MOAT LANE SPRING 2017 UPDATE

After

Before Moat Lane Whittons and Regeneration Bakers Lane Since its inception, the Moat Lane These lanes are important links from Regeneration Project has transformed into the heart of Moat this historic part of Lane, leading directly to the new town centre into a hub for housing, public square outside The Forum. Both employment, community and lanes will be characterised by small commercial activity for the benefit of shops, cafes, offices and homes, future generations. creating an attractive and lively space From The Forum’s new offices for surrounding Bury Mount. the council and library, to the popular leisure areas of Bury Mount and the Water Meadows, the Towcester Mill regeneration of Moat Lane offers Although not strictly part of the something for everyone. regeneration phasing, Towcester Mill Clayson Country Homes Ltd are now Brewery has now become a thriving Before starting redevelopment works for the business with the help of South next phase of the project (see map Council, generating overleaf), bringing to life the corner employment and paving the way for section on Road, Bakers economic growth within Moat Lane Lane and Whittons Lane. and Towcester as a whole. For more information on the Moat Lane South Northamptonshire Council is Regeneration project follow us on social media or visit also investing further into the future of www.southnorthants.gov.uk/ The Mill by improving the sluice gates MoatLaneRegeneration.htm and river infrastructure, scheduled for completion in 2017. For more information or enquiries about phase two of the development please email Moat Lane [email protected] or call 01604 604033 Parking Much work has also been done to Northampton Road offer increased parking provisions in On the corner of Northampton Road and around Moat Lane, with the addition of disabled/parent parking Before there will be retail space, which will provide new opportunities for bays next to The Forum, parking bays economic growth within the town. on Northampton Road, Tove Short Further down the road there will also Stay and Tove Long Stay all offering be several homes with residential various parking options for those parking located next to The Forum. living, working in or visiting Towcester.

Please note that all timings within this newsletter are estimates and subject to change. 87.0m 2017 Moat Lane Regeneration Update

86.

River Tove

Def l MOAT LANE SPRING 2017 UPDATE e

r Broad Wate

Def

Garage FB

1 7 4

1 6 1 8 e 7 e 0 t

88.0m

1 6 6 Car Park

7 24 TCB LB

1 6 0

Hall d

a

3 o

4 2 R n to p rtm

ua

a Club o

9 h

3 Ct

2

9 ROMAN ROAD r 3 e

2 vo No T

5 23 The Forum 1 4 6 1 4 8

FB

3

2 2

89.9m

The Old Barn 4

1

3 8 2 WHITTONS LANE T

owc

9 Bury es

1 te 2 6 r 3 ry 1 b 6 to 3 M c 1 Mount ill a a F 6 3 1 ESS k n a Tinsmith B Motte

© Crown Copyright. All rights and database reserved. © Crown Copyright. Cott

1 3 0 Hotel 1 2 6

1 1 to 6 3 1

South Northamptonshire Council 100022487 2017 South Northamptonshire d Ol

e ffic

1 O d

9 2 st ar

0 0 o Y 2 P Home Place

4

a 5

9

THE 0 0 2 The Studio

3 2

RU 0

Silo INS 2 1

a Mill 1 Cottage nk

Ba

1

0 2 1 0

8

1 E

t

1 o N

7

0 2

9 4 A 1 - L 12 1 k 8 0 n Y 2 6 a R 16 B T N PARK STREET A

H

1 5 1 C

9

1 9 3 1 0 5 2 9

1 St Lawrence Church

The Old

2 3 1 5 Coach

00

b House 7 3 9 1 4 3 9 a 1 8 9 H 98 P 8 N 1 E R M E W 96 A N R A O C

Map scale 1:2000 T W L

A IN T 1

L G

I b N S

G T c k R

n S d E

1 a 1 B T E

R

1 T 1 B

1 PO 1 R E

O E E 1

1 W A a T N S S W T Y 8 A E 8 Weir R S

D T

1

5 T a El 7 C Church B Sub

Sta 9 6 17 The Old Barn Vicarage Town e

g 5 Hall a tt 1 o 3 C h nk rc 2

a 8 u Q 4 B 6 h

a C U

2 E

E 2 N 1 Starting summer 2018, S e 8 Nookfield House r 8 4 R t 4 D E O n h c A e Site boundary completionr due autumn 2019 D C u KEY h g les C in ( tab ) e 4 ehousingS n p Th a Allotment

8 p

7 L o 6 8

h 1 2 Pump Gardens S 1 4 e b s 2 Ho u Starting spring 2018, Work in progress, 24 o 10 Well H to )

1 2 en

ev 26

e ( 1 (

Completed completion due summer 2019o completion due summer 2018

2 n d 23

1 d

n 4 )

c 1 Depot

o t

o 25 p 9

S (housing) (housing)

1

6 1 1 2 4 7 2 a 6 e

Key m g

u 7 5 ra

Starting February 2017, CStartinghurch summer 2018,e 1 Startinga spring 2017,T s h u G e F O M ir D e ld completion due summer 2018 completion due autumnR 2019 completion due autumnS 2018 A ta Malthouse

Y 7 1 4

3 2 8

6 E 5 1

1 1

( ) ( ) 1 ( ) S housing and shops housing 5 housing and shops R a

72 Court Site Boundary 1 Starting spring 2018, completion due summer 2019 (housing)

E O N H 1 A L E IT 2

G 3

o H 1

6 IN t

2 W

3 T 1

1 b 7 2 7 7

9 2

E 86.1m 7

E 6 9

Library 4 a 7 Completed 2 Starting summer 2018, completion due autumn 2019 (housing)

M

1 8 4 1

7 to 1 a ta

0 2 S 7

5 o 7 t

1 b 3 2b

4

Su 4 o l 1 t R 4 E 1 I Starting February 2017, completion dueCsH ummer 2018 (6housing and4a shops) Starting summer 2018, completion due autumn 2019 (housing) MON D R 4b

OAD 4c

A

3

2

6

3

o t

Starting spring 2017, completion 2 due autumn 2018 (housing and shops) Work in progress, completion due summer 2018 (housing) 4 1 4 to

7 Car Park 1

2 5 8

8

1 S 3 EN

ND

7 El Sub Sta I 1 L HE Montana T NOTE: All dates and timings are estimates, which SNC has no control ove34r 5 9 3 1 TCB 0 6