 Monoranjan Sarma Section Asstt 10-06-1987 9864382644 22 Sukadev Talukder Section Asstt 02-05-1988 9613505949 23 Jagat Talukder Section Asstt 02-05-1988 9864148126 24 Pratul Sarma Section Asstt 10-06-1987 9954676460 25 Kameswar Talukder Section Asstt 10-06-1987 9435323017 26 Nilamoni Deka Section Asstt 01-02-1993 9859109483 27 Girish Barman Section Asstt 06-04-1988 9864750686 28 Tafiqur Rahman Section Asstt 02-07-1995 8486844765 29 Abdul Majid Section Asstt 16-06-1987 7896471832 30 Harkanta Deka Section Asstt 01-01-1987 9864843569 31 Guneswar Baruah Section Asstt 20-02-1993 9859482528 32 Ratul Talukder Section Asstt 04-11-1986 9864560059 33 Jyoti Prasad Sarma Section Asstt 15-06-1994 9854410576 34 Pradip Basumatary Section Asstt 20-03-1995 9435293733 35 Akshay Kr. Sarma Section Asstt 05-11-1993 9854014284 36 Bhabesh Mahata Section Asstt 01-08-1994 9864933507

List of Employees of the Mukalmua P.W.D. Building Sub-Division, Mukalmua.

Sl. Name of Employees Designation Date of joining Mobile No. N in the Division o.

1 Sri Dilip Kr Das. Assistant 15-09-2008 9864016944 Executive Engineer 2 Sri Pramod Sarma. H/A 12-11-1979 9613025970

3 Sri Pradip Kr Sarma Jr. Asstt. 24-12-2010 9678875875

4 Sri Keshab Mudiar. Office Peon. 07-05-2005 9864781385

5 Sri Amar Bahadur I.B. 30-11-1982 9859034597 Chetri. Chowkider.

6 Sri Huamesh Seal. Office 18-12-2013 9854611310 Chowkider.

7 Sri Hanif Ali. M/R Lab. 30-03-1995 9864633326

8 Sri Basudev Das. J.E. 08-08-2003 9864947702 9 Sri Alxul Jalil Sub-Engr. Gr- 05-08-1987 9706064235 II.

10 Sri Janiur Rahman J.E. 07-03-2011 9085720510

11 Sri Maser Ali. Sub-Engr. Gr- 25-07-1980 8822252557 II.

12 Sri Satish Ch. Barman. S/A. 31-12-1992 9707116189

13 Sri Niyamat Ali. S/A. 06-09-1985 9707916933

14 Sri Umesh Mudiar. S/A. 26-06-1980 9864402109

15 Sri Sorat Ch. Sarma. S/A. 12-06-1987 9854705145

16 Sri Bipin Ch C/C Staff. 04-05-1993 9678702103 Swargiyari.

Functional Organization structures at state , District & Local Levels under Assam Public (Bldg. & N.H.) Department

S Name of Officers Name of Department Phone No. l .

N o .

1 Sri Ajoy Bardoloi Commissioner & Spl. Secretary 9435012873 to Govt. of Assam PW(Bldg. & NH) Deptt.. , -6 2 Sri P.K. Chaudhury Chief Engineer , PW(Bldg.)D, Assam , Chandmari , Guwahati - 9435041799 . 3

3 Sri Pulin Knowar Superintending Engineer , PWD, Guwahati Building Circle-I, 9435303515 . Fancy Bazar, Ghy-1

4 Sri Dipak Kr. Barman Executive Engineer , PWD , 9435114856 . Nalbari Building Division, Nalbari 5 Sri Madhu Sudhan Asstt. Executive Engineer PWD 9435043632 . Das Nalbari Building Sub-Division, Nalbari

6 Sri Ajoy Kr Das Asstt. Executive Engineer PWD Mukalmua Building Sub- 9435082586 . Division., Mukalmua

7 Sri Barindra Kr. Asstt. Executive Engineer PWD 9954533398 . Talukdar Barpeta Building Sub-Division., Barpeta B) SCHEMATIC DETAILS OF SCHEMES IMPLEMENTED BY P.W.D. NALBARI BUILDING DIVISION FOR THE YEAR 2014-15.

1) UP to date Status (Physical & Financial) of the Scheme under Education Department for the year 2011-12 under PWD Nalbari Building Division .

Ten Progress Up to S Sancti der Date 31st Jan . 2015 L oned Am of Name Date Fina Amou oun compl Name of program and of of ncial Phy N nt (Rs. t etion Remarks Scheme Contrac Allot (Rs. sica o in (Rs. as per tor ment in l . Crore . in Tende Lakh ) Lak r ) h.) 1 2 3 4 5 6 7 9 11 13 1 "Establishment of 21 Work is in Nos. New Polytechnics progress.. in different District of Contractor Assam under Plan assured to Pulen during 2011-12 at complete the Haloi, Chandkuchi Bahjani in 12.3 780 12-1- 12-7- 236. 62 Adm. Gopal Nalbari District Cr. .90 2013 2014 37L % Bldg, Hostel Bazar, (Pakage No. Poly-11) and Nalbari Workshop before 31st March,2015. "Establishment of 21 M/S Nos. New Polytechnics Anupa 12.3 780 11-3- 11-11- 205. 41 Work is in 2 in different District of m Cr. .92 13 14 0 % progress. Assam under Plan Nirman during 2011-12 at Pvt. Belguri Pathar in Ltd. Baska District (Package Poly-19.)

3 Const. Of 2(Two) Work is in storyed Hostel progress.. Afzal Building of Nalbari 04- Painting and 0.50 48. Ali, 04-05- 22.7 95 Sanskrit College at 11- Water Cr. 92 Batsar, -2015 5 L % Nalbari under plan 2013 Supply is to be Nalbari 2009-10. done.

Const. Of RCC Afzal 15- Sanskrit College 1.00 98. Ali, 15-06- 39.5 50 Work is in 4 12- Building at Nalbari Cr. 60 Batsar, -2015 8 L % progress. . 2013 under plan 2010-11. Nalbari

2) Up to date Status (Physical & Financial) of the Schemes under GAD Department in Nalbari District.

