FY 2016 STATUS OF CONTRACTS - REPORT FOR STAKEHOLDER REGULAR INFRA - Central Office-Implemented As of 30 June 2021

REGION: CENTRAL OFFICE IMPLEMENTING OFFICE: BRIDGES MANAGEMENT CLUSTER % CONTRACT CONTRACT EFFECTIVIT EXPIRY CONTRACT DESCRIPTION CONTRACTOR ACCOMPLISHMEN ID COST Y DATE DATE T 16Z00009 BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) R.D. INTERIOR JUNIOR 708,059,664.86 05/08/2018 07/20/2021 39.24 I, DESIGN AND BUILD BRIDGES IN LUZON CONTRACT CONSTRUCTION (6483) PACKAGE 1B 16Z00010 CONTRACT PACKAGE 3, BRIDGE CONSTRUCTION GRACE CONSTRUCTION 537,989,252.60 02/27/2019 04/16/2021 8.14 REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD CORPORATION (3771) BRIDGES IN LUZON

PCMA 6/30/2021 12:03:09 AM [The slippage indicated herein are not conclusive but subject to verification from the Implementing Office] Page 1 of 6 REGION: CENTRAL OFFICE IMPLEMENTING OFFICE: FLOOD CONTROL MANAGEMENT CLUSTER % CONTRACT CONTRACT EFFECTIVIT EXPIRY CONTRACT DESCRIPTION CONTRACTOR ACCOMPLISHMEN ID COST Y DATE DATE T 15OB0471 PMRCIP,PHASE V CONTRACT PACKAGE 10-1, RIVER J.D. LEGASPI 151,544,475.30 07/07/2016 11/15/2020 50.02 IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER, CONSTRUCTION (9608) STATION 0+500 TO STATION 0+757 16C00019 CONSTRUCTION OF LAYAC DIVERSION CHANNEL, , NORTHERN BUILDERS 192,672,905.77 10/26/2016 02/02/2020 100.00 HERMOSA AND DINALUPIHAN, BATAAN (34168) / PASCAL CONSTRUCTION (34168) / NORTHERN BUILDERS (8789) / PASCAL CONSTRUCTION (8789) 16C00020 FLOOD CONTROL WORKS - TOKWING CONSTRUCTION, 237,123,644.51 07/05/2016 04/29/2018 100.00 REHABILITATION/RESTORATION OF DETERIORATED CORP.(FOR; TOKWING DIKES/ERODED RIVER BANK INCLUDING CONSTRUC (20301) / CANDABA CUT-OFF CHANNEL, PAMPANGA AND NUEVA EDDMARI CONSTRUCTION & ECIJA TRADING (20301) / TOKWING CONSTRUCTION, CORP. (FOR; TOKWING CONSTRUC (9650) / EDDMARI CONSTRUCTION & TRADING (9650) 16C00021 DIKING WITH SLOPE PROTECTION, SACOBIA-BAMBAN D.L CERVANTES 173,562,382.76 07/05/2016 07/06/2017 100.00 RIVER, PAMPANGA AND CONSTRUCTION CORPORATION (FORMERLY: (29646) / 11-16 CONSTRUCTION (29646) / D.L CERVANTES CONSTRUCTION CORPORATION (FORMERLY: (13799) / 11-16 CONSTRUCTION (13799) 16C00022 FLOOD CONTROL WORKS IN -GUMAIN, SAN AKN CONSTRUCTION 163,915,675.69 07/06/2016 05/12/2017 100.00 FERNANDO RIVER, , SASMUAN, GUAGUA AND CITY CORPORATION (11845) OF SAN FERNANDO, PAMPANGA 16C00034 FLOOD CONTROL WORKS-SACOBIA-BAMBAN-ABACAN NORTHERN BUILDERS 284,171,467.28 10/06/2016 11/12/2019 100.00 RIVER TRAINING WORKS INCLUDING RIO CHICO RIVER, (8789) TARLAC AND

