DriveERT WEEKLY LANE CLOSURE SCHEDULE From Friday, June 5 to Friday, June 12

Below is a list of significant tunnel/lane closures for the Elizabeth River Crossings (ERC) facilities. All work is dependent upon weather conditions and closure dates are subject to change. For updates, follow us on Twitter @DriveERT.

US 58 East Midtown Tunnel: Alternating lane closures in the Midtown Tunnel eastbound on Sunday, June 7 from 6 a.m. to 10 a.m. US 58 West Midtown Tunnel: Alternating lane closures in the Midtown Tunnel westbound on Sunday, June 7 from 6 a.m. to 10 a.m.

I-264 East : Alternating lane closures in the Downtown Tunnel eastbound on Sunday, June 7 from 6 a.m. to 10 a.m. I-264 West Downtown Tunnel: Alternating lane closures in the Downtown Tunnel westbound on Sunday, June 7 from 6 a.m. to 10 a.m.

I-264 East: Left lane closure on I-264 East between Frederick Blvd. and Effingham St. on Sunday, June 7 from 10 a.m. to 2 p.m. I-264 West: Left lane closure on I-264 West between Effingham St. and Frederick Blvd. on Sunday, June 7 from 10 a.m. to 2 p.m. I-264 East: Left lane closure on I-264 East between Frederick Blvd. and Effingham St. on Monday, June 8; Tuesday, June 9; Wednesday, June 10 and Thursday, June 11 from 8 p.m. to 5 a.m. the following morning. I-264 West: Left lane closure on I-264 West between Effingham St. and Frederick Blvd. on Monday, June 8; Tuesday, June 9; Wednesday, June 10 and Thursday, June 11 from 8 p.m. to 5 a.m. the following morning.

US 58 East: Left lane closure on US 58 East from London Blvd. to a half-mile before the Midtown Tunnel eastbound on Sunday, June 7 from 10 a.m. to 2 p.m. US 58 West: Left lane closure on US 58 West from a half-mile after the Midtown Tunnel westbound to London Blvd. on Sunday, June 7 from 10 a.m. to 2 p.m. US 58 East: Left lane closure on US 58 East from London Blvd. to a half-mile before the Midtown Tunnel eastbound on Monday, June 8; Tuesday, June 9; Wednesday, June 10 and Thursday, June 11 from 8 p.m. to 5 a.m. the following morning. US 58 West: Left lane closure on US 58 West from a half-mile after the Midtown Tunnel westbound to London Blvd. on Monday, June 8; Tuesday, June 9; Wednesday, June 10 and Thursday, June 11 from 8 p.m. to 5 a.m. the following morning.

Follow us!

The Department of Transportation (VDOT) encourages motorists to “Know Before You Go” and plan your trip with free tools:

• Download the 511 smartphone app • Visit the 511 Virginia website or dial 511 for traffic information on your phone http://DriveERT.com

HAMPTON ROADS CLOSURES ON WATER CROSSINGS, INTERSTATES AND OTHER NOTABLE DETOURS For the week of June 7-13

NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.

*Scheduled closures are subject to change based on weather conditions and other factors.* For information on the many other lane closures necessary for maintenance and construction throughout , visit 511Virginia.org, download the 511VA smartphone app, or dial 511.

Bridges & Tunnels:

Hampton Roads Bridge-Tunnel, I-64:  Single-lane closure eastbound on June 9 from 9 p.m. to 5 a.m.  Single-lane closure westbound on June 11 from 9 p.m. to 5 a.m.

HRBT Expansion Project:  For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org.

Monitor-Merrimac Memorial Bridge-Tunnel, I-664:  Single-lane closures southbound on June 7-8 and June 10-11 from 9 p.m. to 5 a.m.  Single-lane closures northbound on June 8-10 from 9 p.m. to 5 a.m.

Berkley Bridge, I-264:  Full closure of the on-ramp from Market Street to I-264 west on June 11 from 9 p.m. to 4 a.m.

I-64 Widening Segment III Project, York County:  Single-lane closures on I-64 east and west from Route 199 Lightfoot exit (exit 234) to Route 199/Humelsine Parkway (exit 242) June 7-11, starting as early as 7 p.m. to 5 a.m..  Lane closures under flagger control on Lakeshead Drive at the I-64 overpass intermittently throughout the week of June 8-12, from 8 a.m. to 3 p.m.  Lane closures under flagger control on Rochambeau Drive west of Route 199/Newman Road (exit 234) on June 8-12, from 8 a.m. to 4 p.m.  A consecutive, long-term lane closure under traffic signal control on Colonial Parkway at the I-64 overpass continues.  A consecutive, long-term full ramp closure on Route 143 Merrimac Trail north to I-64 west continues. Traffic will follow detour signage in place directing motorists to the Route 143 south on-ramp to I-64 west during the closure. I-64 Southside Widening, Expansion:  Alternating, single-lane closures on I-64 in both directions between South Military Highway (exit 297) and Greenbrier Parkway (exit 289):  June 8-11, from 7 p.m. to 5 a.m.  June 12, from 9 p.m. to 7 a.m.  June 13, from 8 p.m. to 9 a.m.  June 14, from 8 p.m. to 5 a.m.  Full closure of the I-64 west off-ramp to Great Bridge Boulevard/Route 17/Elizabeth City (exit 292A) on June 9-10 from 9 p.m. to 5 a.m.  Full closure of the I-64 east on-ramp from S. Military Highway (exit 31B) on June 8 from 9 p.m. to 5 a.m.  Overnight detour on southbound Military Highway under the I-64 overpass, June 1-30, 9 p.m. to 5 a.m. For more information, view project traffic alerts: http://64highrise.org/news_and_traffic_alerts/lane_closures.asp.

I-64 Express Lanes:  Full closure of I-64 Express Lanes in both directions on June 8 from 11 a.m. to 12:30 p.m. .

I-64/I-264 Improvements Project, Norfolk/Virginia Beach:  Alternating, mobile lane closures on I-64 east from Twin Bridges to I-264 on June 7 from 7 p.m. to 5 a.m.  Alternating, double-lane closures on I-264 east from Newtown Road (exit 15) to Witchduck Road (exit 16) on June 7-11, starting as early as 7 p.m.  Single-lane closure on I-264 west from Witchduck Road (exit 16) to Newtown Road (exit 15) on June 7-12 from 7 p.m. to 5 a.m.  Single-lane closure on the I-264 west off-ramp to Witchduck Road (exit 16) on June 9-10 from 7 p.m. to 5 a.m.  Ongoing closure with detour of southbound Newtown Road at the I-264 interchange. More information is available here: https://conta.cc/2xb166Q.

Other Notable Closures:

Laskin Road Widening and Bridge Replacement Project -- City of Virginia Beach  Traffic shift on eastbound Laskin Road from east of the Linkhorn Bay Bridge to east of Red Robin Road, starting as early as the week of June 8. Click here for the full traffic alert: https://conta.cc/36U9p4n

Elizabeth River Tunnels (Downtown/Midtown tunnels): Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).

(END)

‌ ‌ ‌