Progress Up to S Date Exte Tende 31st Jan . 2015 l Sanctio of ntion r Date Fina Phy Name of ned Name of compl of Amou of ncial sica Remar N program and Amoun Contract etion time nt (Rs. Allot (Rs. l ks o Scheme t (Rs. in or as per grant in ment in . Lakh.) Tende ed up Lakh.) Lakh r to )

1 2 3 4 5 6 7 8 9 11 13 Work in Progre ss. Const. Of Pavili Const. of watch on Security Tower, & Permanent Barrac Sheds for VIP, Md. k in VVIP and Drain 15-8- 15-2- 28-2- 90 1 33.95 34.63 Tazer --- progre around SP 14 15 15 % Ali ss. office Parade All Ground at works Nalbari. will be compl eted before 28th Feb,1 5.

Renovation of Work D.C. Court Md. 25.30 5-11- 12-2- 28-2- 30 is in 2 Building at Tazer --- 9 14 15 15 % progre Nalbari. Ali ss.

3) Up to date Status (Physical & Financial) of the Schemes of Girls Hostel under P.W.D. Nalbari Building Division under RMSA Assam . Na Progress Up to me Date 31st Jan . 2015 of Tender of Target Di Name of Amoun Name of F.W.O. Compl Financ date of Remar stri Scheme/Name t Contract No. & n. ial Physi Comple ks ct/ of Scheme (In or Date as per (Rs. in cal tion. Di Rs.) Tende Lakh) vis r. ion 2 3 5 6 7 8 10 11 12 13 Construction Painti of Girls Hostel ng at Chandi and M/s FWO no - Na Medhi Balika Finish 1,42,34 Mayur .BN/46/20 6/15/2 31-12- lba H.S. under --- 85% ing ,200/ Associat 13/9 dt.8- 014 14. ri Barkhetri works es 8-13. Block in are Nalbari Dist to be (Gr. No,-43) done. 4) Up to date Status (Physical & Financial) of the works under Judicial Department in Nalbari District .

San Progress Up to ctio Tend st S Date Exte 31 Jan . 2015 n er L of nsion Am Amo Name Date comp of Name of program and oun unt of of Remark N ln. as Time Fina Scheme t (Rs. Contra Allot Phy s o per grant ncial (Rs in ctor ment sica . Tend ed up (Rs in Lakh l er to in L) Lak .) h.) 1 2 3 4 5 6 7 8 9 11 13 1 Repair/Renovation of Progres Chief Judicial s of Magistrate Court Bldg. work is (Ground floor D.C.'s slow, Office Bldg. in Nalbari 19- because 54. 53.7 Brajen 19-3- 31-9- 31.9 85 District at Nalbari. 12- work 79 2 Das 12 14 7 % 12 site is not clearly receive d.. Construction of ADR Harun 2 Centre under 13th 19- 31- 100 ar 12-5- 34.6 96 Work Finance Commission 95.8 12- 11- .00 Rashi 13 2 % in prog. Pakage No. ADR-3 at 8 13 14 d Nalbari District. Const. of Garrage for P- . 3 1 the Qtr of Dist. Sessions Judge Qtr and CJM Qtr and const. of 25. 26.3 Sri 21- 28-2- 30-6- 100 servant room with 703 542 Rajibu 10- 14. 14 % attach bathroom & WC l 13 for the qtr of Dist. Haque Sessions Judge, Nalbari & others 6 nos . Judicial Qtr (One No Garrage)

4 Imp. Of CJM’s Qtr at Nalbari by providing Vitrified Tiles, CC 12. 12.6 Sri 21- 28-2- 30-6- Nil 100 Work Floring, , Gr-IV Qtr and 36 3 Rajibu 10- 2014 14 % Comple grill. l 13 . ted Haque 5) Up to date Status (Physical & Financial) of the Model Schools under RMSA Assam in Nalbari District .

Target Exte Progress Up to Sancti Tende date nsion 31st Jan . 2015 S oned r Date of of Fina L Name of Name of Amou Amou of compl Time ncial Phy Remark program and Contract nt (Rs. nt (Rs. Allot etion grant (Rs sica s N Scheme or in in ment as per ed up in l o Lakh.) Lakh.) Tende to Lakh r ) 1 2 3 4 5 6 7 8 9 11 13 1 Construction Progres of Model Sri s slow 25- 25- School at 362.0 362.0 Balaji 25-2- 83.6 42 due to 04- 12- Different 0 0 Construc 13. 0 % site 12 14 District under tion disturba RMSA, Assam nce at village Bahbari under Tamulpur Block in Baska District . (Group-15) 2 Construction Work of Model complet School at ed. Different Rectific District under ation RMSA, Assam work of at village Kaldi Floors M/S under are in Anupam 29- 31- Barkhetri 362.0 361.9 29-05- 360. 100 prog Nirman 07- 03- Block in 0 9 13 0 % and is Pvt. Ltd. 12 14 Nalbari likely District to be Assam, (Group complet No.II) ed by 20th Jan,201 5. 6) Up to date Status (Physical & Financial) of the Schemes under MPLAD fund under PWD Nalbari Building Division.

Ten Progress Up to Target der Exte 31st Jan . 2015 Sancti date S Am nsion oned Nam Date of L oun of Name of program Amou e of of compl Fina Phy Remark t time and Scheme nt (Rs. contr allot etion ncial sica s N (Rs. grant in actor ment as per (Rs l o in ed up Lakh.) Tende in L) Lak to. r h.) 8 1 2 3 4 5 6 7 9 11 12 Construction of Building/Classroom( RCC Gr.Fl) with Sri provision of 3 Chan Work Storied Building at 20. dra 19-9- 5-12- 31-7- 8.50 100 1 20.00 Comple Piplibari High 00 Kr. 13 13. 2014 L % ted. School, under Barm MPLAD Fund in an. Nalbari Dist. for 2010-11. Construction of RCC Building ( Gr.Fl) Sri Work is with provision of 2 Chan in Storied Building at 20. dra 4-3- 12-03------25 progres 2 20.00 Kakaya HS School, 00 Kr. 14. 15 - - % s. under MPLAD Fund Barm Plinth in Nalbari Dist. an Comp, 2013-14. Construction of RCC Building ( Gr.Fl) Administrative Work is Building for Natun in Dehar Mauza Milan Sri progres Higher Secondary 20. Dilip 4-3- 12-03------25 3 20.00 s. School, Banekushi, 00 Med 14. 15 - - % .Plinth Nalbari, under hi Comple MPLAD Fund in ted Nalbari Dist. 2013-14.