PCMA 6/30/2021 12:03:09 AM [The slippage indicated herein are not conclusive but subject to verification from the Implementing Office] Page 2 of 6 16C00084 FLOOD/ CONTROL WORKS IN PASIG-POTRERO R.U. AQUINO 376,844,494.45 02/10/2017 01/09/2019 76.13 RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING CONSTRUCTION AND DIVERSION OF FLOW OF WATER TO PASIG-POTRERO DEVELOPMENT CORP. (FO RIVER, BACOLOR, PAMPANGA (23507) 16C00085 FLOOD CONTROL PROJECT-WESTERN RIVER, STO. HORAMABI BUILDERS 432,499,273.64 03/08/2017 12/11/2019 67.37 TOMAS/BUCAO RIVER, (24129) / R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (24129) / HORAMABI BUILDERS (23507) / R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507) 16O00023 UPPER MARIKINA RIVER IMPV'T./REVETMENT E.M. CUERPO, INC. (30963) / 256,811,917.06 05/10/2016 01/28/2020 100.00 WALL,MARIKINA CITY 1ST LD (CONTRACT PACKAGE 3) MSB VITUG CONSTRUCTION RIVER IMPV'T. (30963) / E.M. CUERPO, INC. (33019) / MSB VITUG CONSTRUCTION (33019) 16O00047 FLOOD CONTROL PROJECTS BAS3ED ON FLOOD MASTER E. F. CHUA CONSTRUCTION, 114,864,618.79 04/26/2018 06/30/2019 100.00 PLAN FOR METRO MANILA AND SURROUNDING AREAS, INC. (37826) LAS PINAS RIVER IMPROVEMENT INCLUDING ROW (REVETMENT WORKS ALONG MARULAS-TUNGTONG CREEK DIVERSION CHANNEL (DPWH: KAYBUBOY CREEK TRIBUTARY)STA. 1+100 TO STA. 1+400, 16Z00019 CONSTRUCTION/IMPROVEMENT OF CATBALOGAN CITY MSB VITUG CONSTRUCTION 438,806,571.28 02/06/2018 12/18/2020 80.22 DRAINAGE SYSTEM, CATBALOGAN CITY INCLUDING (33019) ANTIAO RIVER CONTROL, SAMAR 16Z00020 CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, R.U. AQUINO 942,726,770.24 02/08/2018 01/12/2023 11.51 BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD CONSTRUCTION AND DEVELOPMENT CORP. (FO (23507) 16Z00021 METRO CEBU FLOOD CONTROL PROJECT AND DRAINAGE ARN BUILDERS, INC. (FOR: 684,034,967.51 02/21/2018 05/05/2021 91.04 IMPROVEMENT PROJECT - SUBANG DAKU, LAHUG, ARN BUILDERS) (18930) GUADALUPE, KINALUMSAN, TIPOLO, TEJERO AND BULACAO RIVER BASINS, CEBU CITY 17OB0377 REVETMENT AND DREDGING WORKS ALONG STA. 14+038 MSB VITUG CONSTRUCTION 279,968,582.28 12/18/2017 03/18/2019 94.59 TO STA. 16+050 (TULLAHAN RIVER-LEFT BANK) TULLAHAN (33019) BRIDGE, BRGY. TALIPAPA-GOOD WILL HOMES I SUBDIVISION, BRGY. SAN BARTOLOME, QUEZON CITY 17OB0476 PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT MSB VITUG CONSTRUCTION 130,883,262.27 02/19/2018 03/09/2020 30.20 PROJECT PHASE IV (CONTRACT PACKAGE NO. 2) MIDDLE (33019) MARIKINA RIVER IMPROVEMENT WORKS, LEFT BANK, STA. 7+235 TO STA. 7+335

PCMA 6/30/2021 12:03:09 AM [The slippage indicated herein are not conclusive but subject to verification from the Implementing Office] Page 3 of 6 17OF0198 CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, R.U. AQUINO 247,076,302.13 03/05/2018 02/27/2021 40.04 BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD CONSTRUCTION AND (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. DEVELOPMENT CORP. (FO 0+005.324 - STA. 0+484.093), Q.C. (23507)