7) Up to date Status (Physical & Financial) of the Schemes under NRHM for the year 2010-11 under PWD Nalbari Building Division .

Ten Target Progress Up to S der Exte st Sancti date 31 Jan . 2015 L Am nsion oned Date of Name of oun Name of of Amou of Compl N program and t contracto time Fina Phy Remarks nt (Rs. Allot etion o Scheme (Rs. r grant ncial sica in ment as per . in ed up (Rs l Lakh.) Tende Lak to in L) r h.) 1 2 3 4 5 6 7 8 9 11 13 Work has Constructio Ranjit been rescind n of 10 Sarma, from the bedded Adarsha 31st cont. B/s 11. 17-8- 17-10- 60 1 Maternity 15.00 pur Lane Aug, ---- work is 91 11 11 % ward under No.-2, 14. being NRHM in Dispur, executed Nalbari Ghy-6. through District for Work other the year re- contractor. 2010-11.At alloted Up to Truss Ghograpar to Comp. BPHC J. Pasa P.O. Nalbari.

8) Up to date Status (Physical & Financial) of the Schemes for the work of Planetarium under P.W.D. Nalbari Building Division .

Targ Progress Up to Ten et 31st Jan . 2015 S der Exte Sancti date L Am nsion oned Date of Physi Name of oun Name of of Amou of comp Fina cal N program and t Contracto Time Remarks nt (Rs. Allot letio ncial o Scheme (Rs. r Gran in ment n as (Rs . in ted Lakh.) per in L) Lak up to Tend h.) er 1 2 3 4 5 6 7 8 9 11 13 1 Construction of proposed Sub-Regional Science Work in Centre Cum Progress Planetarium Sri 05- Finishing for ASTEC 150.0 150 5-11- 5-11- 36.0 Gautam 05- 87% of Civil under 0 .00 12 14. 8 Kalita 14 works are Department going of Science & on... Technology, Govt. of Assam at Nalbari.

9) Up to date Status (Physical & Financial) of the works under Revenue Department for 2014-15. in Nalbari District up to 28th Feb./2015.

S Sancti Tende Name Date Target Progress Up to Rem Name of program and Scheme L oned r of of date 31st Jan . 2015 arks Amou Amou Contra Allot of N nt (Rs. nt (Rs. ctor ment compl Fina Phy o in in etion ncial sica Lakh.) Lakh.) as per (Rs l Tende in L) r 1 2 3 4 5 6 7 9 11 13 1 Renovation of Circle Office Building in respect of Circle Officer Tihu. 1.50 1.50 Head “2029-LR-00-103-LR- 0146-DC-00-13-MW-00(N/P)”

2 Renovation of Residence and Construction of one Garrage in respect of Circle Officer Barkhetri Revenue Circle.. 5.00 5.00 Head “2029-LR-00-103-LR- 0146-DC-00-13-MW-00(N/P)”

3 Construction of Circle Office Building, Brick Boundary wall and site development, RCC Md. 12 Staging and Electrification 100 101.2 27-1- Jiyaur month KVA Sub Station with HT & LT 2172 15. Pasa. s line in respect of Circle Officer, Banekushi Revenue Circle.

4 Construction of Residence including Boundary Wall, Mrin Heavy Duty Iron Gate, Raising 27.15 moy 14-2- Low site in respect of Circle 609 Kuma 15. Officer, Tihu Revenue Circle r Das. under Nalbari Dist. 5 Renovation of Circle Office Khairu Building in respect of Circle l 4 7.953 . 23- Officer, Barkhetri Revenue Hoque Month 69 2-15. Circle under Nalbari Dist Choud s hury 6 Ghograpar 9.90 Loy Ram Das

7 Construction of Residence including raising low Rafiku compound, compound wall with 26.09 l Islam 18-2- 4 iron gate in respect of Circle 199 Sarthe 15 Month Officer, Nalbari Revenue Circle bari. s under Nalbari Dist. 10) Up to date Status (Physical & Financial) of the Schemes under PWD Nalbari Building Division under Rashtriya Madhamik Siksha Abhijan for the year 2010-11 .

S Date Progress Up to Sancti L Tende of 31st Jan . 2015 oned Date r Name of compl Name of program Amou of Fina Phy N Amou Contracto etion Remarks and Scheme nt Allot ncial sica o nt (In r as per (In ment (Rs l . Rs..) Tende Rs..) in L) r 1 2 3 4 5 6 7 9 11 13

A Construction of High School and Higher Secondary School under Rashtriya Madhmik . Siksha Abhijan for the year 2010-11 under Nalbari District) Addl. Class Room, Science Lab., Computer Lab. & Library etc. in the Secondary School. 1 Amoni Janakalyan Dilip 25- 3 Painting and 24,35, 20,51, 11.2 85 . High School patowary, 06- month Furniture are 170/ 358/ 1 % (Gr.-I) Ghy-21. 13 s to be done.. 2 Asomi High School 19,44, 19,44, Jogesh 24-6- 3 50 Work Balizar ------335/ 333/ Das 13 month % Withdrawn (Gr-2) s from Cont.. 3 Completed B.R. Medhi H.S. 3 in all 17,45, 17,61, Kamal 26-6- 100 School month 8.07 respect. 505/ 276/ Talukdar 13 % (Gr.3) s Handed Over. Banbhag Completed 4 Batahghilla high Jiyaur 3 in all 19,44, 19,28, 17-5- 100 School Pasa, month 8.66 respect. 335/ 033/ 13 % (Gr.-4) Nalbari s Handed Over 5 Civil works Banbhag Khata 3 completed. Digijari High 24,35, 24,35, Lakshmi 10-6- month 10.4 92 Only School 170/ 170/ Daimari 13 s 9 % Furniture are (Gr.-5) to be supplied. 6 Naba Barbori High School 3 23,35, 23,10, Kanta 21-5- 12.0 92 Work in (Gr.-6) month 170/ 000/ Talukadr, 13 1 % prog. s Kalag 7 Barnibari Milan Pradip 3 Painting an 24,35, 20,27, 18-4- 89 High School Barman month 9.51 Furniture 170/ 833/ 13 % (Gr.-7) Belsor s Left. Completed Altafuddi 8 3 in all Bartala High School 24,35, 21,91, n Ahmed, 10-6- 100 month 9.65 respect. (Gr. No.8) 170/ 653/ Mukalmu 13 % s Handed a Over Civil works 9 Paramesh completed. Chanda Kushi 30- 3 19,44, 19,44, M.B. 90 Only Public High School 05- month ------335/ 147/ Baruah, % Furniture are (Gr. 9) 13 s Nalbari to be supplied. Golap 13- 3 1 29,89, 29,89, Hussain 14.9 100 Work Dahudi High School 06- month 0 005/ 005/ Khan, 0 % completed . (Gr.10) 13 s Chenga Dakhin Pokowa 29,89, 29,89, Khanindra 05- 3 11.9 90 Civil works 1 Bahjani High 005/ 005/ Choudhur 06- month 8 % completed. 1 School (Gr. 11) y, Nalbari 13 s Only Furniture are to be supplied. Civil works 1 completed. Debiram Pathsala M/s DD 3 2 18,08, 17,18, 5-7- 89 Only H.S. School Enterprise month ------505/ 080/ 13 % Furniture are (Gr.-12) , Nalbari s to be supplied. 90 Civil works 1 Anil Kr. % completed. Dhamdhama Girls 21- 3 3 15,98, 15,82, Chakrabor Only High School 06- month 8.34 505/ 520/ ty, Furniture are (Gr.13) 13 s Nalbari to be supplied. 1 90 Civil works 4 % completed. Dhamdhama High Arikul 3 19,44, 18,48, 10-7- Only School Hussain, month ------335/ 347/ 13 Furniture are (Gr. -14) Nalbari s to be supplied. 1 85 Paint, Ganga Pukhuri 24- 3 5 23,35, 23,35, Jogesh 12.0 % furniture etc. Barkuriha High 06- month 170/ 162/ Das 3 Not School (Gr. -15) 13 s completed Civil works Satya 1 Gograpar Girls High 31- 3 completed. 24,35, 24,59, Ranjan 6 School 05- month ------90 Only 170/ 241/ Haloi, (Gr. -16) 13 s % Furniture to Dispur be supplied. Gograpar High 24,35, 24,59, 31- 3 90 Civil works Do ------School (Gr.-17) 170/ 241/ 05- month % completed. 1 13 s Only 7 Furniture are to be supplied. Gopalthan M/S Paint, 10- 3 1 Polytechnical 19,44, 19,36, M.M. 10.6 85 furniture etc. 06- month 8 Institution 335/ 919/ Internatio 6 % Not 13 s (GR.-18) nal, Ghy. completed Completed 1 04- 3 in all Jagra high School 29,80, 29,89, Abjal Ali, 19.7 100 9 06- month respect. (Gr. 19) 005/ 005/- Nalbari 7 % 13 s Handed Over Completed 2 up to roof Jalkhana 0 Bijay 26- 3 truss, L.D. Bhatuakhana High 28,89, 28,80, 12.7 75 Talukdar, 06- month (Penalty) School 005/ 629/ 0 L % Tihu 13 s imposed on (Gr.-20) cont.

2 Completed Alimuddi 1 3 in all Janakalyan High 24,35, 24,35, n 30-5- 18.0 100 month respect. School (Gr.-21) 170/ 170/ Ahmed,N 13 9 % s Handed albari Over Mahseen Completed, 27- 3 2 Janata H.S. Rampur 11,54, 11,50, Ali, 100 some minor 06- month 5.68 2 (Gr.-22) 670/ 700/ Rampur, % rectification 13 s Nalbari is in prog. Completed 2 Pinku 04- 3 in all Janapit High Schhol 23,35, 22,41, 16.7 100 3 Baishya, 06- month respect. (Gr. -23) 170/ 849/ 8 % Ghy. 13 s Handed Over M/S H.B. 2 Civil works Kakaya higher Engineers 09- 3 4 17,45, 14,53, 11.0 95 completed. Secondary School , Binoth 05- month 505/ 833/ 2 % Furniture (Gr.-24) M Bez 13 s not yet Baruah supplied 2 Arup Kamarkuchi High 17- 3 painting, 5 24,35, 24,35, Kalita, 85 Schhol 06- month ------furniture etc. 170/ 170/ Santipur, % (Gr.-25) 13 s not done hillside Kampur Bidhapiya 2 High School Pankaj 17- 3 19,44, 19,05, 10.4 100 Work 6 Mug kushi Bezbarua 06- month 335/ 448/ 9 % completed . (Gr.-26) y, Nalbari 13 s

2 Completed 7 Kaldi Gopalthan Jiyaur 17- 3 in all 24,35, 24,72, 12.4 100 High School Pasa, 05- month respect. 170/ 969/ 1 % (Gr.-27) Nalbari 13 s Handed Over Work 2 Ganashya completed Karia Higher 14- 3 8 17,45, 17,01, m 85 except . Secondary School 06- month 8.42 505/ 867/ Talukdar, % Furniture, (Gr.-28) 13 s Ghy. Laboratory slab. 2 Lawpara High Dhaniram 29- 3 Work 24,35, 24,70, 12.6 100 9 School (Gr.-29) Das, 05- month completed .. 170/ 000/ 0 % Kulhati 13 s 3 Mahendra Narayan 0 Choudhury Balika Arikul 3 Work in 23,35, 22,58, 10-7- 70 Bidyapith Hussain. . month ------progress 170/ 822/ 13 % (Gr.-30) . Nalbari s One room will be in 1st floor.