PCMA 6/30/2021 12:03:09 AM [The slippage indicated herein are not conclusive but subject to verification from the Implementing Office] Page 4 of 6 REGION: CENTRAL OFFICE IMPLEMENTING OFFICE: ROADS MANAGEMENT CLUSTER I (BILATERAL) % CONTRACT CONTRACT EFFECTIVIT EXPIRY CONTRACT DESCRIPTION CONTRACTOR ACCOMPLISHMEN ID COST Y DATE DATE T 18I00073 ANNUAL WORK PROGRAM 3 / PREVENTIVE MAINTENANCE MAC BUILDERS (7249) 163,813,468.81 02/19/2019 12/15/2019 89.23 (AWP3/PM), PALO - CARIGARA - ORMOC ROAD, CARIGARA - ORMOC SECTION, KO991+661 - K1005+1040, WITH EXCEPTIONS, LEYTE 18I00074 ANNUAL WORK PROGRAM 3 / PREVENTIVE MAINTENANCE MAC BUILDERS (7249) 195,427,502.11 02/19/2019 12/15/2019 95.16 (AWP3/PM), ORMOC - BAYBAY - SOUTHERN LEYTE BDRY. ROAD, ORMOC - ALBUERA SECTION, K1012+614 - K1026+000 (WITH EXCEPTIONS), LEYTE 18L00171 PREVENTIVE MAINTENANCE(PM),ROAD UPGRADING & WEE ENG CONSTRUCTION, 167,188,628.32 01/09/2019 05/08/2019 100.00 PRESERVATION PROJECT (RUPP) UNDER JAPAN INT'L. INC. (16380) COOPERATI 18Z00001 NEGOTIATED PROCUREMENT FOR THE WIDENING FROM 2- SHIMIZU CORPORATION 1,092,133,039.9 07/06/2018 12/16/2020 91.45 LANES TO 4-LANES PF CONTRACT P[ACKAGE 3, PLARIDEL (OECO_16693) / F.F. CRUZ & 7 BYPASS ROAD, STA. 47+400.00 TO STA. 49+625, ARTERIAL CO., INC. (OECO_16693) / ROAD BYPASS PROJECT, PHASE III, FUNDED UNDER JICA SHIMIZU CORPORATION LOAN AGREEMENT NO. PH-P266 AND JICA L/A PH-P250 (123) / F.F. CRUZ & CO., INC. (123)

PCMA 6/30/2021 12:03:09 AM [The slippage indicated herein are not conclusive but subject to verification from the Implementing Office] Page 5 of 6 REGION: CENTRAL OFFICE IMPLEMENTING OFFICE: ROADS MANAGEMENT CLUSTER II (MULTILATERAL) % CONTRACT CONTRACT EFFECTIVIT EXPIRY CONTRACT DESCRIPTION CONTRACTOR ACCOMPLISHMEN ID COST Y DATE DATE T 16J00087 CP 3B - 1A : CONSTRUCTION / IMPROVEMENT / RCDG CONSTRUCTION 102,731,520.72 07/17/2017 08/11/2018 100.00 REHABILITATION ALONG TUMAHUBONG - LIMBO CANDIIS CORPORATION (5063) SECTION STA. 64 + 000.00 TO STA. 78 + 200.00 ( WITH EXCEPTIONS )

16J00088 CP 3B-1B: CONSTRUCTION/ IMPROVEMENT OF BASILAN RCDG CONSTRUCTION 44,460,757.44 09/15/2017 05/09/2019 90.60 CIRCUMFERENCIAL ROAD, APPROACHES TO THREE (3) CORPORATION (5063) BRIDGES: BACUNG BR. STA. 70+210, GUIONG BR. STA 72+780, LIMBO CANDIIS BR. STA. 78+985.43, BASILAN PROVINCE 16J00089 CP 3A - NA : CONSTRUCTION / IMPROVEMENT ALONG R.D. INTERIOR JUNIOR 234,324,201.65 10/14/2016 07/10/2018 98.39 ISABELA - LAMITAN SECTION, STA. 00 + 000.00 TO STA. 27 + CONSTRUCTION (6483) 300.00 (WITH EXCEPTIONS) 16J00090 CP 3B - NA : CONSTRUCTION / IMPROVEMENT ALONG M. ABUBAKAR CONST. AND 211,948,936.06 02/01/2017 09/27/2018 99.58 CANAS - MALUSO - ISABELA SECTION, STA. 88 + 203.36 TO ENGINEERING, INC. (36365) STA. 132 + 000.00 (WITH EXCEPTIONS) TOTAL NUMBER OF CONTRACTS: 26

PCMA 6/30/2021 12:03:09 AM [The slippage indicated herein are not conclusive but subject to verification from the Implementing Office] Page 6 of 6