3 Work 1 withdrawn Makhibaha Girlas Bijay 3 from High School 24,35, 24,35, 26-6- Talukdar, month ------cont.and will (Gr.-31) 170/ 170/ 13 Tihu s be executed through SMDC. 3 Milan High School 24- 3 35,42, 32,13, Harunur 18.1 100 works 2 Panigaon 05- month 840/ 520/ Rashid, 4 % completed. (Gr.-32) 13 s Civil works Dipankar 3 Milan High School 24- 3 completed. 28,89, 28,89, Kalita, 14.7 90 3 Banekushi 05- month Furniture 005/ 005/ Lachit 5 % (Gr.-33) 13 s not yet Nagar supplied Toilet Block Morowa Ananda 3 Uday 3 not started, Ram Baruah H.S. 17,45, 17,72, 10-6- 85 4 Baishya month ------finishing School 505/ 968/ 13 % Morowa s works to be (Gr.-34) done. M/S. Civil works 3 Mugdi Milan 23,35, Mayur 05- 3 completed. 23,35, 93 5 H.S.School 170/ Associatre 06- month ------Furniture 170/ % (Gr.-35) s , 13 s not yet Hatogaon supplied Pranab 3 Namati Vidyapit Kr. 13- 3 23,35, 23,35, 12.6 100 works 6 High School. , 06- month 170/ 170/ 3 % completed.. (Gr.-36) Patachark 13 s ushi Completed 3 Narayan 26- 3 in all P.B. Allia High 24,35, 23,01, 13.7 100 7 Kalita, 04- month respect. School (Gr.-37) 170/ 236/ 0 % Gograpar 13 s Handed Over Lakshmi 06- 3 3 Pachim Banbhag 24,35, 24,35, 12.3 60 Work Daimari, 06- month 8 H.S. School 170/ 170/ 7 % Withdrawn Gograpar 13 s (Gr.-38) from Cont. Civil works Pub Barkhetri High Mreegan 13- 3 3 24,35, 22,61, 11.1 93 completed. School Saharia, 06- month 9 170/ 542/ 5 % Furniture are (Gr.-39) Ghy. 13 s ordered Civil works Wahedur 06- 3 Pub Kalakushi High 24,85, 24,40, 10.7 90 completed. Rahman, 06- month 4 School 170/ 156/ 7 % Furniture are Japorigog 13 s 0 (Gr.-40) ordered Completed 4 Brajen 19- 3 in all Raj Kadamtal High 24,35, 23,86, 11.9 100 1 Das, 04- month respect. School 170/ 467/ 7 % Nalbari 13 s Handed (Gr.-41) Over Khairul Completed Haque Raghunath 09- 3 in all 4 27,06, 27,00, Choudhur 15.8 100 Choudhury H.S. 05- month respect. 2 175/ 000/ y, 7 % School 13 s Handed Mukalmu (Gr.-42) Over a Dilip 17- 3 Painting and 4 Chamata Girls High 19,44, 16,91, 85 Patowary, 06- month ------furniture are 3 School 335/ 267/ % Ghy. 13 s to be done. (Gr.-43) Completed M/S. 4 17- 3 in all Solmara Higher 23,35, 22,40, Sunrise 14.0 100 4 06- month respect. Secondary School 170/ 412/ Enterprise 3 % 13 s Handed (Gr.-44). ,. Over

Pankaj 17- 3 Work in Suradi High 29,89, 28,39, 55 Bezbarua 06- month ------prog. Up to 4 Madrassa 005/ 553/ % h, Nalbari 13 s roof truss. 5 (Gr.-45) Dinesh 4 Swahid Mukunda Civil works Goswami, 26- 3 6 Kakati Vidyapith, 24,35, 21,06, 85 completed. Christaian 04- month 6.50 Barbhag 170/ 422/ % Furniture are -basti, 13 s (Gr.-46) ordered Ghy.

11) Up to date Status (Physical & Financial) of the works under SCA Plan in Nalbari Distinct . Ten Progress Up to S der 31st Jan . 2015 Sancti Target Extens L Am oned Name Date date of ion of Name of oun Amou of of Comple time Fina N program and t Phy Remarks nt (Rs. Contra Allot tion as grante ncial o Scheme (Rs. sica in ctor ment per d up (Rs . in l Lakh.) Tender to in L) Lak h.) 1 2 3 4 5 6 7 8 9 11 13 1 Construction of Kumar Work is in Bhaskar progress Barman finishing Sanskrit 11- works are University at 250.0 182 Tapan 30-06- 92.8 85 03- --- left.. Will Nalbari 0 .24 Deka 14 7 % 12 be (Administrativ completed e Building and in Barrack) Feb,2015 Pakage-I

2 Construction of Kumar Work is in Bhaskar progress Barman Letter Sanskrit Likely to 200.0 176 Tapan 02-1- 31-05- 170. 98 University at 2-04-14 be 0 .47 Deka 13 14 31 % Nalbari (Entire completed Boundary wall, in main entrance Feb,2015. and site . Development by earth filling under SCA Plan during 2011-12)

12) Up to date Status (Physical & Financial) of the Schemes under Medical 2011-12 & 2012-13 in Nalbari District .

Ten Progress Up to der Date 31st Jan . 2015 Sancti Time S Am of Remark oned Name Date Exte l oun compl Phy s Name of program Amou of of nsion Fina t etion sica and Scheme nt (Rs. Contra Allot grant ncial N (Rs. as per l in ctor ment ed up (Rs o in Tende Lakh.) to in L) Lak r h.) 1 2 3 4 5 6 7 8 9 11 13 Construction/ A Re-construction of portion boundary wall of around the Hospital 5%wall staff Qtr campus of could SMK Civil 35. Abjal 17-1- 17-3- 95 not be 1 35.75 --- Hospital, Nalbari 76 Ali 12 12 …. % execute under Annual plan d due to 2011-12 non possess ion of site. Construction of 46.14 45. Abjal 25-4- 1-12- 26.6 100 2 1-8-13 /Reconstruction of L 24 Ali 13 13 0 % boundary wall around the SMK Work Civil Hospital Comple (Balance portion of ted campus covering Joint Director, Girls Hostel & front site and new morque side) under 2012-13. Construction of Work is PHC Building and in and RCC Bldg. Gr. progres Fl. (Phase-1) with s, provision of (G+2) Sri Likely 48.90 47. 3-9- 1-12- 27.4 60 3 with top floor Jogesh 1-8-14 to be 7 948 13 14. 4 L % Assam type at Das. complet Ghograpar in ed in Nalbari District March, under Non plan. 2015. 2012-13.

13) Up to date Status (Physical & Financial) of the Schemes under Untied fund for the year 2012-13 under PWD Nalbari Building Division .

Ten Progress Up to S der Date Exte 31st Jan . 2015 Sancti L Am of nsion oned Date Name of oun Name of compl of Amou of Fina N program t contracto etion time Phy Remarks nt (Rs. allot ncial o and Scheme (Rs. r as per grant sica in ment (Rs . in Tende ed up l Lakh.) in L) Lak r to. h.) 8 1 2 3 4 5 6 7 9 11 13 1 Developme nt of Nalbari 50.00 Gordon . Field Under Untied fund 2012-13. 99, 16-9- 16-11- Gr.A=4 490 Work in 13 13 /- Progress. Gr.C=4 99, Work is Sri Biraj 16-9- 16-11- 490 likely to be Das 13 13 /- 31-3- 90 completed Maligao -- Gr.G=4 98, 14 % by Feb2015. n 21-9- 21-11- 816 13 13 /- Gr.H=4 99, 21-9- 21-11- 046 13 13 /- Gr.J=4 75, 21-9- 21-11- 268 13. 13 /- 99, 16-9- 16-11- Gr.B=4 490 13 13 /- Work in 99, Progress. Sri. 16-9- 16-11- Gr.D=4, 490 31-3- 90 Work is Prasanta 13 13 -- /- 14 % likely to be Barman completed 96, 23-9- 23-11- by Feb2015 Gr.F=4, 913 13 13 /- Work is M/s likely to be 75, Jonali 16-9- 16-11- 31-3- 90 completed Gr.E=4, 455 -- enterpris 13 13. 14 % by Feb2015, /- e Work in Progress..

RKVEY 31- 1 Uday 26-3- 25-9- 49.9 100 Works 49.95 03- i) Marowa Baishya 13 13 3 % Completed. 14 ESVHD Works 28-8- 100 i) Debochara 7-3-14 ------Completed. Narayan 13 % 2 40.80 ii) Kalita 28-8- 100 Works 7-3-14 ------Dhamdhama 13 % Completed. iii) 28-8- 40 Work in 7-3-14 ------Makhibaha 13 % progress.

3 RIDF - Sri Rajib XVIII Das Zoo 25- 60.93 25-6- 70 Work in i) Barnadi Road , 12- 3 13 % prog Pk-72 Ghy-5 13 Nayanjy oti ii) 58.89 Talukdar 70 Work in Ghograpar 9 , % prog. Pk-74 Sorbhog, Barpeta. Work in iii) Jagra 60.69 Sri 6-3- 17-11- 50 Pk-76 952 Atikur 14 14 % progress. Rahman, Majdia, Sartheba ri. Md. Work in Khairul Prog. 63.49 Haque iv) Satemari 17-5- 65 5 Choudhu Pk- 77 14 % ry, Mukalm ua. M/s Work in v) Nalbari Mayur Prog 59.11 5% Pk-75 Associat es vi) Md. Work in 3-3- 70 Chandakushi 60.93 Jiyaur 6-9-14 Prog. 14 % Pk- Pasa. 30 Work in vii)Ranakus Sri Uday Prog hi Baishya %-

14) Up to date Status (Physical & Financial) of the Schemes of IMPLEMENTATION OF SCHEMES UNDER THE AWARD OF FOURTH ASSAM STATE FINANCE COMMISSION DURING THE YEAR 2011-12. .

Progress Up to S Tende F.W.O. Date of 31st Jan . 2015 l A.A. Name r No. & Comple . Amou of Fina Name of Scheme Value Date of tion (as Phy Remarks nt (In Contrac ncial (In Commen per sica N Rs..) tor (Rs Rs..) cemt. tender) l o in L) 1 3 5 6 7 8 9 10 11 1 Construction of Gr. IV Qtr. Under the Sri NZP/9/F Award of Fourth 2,10,0 210,0 Anjan ASC/201 2.10 100 Work Assam Finance 00/ 00/ Deka, 2/637A % Completed commission during Nalbari dt.14/8/1 the year 2011-12 at . 3. 16 No. Khatikuchi G.P. Sri 2 -Do- 2,10,0 210,0 Anjan 45 80 Up to roof at 13 No. Gograpar 00/ 00/ Deka, Days % G.P. Nalbari .

3 -Do- 2,10,0 199,5 Sri NZP/9/F 45 1.18 100 Work at 09 No. Madhya 00/- 00/ Dhiren ASC/201 Days 6L % Completed Bahjani G.P. Bezbar 2/640A uah, dt.14/8/1 Bahjani 3. . Works Not 4 -Do- Started yet, at Kuriahamari Sri. the work Barsulia G.P. 2,10,0 210,0 Biraj may be 00/- 00/ Das, withdrawn Nalbari from the cont. Letter to CEO submitted. Sri. 5 -Do- 2,10,0 210,0 Biraj 100 Work at Upper Barbhag 00/- 00/ Das, % Completed G.P. Nalbari 6 Construction of Gr. IV Qtr. Under the Award of Fourth 2,10,0 210,0 Sri. 100 Work Assam Finance 00/- 00/ Biraj % Completed commission during Das, the year 2011-12 at Nalbari 04 No. Khata G.P. 7 -Do- Sri at 38 No. paschim 2,10,0 210,0 Bijay 45 Work Natun dehar G.P. 00/- 00/ Talukd % started. ar Tihu 8 -Do- at 24 No. Dakhin 199,5 Md. 100 Work Madhya Dharmapur 00/ Sariful % Completed. G.P. haque Belsor. 9 -Do- Sri at Jalkhana 2,10,0 210,0 Bijay 35 Work in Bhatwakhana G.P. 00/- 00/ Talukd % progress ar Tihu 1 -Do- Md. NZP/9/F 0 at 31 (3) Dakhin 2,10,0 199,5 Abdul ASC/201 45 100 completed Pakowa G.P. 00/- 00/ Ali 2/633A Days % Ahmed dt.14/8/1 Nalbari 3. . 1 -Do- Rafique completed 1 at Mugdi Rampur 2,10,0 210,0 Zaman NZP/9/F 45 100 G.P. 00/- 00/ Talukd ASC/201 Days % ar, 2/636A Mugdi. dt.14/8/1 3. 1 -Do- Md. NZP/9F 2 at 25 No. 2,10,0 199,5 Sariful ASC/201 10 Modificatio Rupiyabathan G.P. 00/- 00/ haque 2. dt.14- % n required. Belsor. 8-13 1 Construction of 3 G.P. Secy. Qtr. Md. Under the Award of 340,0 340,0 Rajibul 50 In progress Fourth assam State 00/ 00/ Haque, % Finance Nalbari Commission during . the year 2011-12 at 16 No. Khatikushi G.P. 1 Construction of 4 G.P. Office Bldg. Anisur Under the Award of Rahma Fourth assam State 10,72, 1,019, n, 2.5 50 In progress Finance 700/ 065/ Nalbari 15 % Commission during the year 2011-12 at 05 No. Pub Batahghilla G.P. 1 Construction of As there is 5 G.P. Office Bldg. no land Under the Award of Anisur available in Fourth assam State 10,72, 10,72, Rahma ---- Kalar Char, Finance 700/ 700/ n, Hence Commission during Nalbari work may the year 2011-12 at be Kalar Char G.P. Withdrwan from the Cont. Letter issued to CEO.

1 Construction of 6 G.P. Office Bldg. Under the Award of Atiqur NZP/9/F Work Fourth assam State 10,72, 1,019, Rahma ASC/201 90 4.06 100 completed Finance 700/ 065/ n 2/628A Days % Commission during Barpeta dt.14/8/1 the year 2011-12 at . 3. 23 No. Dakhin Khetri Dharmapur G.P. 1 Construction of 7 G.P. Office Bldg. Under the Award of Prabir NZP/9/F Land Fourth assam State 10,72, 10,72, barman ASC/201 90 ---- possession Finance 700/ 700/ Nalbari 2/629A Days not yet Commission during dt.14/8/1 given. the year 2011-12 at 3. Pani gaon. G.P. 1 Extension of G.P. 8 Office Bldg. Under Md. the Award of Fourth 8,50,0 8,50,0 Nazrul NZP/9/F assam State Finance 00/ 00/- Islam ASC/201 45 3.69 100 Work Commission during Buri 2/ 231 Days % comp. the year 2011-12 at Nagar, Dt.22-4- Mukalmua Nalbari 13 Narayanpur . G.P. . 1 Extension of G.P. 9 Office Bldg. Under Dipak NZP/9/F the Award of Fourth 8,50,0 8,07,5 Deka, ASC/201 45 7.18 100 Comp. assam State Finance 00/ 00/- Bidyap 2/ 230 Days 7 % Commission during ur Dt.22-4- the year 2011-12 at 13 Mugdi Rampur . G.P. 2 Extension of G.P. 0 Office Bldg. Under the Award of Fourth Sri Site handed assam State Finance 8,50,0 8,07,5 Sarat -- over but Commission during 00/- 00/- Kalita work not the year 2011-12 at Gograp started. 13 No. Gograpar . ar G.P. 2 Extension of G.P. 1 Office Bldg. Under the Award of Fourth Sri NZP/9/F assam State Finance 8,50,0 8,07,5 Naba ASC/201 60 100 Work Commission during 00/- 00/- Kanta 2/ 648A Days % completed the year 2011-12 at Talukd Dt.14-8- 48(2) Upper ar, 13 Barbhag . G.P. Kalag 2 Extension of G.P. 2 Office Bldg. Under Sri Atul NZP/9/F the Award of Fourth 8,50,0 8,07,5 Basuma ASC/201 60 5.40 90 Work in assam State Finance 00/- 00/- tary, 2/ 649A Days % Progress. Commission during Baska Dt.14-8- the year 2011-12 at 13 Nathkushi . G.P. 2 Extension of G.P. 3 Office Bldg. Under M/s NZP/9/F the Award of Fourth 8,50,0 8,07,5 MM ASC/201 Work assam State Finance 00/- 00/- Internat 2/ 645A 100 completed Commission during io-nal, Dt.14-8- % the year 2011-12 at Chand 13 7 No. Pub Bahjani . mari, G.P. Ghy-3 2 Extension of G.P. 4 Office Bldg. Under Md. the Award of Fourth Zohirul NZP/9/F Work assam State Finance 8,50,0 8,07,5 Islam ASC/201 60 4.05 100 completed Commission during 00/- 00/- Hatigao 2/ 644A Days % the year 2011-12 at n, Dt.14-8- 19 No. Chataibari . Sijubari 13 G.P. 2 Extension of G.P. 5 Office Bldg. Under Sri NZP/9/F 60 the Award of Fourth 8,50,0 8,07,5 Mridul ASC/201 Days Only assam State Finance 00/- 00/- Barman 2/647A. painting is Commission during Vill:- dt 14-8- to be done the year 2011-12 at Belsor, 13 33 No. Belsor . G.P. Nalbari . 2 Extension of G.P. 6 Office Bldg. Under Sri the Award of Fourth Kamala NZP/9/F Work assam State Finance 8,50,0 8,07,5 Kanta ASC/201 60 3.76 100 completed Commission during 00/- 00/- Basuma 2/ 646A Days % the year 2011-12 at tary, Dt.14-8- 38 No. Paschim Kathalb 13 Natun Dehar G.P. ari, Nalbari . 2 Construction of 7 BDO/ EO Qtr for Sri A.P. Under the Satya Work Award of Fourth 6,30,0 5,98,5 Ranjan 2.16 100 completed assam State Finance 00/- 00/- Haloi, % Commission during Dispur the year 2011-12 at Borigog Banbhag A.P.

2 Extension of 3 8 Storyed RCC Office Md. NZP/9/F Building (Ground Jiyaur ASC/201 45 12. 100 Work floor) only for 2,100,0 2,100,0 Pasa, 2./229. Day 997 % completed Barkhetri A. P. 00/ 00/ Nalbari. Dt. 22-4- s Under the Award of 13 Fourth assam State Finance Commission during the year 2011-12 2 Construction of 9 Multipurpose Hall for A.P. at Paschim M/s NZP/9/F Nalbari A.P. 1,22,56 11,644, Sunrise ASC/201 45 47.8 91 Work in Solmara Under the ,900/ 055/ Enterpris 2/232.. Day 68 % Progress Award of Fourth e, Prop. Dt. 22-4- s assam State Finance Mainul 13 6 Commission during Ali, mo the year 2011-12 Khanapa nths ra. 3 Construction of 0 G.P. Secy. Qtr. Under the Award of NZP/9/F Completed Fourth assam State 3,40,00 3,40,00 Sarif Ali ASC/201 60 1.85 100 & handed Finance 0/- 0/- 2/655A Day 5 % over Commission during dt.14/8/1 s the year 2011-12 at 3. 31 (3) Dakshin Pokowa G.P. Construction of G.P. Secy. Qtr. Under the Award of Bijoy Fourth assam State 3,40,00 3,23,00 talukdar Work in 3 Finance 0/- 0/- Tihu 35 Progress 1 Commission during % the year 2011-12 at Jalkhana Bhatuakhana G.P. Construction of G.P. Secy. Qtr. Under the Award of Sri Uday Tender not 4th.Assam State 3,40,00 3,23,00 Baishya received. 3 Finance Commi- 0/- 0/- Morowa 2 ssion during the year 2011-12 at 50(4) Uppar Barbhag G.P. Construction of G.P. Secy. Qtr. Sri NZP/9/F Under the Award of Gurucha ASC/201 Work 3 4th.Assam State 3,40,00 3,38,63 ran 2/ 60 1.87 100 completed 3 Finance Commi- 0/- 5/- Deka, 656ADt. Day 4 % ssion during the Kazipara 14-8-13 s year 2011-12 at 6 . No. Batahgilla G.P. Construction of G.P. Secy. Qtr. Under the Award M/s MM Only 3 4th.Assam State 3,40,00 3,23,00 Internati 100 painting is 4 Finance Commi- 0/- 0/- onal, % to be done ssion during the Chandm year 2011-12 at 9 ari, Ghy- No. Madhya 3 Bahjani G.P.

Construction of G.P. Secy. Qtr. Work Under the Award Kamala NZP/9/F completed 4th.Assam State 3,40,00 3,23,00 Kanta ASC/201 60 up to Post 3 100 Finance Commi- 0/- 0/- Basumat 2/ 660A Day 1.69 plate. 5 % ssion during the ary, Dt.14-8- s year 2011-12 at 38 Kathalba 13 No. Paschim Natun ri, Dehar G.P. Nalbari Construction of G.P. Secy. Qtr. Md. Under the Award Mahrum NZP/9/F Work 60 3 4th.Assam State 3,40,00 3,23,00 Ali, ASC/201 100 completed Day 6 Finance Commi- 0/- 0/- Barnaddi 2/ 661A % s ssion during the , Dt.14-8- year 2011-12 at 26 Nalbari. 13 No. Bangaon G.P. Construction of G.P. Secy. Qtr. Rafique NZP/9/F Work Under the Award of 3,40,00 3,23,00 Zaman ASC/201 completed 60 3 4th.Assam State 0/- 0/- Talukdar 2/652A 100 Day 3.23 7 Finance Commi- , Mugdi. dt.14/8/1 % s ssion during the 3. year 2011-12 at Mugdi Rampur G.P. Construction of G.P. Secy. Qtr. 60 Glass 3 85 Under the Award of Day Fitting in 8 % 4th.Assam State 3,40,00 3,40,00 Dipak s Windows Finance Commi- 0/- 0/- Deka, and ssion during the Bidyapur Electrical year 2011-12 at fittings are Loharkatha Adabari to be done. G.P. Construction of G.P. Secy. Qtr. Under the Award of Md. NZP/9/F Work 4th.Assam State 3,40,00 3,40,00 Sarif Ali, ASC/201 60 completed 3 100 Finance Commi- 0/- 0/- Batsor, 2/653A Day 9 % ssion during the Nalbari. dt.14/8/1 s year 2011-12 at 3. Kurihamari Barsulia G.P. Construction of Gr. III Qtr for AP. Md. Under the Award 3,40,00 3,23,00 Safikul Work 60 4 4th.Assam State 0/- 0/- Islam, 100 completed Day 0 Finance Commi- Mularku % s ssion during the shi, year 2011-12 at Nalbari. Pub Nalbari A.P.

Executive Engineer, P.W.D. Nalbari Building Division. Nalbari. Model School at Kaladi Additional Classrooms & Computer Lab. Girls Hostel at Mukalmua

\ Polytechnic College at Chandkuchi Veterinary Hospital ADR (Judicial)BUILDING AT NALBARI Major Projects in last 3 years

Name of Project Amount (Rs.)

New Polytechnic Building at Chandakushi 780.00 L

Brick Boundary wall and Gate of Sanskrit University 200.00 L

Administrative Building of Sanskrit University at Namati 200.00 L

Model School at Kaldi under RMSA 362.00 L

Planetarium at Sariahtuli village 200.00 L

Boundary Wall around SMK Civil Hospital 146.00 L

ADR centre at Nalbari under Judicial Department 100.00 L Development of Nalbari Gordon Field (Untied Fund) 50.00 L

Ambedkar Bhawan 50.00 L Name of Project Amount (Rs.)

9 Nos. of Office Building and Residential Quarter of Vety. Deptt. 60.00 L (each)

Auditorium of District Library 100.00 L

40 nos. of office and Residential Buildings of CEO, Zilla Parishad 349.80 L

100 Bedded Girls Hostel at Mukalmua under RMSA 142.34 L

3 nos. of School Building under MPLAD fund 60.00 L

Additional Class Rooms, Science Lab., Computer Lab. etc.(46 1066.65 L Schools)

Sanskrit College and Hostel Building, Nalbari 150.00 L

Construction of Class Room and Science Laboratory for 133.00 L introduction of Science Stream in High Schools.(8 nos.)